BTS GATES 23,294 sq m

Legnica Park 23,294 offers sq m of industrial WROCŁAW LEGNICA space suitable for light production, logistic 70 km, 80 min CITY CENTER 200 km, 130 min and e-commerce activities. The facility 9 km, 15 min PRAGUE is built in the area of the Legnica Special 250 km, 150 min 247 km, 185 min Economic Zone. 280 km, 200 min

A4

LOCATION IS KEY A6

DEVELOPMENT SPACE

A11

Legnica Park offers 23,294 sq m of industrial space E65 suitable for light production, logistic and e-commerce activities.

BERLIN POZNAN ACCESS A2/E30 A12 A2/E30 Excellent and easy access to the connecting Szczecin, Legnica and Prague and highway A4 connecting Śląsk, Wrocław and Dresden. E65 PL A15 PUBLIC TRANSPORT

Existing bus stop is 50 m from the Park. A13 DE A18/E36 Legnica LEGNICA LABOR FORCE The Park is located in one of the most A4/E40 A4/E40 A4 WROCLAW industrialized and urbanized regions in Central DRESDEN and Eastern Europe. Available resources of PANATTONI S3 LEGNICA PARK LIBEREC qualified personnel with a total population of E442 ÚSTÍ NAB LABEM 2.9 million inhabitants and 39 E67 institutions in the Voivodship educating over D8/E55

CZ E65 A4 120,000 students per year. BTS GATES D10/E65 LEGNICA

D11/E67 OTHER PARK ADVANTAGES The Park is about 58 km away from PCC Dolny PRAGUE terminal that handles goods flowing into and out of the Lower region. It is located 75 km away Excellent and easy access to the from RAIL POLSKA Siechnice container. expressway S3 and highway A4. BUILDING INFORMATION

Building 1 23,294 sq m

WAREHOUSE

Gates Column grid 12 x 22,5/24 x 22,5 Clear height 10 m ESFR sprinkler system Light intensity in the hall Skylights min 2% Floor loading 5 t/sq m

OFFICE PREMISES

Clear height 3m Light intensity 500lx + Built to suit solution

STANDARD TECHNICAL SPECIFICATION

1 SUPPORTING STRUCTURE 2 FLOOR 3 ROOF 4 FAÇADE 5 DOCKS Pad or pilot foundations, Fibre reinforced concrete floor, Corrugated steel sheets, mineral Horizontal sandwich panels 1x electrically operated 3 x 3.2 m insulated plinth panels up PE membrane, cut joints, 18 cm wool insulation, PVC membrane. with mineral wool insulation. dock for each 1,000 sq m of hall. to 30 cm above floor. thick, surface treated with hardener.

6 HALL INSTALLATIONS 7 PRODUCTION UPGRADE 8 OFFICES 9 OUTSIDE AREAS Gas Sahara heaters (OPTIONAL) 2 level custom designed Hard areas from concrete or infrared gas radiators, Increased façade and roof in-built, incl. offices, socials, pavers, sloped for drainage. heating according to norms insulation. locker rooms, day room, excl. for warehousing. furniture and appliance.

3 1 5 7 4

6

2 8

9

Accolade Holding, a.s. Czech Republic [email protected] Financial Center (29th floor) [email protected] www.accolade.eu Sokolovská 394/17 +420 220 303 019 Emilii Plater 53 +48 504 424 504 186 00 Prague 8 00-113 Warszawa