REGISTRATION CONTACT The registration for the CESBA Sprint Workshop 2017 CESBA Office – Ines Feurstein Markus Berchtold-Domig [email protected] with the code „CESBA CESBA Office CESBA Project Manager t +43680/55 68 697 +43664/38 33 792 SPRINTWORKSHOP 2017“ e [email protected] [email protected] Reservation of accommodation can be done directly at the hotels beneath with the code TRAVEL INFORMATION „CESBA SPRINTWORKSHOP 2017“. If you come by car you leave the motorway A14 at the exit “ Nord”. Follow the VENUE AND signs Bregenzerwald/. ACCOMMODATION Airport Friedrichshafen, 68 km distance

All-inclusive price for conference at the Airport Zürich, 141 km distance Hotel Post in Bezau, meals (without breakfast), coffee breaks, soft drinks and spa Airport Munich, 251 km distance use for the whole periode: € 190,- Train stations: or Dornbirn and then Two nights accomodation with breakfast in take bus lines: 35 or 37 from Bregenz to Bezau double room single use: and 38 or 40 from Dornbirn to Bezau (details:

Hotel Post Bezau ****S € 182,- http://www.vmobil.at/) Brugg 35, 6870 Bezau t +435514/22 070 e [email protected]

Gesundhotel Bad **** € 236,- 6870 Reuthe single room t +435514/22 650 e [email protected]

Aktivhotel **** € 158,- Platz 60, 6881 Mellau t +435518/22 56 e [email protected]

Gasthof Hirschen Bezau *** Platz 40, 6870 Bezau t +435514/23 82 e [email protected] double room with balcony € 148,- double room without balcony € 112,- Bregenzerwald Guest-Card Gasthaus Engel Bezau *** € 160,- Platz 29, 6870 Bezau The Bregenzerwald Guest-Card is available to t +435514/22 03 all visitors who spend at least three nights in e [email protected] the Bregenzerwald, and is included in the accommodation price. With the Bregenzerwald Guest-Card you can use all the public buses and cable cars in the region for free. www.bregenzerwald.at/s/en/bregenzerwald-guest-card-the-offer

INVITATION

September 18th - 20th, 2017

Bezau / /

ENJOY INSPIRED WORKING 3 days of exchange in the mountains for Staying away from the office for 3 days offers people who the possibility to focus on a certain topic and establish a strong relationship with other - want to broaden their horizons and be at experts. the pulse of time. - like to interact and network, be creative and The participants can expect a comprehensive want to share ideas and develop common development of quality standards for future projects with colleagues from other nations. territories. A concrete perspective for action - want to design the future in the built and ideas for further cooperation and environment sector locally, regionally, or strengthening the personal network among transnationally. other experts.

Hosted by:

Supported by:

CESBA VISION

CESBA - Common European Sustainable Built Environment Assessment represents a bottom- up initiative towards promoting a harmonization of assessing the built environment on sustainability from buildings to neighborhoods to regions throughout Europe. THEMATIC WORKING TEAMS The goal of CESBA is to facilitate the diffusion and adoption of sustainable built environment 6 teams, each focusing on the special topics, principles among all stakeholders in the sector but linked to each other guide themselves through the use of harmonized assessment through the CESBA Sprint Workshop 2017. systems in the whole life cycle of the built All teams have a moderator and a co- environment. CESBA is more than moderator who are experts in their fields. A assessment; it is also a process towards a new team of overall moderators ensure a fruitful culture and standards in Europe. working atmosphere and useful results.

TEAM 1 TEAM 2 TEAM 3 Territorial and Neighborhood User Behavior, Municipal and New Development. Scale. technologies, Assessment, Assessment Low Tech Planning, Systems Approach, Mapping, Harmonization. Public Monitoring. participation.

TEAM 4 TEAM 5 TEAM 6 Methods. Circular CESBA Assessment economy, local Movement, Systems and Resources, EU- framework Innovation, Public Policies. Waste and Projects. Incentives, Materials. Building codes, Green Public Urban Plans. Procurement, Legal implementation.

(status May 2017)

This sprint workshop is a common effort of the following Interreg projects: CESBA Alps, CESBA Village of Bezau MED, GREENCYCLE, THE 4 BEES, Greta, PEACE Alps, CaSCo and Horizont 2020 Project: The New TREND; co-financed by the European Regional Development Fund

Under the patronage of Deputy State Governor of Vorarlberg Mag. Karlheinz Rüdisser; State Councillor for energy & climate protection Ing. Erich Schwärzler, Member of provincial parliament Martina Rüscher MBA Msc

PROGRAM MONDAY 18th September 2017 12.00 Arrival and Common Lunch 14.00 Welcome, Introduction and Working Teams 14.30 Prallel Working Teams – Round 1 TEAM 1 TEAM 2 TEAM 3 TEAM 4 TEAM 5 TEAM 6 Territorial and Neighborhood User Behavior, Methods. Circular CESBA Municipal and District New Assessment economy, local Movement, Development. Scale. technologies, Systems and Resources, EU- framework Assessment, Assessment Low Tech Public Policies. Waste and Innovation, Planning, Systems Approach, Incentives, Materials. Projects. Mapping, Harmonization. Public Building codes, Green Public Monitoring. participation. Urban Plans. Procurement, Legal implementation.

17:30 Individual Check-in (if needed)

18.00 Common Dinner 19.00 Plenary presentations – Results round 1 19.30 Prallel Working Teams – round 2 TEAM 1 TEAM 2 TEAM 3 TEAM 4 TEAM 5 TEAM 6

TUESDAY 19th September 2017 Individual Breakfast and sunrise walk 09.00 Plenary presentations – Results round 2 09.30 Prallel Working Teams – round 3 TEAM 1 TEAM 2 TEAM 3 TEAM 4 TEAM 5 TEAM 6 11:30 Plenary presentations Results round 3 – Mid term

Change of Teams (if needed) 12.30 Common Lunch 14.00 Prallel Working Teams – round 4 TEAM 1 TEAM 2 TEAM 3 TEAM 4 TEAM 5 TEAM 6 17.00 Plenary presentations - Results round 4

18.00 Common Dinner 19.00 Prallel Working Teams – round 5 TEAM 1 TEAM 2 TEAM 3 TEAM 4 TEAM 5 TEAM 6

WEDNESDAY 20th September 2017 Individual Breakfast and sunrise walk 09.00 Plenary presentations – Results round 5 09.30 Prallel Working Teams – round 6 TEAM 1 TEAM 2 TEAM 3 TEAM 4 TEAM 5 TEAM 6 11:30 Plenary presentations Results round 6 – Summary and common final statement of the Sprint Workshop

12.30 Common Lunch 14.00 Individual Consultations and Next Steps for CESBA