Waste Management

Total Page:16

File Type:pdf, Size:1020Kb

Waste Management Waste management Dr. Wan Zuhairi Wan Yaacob Program Geologi, UKM Aug-09 STAG3042 - Environmental issues and assessment Satellite images of Landfill sites in Selangor River River AIR HITAM SANITARY LANDFILL (CLOSED) JERAM SANITARY LANDFILL River 2 UKM Pakarunding Sdn. Bhd Satellite images of Landfill sites in Selangor SG. SEDU LANDFILL BUKIT TAGAR SANITARY LANDFILL 3 UKM Pakarunding Sdn. Bhd Kelana Jaya Landfill 4 UKM Pakarunding Sdn. Bhd Concepts of waste management • (1) DILUTE AND DISPERSE – Small amount of waste – few factories and sparse population • (2) CONCENTRATE AND CONTAIN – Not always achieved : leakage • (3) RESOURCE RECOVERY – Converted waste to useful materials – Waste = resources ; waste-to-energy – Eg: old computers – “NEW” gold mining Aug-09 STAG3042 - Environmental issues and assessment Dilute and disperse Aug-09 STAG3042 - Environmental issues and assessment SOLID WASTE • Types of solid waste:-- – (1) Light industrial waste – (2) Construction waste – (3) Demolition waste – (4) Garbage (home) and rubbish (paper, etc) – (5) Street refuse Cinders = Residue of coal or wood/ashes Aug-09 STAG3042 - Environmental issues and assessment SOLID WASTE • Solid waste: – 7.2 million tons/year OR 18,900 tons/day (year 2002; 21million of population). Hazardous waste • Toxic - cause injury or death if swallowed, absorbed, or inhaled. • Flammable - can be ignited by a flame, spark, ignition source or hot surface under almost all temperature conditions. • Corrosive - a chemical or its vapors that can burn or destroy living tissues at the site of contact, and deteriorate or wear away the surface of a material. • Explosive - violently bursting when exposed to pressure or heat. Aug-09 STAG3042 - Environmental issues and assessment E-waste Aug-09 STAG3042 - Environmental issues and assessment Method of disposal • 1. Onsite disposal • 2. Composting • 3. Open dumps • 4. Sanitary landfills • 5. Incineration Aug-09 STAG3042 - Environmental issues and assessment 1. On-site disposal • Mechanical grinding of kitchen food waste – “Flintstone” • The garbage is ground and flushed into a kitchen sink Aug-09 STAG3042 - Environmental issues and assessment 2. Composting • Biochemical process :Organic materials decompose to humus like material • Excellent method to recycle material • to enrich soils • Reduce the amount of material sent to local landfills. Aug-09 STAG3042 - Environmental issues and assessment Composting Aug-09 STAG3042 - Environmental issues and assessment 3. Open dumps • Oldest and most common way • Wherever land is available; no safety, health hazards, aesthetic degradation • Pile of waste – ignite and burn • Health hazard – Breeding pests, polluting air, contaminating surface and groundwater • Still common in developing countries (Malaysia ?? – 20 years behind !!) Aug-09 STAG3042 - Environmental issues and assessment Illegal dumps • Illegal dumps associated with scheduled waste – 2002 to 2006: 107 cases – 60% in the state of Selangor (the most developed state in Malaysia) Geo-Environmental Engineering 2008 :: Kyoto University, Japan :: June 12-14, 2008 Example of illegal dumping of toxic waste in Malaysia Toxic waste that was illegally dumped at Kg. Sungai Gatom, in Labis, Johor. Januari 2006 Geo-Environmental Engineering 2008 :: Kyoto University, Japan :: June 12-14, 2008 Open dumps pose the following health, safety, and environmental threats: • Fire and explosion • Inhalation of toxic gases • Injury to children playing on or around the dump site • Disease • Contamination of streams, rivers and lakes • Contamination of soil and groundwater • Contamination of drinking water • Damage to plant and wildlife habitats • Decrease in the quality of life to nearby residents Aug-09 STAG3042 - Environmental issues and assessment Open dumps Aug-09 STAG3042 - Environmental issues and assessment Rodent – rats, mouse, squirrel OPEN DUMPS Decomposing wastes burn and Birds and disease carrying Debris and odors produce fires and rodents and insects smoke Liquids produced in landfill Contaminate stream and groundwater Aug-09 STAG3042 - Environmental issues and assessment LANDFILL OUT OF SIGHT, OUT OF MIND NIMBY – Not in my back yard NIABY (Not In Anyone's Backyard) BANANA -Build Absolutely Nothing Anywhere Near Anything NOTE (Not Over There, Either) NOPE (Not On Planet Earth) Aug-09 STAG3042 - Environmental issues and assessment Aug-09 STAG3042 - Environmental issues and assessment Landfill in Malaysia April 2007 A total of 261 landfills; 111 were closed. From 150 active landfills, 10 are sanitary (engineered) MHLG – Ministry of Housing and Local Government What Happens to Trash in a Landfill? • Stay there for a very long time. • Inside a landfill: little oxygen and little moisture. --trash does not break down very rapidly. • 40-year-old newspapers have been found with easily readable print. • Landfills are not designed to break down trash, merely (only) to bury it. • When a landfill closes, the site must be monitored and maintained for up to 30 years! Aug-09 STAG3042 - Environmental issues and assessment Aug-09 STAG3042 - Environmental issues and assessment What is landfill? (1) • Pleasant term for a garbage dump • Located in a cavity in the ground. • When full, it may be covered up and look like part of the land. • Today's landfills are sanitary • Special technology to eliminate methane gas and toxic leachate. Aug-09 STAG3042 - Environmental issues and assessment Sanitary landfill Method of solid waste disposal that functions without creating a hazard to public health or safety (Definition by American Society of Civil Engineering, ASCE) Aug-09 STAG3042 - Environmental issues and assessment Sanitary landfill A method of disposing of solid wastes on land without creating nuisances or hazards to public health or the environment. Using the principles of engineering the solid waste is confined to the smallest practical area, reduced to the smallest practical volume, and covered with a layer of earth at the conclusion of each day’s operation (daily cover), or at more frequent intervals as may be necessary. The Technical Guideline for Sanitary Landfill, Design and Operation. MHLG, Malaysia 2006 Aug-09 STAG3042 - Environmental issues and assessment Sanitary landfill • Emerged in 1930s • Two types: area landfill & depression landfill • Refuse is deposited, compacted and covered • Potential hazards: – (1) Leachate (i.e. waste juice !!) – (2) Landfill gas Aug-09 STAG3042 - Environmental issues and assessment Classification of sanitary landfills levels Level 0 – open dumps Level 1 – controlled tipping Level 2 – sanitary landfill with a bund and daily cover soil Level 3 – sanitary landfill with leachate recirculation system Level 4 – sanitary landfill with leachate Sg. Sabai, Hulu Selangor. treatment facilities Ampar Tenang Landfill Kyoto Japan Aug-09 STAG3042 - Environmental issues and assessment Level of sanitary landfill system Size of RISK Level Description Level O Open dumpsite Level I Controlled tipping Level II Sanitary landfill with bund and daily cover New facility should be designed to achieve minimum Level 3 landfill Level IIII Sanitary landfill with leachate • Monitoring • Water quality recirculation system • Liner facility Level IV Sanitary landfill with leachate treatment facilities and MORE Lower impact, fewer countermeasures for closure. 31 UKM Pakarunding Sdn. Bhd Sanitary Landfill Advantages Disadvantages 1. Most Economic method 1. Not suitable in densely 2. Low initial investment populated area 3. Operation in a short time 2. Require daily maintenance period 3. Methane and other gases 4. All types of waste – all in 4. Leachate – problem for one (MMA !!!) years 5. Completed sites – other purposes Aug-09 STAG3042 - Environmental issues and assessment LEACHATE (1) • A liquid: result of water seeping into and through the wastes. • The water dissolves part of the organic and inorganic matter. • Exit the bottom of the landfill -- contaminants to the groundwater and/or surface water. Aug-09 STAG3042 - Environmental issues and assessment LEACHATE (2) • Strength and nature depend on:-- – (1) the composition of waste – (2) length of time – contact with waste – (3) amount of water in waste Aug-09 STAG3042 - Environmental issues and assessment 1. Leachate The values are expressed in mg/L. Aug-09 STAG3042 - Environmental issues and assessment LEACHATE Aug-09 STAG3042 - Environmental issues and assessment Biogas Landfill gas (1) • 45% to 60% methane (Colorless; odorless, explosive) • 40% to 60% carbon dioxide. • Small amounts of nitrogen, oxygen, ammonia, sulfides, hydrogen, carbon monoxide • Nonmethane organic compounds (NMOCs) such as trichloroethylene, benzene, and vinyl chloride Aug-09 STAG3042 - Environmental issues and assessment Landfill gas (2) Aug-09 STAG3042 - Environmental issues and assessment Evolution of gas in landfill Stage 1: acid formation (complex arganic acetic acid, propionic acid, pyruvic acid) Stage 2: methane formation (methanogenesis) Initial decomposition of waste via aerobic biological processes (air pockets in fill) CO2 is a main gas Achieved after produce during CH4 & CO2 2-3 years aerobic stage are main gaseous end products at anaerobic stage End ratio: CH4 (55%) CO2 (45%) O exhausted soon the aerobic 2biodegradation started anaerobic Weeks or months Aug-09 STAG3042 - Environmental issues and assessment Landfill gas (3) • Methane is highly explosive when mixed with air at a volume between its LEL of 5% and its UEL of 15%. • At concentrations below 5% and above 15%, methane is not explosive. LEL – Lower explosion
Recommended publications
  • Cadangan Naiktaraf Loji Rawatan Air (LRA) Dan Loji Baru Langat II
    Rajah 5.4.5 : Cadangan Naiktaraf Loji Rawatan Air (LRA) dan Loji Baru Langat II PERAK PAHANG (LRA Sungai Selangor Plant I) Naiktaraf ke kapasiti rekabentuk asal (950 JLH) I (LRA Sungai Batu) (LRA Sungai Selangor Plant III) III Naiktaraf ke operasi Naiktaraf ke kapasiti pengeluaran semasa rekabentuk asal (800 JLH) (150 JLH) IV (LRA Sungai Rasa) VII S Naiktaraf ke kapasiti E II L rekabentuk asal (250 JLH) A T M E (LRA Sungai Selangor Plant II) L Naiktaraf ke operasi A K pengeluaran semasa (1,000 JLH) A (LRA Sungai Langat) Naiktaraf ke operasi VI pengeluaran semasa (500 JLH) W.P (LRA Sungai Semenyih) PUTRAJAYA Naiktaraf ke operasi V pengeluaran semasa (700 JLH) Pembinaan Loji Air Baru Langat II BIL. TAHUN MULA TAHUN SIAP KAPASITI FASA VIII NEGERI SEMBILAN 1. 2014 2018 1,130 JLH I (LRA Sungai Labu) 2. 2022 2026 1,200 JLH II Naiktaraf ke operasi 3. 2029 2033 1,200 JLH III pengeluaran semasa (105 JLH) Jumlah 3,530 JLH Sumber: Kajian Semula Rancangan Struktur Negeri Selangor, 2012 Petunjuk: Loji Rawatan Air (LRA) Sungai Sempadan Daerah Sempadan Negeri Dasar-dasar Draf Rancangan Struktur Negeri Selangor 2035 DASAR MM 24 KADAR AIR TIDAK TERAKAUN (NRW) AKAN DIKURANGKAN DARIPADA 32% (TAHUN 2012) KEPADA 20% (MENJELANG TAHUN 2035) Tindakan dan Agensi Pelaksana Utama Inisiatif Pelaksanaan Penguat- Pemantau Perancangan Pelaksanaan kuasaan an Menjalankan kerja-kerja penggantian paip sistem pengagihan bekalan air bersih dari jenis asbestos cement kepada Penyedia Penyedia Tidak Penyedia P1 paip yang berkualiti tinggi seperti Utiliti, Utiliti, Berkait, Utiliti, HDPE, Mild Steel dan UPVC secara LUAS LUAS LUAS LUAS lebih menyeluruh untuk mengurangkan kejadian paip bocor/pecah.
    [Show full text]
  • Chapter 6 Existing Environment
    ENVIRONMENTAL IMPACT ASSESSMENT (EIA) October 2019 Proposed Development of Sustainable Scheduled Waste Treatment Center (SSWTC) at PT1682 Bukit Tagar Sanitary Landfill, Mukim Sungai Tinggi, Daerah Hulu Selangor, Selangor Darul Ehsan for Berjaya Alam Murni Sdn. Bhd. CHAPTER 6 EXISTING ENVIRONMENT 6.0 Introduction This chapter outlines the existing environment concerning the physical environment, land use pattern, socio-economic characteristics and human health conditions in vicinity of the existing Proposed Project site. The information serves as the background or baseline data on various aspects of subject matters in connection with the proposed scheduled waste management facilities. The existing environmental baseline is obtained from primary and secondary sources. Field investigations were carried out to supplement any insufficient of information for the study area. The condition of the existing environment of the project site and within five (5) km radius of surrounding area is further described in this chapter. The compiled data on the existing environment is regarded as ‘baseline’ environmental condition to assess potential environmental changes, if any that may arise during the implementation of SSWTC project. The discussion on existing environment will be based on the physical environment, human environment and baseline environmental quality at the surrounding area of the project site. Information provided on this chapter was gathered through primary and secondary information including site observations and monitoring, socio- economic and health assessment survey, desktop data search, abstraction of information from published reports and related agencies. 6.1 Zone of Study The zone of study is within five (5) km radius from the Proposed Project site called as the Zone of Impact (ZOI).
    [Show full text]
  • Groundwater Quality at Two Landfill Sites in Selangor, Malaysia
    Bulletin of the Geological Society of Malaysia 57 (2011) 13 – 18 Groundwater quality at two landfill sites in Selangor, Malaysia MOHD RAIHAN TAHA1, WAN ZUHAIRI WAN YAACOB2, ABD RAHIM SAMSUDIN2 & JASNI YAAKOB3 1Department of Civil & Struct Engineering, Universiti Kebangsaan Malaysia, 43600 Bangi, Selangor, Malaysia Email address: [email protected] 2 School of Environmental Sciences, Universiti Kebangsaan Malaysia, 43600 Bangi, Selangor, Malaysia 3Institute for Environment and Development (LESTARI), Universiti Kebangsaan Malaysia, 43600 Bangi, Selangor, Malaysia Abstract: The groundwater quality in and around two landfills sites in the state of Selangor, Malaysia is studied to evaluate levels of contamination around an unengineered site and an engineered site. The two landfill sites are Ampar Tenang and Bukit Tagar. Data were obtained through site sampling from available boreholes. In addition results from published data and reports of previous works are used for analysis. The data indicate serious groundwater contamination in and around unengineered landfill sites. Analytical data include quality of groundwater, leachate and surface water in which many parameters were above the regulatory limits. Whereas, at the engineered site, contamination was generally below the standards. The findings serve to warn waste management industry stakeholders in Malaysia that for sustainability, unengineered landfills must be closed and cleaned up. Keywords: landfill, groundwater quality, leachate, Selangor INTRODUCTION • Malaysian Environmental Impact Assessment Guidelines for Groundwater and/or surface Water Supply Project Solid waste disposal by landfill poses a threat to (DOE, 1995), and groundwater and surface water quality through the formation • The background data from EIA before the development. of polluting liquids known as leachate. Leachate can The DOE (1995) document is also known as the Interim percolate through the base of the landfill and enter the National Water Quality Standards for Malaysia (INWQS).
    [Show full text]
  • Be Open to Using Incinerators
    Be open to using incinerators ASED on a 2012 report, Most developed countries are pletely rule out the use of incinera­ about their daily chores with an Malaysia produces about using incinerators to get rid of their tors in other parts of the country incinerator in their backyard with­ B daily waste along with a strong where landfills may have a poten­ out any complaint, I wonder why is 33,000 tonnes of solid wasteemphasis on recycling. tial negative impact on air, water there so much fuss and resistance per day and it was projected to The best thing about modern and soil quality. over here. increase at a rate of 3.5% annually. incinerators is that they are designed Landfills have been singled out Despite assurances by the At this projected rate, the dis­ to mitigate all ldnds of hazardous as one of the major contributing authorities that the incinerators are posal of solid waste in the country, pollution. Apart from this, modern sources of the greenhouse effect. of the latest design and is safe and especially in the cities, if not han­ incinerators are designed in such a The methane gas released from the environment-friendly, I am puzzled dled professionally, may turn out to way that they can recover energy decaying waste in landfills is chok­ as to why certain groups are still be a mega stinking problem. from waste combustion. ing and heating up the environ­ resisting it. Burying the waste in sanitary I am not totally against the use ment. I concur with the views landfills may be economical but it of sanitary landfills.
    [Show full text]
  • Impact of Effluent from the Leachate Treatment Plant of Taman Beringin
    processes Article Impact of Effluent from the Leachate Treatment Plant of Taman Beringin Solid Waste Transfer Station on the Quality of Jinjang River Pui Mun Chin 1 , Aine Nazira Naim 1, Fatihah Suja 1,* and Muhammad Fadly Ahmad Usul 2 1 Department of Civil Engineering, Faculty of Engineering and Built Environment, Universiti Kebangsaan Malaysia, Bangi Selangor 43600, Malaysia; [email protected] (P.M.C.); [email protected] (A.N.N.) 2 Department of Solid Waste Management, Ministry of Housing and Local Government, 51 Persiaran Perdana, Presint 4, Putrajaya 62100, Malaysia; [email protected] * Correspondence: [email protected]; Tel.: +60-1-9304-2621 Received: 3 September 2020; Accepted: 19 November 2020; Published: 27 November 2020 Abstract: Rapid population growth has contributed to increased solid waste generated in Malaysia. Most landfills that have reached the design capacity are now facing closure. Taman Beringin Landfill was officially closed, so the Taman Beringin Solid Waste Transfer Station was built to manage the relocation, consolidation, and transportation of solid waste to Bukit Tagar Sanitary Landfill. Leachates are generated as a consequence of rainwater percolation through waste and biochemical processes in waste cells. Leachate treatment is needed, as leachates cause environmental pollution and harm human health. This study investigates the impact of treated leachate discharge from a Leachate Treatment Plant (LTP) on the Jinjang River water quality. The performance of the LTP in Taman Beringin Solid Waste Transfer Station was also assessed. Leachate samples were taken at the LTP’s anoxic tank, aeration tank, secondary clarifier tank, and final discharge point, whereas river water samples were taken upstream and downstream of Jinjang River.
    [Show full text]
  • EXECUTIVE SUMMARY INTRODUCTION the Proposed
    Detailed EIA for the Proposed Expansion of 130.55 Acres Sanitary Landfill in Mukim Jeram, District of Kuala Selangor, Selangor Darul Ehsan (Rev.01). EXECUTIVE SUMMARY I. INTRODUCTION The proposed landfill expansion facility is to be constructed on 130.55 acres of State Government Land in Mukim Jeram, District of Kuala Selangor, Selangor Darul Ehsan. The Project is initiated by the Selangor State Government through its State Economic Planning Unit (UPEN). It shall be developed by Worldwide Holdings Berhad (WHB) and operated by Worldwide Landfills Sdn. Bhd. (WLSB), which is a subsidiary of the Selangor State Government, i.e., Perbadanan Kemajuan Negeri Selangor (PKNS). It will share a common boundary at the eastern side with the 160 acres existing Jeram Sanitary Landfill. The proposed expansion landfill site has been approved by Selangor State Government through their letter Ref: (40)PKNS/SUK/M/1.12 Jld.9 dated 24 March 2014 (refer to Appendix 1) and 130.55 acres land acquisition has been carried out by UPEN and obtained. The proposed expansion of the Sanitary Solid Waste Landfill at Jeram shall have a daily capacity of 1,500 - 3,000 tonnes/day with a total target of 7 million tonnes for its lifespan and is expected to provide municipal waste disposal services for the Districts of Shah Alam, Klang, Petaling, and Kuala Selangor for additional 8.3 years after the year 2017. The geographical location of the proposed Project Site is a latitude of 03o11’3.91’N and a longitude of 101o21’44.05’E at the southeastern portion of the Project Site near to existing Jeram Landfill and a latitude of 03o11’3.92’N and a longitude of 101o21’11.11’E at the southwestern portion of the Project Site.
    [Show full text]
  • Development of Waste-To-Energy Plant in Kuala Lumpur
    1237 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 56, 2017 The Italian Association of Chemical Engineering Online at www.aidic.it/cet Guest Editors: Jiří Jaromír Klemeš, Peng Yen Liew, Wai Shin Ho, Jeng Shiun Lim Copyright © 2017, AIDIC Servizi S.r.l., ISBN 978-88-95608-47-1; ISSN 2283-9216 DOI: 10.3303/CET1756207 Development of Waste-to-Energy Plant in Kuala Lumpur Mohd Rozainee Taib*, Wai Shin Ho, Pang Soon Ng Faculty of Chemical and Energy Engineering, Universiti Teknologi Malaysia, 81310 Skudai, Johor, Malaysia. [email protected] The increasing of waste generation and its accumulation is alarming due to its potential negative effect on the well-being of the society and the integrity of environment sustainability. Waste generation in Kuala Lumpur is about 2,500 t/ d and is expected to increase to about 4,000 t/ d in 2020. The waste is sent to Bukit Tagar Sanitary Landfill via Taman Beringin Transfer Station. The transfer station is overloaded with the design capacity of only 1,700 t/ d. The government of Malaysia has decided to construct a 1,200 t/d waste-to-energy (WtE) plant at Taman Beringin, which is adjacent to the transfer station. As the location is highly populated, the project might raise the concerns from nearby residents. This paper describes the project facilitating activities that have been conducted for the development of WtE plant in KL. The studies include technology selection, site assessment and soil investigation, public safety and health assessment, power system study and waste characteristics. The results of the studies are necessary for the decision making and approval by government agencies such as Department of Environment and local authority, as well as the design of WtE.
    [Show full text]
  • “ Our Quality and Track Record Will Do the Talking…”
    Business Alliances Countries: SINGAPORE CHINA THAILAND VIETNAM AUSTRALIA TAIWAN USA GERMANY INDIA UNITED KINGDOM DOHA ABU DHABI DUBAI “ Our Quality And Track Record Will Do The Talking…” For more information, kindly contact: ZACKLIM FLOOR SPECIALIST SDN BHD (526019-W) 70-1, Jalan PJS 5/30, Petaling Jaya Commercial City (PJCC), 46150 Petaling Jaya, Selangor, Malaysia. Tel : +603-7782 2996 Fax : +603-7782 1196 Website : www.zacklim.com E-mail : [email protected] 2 3 Achievements In 1984, Zacklim Industrial Works Sdn. Bhd. has already started making its dedication to this industry. The Western Digital factory located at Sungai Way and Nestlé Distribution Centre at Bukit Raja, Klang worth RM 34 million and RM 43 million respectively were the major projects completed. Zacklim was later approached by IKEA Singapore for another project in 2006. Up to date, Zacklim has accumulated its experience with over 60 projects throughout the years. This includes Malaysian Institute Aviation Technology (MIAT) in Sepang, Sungai Petani Hospital, Proton City, Alor Setar Hospital, Infineum Power Fab, Syarikat Pembenaan Fajar Baru, Mydin Subang Jaya, Western Digital Thailand, Carrefour Kepong, Jaya Jusco, SMART Tunnel Project, Pelabuhan Tanjung Pelepas, KLIA, Sultan Ismail Airport, GIANT Kota Damansara, Intel Warehouse in Vietnam, Shopping Complex in Damansara and many more. Zacklim Floor Specialist Sdn Bhd is a leading floor specialist founded in Malaysia. Began as Zacklim Industrial Works Sdn Bhd in 1984 the company has since then amassed vast experiences in construction of factories, warehouses, cleanrooms and even residential buildings – amongst its early notable projects were Western Digital and Nestle Distribution Center. In 1998 Zacklim Industrial Works Sdn Bhd was appointed the main contractor for Nestle Distribution Center.
    [Show full text]
  • Static and Seismic Stability Analysis of Malaysia's Largest Sanitary Landfill
    Static and Seismic Stability Analysis of Malaysia’s Largest Sanitary Landfill Hamed Saiedi Department of Civil Engineering – University of Calgary, Calgary, Alberta, Canada Saied Saiedi, Niraku Rosmawati Binti Ahmad Department of Civil Engineering – Petronas University of Technology, Tronoh, Ipoh, Malaysia Ho Kum Hou Tai Hoe Resources Sdn Bhd, Kuala Lumpur, Selangor, Malaysia ABSTRACT The global static and seismic stability of the first phase of the largest Malaysian Sanitary Landfill in Bukit Tagar is investigated and the sensitivity of the safety factor to the waste geotechnical parameters is demonstrated. It is found that with satisfactory drainage conditions, the landfill is stable under the range of possible values of the waste’s geotechnical parameters. The landfill is not stable under a hypothetical failed drainage and extreme rainfall and proper drainage can assure satisfactory performance during earthquakes. RÉSUMÉ La stabilité globale statiques et sismiques de la première phase de la plus grande d'enfouissement sanitaire de Malaisie à Bukit Tagar est étudiée et la sensibilité du coefficient de sécurité pour les déchets des paramètres géotechniques est démontrée. Il est constaté que, avec un bon drainage, la mise en décharge est stable dans la gamme des valeurs possibles des paramètres géotechniques des déchets. La mise en décharge n'est pas stable dans un drainage hypothétique échoué et les précipitations extrêmes et le drainage peuvent assurer une performance satisfaisante au cours de tremblements de terre. 1 INTRODUCTION With a potential capacity of 120 million tonnes on an 800-ha-land, it is expected to operate for 40 years. It is Malaysia generates 18,000 tonnes of solid waste designed to receive a mix of non-hazardous commercial daily, of which 5,500 tonnes come from Klang Valley with and domestic putrescible and inert waste.
    [Show full text]
  • EXECUTIVE SUMMARY I. INTRODUCTION the Proposed
    Preliminary Environmental Impact Assessment Cash Band (M) Berhad – Eco-Templer EXECUTIVE SUMMARY I. INTRODUCTION The proposed development is known as the PERMOHONAN BAGI TUJUAN PERAKUAN PELAN INDUK BAGI CADANGAN PERUMAHAN BERCAMPUR BERSTRATA DI ATAS LOT 614 DAN LOT 11, PEKAN TEMPLER, DAERAH GOMBAK, SELANGOR DARUL EHSAN UNTUK TETUAN CASH BAND (M) BERHAD The proposed development covers a total area of 184.88 acres on Lot 614 (PN 16838) and Lot 11 (PN 17396) Pekan Templer, District of Gombak, Selangor. The Project site is located on the existing Perangsang Templer Golf Club (PTGC) and access to the Project site is via Federal Route 1 and Jalan Bukit Anak Tukun.The proposed Project comprises mixed and stratified housing development with community amenities in a green, open and sustainable development concept. The location of the proposed Project site is shown in Figure A. II. PROJECT INITIATOR / CONSULTANT The proposed development is initiated by Cash Band (M) Berhad. Any enquiries with regards to the development can be directed to: CASH BAND (M) BERHAD 17th Floor, Plaza Perangsang, Persiaran Perbandaran, 40000 Shah Alam, Selangor Darul Ehsan, Malaysia, Peti Surat 7139, 40923 Shah Alam, Selangor Darul Ehsan. Contact person : Mr. Yat Weng Cheong Position : Project Manager Tel. No. : 03 - 5510 3999 Fax No. : 03 - 5519 7493/ 03-5510 9977 The environmental consultant commissioned to undertake the Preliminary Environmental Impact Assessment study is Environment Asia Sdn Bhd. The official contact address is listed below. ENVIRONMENT ASIA SDN BHD 81B, Jalan SS22/23 Damansara Jaya 47400 Petaling Jaya, Selangor Darul Ehsan. Contact person : Mr. Edward Wong Position : Principal Consultant / General Manager Tel.
    [Show full text]
  • List of Installations Affected Under Efficient Management of Electrical Energy Regulations 2008 (Emeer 2008) State: Selangor
    LIST OF INSTALLATIONS AFFECTED UNDER EFFICIENT MANAGEMENT OF ELECTRICAL ENERGY REGULATIONS 2008 (EMEER 2008) STATE: SELANGOR No. Installation Name Address PLAZA ALAM SENTRAL PLAZA ALAM SENTRAL,TNGKAT 4, JALAN MAJLIS, 40000 SEKSYEN 1 (MRCB SELBORN CORPORATION SDN 14,SHAH ALAM, SELANGOR BHD) 4, JLN P/10,KAWASAN PERUSAHAAN BANGI,43650 BANDAR BARU 2 NICHICON (M) SDN BHD BANGI,SELANGOR 12 (10 & 8),JLN TLK GADUNG 27/93,40400 SEKSYEN 27,SHAH ALAM, 3 PERUSAHAAN JAYA PLASTIK SELANGOR 4,SOLOK SULTAN HISHAMUDDIN 9,42000 SELAT KELANG 4 INTERCONTINENTAL UTARA,PELABUHAN KLANG, SELANGOR 5 PLASTIC CENTRE SDN BHD 6065,JLN HJ ABD MANAN BT 5,,41050 MERU,KLANG, SELANGOR 6 PLASTICTECNICS [M] SDN P/2A PERSIARAN 2A,43650 BANDAR BARU BANGI,SELANGOR, 7 PLASTIK V SDN BHD 8595,JLN LANGAT BT 6 1/2,41200 KG AIR HITAM,SELANGOR 60 & 61,JLN SG PINANG 5/1,42920 PULAU INDAH,PELABUHAN KLANG, 8 POSCO-MALAYSIA SDN. BHD. SELANGOR 6464 & 6486,JLN SG PULUH,42100 KAW PERINDUSTRIAN LADANG SG 9 PRESS METAL BERHAD PULUH,KAPAR, SELANGOR 24,JLN CJ 1,43200 BERSATU INDUSTRIAL PARK CHERAS 10 R O WATER SDN BHD JAYA,BALAKONG, SELANGOR 11,JLN PERUSAHAAN 1,43700 BERANANG IND ESTATE,BERANANG, 11 RANK METAL SDN BHD SELANGOR NO. 2,JLN SULTAN MOHAMED 1, ,42000 KAWASAN PERINDUSTRIAN 12 KAWAGUCHI MFG. SDN BHD BANDAR SULTAN SULAIMAN,PELABUHAN KLANG, SELANGOR KIAN JOO CAN FACTORY BHD BOX - 13 LOT 4,JLN PERUSAHAAN 2,68100 BT CAVES,SELANGOR PAK (M) BHD PANDAN KAPITAL, JLN PANDAN INDAH UTAMA, , PANDAN INDAH, 14 INTI JOHAN SDN BHD AMPANG, 56100, SELANGOR LOT 1, JALAN P/1B,KAWASAN PERINDUSTRIAN BANGI,43650,BDR
    [Show full text]
  • April to June 2019 CPO Supplier
    Intercontinental Specialty Fats Sdn Bhd Period Assessed: April to June 2019 CPO Supplier RSPO No. Supplier Palm Oil Mill Parent Company of (P.O.M) Mill Address Latitude Longtitude Certification 1 Dara-Lam Soon Sdn Bhd Dara Lam Soon Lam Soon Plantations Sdn Bhd 92 KM Off Kuantan-Segamat Highway, 26700 Muadzam Shah, Pahang, Malaysia Yes 3.157017 103.163633 2 Kuala Lumpur Kepong Jeram Padang Kuala Lumpur Kepong Sdn Bhd KM 12, Jalan Jelai - Rompin, 72100 Bahau, Negeri Sembilan, Malaysia Yes 2.7351111 102.4085 3 Kuala Lumpur Kepong KKS Kekayaan Kuala Lumpur Kepong Sdn Bhd K/B 110, 86609 Paloh, Kluang, Johor, Malaysia Yes 2.204975 103.2702972 4 Kuala Lumpur Kepong KKS Changkat Cermin Kuala Lumpur Kepong Sdn Bhd Batu 13 1/2, 32400 Ayer Tawar, Perak, Malaysia Yes 4.27527 100.78498 5 Mahamurni Plantation Tereh Kulim Berhad K.B 538, 86009 Kluang, Johor, Malaysia Yes 2.217518 103.35139 6 Mahamurni Plantation Palong Cocoa Kulim Berhad K.B 504, 85009 Segamat, Johor, Malaysia Yes 2.706414 102.785011 7 Eng Hong Eng Hong Eng Hong Palm Oil Mill Sdn Bhd 250, Jln. Sg. Buaya, Kg. Sg. Buaya,42700 Banting, Selangor, Pen. Malaysia No 2.860000 101.476389 8 Gan Teng Siew Ulu Kanchong Gan Teng Siew Realty Sdn Bhd Ulu Kanchong Estate, 71209 Rantau, Negeri Sembilan, Pen. Malaysia No 2.583461 101.998469 9 Jugra Palm Oil Jugra Jugra Palm Oil Mill Sdn Bhd Lot 340 Jalan Tok Mujir Sg Buaya, 42700 Banting Selangor, Pen. Malaysia No 2.845609 101.467993 10 Pujaan Makmur Pujaan Makmur Tian Siang Holdings Sdn Bhd 6 Km Off Jalan Triang Ke Kemayang, Triang, Pahang Darul Makmur No 3.181753 102.458895 11 Raub Oil Mill Raub Raub Mining & Development Company Sdn Bhd 27600 Raub District, Pahang, Pen.
    [Show full text]