<<

Tour Notes 201

102ND ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From 145th Ave To CR 67 History

11/2/2015 rip rap this spring stabilized the slope

103RD ST SE Road SurfaceUnk Plow Route Unknown Maintenance 1-1/2" Overlay, '02, Crackfill, '11, From City Limits To CSAH 23 History Reclaim & 2" W '15

4/11/2015 reclaim township portion

107TH ST SE Road SurfaceGravel Plow Route Route 1 Maintenance From CR 57 To History

11/2/2015 dead end signs changing to No Outlet - Eyk has list for Jeff 11/2/2015 Dead end - bus turn around tough? Let bus drivers know it is ok to use the to turn around

109TH ST SE Road SurfaceUnk Plow Route Route 3 Maintenance 1-1/2" Overlay, '01, Crackfill, '11, Seal From 185th Ave To Town Line History Coat ,'14

11/2/2015 Orrock Town Line

112TH ST SE Road SurfaceGravel Plow Route Route 2 Maintenance From CR 51 To Dead End History

11/2/2015 - need 9 button - Township Road Tour van almost got stuck. Routine blading? Not minimum maintenance road so should be on regular schedfule. Right now being bladed every other time or so.

122ND ST SE Road SurfaceGravel Plow Route Route 2 Maintenance From Dead End To CSAH 11 History

11/2/2015 East 400' gets calcuim chloride. Call from resident for more class 5. Board: check budget first - blade for now

4/11/2015 dust control - work with city

Monday, November 2, 2015 Page 1 of 11 127TH ST SE Road Surface8"Cl 5, 2" NW, 1-1/2 Plow Route Route 2 Maintenance From City Limits To CSAH 11 History

11/2/2015 looks good - even with . No bus stop ahead sign going in - clear site.

128TH AVE SE Road SurfaceGravel Plow Route Route 1 Maintenance From 82nd Str To Dead End History

11/2/2015 needs gravel and new 9 button sign

4/11/2015 gravel needed

157TH AVE SE Road SurfaceGravel Plow Route Maintenance From CSAH 4 To 92nd Str History

11/2/2015 URGENT: . Ditch missing section. large - needs repair

173RD AVE SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 3 Maintenance Crackfill '11 From CSAH 4 To 87th Str History

4/11/2015 crackseal with chips to fill

175TH AVE SE Road SurfaceGravel Plow Route Route 3 Maintenance From 77th Str To Lutz History

11/2/2015 CHECK: Gravel road - full maintenance - needs gravel - it is not minimum maintenance until after Lutz farm. If it is recorded differently, minimum maintenance sign needed

185TH AVE SE Road SurfaceUnk Plow Route Route 3 Maintenance Seal Coat '07 From CR 73 To CSAH 4 History

11/2/2015 10760 185th - new retaining wall way too large - needs to change. Letter? 11/2/2015 at 102nd - holding water. batch truck off road caused damage in October. Was to be repaired on Friday. Outlet was 'shut off' for now - 2.5'-3' deep hole. Eyk to call and see why repair has not begun. 11/2/2015 Hole that keeps coming up and needs filling in - done again last week 11/2/2015 coming to end of surface life.

190TH AVE SE Road SurfaceGravel Plow Route Route 3 Maintenance From 95th Str To Dead End History Monday, November 2, 2015 Page 2 of 11 11/2/2015 needs minimum maintenance sign. School bus turns around? Class 5 needed and blade occasionally

4/11/2015 needs minimum maintenance sign

67TH ST SE Road SurfaceGravel Plow Route Route 1 Maintenance 30' Constructed '99 From CSAH 11 To CR 93 History

4/11/2015 crackseal with chips to fill - split cost with Santiago - Eyk will call first

77TH ST SE Road SurfaceGravel Plow Route Route 1 Maintenance From Dead End To CR 27 History

11/2/2015 CHECK: see if recorded as minimum maintenance - needs minimum maintenance sign if it has been declared a minimum maintenance road.

4/11/2015 Gravel/minimum maintenance road - needs a minimum maintenance sign Road SurfaceUnk Plow Route Route 3 Maintenance From CSAH 11 To 175th Ave History

11/2/2015 gravel coming (approval at October 2015 BTB Mtg) 11/2/2015 near end of surface life. Candidate for reclaim within the next 5 years

82ND ST SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '99, Seal Coat & East From TH 25 To CR 127 History 1400' reclaimed, 2"W, '13

11/2/2015 needs Crackfilling

87TH ST SE '09 Borings, 4" grav Plow Route Route 3 Maintenance 1-1/2" Overlay, '01, Emb Widened to From CSAH 11 To 175th Ave History 30', '14

11/2/2015 reclaim and widened when surfaced

4/11/2015 crackseal with chips to seal

97TH ST SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '08, Crackfill, '11 From CR 53 To TH 25 History

11/2/2015 Trees need to be trimmed N of 125th yet this fall (section right before Clear Lake Township)

ASPEN RIDGE Monday, November 2, 2015 Page 3 of 11 173RD AVE SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 2 Maintenance From CR 73 To 123rd Str History

4/11/2015 not sure if right section of 173rd - large rocks - are these a right of way issue for plowing

BIG OAK ESTATES

192ND CT SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 3 Maintenance Crackfill '11, Seal Coat '12 From CSAH 4 To Cul de Sac History

11/2/2015 Chinese elms to come out this fall. 3 at end of cul de sac & 2 coming into cul de sac

193RD AVE SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 3 Maintenance Crackfill '11, Seal Coat '12 From 95th Str To 191st Ave History

11/2/2015 9 button needed

4/11/2015 Patch or crack fill

BOULDER CROSSING

117TH AVE SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 3 Maintenance From 87th Str To 119th Ave History

4/11/2015 Needs crackseal with chips to fill - Todd will check with Frank

BRIDGEVIEW

170TH ST SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 2 Maintenance Crackfill '11, Seal Coat '12 From Cul de Sac To CSAH 11 History

4/11/2015 All Bridgeview Cul De Sacs - crackseal with chips to fill 4/11/2015 Bridgeview - 17258 gravel in corner - to repair

CEDAR CREST ACRES

164TH ST SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '01, Crackfill, '11, Seal From Dead End To 165th History Coat '15

Monday, November 2, 2015 Page 4 of 11 11/2/2015 9 button is fine. Path into field is on private property - not township's right of way 11/2/2015 9 button fine. Entrance into field is via private property

165TH ST SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '04, Crackfill, '11, Seal From 166th Str To 173rd Ave History Coat '15

4/11/2015 crackseal with chips to fill - Todd thought this week if weather cooperates

166TH ST SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '04, Crackfill, '11, Seal From Cul de Sac To 173rd Ave History Coat '15

11/2/2015 field road side doesn't look like it is being used as an access to 166th

172ND AVE SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '04, Crackfill, '11, Seal From 163rd Str To Cul de Sac History Coat '15

11/2/2015 end of road is into wooded area

CEDAR OAK ESTATES

169TH AVE SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '04, Crackfill, '11, Seal From CSAH 11 To Cul de Sac History Coat '15

11/2/2015 good - new 9 button needed

4/11/2015 crackseal with chips to fill - Todd thought this week if weather cooperates

CRESTVIEW

163RD ST SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '04, Crackfill, '11, Seal From Cul de Sac To CR 50 History Coat '15

4/11/2015 gravel needed - fix

165TH ST SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '04, Crackfill, '11, Seal From Cul de Sac To CR 50 History Coat '15

4/11/2015 gravel needed and - Type 3 Barricade needed - Todd

EAGLE LAKE ESTATES Monday, November 2, 2015 Page 5 of 11 192ND ST NW Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 2 Maintenance From Town Line To Town Line History

11/2/2015 needs 9 button - See if Orrock Town Board is interested in Snowplow agreement.

EAGLES LANDING

82ND ST SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 3 Maintenance Crackfill '11, Seal Coat '12 From 173rd Ave To 175th Ave History

11/2/2015 Paved in 98, sealcoat in 2012

85TH ST SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 3 Maintenance Crackfill '11, Seal Coat '12 From 172nd Ave To 175th Ave History

11/2/2015 viewed where pipe was replaced

ELK RIVER GARDENS

Garden Grove RD SE Sub 1 Road Surface4" Cl 5, 1-1/2" W Plow Route Route 2 Maintenance Seal Coat, '11 From Peggy Place To Town Line History

11/2/2015 Chlorided - not bladed since chloride put down - holding

GEORGIA CIR SE Road SurfaceGravel Plow Route Route 2 Maintenance From Garden Grove Rd To Cul de Sac History

4/11/2015 Gravel needed - and fixing up

ELKWOOD

RIVERVIEW DR SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '06, Crackfill, '11 From Woodcrest Lane To Cul de Sac History

11/2/2015 due for seal coats soon. Needs 9 button sign

WOODCREST LN SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '06, Crackfill, '11 From Riverview Dr To TH 25 History

Monday, November 2, 2015 Page 6 of 11 11/2/2015 URGENT: needs a yield sign. Needs crackfill in the spring. Candidate for Seal Coat

GARBRIAN WOODS

96TH ST SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 1 Maintenance Crackfill '11, Seal Coat '12 From 131st Ave To CSAH 23 History

10/29/2015 131st divided into two segments. Majestic Knoll designation in the from portion means from the plat line

Half City

127TH ST SE Road SurfaceGravel Plow Route Route 2 Maintenance From 153rd Ave To City Limits History

4/11/2015 dust control - work with city

HEGGE INDUSTRIAL PARK

149TH ST SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 2 Maintenance Crackfill '11, Seal Coat '13 From Dead End To CSAH 11 History

11/2/2015 was a 9 button - need to see if it is still there or put up again - to side for tractors to get into field.

4/11/2015 crackseal with chips to fill

HIDDEN HAVEN

101ST ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From CR 67 To 100th Str History

11/2/2015 basin is in the Township easement. Bad Scourys (check word with Eyk) - The hole Jamie repaired with dirt needs rip rap

4/11/2015 Hidden Haven washout - Eyk sent quote to homeowners association. It is in township easement. Rocks worked for fixing the last one.

103RD ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From 157th Ave To Cul de Sac History

11/2/2015 Jeff pull out 9 button - needs new 9 button sign at end by Elms

Monday, November 2, 2015 Page 7 of 11 HYTTSTEN CREEK

98TH ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From Cul de Sac To 145th Ave History

11/2/2015 needs new 9 button at end of cul de sac

MAJESTIC KNOLL

131ST AVE SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 1 Maintenance Crackfill '11, Seal Coat '12 From GARBRIAN WOODS To 91st Str History

4/11/2015 fix stop sign - turned wrong direction

MAJESTIC PONDS

114TH ST SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 1 Maintenance Crackfill '11, Seal Coat '12 From 185 Ave To Cul de Sac History

11/2/2015 pines still there - double check that letter to remove the two white spruce trees was sent. 9 button needed at end of cul de sac

OAK CREST ESTATES

170TH ST SE Road Surface6" Reclaim, 2" W, '1 Plow Route Route 2 Maintenance 6" Reclaim, 2" W, '14 From CSAH 11 To CR 50 History

11/2/2015 send letter to remove boulders in cul de sac? Two cul de sac's end near each other (is this note on the right road?)

OAKWOOD ESTATES

68TH ST SE Road Surface Plow Route Route 1 Maintenance Seal Coat, '11 From 70th Str To CSAH 11 History

4/11/2015 holding water - add dirt in corner

PEBBLE CREEK NORTH 2nd

IRONWOOD CIR SE

Monday, November 2, 2015 Page 8 of 11 Road Surface Plow Route Route 1 Maintenance Seal Coat, '07, Reclaim, 2" Surf, '13 From Greenview Rd To Cul de Sac History

11/2/2015 Needs a 9 button. Basket ball hoop in cul de sac - does Township have any rules regarding removal before winter?

PETERSON FARM

146TH AVE SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From 83rd Str To Cul de Sac History

11/2/2015 9 sediment ponds - none have overflow structures. in good shape

4/11/2015 with 83rd - rake back corner 4/11/2015 crackseal with chips to fill

148TH AVE SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From CSAH 23 To 82nd Str History

11/2/2015 needs 9 button sign

80TH ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From Cul de Sac To 146th Ave History

11/2/2015 Needs 9 Button

82ND ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Maintenance Crackfill '11 From 148th Ave To Subdivision Line History

11/2/2015 gravel road. 1:1 slopes with 7' ditches

83RD ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From Cul de Sac To CSAH 23 History

11/2/2015 sediment ponds in the subdivision

4/11/2015 Crackseal with chips to fill - Peterson Farms

SALIDA CROSSING

164TH AVE SE

Monday, November 2, 2015 Page 9 of 11 Road Surface Plow Route Not Town Maintenance From 149th Str To Cul de Sac History

11/2/2015 public road - fine for now - gravel

SAND HILL

91ST ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 3 Maintenance Crackfill '11, Seal Coat '15 From Cul de Sac To CR 93 History

11/2/2015 Shared sewage system - infiltration basin pond - some problems

4/11/2015 crackseal with chips to fill

SNAKE RIVER ESTATES

180TH AVE SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Not Town Maintenance From Cul de Sac To 118th Str History

4/11/2015 Snake River Estates - crackseal with chips to fill

WILDWOOD ACRES 1ST

84TH ST SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '04, Crackfill, '11 From TH 25 To Oakwood DR History

11/2/2015 subgrade failures in this development - more on Beatrice. New 9 button needed on cul de sac - Eyk has listing

WILDWOOD ACRES 2ND

E BEATRICE DR SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '06, Crackfill, '11 From W Beatrice Dr To 82nd Str History

4/11/2015 crackseal with chips to fill

W BEATRICE DR SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '06, Crackfill, '11 From E Beatrice Dr To 82nd Str History

11/2/2015 Patches noted. Failures where stumps were burried. 4-5 - large one by 8231. Before reclaim or maintenance of this road, these failures need to be addressed

Monday, November 2, 2015 Page 10 of 11 4/11/2015 crackseal with chips to fill

WOODBERRY FARMS

183RD AVE SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 3 Maintenance Seal Coat, '14 From 96th Str To Cul de Sac History

11/2/2015 ok - not looked at - seal coated in 2013

Monday, November 2, 2015 Page 11 of 11