Road Tour Notes 201
102ND ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From 145th Ave To CR 67 History
11/2/2015 rip rap this spring stabilized the slope
103RD ST SE Road SurfaceUnk Plow Route Unknown Maintenance 1-1/2" Overlay, '02, Crackfill, '11, From City Limits To CSAH 23 History Reclaim & 2" W '15
4/11/2015 reclaim township portion
107TH ST SE Road SurfaceGravel Plow Route Route 1 Maintenance From CR 57 To Dead End History
11/2/2015 dead end signs changing to No Outlet - Eyk has list for Jeff 11/2/2015 Dead end - bus turn around tough? Let bus drivers know it is ok to use the lane to turn around
109TH ST SE Road SurfaceUnk Plow Route Route 3 Maintenance 1-1/2" Overlay, '01, Crackfill, '11, Seal From 185th Ave To Town Line History Coat ,'14
11/2/2015 Orrock Town Line
112TH ST SE Road SurfaceGravel Plow Route Route 2 Maintenance From CR 51 To Dead End History
11/2/2015 gravel - need 9 button - Township Road Tour van almost got stuck. Routine blading? Not minimum maintenance road so should be on regular schedfule. Right now being bladed every other time or so.
122ND ST SE Road SurfaceGravel Plow Route Route 2 Maintenance From Dead End To CSAH 11 History
11/2/2015 East 400' gets calcuim chloride. Call from resident for more class 5. Board: check budget first - blade for now
4/11/2015 dust control - work with city
Monday, November 2, 2015 Page 1 of 11 127TH ST SE Road Surface8"Cl 5, 2" NW, 1-1/2 Plow Route Route 2 Maintenance From City Limits To CSAH 11 History
11/2/2015 looks good - even with traffic. No bus stop ahead sign going in - clear site.
128TH AVE SE Road SurfaceGravel Plow Route Route 1 Maintenance From 82nd Str To Dead End History
11/2/2015 needs gravel and new 9 button sign
4/11/2015 gravel needed
157TH AVE SE Road SurfaceGravel Plow Route Maintenance From CSAH 4 To 92nd Str History
11/2/2015 URGENT: gravel road. Ditch missing section. large washout - needs repair
173RD AVE SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 3 Maintenance Crackfill '11 From CSAH 4 To 87th Str History
4/11/2015 crackseal with chips to fill
175TH AVE SE Road SurfaceGravel Plow Route Route 3 Maintenance From 77th Str To Lutz History
11/2/2015 CHECK: Gravel road - full maintenance - needs gravel - it is not minimum maintenance until after Lutz farm. If it is recorded differently, minimum maintenance sign needed
185TH AVE SE Road SurfaceUnk Plow Route Route 3 Maintenance Seal Coat '07 From CR 73 To CSAH 4 History
11/2/2015 10760 185th - new retaining wall way too large - needs to change. Letter? 11/2/2015 at 102nd - holding water. Concrete batch truck off road caused damage in October. Was to be repaired on Friday. Outlet was 'shut off' for now - 2.5'-3' deep hole. Eyk to call and see why repair has not begun. 11/2/2015 Hole that keeps coming up and needs filling in - done again last week 11/2/2015 coming to end of surface life.
190TH AVE SE Road SurfaceGravel Plow Route Route 3 Maintenance From 95th Str To Dead End History Monday, November 2, 2015 Page 2 of 11 11/2/2015 needs minimum maintenance sign. School bus turns around? Class 5 needed and blade occasionally
4/11/2015 needs minimum maintenance sign
67TH ST SE Road SurfaceGravel Plow Route Route 1 Maintenance 30' Embankment Constructed '99 From CSAH 11 To CR 93 History
4/11/2015 crackseal with chips to fill - split cost with Santiago - Eyk will call first
77TH ST SE Road SurfaceGravel Plow Route Route 1 Maintenance From Dead End To CR 27 History
11/2/2015 CHECK: see if recorded as minimum maintenance - needs minimum maintenance sign if it has been declared a minimum maintenance road.
4/11/2015 Gravel/minimum maintenance road - needs a minimum maintenance sign Road SurfaceUnk Plow Route Route 3 Maintenance From CSAH 11 To 175th Ave History
11/2/2015 gravel coming (approval at October 2015 BTB Mtg) 11/2/2015 near end of surface life. Candidate for reclaim within the next 5 years
82ND ST SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '99, Seal Coat & East From TH 25 To CR 127 History 1400' reclaimed, 2"W, '13
11/2/2015 needs Crackfilling
87TH ST SE Road Surface'09 Borings, 4" grav Plow Route Route 3 Maintenance 1-1/2" Overlay, '01, Emb Widened to From CSAH 11 To 175th Ave History 30', '14
11/2/2015 reclaim and widened when surfaced
4/11/2015 crackseal with chips to seal
97TH ST SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '08, Crackfill, '11 From CR 53 To TH 25 History
11/2/2015 Trees need to be trimmed N of 125th yet this fall (section right before Clear Lake Township)
ASPEN RIDGE Monday, November 2, 2015 Page 3 of 11 173RD AVE SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 2 Maintenance From CR 73 To 123rd Str History
4/11/2015 not sure if right section of 173rd - large rocks - are these a right of way issue for plowing
BIG OAK ESTATES
192ND CT SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 3 Maintenance Crackfill '11, Seal Coat '12 From CSAH 4 To Cul de Sac History
11/2/2015 Chinese elms to come out this fall. 3 at end of cul de sac & 2 coming into cul de sac
193RD AVE SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 3 Maintenance Crackfill '11, Seal Coat '12 From 95th Str To 191st Ave History
11/2/2015 9 button needed
4/11/2015 Patch or crack fill
BOULDER CROSSING
117TH AVE SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 3 Maintenance From 87th Str To 119th Ave History
4/11/2015 Needs crackseal with chips to fill - Todd will check with Frank
BRIDGEVIEW
170TH ST SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 2 Maintenance Crackfill '11, Seal Coat '12 From Cul de Sac To CSAH 11 History
4/11/2015 All Bridgeview Cul De Sacs - crackseal with chips to fill 4/11/2015 Bridgeview - 17258 gravel in corner - pothole to repair
CEDAR CREST ACRES
164TH ST SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '01, Crackfill, '11, Seal From Dead End To 165th Street History Coat '15
Monday, November 2, 2015 Page 4 of 11 11/2/2015 9 button is fine. Path into field is on private property - not township's right of way 11/2/2015 9 button fine. Entrance into field is via private property
165TH ST SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '04, Crackfill, '11, Seal From 166th Str To 173rd Ave History Coat '15
4/11/2015 crackseal with chips to fill - Todd thought this week if weather cooperates
166TH ST SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '04, Crackfill, '11, Seal From Cul de Sac To 173rd Ave History Coat '15
11/2/2015 field road side doesn't look like it is being used as an access to 166th
172ND AVE SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '04, Crackfill, '11, Seal From 163rd Str To Cul de Sac History Coat '15
11/2/2015 end of road is into wooded area
CEDAR OAK ESTATES
169TH AVE SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '04, Crackfill, '11, Seal From CSAH 11 To Cul de Sac History Coat '15
11/2/2015 good - new 9 button needed
4/11/2015 crackseal with chips to fill - Todd thought this week if weather cooperates
CRESTVIEW
163RD ST SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '04, Crackfill, '11, Seal From Cul de Sac To CR 50 History Coat '15
4/11/2015 gravel needed - fix rut
165TH ST SE Road SurfaceUnk Plow Route Route 2 Maintenance 1-1/2" Overlay, '04, Crackfill, '11, Seal From Cul de Sac To CR 50 History Coat '15
4/11/2015 gravel needed and grade - Type 3 Barricade needed - Todd
EAGLE LAKE ESTATES Monday, November 2, 2015 Page 5 of 11 192ND ST NW Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 2 Maintenance From Town Line To Town Line History
11/2/2015 needs 9 button - See if Orrock Town Board is interested in Snowplow agreement.
EAGLES LANDING
82ND ST SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 3 Maintenance Crackfill '11, Seal Coat '12 From 173rd Ave To 175th Ave History
11/2/2015 Paved in 98, sealcoat in 2012
85TH ST SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 3 Maintenance Crackfill '11, Seal Coat '12 From 172nd Ave To 175th Ave History
11/2/2015 viewed where pipe was replaced
ELK RIVER GARDENS
Garden Grove RD SE Sub 1 Road Surface4" Cl 5, 1-1/2" W Plow Route Route 2 Maintenance Seal Coat, '11 From Peggy Place To Town Line History
11/2/2015 Chlorided - not bladed since chloride put down - holding
GEORGIA CIR SE Road SurfaceGravel Plow Route Route 2 Maintenance From Garden Grove Rd To Cul de Sac History
4/11/2015 Gravel needed - and fixing up
ELKWOOD
RIVERVIEW DR SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '06, Crackfill, '11 From Woodcrest Lane To Cul de Sac History
11/2/2015 due for seal coats soon. Needs 9 button sign
WOODCREST LN SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '06, Crackfill, '11 From Riverview Dr To TH 25 History
Monday, November 2, 2015 Page 6 of 11 11/2/2015 URGENT: needs a yield sign. Needs crackfill in the spring. Candidate for Seal Coat
GARBRIAN WOODS
96TH ST SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 1 Maintenance Crackfill '11, Seal Coat '12 From 131st Ave To CSAH 23 History
10/29/2015 131st divided into two segments. Majestic Knoll designation in the from portion means from the plat line
Half City
127TH ST SE Road SurfaceGravel Plow Route Route 2 Maintenance From 153rd Ave To City Limits History
4/11/2015 dust control - work with city
HEGGE INDUSTRIAL PARK
149TH ST SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 2 Maintenance Crackfill '11, Seal Coat '13 From Dead End To CSAH 11 History
11/2/2015 was a 9 button - need to see if it is still there or put up again - to side for tractors to get into field.
4/11/2015 crackseal with chips to fill
HIDDEN HAVEN
101ST ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From CR 67 To 100th Str History
11/2/2015 basin is in the Township easement. Bad Scourys (check word with Eyk) - The hole Jamie repaired with dirt needs rip rap
4/11/2015 Hidden Haven washout - Eyk sent quote to homeowners association. It is in township easement. Rocks worked for fixing the last one.
103RD ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From 157th Ave To Cul de Sac History
11/2/2015 Jeff pull out 9 button - needs new 9 button sign at end by Elms
Monday, November 2, 2015 Page 7 of 11 HYTTSTEN CREEK
98TH ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From Cul de Sac To 145th Ave History
11/2/2015 needs new 9 button at end of cul de sac
MAJESTIC KNOLL
131ST AVE SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 1 Maintenance Crackfill '11, Seal Coat '12 From GARBRIAN WOODS To 91st Str History
4/11/2015 fix stop sign - turned wrong direction
MAJESTIC PONDS
114TH ST SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 1 Maintenance Crackfill '11, Seal Coat '12 From 185 Ave To Cul de Sac History
11/2/2015 pines still there - double check that letter to remove the two white spruce trees was sent. 9 button needed at end of cul de sac
OAK CREST ESTATES
170TH ST SE Road Surface6" Reclaim, 2" W, '1 Plow Route Route 2 Maintenance 6" Reclaim, 2" W, '14 From CSAH 11 To CR 50 History
11/2/2015 send letter to remove boulders in cul de sac? Two cul de sac's end near each other (is this note on the right road?)
OAKWOOD ESTATES
68TH ST SE Road Surface Plow Route Route 1 Maintenance Seal Coat, '11 From 70th Str To CSAH 11 History
4/11/2015 holding water - add dirt in corner
PEBBLE CREEK NORTH 2nd
IRONWOOD CIR SE
Monday, November 2, 2015 Page 8 of 11 Road Surface Plow Route Route 1 Maintenance Seal Coat, '07, Reclaim, 2" Surf, '13 From Greenview Rd To Cul de Sac History
11/2/2015 Needs a 9 button. Basket ball hoop in cul de sac - does Township have any rules regarding removal before winter?
PETERSON FARM
146TH AVE SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From 83rd Str To Cul de Sac History
11/2/2015 9 sediment ponds - none have overflow structures. Roads in good shape
4/11/2015 intersection with 83rd - rake back corner 4/11/2015 crackseal with chips to fill
148TH AVE SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From CSAH 23 To 82nd Str History
11/2/2015 needs 9 button sign
80TH ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From Cul de Sac To 146th Ave History
11/2/2015 Needs 9 Button
82ND ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Maintenance Crackfill '11 From 148th Ave To Subdivision Line History
11/2/2015 gravel road. 1:1 slopes with 7' ditches
83RD ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 1 Maintenance Crackfill '11 From Cul de Sac To CSAH 23 History
11/2/2015 sediment ponds in the subdivision
4/11/2015 Crackseal with chips to fill - Peterson Farms
SALIDA CROSSING
164TH AVE SE
Monday, November 2, 2015 Page 9 of 11 Road Surface Plow Route Not Town Maintenance From 149th Str To Cul de Sac History
11/2/2015 public road - fine for now - gravel
SAND HILL
91ST ST SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Route 3 Maintenance Crackfill '11, Seal Coat '15 From Cul de Sac To CR 93 History
11/2/2015 Shared sewage system - infiltration basin pond - some erosion problems
4/11/2015 crackseal with chips to fill
SNAKE RIVER ESTATES
180TH AVE SE Road Surface6" Cl5, 2" NW, 1-1/2 Plow Route Not Town Maintenance From Cul de Sac To 118th Str History
4/11/2015 Snake River Estates - crackseal with chips to fill
WILDWOOD ACRES 1ST
84TH ST SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '04, Crackfill, '11 From TH 25 To Oakwood DR History
11/2/2015 subgrade failures in this development - more on Beatrice. New 9 button needed on cul de sac - Eyk has listing
WILDWOOD ACRES 2ND
E BEATRICE DR SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '06, Crackfill, '11 From W Beatrice Dr To 82nd Str History
4/11/2015 crackseal with chips to fill
W BEATRICE DR SE Road SurfaceUnk Plow Route Route 1 Maintenance 1-1/2" Overlay, '06, Crackfill, '11 From E Beatrice Dr To 82nd Str History
11/2/2015 Patches noted. Failures where stumps were burried. 4-5 - large one by 8231. Before reclaim or maintenance of this road, these failures need to be addressed
Monday, November 2, 2015 Page 10 of 11 4/11/2015 crackseal with chips to fill
WOODBERRY FARMS
183RD AVE SE Road Surface6" Cl5,1-1/2" NW, 1 Plow Route Route 3 Maintenance Seal Coat, '14 From 96th Str To Cul de Sac History
11/2/2015 ok - not looked at - seal coated in 2013
Monday, November 2, 2015 Page 11 of 11