Onshore Transmission Infrastructure Environmental Impact Assessment
Total Page:16
File Type:pdf, Size:1020Kb
Moray Offshore Windfarm (West) Limited Technical Appendix 5.3: Detailed Hydrological and Hydrogeological Information Onshore Transmission Infrastructure Environmental Impact Assessment (EIA) Moray Offshore Windfarm (West) Limited Technical Appendix 5.3: Detailed Hydrological and Hydrogeological Information Hydrology, Hydrogeology and Geology Moray Offshore Windfarm (West) Limited Technical Appendix 5.3: Detailed Hydrological and Hydrogeological Information Hydrology, Hydrogeology and Geology Moray Offshore Windfarm (West) Limited Technical Appendix 5.3: Detailed Hydrological and Hydrogeological Information Table of Contents 1 Introduction ................................................................................................................................................................ 1 Acronyms 1.1 Purpose of this Report ........................................................................................................................................ 1 Acronym Expanded Term 2 Detailed Baseline Results ............................................................................................................................................ 1 AC Aberdeenshire Council 2.1 Water Framework Directive Classifications ........................................................................................................ 1 EIA Environmental Impact Assessment 2.2 Water Resources ................................................................................................................................................. 2 MC Moray Council 2.2.1 Private Water Supplies ................................................................................................................................ 2 OnTI Moray West Onshore Transmission Works 2.2.2 Licensed Discharges .................................................................................................................................... 7 PAB Planning Application Boundary 3 References .................................................................................................................................................................10 PWS Private Water Supply SEPA Scottish Environment Protection Agency List of Tables WFD Water Framework Directive Table 2.1: Detailed WFD Baseline Information ................................................................................................................... 1 Table 2.2: Private Water Supply Abstractions Within Hydrological and Hydrogeological Study Area ............................... 3 Table 2.3: Licensed Discharges within PAB ......................................................................................................................... 7 Copyright © 2018 Moray Offshore Windfarm (West) Limited All pre-existing rights reserved. Liability In preparation of this document Moray Offshore Windfarm (West) Limited has made reasonable efforts to ensure that the content is accurate, up to date and complete. Moray Offshore Windfarm (West) Limited shall have no liability for any loss, damage, injury, claim, expense, cost or other consequence arising as a result of use or reliance upon any information contained in or omitted from this document. Hydrology, Hydrogeology and Geology Moray Offshore Windfarm (West) Limited Technical Appendix 5.3: Detailed Hydrological and Hydrogeological Information Hydrology, Hydrogeology and Geology Moray Offshore Windfarm (West) Limited Technical Appendix 5.3: Detailed Hydrological and Hydrogeological Information 2 Detailed Baseline Results 1 Introduction 2.1 Water Framework Directive Classifications 1.1 Purpose of this Report Across the study area there are 10 WFD waterbodies, comprising seven rivers and three groundwater waterbodies. Six As part of the works undertaken in support of the Moray West Onshore Transmission Infrastructure (OnTI) waterbodies are assessed as being of Moderate or worse status overall, while four are assessed as being of Good overall Environmental Impact Assessment (EIA), this technical appendix presents detailed results of the desktop studies to status (Scottish Environment Protection Agency [SEPA], 2017). Table 2.1 below presents detailed information on the establish the existing baseline hydrological and hydrogeological conditions within the study area. The detailed WFD condition, the future objectives and associated mitigation measures for each of these 10 waterbodies. information presented on Water Framework Directive (WFD) Classifications and Water Resources within this report informs the summary baseline information and the assessment of potential and residual effects in Chapter 5: Hydrology, Table 2.1: Detailed WFD Baseline Information Hydrogeology and Geology of the EIA Report. Background information on the approach to the assessment, including study area and data gathering methodologies, are also presented in Chapter 5 of the EIA Report for reference. Waterbody Waterbody 2015 Condition Reasons for Failure Overall Objective Type of Mitigation (WFD ID) Type to Meet Good Status Measures Anticipated Deskford River Overall – Moderate Fish populations in Good status by 2027. To be determined. Burn (physical condition – the waterbody may (23050) Good; water quality not be in a Good – High; water flows condition. SEPA has and levels – High; not been able to and ecological identify the condition – contributing cause. Moderate). Fordyce River Overall – Moderate Water flows and Good status after Water flows and Burn (physical condition – levels – Water 2027 (long term levels – Agricultural (23052) Good; water flows abstraction from recovery of the irrigation regulation and levels – agricultural waterbody from the enforced by SEPA. Moderate; and water irrigation. impact of nutrient Water quality – quality – Moderate). Water quality – pollution is not Diffuse sources. Nutrient pollution. expected until after Catchment action Diffuse sources of 2027). programme is being pollution from rural undertaken by SEPA sources and point and land managers. source discharges Water quality – Point from waste water source discharges. (sewage) disposal. Waste water sewage regulation is being enforced by SEPA / Scottish Water. Burn of River Overall – Bad Physical condition – Good status by 2027. Partnership between Paithnick (physical condition – Modifications to bed, land managers, local (23175) Bad; water flows and banks and shores communities and levels – High; and due to urban and SEPA is working to water quality – rural land uses. re-design and Good). improve the physical condition of this waterbody. River Isla – River Overall – Bad Physical condition – Good status after Partnership between Keith to (physical condition – Modifications to bed, 2027 land managers, local Shiel Burn Bad; water flows and banks and shores (disproportionately communities and (23179) levels – High; and due to urban and expensive to address SEPA is working to rural land uses. water quality re-design and improve the physical Hydrology, Hydrogeology and Geology 1 Moray Offshore Windfarm (West) Limited Technical Appendix 5.3: Detailed Hydrological and Hydrogeological Information Table 2.1: Detailed WFD Baseline Information Table 2.1: Detailed WFD Baseline Information Waterbody Waterbody 2015 Condition Reasons for Failure Overall Objective Type of Mitigation Waterbody Waterbody 2015 Condition Reasons for Failure Overall Objective Type of Mitigation (WFD ID) Type to Meet Good Status Measures (WFD ID) Type to Meet Good Status Measures Anticipated Anticipated water quality – Water quality – No objective until after condition of this water quality – Moderate). pressures identified. 2027). waterbody. Good). Nutrient levels are not affecting ecology and action is not 2.2 Water Resources required. River Isla – River Overall – Poor Physical condition – Good status by 2027. Partnership between 2.2.1 Private Water Supplies Source to (physical condition – Modifications to bed, land managers, local Keith Poor; water flows banks and shores communities and A total of 53 PWSs were identified within the study area, comprising 37 within the Moray Council (MC) area and 16 (23181) and levels – Good; due to urban and SEPA is working to within the Aberdeenshire Council (AC) area, as shown in Figure 5.3.2 of the EIA Report. Each of these PWS are registered and water quality – rural land uses. re-design and as being type B, which are defined as being supplies only serving domestic premises with less than 50 persons supplied. Good). improve the physical AC provided a list of registered users though were not able to confirm the type or exact location of source supply. From condition of this waterbody. the 53 PWSs identified in Table 2.2 below, 39 are assessed as having a potential hydrological or hydrogeological connection to the PAB. The other 14 are assessed as not being connected and therefore have been scoped out of the Burn of River Overall – Good N/A already at Good N/A already at Good N/A assessment in Chapter 5: Hydrology, Hydrogeology and Geology of the EIA Report. Drum (physical condition – status or above. status or above. (23177) Good; water flows and levels – Good; and water quality – Good). Cairnie Burn River Overall – Good N/A already at Good N/A already at Good N/A (23172) (physical condition – status or above. status or above. Good; water flows and levels – High; and water quality – Good). Cullen Groundwater Overall – Poor (water Water quality – Good status after Nitrate vulnerable (150501) flows and levels – Diffuse sources of 2027 (rate limiting zone action with land Good; and water pollution