Environmental Clearance to SEIAA
Total Page:16
File Type:pdf, Size:1020Kb
Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:May 2, 2017 To, Aatif Yakub, VALENCIA & MISHAL VENTURES PVT. LTD. at Property Bearing C.T. S. No. 427&2/430, Chira Bazar Chandanwadi, Of Bhuleshwar Division Of C Ward, Mumbai, Maharashtra. Environment Clearance for Envirobmental Clearance for Proposed Redevelopment of BIT Chawl No. 01 to 06 Subject: at Property bearing C.T. S. No. 427 & 2/430 of Bhuleshwar Division of C Ward Chira Bazar Chandanwadi, Mumbai. Maharashtra by M/s. Valencia & Mishal Ventures Pvt. Ltd. Sir, This has reference to your communication on the above mentioned subject. The proposal was considered as per the EIA Notification - 2006, by the State Level Expert Appraisal Committee-II, Maharashtra in its th meeting and recommend the project for prior environmental clearance to SEIAA. Information submitted by you has been considered by State Level Environment Impact Assessment Authority in its SEIAA Meeting No. 110th meetings. 2. It is noted that the proposal is considered by SEAC-II under screening category 8 (a) as per EIA Notification 2006. Brief Information of the project submitted by you is as below :- 1.Name of Project Valencia & Mishal Ventures Pvt. Ltd. 2.Type of institution Private 3.Name of Project Proponent Aatif Yakub, VALENCIA & MISHAL VENTURES PVT. LTD. 4.Name of Consultant Dr. D. A. Patil; Mahabal Enviro Engineers Pvt. Ltd. 5.Type of project Redevelopment project 6.New project/expansion in existing project/modernization/diversification Proposed Redevelopment of BIT Chawl No. 01 to 06 in existing project 7.If expansion/diversification, whether environmental clearance Not applicable has been obtained for existing project Property Bearing C.T. S. No. 427&2/430, Chira Bazar Chandanwadi, Of Bhuleshwar Division Of 8.Location of the project C Ward, Mumbai, Maharashtra. 9.Taluka Mumbai 10.Village Bhuleshwar Division of C Ward Chira Bazar Chandanwadi 11.Whether in Corporation / Municipal Corporation of Greater Mumbai (MCGM) Municipal / other area LOI Received from MCGM dated. 19.03.2016 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: LOI Received from MCGM dated. 19.03.2016 Approval Number Approved Built-up Area: 35125.74 13.Note on the initiated work (If No work has been initiated applicable) 14.LOI / NOC / IOD from MHADA/ LOI Received from MCGM dated. 19.03.2016 Other approvals (If applicable) 15.Total Plot Area (sq. m.) 9,168.13 m2 16.Deductions Nil SEIAA Meeting No: SEIAA Meeting No. 110 Meeting Date: May 2, 2017 ( SEIAA-STATEMENT-0000000284 ) SEIAA-MINUTES-0000000086 Shri. Anil Diggikar (Member SEIAA-EC-0000000062 Page 1 of 14 Secretary SEIAA) 17.Net Plot area 9,168.13 m2 FSI area (sq. m.): 35125.74 m2 18 (a).Proposed Built-up Area (FSI & Non FSI area (sq. m.): 45498.26 m2 Non-FSI) Total BUA area (sq. m.): 91929.92 m2 Approved FSI area (sq. m.): 18 (b).Approved Built up area as per Approved Non FSI area (sq. m.): DCR Date of Approval: 19.Total ground coverage (m2) 4950.79 m2 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open 54.01% to sky) 21.Estimated cost of the project 3030000000 SEIAA Meeting No: SEIAA Meeting No. 110 Meeting Date: May 2, 2017 ( SEIAA-STATEMENT-0000000284 ) SEIAA-MINUTES-0000000086 Shri. Anil Diggikar (Member SEIAA-EC-0000000062 Page 2 of 14 Secretary SEIAA) 22.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 23.Total Water Requirement Source of water Municipal Corporation of Greater Mumbai (MCGM) Fresh water (CMD): 382 Recycled water - 197 Flushing (CMD): Recycled water - 3 Gardening (CMD): Swimming pool - make up (Cum): Dry season: Total Water Requirement (CMD) 576 : Fire fighting - Underground water As per CFO NOC tank(CMD): Fire fighting - Overhead water As per CFO NOC tank(CMD): Excess treated water 335 Source of water Municipal Corporation of Greater Mumbai (MCGM) Fresh water (CMD): 321 Recycled water - 194 Flushing (CMD): Recycled water - 0 Gardening (CMD): Swimming pool - make up (Cum): Wet season: Total Water Requirement (CMD) 576 : Fire fighting - Underground water As per CFO NOC tank(CMD): Fire fighting - Overhead water As per CFO NOC tank(CMD): Excess treated water 335 Details of Swimming NA pool (If any) SEIAA Meeting No: SEIAA Meeting No. 110 Meeting Date: May 2, 2017 ( SEIAA-STATEMENT-0000000284 ) SEIAA-MINUTES-0000000086 Shri. Anil Diggikar (Member SEIAA-EC-0000000062 Page 3 of 14 Secretary SEIAA) 24.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Not Not Not Not Not Not Not Not Not Domestic applicable applicable applicable applicable applicable applicable applicable applicable applicable Level of the Ground 4-5 m water table: Size and no of RWH tank(s) and RWH : 3 tanks will be provided with total capacity 122 m3 Quantity: Location of the RWH Rehab:- Below Ground; Sale:- Below Ground tank(s): Quantity of recharge 25.Rain Water NA Harvesting pits: (RWH) Size of recharge pits NA : Budgetary allocation 28 Lakh (Capital cost) : Budgetary allocation 2 Lakh/Year (O & M cost) : Details of UGT tanks Rehab:- Under Ground if any : Sale:- Under Ground Natural water Towards west side drainage pattern: 26.Storm water Quantity of storm 1060 m3/hr drainage water: Size of SWD: 600 mm dia SWD Sewage generation 537 KLD in KLD: STP technology: MBBR Technology Capacity of STP Sale STP: 475 KLD; Rehab STP: 100 KLD (CMD): 27.Sewage and Location & area of Rehab:- Ground; Sale:- Ground Waste water the STP: Budgetary allocation 121 Lakh (Capital cost): Budgetary allocation 23 Lakh/Year (O & M cost): SEIAA Meeting No: SEIAA Meeting No. 110 Meeting Date: May 2, 2017 ( SEIAA-STATEMENT-0000000284 ) SEIAA-MINUTES-0000000086 Shri. Anil Diggikar (Member SEIAA-EC-0000000062 Page 4 of 14 Secretary SEIAA) 28.Solid waste Management Waste generation in Waste generation: Construction debris: 2,633 m3; Demolition waste: 5,200 m3 the Pre Construction Disposal of the The construction debris/demolition waste will be disposed as per the and Construction construction waste “Construction and Demolition and Desilting Waste (Management and phase: debris: Disposal) Rules 2006. Dry waste: 854.4 kg/day Wet waste: 1281.6 kg/day Hazardous waste: NA Waste generation Biomedical waste (If in the operation 200 kg/month Phase: applicable): STP Sludge (Dry 5 m3/day sludge): Others if any: NA Dry waste: Dry garbage will be segregated & disposed off to recyclers Wet garbage will be composted using Mechanical Composting and used Wet waste: as organic manure for landscaping. Hazardous waste: NA Mode of Disposal of waste: Biomedical waste (If Biomedical waste will be handed over to MPCB & MCGM authorized applicable): vendor for disposal as per Biomedical Waste Handling rules 2016 STP Sludge (Dry Sludge use as manure for gardening sludge): Others if any: NA Location(s): Rehab:- Ground; Sale:- Ground Area Area for the storage of waste & other Ground requirement: material: Area for machinery: 50 m2 Budgetary allocation Capital cost: 52 Lakh (Capital cost and O&M cost): O & M cost: 21 Lakh/year SEIAA Meeting No: SEIAA Meeting No. 110 Meeting Date: May 2, 2017 ( SEIAA-STATEMENT-0000000284 ) SEIAA-MINUTES-0000000086 Shri. Anil Diggikar (Member SEIAA-EC-0000000062 Page 5 of 14 Secretary SEIAA) 29.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not applicable Not applicable Not applicable Not applicable applicable Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable SEIAA Meeting No: SEIAA Meeting No. 110 Meeting Date: May 2, 2017 ( SEIAA-STATEMENT-0000000284 ) SEIAA-MINUTES-0000000086 Shri. Anil Diggikar (Member SEIAA-EC-0000000062 Page 6 of 14 Secretary SEIAA) 30.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not applicable Not applicable applicable applicable applicable applicable applicable 31.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not applicable Not applicable Not applicable applicable applicable applicable 32.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not applicable Not applicable Not applicable Not applicable 33.Source of Fuel Not applicable 34.Mode of Transportation of fuel to site Not applicable 35.Energy Source of power BEST supply : During Construction Phase: (Demand 250 kVA Load) DG set as Power back-up during 250 kVA construction phase During Operation phase (Connected 7.5 MW load): Power During Operation requirement: phase (Demand 4.49 MW load): Transformer: - DG set as Power Capacity of DG sets will be provided to Rehab: 1 x 625 kVA and Sale: 1 back-up during x 350 kVA operation phase: Fuel used: HSD Details of high tension line passing No through the plot if any: Energy saving by non-conventional method: ? Efficient wall systems like solid blocks with fly ash content ? Energy efficient lighting using T5 lamps, CFLs in offices and LEDs in Lift Lobby, Toilets & Core area Passages ? Solar lighting on street and RG area ? Use of high energy efficient pumps for fire fighting, UG tanks and STP ? Common Area lighting through Solar PV Panels ? Energy efficient lighting fixtures (LED lights) to all buildings SEIAA Meeting No: SEIAA Meeting No. 110 Meeting Date: May 2, 2017 ( SEIAA-STATEMENT-0000000284 ) SEIAA-MINUTES-0000000086 Shri.