ESTD - 1985 P.O.Box :- 16694, . U.A.E Email :- [email protected] Website:-www.nasseryoosuf.com Tel.:-04-2244117 Fax: - 04-2248707

1.

P..O.. BOX 16694 ,, DUBAI - U..A..E..

C O M M U N I C A T I O N Tel : 04 – 2244117 Fax : 04 – 2248707 Mob : +00971-55 – 2789296 E-mail : [email protected] Website: www.nasseryoosuf.com

O U R B A N K E R S  Dubai Islamic Bank DUBAI – U.A.E.  Emirates Islamic Bank Dubai,UAE Nearest Airport  Dubai International Airport  Sharjah International Airport

Nearest Seaport  Port Rashid, Dubai, U.A.E.  Jebel Ali Sea Port, U.A.E.

2

YEAR OF ESTABLISHMENT IN UAE & ACTIVITIES

We structured in 1985 to handle in the field of Earth work, Back filling,

Interlock tiles fixing, Kerb stone fixing, Formation preparation, Sub Grade preparation, Sub base preparation & Road base preparation and Laying Asphalt for Roads, Traffic Parking, Airport Hangers, Airport Runways, Military Parade

Ground & Other Parking areas in various projects in U.A.E.

CLASSIFICATION OF WORK AS FOLLOWS.

 BACK FILLING.  CUTTING & FILLING  INTER LOCKING TILES FIXING.  KERB STONE FIXING.  FORMATION PREPARATION. (For Roads & Parking)  SUB GRADE PREPARATION. (For Roads & Parking)  SUB BASE PREPARATION. (For Roads & Parking)  ROAD BASE PREPARATION. (For Roads & Parking)  ASPHALT WORKS. (For Roads & Parking)

3

4

5

6

Performance of previous projects

7

1. 1987 Interlocking Paving.  New Dubai Sewerage Treatment Plant Contract No. DS 51. with M/S. Al Naboodha.

2. 1988 Earthwork, Kerbstone  Jumairah Beach Park and Interlocking Paving. with M/S. Ibrahim Lootha Enterprises.

3. 1988 Stone Pitching work. Contract No. R 334.  With M/S. Al Naboodha.

4. 1989 Stone Pitching work. Contract No. R 337.  With M/S. Al Naboodha.

5. 1990 Stone Pitching work.  With M/S. Al Naboodha. Contract No. R 340.

6. 1991-92 Gabion Boxes filling.  With M/S. Darwish Engineering Co.

7. 1992 Interlocking Paving.  Rehabilitation of Al Gusais Road Contract No. R 344. with M/S. U.T.C.C. Wade Adams Ltd. L.L.C.

8. 1993-95 Back filling. Contract  With M/S. Lilley International. No. DS 61/I & Cont. No. DS 69/II.

9. 1995 Excavation & Back-  Abu Hail Sewerage and Drainage filling. Cont.No.DS 67. with M/S. U.T.C.C. Wade Adams Ltd. L.L.C.

10. 1996 Back filling & Road -  with M/S. Lilley International. Base preparation . Contract No. DS 68/1, DS 83/3 & DS 105.

11. 1997 Trench Back filling  Al Ghusais, Sharjah Second Link Road Contract No.R 583. with M/S. Khansaheb.

8

12. 1997 Earthworks & Roadworks  For M/S. Dubai Customs on Plot No. B- 1474 at Hamariya Port with M/S. System Construct.

13. 1997 Subkha & Road Base  For Dubai Muncipality Staff Club at Za’abeel Est. Preparation for Road PJ 4010 with M/S. GINCO Contracting Est. and Parking.

14. 1997 SubBase & Road Base  For Rehabilitation Centre, PJ 1067 Preparation for Road with M/S. GINCO Contracting Est. and Parking.

15. 1997 Road Base Preparation  For Manama Defence Camp for Roads & Parking. with M/S. Al Futtaim Tarmac.

16. 1997 Road Base Preparation  For Naval Base, Murba, Fujairah for Roads & Parking. with M/S. Al Futtaim Tarmac.

17. 1997 Trench Back filling  with M/S. Al Futtaim Tarmac.

18. 1997 Road Base preparation  For Fujairah Defence Camp for Roads & Parking. with M/S. Al Futtaim Tarmac.

19. 1997 Road Base preparation  For Sharjah Defence Camp for Roads & Parking. with M/S. Al Futtaim Tarmac.

20. 1998 Road Base preparation  For Jebel Ali Defence Camp for Roads & Parking. with M/S. Al Futtaim Tarmac.

21. 1998 Road Base preparation  For Jebel Ali Emirates Live Stock for Roads & Parking. with M/S. Al Futtaim Tarmac.

22. 1998 Excavation,Formation &  Used Car Exhibition Centre at Subkha preparation for Ras Al Khor Industrial Area,Al Aweer Road Road & Parking. PJ 1094 with M/S. Al Arif & Al Mutawa Contracting L.L.C.

9

23. 1998 Sub Base & Road Base  Used Car Exhibition Centre at preparation for Roads Ras Al Khor Industrial Area,Al Aweer Road Parking. PJ 1094. with M/S. Al Arif & Al Mutawa Contracting L.L.C.

24. 1998 Road Base Preparation  For Defence Camp, Fujairah for Parede Ground, with M/S. Eastern Ltd. Road & Parking.

25. 1998 Subka and Road Base  For M/S. Arabian Mix Access Road Preparation with M/S. Al Futtaim Tarmac.

26. 1998 Road Base Preparation  For Pedestrian Bridges Contract No. R 579 with M/S. Waagner Biro, Dubai.

27. 1998 Trench Back filling.  For Dubai Airport Free Zone 005 Phase 1 with M/S. National Wheel J&P L.L.C.

28. 1998 Earthwork & Roadbase  For Spic Fertilizers and Chemicals at Jebel Ali Preparation. Free Zone with M/S. ASCON.

29. 1998 SubBase & RoadBase  For Spic Fertilizers and Chemicals at Jebel Ali Preparation. Free Zone with M/S. Al Futtaim Tarmac.

30. 1998 SubBase & RoadBase  For Al Qusais Police Station for Roads & Parking. with M/S. Al Futtaim Tarmac.

31. 1998 SubBase & RoadBase  For ECC Jebel Ali Sewerage Treatment Plant for Roads & Parking. with M/S. Al Futtaim Tarmac.

32. 1998 SubBase & RoadBase  For Biosaline Agricultural Centre at Higgs & Hill site for Roads & Parking. with M/S. Al Futtaim Tarmac.

33. 1998 SubBase & RoadBase  For Sheikh Rashid Palace, Za’abeel Road for Parking Area. with M/S. Al Futtaim Tarmac.

10

34. 1998 SubBase & RoadBase  For Bus Station No.2 at Rashidiya with for Roads & Parking. M/S. Technical Engineering Gen. Contracting Est.

35. 1999 Excavation, Formation,  For Hamour Project, Jebel Ali - MW/1810-Phase 2 SubBase & RoadBase with M/S. ASCON, Abu Dhabi. Preparation for Parede- Ground & Parking Area.

36. 1999 Road Base Preparation  For New Cement Factory, Ras Al Khaima for Roads & Parking. with M/S. Al Futtaim Tarmac.

37. 1999 Cutting,Filling & Road-  For Fujairah Military Camp Project MW/1597 R base preparation for Parede with M/S. Al Futtaim Tarmac. Ground,Roads & Parking.

38. 1999 Excavation,Formation,  For Hor Al Anz & Rashidiya Bus Station PJ 8800. SubBase & Road Base M/S. Technical Engineering Gen. Contracting Est. Preparation.

39. 1999 Formation & Road Base-  For Nad Al Shiba Market, Dubai Preparation for Roads & with M/S. Al Futtaim Tarmac. Parking Area.

40. 1999 Road Base Preparation  For Light Industial Unit, Jebel Ali Free Zone Area for Roads & Parking. with M/S. Al Futtaim Tarmac.

41. 1999 Formation & Roadbase  For Sharjah Sports Centre Preparation for Courts with M/S. Al Futtaim Tarmac. & Running Track.

42. 1999 Excavation, Cartaway,  For Dubai Muncipality Stores, Al Ramool Sub Base & Road Base with M/S. Al Futtaim Tarmac. Preparation.

11

43. 1999 Excavation, Cartaway,  For SH. RASHID TERMINAL - DUBAI Sub Grade, Sub Base& INTERNATIONAL AIRPORT, TD 48. Road Base Preparation Main Contractor M/S. AL HABTOOR - for Roads & Parking. & JV MARAINE ROBERT. with M/S. Al Futtaim Tarmac.

44. 1999 Sub Base & Road Base  For New Power Station, Jebel Ali Preparation for Roads. with M/S. Al Futtaim Tarmac.

45. 1999 Excavation, Formation  For VIP Entrance Roads & Parking at Sub Base & Road Base Dubai International Airport with Preparation for Roads M/S. Al Futtaim Tarmac. & Parking Area.

46. 1999- Excavation, Formation  For SH. RASHID TERMINAL Building, 2000 Sub Base & Road Base Dubai International Airport. with Preparation for Roads M/S. Al Futtaim Tarmac. & Parking Area.

47. 1999- Formation, Sub Base &-  For Al Falah Military Camp, Sharjah with 2000 Road Base Preparation M/S. Amana Steel Building Cont. Co. L.L.C. for Roads & Parking.

48. 2000 Formation, Sub Base & -  For Bu Haleeba Dubai Comercial Building Road Base Preparation Complex near WAFI Shopping Center. for Roads & Parking Area. with M/S. Al Futtaim Tarmac.

49. 2000 Formation, Sub Base & -  For At Uom Kalid School , Ajman Road Base Preparation near Ajman City Center. for Roads & Parking Area. with M/S. OBAID AL ABDI.

50. 2000 Formation, Sub Base &-  For Al Falah Military Camp, Sharjah Road Base Preparation with M/S. DHABI CONTRACTING. For Roads & Parking Area.

51. 2000 Formation, Sub Base &-  For the Run way of Military Air Base Road Base Preparation PJ. M/W 2095 – Umm Al Naar – Abu Dhabi for Air Base Runway. Asphalt done by M/S. Al Futtaim Tarmac.

12

52. 2000 Excavation, Formation,  For the upgrading of Roads & Parking area Sub Base & Road Base in new housing complex at Rashid Hospital, Preparation Dubai.

53. 2000 Interlocking tiles fixing  For the new housing complex in Rashid - & Kerb stone fixing for Hospital, Dubai. Parking area.

54. 2001 Formation, Sub Base &-  For Urqub Theray Regiment Camp, Al Ain Road. Road Base Preparation with M/S. DHABI CONTRACTING. Asphalt done by M/S. Al Futtaim Tarmac.

55. 2001 Excavation, Formation -  For Dubai Port & Customs Department “DUCAMZ” Sub Base & Road Base - at Ras Al Koar, Al Aweer. for Road & Parking Area. Asphalt done by M/S. Al Futtaim Tarmac.

56. 2001 Formation, Sub Base & -  For Desalination Plant at ‘K’ Station – Jebel Ali Road Base Preparation - with M/S. Al Futtaim Tarmac. for Road & Parking Area.

57. 2001 Cutting,Filling & Road-  For Manama Thoban Military Camp PJ MW/2235 base preparation for Parede with M/S. Al Futtaim Tarmac. Ground,Roads & Parking.

58. 2001 Cutting,Filling & Road-  For Manama Military Camp PJ MW- Q/D/187 base preparation for Parede with M/S. Al Futtaim Tarmac. Ground,Roads & Parking.

59. 2002 Excavation, Formation -  For Dubai Port & Customs Department “DUCAMZ” Sub Base & Road Base - 19 Offices near Ras Al Koar, Al Aweer for Road & Parking Area. Asphalt done by M/S. Al Naboodha Contracting.

60. 2002 Cutting,Filling, Formation-  For Fujairah Civil Defence & Road base preparation - with M/S. Al Futtaim Tarmac. Roads & Parking.

61. 2002 Excavation, Formation -  For “ENOC” in Jebel Ali Free Zone Area 13

Sub Base & Road Base - with M/S. Al Banna Engineering. for Road & Parking Area. Asphalt done by M/S. Al Futtaim Tarmac.

62. 2002 Excavation, Formation -  For “Lamprell Energy LLC ” at Jebel Ali Free Sub Base & Road Base - Zone Area with M/S. Al Banna Engineering. for the Over Head Crane foundations.

63. 2002 Excavation, Formation -  For Technical School Fujairah & Road Base preparation- Asphalt done by M/S. Al Futtaim Tarmac. for Roads & Parkings.

64. 2002 Excavation, Formation -  For the Extension Project of New Offices & Sub Base & Road Base - Yard for “Lamprell Energy LLC ” at Jebel Ali Preparation. Free Zone Area with M/S. Al Banna Engineering.

65. 2002 Excavation, Formation -  For the Endurance Village, Al Lussaily Road Base preparation - Asphalt done by M/S. Al Futtaim Tarmac. & Asphalt laying for - Roads & Parkings.

66. 2003 Cutting,Filling, Formation-  For Sheik Hamdan Palace Road Road base preparation & - Asphalt done by M/S. Al Futtaim Tarmac. & Asphalt laying for - Roads & Parkings.

67. 2003 Excavation, Formation -  For Australians, Americans & Canadians Road Base preparation - Military Accomodation Area in Al Minhad & Asphalt laying for - Military Airbase, Umm Nahd, Dubai. Roads & Parkings. Asphalt done by M/S. Al Futtaim Tarmac.

68. 2003 Cutting, Filling, Sub grade-  For Jebel Ali Sheik Palace & Mosque. preparation, Road Base - preparation & Asphalt laying for Roads & Parkings.

69. 2003 Cutting, Filling, Subgrade-  For Ajman Festival City > Pavilion area & preparation, Road Base - Car parking area.

14

preparation & Asphalt laying.

70. 2003 Excavation, Sub grade -  For Jumeirah Military Camp, Dubai. preparation, Road Base - Asphalt done by M/S. Al Futtaim Tarmac. preparation & Asphalt - laying for Road & Parking.

71. 2003 Excavation, Sub grade -  For Al Minhad Military Airbase > Hanger, preparation, Road Base - Taxiway, Roads & Parking at Umm Nahd, Dubai. preparation & Asphalt - Asphalt done by M/S. Al Futtaim Tarmac. laying for Road & Parking.

72. 2003 Excavation, Sub grade -  For Ports & Customs - Jebel Ali Free Zone preparation, Road Base - Building & Container Yard – RHS Logistics. preparation, Kerb stone - laying & Chain link fencing.

73. 2003 Cutting, Filling, Subgrade -  For Central Fruit & Vegetable Market Sub base, Road base prepa- Loading, Unloading area & Car Parking - ration, Kerb stone & Inter- area – Ras Al Khor, Al Awir. lock tiles laying & Asphalt- laying

74. 2003 Sub grade, Road Base &-  For St. Marrys’ High School > Basket Ball Asphalt laying Court – Near Rashid Hospital, Dubai.

75. 2003 Excavation, Sub grade -  For Al Minhad Military Airbase > External- preparation, Road Base - parking areas and Roads near New Security preparation & Asphalt - Gate at Umm Nahd, Dubai. laying for Road & Parking.

76. 2003 Excavation, Sub grade -  For Parade ground, Road & Parking in Squadrom preparation, Road Base - H.Q. Hamza Bin Muthalib Military Camp, preparation & Asphalt - at Tawi Al Murah, Al Lussaily, Dubai. laying for Road & Parking. Asphalt done by M/S. Al Futtaim Tarmac.

77. 2003 Excavation, Formation -  For Al Minhad Military Airbase > Flight Hanger, preparation, Road Base - Roads & Parking area with Ms. Al Ahmdia Cont. preparation & Asphalt - at Umm Nahd, Dubai. 15

laying for Road & Parking. Asphalt done by M/S. Al Futtaim Tarmac.

78. 2003 Excavation, Formation -  For Central Fruit & Vegetable Market > Al Awir, preparation, Road Base - Truk loading & unloading area, Roads & Parking area. preparation & Asphalt - Asphalt done by M/S. Al Futtaim Tarmac. Laying .

79. 2003 Excavation, Formation -  For Al Minhad Military Airbase > Accomodation- preparation, Road Base - area of Australians & Canadians and Roads & preparation & Asphalt - Parking area with M/s. Modest Co. L.L.C. laying for Road & Parking. Asphalt done by M/S. Al Futtaim Tarmac.

80. 2004 Excavation, Sub grade -  For Parade ground, Road & Parking area in - preparation, Road Base - Tawi Al Murah, Military Camp at Al Lussaily. preparation, Kerb stone - Asphalt done by M/S. Al Futtaim Tarmac. fixing & Asphalt laying.

81. 2004 Excavation, Formation -  For Al Minhad Military Airbase > Helipad Area, preparation, Road Base - Roads & Parking area at Umm Nahd, Dubai. preparation, Kerb stone- Asphalt done by M/S. Al Futtaim Tarmac. fixing & Asphalt laying.

82. 2004 Excavation, Formation -  For NAFFCO > Jebel Ali Free Zone, in New preparation, Road Base - Storage Area, Roads & Car Parking area. preparation, Kerb stone- Wire Fencing done by M/S. Link ME LLC. fixing & Wire Fencing.

83. 2004 Excavation, Formation -  For Dubai New Modern School > Roads & preparation, Road Base - Parking area at Al Mizhar, Dubai. preparation, Kerb stone- Asphalt done by M/S. Bartawi Group of Co. fixing & Asphalt laying.

84. 2004 Excavation, Formation -  For Musallah Al Eid, Jumeriah > Road, Parking preparation, Road Base - area & Jogging area with M/s. Chicago, Dubai. preparation, Kerb stone- Asphalt by M/S. Al Futtaim Tarmac. fixing, Heel kerb fixing- 16

& Asphalt laying.

85. 2005 Excavation, Formation -  For Sheffield English School, Al Gusais. preparation, Road Base - Ground area & Parking area. preparation, Kerb stone- fixing, Heel kerb fixing.

86. 2005 Cutting, Filling, leveling-  For DAMAC Properties Co. LLC, Jumeirah. for buildings.

87. 2005 Earth work & Asphalt -  For JABEL ALI FREE ZONE AUTHORITY. work for Jabel Ali Port- JAFZA – DUBAI. Berth Expansion.

88. 2005 Earth work & Asphalt -  For NAFFCO, JABEL ALI FREE ZONE work for NAFFCO - JAFZA – DUBAI. Yard Expansion.

89. 2005 Cutting, filling, watering -  For WADE ADAMS CONTRACTING L.L.C. & compaction AT RAHMANIA AREA, SHARJAH

90. 2005 Cutting, filling, watering -  For AL NOUF AREA , SHARJAH & compaction

91. 2005 Excavation, Formation -  For Roads, Parking, Hangers & Helipad Area preparation, Road Base - Al Minhad Military Airbase, Umm Nahd, Dubai. preparation & Asphalt - Asphalt done by M/S. Al Futtaim Tarmac. laying for Road & Parking. 92. 2005 Reinstatement of Road -  For DUBAI MUNICIPALITY - PJ DS 148/4 works & Earth work ‘MAIN PUMPING STATION ‘Q’ PHASE 4’. 17

93. 2005 Excavation, Formation -  For Roads & Parking -- Road Base preparation, - TAWI AL MURAH - MILITARY CAMP, Kerb stone & Asphalt - AT AL LISSAILY, DUBAI. laying work.

94. 2006 Formation preparation -  For Roads & Parking -- Road Base preparation, - MW-LF-085-2004; MILITARY CAMP, Kerb stone & Asphalt - AT SHARJAH - MANAMA. laying work.

95. 2006 Formation preparation -  For Roads & Parking -- Road Base preparation, - MW-AF-222-2004; MILITARY CAMP, Kerb stone & Asphalt - AT AL MINHAD AIR BASE. laying work.

96. 2006 Excavation, Cartaway,-  For Wearhouse Yard -- Formation, Road Base,- GULF EXTRUSION ALUMINIUM FACTORY Preparation & Asphalt - AT JEBEL ALI, DUBAI. laying work.

97. 2006 Excavation, Cartaway,-  For Wearhouse Yard, Roads & Parking Area-- Formation, Road Base,- FOR DUBAI PIPE STORAGE FACTORY Preparation, Kerb stone- WITH ROSHAN CONSTRUCTION LLC. & Asphalt laying work. AT DUBAI INVESTMENT PARK Consultant : Orion

98. 2006 Excavation, Cartaway,-  For Wearhouse, Plant Yard, Roads & Parking Formation, Road Base - FOR JABEL ALI CEMENT FACTORY Preparation & Asphalt laying. Consultant : ORION

99. 2006 Excavation, Cartaway,-  For Wearhouse Yard, Roads & Parking Area--

18

Formation, Road Base - FOR GULF OASIS PROPERTY Preparation, Kerb stone- WITH ROSHAN CONSTRUCTION LLC. laying work. Consultant : CHAWLA

100. 2006 Reinstatement of Road -  For DUBAI MUNICIPALITY - PJ DS 117/2 works, Earth work & ‘MAIN PUMPING STATION ‘K’ PHASE 2’. Asphalt laying work.

101. 2006 Asphalt laying work  For Wearhouse Yard, Roads & Parking Area-- FOR LANDMARK GROUP WITH ROSHAN CONSTRUCTION LLC. Consultant : CHAWLA

102. 2006 Cutting, Filling, Formation,  For Arabian Ranches R/A Emirate road widening Road Base Preparation & FOR TAISEI CORPORATION Asphalt work for Roads WITH AL FUTTAIM TARMAC & parking area. Consultant : PARSONS

103. 2006 Cutting, Filling, Formation,  For Sheik. Hamdan Palace, Al Lissaily Road Base Preparation Near Endurance City. for Roads & parking area. Consultant : R T A

104. 2006 Cutting, Filling, Formation,  For Dubai Outlet Mall City & Complex Road Base Preparation, - FOR AL AHLI GROUP Kerb stone & Asphalt work WITH DUBAI LAND CO. LLC. For Roads & parking area. Consultant : ARENCO

105. 2007 Formation Preparation,,  For PALM JEBEL ALI Road Base Preparation, - WITH SAMSUNG CONTRACTING. Kerb stone & Asphalt work For Roads & parking area.

19

106. 2007 Formation Preparation,  For AL MINHAD AIRBASE, UMM NAHAD. Road Base Preparation, - & Asphalt work for the Roads & parking area.

107. 2007 Sub base Preparation &  For JUMEIRAH VILLAGE Entrance # 1 & 5 Road Base Preparation WITH M/S. DODSAL Pte LIMITED. For Roads & parking area.

108. 2007 Formation Preparation,  For M/S. EMIRATES INDUSTRIAL PANEL Road Base Preparation, - WITH ROSHAN CONSTRUCTION. Kerb stone & Asphalt work Consultant : ORION - DIP For Roads & parking area.

109. 2007 Excavation, Formation,  For M/S. MOHEBI LOGISTICS CENTRE Road Base Preparation, - WITH ROSHAN CONSTRUCTION. Kerb stone & Asphalt work Consultant : ORION -JAFZA For Roads & parking area.

110. 2008 Formation, Subgrade, Sub Base,  For M/S. FUEL FARM, JEBEL ALI - Road Base Preparation, - INTERNATIONAL AIRPORT >PHASE I Roads & parking area. WITH AMANA -JV- THERMO Asphalt Done by AL FUTTAIM TARMAC.

111. 2008 Formation, Subgrade, Sub Base  For M/S. MAMMUT BUILDING SYSTEMS Road Base Preparation & JEBEL ALI IND AREA # 599-176. Asphalt work for the Yard, WITH ROSHAN CONSTRUCTION. Roads & parking area. Consultant : MODEL ENGINEERING

112. 2008- Cutting, Filling, Formation,  For M/S. MOHD.IBRAHIM SAMIR TAYEB -2009 Sub grade, Sub Base, Road - 96 NOS. SHED ON PLOT # 598-1000 Base preparation & Asphalt- AT DUBAI INVESTMENT PARK work for the Yard, Roads &- WITH ROSHAN CONSTRUCTION. parking area. Consultant : MODEL ENGINEERING

113. 2009 Cutting, Filling, Formation,  For JUMEIRAH VILLAGE-III 20

Sub grade, Sub Base, Road - CIRCULAR PROJECT INFRASTRUCTURE Base preparation & Asphalt- AT JUMEIRAH VILLAGE work for 95 km Roads &- WITH DODSAL Pte Ltd. parking area. Consultant : Mouchel Parkman

114. 2010 Formation preparation,  For AL MINHAD AIRBASE Sub Base, Road Base- AUSTRALIAN F ACILITIES preparation & Asphalt- AT DUBAI – ALAIN ROAD work for the Yard &- WITH ROSHAN CONSTRUCTION. parking area.

115. 2007-2008-2009-2010-2011-2012  For JUMEIRAH VILLAGE-PHASE III- [NAKHEEL PROJECT ] WITH M/S. DODSAL Pte LIMITED.

Scope : Cutting, Filling, Formation Preparation, Sub Base Preparation, Sub Grade Preparation, Kerbstone fixing & Road Base Preparation for 95 kms Road Area. Asphalt done by M/s. Al Futtaim Tarmac.

116. 2008-2009-2010  For M/S. MAMMUT FACTORY FACILITY, DUBAI JEBEL ALI INDUSTRIAL AREA - PLOT # 599-176 WITH M/S. ROSHAN CONSTRUCTION LLC.

Scope : Cutting, Filling, Formation Preparation, Sub Base Preparation, Sub Grade Preparation, Road Base Preparation & Asphalt laying work for the inside Roads & Parking Area.

117. 2011 Formation preparation,  For AL MINHAD AIRBASE Sub Base, Road Base- F ACILITIES & Asphalt- AT DUBAI – ALAIN ROAD work for the Road &- WITH MODEST CO NSTRUCTION. parking area.

118. 2012 Cutting, Filling, Formation,  For AL GARMET FACTORY preparation, Sub Base, AT DUBAI FREEZONE (JAFZA) 21

Road Base preparation & WITH AL KITHIBI CO NSTRUCTION. Asphalt work for the Road &- parking area.

119. 2012 Formation Preparation, Sub Base,  For ASCON CONSTRUCTION Road Base & Asphalt. AT DUBAI LIFESTYLE CITY WITH RELIABLE STAR CONSTUCTION.

120. 2013 Cutting, Filling, Formation,  For AL MINHAD AIRBASE preparation Sub Base, Road AUSTRALIAN FACILITIES Base-preparation & Asphalt- AT DUBAI – ALAIN ROAD work for the Road &- WITH MODEST CONSTRUCTION. parking area.

121. 2013 Backfilling, Formation,  For LARSEN AND TOUBRO Road Base Preparation UMM AL QUWAIN WITH RELIABLE STAR CON STUCTION.

122. 2013 Cutting, Filling, Formation,  For AL MINHAD AIRBASE Preparation, Road Base Preparation AUSTRALIAN FACILITIES AT DUBAI – ALAIN ROAD WITH MODEST CONSTRUCTION.

123. 2014 Cutting, Filling, Formation,  For AL HABTHOOR (STORAGE YARD) Preparation, 200mm Thick Road DUBAI INDUSTRIAL CITY (DIC) Base Preparation And Interlock Laying. WITH CANADIAN-GULF (AREA : 260,000Sq.m) CONSTRUCTION COMPANY.L.L.C.

124. 2014 Cutting, Filling, Formation,  For ASECO (Phase I) Preparation, 150mm Thick Road DUBAI INDUSTRIAL CITY (DIC) Base Preparation And Interlock Laying. AT JEBAL ALI WI TH HONEST CONSTRUCTION COMPANY.L.L.C.

125. 2014 Cutting, Filling, Formation,  For BJVJ CONTRACTING Preparation, 200mm Thick Road DUBAI WORLD CENTRAL(DWC) Base Preparation And Interlock Laying.

126. 2014-15 Cutting, Filling,  For GORICA (Phase I)

22

Formation, Preparation, 150mm DUBAI INDUSTRIAL CITY (DIC) Thick Road Base Preparation And AT JEBAL ALI WI TH HONEST Interlock Laying. CONSTRUCTION COMPANY.L.L.C.

127. 2015 Cutting, Filling,  For Leminar A/C Industries L.L.C. Formation, Preparation, 150mm DUBAI INDUSTRIAL CITY (DIC) Thick Road Base Preparation And AT JEBAL ALI WI TH HONEST Interlock Laying. CONSTRUCTION COMPANY.L.L.C.

128. 2015 (Continuation) Cutting, Filling,  For GORICA (Phase II) Formation, Preparation, 150mm DUBAI INDUSTRIAL CITY (DIC) Thick Road Base Preparation And AT JEBAL ALI WI TH HONEST Interlock Laying. CONSTRUCTION COMPANY.L.L.C.

129. 2015 (Continuation) Cutting, Filling,  For ASECO (Phase II) Formation, Preparation, 150mm DUBAI INDUSTRIAL CITY (DIC) Thick Road Preparation And AT JEBAL ALI WI TH HONEST Interlock Laying. CONSTRUCTION COMPANY.L.L.C.

130. 2015 Cutting, Filling, Formation,  For K.M.TRADING Preparation, 200mm Thick Road DUBAI INDUSTRIAL CITY (DIC) Base Preparation And Interlock Laying. AT JEBAL ALI WI TH PROFILES RHF.L.L.C.

131. 2015 Cutting, Filling, Formation,  For NEW EAST TRADE, JAFZA Preparation, 200mm Thick Road AT JEBAL ALI WI TH EAJCO Base Preparation And Interlock Laying. CONSTRUCTION. L.L.C.

132. 2016 Cutting, Filling, Formation,  For ELEGENT INDUSTRIES Preparation, 200mm Thick Road DUBAI INDUSTRIAL CITY (DIC) Base Preparation And Interlock Laying. AT JEBAL ALI WITH AL BHARAT CONTRACTING.L.L.C.

133. 2016 Cutting, Filling, Formation,  For Three Star Transport.L.L.C. (Chemical Preparation, 200mm Thick Road Factory), JAFZA AT JEBAL ALI WITH Base Preparation And Interlock Laying. WITH HONEST CONSTRUCTION COMPANY.L.L.C.

134. 2016 Filling, Formation Preparation,  For Dubai Labour Supply Company JAFZA WITH 150mm Thick Road Base & 80mm HONEST CONSTRUCTION Thick Interlock with 50mm Thick COMPANY.L. L.C Bedding Sand 23

135. 2017 Cutting, Filling, Formation,  For Ware house,Service Center,Retail Preparation, 150mm Thick Road Store,Receiving Bay,Final Inspection Bay & Base Preparation And Interlock Laying. Yard at 369-322 at AL QUOZ WITH AL BHARATH CONTRACTING L.L.C

136. 2017 Cutting, Filling, Formation,  For HIDAYATH Preparation, 150mm Thick Road DUBAI INDUSTRIAL CITY (DIC) Base Preparation And Interlock Laying. AT JEBAL ALI WITH AL BHARAT CONTRACTING.L.L.C.

137. 2017 Earth work, Interlock tile Laying &  for Technopark for Project No. 232 G+M Kerbstone Laying Warehouse, Jebel Ali, Dubai with Honest Contruction L.L.C

138. 2017 Roadbase Preparation, MC Spray and  for Standard Carpet,DIC, Dubai, U.A.E 70mm thick Asphalt Supply & Laying with Amana Steel Building Contracting L.L.C

139. 2017 80mm Interlock Laying  for Project DJ-218-Warehouses Pahse 3 For M/s Dubai Industrial City Authority at Dubai Industrial City, with Amana Steel Building Contracting L.L.C

140. 2017 80mm Interlock Laying  for Project DJ-224-for ISUZU Project Jabel ali Port, Dubai, U.A.E with Amana Steel Building Contracting L.L.C

141. 2017 Supply & Installation of Rectangular  for Dubai Autism Center Project Al Garhoud, Dubai Paves With Canadian Gulf Construction L.L.C.

142. 2017 Formation Preparation, Supply  for A-10 Project : Construction of & Laying of 150mm Road base Hydroponic Farm Sharjah, U.A.E With Amieton Technical Services L.L.C

143. 2017 Earth Work, Road Base and Kerbstone  for BLUE WATER BOARD WALK Project Jumairah, Dubai UAE With Jupiter Contracting 24

144. 2017 Earth Work, Road Base and Asphalt work  For Al Minhad Airbase for USA car wash Area, Dubai with Modest Company

145. 2017 Asphalt & Road Base Work  For UPC Ware House at DIC with HONEST CONSTRUCTION L.L.C

146. 2018 Supply & Laying of Road Base & Asphalt Works  For the project global Shipping Logistics -Ph2 At Dubai Industrial Park with Al Amana Steel Building Contracting L.L.C

147. 2018 150mm thick Subbase Prepation  For the Project Construction of ENOC Station Site 1064 at Warsan Third Dubai with Beaver Gulf Contracting L.L.C

148. 2019 Excavation & Backfilling work  For Project Improvement of Al Shindagha Corridor Phase 2C Main Bridge with Jupiter Contracting

149. 2019 Temporary Traffic Management External Roads  For City Centre at Al Zahia, Sharjah with Road Tiger Road Maintenance L.L.C

150. 2019 Road Base, Interlock & Kerbstone Work  For the Project Proposed Gr. Only Office 55000M2 Area BuildingCrane Transit Sheds,Open Yard and Ancillary Building on Plot No:5310950 at DIC with Sea Shore Constructions L.L.C

151. 2019 Excavation, pipe laying & Backfilling Work  for Project Ajman Sewerage System 729 Villas Development At Muntazy with Jupiter Contracting

152. 2020 Asphalt Work  for the Project (G+3) Labour Accommodation on plot no.533-3499, Dubai, UAE with Gulf Asia Contracting L.L.C

25

2020 Running Projects

.

1. 2020 Supply & Laying of 250mm thick Road Base  Construction of Proposed Addition of, Jetty Pipeline, Tanker Loading Gantry, Admin Building, Water Tank, Pump Room, Control Room, and Other ServicesFor Liquid Tank FarmOn Plot no. B049F01 at Jebel Ali Free Zone, Dubai, U.A.E. For M/s Tristar Transport with Honest Construction L.L.C

2. 2020 Interlock Work & Kerbstone Works  for the Project Proposed warehouse Building at Al Quoz-1 Plot No:3640140 With Al Bharath Contracting L.L.C

26

INCOMING projects

1) Asphlat Work  for the Project :-Proposed Visiter Center at Mohammad Bin Rashid Al Maktoum

Solar Park Phase-IV – Al Qudra Road ,Dubai with Gayathi Construction L.L.C

27

PLANT & MACHINERY

SHOVEL 950 F  2 no.

GRADER 14 H  1 no.

GRADER 14G  1 no

ROLLER 211 D  2 nos.

WATER TANKER  2 nos.

PLATE COMPACTOR  3 nos.

SERVICE VEHICLE  1 nos.

K.G. YOGIDAS MANAGING DIRECTOR