Einstein BX Building Controller User's Guide

Total Page:16

File Type:pdf, Size:1020Kb

Einstein BX Building Controller User's Guide 026-1602 Rev 3 4-11-01 Einstein BX Building Controller U s e r ’ s G u i d e Computer Process Controls, Inc. 1640 Airport Road Suite #104 Kennesaw, GA 31044 Phone (770) 425-2724 Fax (770) 425-9319 ALL RIGHTS RESERVED The information contained in this manual has been carefully checked and is believed to be accurate. However, Computer Process Controls, Inc. assumes no responsibility for any inaccuracies that may be contained herein. In no event will Computer Process Controls, Inc. be liable for any direct, indirect, special, incidental, or consequential damages resulting from any defect or omission in this manual, even if advised of the possibility of such damages. In the interest of continued product development, Com- puter Process Controls, Inc. reserves the right to make improvements to this manual, and the products described herein, at any time without notice or obligation. Revision History 026-1602 Rev 3 4-11-01 • Removed support for old Lighting Control and RT-100 applications • Added documentation of Enhanced Lighting application • Added ARTC graphic illustration guide • Added ARTC board numbering instructions • "Cold Reset" and "Cold Reset Button" now called "Clean Out" and "Clean Out Button." • Split "Quick Start" section into full-sized chapters on AHU, Zone Control, ARTC, Time Scheduling, and Enhanced Lighting • Added instructions for using Holiday Schedules • SP1, SP2, SP3, and SP4, previously used as days of the week for holiday dates, now appear as HD1, HD2, HD3, and HD4. • Added "In vs. Out Enthalpy" strategy of economization control to AHUs and Zone Control. • "Average KW" in Power Monitoring now means the average of all KW samples taken in a one-minute window. • Added section about input and output alarm setup. • Added warning to power down Einstein before plugging internal modem into the PC-104 slot • Appendix C Network ID Worksheets changed to 8-1/2" by 11" format (were 11x17 fold-outs). • Included index Revision History • v Table of Contents REVISION HISTORY ................................................................................................................................................ I-V 1 INTRODUCTION...................................................................................................................................................... 1-1 1.1 EINSTEIN BX MODELS .............................................................................................................................................. 1-1 1.2 THE EINSTEIN RX...................................................................................................................................................... 1-1 1.3 INTRODUCTION TO EINSTEIN NETWORKING.............................................................................................................. 1-1 1.3.1 The Einstein BX’s I/O Network.......................................................................................................................... 1-1 1.3.2 The Einstein BX’s Echelon Lonworks Network ................................................................................................. 1-2 1.3.3 Interconnection With Other Einsteins................................................................................................................ 1-3 1.4 EINSTEIN DOCUMENTATION ...................................................................................................................................... 1-3 2 HARDWARE OVERVIEW...................................................................................................................................... 2-1 2.1 EINSTEIN PROCESSOR ................................................................................................................................................ 2-1 2.2 ASSOCIATED CIRCUIT BOARDS ................................................................................................................................. 2-1 2.2.1 16AI.................................................................................................................................................................... 2-1 2.2.2 The 8RO Relay Board ........................................................................................................................................ 2-2 2.2.3 4AO .................................................................................................................................................................... 2-2 2.2.4 8IO Combination Input/Output Board............................................................................................................... 2-2 2.2.5 8DO Digital Output Board and PMAC II Anti-Sweat Controller ..................................................................... 2-3 2.2.6 Advanced Rooftop Controller ............................................................................................................................ 2-3 2.3 THE ECHELON®NETWORK....................................................................................................................................... 2-4 2.3.1 The 16AIe ........................................................................................................................................................... 2-4 2.3.2 The 8ROe............................................................................................................................................................ 2-4 3 HARDWARE MOUNTING...................................................................................................................................... 3-1 3.1 THE EINSTEIN ............................................................................................................................................................ 3-1 3.1.1 Location ............................................................................................................................................................. 3-1 3.1.2 Mounting ............................................................................................................................................................ 3-1 3.1.2.1 Hinged Box .............................................................................................................................................................. 3-1 3.1.2.2 Flush Mount ............................................................................................................................................................. 3-1 3.2 MOUNTING I/O BOARDS............................................................................................................................................ 3-1 3.2.1 Single/Double Enclosure Mounting for I/O Boards ......................................................................................... 3-1 3.2.2 8IO/ARTC Weather Resistant Enclosure Mounting........................................................................................... 3-2 3.2.3 16AI, 8RO, 8DO, and 4AO Boards Without Enclosures ................................................................................... 3-2 3.2.3.1 8IOs/ARTCs Without Enclosures Mounting........................................................................................................... 3-3 3.2.3.2 4AO Boards Without Enclosures Mounting............................................................................................................ 3-3 3.3 MOUNTING THE INTERNAL MODEM .......................................................................................................................... 3-3 3.4 MOUNTING REPEATERS ............................................................................................................................................. 3-4 3.4.1 Mounting for Internal Repeaters........................................................................................................................ 3-4 3.4.2 Mounting for External Repeaters....................................................................................................................... 3-4 3.5 SENSORS AND TRANSDUCERS.................................................................................................................................... 3-4 3.5.1 Inside Temperature Sensor ................................................................................................................................ 3-4 3.5.1.1 Location ................................................................................................................................................................... 3-4 3.5.1.2 Mounting.................................................................................................................................................................. 3-4 3.5.2 Outside (Ambient) Temperature Sensor............................................................................................................. 3-5 3.5.2.1 Location ................................................................................................................................................................... 3-5 3.5.2.2 Mounting.................................................................................................................................................................. 3-5 3.5.3 Insertion Temperature Probe............................................................................................................................. 3-5 3.5.3.1 Location ..................................................................................................................................................................
Recommended publications
  • RP1008-Climatemaster-Residential-Accessories-Geothermal-Heating-And-Cooling-Product
    ACCESSORIES UNIT AND LOOP ACCESSORIES Accessories Table of Contents Accessory Description .......................................................................3 Loop Accessories ................................................................................18 Accessory Compatability ..................................................................4 Extra Large Loop Accessories .....................................................20 Thermostats and Service Tools ......................................................5 Installation Accessories ....................................................................21 AWC99B01 iGate® Connect, Two-Way Geothermal Loop Pipe ...................................................................22 Communicating Thermostat ............................................................6 Geothermal Fittings ...........................................................................23 ATU3203 iGate® Communicating Thermostat ....................7 Socket Fusion Tools............................................................................25 ATP32U03 Thermostat ......................................................................9 Service Tools ..........................................................................................26 ATP32U04 Thermostat ...................................................................11 Service Parts Kit ..................................................................................26 ATA21U01 Thermostat ...................................................................13
    [Show full text]
  • HVAC TERMINOLOGY.Pdf
    HVAC TERMINOLOGY Abatement Reduction or removal of a contaminant. Absolute Humidity It is the ratio of the mass of water vaporto the unit volume of moist air represented in grams per cubic foot (g/ft3). Absolute Zero Temperature at which all molecular motion ceases (-460 F. and -273 C.). Absorption Refrigerator Refrigerator which creates low temperature by using the cooling effect formed when a refrigerant is absorbed by chemical substance. ACCA Air Conditioning Contractors of America - a leading HVAC/R Association. Acceptable indoor air quality Indoor air that does not contain harmful concentrations of contaminants; air with which at least 80% of building occupants do not express dissatisfaction. Accumulator Storage tank which receives liquid refrigerant from evaporator and prevents it from flowing into suction line before vaporizing. Tank on the suction side of a system that holds excess refrigerant to prevent slugging the compressor with liquid. ACH Air Changes Per Hour. The number of times that air in a house is completely replaced with outdoor air in one hour. Acid Condition In System Condition in which refrigerant or oil in system is mixed with fluids that are acid in nature. ACR Tubing Tubing used in air conditioning and refrigeration. Ends are sealed to keep tubing clean and dry. Activated Carbon Specially processed carbon used as a filter drier ; commonly used to clean air. Actuator That portion of a regulating valve which converts mechanical fluid, thermal energy or insulation energy into mechanical motion to open or close the valve seats. Adiabatic Compression Compressing refrigerant gas without removing or adding heat. Adjustable Grille A grille with linear blades which can be adjusted to vary the direction of the discharged air.
    [Show full text]
  • Dr. Ben's Solar Hot Water Systems Install
    Dr. Ben’s Solar Hot Water Systems Installation Manual By Ben Gravely, PhD Holocene Technologies 1241 Wicker Drive Raleigh, NC 27604 (c) 2012 2 Table of Contents 1. Planning the Installation 1.1 Site Analysis 1.2 Collector Tilt 1.3 Materials 2. Tank Installation 3. Collector Installation and Controls 3.1 Frame and Collector Mounting 3.2 Collector Piping 3.3 Pipe Insulation 3.4 Solar Controls and Wiring 3.5 Collector System Startup 4. Domestic Hot Water 4.1 Piping 4.2 Re-circulator DHW Controls 4.3 DHW System Startup 5. Space Heating 5.1 Forced Air Systems 5.1.1 Solar Controls for Gas/Oil Furnaces 5.1.2 Solar Controls for Heat Pumps (Reverse on Cooling) 5.1.3 Solar Controls for Heat Pumps (Reverse on Heating) 5.1.4 Space Heating Startup and Test 5.2 Radiant Slab Systems 5.3 Radiant Baseboard Systems 6. Pool/Spa 6.1 Pool/Spa Piping 6.2 Pool/Spa Controls 6.3 Pool Startup 7. Manually Fired Wood/Coal Boilers 7.1 Boiler Installation 7.2 Boiler Piping 7.3 Boiler Controls 8. Troubleshooting 8.1 Collector System 8.2 Differential (delta-T) Controllers 8.3 Space Heating System 8.4 Pumps About the Author Holocene Technologies © 2012 3 1. Planning the Installation This manual was written to provide a straight forward procedure for the installation of solar hot water systems. As with any project, a few minutes of planning will save hours of fixing. 1.1 Site Analysis Measure the angle of the collector mounting surface from south with a compass.
    [Show full text]
  • Maintenance Items N475HM
    02-Jul-2020 Maintenance Items N475HM Make & Model (Serial) Operator Date Hours Landings BEECHCRAFT HAWKER 800XP (258451) Business Jet Access 01-Jul-2020 3997.30 2744 Major Components Component Model (Serial) Hours Cycles Engine 1 TFE731-5BR-1H (P-107444) 3840.90 2656.00 Engine 2 TFE731-5BR-1H (P-107443) 3890.20 2680.00 APU 0 GTCP36-150 (P-522) 3984.00 0.00 ATA / Type / Group Description Compliance Intervals Tolerance TSN/TSO Next Due Remaining 01 1001 INSPECT AIRCRAFT KEY STORAGE UNIT FOR LOCATION AND SECURITY 08-JUN-2020 M: 6 31-DEC-2020 M: 5 D: 29 Airframe Work Order H: 3990.80 INSPECTION Number L: 2741 #2263 June 2020 04 0010 AIRCRAFT PAINT 29-NOV-1999 Airframe H: 0.00 INSPECTION #299 04 0015 AIRCRAFT INTERIOR 29-NOV-1999 Airframe H: 0.00 INSPECTION #1532 04 0500 LUBRICATE ALL AIRCRAFT LOCKS TO INCLUDE MAIN ENTRANCE DOOR AND SERVICE 17-MAR-2020 M: 4 M: 1 31-JUL-2020 M: 0 D: 29 Airframe PANELS H: 3975.50 INSPECTION Work Order Man Hours L: 2726 #483 Number July 2020 0.50 04 100 AIRCRAFT REGISTRATION-FAR 47.40 29-NOV-2019 M: 36 M: 4 30-NOV-2022 M: 28 D: 28 Airframe H: 3962.70 INSPECTION L: 2714 #1803 04 200 REDUCED VERTICAL SEPARATION MINIMUM (RVSM) MONITORING REQUIREMENTS LAST 21-OCT-2019 M: 24 21-OCT-2021 M: 15 D: 19 Airframe FLIGHT OVER AGHME H: 3883.60 INSPECTION L: 2669 #1593 05 0001 PRE-FLIGHT INSPECTION 29-NOV-1999 Airframe H: 0.00 INSPECTION #1675 Maintenance Items Copyright © 2020 Flightdocs, Inc.
    [Show full text]
  • (12) United States Patent (10) Patent No.: US 9,267,713 B2 Zamir (45) Date of Patent: Feb
    US009267713B2 (12) United States Patent (10) Patent No.: US 9,267,713 B2 Zamir (45) Date of Patent: Feb. 23, 2016 (54) TEMPERATURE CONTROL SYSTEM USPC ......................................... 62/235.1; 165/48.2 See application file for complete search history. (75) Inventor: Ofri Zamir, Hogla (IL) (73) Assignee: DZSOLAR LTD, Richmond (GB) (56) References Cited (*) Notice: Subject to any disclaimer, the term of this U.S. PATENT DOCUMENTS patent is extended or adjusted under 35 4.256,475 A 3, 1981 Schafer ........................ 62/235.1 U.S.C. 154(b) by 821 days. 4,285,208 A * 8/1981 Takeshita et al. ............... 62/141 5,177,977 A 1/1993 Larsen (21) Appl. No.: 13/502.923 5,261,251 A * 1 1/1993 Galiyano ..................... 62,176.6 (Continued) (22) PCT Filed: Oct. 20, 2010 FOREIGN PATENT DOCUMENTS (86). PCT No.: PCT/L2O1O/OOO863 AU 2011 100888 A4 2, 2012 S371 (c)(1), CN 26795.62 Y 2, 2005 (2), (4) Date: Apr. 19, 2012 (Continued) (87) PCT Pub. No.: WO2011/048594 OTHER PUBLICATIONS PCT Pub. Date: Apr. 28, 2011 The International Search Report for International Application No. (65) Prior Publication Data PCT/IL2010/000863, three pages, mailed May 12, 2011. US 2012/0204587 A1 Aug. 16, 2012 O O Primary Examiner — Ljiljana Ciric Related U.S. Application Data Assistant Examiner — Alexis Cox (60) Provisional application No. 61/253,573, filed on Oct. (74) Attorney, Agent, or Firm — Vorys, Sater, Seymour & 21, 2009. Pease LLP (51) Int. Cl. F25B 27/00 (2006.01) (57) ABSTRACT F25B I3/00 (2006.01) A temperature control system, including a closed refrigerant (52) U.S.
    [Show full text]
  • Do-It-Yourself HVAC Apprentice Contest Basic Guidelines for Planning an Apprentice Contest
    PHCC Educational Foundation Do-It-Yourself HVAC Apprentice Contest Basic Guidelines for Planning an Apprentice Contest 1. Find volunteers! Members, teachers, technicians and inspectors all make good volunteers. 2. Designate a chairman or coordinator to run the contest. The role of chairman or coordinator can be done by anyone who is willing to volunteer and dedicate the time it takes to plan and administer the contest. He or she should have some HVAC background as well as the ability to answer technical questions about the contest. The chairman/coordinator is responsible for delegating all necessary job tasks. His/her decisions are final. Normally, the chairman/coordinator is the state or local apprenticeship committee chairman or an instructor at an apprentice school. 3. Set up a timeline or schedule of events. 4. Design the test and/or contest you will use. A sample contest has been provided at the end of this book. 5. Make a list of contest rules for the apprentices to follow. Provide this information with the registration form. 6. Make an agenda for the apprentices to follow. Include registration deadlines, time to arrive at the contest site and time of the awards presentation. 7. Find students to compete. Ideally, they should be PHCC apprentices and/or SkillsUSA students. You can have as few as three and as many as you feel you can handle. 8. Find a location for the contest. Some suggestions include outside under a tent, inside an exhibition hall, in a member’s shop or at the apprentice school. If you use an exhibition hall, please note that you may have to obtain a permit from the local fire marshal.
    [Show full text]
  • About Wiring Color
    About Wiring Color There is no official industry standard for wiring colors. However, the majority of manufacturers follow the common practices for installation. The following information is strictly for reference. Please be advised that the technician who did the previous installation of the thermostat may not incorporate conventional color coding for various reasons. Red for the R terminal. The R terminal is the power. This comes from the transformer usually located in the air handler for split systems but you may find the transformer in the condensing unit. For this reason, we advise turning off the power before adjusting the thermostat's wiring. Red for the RH terminal. RH – The RH terminal is designated for the power for heating when two transformers are used. See RC below for an explanation for the cooling. It should be noted that a jumper can be installed between RC and RH for a heating and cooling system equipped with a single transformer. It should be noted that a jumper wire can be installed between RC and RH for a heating and cooling system equipped with a single transformer. Red for the RC terminal. The RC terminal is designated to the cooling power source. Some HVAC systems consist of two transformers, one for cooling and the other for heating. In this case the power from the transformer in the air conditioning system would go to the thermostat terminal RC. It should be noted that a jumper wire can be installed between RC and RH for a heating and cooling system equipped with a single transformer.
    [Show full text]
  • Iii I 1 111.11111 Ii 111111
    THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS 345 E. 47th St., New York, N.Y. 10017 , k97-AA-30 kr The Society shall not be responsible for statements or opinions achrancedin papers or cricussion at meetings of the Society or of Its Divisions or. Sections, or printed In its publications. Discussion is printed only it the paper is published in'an ASME Journal. Authorization to photocopy , , material for Internal or personal use under circumstance not falling within the fair use provisions's% the Copyright Act Is granted by ASME to libraries and other users registered with the Copyright Clearance Center (CCC)Transactional Reporting Service provided that the base fee of $OSO , per page is paid directly to the CCC. 27 Congress Street. Salem MA 01970. Requests for special permission or bulk reproduction shotdd be addressed to the ASME Technical Pubishing Department Copyright *1997 by ASME All Rights Reserved . Printed in U.S.A Heat Exchanger Design And System Balance Of Downloaded from http://asmedigitalcollection.asme.org/GT/proceedings-pdf/TA1997/78675/V001T13A006/4460073/v001t13a006-97-aa-030.pdf by guest on 01 October 2021 An Air Source Heat Pump/Chiller Using Brazed Plate Heat Exchangers. III I 1 111.11111 II 111111 By Changiz Tolouee (M.Sc), Member of International Institute of Refrigeration, Member of Australian Institute of Refrigeration, Air Conditioning and Heating. ABSTRACT Air Source heat pump/chiller is used to provide chilled water for cooling and hot water for heating purposes. This is one investment for both applications with no requirement for boiler and fuel with the advantage of heat pump efficiency.
    [Show full text]
  • Console Water Source Heat Pumps R-410A Models MHC Standard Range & MHW Geothermal Range Flat Top & Slope Top – Unit Sizes 007 – 018
    Installation & Maintenance Data IM 985-2 Group: WSHP Part Number: 669479302 Date: November 2011 Console Water Source Heat Pumps R-410A Models MHC Standard Range & MHW Geothermal Range Flat Top & Slope Top – Unit Sizes 007 – 018 Slope Top Unit Flat Top Unit ® ©2011 McQuay International Contents Model Nomenclature ...........................................................3 Start-up ...............................................................................25 Receiving and Storage ........................................................4 Cooling or Heating – Manual Operation ........................25 Pre-Installation.....................................................................4 Additional Accessories .....................................................25 General ...........................................................................25 Unit Installation (Recommended) ......................................5 Alternate Unit Installation ..................................................7 Wall-Mounted Programmable Electronic Thermostat (Using Provided Brackets) ................................................7 (P/N 668811301) ............................................................... 25 Non-Programmable Electronic Thermostat ...................26 Piping ....................................................................................8 (P/N 668811201) .............................................................26 Water Connections ..............................................................9 Programmable Electronic
    [Show full text]
  • Heating, Ventilation, Air-Conditioning, and Refrigeration. Occupational Competency Analysis Profile. INSTITUTION Ohio State Univ., Columbus
    DOCUMENT RESUME ED 488 875 CE 070 293 TITLE Heating, Ventilation, Air-Conditioning, and Refrigeration. Occupational Competency Analysis Profile. INSTITUTION Ohio State Univ., Columbus. Vocational Instructional Materials Lab. SPONS AGENCY Ohio State Dept. of Education, Columbus. Div. of Vocational and Adult Education. PUB DATE 95 NOTE 80p.; For the 1992 edition, see ED 345 074. For other related profilos, see CE 070 281-294. AVAILABLE FROMVocational Instructional Materials Lab, Center on Education and Training for Employment, 1900 Kenny Road, Columbus, OH 43210-1090 (order no. OCAP-07R: $10). PUB TYPE Guides - Classroom Use - Teaching Guides (For Teacher) (052) EDRS PRICE MF01/PC04 Plus Postage. DESCRIPTORS Air Conditioning; Air Conditioning Equipment; Behavioral Objectives; Career Development; *Competence; Competency Based Education; *Employment Potential; Entry Workers; *Heating; *Job Skills; *Occupational Information; Postsecondary Education; *Refrigeration; Refrigeration Mechanics; Secondary Education; Ventilation IDENTIFIERS DACUM Process; Ohio ABSTRACT This Occupational Competency Analysis Profile (OCAP) contains a competency list verified by expert workers and developed through a modified DACUM (Developing a Curriculum) involving business, industry, labor, and community agency representatives from This OCAP identifies the occupational, academic, and employability skills (competencies) needed to enter building climate control occupations. The competencies are clustered into 12 units that cover the following topics: fundamental concepts
    [Show full text]
  • Air-Source Heat Pumps
    YOUR GUIDE TO Air-Source Heat Pumps AIR-SOURCE HEAT PUMPS: Four Reasons to Switch 1 2 3 4 LOWER GREENHOUSE COST ALL-IN-ONE VERSATILE GAS EMISSIONS COMPETITIVE COMFORT Air-source heat pumps are efficient heating and cooling systems that can keep your home at a comfortable temperature all year round. Clean Energy Lives Here MASSCEC.COM/GOCLEAN Ⓡ TABLE OF CONTENTS Air-Source Heat Pumps (ASHP) Technology Overview 3 Are ASHPs a Good Fit for My Home? 8 Case Studies 9 Benefits of ASHPs 10 Costs 11 Incentives & Financing 12 Efficiency First 13 Making the Switch 14 How Can I Prepare for an ASHP Installation? 15 Questions to Ask Your Installer 17 Getting the Most From Your New System 22 2 Air-Source Heat Pumps (ASHP) Technology Overview Air-Source Heat Pumps are heating and cooling systems that move heat into a home in the winter and draw heat out of the home in the summer. Instead of burning fossil fuels, they operate on the same principle as your refrigerator: using a refrigerant cycle, powered by electricity, to move heat and to keep your home at a comfortable temperature year round. They are much more efficient than electric resistance (electric baseboard) heating and also provide highly efficient air conditioning. Outdoor Unit Indoor Unit Air-source heat pump systems feature an outdoor unit (containing a compressor, reversing valve, heat exchanger and expansion device) connected to one or more indoor units by small refrigerant piping. The refrigerant is a substance with properties that enable it to easily absorb and release heat.
    [Show full text]
  • Technology Review CSU DECARBONIZATION FRAMEWORK TASK 4: TECHNOLOGY REVIEW TABLE of CONTENTS SECTION 4.1: Introduction
    CSU Office of the Chancellor CSU Decarbonization Framework: Technology Review CSU DECARBONIZATION FRAMEWORK TASK 4: TECHNOLOGY REVIEW TABLE OF CONTENTS SECTION 4.1: Introduction ........................................................................................................................ 3 SECTION 4.2: Space Heating Technologies .............................................................................................. 4 4.2.1 Heat Pump Overview .................................................................................................................. 6 4.2.2 Hydronic Heat Pumps ................................................................................................................. 7 Air-to-Water Heat Pump (AWHP)............................................................................................................ 7 Water-to-Water Heat Pump (WWHP) .................................................................................................... 13 4.2.3 Non-Hydronic Heat Pumps ....................................................................................................... 21 Water source heat pump (WSHP)......................................................................................................... 21 Air-to-Air Heat Pump ............................................................................................................................ 25 Variable Refrigerant Flow (VRF/VRV) .................................................................................................... 27
    [Show full text]