171532 – Site for a Mixed Use Development I
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Selected Problems in Railway Vehicle Dynamics Related to Running Safety
THE ARCHIVES OF TRANSPORT ISSN (print): 0866-9546 Volume 31, Issue 3, 2014 e-ISSN (online): 2300-8830 DOI: 10.5604/08669546.1146984 SELECTED PROBLEMS IN RAILWAY VEHICLE DYNAMICS RELATED TO RUNNING SAFETY Ewa Kardas-Cinal Warsaw University of Technology, Faculty of Transport, Warsaw, Poland e-mail: [email protected] Abstract: The paper includes a short review of selected problems in railway vehicle-track system dynamics which are related to the running safety. Different criteria used in assessment of the running safety are presented according to the standards which are in force in Europe and other countries. Investigations of relevant dynamic phenomena, including the mechanism of railway vehicle derailment, and the resulting modifications of the running safety criteria are also discussed. Key words: railway vehicle, dynamics, running safety, derailment 1. Introduction and a great development in the field of modeling of Among the first problems that have emerged in the the railway vehicle-track systems and simulations early development of the railways was guidance of of their motion, remain valid and are still used in the railway vehicle along the track and the the analysis of the dynamics of such systems. associated excessive wear of wheel flanges. Solution to both problems was achieved in the 2. Investigations of railway vehicle dynamics second and third decades of the nineteenth century The first realistic model of railway vehicle by the introduction of a conical wheel tread and a dynamics was proposed by Frederick W. Carter – a clearance between wheel flange and the rail head. British engineer who graduated in mathematics at This was primarily the result of empirical the University of Cambridge. -
LDHS Yearbook1415 14May15
Linton and District History Society 2014 -2015 Yearbook Published 14th May 2015 by the Linton and District History Society herefordshire LINTON & DISTRICT HISTORY SOCIETY Linton and District History Society 2014 -2015 Yearbook CONTENTS Chairman’s Introduction 1 Chapter 1 Retrospect on Programme for 2014-15: The Newsletters 2 Chapter 2 2015 Founders Lecture: Margaret of Anjou – John Reid 60 Chapter 3 2014 Chairman’s Lecture: Linton Life in 1914 – Fiona Morrison 62 Chapter 4 Lest We Forget – Roger Davies 78 Chapter 5 Anniversaries in 2015 ed. Richard Hoare 112 Chapter 6 Linton and District History Society: Information 124 LINTON & DISTRICT HISTORY SOCIETY 2014-2015 YEARBOOK CHAIRMAN’S INTRODUCTION Chairman’s Introduction It gives me great pleasure to be part of the launch of a new venture for the Linton and District History Society – the Yearbook. The LDHS was founded in 1983. Its purpose is to host a lecture and fieldwork programme on historical topics which extends from the local to the international. The LDHS also provides a forum for local research and record keeping. The aim of the Yearbook is to celebrate what we have achieved over the previous year. It gives me an opportunity to thank all the people who work so willingly to make the enjoyment of History part of the community life of Linton and the area around it. I hope you enjoy reading about the society and all its activities. If you wish to join us, you would be very welcome. Fiona Morison Chairman Linton and District History Society . April 2015. LINTON & DISTRICT HISTORY SOCIETY page 1 of 128 2014-2015 YEARBOOK CHAPTER 1 NEWSLETTERS Chapter 1 Retrospect on Programme for 2014-15 The Newsletters LINTON & DISTRICT HISTORY SOCIETY NEWSLETTER Number: 1 23rd September 2014 In many ways, the last week has been momentous in history for us all with the Scottish referendum. -
Review and Summary of Computer Programs for Railway Vehicle Dynamics (Final Report), 1981
9( <85 W f Review and Sum m ary of U.S. D epartm ent of Transportation Computer Programs for Federal Railroad Administration Railway Vehicle Dynam ics Office of Research and Development Washington, D.C. 20590 FRA/ORD-81/17 February 1981 Document is available to the U.S. Final Report public through the National Technical information Service, Walter D. Pilkey and Staff Springfield, Virginia 22161 School of Engineering and Applied Science University of Virginia 03 - Rail Vehicles at Charlottesville, V A 22901 Components NOTICE This document is disseminated under the sponsorship of the U.S.Department of Transportation in the interest of information exchange. The United States Government assumes no liability for the contents or use thereof. NOTICE The United States Government does not endorse products of manufacturers. Trade or manufacturer's names appear herein solely because they are considered essential to the object of this report. Technical Report Documentation Page 1. Report No. 2. Governm ent A c c e s s io n N o. 3. R e c ip ie n t 's C a t a lo g No. FRA/0R&D-81/17 . 4. Title and Subtitle 5. R e p o rt D ate REVIEW AND SUMMARY OF COMPUTER PROGRAMS FOR RAILWAY February 1981 VEHICLE DYNAMICS . Q. 6. Performing Organization Code 8. Performing Orgoni zofion Report No. 7. A u th o r's) UVA-529162-MAE80-101 Walter D. Pilkey 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) School of Engineering and Applied Science, University of Virginia 11. Contract or Grant No. -
Draft Neighbourhood Development Plan July 2017
Yarkhill Draft NDP 2017 – 2031 July 2017 1 Yarkhill Draft NDP 2017 – 2031 July 2017 Prepared by the Neighbourhood Plan Steering Group on behalf of the Parish Council with assistance from 2 Yarkhill Draft NDP 2017 – 2031 July 2017 Table of Contents Section Page Public Consultation 4 Executive Summary 6 1.0 Introduction and Background 7 2.0 A P ortrait of Yarkhill 15 3.0 Planning Policy Context 22 4.0 Draft Vision and Objectives 24 5.0 Yarkhill NDP Planning Policies 27 6.0 Housing 29 7.0 Employment 44 8.0 Transport and Infrastructure 49 9.0 Community Facilities 56 10.0 Agriculture and the Rural Area 59 11.0 Timescales and Next Steps 64 Appendices Appendix I Listed Buildings – Historic England List 65 IAppendix I NDP Timeline Yarkhill Parish Council (as at June 2017) 66 Appendix III Considerate Constructors 67 VAppendix I - Emails relating to Site 13 68 3 Yarkhill Draft NDP 2017 – 2031 July 2017 Public Consultation Howo t Comment on this Document Welcomeo t the Draft Neighbourhood Development Plan (NDP) for Yarkhill Parish. We need your help in preparing the Plan and your views on this Draft Plan are a key part of this process. This consultation will run for 8 weeks from Friday 21 st July 2017 until 5pm Friday 15 th September 2017 *. This document and an accompanying response form are available online at https://sites.google.com/site/yarkhillneighbourhoodplan/ Hard copies are available on request from the parish clerk at: [email protected] Please em ail your completed response form or written representations to [email protected] or l eave them in the reply box es provided at the village hall and church. -
Yarkhill Representations Received During Submission Consultation
Latham, James From: Turner, Andrew Sent: 14 February 2018 16:47 To: Neighbourhood Planning Team Subject: RE: Yarkhill Regulation 16 neighbourhood development plan consultation RE: Yarkhill Regulation 16 draft Neighbourhood Development Plan Dear Neighbourhood Planning Team, I refer to the above and would make the following comments with regard to the above proposed development plan. It is my understanding that you do not require comment on Core Strategy proposals as part of this consultation or comment on sites which are awaiting or have already been granted planning approval. Having reviewed records readily available, I would advise the following: Policy Y1 :Site Allocations for New Housing The site identified as ‘Site 1’ allocated for new housing outlined in blue on Maps 6a appears from a review of Ordnance survey historical plans to have historically been used as orchards. By way of general advice I would mention that orchards can be subject to agricultural spraying practices which may, in some circumstances, lead to a legacy of contamination and any development should consider this. Policy Y4 Conversion of Former Agricultural Buildings for Residential Use Regarding former agricultural building conversions I would add the following; Some farm buildings may be used for the storage of potentially contaminative substances (oils, herbicides, pesticides) or for the maintenance and repair of vehicles and machinery. As such it is possible that unforeseen contamination may be present on the site. Consideration should be given to the possibility of encountering contamination on the site as a result of its former uses and specialist advice be sought should any be encountered during the development. -
BACKTRACK 22-1 2008:Layout 1 21/11/07 14:14 Page 1
BACKTRACK 22-1 2008:Layout 1 21/11/07 14:14 Page 1 BRITAIN‘S LEADING HISTORICAL RAILWAY JOURNAL VOLUME 22 • NUMBER 1 • JANUARY 2008 • £3.60 IN THIS ISSUE 150 YEARS OF THE SOMERSET & DORSET RAILWAY GWR RAILCARS IN COLOUR THE NORTH CORNWALL LINE THE FURNESS LINE IN COLOUR PENDRAGON BRITISH ENGLISH-ELECTRIC MANUFACTURERS PUBLISHING THE GWR EXPRESS 4-4-0 CLASSES THE COMPREHENSIVE VOICE OF RAILWAY HISTORY BACKTRACK 22-1 2008:Layout 1 21/11/07 15:59 Page 64 THE COMPREHENSIVE VOICE OF RAILWAY HISTORY END OF THE YEAR AT ASHBY JUNCTION A light snowfall lends a crisp feel to this view at Ashby Junction, just north of Nuneaton, on 29th December 1962. Two LMS 4-6-0s, Class 5 No.45058 piloting ‘Jubilee’ No.45592 Indore, whisk the late-running Heysham–London Euston ‘Ulster Express’ past the signal box in a flurry of steam, while 8F 2-8-0 No.48349 waits to bring a freight off the Ashby & Nuneaton line. As the year draws to a close, steam can ponder upon the inexorable march south of the West Coast Main Line electrification. (Tommy Tomalin) PENDRAGON PUBLISHING www.pendragonpublishing.co.uk BACKTRACK 22-1 2008:Layout 1 21/11/07 14:17 Page 4 SOUTHERN GONE WEST A busy scene at Halwill Junction on 31st August 1964. BR Class 4 4-6-0 No.75022 is approaching with the 8.48am from Padstow, THE NORTH CORNWALL while Class 4 2-6-4T No.80037 waits to shape of the ancient Bodmin & Wadebridge proceed with the 10.00 Okehampton–Padstow. -
Land North of Viaduct, Adjacent to Orchard Business Park, Ledbury Application Ref: 171532
Our ref: APP/W1850/W/20/3244410 Guy Wakefield Ridge and Partners LLP 15 March 2021 Dear Sir TOWN AND COUNTRY PLANNING ACT 1990 – SECTION 78 APPEAL MADE BY BLOOR HOMES WESTERN LAND NORTH OF VIADUCT, ADJACENT TO ORCHARD BUSINESS PARK, LEDBURY APPLICATION REF: 171532 1. I am directed by the Secretary of State to say that consideration has been given to the report of Lesley Coffey BA Hons BTP MRTPI, who held a public local inquiry starting on 13 July 2020 into your client’s appeal against the decision of Herefordshire Council to refuse your client’s application for outline planning permission for a mixed use development including the erection of up to 625 new homes (including affordable housing), up to 2.9 hectares of B1 employment land, a canal corridor, public open space (including a linear park), access, drainage and ground modelling works and other associated works, in accordance with LPA reference 171532, dated 22 June 2018. The proposal is for outline planning permission with all matters reserved for future consideration with the exception of access. Only the means of access into the site is sought as part of this outline application, not the internal site access arrangements (i.e. they do not formally form part of the application). Vehicular access is proposed off the Bromyard Road. 2. On 26 March 2020, this appeal was recovered for the Secretary of State's determination, in pursuance of section 79 of, and paragraph 3 of Schedule 6 to, the Town and Country Planning Act 1990. Inspector’s recommendation and summary of the decision 3. -
Railway Car Dynamic Response to Track Transition Curve and Single Standard Turnout
Computers in Railways X 849 Railway car dynamic response to track transition curve and single standard turnout J. Droździel & B. Sowiński Warsaw University of Technology, Poland Abstract In this paper vehicle dynamic responses to clothoidal, sinusoidal and parabolic types of transition curves are considered. The responses such as vehicle motion and wheel-rail forces are significantly dependent on the type of curve. Also the dynamic interaction between the railway car and a track on a switch and a crossing of a standard turnout is considered. It was made for car-running direction “on” and “from” a switch facing point, and for nominal and geometrically imperfect track. The results imply the conclusion that specific transition curve and turnout parameters create a vital cause of dynamic interaction growth between a vehicle and a track. Keywords: vehicle, track, dynamics, transition curve, standard turnout. 1 Introduction In this paper, the railway car–track system dynamic interaction influenced by track transient excitations is presented. A few transition curves and a single standard turnout are taken into account. Simulation results are obtained and discussed for elastically moveable rails. Modern railway tracks designed for high speed traffic should meet a number of requirements regarding travel comfort and safety. Designed transition track geometry changes may cause additional dynamic forces which are dependent, among others, on the shape and magnitude of these changes. During track operation the changes are additionally affected by the state of track maintenance. They are also the cause of increased local degradation of track components. For analyzing dynamic processes of this type, an appropriate simulation model was elaborated. -
Yarkhill Referendum NDP 2018 – 2031 - July 2018
Yarkhill Referendum NDP 2018 – 2031 - July 2018 1 Yarkhill Referendum NDP 2018 – 2031 - July 2018 Prepared by the Neighbourhood Plan Steering Group on behalf of the Parish Council with assistance from 2 Yarkhill Referendum NDP 2018 – 2031 - July 2018 Table of Contents Section Page Executive Summary 5 1.0 Introduction and Background 6 2.0 A Portrait of Yarkhill 8 3.0 Planning Policy Context 15 4.0 Vision and Objectives 17 5.0 Yarkhill NDP Planning Policies 20 6.0 Housing 23 7.0 Employment 36 8.0 Transport and Infrastructure 42 9.0 Community Facilities 49 10.0 Agriculture and the Rural Area 52 11.0 Timescales and Next Steps 57 Appendices Appendix I Listed Buildings – Historic England List 58 Appendix II NDP Timeline Yarkhill Parish Council (as at July 2018) 59 Appendix III Considerate Constructors 60 3 Yarkhill Referendum NDP 2018 – 2031 - July 2018 Map 1 Yarkhill Neighbourhood Plan Area and Parish Boundary @Crown copyright and database rights [2015] Ordnance Survey 100055940 Yarkhill Parish Council (Licensee) License No: 0100053362 4 Yarkhill Referendum NDP 2018 – 2031 - July 2018 Executive Summary This is the Referendum Neighbourhood Development Plan (NDP) for Yarkhill Neighbourhood Area. The Plan has been prepared by a Steering Group of local residents and Parish Councillors taking into consideration the results of residents and business questionnaires, a technical site assessment of proposed housing sites put forward following a Call for Sites process, and a public consultation on the emerging Preferred Options Plan in Spring 2017. The Plan has been prepared taking into account representations submitted during the two formal public consultation periods, and the proposed modifications as set out in the Examiner's Report, May 2018. -
Western Route Strategic Plan V7
Route Strategic Plan Western Route Version 7.0: Strategic Business Plan submission 2nd February 2018 Western Route Strategic Plan Contents Section Title Description Page 1 Foreword and summary Summary of our plan giving proposed high level outputs and challenges in CP6 3 2 Stakeholder priorities Overview of customer and stakeholder priorities 14 3 Route objectives Summary of our objectives for CP6 using our scorecard 26 4 Activity prioritisation on a page Overview of the opportunities, constraints and risks associated with each objective area, the 32 controls for managing these and the resulting output across CP5 and CP6 5 Activities & expenditure High level summary of the cost and activity associated with our plan based on the prioritisation in 41 section 4 6 Customer focus & capacity strategy Summary of customer and capacity themed strategies that will be employed to deliver our plan 66 7 Cost competitiveness & delivery strategy Summary of delivery strategies that will be employed, and of headwinds and efficiency plans 69 accounted developed to date 8 Culture strategy Summary of the culture themed strategies that will be deployed to deliver our plan 80 9 Strategy for commercial focus Summary of our strategy and plans to source alternative investment 86 10 CP6 regulatory framework Information relating to our revenue requirement and access charging income 88 11 Sign-off Senior level commitment from relevant functions 91 Appendix A Joint performance activity prioritisation by Overview of the opportunities, constraints and risks associated -
Feasiblity Business Case
Outline Business Case Date: 7 January 2021 Appendix E PROJECT DOCUMENTATION OUTLINE BUSINESS CASE Estate Building Improvement Programme Release: Second Issue Date: 12.11.20 Author: Document Number: v.3 Page 1 Outline Business Case Date: 7 January 2021 Document History Document Location This document is only valid on the day it was printed. Revision History Revision Summary of Changes Changes marked date 10/11/20 First issue – v1 12/11/20 Second issue – v2 12/11/20 Third issue – v3 07/12/20 Fourth issue – v4 Approvals This document requires the following approval. Name Signature Title Date of Issue Version Strategic Property Services Manager Assistant Director for Technical Services Distribution This document has been distributed to Name Title Date of Issue Version Strategic Property 12/11/20 V4 Services Manager Special Projects Officer 12/11/20 V4 Head of Programme 07/12/20 V4 Management Office Strategic Capital Finance 07/12/20 V4 Manager Page 2 Outline Business Case Date: 7 January 2021 Table of Contents 1. Purpose of document ............................................................................................................................ 17 2. Project aims and objectives ..................................................................................................................... 4 3. Background ............................................................................................................................................ 17 3.1. Project Drivers and High Level Issues ............................................................................................ -
Technical and Safety Analysis Report
HIGH SPEED RAIL ASSESSMENT, PHASE II Norwegian National Rail Administration Technical and Safety Analysis Report JBV 900017 February 2011 HSR Assessment Norway, Phase II Technical and Safety Analysis Page 1 of (270) Preparation- and review documentation: Review documentation: Rev. Prepared by Checked by Approved by Status 1.0 DEF/18.02.2011 RFL, KJ GI Final List of versions: Revision Rev. Description revision Author chapters Nr. Date Version 1 18.02.2011 1.0 Delivery final version DEF, RFL 2 3 4 HSR Assessment Norway, Phase II Technical and Safety Analysis Page 2 of (270) Table of contents List of tables ..................................................................................................................8 List of figures...............................................................................................................11 List of abbreviations ...................................................................................................16 1 Subject – Technical solutions..............................................................................18 1.0 Introduction ...........................................................................................................18 1.0.1 Brief description of scenarios....................................................................................19 1.0.2 World high speed rail (HSR) overview......................................................................20 1.0.2.1 Infrastructure...........................................................................................................