Professional Resume

Total Page:16

File Type:pdf, Size:1020Kb

Professional Resume Mobile no. 8770061400, 8109991550 JR MIG 57 Patel Nagar, Mandideep, Raisen, Bhopal (M.P.) INDIA- 462046 E-mail: [email protected] SoURAbHSInGH OBJECTIVE A prospective career in the field of civil engineering admits challenging environment that would utilize and hone my professional and interpersonal skills and in the process augment value to the concern. EXPERIENCE Company Name: Bansal Construction Works pvt.ltd Designation : Site Engineer ( 25/06/2018 - 30/06/2019) Company Name: Bansal pathway’s habibganj pvt.ltd Designation : Site Engineer ( 01/07/2019- till date) 1. Responsible for investigation and checking of the sites for the project. JOB SUMMARY 2. Handling the construction layout. 3. Coordinating with the suppliers and dealers for the materials. 4. Checking of the safety of workers and others at the sites. 5. To ensure the quality of the products used in the constructions. 6. To make the presentation and present in front of the seniors for New assignment. 7. Checking that all the technical equipment’s are in good working Condition. 8. Checking that all the government policies and rules are being followed. 9. Coordinating with the other staff as per requirement. 10. Maintaining the daily and monthly reports of working. 11. Maintain all the records of the projects. PROJECTS PROJECT NAME: Rehabilitation and Up-gradation of sindoor river Designation: Site Engineer Employer: Theme engineering services pvt.ltd EPC Contractor: Bansal Construction Works pvt.ltd Client: Madhya Pradesh Road development Corporation Duration: 01/05/2020- till date Job Responsibilities: Assistance in Billing (Sub-Contractor), Surveying and Demarcation includes Layout of Various structure’s like Box culvert, Pre‐Stress Concrete Girders, Bridge Deck Slab, Retaining Walls, Diaphragms etc Preparation of Detailed Design and Drawings, Coordination with Consultants, Periodic Supervision of Site Activities like execution of RE wall segmental casting, Preparing of B.B.S for major & minor bridge Developing daily & monthly progress reports, checking monthly bills and documentation for project activity. PROJECT NAME: Redevelopment of Habibganj Railway Station Bhopal Designation: Site Engineer Employer: Bansal Pathway’s Habibganj pvt.ltd Client: Indian Railway Station Development Company Duration: 01/10/2017-15/11/2019 Job Responsibilities: Two numbers of subways their excavation, layout, precast RCC box casting, box Pulling around 141m. Assembly, Launching and DE launching 24 no’s 1080MT of RH (restricted height) girder in railway station yard. New station building, Making BBS of air concourse foundation’s, concreting, launching of Air concourse steel composite girder supply by HMM infra Ambala by side slewing method approx. 9.45-meter Height from the rail top. TRAINING 1. Engineering College building work, Road work etc in Madhya Pradesh PWD department for 45 days under Executive Engineer. 2. Summer practical training of PMGSY project no. MP-3112 Shivgarh to Patdi-road for 27 days under the guidance of project engineer of M/S Bharti construction. 3. Summer practical training on ROB/RUB work under the assistant engineer at Itarsi- Hoshangabad Section of West Central Railway. ACADEMIC - Diploma (CE) from R.G.P.V. Bhopal 2014-2018 - 62.23% QUALIFICATION - Secondary from M.P. Board in 2011– 50 % LEADERSHIP - Inducted 450+ Students for Summer Industrial and Training Program KEY SKILLS - Estimating, coasting & Billing's - AutoCAD 2D & 3D-2018 - Excellent written and communication skills - High Problem solving and Analytical Skills - MS- Office (Moderate) PERSONAL PROFILE – Saurabh Singh Name January 14, 1995 Date of Birth Mr. Satyendra Singh Father’s Name Indian Nationality Male Gender Any where Relocate- Single Status- English, Hindi. Languages Declaration I hereby declare that all the above furnished information is true & correct to the best of my knowledge. Date: Place: Bhopal Saurabh Singh .
Recommended publications
  • BUS ROUTES and TIMINGS for 1 Shift (9.30-2.30)
    st BUS ROUTES AND TIMINGS for 1 Shift (9.30-2.30) S.No Stoppage Timings S.No Stoppage Timings 1 Habibganj Naka 08.10 1 NayaPura 08.10 2 10,1 12 No. Stop 08.15 2 Beema kunj 08.15 3 Shivay 08.20 3 Chuna Bhatti 08.20 4 PNB 08.20 4 MACT 08.30 5 Trilanga 08.25 5 Nehru Nagar 08.35 6 Shahpura 08.25 6 P&T 08.40 7 1100 quarter 08.30 7 Dipo 08.40 8 Arera Pump 08.35 8 Rang Mahal 08.40 9 7,6,5 No Stop 08.35 9 Poly Technic 08.45 10 Jain Mandir 08.45 10 Moti Masjid 08.50 1 Mata Mandir 08.45 11 Lal Ghati 09.05 11 Roshan Pura 08.50 12 College 09.15 12 Lily Talkies 08.55 13 College 09.15 S.No Stoppage Timings S.No Stoppage Timings 1 RKDF Hostel 08.00 1 Nariyal Kheda 08.15 2 Danish nagar 08.10 2 DIG 08.20 3 Bagh Sevaniya 08.15 3 Chhola Naka 08.25 Thana 4 Katara Hills 08.20 4 Bus Stand 08.30 5 AIIMS Road 08.25 5 SBI 08.35 6 Saket nagar 08.30 6 Bairagarh 08.50 7 Panchvati 08.30 7 CTO 08.55 8 Barkheda 08.35 8 Kailash Nagar 09.00 9 Piplani 08.40 9 Data Colony 09.05 10 Karond 09.05 10 College 09.15 11 College 09.15 S.No Stoppage Timings S.No Stoppage Timings 1 S P 08.00 1 IndraPuri 08.10 2 S P S 08.10 2 Beema Hospital 08.10 3 Saket Nagar 08.15 3 JK Road 08.15 4 Awadh Puri 08.25 4 Apsara 08.25 5 Vidhya Sagar 08.30 5 Pushpa Nagar 08.35 6 Piplani 08.35 6 Railway Station 08.45 7 Karond 09.10 7 Bhopal Talkies 08.45 8 College 09.15 8 Housing Board 08.50 9 Karond 09.00 10 College 09.15 S.No Stoppage Timings S.No Stoppage Timings 1 Prabhat 08.20 1 Patel Nagar 08.30 2 Ashoka Garden 08.25 2 Ratnagiri 08.35 3 Pushpa Nagar 08.35 3 Vrindavan Nagar 08.40 4 Dwarka Nagar 08.40
    [Show full text]
  • Press Release Bansal Pathways Habibganj Private
    Press Release Bansal Pathways Habibganj Private Limited March 03, 2020 Ratings Amount Facilities Ratings1 Rating Action (Rs. crore) CARE BBB (CE); Stable Long term Bank Facilities 410.00 [Triple B (Credit Enhancement); Reaffirmed Outlook: Stable] CARE BBB (CE); Stable/ CARE A3 (CE) Long term/Short term [Triple B (Credit Enhancement); 35.00 Reaffirmed Bank Facilities Outlook: Stable/ A Three (Credit Enhancement)] Total Facilities@ 445.00 (Rupees Four Hundred Forty Five crore only) Details of facilities in Annexure-1 @backed by unconditional and irrevocable corporate guarantee of Bansal Construction Works Private Limited (BCWPL, rated CARE BBB; Stable/CARE A3) Unsupported Rating 2 CARE BB+ /CARE A4+ (Double B Plus/ A Four Plus) Note: Unsupported Rating does not factor in the explicit credit enhancement Detailed Rationale & Key Rating Drivers for the credit enhanced debt The ratings assigned to the bank facilities of Bansal Pathways Habibganj Private Limited (Habibganj) are based on the credit enhancement in the form of an unconditional and irrevocable corporate guarantee extended by BCWPL. Detailed Rationale & Key Rating Drivers of BCWPL The ratings assigned to the bank facilities of Bansal Construction Works Pvt Ltd (BCWPL) continue to derive strength from its established presence in construction and operations of road projects, growth in its scale of operations along with healthy revenue visibility, healthy profitability, adequate liquidity and stable demand outlook for construction sector. The ratings, however, continue to be constrained by its moderate capital structure with high debt repayment obligations in the near to medium term, large amount of ‘with recourse’ debt in its SPVs (Special purpose vehicle) including SPVs having project implementation and stabilisation risks and investment requirement for project completion in one of its under- construction SPVs.
    [Show full text]
  • Bus Route for 1St Year Students
    Bus Route for 1st Year Students Route No.1 Route No.2 Stop Bus no. 2096 Time Stop Bus no. 2368 Time Khanugaon 7:35 Danish 7:25 Lalghati 7:45 Akriti Eco City 7:30 Koh-e-Fiza 7:48 Indus 7:33 Paripark 7:53 Rohit Nagar 7:35 Shajanabad pani tankoi 7:55 Trilanga 7:38 Thana 7:57 Aura Mall 7:39 Taj Mahal 7:58 Shevoy Complex 7:41 Royal Market 8:00 1100 Quarters 7:45 Peer Gate 7:02 College 8:35 Moti Masjid 7:06 Kamla Park 7:08 Polytechnic 8:11 Link Road No.1 8:14 College 8:35 Route No.3 Route No.4 Stop Bus no. 1608 Time Stop Bus no. 1102 Time Baghsewaniya Police Station 7:40 Amrai 7:40 Raja Bhoj 7:43 BDA 7:45 Central Plaza 7:46 Sagar Public School 7:47 Mount Carmel 7:52 Barkheda Pathani 7:50 Rameshwaram 7:55 Vijay Market 7:52 Global Park City 7:57 AdhaarShila 7:58 Spring Valley 7:59 Rishipuram 8:00 Signature 360 8:01 College 8:35 Route No.5 Route No.6 Stop Bus no. 2366 Time Stop Bus no. 1095 Time Railway Colony 7:40 Vidya Sagar College 8:10 Shakti Nagar Complex 7:42 Awadhpuri Chouraha 8:13 Panchvati 7:44 SOS 8:19 Gulab Garden 7:46 Gopal Nagar 8:21 Higher Secondary Square 7:48 College 8:35 Piplani 7:53 College 8:35 Route No.7 Route No.8 Stop Bus no. 1561 Time Stop Bus no.
    [Show full text]
  • INTRODUCTION 1.1 Introduction the Purpose of Development Projects Is
    Environment Clearance of Residential Development Project “Virasha Heights” on khasra no. 401/4/1(kha), 401/4/2(kha), 401/2, 401/3, 401/4/3(gh), 401/4/3(ga), 401/4(ka), 401/4/3(kha), 400/2, 401/1 & 400/1 at Village- Banjari, Tehsil-Huzur, District- Bhopal, Madhya Pradesh, India. EIA REPORT INTRODUCTION 1.1 Introduction The purpose of Development projects is to plan, design and construct buildings and ancillary facilities as well as parks in a manner that is consistent with City policies and is meant to give economic benefits to the society like increase in GDP, employment generation, foreign exchange earning etc., which mostly aimed at, are tangible ones. Simultaneously, development of projects also causes some social and environmental losses and gains. A sustainable project should have environmental compatibility in addition with techno- economic feasibility. Ministry of Environment and Forest notification dated Sept 14, 2006 vide S.No. 1533, that project should be designed under the Environmental Impact Assessment Notification and requires prior Environmental Clearance (EC) from the MoEF/SEIAA. 1.2 About the City – Bhopal Bhopal, known as the city of lakes is the capital of Indian state of Madhya Pradesh. Geographical location of Bhopal is 23° 15′ 0″ North Latitude and 77° 25′ 0″East Longitude. With an elevation of approx 500 m Bhopal is located in the central part of India and is just north of the upper limit of Vindhya mountain range. Bhopal is a fascinating amalgam of scenic beauty, old historic city and modern urban planning. Bhopal is the 16th largest city in India and 231st largest city in the world.
    [Show full text]
  • Redevelopment of Habibganj Station Vaibhav Singh Chandan Gupta Mayank Patel Sakshi Gupta Prof
    International Journal of Engineering Research in Current Trends (IJERCT) ISSN: 2582-5488, Volume-3 Issue-4, July 2021 Redevelopment of Habibganj Station Vaibhav Singh Chandan Gupta Mayank Patel Sakshi Gupta Prof. Mayank Department of Civil Department of Civil Department of Civil Department of Civil Gupta Engineering, Sagar Engineering, Sagar Engineering, Sagar Engineering, Sagar Department of Civil Institute of Research Institute of Research Institute of Research Institute of Research Engineering, Sagar and Technology- and Technology- and Technology- and Technology- Institute of Research Excellence, Bhopal, Excellence, Bhopal, Excellence, Bhopal, Excellence, Bhopal, and Technology- India, India, India, India, Excellence, Bhopal, vaibhavsingh1235@ cg0332152@gmail. mayankpatelmk6@ sakahigipt291999@ India, gmail.com com gmail.com gmail.com mayankg598@gmai l.com Abstract—Habibganj is the first railway station which is area on the platform. On the western side of the station, there redeveloped with the Public Private Partnership under the is commercial establishments, a bus terminal, and office redevelopment program of railway station. It is India’s First ISO lobbies. The renovated Habibganj station is likely to witness certified private railway station. The total estimated cost of average 35,000 to 40,000 passengers everyday. Around 85 redevelopment of station is 100Cr, and the estimated cost of pairs of trains will be given a stoppage. Before Covid19 the commercial development is 350Cr. The station is being 54 pairs of trains operated here everyday and movement of remodeled on the lines of Germany’s Heidelberg station. This about 25,000 people was being recorded. At present, 22 pairs paper is focusing on the detail study on redevelopment of of trains are operating from here.
    [Show full text]
  • 47100-004: Madhya Pradesh Power Transmission and Distribution
    Initial Environment Examination Project Number: 47100-004 January 2019 IND: Madhya Pradesh Power Transmission and Distribution System Improvement Project Submitted by Madhya Pradesh Madhya Kshetra Vidyut Vitaran Co. Ltd. (DISCOM-C), Bhopal This initial environmental examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. This report is an updated version of the IEE report posted in September 2013 available on https://www.adb.org/projects/documents/madhya-pradesh-power-transmission-distribution-system- improvement-project-iee. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. INITIAL ENVIRONMENTAL EXAMINATION [IEE] REPORT November 2018 Madhya Pradesh Madhya Keshtra Vidyut Vitaran Co. Limited- DISCOM-Central, Nishtha Parisar, Govindpura, Bhopal (MP) Power Transmission and Distribution System Improvement Project under ADB Loan-No -3066 IND Prepared by: Environmental Planning and Coordination Organization [EPCO], Bhopal, Department of Environment, Government of Madhya Pradesh The initial environmental examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB‟s Board of Directors, Management, or
    [Show full text]
  • Madhya Pradesh.Xlsx
    Madhya Pradesh S.No. District Name of the Address Major Activity Broad NIC Owner Emplo Code Establishment Description Activity ship yment Code Code Class Interval 130MPPGCL (POWER SARNI DISTT POWER 07 351 4 >=500 HOUSE) BETUL(M.P.) DISTT GENERATION PLANT BETUL (M.P.) 460447 222FORCE MOTORS ARCADY, PUNE VEHICAL 10 453 2 >=500 LTD. MAHARASHTRA PRODUCTION 340MOIL BALAGHAT OFFICER COLONEY MAINING WORK 05 089 4 >=500 481102 423MARAL YARN KHALBUJURG A.B. CLOTH 06 131 2 >=500 FACTORY ROAD MANUFACTRING 522SHRI AOVRBINDO BHOURASALA HOSPITAL 21 861 3 >=500 MEDICAL HOSPITAL SANWER ROAD 453551 630Tawa mines pathakheda sarni COOL MINING WORK 05 051 1 >=500 DISTT BETUL (M.P.) 460447 725BHARAT MATA HIGH BAJRANG THREAD 06 131 1 >=500 SCHOOL MANDAWAR MOHHALLA 465685 PRODUCTION WORK 822S.T.I INDIA LTD. PITHAMPUR RING MAKING OF 06 141 2 >=500 ROAD 453332 READYMADE CLOTHS 921rosi blue india pvt.ltd sector no.1 454775 DAYMAND 06 239 3 >=500 COTIND&POLISING 10 30 SHOBHAPUR MINSE PATHAKERA DISTT COL MININING 05 051 4 >=500 BETUL (M.P.) 440001 11 38 LAND COLMINCE LINE 0 480442 KOLMINCE LAND 05 089 1 >=500 OFFICE,MOARI INK SCAPE WORK 12 44 OFFICE COAL MINES Bijuri OFFICE COAL COAL MINES 05 051 1 >=500 SECL BILASPUR MINES SECL BILASPUR Korja Coliery Bijuri 484440 13 38 W.C.L. Dist. Chhindwara COL MINING 05 051 4 >=500 480559 14 22 SHIWALIK BETRIES PANCHDERIYA TARCH FACTORY 06 259 2 >=500 PVT. LTD. 453551 15 33 S.S.E.C.N. WEST Katni S.S.E.C.N. RIPERING OF 10 454 1 >=500 RAILWAY KATNI WEST RAILWAY MALGADI DEEBBE KATNI Nill 483501 16 44 Jhiriya U.G.Koyla Dumarkachar Jhiriya CAOL SUPPLY WORK 06 239 4 >=500 khadan U.G.Koyla khadan Dumarkachar 484446 17 23 CENTURY YARN SATRATI 451228 CENTURY YARN 06 141 4 >=500 18 21 ret spean pithampur 454775 DHAGA PRODUCTS 06 131 4 >=500 19 21 hdfe FEBRICATION PITHAMPUR 454775 FEBRICATION 06 141 2 >=500 20 29 INSUTATOR ILE.
    [Show full text]
  • Traffic Pre-Feasibility Study for Bhopal Metro
    TRAFFIC PRE-FEASIBILITY STUDY FOR BHOPAL METRO CLIENT: URBAN ADMINISTRATION AND DEVELOPMENT DEPARTMENT GOVERNMENT OF MADYAPRADESH PREPARED BY DELHI METRO RAIL CORPORATION LTD. Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi-110 001 October, 2012 TRAFFIC PRE-FEASIBILITY STUDY FOR BHOPAL METRO CLIENT: URBAN ADMINISTRATION AND DEVELOPMENT DEPARTMENT GOVERNMENT OF MADYAPRADESH PREPARED BY DELHI METRO RAIL CORPORATION LTD. Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi-110 001 October, 2012 TRAFFIC PRE-FEASIBILITY STUDY FOR BHOPAL METRO 1.0 Executive summary Pre-feasibility traffic study for Bhopal was conducted for finding out the best possible alignment of a grade separated mass rapid transit system (metro rail) and after identifying that daily ridership on the network was estimated. Method used in estimating travel demand consists of (1) Collection of Primary and Secondary data which are related with daily travel, (2) Making them usable as input to calibrate travel demand models, (3) Generating outputs for further analysis (4) Recommending alignment for metro line construction. Procedural details are given in chapter 2. Preliminary alignment was decided by physically observing traffic flow on road arterials, generation of traffic from important places such as rail stations, industrial and commercial zones, availability of road space for construction of metro lines, and to connect different parts of the city. Full network identified is given in Table 1 and shown in figure 1. Table 1: Lines and Lengths of Metro Network Tested (69.13 KM) PHASE SECTION LINE NO SECTION NAME KM LENGTH 1 5 1 KAROD KALAN-HABIB GANJ RS 11.57 5 6 1 HABIBGANJ RS-MANDIDEEP RS 19.19 3 8 2 SURUCHI NAGAR-BHEL 9.79 7 7 2 LAW INSTT-SURUCHI NAGAR 3.4 9 9 2 BHEL-ANAND NAGAR 5.08 2 2 3 LALGHATI-PLATINUM PLAZA 7.88 4 3 3 PLATINUM PLAZA-CHUNABHATTI 3.75 6 4 3 CHUNABHATTI-DAMKHEDA 5.15 8 1 3 AIRPORT-LALGHATI 3.32 69.13 Line 1 [green and cyan color] will be connecting the North of the city with south-east part of the city.
    [Show full text]
  • India's Top 20 Promising Cities
    SM@RT CITIES COUNCIL www.ConstructionWorld.inwww.ConstructionWorld.in COVER STORY SURAT NAGPUR LUCKNOW VADODARA VISAKHAPATNAM THANE JAIPUR PIMPRI CHINCHWAD INDIA’S TOP 20 PROMISING CITIES CHANDIGARH INDORE NAVI MUMBAI KANPUR KALYAN-DOMBIVLI FARIDABAD GURGAON GHAZIABAD 2 Construction World March 2013 1 RAJKOT BHOPAL LUDHIANA NASHIK SM@RT CITIES COUNCIL ndia in 2012: 153 rural, 219 transition, 84 semi-urban and 33 urban (Punjab), and Nashik (Maharashtra). In fact, representatives of these cities – districts (excluding the Northeast states and Jammu & Kashmir). And in their municipal chiefs – will be awarded at the upcoming Sm@rt Cities Summit 2025: 96 rural, 220 transition, 115 semi-urban and 58 urban districts. to be held in New Delhi in February and organised by FIRST Sm@rt Cities Council. These numbers from McKinsey & Company’s recent report, India’s Economic Geography in 2025: States, Clusters and Cities, attest to the Commissionerspeak Icountry’s growing urban sprawl. Attendant woes, though, include a big city So what makes these cities so promising? We spoke to some of their bias with the major cities consuming a bulk of natural and financial resources representatives for the answer. as well as unplanned development. As Prof Jagan Shah, Director, National For instance, Dr Amit Agrawal, Municipal Commissioner, Municipal Institute of Urban Affairs, says, “This has resulted in the sprawling of Corporation Faridabad, tells us how his city holds great promise to be a good existing urban centres with haphazard growth patterns and a corrosive effect urban centre. “The most important factor is the city’s location and connectivity,” on the surrounding region.” he reasons.
    [Show full text]
  • Hotel Ganpati and Sambodhi International
    +91-9755031122 HOTEL GANPATI AND SAMBODHI INTERNATIONAL https://www.indiamart.com/hotel-ganpati-bhopal/ Since its inception in 1994 Hotel Ganpati has established an enviable refreshing Hospitality and personalized service. It is the ideal place for business and leisure travellers located in the heart of Bhopal ,the majestic capital city of ... About Us Since its inception in 1994 Hotel Ganpati has established an enviable refreshing Hospitality and personalized service. It is the ideal place for business and leisure travellers located in the heart of Bhopal ,the majestic capital city of Madhya-Pradesh.Hotel Ganpati is poised to meet your every desire. Its prime location & excellent business services make Hotel Ganpati the favorite among business travelers : A Home & office away from Home & office. Singularly committed to provide a touch of excellence & business ambience to its guests Bhopal is well known for its inimitable hospitality and cultural diversity hence justifies it being the capital of Madhya Pradesh. Keeping up with the same fervor, we at Hotel Ganpati provide you luxury accommodation right inside M P Nagar, the business hub of Bhopal at economic tariff making it available to almost every cadre of corporate guests. Its personalized services along with its district court, the police Headquarters, BHEL and Government, semi-government and private offices and Govindpura industrial Estate/ the impending ISBT (Inter State Bus Terminus) & the Habibganj Railway Station, the shopping hub of New Market & DB mall makes it one of most
    [Show full text]
  • Cfreptiles & Amphibians
    WWW.IRCF.ORG/REPTILESANDAMPHIBIANSJOURNALTABLE OF CONTENTS IRCF REPTILES & AMPHIBIANSIRCF REPTILES • VOL 15,& NAMPHIBIANSO 4 • DEC 2008 •189 25(2):104-114 • AUG 2018 IRCF REPTILES & AMPHIBIANS CONSERVATION AND NATURAL HISTORY TABLE OF CONTENTS FEATURE ARTICLES Reptilian. Chasing Bullsnakes Diversity (Pituophis catenifer sayi) in Wisconsin: of the Bhopal Region in On the Road to Understanding the Ecology and Conservation of the Midwest’s Giant Serpent ...................... Joshua M. Kapfer 190 the State. The Shared Historyof of TreeboasMadhya (Corallus grenadensis) and HumansPradesh on Grenada: in Central India A Hypothetical Excursion ............................................................................................................................Robert W. Henderson 198 1* 2 1 RESEARCH ARTICLESAmit Manhas , Rajni Raina , and Ashwani Wanganeo . 1Department of EnvironmentalThe Texas Horned Sciences Lizard in andCentral Limnology, and Western Barkatullah Texas ....................... University, Emily Bhopal, Henry, Jason Madhya Brewer, Pradesh, Krista Mougey, India and (amitmanhas1986@gmail Gad Perry 204 .com) . The 2KnightDepartment Anole (Anolis of Zoology, equestris) inGovernment Florida Science and Commerce College, Bhopal, Madhya Pradesh, India .............................................Brian J. Camposano, Kenneth L. Krysko, Kevin M. Enge, Ellen M. Donlan, and Michael Granatosky 212 CONSERVATION ALERT Photographs by the senior author. World’s Mammals in Crisis ............................................................................................................................................................
    [Show full text]
  • District Census Handbook, Bhopal, Part XIII-A, Series-11
    '11tT XIII-CR ~'I~'Co 11 • • 1981 C.~NSUS-PUBLICATION PLAN (1981 Celtrll> Publicati'JllY, Series 11 in AlII"dl:J Series wIll be publislted in the following Prl,uts) GOVERNMENT OF INDIA PUBLICA nONS Part I-A Administration Report-Enumeration Part I·B Administration Report-Tabulation Part II·A General Population Tables Part II·B Primary Census Abstract Part III General Economic Tables Part IV Social and Cultural Tables Part V Migration Tables Part VI Fertility Tab!es Part VII Tables on Houses and Disabled Population Part VIII Household Tahles Part IX Special Tables on Scheduled Castes and Scheduled Tribes Part X-A Town Directory Part X-B Survey Report. on selected Towns Part X-C Survey Reports on selected Villages Part XI Ethnographic Notes and special studies on :scheduled Castes and Scheduled Tribes Part XII Census Atlas Paper I -of 1982 Primary Census Abstract for Scheduled Castes and Scheduf ed Tribes Paper 1 of 1984 Household Population by Religion of Head of Houo;ehold STATE GOVERNMENT PUBLICATIONS Part XIII-A&B District Census Handbook for each of the 45 districts in the State. (Village and Town Directory and Primary Census Abstract) CONTENTS crto.. ij'~lfT Pages 1 ~'f;r Foreword ;-iv 2 ~'(Cf"fT Preface v-vi 3 f~ ~ if1.f!ll'T Distri(;t Map 4 if~~:Jf~ artCfi~ Important Statistics vii 5 fat1lilrq1Jf'f~ifi {?;cqvr"t Analytical Note xxi-xxxiv ~Cififi RCtJurT : ar2;~m iiIlfff ait~ ar.t~a­ Notes & Explanations; List of Scheduled Gf"f"TTrn- Ofil' ~T. ( ~w)F1;r ), mlfi 1 976; Castes and Scheduled Tribes Order ~T iif'l'lTur;;T 9;ila-IfiT !fiT ~fuijJ~ ar1~ ~~ I (Amendment) Act, 1976.
    [Show full text]