+ July 19, 1996

Total Page:16

File Type:pdf, Size:1020Kb

+ July 19, 1996 Mission update Vol. 35, No. 15 July 19, 1996 Spaceport News America's gateway to the universe. Leading the world in preparing and launching missions to Earth and beyond. John F. Kennedy Space Center Bertha sends Atlantis to VAB, boosters keep her there Mission: STS-78 on Columbia. After the threat from Hurri- flight, Mission STS-79, will be replaced because technicians disassembling the motors from Launch date, time: June 20, cane Bertha forced the rollback delayed until around mid-Sep- 10:49 a.m. from Launch Pad 39B. of the Shuttle Atlantis to the tember. It also means that U.S. the previous flight, STS-78, ob- Vehicle Assembly Building on astronaut Shannon Lucid is on served that hot gas had seeped Primary payload: Life and July 10, mission managers opted her way to setting a new record into J-joints in the field joints Microgravity Spacelab (LMS). to keep her there to replace her for U.S. long-duration space- of the motors. solid rocket boosters. flight that will stand for some The most probable cause for Landing date, time: Columbia The decision means the time to come. touched down at Runway 33 of fourth Shuttle-Mir docking Atlantis’ motors are being (See STS-79, Page 8) the Shuttle Landing Facility at 8:36 a.m. on July 7, 1996. The nearly 17-day-long flight made STS-78 the longest Shuttle KSC rolls out welcome for Olympic flame mission to date. Kennedy Space Center welcomed the Olympic flame July 7 in a big way. In addition to the landing of Columbia, which occured on time at 8:36 a.m., spectators and media were also offered an Mission: STS-79 on Atlantis. Launch date, time: Mid- September from Launch Pad 39A. unforgettable view of the Mission Synopsis: STS-79 is flame passing in front of the the fourth in a series of NASA Space Shuttle for STS-79. docking missions to the Russian As the flame made its way Mir Space Station, leading to the to the Visitor Center, a throng construction and operation of the of spectators heralded its International Space Station. As the first flight of the Spacehab arrival with flag waving and Double Module, (see photo, page cheers. The Melbourne 7) STS-79 encompasses Municipal Band and Chal- research, test and evaluation of lenger Fife and Drum Corps ISS as well as logistics resupply provided patriotic music. And for the Mir Space Station. STS-79 a recap of the day's activities is also the first NASA/Mir and the torch's journey across American crew member the United States played on a exchange, with astronaut John jumbo video wall. Blaha replacing Shannon Lucid KSC SHUTTLE Operations Manager Loren Shriver, right, transfers the Olympic flame to KSC runner Joanne Maceo's torch at the top of Launch Pad 39A after he aboard the Mir. NASA Administrator Dan carried the Olympic torch to the top of the pad as his contribution to the torch relay Goldin and Center Director effort. Jon Granston of the Atlanta Committee for the Olympic Games (center) Landing date, time: To be witnesses the exchange. Maceo then carried her lit torch down the concrete hard determined. stand of the pad to pass the flame to another member of the KSC runner team. (See TORCH, Page 3) Page 2 SPACEPORT NEWS July 19, 1996 THE NASA KENNEDY Management Association recently named new officers for 1996- 97. The officers, installed during a banquet June 28 at KARS II are, from the left, Bob Gerron, Mission Assurance, treasurer; Vanessa Stromer, Shuttle Processing, secretary; and Catherine Alexander, Installation Operations, president. Not pictured is Miguel SIX STUDENTS participating in the KSC/UCF Space Scholars Program and Rodriguez, Payloads Processing, vice president. Science and Engineering Scholars Program recently assisted with a presentation at the University of Central Florida on preparing high school sophmores, juniors and seniors for college. They are, from the left, Arthur McClung, a math major Space Week events planned at Visitor Center at Morehouse College in Atlanta; Summer Weisburg, a computer engineering major at the University of Central Florida; Monica Rivas, an industrial engineering The Kennedy Space Center memorating the 20th anniver- major at the University of Central Florida; Mimmie Lui, a civil engineering major Visitor Center has a number of sary of the Viking probe. That at the University of New Mexico; Shalot Armstrong, an electrical engineering events underway to celebrate exhibit will be on display major at the University of Texas; and Brian Baron, a math major at Morehouse. Space Week, Tuesday, July 16 through January 1997. The scholars programs target minority students who have traditionally been under-represented in engineering and science career fields. The objective is to through Tuesday, July 23. Upcoming features include an provide trained employees for permanent employment within the U.S. workforce. Space Week is a nationally exclusive viewing of a com- The students must maintain a 3.0 GPA and are awarded with a four-year recognized period to honor the memorative film on Apollo 11 to scholarship, a yearly allowance and ten weeks of summer employment at KSC. men and women whose efforts be shown throughout the day on The programs are administered by the Equal Opportunity Office. have contributed to America’s July 20, a public briefing and achievements in space. At press poster signing by astronaut/art- time activities were set to begin ist Alan Bean on July 22 from July 16 with a talk and book 10 a.m. to noon and 1-3 p.m.; and signing by Buzz Aldrin, the sec- an appearance by Barbara ond man to walk on the moon, Eden, star of the television se- and the grand opening of the ries "I Dream of Jeannie" on Visitor Center’s “Mission to July 23 from 11:30 a.m. to 1:30 Mars” interactive exhibit com- p.m. The activities are all free. Brevard crisis line seeks volunteers Kennedy Space Center who offer telephone outreach employees have an opportu- and reassurance to isolated or nity to contribute directly to homebound elderly clients; the community by volunteer- data entry assistants, who JUDY CASPER worked in sports information during the Olympic Trials last month. ing to assist Crisis Services of assist in entering call data Brevard, Inc. in responding to and community resource data KSC employees volunteer at Olympics calls for help. into a computer system; and The telephone counseling fund-raising, special projects Judy Casper, branch man- tional Amateur Athletics Asso- service provides confidential or administrative assistants ager of public relations for ciation, the official governing 24-hour-a-day service to who help with events and EG&G Florida, Inc., and Klaus body for track and field compe- people who call in with any projects. Staefe, who works in the Instal- tition, for the duration of the type of problem. Time commitments vary lation Operations Directorate, Games, July 22 through Aug. 4. Opportunities are available depending upon the area of are volunteering their sports- Staefe, who has officiated at for trained and untrained service. For more information, related experience to the Olym- hockey games on the interna- positions as crisis line volun- contact Linda Lawrence, pics. tional level, has been designated teers, who provide 24-hour-a- program director, at 631-9290. Casper, who has an extensive as the officials coordinator for all day assistance to callers; Crisis Services of Brevard, background in sports adminis- soccer games played in Orlando. sunshine service volunteers Inc. is a United Way agency. tration, will be working with Staefe also officiated at the representatives of the Interna- World Cup in Orlando in 1994. July 19, 1996 SPACEPORT NEWS Page 3 Warm crowds greet torch along road through KSC TORCH. (Continued from Page 1) TOP LEFT: KSC runner Eric Oulette, accompanied by an Atlanta Committee for the Jay Honeycutt were on hand to Olympic Games escort, proudly carries the torch welcome the torch as were STS-78 down the Saturn Causeway on the way to Launch Commander Tom Henricks and Pilot Pad 39A. Kevin Kregel, who presented a sym- TOP RIGHT: Marty Winkel savors the cheers of the crowd as he delivers the torch to the KSC bolic torch that was flown on that Vistor Center. mission to a representative from the CENTER: Loren Shriver pauses in front of the Atlanta Committee for the Olympic Space Shuttle Atlantis after receiving the flame Games. at Launch Pad 39A. BELOW LEFT: STS-78 Pilot Kevin Kregel, NASA Hugh Harris, director of Public Administrator Dan Goldin, Center Director Jay Affairs, acknowledged each of the 20 Honeycutt and STS-78 Commander Tom Henricks runners who carried the torch through stand with the symbolic torch the STS-78 crew Kennedy Space Center before signal- carried aboard that mission. BELOW RIGHT: Jane Hodges lights her torch ing Jane Hodges, a Public Affairs from a cauldron where the flame was held during employee, to light her torch from a ceremonies at the Visitor Center. cauldron holding the flame, and carry it forward on its journey to Atlanta and the Games. Page 4 SPACEPORT NEWS Mars probes build on past f wenty years after the landing of the Viking Orbiter on Mars, plans Tare underway for a decade of ex- ploratory missions to the Red Planet. On Nov. 6, NASA and the Jet Propulsion Laboratory (JPL) plan to begin the effort with the launch of Mars Global Surveyor on a Delta II rocket from Cape Canaveral Air Station (CCAS) Complex 17A. The Sur- veyor will travel hundreds of millions of ki- lometers to carry out an extensive study of the planet using its suite of sophisticated remote-sensing instruments.
Recommended publications
  • The SKYLON Spaceplane
    The SKYLON Spaceplane Borg K.⇤ and Matula E.⇤ University of Colorado, Boulder, CO, 80309, USA This report outlines the major technical aspects of the SKYLON spaceplane as a final project for the ASEN 5053 class. The SKYLON spaceplane is designed as a single stage to orbit vehicle capable of lifting 15 mT to LEO from a 5.5 km runway and returning to land at the same location. It is powered by a unique engine design that combines an air- breathing and rocket mode into a single engine. This is achieved through the use of a novel lightweight heat exchanger that has been demonstrated on a reduced scale. The program has received funding from the UK government and ESA to build a full scale prototype of the engine as it’s next step. The project is technically feasible but will need to overcome some manufacturing issues and high start-up costs. This report is not intended for publication or commercial use. Nomenclature SSTO Single Stage To Orbit REL Reaction Engines Ltd UK United Kingdom LEO Low Earth Orbit SABRE Synergetic Air-Breathing Rocket Engine SOMA SKYLON Orbital Maneuvering Assembly HOTOL Horizontal Take-O↵and Landing NASP National Aerospace Program GT OW Gross Take-O↵Weight MECO Main Engine Cut-O↵ LACE Liquid Air Cooled Engine RCS Reaction Control System MLI Multi-Layer Insulation mT Tonne I. Introduction The SKYLON spaceplane is a single stage to orbit concept vehicle being developed by Reaction Engines Ltd in the United Kingdom. It is designed to take o↵and land on a runway delivering 15 mT of payload into LEO, in the current D-1 configuration.
    [Show full text]
  • Minotaur I User's Guide
    This page left intentionally blank. Minotaur I User’s Guide Revision Summary TM-14025, Rev. D REVISION SUMMARY VERSION DOCUMENT DATE CHANGE PAGE 1.0 TM-14025 Mar 2002 Initial Release All 2.0 TM-14025A Oct 2004 Changes throughout. Major updates include All · Performance plots · Environments · Payload accommodations · Added 61 inch fairing option 3.0 TM-14025B Mar 2014 Extensively Revised All 3.1 TM-14025C Sep 2015 Updated to current Orbital ATK naming. All 3.2 TM-14025D Sep 2018 Branding update to Northrop Grumman. All 3.3 TM-14025D Sep 2020 Branding update. All Updated contact information. Release 3.3 September 2020 i Minotaur I User’s Guide Revision Summary TM-14025, Rev. D This page left intentionally blank. Release 3.3 September 2020 ii Minotaur I User’s Guide Preface TM-14025, Rev. D PREFACE This Minotaur I User's Guide is intended to familiarize potential space launch vehicle users with the Mino- taur I launch system, its capabilities and its associated services. All data provided herein is for reference purposes only and should not be used for mission specific analyses. Detailed analyses will be performed based on the requirements and characteristics of each specific mission. The launch services described herein are available for US Government sponsored missions via the United States Air Force (USAF) Space and Missile Systems Center (SMC), Advanced Systems and Development Directorate (SMC/AD), Rocket Systems Launch Program (SMC/ADSL). For technical information and additional copies of this User’s Guide, contact: Northrop Grumman
    [Show full text]
  • Spaceport Infrastructure Cost Trends
    AIAA 2014-4397 SPACE Conferences & Exposition 4-7 August 2014, San Diego, CA AIAA SPACE 2014 Conference and Exposition Spaceport Infrastructure Cost Trends Brian S. Gulliver, PE1, and G. Wayne Finger, PhD, PE2 RS&H, Inc. The total cost of employing a new or revised space launch system is critical to understanding its business potential, analyzing its business case and funding its development. The design, construction and activation of a commercial launch complex or spaceport can represent a significant portion of the non-recurring costs for a new launch system. While the historical cost trends for traditional launch site infrastructure are fairly well understood, significant changes in the approach to commercial launch systems in recent years have required a reevaluation of the cost of ground infrastructure. By understanding the factors which drive these costs, informed decisions can be made early in a program to give the business case the best chance of economic success. The authors have designed several NASA, military, commercial and private launch complexes and supported the evaluation and licensing of commercial aerospaceports. Data from these designs has been used to identify the major factors which, on a broad scale, drive their non-recurring costs. Both vehicle specific and location specific factors play major roles in establishing costs. I. Introduction It is critical for launch vehicle operators and other stakeholders to understand the factors and trends that affect the non-recurring costs of launch site infrastructure. These costs are often an area of concern when planning for the development of a new launch vehicle program as they can represent a significant capital investment that must be recovered over the lifecycle of the program.
    [Show full text]
  • Spaceport News America's Gateway to the Universe
    MissionUpdate Vol. 36, No. 17 August 29, 1997 Shuttle-Mir Spaceport News America's gateway to the universe. Leading the world in preparing and launching missions to Earth and beyond. John F. Kennedy Space Center Internal EVA conducted: Mir 24 cosmonauts Anatoly Solovyev and Pavel Vinogradov and U.S. astronaut Michael Foale continue the process of verifying restoration of electrical power to the Russian Busy week at Space Station Mir after an intravehicular activity Aug. 22. Troubleshooting of the oxygen- generating system also was under America’s way, and an extravehicular activity was tentatively set for the first week of September to conduct an spaceport inspection of leak sites on the damaged Spektr module. STS-86 ONE Shuttle rolled out to the launch pad Aug. 18 and another returned to KSC the following day. The Space Shuttle Atlantis (above) is now at Pad 39A, undergoing final preparations for launch Sept. 25 on the seventh Shuttle-Mir docking mission, STS-86. The Terminal Countdown Demonstration Test is scheduled for Sept. 9- Atlantis (20th flight OV-104) 10. At about 7:08 a.m., Aug. 19, Discovery (right) 87th Shuttle flight touched down on Runway 33 of KSC's Shuttle Landing Pad 39A Facility, bringing Mission STS-85 to a successful 7th Mir Docking conclusion. Researchers were delighted with the Launch: Sept. 25, 10:34 p.m. performance of the primary scientific instruments flown Crew: Wetherbee; Bloomfield; on the 86th Shuttle flight, the Cryogenic Infrared Parazynski; Titov; Chretien Spectrometers and Telescopes for the Atmosphere (France); Lawrence; Wolf. (CRISTA)-SPAS and the Middle Atmosphere High Commander Wetherbee flew on Resolution Spectrograph Investigation (MAHRSI), both of STS-63, the Shuttle flight that which performed flawlessly.
    [Show full text]
  • SPACE VEHICLE OPERATORS CONCEPT of OPERATIONS a Vision to Transform Ground and Launch Operations
    SPACE VEHICLE OPERATORS CONCEPT OF OPERATIONS A Vision to Transform Ground and Launch Operations Future Interagency Range and Spaceport Technologies October 2004 Future Interagency Range and Spaceport Technologies (FIRST) FOREWORD The Future Interagency Range and Spaceport Technologies (FIRST) initiative is a partnership and interagency working group of NASA, the Department of Defense (Air Force Space Command and Office of the Secretary of Defense), and the Federal Aviation Administration. The partnership was established to guide transformation of U.S. ground and space launch operations toward a single, integrated national “system” of space transportation systems that enables low-cost, routine, safe access to space for a variety of applications and markets through technology infusion. This multi-agency consortium is formulating plans to create a national program office that will coordinate individual agency plans to produce an integrated national space transportation system infrastructure comprised of spaceports, ranges, and space and air traffic management systems. A set of concepts of operations, or CONOPS, has been produced to articulate a cohesive interagency vision for this future space transportation system in support of FIRST program formulation efforts. These concepts are intended to guide and support the coordinated development of technologies that allow multiple launch vehicle architectures and missions to be supported by the same ground and launch systems without significant modification. These documents reflect the interests of the partners in the working group, and are not intended to imply final approval or policy of any of the participating agencies. These visionary CONOPS documents have been built on the foundation that was established over the past two years by the Advanced Range Technology Working Group (ARTWG) and Advanced Spaceport Technology Working Group (ASTWG).
    [Show full text]
  • The World's Spaceport
    Strict security THE WORLD’S The French government, the CSG, and Arianespace follow strict security measures that meet the most rigorous international SPACEPORT and national agreements and requirements. Arianespace activities are characterized as highly security sensitive ones by the French governement and consequently very strict and rigorous measures are implemented with the Ideal location support of national authorities to satisfy both national and international requirements. They apply to the three launch The Guiana Space Center (CSG) offers ideal conditions for systems: Ariane 5, Soyuz, and Vega, and strictly limit access launching any payload to any orbit at any time. Located to spacecraft. at 5 degrees North latitude, its proximity to the equator provides an extra boost of energy due to the Earth’s Specifically, the security regime is compliant with requirements rotation – a slingshot effect that is greater here than at most governing the export of U.S. manufactured satellites or parts other launch sites. under the ITAR regulation. State-of-the-art facilities Safety mission TECHNICAL OVERVIEW The CSG provides modern Payload Preparation Facilities The CSG entities apply rigorous Safety Rules during each that are recognized for their high quality in the space launch campaign: this includes authorization of equipment industry. The facilities are capable of processing several use, operator certification, and permanent operation spacecrafts from different customers simultaneously, thanks monitoring. Any potentially dangerous activity is to be to vast clean-rooms and commodious infrastructure. reported to the CSG responsible, which in turn, makes certain Designed to support the rockets’ multiple launch capability that safety equipment and emergency response teams are SOYUZ and high launch tempo, the preparation facilities meet the poised to deal with any hazard.
    [Show full text]
  • Forging Commercial Confidence
    SPACEPORT UK: AHEAD FORGING WITH COMMERCIAL CONFIDENCE Copyright © Satellite Applications Catapult Ltd 2014. SPACEPORT UK: FORGING AHEAD WITH COMMERCIAL CONFIDENCE TABLE OF CONTENTS 1 EXECUTIVE SUMMARY 07 2 DEMAND FORECAST 11 • Commercial human spaceflight • Very high speed point to point travel • Satellite deployment • Microgravity research • Other commercial demand 3 SPACEPORT FACILITIES 47 • Core infrastructure required • Spaceflight preparation and training • Tours/visitor centre • Space campus • Key findings 4 WIDER ECONOMIC IMPACT 57 • Summary • Site development • Employment • Tourism • R&D/education • Key findings 4 TABLE OF CONTENTS 5 REGULATORY ENVIRONMENT 67 • Unlocking commercial potential 6 RISKS 73 • Accidents • Single operator • Local opposition 7 FINANCING 77 • Existing scenario • Potential funding sources • Other sources of funds • Insurance • Key findings Appendices 85 • Appendix A • Appendix B Acknowledgements and contact information 89 5 Spaceport UK: A pillar of growth for the UK and European space industry, enabling lower cost access to space, and creating economic benefit far beyond its perimeter fence. A spaceport will unlock economic growth and jobs in existing UK industries and regions, while positioning the UK to take advantage of emerging demand for commercial human spaceflight, small satellite launch, microgravity research, parabolic flights, near-space balloon tourism, and eventually high-speed point-to-point travel. Without a specific site selected and looking at the economic impact of a spaceport generically, this report expects the spaceport to deliver approximately £2.5bn and 8,000 jobs to the broader UK economy over 10 years. EXECUTIVE SUMMARY 1 Executive Summary Our plan is for Britain to have a fully functional, operating spaceport “by 2018. This would serve as a European focal point for the pioneers of commercial spaceflight using the potential of spaceflight experience companies like Virgin Galactic, XCOR and Swiss S3 to pave the way for satellite launch services to follow.
    [Show full text]
  • NASA's Space Launch System
    https://ntrs.nasa.gov/search.jsp?R=20160006989 2019-08-31T02:36:41+00:00Z View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by NASA Technical Reports Server SP2016_AP2 NASA’s Space Launch System: An Evolving Capability for Exploration Stephen D. Creech(1), Dr. Kimberly F. Robinson(2) (1)Deputy Manager , SLS Spacecraft/Payload Integration and Evolution, XP50, NASA Marshall Space Flight Center, Alabama, 35812, USA, [email protected] (2)SLS Strategic Communications Manager, XP02, NASA Marshall Space Flight Center, Alabama, 35812, USA, [email protected] ABSTRACT: launch capability via an affordable and sustainable development path. Designed to meet the stringent requirements of human exploration missions into deep space and to Mars, NASA’s Space Launch System (SLS) vehicle represents a unique new launch capability opening new opportunities for mission design. NASA is working to identify new ways to use SLS to enable new missions or mission profiles. In its initial Block 1 configuration, capable of launching 70 metric tons (t) to low Earth orbit (LEO), SLS is capable of not only propelling the Orion crew vehicle into cislunar space, but also delivering small satellites to deep space destinations. The evolved configurations of SLS, including both the 105 t Block 1B and the 130 t Block 2, offer opportunities for launching co-manifested payloads and a new class of secondary payloads with the Orion crew vehicle, and also offer the capability to carry 8.4- or 10-m payload fairings, larger than any contemporary launch vehicle, delivering unmatched mass-lift capability, payload volume, and C3.
    [Show full text]
  • Building a Global Launch Network: Extending the Reach of Dedicated Small Satellite Launch Using New, Data-Driven Spaceport Assessment Tools
    SSC20-VIII-07 Building a Global Launch Network: Extending the Reach of Dedicated Small Satellite Launch Using New, Data-Driven Spaceport Assessment Tools John Fuller, Ren Liao, Kirit Patel, Sirisha Bandla, Monica Jan Virgin Orbit 4022 E Conant Street, Long Beach, CA 90808, United States [email protected] Wade McElroy, Mandy Vaughn VOX Space 840 Apollo St, Suite 100, El Segundo, CA 90245, United States [email protected] ABSTRACT The proliferation and sustained growth of small satellite architecture solutions, once an uncertain aspect of tomorrow’s space industry, are now largely perceived as a firm reality. Recent trends continue to show an increasing fraction of launch industry revenue being captured by small and dedicated launch vehicles, such as Virgin Orbit’s LauncherOne. Concurrently, another indicator of small satellite proliferation are recent announcements of increased rideshare opportunities by large launch vehicle operators. As numerous dedicated and rideshare launches emerge as solutions for small satellite customers, understanding the relative advantages and performance of these vehicles will be crucial to satisfy not only single launch, but broader architectural mission needs. Virgin Orbit and VOX Space have presented how a responsive air-launched architecture with multiple hosting spaceports and modularized systems at each can be leveraged to launch entire constellations within days. We have since continued to grow our spaceport network to support domestic and international mission planners that desire a launch vehicle that isn’t constrained to a permanent fixed site or departure corridor. Building upon that work, new analytical methods to analyze and communicate the advantages of air-launch from spaceports around the globe have been devised.
    [Show full text]
  • Cecil Spaceport Master Plan 2012
    March 2012 Jacksonville Aviation Authority Cecil Spaceport Master Plan Table of Contents CHAPTER 1 Executive Summary ................................................................................................. 1-1 1.1 Project Background ........................................................................................................ 1-1 1.2 History of Spaceport Activities ........................................................................................ 1-3 1.3 Purpose of the Master Plan ............................................................................................ 1-3 1.4 Strategic Vision .............................................................................................................. 1-4 1.5 Market Analysis .............................................................................................................. 1-4 1.6 Competitor Analysis ....................................................................................................... 1-6 1.7 Operating and Development Plan................................................................................... 1-8 1.8 Implementation Plan .................................................................................................... 1-10 1.8.1 Phasing Plan ......................................................................................................... 1-10 1.8.2 Funding Alternatives ............................................................................................. 1-11 CHAPTER 2 Introduction .............................................................................................................
    [Show full text]
  • National Spaceport Network Development Plan
    SPfciCEPORT ALLIANCE National Spaceport Network Development Plan Prepared by the Global Spaceport Alliance for the Office of Spaceports Office of Commercial Space Transportation Federal Aviation Administration June 1, 2020 EXECUTIVE SUMMARY Space has become an indispensable part of everyday life in the 21st century, supporting not only our nation's military and intelligence capabilities, but also communications, navigation, weather forecasting, agriculture, financial transactions, disaster response, and even entertainment. The Eastern Range, located at Cape Canaveral Air Force Station, Florida, and the Western Range, located at Vandenberg Air Force Base, California, have served as the military's primary launch sites for space launches and missile tests for more than 60 years. Many NASA and commercial space missions have also been conducted from those locations. Recently however, a number of commercial spaceports have been established by state and local governments, or by private companies, based on a desire to take advantage of the growing space economy, to minimize the federal regulatory burden, and to provide additional launch opportunities for civil and commercial space missions. The development of a National Spaceport Network, consisting of current and prospective commercial spaceports, government-owned-and-operated launch & landing sites, and privately- owned-and-operated launch & landing sites, offers an opportunity to increase the safety, capacity, efficiency, and resiliency of the nation's space operations. Such a network could provide the framework for formal or informal public-private partnerships between federal, state, and local governments; the aerospace industry; and academia. A key component of the operation of a successful network of spaceports is federal funding for infrastructure development.
    [Show full text]
  • Space Launch Vehicles: Government Activities, Commercial Competition, and Satellite Exports
    Order Code IB93062 CRS Issue Brief for Congress Received through the CRS Web Space Launch Vehicles: Government Activities, Commercial Competition, and Satellite Exports Updated September 7, 2001 Marcia S. Smith Resources, Science, and Industry Division Congressional Research Service The Library of Congress CONTENTS SUMMARY MOST RECENT DEVELOPMENTS BACKGROUND AND ANALYSIS U.S. Launch Vehicle Policy From “Shuttle-Only” to “Mixed Fleet” Clinton Administration Policy U.S. Launch Vehicle Programs and Issues NASA’s Space Shuttle Program Future Launch Vehicle Development Programs DOD’s Evolved Expendable Launch Vehicle (EELV) Program Government-Led Reusable Launch Vehicle (RLV) Programs Private Sector RLV Development Efforts U.S. Commercial Launch Services Industry Congressional Interest Foreign Competition (Including Satellite Export Issues) Europe China Russia Ukraine India Japan LEGISLATION IB93062 09-07-01 Space Launch Vehicles: Government Activities, Commercial Competition, and Satellite Exports SUMMARY Launching satellites into orbit, once the X-33, suffered delays and on March 1, 2001 exclusive domain of the U.S. and Soviet gov- NASA decided to end the program. ernments, today is an industry in which compa- Companies developing new launch vehicles are nies in the United States, Europe, China, Rus- reassessing their plans, and NASA has initiated sia, Ukraine, Japan, and India compete. In the a new “Space Launch Initiative” (SLI) to United States, the National Aeronautics and broaden the choices from which it can choose Space Administration (NASA) continues to be a new RLV design. Some of the SLI funding responsible for launches of its space shuttle, and is going to companies that have been trying to the Air Force has responsibility for launches develop their own new launch vehicles.
    [Show full text]