FY 2001 MILITARY CONSTRUCTION, DEFENSE-WIDE ($ in Thousands)
Total Page:16
File Type:pdf, Size:1020Kb
FY 2001 MILITARY CONSTRUCTION, DEFENSE-WIDE ($ in Thousands) New/ Authorization Approp. Current Page State/Agency/Installation/Project Request Request Mission No. Alaska Tricare Management Activity Fort Wainwright Hospital Replacement (Phase II) 0 44,000 C 8 California Tricare Management Activity Camp Pendleton MC Base FHOTC Support Facilities 2,900 2,900 C 12 Medical/Dental Clinic Repl (Horno) 3,950 3,950 C 15 Medical/Dental Clinic Repl (Las Flores) 3,550 3,550 C 18 Medical/Dental Clinic Repl (Las Pulgas) 3,750 3,750 C 21 Edwards Air Force Base Medical Clinic Addn/Dental Clinic Alt 17,900 17,900 C 24 Florida Tricare Management Activity Eglin Air Force Base Hospital Addition/Alteration/LSU 37,600 37,600 C 28 Patrick Air Force Base Medical Clinic 2,700 2,700 C 32 Tyndall Air Force Base Medical Clinic Addition/Alteration 7,700 7,700 C 36 New York Tricare Management Activity Fort Drum Veterinary Treatment Facility 1,400 1,400 C 40 Total Inside the United States 81,450 125,450 Germany Tricare Management Activity Kitzingen Health/Dental Clinic Life Safety Upgrade 1,400 1,400 C 45 Wiesbaden Health/Dental Clinic Addition/Alteration 7,187 7,187 C 48 FY 2001 MILITARY CONSTRUCTION, DEFENSE-WIDE ($ in Thousands) New/ Authorization Approp. Current Page State/Agency/Installation/Project Request Request Mission No. Italy Tricare Management Activity Naples Medical/Dental Facility Replacement 43,850 43,850 C 51 Total Outside the United States 52,437 52,437 Total 133,887 177,887 1. COMPONENT FY 2001 MILITARY CONSTRUCTION PROGRAM 2. DATE DEF (TMA) FEBRUARY 2000 3. INSTALLATION AND LOCATION 4. COMMAND 5. AREA CONSTRUCTION Fort Wainwright COST INDEX US Army Pacific Alaska 1.71 6. PERSONNEL STRENGTH: PERMANENT STUDENTS SUPPORTED OFFICER ENLIST CIVIL OFFICER ENLIST CIVIL OFFICER ENLIST CIVIL TOTAL A. AS OF 30 SEP 1999 558 4305 677 0 0 0 9 63 995 6,307 B. END FY 2005 558 4305 676 0 0 0 9 63 995 6,306 7. INVENTORY DATA ($000) A. TOTAL AREA 265,572 ha B. INVENTORY TOTAL AS OF 30 SEPTEMBER 1999 509,175 C. AUTHORIZATION NOT YET IN INVENTORY 18,000 D. AUTHORIZATION REQUESTED IN THIS PROGRAM 44,000 E. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM 38,000 F. PLANNED IN NEXT THREE YEARS 33,000 G. REMAINING DEFICIENCY 0 H. GRAND TOTAL 642,175 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY PROJECT PROJECT TITLE COST DESIGN STATUS CODE NUMBER ($000) START COMPLETE 510 51641 Hospital Replacement (Phase II) 44,000 09/1997 05/2000 TOTAL 44,000 9. FUTURE PROJECTS: CATEGORY COST CODE PROJECT TITLE ($000) A. INCLUDED IN THE FOLLOWING PROGRAM (FY 2002) NONE 510 Hospital Replacement PH III 38,000 TOTAL 38,000 B. PLANNED NEXT THREE YEARS: NONE 510 Hospital Replacement PH IV 23,000 510 Hospital Replacement PH V 10,000 TOTAL 33,000 10. MISSION OR MAJOR FUNCTION: The mission is the defense of Alaska, including the initial defense of the Aleutian Islands. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES: ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 RPM Backlog: There are no service estimated costs associated with deficiencies in medical facilities at this installation. Director DMFO: Mr. Surinder K. Sharma, P.E. Phone Number: 703-681-3970 Form PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. DD 1 Dec 76 1390 1. Component 2. Date DEF (TMA) FY 2001 MILITARY CONSTRUCTION PROJECT DATA FEB 2000 3. Installation and Location/UIC: 4. Project Title Fort Wainwright Hospital Replacement (Phase II) Alaska 5. Program Element 6. Category Code 7. Project Number 8. Project Cost ($000) 87717D 510 51641 Auth 0 Appr 44,000 9. COST ESTIMATES Item U/M Quantity Unit Cost Cost ($000) PRIMARY FACILITIES 33,520 Hospital Replacement (Phase II) LS -- -- (33,520) SUPPORTING FACILITIES 7,795 Supporting Facilities LS -- -- (7,795) ESTIMATED CONTRACT COST 41,315 CONTINGENCY PERCENT (0.00%) 0 SUBTOTAL 41,315 SUPERVISION, INSPECTION & OVERHEAD (6.50%) 2,685 CATEGORY E EQUIPMENT (0) TOTAL REQUEST 44,000 TOTAL REQUEST (ROUNDED) 44,000 INSTALLED EQT-OTHER APPROPRIATIONS (0) 10. Description of Proposed Construction: This project is the second phase (main structures) of construction of the new 32-bed hospital at Fort Wainwright to replace the current Bassett Army Community Hospital built in 1951. The total project will provide an energy efficient building of reinforced concrete foundation and floor slab, structural steel frame and all utility, communication, security and fire protection systems. The project will provide health care facilities for internal medicine, general surgery, ENT, orthopedics, obstetrics and gynecology, pediatrics and family practice. The project will be designed in accordance with criteria prescribed in MIL-HDBK-1191 and the Uniform Federal Accessibility Standards/Americans with Disabilities Act Accessibility Guidelines. Operation and maintenance manuals will be provided. Air Conditioning: 2,950 KW. 11. REQ: 24,109 m2 ADQT: NONE SUBSTD: 14,427 m2 PROJECT: Construct a replacement for the existing Bassett Army Community Hospital. (CURRENT MISSION) REQUIREMENT: This project is required to provide a facility designed to support current health care practices for the military, dependent, and retiree population of Forts Wainwright and Greely, and remote military sites north of the Alaska Range. The service area is approximately 46,400 square miles. The increased emphasis upon outpatient care, work measurement standards, and the increased use of automation equipment (both clinical and administrative) requires a facility designed to efficiently support these functions. Bassett ACH also provides hospital and specialty services to Eielson AFB, some 20 miles distant, with an active duty population of 3,400 airmen. CURRENT SITUATION: Bassett Army Community Hospital was constructed in 1951 as a 300-bed facility, and still has the original steam radiator heating system, plumbing system, and electrical wiring system. The practice of health care has changed significantly since the building was constructed, with emphasis shifting from inpatient care to ambulatory care. Outpatient care is being performed in areas designed for inpatient care. The existing electrical system cannot support the expanding use of state-of-the-art electronic medical and laboratory equipment. The steam and water lines are corroded and have exceeded their life expectancy. There is asbestos material in the existing pipe insulation, counter tops, and floor tile. The in-line medical air system is currently constructed of galvanized steel piping, which violates code for such construction. The cost of repair of this system is prohibitive due to the presence of asbestos. DD Form 1391 1 Dec 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. UNTIL EXHAUSTED 1. Component 2. Date DEF (TMA) FY 2001 MILITARY CONSTRUCTION PROJECT DATA FEB 2000 3. Installation and Location/UIC: 4. Project Title Fort Wainwright Hospital Replacement (Phase II) Alaska 5. Program Element 6. Category Code 7. Project Number 8. Project Cost ($000) 87717D 510 51641 Auth 0 Appr 44,000 CURRENT SITUATION (CONTINUED): This system has been placed out of service. Outside temperatures range from -70 degrees F in winter to 95 degrees F in summer. Daylight hours range from three hours in winter to over twenty-two hours in summer. The climatic extremes make the internal building environment miserable for patients and staff. IMPACT IF NOT PROVIDED: Failure to provide this project will continue to impede mission accomplishment. Staff and patient safety and comfort will continue to be compromised by lack of modern utility systems and adequate life safety provisions. 12. Supplemental Data: A. Estimated Design Data: (1) Status: month & year (a) Design Start Date SEP 1997 (b) Percent Complete As Of 01 Jan 2000 (BDGT YR) 100 (c) Percent Complete As Of 01 Oct 2000 (PROG YR) 100 (d) Concept Complete Date JUN 1999 (e) Design Complete Date JAN 2000 (f) Type of Design Contract: 1. Design Build (YES/NO) NO 2. Design-Bid-Build (YES/NO) YES 3. Site Adapt (YES/NO) NO (2) Basis: (a) Standard or Definitive Design - (YES/NO) N (b) Where Design Was Most Recently Used (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): ($000) (a) Production of Plans and Specifications 6,181 (b) All Other Design Costs 8,068 (c) Total Design Cost 14,249 (d) Contract 11,650 (e) In-house 2,599 month & year (4)Design Contract Award SEP 1997 (5) Construction Start JAN 2001 (6) Construction Completion JUN 2005 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Medical Equipment OMA 2003 $16,750 Director, Defense Medical Facilities Office: Mr. Surinder K. Sharma, P.E. Phone Number: 703-681-3970 Form DD 1 Dec 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. UNTIL EXHAUSTED 1. COMPONENT FY 2001 MILITARY CONSTRUCTION PROGRAM 2. DATE DEF (TMA) FEBRAURY 2000 3. INSTALLATION AND LOCATION 4. COMMAND 5. AREA CONSTRUCTION COST INDEX Camp Pendleton Bureau of Medicine and Surgery California 1.14 6. PERSONNEL STRENGTH: PERMANENT STUDENTS SUPPORTED OFFICER ENLIST CIVIL OFFICER ENLIST CIVIL OFFICER ENLIST CIVIL TOTAL A. AS OF 30 SEP 1999 286 1,066 1,542 69 5477 0 2,213 29,019 3,908 43,580 B. END FY 2005 162 1,090 1,566 147 6678 0 2,481 30,467 3,867 46,458 7. INVENTORY DATA ($000) A. TOTAL AREA 186,061 Acres B. INVENTORY TOTAL AS OF 30 SEPTEMBER 1999 1,018 C. AUTHORIZATION NOT YET IN INVENTORY 0 D. AUTHORIZATION REQUESTED IN THIS PROGRAM 14,150 E. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM 0 F. PLANNED IN NEXT THREE YEARS 3,300 G. REMAINING DEFICIENCY 0 H. GRAND TOTAL 18,468 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY PROJECT PROJECT TITLE COST DESIGN STATUS CODE NUMBER ($000) START COMPLETE 510 48981 FHOTC Support Facilities 2,900 04/1999 07/2000 550 25940 Medical/Dental Clinic Replacement (Horno) 3,950 Site Adapt 01/2001 550 25943 Medical/Dental Clinic Replacement (Las Flores) 3,550 Site Adapt 01/2001 550 25941 Medical/Dental Clinic Replacement (Las Pulgas) 3,750 Site Adapt 01/2001 TOTAL 14,150 9.