FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, 411027

APPENDIX I (See paragraph – 6)

FORM – 1

(I) Basic Information

S.No. Item Details

1 Name of the Project Expansion of “Neco Skypark ” 2 S. No. in the Schedule 8(a) Total Plot Area = 16117.10 m2 Existing : Proposed Total Construction area: 34801.23 m2 2 2 capacity/area/length/tonnage to be (FSI 14105.08 m + NON FSI 20696.15 m ) 3 2 handled/ command area/ lease area/ Proposed : Total Construction area: 8763.11 m (FSI 4883.81 m2 + NON FSI 3879.30 m2 ) number of wells to be drilled Total Existing and proposed Total Construction Area: 43564.34 m2 (FSI 18988.89 m 2 + NON FSI 24575.45m2) 4 New/Expansion/Modernization Expansion Total Plot Area = 16117.10 m2 Existing : 5 Total Construction area: 34801.23 m2 2 2 (FSI 14105.08 m + NON FSI 20696.15 m ) Existing Capacity/Area etc. 2 Proposed : Total Construction area: 8763.11 m (FSI 4883.81 m2 + NON FSI 3879.30 m2 )

Total Existing and proposed Total Construction Area: 43564.34 m2 (FSI 18988.89 m 2 + NON FSI 24575.45m2) 6 Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ Does it attract the general 7 No condition? If yes, please specify. Does it attract the specific 8 No condition? If yes, please specify. Location Pimple Nilakh Plot/Survey/Khasra No. Survey No.20 Village Pimple Nilakh 9 Tehsil Haveli District Pune State Nearest railway station/airport Railway Station –6.0 Km 10 along with distance in Kms. – 18.60 Km Nearest Town, city, District 11 Headquarters along with distance in Nearest City– 13.00 Km Kms

FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, PUNE 411027

Village Panchayats, Zilla Parishad, Municipal Corporation, Local body 12 Municipal Corporation (Complete postal addresses with telephone nos. to be given) 13 Name of the applicant Tirth Home Developers 595/D Narendra Villa, Dr. Ambedkar Road, 14 Registered Address Matunga (CR), 400019 Pundol Apartment, 160 M G Road, Camp, Pune Address for correspondence: 411001 Name Mr. Dhanesh Ajmera

Designation (Owner/Partner/CEO) Partner 15 Address Pundol Apartment, 160 M G Road, Camp, Pune Pin code 411001 E- mail [email protected] Telephone No. 020-26357731, 020- 26346425 Fax No. 020- 26332013 Details of Alternative Sites examined, if any. Location of these No 16 sites should be shown on a toposheet. 17 Interlinked Projects No Whether separate application of 18 interlinked project has been Not Applicable submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. 21 (a) The Forest (Conservation) Act, No 1980? (b) The Wild life (Protection) Act 1972? (c) The C.R.Z. Notification, 1991? Whether there is any Government 22 Order / Policy relevant/ relating to No the site? 23 Forest Land involves (hectares) No Whether there is any litigation pending against the project and/ or 24 land in which the project is proposal No to be set up Name of the Court Case No. Orders / directions of the

FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, PUNE 411027

Court, if any and its relevance with the proposed project.

II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (Topography, land use, etc.)

Details thereof (with approximate Sr. Information/Checklist Yes/ quantities /rates, wherever possible) with No. confirmation No source of information data Basically land was Developed land. The proposed project site is designated for the Permanent or temporary change in intended purpose and the necessary change land use, land cover or topography in the land use of the plot area measuring 1.1 including increase in intensity of No 16117.10m2 has already been affected by land use (with respect to local land converting it for residential use. use plan) ANNEXURE II : SITE LOCATION PLAN Clearance of existing land, 1.2 No Not Applicable vegetation and buildings? 1.3 Creation of new land uses? No Not Applicable Pre-construction investigations e.g. 1.4 Yes Not Applicable bore houses, soil testing? Total Plot Area = 16117.10 m2 Existing : Total Construction area: 34801.23 m2 (FSI 14105.08 m2 + NON FSI 20696.15 m2) Proposed : Total Construction area: 1.5 Construction works? Yes 8763.11 m2 (FSI 4883.81 m2 + NON FSI 3879.30 m2 ) Total Existing and proposed Total Construction Area: 43564.34 m2 (FSI 18988.89 m 2 + NON FSI 24575.45m2)ANNEXURE V: MASTER PLAN 1.6 Demolition works? No Not Applicable Temporary sites used for During construction total 50 Nos. of 1.7 construction works or housing of Yes workers will be on site. construction workers? As it is Expansion Project So Plot is Above ground buildings, structures Developed Land. 1.8 or Earth works including linear Yes Total 43564.34 m2 (FSI + Non FSI) will be structures, cut and fill or excavations built up area for residential purpose. Excavated material during construction will

FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, PUNE 411027

Details thereof (with approximate Sr. Information/Checklist Yes/ quantities /rates, wherever possible) with No. confirmation No source of information data be used for landscape & backfilling; therefore there will not be any solid waste problem from the generation of construction- excavated earth. Underground works including 1.9 No Not Applicable mining or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable Production and manufacturing 1.13 No Not Applicable processes? Facilities for storage of goods or Temporary shed will be constructed for the 1.14 Yes materials? storage of the construction material Solid Waste Management During Construction Phase – Excavated material will be used for backfilling and landscape. During Operation Phase – Total population of the residential scheme is 1390 Nos and & Commercial 25 Nos. 1) Quantity of the solid waste- 716.25 Kg/Day 2) Quantity of the wet waste – 428.5 Kg/Day 3) Quantity of the dry waste- 287.75 Kg/Day Facilities for treatment or disposal of Biodegradable and non biodegradable waste 1.15 Yes solid waste or liquid effluents? will be segregated. Dry waste will be sold out. Wet waste will be treated by ‘Organic Waste Composter’ for composting. WATER MANAGEMENT - During Construction Phase: Source of water – Bore-well Total Water requirement – 50 m3/day During Operation Phase: Water Source: Pimpri Chinchwad Municipal Corporation. Total Water demand is 213.35 m3/day • Domestic for residence is 125.10 m3/day • Flushing for residence is 62.55m3/day

FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, PUNE 411027

Details thereof (with approximate Sr. Information/Checklist Yes/ quantities /rates, wherever possible) with No. confirmation No source of information data • Domestic for commercial is 0.7 m3/day • Flushing for commercial is 0.5 m3/day • Landscaping is 23 m3/day • Club House/ Swimming Pool is 1.5 m3/day (ANNEXURE VIII – WATER BALANCE STATEMENT) Facilities for long term housing of 1.16 No Not Applicable operational workers? New road, rail or sea traffic during 1.17 No Not Applicable construction or operation? New road, rail, air waterborne or other transport infrastructure 1.18 No Not Applicable including new or altered routes and stations, ports, airports etc? Closure or diversion of existing transport routes or infrastructure 1.19 No Not Applicable leading to changes in traffic movements? New or diverted transmission lines or 1.20 No Not Applicable pipelines? Impoundment, damming, culverting, realignment or other changes to the 1.21 No Not Applicable hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not Applicable Abstraction or transfers of water 1.23 No Not Applicable from ground or surface waters? Changes in water bodies or the land 1.24 No Not Applicable surface affecting drainage or run-off? Transport of personnel or materials 1.25 for construction, operation or No Not Applicable decommissioning? Long-term dismantling or 1.26 decommissioning or restoration No Not Applicable works? Ongoing activity during 1.27 decommissioning which could have No Not Applicable an impact on the environment?

FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, PUNE 411027

Details thereof (with approximate Sr. Information/Checklist Yes/ quantities /rates, wherever possible) with No. confirmation No source of information data INFLUX DURING CONSTRUCTION: During construction approximately 50 nos. workers. Influx of people to an area in either INFLUX DURING OPERATION: 1.28 Yes temporarily or permanently? During operation influx of approximately 1390Nos . of persons are going to reside in the Residential complex and 25 Nos. in Commercial Complex 1.29 Introduction of alien species? No Not Applicable Loss of native species or genetic 1.30 No Not Applicable diversity? 1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate Sr. Yes/ Information/checklist confirmation quantities /rates, wherever possible) with No. No source of info rmation data As it is expansion so developed land of about 16117.10 m2. Land especially undeveloped or The proposed development has been 2.1 Yes agricultural land (ha) planned in such a way that it does not damage the existing contours as well as flora & fauna at site. WATER MANAGEMENT - During Construction Phase: Source of water – Bore-well Total Water requirement – 50m3/day During Operation Phase: Water Source : Pimpri Chinchwad Municipal Corporation PROPOSED : Total Water demand is 213.35 m3/day Water (expected source & competing 2.2 Yes • Domestic for residence is 125.10 m3/day users) unit: KLD • Flushing for residence is 62.55 m3/day • Domestic for commercial is 0.7 m3/day • Flushing for commercial is 0.5 m3/day • Landscaping is 23 m3/day • Club House/ Swimming Pool is 1.5 m3/day (ANNEXURE VIII – WATER BALANCE STATEMENT) 2.3 Minerals (MT) No Not Applicable

FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, PUNE 411027

Details thereof (with approximate Sr. Yes/ Information/checklist confirmation quantities /rates, wherever possible) with No. No source of information data Construction material – stone, Companies authorized/ approved local 2.4 aggregates, sand / soil (expected Yes source – MT) vendors

2.5 Forests and timber (source – MT) No Not Applicable SOURCE – Maharashtra State Electricity Distribution Company Limited (MSEDCL) During Construction Phase: • Total Demanded load – 10 KW • D.G. Set Suggested – 1 x 30 KVA • Fuel Consumption –For 30KVA DG set 20 Lit./hr During Operation Phase: Energy including electricity and fuels • Total Demanded load –1380.00 2.6 (source, competing users) Unit: fuel Yes KW (MT), energy (MW) • Transformer Suggested – 22KV/ 630KVA- 2 indoor • DG Set for residential-1 x 200 KVA & 1 x 125KVA • Total Fuel Consumption-for 200KVA DG Set 38lits/hr for 100% load and 32 lits/hr for 75%load For 125KVA: 21lit/hr for 100% load and 17lit/hr for 75% load Any other natural resources (use 2.7 No Not Applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approx. quantities/ Yes/ Sr. rates, wherever possible) with source of Information/Checklist confirmation No No. information data Use of substances or materials, which are hazardous (as per MSIHC rules) to 3.1 human health or the environment No Not Applicable (flora, fauna, and water supplies) Changes in occurrence of disease or 3.2 affect disease vectors (e.g. insect or No Not Applicable water borne diseases) Affect the welfare of people e.g. by It can help in improving the living standards 3.3 No changing living conditions? of that area. Vulnerable groups of people who could be affected by the project e.g. 3.4 No Not Applicable hospital patients, children, the elderly etc.,

FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, PUNE 411027

Details thereof (with approx. quantities/ Yes/ Sr. rates, wherever possible) with source of Information/Checklist confirmation No No. information data 3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Details thereof (with approx. Sr. Yes/ Information/Checklist confirmation quantities/rates, wherever possible) with No. No source of information data Excavated material will be used for back 4.1 Soil, overburden or mine wastes No filling site. SOLID WASTE MANAGEMENT During Construction Phase –Excavated material will be used for backfilling and landscape. During Operation Phase –Total population of the residential scheme is – 1390 Nos and for commercial is 25Nos. 1) Quantity of the solid waste- 716.25 Kg/Day Municipal waste (domestic and or 2) Quantity of the wet waste - 428.5 4.2 Yes commercial wastes) Kg/Day 3) Quantity of the dry waste- 287.75 Kg/Day Biodegradable and non biodegradable waste will be segregated. Dry waste will be sold out. Wet waste will be treated by ‘ Organic Waste Convertor’ for composting. ANNEXURE XIII – SOLID WASTE MANAGEMENT

Hazardous wastes (as per Hazardous 4.3 No Not Applicable Waste Management Rules)

4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable Sewage Treatment Plant will be provided Sewage sludge or other sludge from for treatment of domestic waste. 4.6 Yes effluent treatment ANNEXURE XII: SEWAGE TREATMENT PLANT 4.7 Construction or demolition wastes No Not Applicable

4.8 Redundant machinery or equipment No Not Applicable 4.9 Contaminated soils or other materials No Not Applicable 4.10 Agricultural waste No Not Applicable 4.11 Other solid wastes No Not Applicable

FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, PUNE 411027

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approx. Sr. Yes/ Information/Checklist confirmation quantities/rates, wherever possible) with No. No source of information data Emissions from combustion of fossil 5.1 No Not Applicable fuels from stationary or mobile sources 5.2 Emissions from production processes No Not Applicable Emissions from materials handling 5.3 No Not Applicable including storage or transport

Emissions from construction activities There will be temporary emission from 5.4 Yes including plant and equipment construction equipments (mobile Source)

Dust or odors from handling of materials As per Environment Management Plan 5.5 including construction materials, sewage Yes ANNEXURE XIX and waste 5.6 Emissions from incineration of waste No Not Applicable Emissions from burning of waste in open Not Applicable 5.7 air (e.g. slash materials, construction No

debris) 5.8 Emissions from any other sources No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approx. Sr. Yes/ quantities/rates, wherever possible) with Information/Checklist confirmation No. No source of information data with source of information data Sources of noise Pollution during construction phase are machinery like compressor, Compactors, Concrete Plant, From operation of equipment e.g. 6.1 Yes Cranes and transportation materials. engines, ventilation plant, crushers During operation phase DG sets will be provided with Canopy to reduce noise and vibration. 6.2 From industrial or similar processes No Not Applicable 6.3 From construction or demolition Yes As per Environment Management Plan. 6.4 From blasting or piling No Not Applicable 6.5 From construction or operational traffic Yes As per Environment Management Plan. 6.6 From lighting or cooling systems No Not Applicable 6.7 From any other sources No Not Applicable

7.Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea

Details thereof (with approx. Sr. Yes/ Information/Checklist confirmation quantities/rates, wherever possible) with No. No source of information data

FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, PUNE 411027

From handling, storage, use or spillage of 7.1 No Not Applicable hazardous materials Sewage will be treated and reused for From discharge of sewage or other flushing, gardening and green belt areas. 7.2 effluents to water or the land (expected No Hence there is no risk of contamination due mode and place of discharge) to release of sewage or effluent. By deposition of pollutants emitted to air 7.3 No Not Applicable into the land or into water 7.4 From any other sources No Not Applicable Is there a risk of long term build up of 7.5 pollutants in the environment from these No Not Applicable sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Details thereof (with approx. Sr. Yes/ Information/Checklist confirmation quantities/rates, wherever possible) with No. No source of information data From explosions, spillages, fires etc from 8.1 storage, handling, use or production of No Not Applicable hazardous substances There is a risk of accident during 8.2 From any other causes Yes construction however proper safety measures will be taken Adequate earthquake proof RCC design will Could the project be affected by natural be adopted. disasters causing environmental damage 8.3 Yes ANNEXURE XI: SEISMIC ZONING (e.g. floods, earthquakes, landslides, MAP OF INDIA & EARTHQUAKE cloudburst etc)? STABILITY CERTIFICATE

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

Details thereof (with approx. Sr. Yes/ Information/Checklist confirmation quantities/rates, wherever possible) with No. No source of information data Lead to development of supporting . 1) Power supply is available. Facilities, ancillary development or 2) Sewage Treatment Plant will be provided development stimulated by the project hence there will not additional load on which could have impact on the Municipal Sewage treatment. environment e.g.: 3) Solid Waste Management facility will be • Supporting infrastructure (roads, power 9.1 Yes provided. supply, waste or waste water treatment, 4) Adequate parking facility available within etc.) campus. • Housing development

• Extractive industries Housing Development • Supply industries

• Other

FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, PUNE 411027

Details thereof (with approx. Sr. Yes/ Information/Checklist confirmation quantities/rates, wherever possible) with No. No source of information data Lead to after -use of the site, which could 9.2 No Not Applicable have an impact on the environment 9.3 Set a precedent for later developments No Not Applicable Have cumulative effects due to proximity 9.4 to other existing or planned projects with No Not Applicable similar effects

III) Environmental Sensitivity

Sr. Name/ Aerial distance (within 15 km.) Areas No Identity Proposed project location boundary Areas protected under international conventions, national or local legislation 1 No Not Applicable for their ecological, landscape, cultural or other related value Areas which are important or sensitive for ecological reasons - Wetlands, 2 watercourses or other water bodies, No Not Applicable coastal zone, biospheres, mountains, forests Areas used by protected, important or sensitive species of flora or fauna for 3 No Not Applicable breeding, nesting, foraging, resting, over wintering, migration Inland, coastal, marine or underground 4 No Not Applicable waters

5 State, National boundaries No Not Applicable

Routes or facilities used by the public 6 for access to recreation or other tourist, No Not Applicable pilgrim areas 7 Defence installations No Not Applicable 8 Densely populated or built-up area No Not Applicable Areas occupied by sensitive man-made 9 land uses (hospitals, schools, places of No Not Applicable worship, community facilities) Areas containing important, high quality or scarce resources 10 (Ground water resources, surface No Not Applicable resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to pollution or 11 environmental damage. (Those where No Not Applicable existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard No Not Applicable

FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, PUNE 411027

Sr. Name/ Aerial distance (within 15 km.) Areas No Identity Proposed project location boundary which could cause the project to present environmental problems (Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

(IV) Proposed Terms of Reference for EIA studies. EIA not required as project is under B-2 Category.

FORM 1 & 1A FOR PROPOSED EXPANSION OF RESIDENTIAL PROJECT “NECO SKYPARK” AT SURVEY No. 20, VISHAL NAGAR, PIMPLE NILAKH, PUNE 411027