World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
Detailed Annual Procurement Plan From November 2017 to Year 2018 Mekong Integrated Water Resource Management Project: Additional Financing Revised as of 02 March 2018 I. General 1. Project information: • Country: Lao PDR Public Disclosure Authorized • Project Implementing Agency: 1. Department of Planning and Cooperation, Ministry of Natural Resources and Environment (MoNRE) 2. Department of Irrigation-DIMU/PAFO in KHM. and SVK. 3. Department of Livestock and Fisheries-FCMU (CPS. ATP. and SEK.) 2. Bank’s approval Date of the procurement Plan • Original Plan: February, 3, 2017 • First Revision: January, 18, 2018 • Second Revision: February 12, 2018 • Third Revision: March 02, 2018 3. Date of General Procurement Notice: • To be advertised by ___ 2017 (UNDB online) 4. Period covered by this procurement plan: • Until the year 2018 implementation of the project. Public Disclosure Authorized II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Contract Value No. Procurement Method Prior Review Threshold US$ Comments Threshold US$ 1 ICB and LIB (Goods) >=600,000 All contracts above 1.5 million 2 NCB (Goods) 100,000 - <600,000 None 3 Shopping (Goods) <100,000 None 4 Direct Contracting (Goods, - All contracts above 1.5 million and Works, and Non-consulting 5 million for goods and works Public Disclosure Authorized Services) respectively 5 ICB (Works) >= 2,000,000 All contracts above 5 million 6 NCB (Works) 200,000 - <2,000,000 None 7 Shopping (Works) <200,000 None 8 Community Participation None None 2. Prequalification. Not expected for the works/goods packages. 3. Reference to Project Operational Manual: Operation Manual dated 27 March 2017. 4. Any Other Special Procurement Arrangements: National procurement procedures as specified under paragraph 3.3 and 3.4 of the Procurement Guidelines and the conditions specified in Annex 1 to this Procurement Plan. 5. Procurement Packages for Works & Goods (prior & post reviews) with Methods and Time Schedule Public Disclosure Authorized 1 2 3 4 5 6 7 8 9 Review by PQ Domestic Expected Estimated Procuremen Bank No. Contract (Description) (yes/no Preference Bid/Quotation Comment Cost USD t Method (Prior / ) (yes/no) Opening Date Post) Component 2.1 : Support for Refining a Legal Framework Enabling integrated Water Resources Management C2.1-G-001 Office Equipment: Lot 1 10,000 Shopping No No Post May 2018 Component 2.2 : Support for Water Quality and Eco-System Health Completed C2.2-W- Fence, parking lodge and Sonexay 199,000 Shopping No No Post Jan 2018 001 warehouse Construction Sole Company, Ltd C2.2-G-002 Laboratory Furniture 220,000 NCB No No Post May 2018 (Customized and Specialized) C2.2-G-003 Office furniture and IT equipment 99,000 Shopping No No Post May 2018 C2.2-G-004 Vehicle 60,000 Shopping No No Post May 2018 Component 2.3 : Support for Water Resources Modelling and Assessment C2.3-G-001 Office Furniture and 40,000 Shopping No No Post Apr 2018 Equipment for modeller C2.3-G-002 Data on Geography, River network, Hydro-met, Socio- 20,000 SS No No Post Mar 2018 economic C2.3-G-003 Data on Geography, River network, Hydro-met, Socio- 20,000 SS No No Post Apr 2018 economic C2.3-G-004 Data on Geography, River network, Hydro-met, Socio- 10,000 SS No No Post Jul 2018 economic Component 2.4 : Support for Hydrological and Meteorological (Hydro-Met) Network Upgrading ADCP equipment supply and C2.4-G-001 200,000 NCB No No Post May 2018 training Hydro-Met Equipment and C2.4-G-002 Software and Automatic Rain 740,000 ICB No No Post Jun 2018 Gauges Rehabilitation of 2 provincial C2.4-W-003 and local offices in 5 river 150,000 Shopping No No Post Jun 2018 basins Component 2.5 : National Project Management Unit (NMPU) Completed C2.5-G-001 Vehicles for NPMU: Lot 1 45,000 Shopping No No Post Jan 2018 Isuzu Lao Service Company C2.5-G-002 Office Equipment: Lot 1 15,000 Shopping No No Post Feb 2018 Office Renovation of new May 2018 C2.5-W-003 20,000 Shopping No No Post NPMU Feb 2018 Completed Kayasit Furniture C2.5-G-004 Office Furniture: Lot 1 7,000 Shopping No No Post Trading Component 3.1.1: River Basin Management Office Renovation of C3.1.1-W- Component Management, 180,000 NCB No No Post Apr 2018 001 PONRE, DONRE Coordination Office C3.1.1-G-002 Office equipment for Component Management, 42,000 Shopping No No Post Apr 2018 PONRE, DONRE Offices (e.g. camera, laptop, printer) C3.1.1-G-003 Three (3) Vehicles for PONRE 120,000 NCB No No Post May 2018 offices C3.1.1-G-004 Motorbikes 30,000 Shopping No No Post May 2018 Payables under Retention contract 10% of total Orginal Financing C3.1.1-W- O contract for Construction 28,000 Shopping No Post Apr 2018 with Contract 005 o building of PONRE-KHM Number: C3.1.1- W-01 Component 3.1.2:Sustainable Irrigation and Drainage C3.1.2-W- Rehabilitation of Floodgates in 100,000 Shopping No No Post Dec 2018 001 Houay Nonglom, Nongbok 2 District, KHammouane Province: Lot 1 C3.1.2-W- Rehabilitation of Floodgates in 002 Houay Deuth 1, Nongbok 100,000 Shopping No No Post Dec 2018 District, KHammouane Province: Lot 2 C3.1.2-W- Rehabilitation of Floodgates in 003 Houay Deuth 2, Nongbok 100,000 Shopping No No Post Dec 2018 District, KHammouane Province:: Lot 3 C3.1.2-W- Rehabilitation of Floodgates in 004 Houay Boungsan, Nongbok 100,000 Shopping No No Post Dec 2018 District, KHammouane Province:: Lot 4 C3.1.2-W- Rehabilitation of Floodgates in 005 Xaibouly District, Savannakhet 100,000 Shopping No No Post Dec 2018 Province: Lot 5 Steel Pontoons for Irrigation Completed Pumping Stations in the Phouvieng Building C3.1.2-G-006 Catchment of Xebangfai: Lot 1 90,000 Shopping No No Post Sep 2017 and Irrigation (Nongbok and Xebangfai Construction Districts, Khammouane Company Province C3.1.2-G-007 Steel Pontoons for Irrigation Pumping Stations in the Completed Catchment of Xebangfai: Lot 2 Phouvieng Building (Nongbok District in 90,000 Shopping No No Post Sep 2017 and Irrigation Khammouane Province and Construction Xaybouly District, Savanakhet Company Province) C3.1.2-G-008 Pontoon Mounted Electric Completed Centrifugal Pump (75KW) for Noukham Irrigation Irrigation Pumping Stations in 99,000 Shopping No No Post Oct 2017 Road and Bridge the Catchment of Xebangfai, Construction Co., Nongbok District, LTD Khammouane Province: Lot 1 C3.1.2-G-009 Pontoon Mounted Electric Completed Centrifugal Pump (75KW) for Noukham Irrigation Irrigation Pumping Stations in 99,000 Shopping No No Post Oct 2017 Road and Bridge the Catchment of Xebangfai, Construction Co., Nongbok District, LTD Khammouane Province: Lot 2 C3.1.2-G-010 Pontoon Mounted Electric Centrifugal Pump (75KW) for Completed Irrigation Pumping Stations in Noukham Irrigation the Catchment of Xebangfai, 99,000 Shopping No No Post Oct 2017 Road and Bridge Nongbok District, Construction Co., Khammouane Province and LTD Xaibouly District Savannakhet Province: Lot 3 C3.1.2-G-011 Pontoon Mounted Electric Centrifugal Pump (75KW) for Completed Irrigation Pumping Stations in Noukham Irrigation the Catchment of Xebangfai, 99,000 Shopping No No Post Oct 2017 Road and Bridge Nongbok District, Construction Co., Khammouane Province and LTD Xaibouly District Savannakhet Province Lot 4 C3.1.2-G-012 Pontoon Mounted Electric Centrifugal Pump (75KW) for Irrigation Pumping Stations in 99,000 Shopping No No Post Aug 2018 the Catchment of Xebangfai, Nongbok District, Khammouane Province: Lot 5 C3.1.2-G-013 Electric Cables for Pumps and Motors in the Catchment of Completed Xebangfai, Nongbok District, Bay Electric 90,000 Shopping No No Post Dec 2017 Khammouane Province and Company, Ltd. Xaibouly District Savannakhet Province Lot 4 C3.1.2-G-014 Supply of High Density Polyethylene Pipes (HDPE) and Completed Flange Adapters for Irrigation Xaignavong Group Pumping Stations in the 90,000 Shopping No No Post Feb 2018 Sole Company. Ltd Catchment of Xebangfai (Nongbok District, Khammouane Province): Lot 1 C3.1.2-G-015 Supply of High Density 90,000 Shopping No No Post Feb 2018 Completed 3 Polyethylene Pipes (HDPE) and Xaignavong Group Flange Adapters for Irrigation Sole Company. Ltd Pumping Stations in the Catchment of Xebangfai (Nongbok District, Khammouane Province and Xaibouly District, Savannakhet Province): Lot 2 C3.1.2-G-016 Completed Supply of Flexible Pipes for Noukham Irrigation Irrigation Pumping Stations in 90,000 Shopping No No Post Oct 2017 Road and Bridge the Catchment of Xebangfai : Construction Co., Lot 1 LTD C3.1.2-G-017 Supply of Flexible Pipes for Irrigation Pumping Stations in Completed the Catchment of Xebangfai Noukham Irrigation (Nongbok District, 90,000 Shopping No No Post Oct 2017 Road and Bridge Khammouane Province and Construction Co., Xaibouly District, Savannakhet LTD Province):: Lot 2 C3.1.2-G-018 Construction Materials for Completed Canal Improvement at Navang Phouvieng Building Noi; Navang Thong; Navang 99,000 Shopping No No Post Oct 2017 and Irrigation Thay Scheme, Nongbok Construction District, Khammouane Company Province: Lot 1 C3.1.2-G-019 Construction Materials for Completed Canal Improvement at Sadu Phouvieng Building Tay; Phonesao-A; Thamouang 99,000 Shopping No No Post Oct 2017 and Irrigation Scheme, Nongbok District, Construction Khammouane Province: Lot 2 Company C3.1.2-G-020 Construction Materials for Completed Canal Improvement at Phouvieng Building Dongphakpheua 1; Natai; 99,000 Shopping No No Post Oct 2017 and Irrigation Sorbo Scheme, Nongbok Construction District, Khammouane Company Province: Lot 3 C3.1.2-G-021 Construction Materials for Completed Canal Improvement at Somsaat Noukham Irrigation 1; Nongheuathong 2; Thakham 99,000 Shopping No No Post Oct 2017 Road and Bridge Scheme, Xaybouly District, Construction Co., Savannakhet Province: Lot 4 LTD C3.1.2-G-022 Construction Materials for Canal Improvement (Nongbok District, Khammouane 99,000 Shopping No No Post Oct 2018 Province and Xaibouly District, Savannakhet Province): Lot 5 C3.1.2-G-023 Supply of High Density Polyethylene Pipes (HDPE) and Completed Flange Adapters for Irrigation 80,000 Shopping No No Post Feb 2018 Xaignavong Group Pumping Stations in the Sole Company.