World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Detailed Annual Procurement Plan From November 2017 to Year 2018 Mekong Integrated Water Resource Management Project: Additional Financing Revised as of 02 March 2018 I. General 1. Project information: • Country: Lao PDR Public Disclosure Authorized • Project Implementing Agency: 1. Department of Planning and Cooperation, Ministry of Natural Resources and Environment (MoNRE) 2. Department of Irrigation-DIMU/PAFO in KHM. and SVK. 3. Department of Livestock and Fisheries-FCMU (CPS. ATP. and SEK.) 2. Bank’s approval Date of the procurement Plan • Original Plan: February, 3, 2017 • First Revision: January, 18, 2018 • Second Revision: February 12, 2018 • Third Revision: March 02, 2018 3. Date of General Procurement Notice: • To be advertised by ___ 2017 (UNDB online) 4. Period covered by this procurement plan: • Until the year 2018 implementation of the project. Public Disclosure Authorized II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Contract Value No. Procurement Method Prior Review Threshold US$ Comments Threshold US$ 1 ICB and LIB (Goods) >=600,000 All contracts above 1.5 million 2 NCB (Goods) 100,000 - <600,000 None 3 Shopping (Goods) <100,000 None 4 Direct Contracting (Goods, - All contracts above 1.5 million and Works, and Non-consulting 5 million for goods and works Public Disclosure Authorized Services) respectively 5 ICB (Works) >= 2,000,000 All contracts above 5 million 6 NCB (Works) 200,000 - <2,000,000 None 7 Shopping (Works) <200,000 None 8 Community Participation None None 2. Prequalification. Not expected for the works/goods packages. 3. Reference to Project Operational Manual: Operation Manual dated 27 March 2017. 4. Any Other Special Procurement Arrangements: National procurement procedures as specified under paragraph 3.3 and 3.4 of the Procurement Guidelines and the conditions specified in Annex 1 to this Procurement Plan. 5. Procurement Packages for Works & Goods (prior & post reviews) with Methods and Time Schedule Public Disclosure Authorized 1 2 3 4 5 6 7 8 9 Review by PQ Domestic Expected Estimated Procuremen Bank No. Contract (Description) (yes/no Preference Bid/Quotation Comment Cost USD t Method (Prior / ) (yes/no) Opening Date Post) Component 2.1 : Support for Refining a Legal Framework Enabling integrated Water Resources Management C2.1-G-001 Office Equipment: Lot 1 10,000 Shopping No No Post May 2018 Component 2.2 : Support for Water Quality and Eco-System Health Completed C2.2-W- Fence, parking lodge and Sonexay 199,000 Shopping No No Post Jan 2018 001 warehouse Construction Sole Company, Ltd C2.2-G-002 Laboratory Furniture 220,000 NCB No No Post May 2018 (Customized and Specialized) C2.2-G-003 Office furniture and IT equipment 99,000 Shopping No No Post May 2018 C2.2-G-004 Vehicle 60,000 Shopping No No Post May 2018 Component 2.3 : Support for Water Resources Modelling and Assessment C2.3-G-001 Office Furniture and 40,000 Shopping No No Post Apr 2018 Equipment for modeller C2.3-G-002 Data on Geography, River network, Hydro-met, Socio- 20,000 SS No No Post Mar 2018 economic C2.3-G-003 Data on Geography, River network, Hydro-met, Socio- 20,000 SS No No Post Apr 2018 economic C2.3-G-004 Data on Geography, River network, Hydro-met, Socio- 10,000 SS No No Post Jul 2018 economic Component 2.4 : Support for Hydrological and Meteorological (Hydro-Met) Network Upgrading ADCP equipment supply and C2.4-G-001 200,000 NCB No No Post May 2018 training Hydro-Met Equipment and C2.4-G-002 Software and Automatic Rain 740,000 ICB No No Post Jun 2018 Gauges Rehabilitation of 2 provincial C2.4-W-003 and local offices in 5 river 150,000 Shopping No No Post Jun 2018 basins Component 2.5 : National Project Management Unit (NMPU) Completed C2.5-G-001 Vehicles for NPMU: Lot 1 45,000 Shopping No No Post Jan 2018 Isuzu Lao Service Company C2.5-G-002 Office Equipment: Lot 1 15,000 Shopping No No Post Feb 2018 Office Renovation of new May 2018 C2.5-W-003 20,000 Shopping No No Post NPMU Feb 2018 Completed Kayasit Furniture C2.5-G-004 Office Furniture: Lot 1 7,000 Shopping No No Post Trading Component 3.1.1: River Basin Management Office Renovation of C3.1.1-W- Component Management, 180,000 NCB No No Post Apr 2018 001 PONRE, DONRE Coordination Office C3.1.1-G-002 Office equipment for Component Management, 42,000 Shopping No No Post Apr 2018 PONRE, DONRE Offices (e.g. camera, laptop, printer) C3.1.1-G-003 Three (3) Vehicles for PONRE 120,000 NCB No No Post May 2018 offices C3.1.1-G-004 Motorbikes 30,000 Shopping No No Post May 2018 Payables under Retention contract 10% of total Orginal Financing C3.1.1-W- O contract for Construction 28,000 Shopping No Post Apr 2018 with Contract 005 o building of PONRE-KHM Number: C3.1.1- W-01 Component 3.1.2:Sustainable Irrigation and Drainage C3.1.2-W- Rehabilitation of Floodgates in 100,000 Shopping No No Post Dec 2018 001 Houay Nonglom, Nongbok 2 District, KHammouane Province: Lot 1 C3.1.2-W- Rehabilitation of Floodgates in 002 Houay Deuth 1, Nongbok 100,000 Shopping No No Post Dec 2018 District, KHammouane Province: Lot 2 C3.1.2-W- Rehabilitation of Floodgates in 003 Houay Deuth 2, Nongbok 100,000 Shopping No No Post Dec 2018 District, KHammouane Province:: Lot 3 C3.1.2-W- Rehabilitation of Floodgates in 004 Houay Boungsan, Nongbok 100,000 Shopping No No Post Dec 2018 District, KHammouane Province:: Lot 4 C3.1.2-W- Rehabilitation of Floodgates in 005 Xaibouly District, Savannakhet 100,000 Shopping No No Post Dec 2018 Province: Lot 5 Steel Pontoons for Irrigation Completed Pumping Stations in the Phouvieng Building C3.1.2-G-006 Catchment of Xebangfai: Lot 1 90,000 Shopping No No Post Sep 2017 and Irrigation (Nongbok and Xebangfai Construction Districts, Khammouane Company Province C3.1.2-G-007 Steel Pontoons for Irrigation Pumping Stations in the Completed Catchment of Xebangfai: Lot 2 Phouvieng Building (Nongbok District in 90,000 Shopping No No Post Sep 2017 and Irrigation Khammouane Province and Construction Xaybouly District, Savanakhet Company Province) C3.1.2-G-008 Pontoon Mounted Electric Completed Centrifugal Pump (75KW) for Noukham Irrigation Irrigation Pumping Stations in 99,000 Shopping No No Post Oct 2017 Road and Bridge the Catchment of Xebangfai, Construction Co., Nongbok District, LTD Khammouane Province: Lot 1 C3.1.2-G-009 Pontoon Mounted Electric Completed Centrifugal Pump (75KW) for Noukham Irrigation Irrigation Pumping Stations in 99,000 Shopping No No Post Oct 2017 Road and Bridge the Catchment of Xebangfai, Construction Co., Nongbok District, LTD Khammouane Province: Lot 2 C3.1.2-G-010 Pontoon Mounted Electric Centrifugal Pump (75KW) for Completed Irrigation Pumping Stations in Noukham Irrigation the Catchment of Xebangfai, 99,000 Shopping No No Post Oct 2017 Road and Bridge Nongbok District, Construction Co., Khammouane Province and LTD Xaibouly District Savannakhet Province: Lot 3 C3.1.2-G-011 Pontoon Mounted Electric Centrifugal Pump (75KW) for Completed Irrigation Pumping Stations in Noukham Irrigation the Catchment of Xebangfai, 99,000 Shopping No No Post Oct 2017 Road and Bridge Nongbok District, Construction Co., Khammouane Province and LTD Xaibouly District Savannakhet Province Lot 4 C3.1.2-G-012 Pontoon Mounted Electric Centrifugal Pump (75KW) for Irrigation Pumping Stations in 99,000 Shopping No No Post Aug 2018 the Catchment of Xebangfai, Nongbok District, Khammouane Province: Lot 5 C3.1.2-G-013 Electric Cables for Pumps and Motors in the Catchment of Completed Xebangfai, Nongbok District, Bay Electric 90,000 Shopping No No Post Dec 2017 Khammouane Province and Company, Ltd. Xaibouly District Savannakhet Province Lot 4 C3.1.2-G-014 Supply of High Density Polyethylene Pipes (HDPE) and Completed Flange Adapters for Irrigation Xaignavong Group Pumping Stations in the 90,000 Shopping No No Post Feb 2018 Sole Company. Ltd Catchment of Xebangfai (Nongbok District, Khammouane Province): Lot 1 C3.1.2-G-015 Supply of High Density 90,000 Shopping No No Post Feb 2018 Completed 3 Polyethylene Pipes (HDPE) and Xaignavong Group Flange Adapters for Irrigation Sole Company. Ltd Pumping Stations in the Catchment of Xebangfai (Nongbok District, Khammouane Province and Xaibouly District, Savannakhet Province): Lot 2 C3.1.2-G-016 Completed Supply of Flexible Pipes for Noukham Irrigation Irrigation Pumping Stations in 90,000 Shopping No No Post Oct 2017 Road and Bridge the Catchment of Xebangfai : Construction Co., Lot 1 LTD C3.1.2-G-017 Supply of Flexible Pipes for Irrigation Pumping Stations in Completed the Catchment of Xebangfai Noukham Irrigation (Nongbok District, 90,000 Shopping No No Post Oct 2017 Road and Bridge Khammouane Province and Construction Co., Xaibouly District, Savannakhet LTD Province):: Lot 2 C3.1.2-G-018 Construction Materials for Completed Canal Improvement at Navang Phouvieng Building Noi; Navang Thong; Navang 99,000 Shopping No No Post Oct 2017 and Irrigation Thay Scheme, Nongbok Construction District, Khammouane Company Province: Lot 1 C3.1.2-G-019 Construction Materials for Completed Canal Improvement at Sadu Phouvieng Building Tay; Phonesao-A; Thamouang 99,000 Shopping No No Post Oct 2017 and Irrigation Scheme, Nongbok District, Construction Khammouane Province: Lot 2 Company C3.1.2-G-020 Construction Materials for Completed Canal Improvement at Phouvieng Building Dongphakpheua 1; Natai; 99,000 Shopping No No Post Oct 2017 and Irrigation Sorbo Scheme, Nongbok Construction District, Khammouane Company Province: Lot 3 C3.1.2-G-021 Construction Materials for Completed Canal Improvement at Somsaat Noukham Irrigation 1; Nongheuathong 2; Thakham 99,000 Shopping No No Post Oct 2017 Road and Bridge Scheme, Xaybouly District, Construction Co., Savannakhet Province: Lot 4 LTD C3.1.2-G-022 Construction Materials for Canal Improvement (Nongbok District, Khammouane 99,000 Shopping No No Post Oct 2018 Province and Xaibouly District, Savannakhet Province): Lot 5 C3.1.2-G-023 Supply of High Density Polyethylene Pipes (HDPE) and Completed Flange Adapters for Irrigation 80,000 Shopping No No Post Feb 2018 Xaignavong Group Pumping Stations in the Sole Company.
Recommended publications
  • Endemic Malaria in Four Villages in Attapeu Province, Lao Pdr
    ENDEMIC MALARIA IN LAO VILLAGES ENDEMIC MALARIA IN FOUR VILLAGES IN ATTAPEU PROVINCE, LAO PDR R Phetsouvanh1, I Vythilingam2, B Sivadong1, S Lokman Hakim2, ST Chan2 and S Phompida1 1Center for Malaria, Parasitology and Entomology, Vientiane, Lao PDR; 2Institute for Medical Research, Kuala Lumpur, Malaysia Abstract. A study was conducted in four villages in Attapeu Province, Lao PDR in 2002 to determine malaria endemicity. The study villages were Mixay, Beng Phoukham, Phou Vong and Pier Geo. Mass blood surveys were conducted in May, August, and October. Finger prick blood was collected for thick and thin blood film as well as for dipstick. The slide positivity rate was highest in Phou Hom in October (41.7%). Plasmodium falciparum was the dominant species comprising more than 80% of the cases. As a whole, the distribution of malaria was similar among males and females. Children below 15 years accounted for a large percentage of the cases. The sensitivity of the optimal dipstick was 62.36 and the specificity was 61.7. Microscopy was taken as the gold standard. Anopheles dirus was found to be the main vector and the vectorial capacity correlated well with the cases. INTRODUCTION entomological and blood examination 3 times during the year. In this report the results of the Malaria is a serious public health problem blood survey are presented. in Lao PDR (Pholsena, 1992) which is a land- locked country bordering Thailand, Vietnam, Cambodia, Myanmar, and China. The actual ma- MATERIALS AND METHODS laria situation in the country remains unknown. Study area However, it is said that about 300,000 confirmed and suspected cases of malaria are reported each Attapeu Province is situated in the southern year (Phetsouvanh et al, 2000).The malaria situ- tip of Lao PDR and has common borders with ation varies from province to province and also Cambodia to the south, Vietnam to the east, village to village within one province.
    [Show full text]
  • Listening to Women Fishers on the Sekong River: Fostering Resilience in Village Fishery Co-Management
    Listening to Women Fishers on the Sekong River: Fostering Resilience in Village Fishery Co-Management Charlotte Moser Abstract The accelerated economic development of landlocked Laos, combined with extreme climate variables, points to dramatic transformations in subsistence fisheries on its rivers. In the country’s first Fisheries Law, adopted in 2009, co-management of village fisheries is required as a way to promote sustainable development at a local level. The co-management model, however, does not stipulate participation by women fishers, important stakeholders who make up almost one-half of all Lao fishers and whose work contributes directly to family nutrition and well-being. Based on fieldwork conducted in fishing villages on the Sekong River in southern Laos in 2013, this paper takes an ecosystems approach to discuss how the country can build resilience and social cohesion into fisheries by incorporating women and their knowledge into village fishery management. In the process, the health of river ecosystems and food security will improve, while women fishers will acquire new skills to help them avoid ‘poverty traps.’ Introduction The concept of resilience is central to effective adaptive management of ecosystems. Developed by ecologist C.S. “Buzz” Holling in the 1970s as a theory for managing complex ecosystems, resilience theory suggests that an ecosystem is resilient if it has the ability to remain cohesive during periods of extreme perturbations or what are called ‘shocks’ (Holling 1973). Rather than “bouncing back” to a former equilibrium, an ecosystem is resilient if it can absorb changes in internal and external variables and still persist, albeit in a somewhat different yet robust form.
    [Show full text]
  • Balancing the Returns to Catchment Management: the Economic Value of Conserving Natural Forests in Sekong, Lao PDR
    Balancing the Returns to Catchment Management: The Economic Value of Conserving Natural Forests in Sekong, Lao PDR Rina Maria P. Rosales, Mikkel F. Kallesoe, Pauline Gerrard, Phokhin Muangchanh, Sombounmy Phomtavong & Somphao Khamsomphou IUCN Water, Nature and Economics Technical Paper No. 5 4 Water and Nature Initiative This document was produced under the project "Integrating Wetland Economic Values into River Basin Management", carried out with financial support from DFID, the UK Department for International Development, as part of the Water and Nature Initiative of IUCN - The World Conservation Union. The designation of geographical entities in this publication, and the presentation of materials therein, do not imply the expression of any opinion whatsoever on the part of IUCN or DFID concerning the legal status of any country, territory or area, or of its authorities, or concerning the delimitation of its frontiers or boundaries. The views expressed in this publication also do not necessarily reflect those of IUCN, or DFID. Published by: IUCN — The World Conservation Union Copyright: © 2005, International Union for Conservation of Nature and Natural Resources. Reproduction of this publication for educational and other non-commercial purposes is authorised without prior permission from the copyright holder, providing the source is fully acknowledged. Reproduction of the publication for resale or for other commercial purposes is prohibited without prior written permission from the copyright holder. Citation: R. Rosales, M. Kallesoe, P. Gerrard, P. Muangchanh, S. Phomtavong and S. Khamsomphou, 2005, Balancing the Returns to Catchment Management: The Economic Value of Conserving Natural Forests in Sekong, Lao PDR. IUCN Water, Nature and Economics Technical Paper No.
    [Show full text]
  • Water, Livelihood and Health in Attapeu Province in Lao PDR
    Southeast Asian Studies, Vol. ῐΐ,No.ῐ, March ῎ῌ῍ῌ Water, Livelihood and Health in Attapeu Province in Lao PDR M>9DG>@6L6 Yutaka ῍ ),M>9DG>@6L6 Kaoru ῎ ), Bounphenh S6C<HDBH68@ ῏ ) Traykhouane P=DJI6K6C ῐ ), Kampheng C=DBA6H6@ ῐ ),W6I6C67: Toru ῑ ) Nanthasane V6CC6KDC< ῒ ),H67: Shigehisa ΐ ),N6@6IHJ Masami ῔ ) KDH6@6 Yasuyuki ῕ ), Kongsap A@@=6KDC<῍ῌ), Boungnong BDJE=6῍ῌ) Michel SIGD7:A῍῍) and N6@6BJG6 Satoshi ῔ ) Abstract This paper presents the results of an investigation on water-borne infectious disease conducted among the people of Attapeu province from ῎ῌῌ῏ to ῎ῌῌ῔. Regardless of the last cholera epidemic in Attapeu province, Lao PDR in the year ῍῕῕῕, the local peoples’ awareness of cholera was remarkably low, as demonstrated by the knowledge survey on diarrheal diseases performed in the province in ῎ῌῌῒ. In the case study material, derived from continuous field observations on malaria among permanent residents in relocated villages in Sanxay district from ῎ῌῌῐ to ῎ῌῌ῔, the infection rate among febrile cases was as high as ῐῑ῏ in the early resettlement period, while it was proved that the rate fell later to ῍ ῕ῌ῍ῐ῏. Judging from the environmental condition of this settlement area, this paper makes clear the persistent threat of malaria. Furthermore, among the villagers, hookworm infection was highly prevalent. However, liver fluke infections were scarce and no ascariasis was found from parasitic stool examination in ῎ῌῌΐ. Water quality analysis of the water sources resulted in remarkably safe water from tube wells from ῎ῌῌ῏ to ῎ῌῌ῔.
    [Show full text]
  • Rra Report Attapeu Watershed Attapeu
    Page 1 of 9 ADB RETA 5771 Poverty Reduction & Environmental Management in Remote Greater Mekong Subregion Watersheds Project (Phase I) RRA REPORT ATTAPEU WATERSHED ATTAPEU & CHAMPASSACK PROVINCE, LAO PDR Special Report By Latsamay Sylavong 1. General Background Attapeu watershed is located in the Southern part of Lao PDR. This watershed is covered in 2 provinces as the whole of Attapeu province and a small part of Champassack provinces (the Plateau Boloven). There are about 900 Kilometres from Vientiane Municipality and 180 kilometres from Pakse. Access to those 4 villages differs from one to another village due to the selection criteria for the RRA survey in order to cover the main ethnic minorities in the watershed area. It is found easy access to 2 villages of Champassack province (Boloven Plateau) for both seasons and very difficult to get to other 2 villages of Attapeu province, especially during raining season. The purpose of this survey is to describe the existing agroecosystems within the watershed area as the relationship to the use of forest resource by human population. In addition, Attapeu watershed is one of the shortlist watersheds priorities in Lao PDR. In the Attapeu watershed 4 villages were studied and detailed information of demographic survey in different ethnic villages as Nha Heune, Alak, Laven and Chung. The number of villages depends on the time available for this survey and the difficulty in access within this area, and the time spending at each village also depends on the size of the village. All 4 villages were selected by the survey team together with the local authorities of both provinces as Champassack and Attapeu.
    [Show full text]
  • Land Concessions, Land Tenure, and Livelihood Change: Plantation Development in Attapeu Province, Southern Laos
    Land Concessions, Land Tenure, and Livelihood Change: Plantation Development in Attapeu Province, Southern Laos Miles Kenney-Lazar Fulbright Scholar & Visiting Research Affiliate Faculty of Forestry, National University of Laos [email protected] Table of Contents Abbreviations 3 Glossary of Lao Language Terms 4 Acknowledgments 5 Executive Summary 6 1. Introduction: Land Concessions in Question 8 2. Methods 9 3. The 2009 Southeast Asian Games: Sports, Aid, and Land 10 4. Hoàng Anh Gia Lai: Growth, Expansion, and International Investment 13 5. Project Description 17 6. Implementation 22 6.1 Governmental Facilitation 22 6.2 Consultation and Negotiation 23 6.2 Resistance 25 7. Land Tenure Insecurity: Loss and Compensation 28 7.1 Loss 28 7.2 Compensation 33 8. Changing Livelihoods: From Land User to Land Laborer 37 8.1 Pre-concession Livelihoods 37 8.2 Changing Livelihoods 39 8.2 Alternative Livelihoods 42 9. Ways Forward 45 9.1 Land Use Zoning and Concession Guidelines 45 9.3 Increased Land Tenure Security 46 9.5 Farmer Awareness Campaigns 46 9.5 Improved Mitigation 47 2 Abbreviations Asian Development Bank ADB Association of Southeast Asian Nations ASEAN Chief Executive Officer CEO Department of Forestry DOF Department of Planning and Investment DPI District Agriculture and Forestry Office DAFO Environmental and Social Impact Assessment ESIA Geographic Information System GIS Geographic Positioning System GPS Gesellschaft für Technische Zusammenarbeit (German Technical Cooperation) GTZ Hoàng Anh Gia Lai Joint Stock Company
    [Show full text]
  • 25-6 Drainage System
    Final Report The Study on Vientiane Water Supply Development Project Figure 25-6 Drainage System Legend River, Canal, Trench, Natural Swamp Planned Drain Cannal Reservoir Irrigation Canal Thatluang Irrigation Pumping Station Swamp Boundary of Master Plan Source: Vientiane Urban Development Master Plan, Urban Research Institute, MCTPC 2 - 43 Final Report The Study on Vientiane Water Supply Development Project 2.5.3 GDP Projection An accurate long-term projection of the GDP is necessary for formulating the future framework of the socio-economic structure in the project sites. Official economic projections in “Five-year National Development Plan 2001-2005” and “Long-term Development Plan 2001-2020” were described in Section 5.1. The Five-year Plan has a more specific projection that includes sectoral scenarios, but the “Long-term Plan” shows overall targets for the year 2020. In this study, then, the future projections are based on the “Five-year Plan” projection scenario. The criteria for the projection are assumed as follows. (1) That major sectors grow at the following annual rates until 2005 as proposed in the “Five-year Plan”: 4.5% in the agricultural sector, 10.5% in the industrial sector, 8.5% in the services sector and a 7.0% rise from import duties. As a result, the GDP is expected to grow at 7.0% per annum on average during the planned period. (2) That after 2005, the respective sectors grow at the same rates as set in the “Five-year Plan” until the target year 2020. The GDP projected with the above assumptions are shown in Table 25-1.
    [Show full text]
  • Sekong, Sesan and Srepok River Basin Energy Profile
    Sekong, Sesan and Srepok River Basin energy profile Courtney Weatherby, Brian Eyler INTERNATIONAL UNION FOR CONSERVATION OF NATURE About IUCN IUCN is a membership Union uniquely composed of both government and civil society organisations. It provides public, private and non-governmental organisations with the knowledge and tools that enable human progress, economic development and nature conservation to take place together. Created in 1948, IUCN is now the world’s largest and most diverse environmental network, harnessing the knowledge, resources and reach of more than 1,300 Member organisations and some 15,000 experts. It is a leading provider of conservation data, assessments and analysis. Its broad membership enables IUCN to fill the role of incubator and trusted repository of best practices, tools and international standards. IUCN provides a neutral space in which diverse stakeholders including governments, NGOs, scientists, businesses, local communities, indigenous peoples organisations and others can work together to forge and implement solutions to environmental challenges and achieve sustainable development. Working with many partners and supporters, IUCN implements a large and diverse portfolio of conservation projects worldwide. Combining the latest science with the traditional knowledge of local communities, these projects work to reverse habitat loss, restore ecosystems and improve people’s well-being. www.iucn.org https://twitter.com/IUCN/ Sekong, Sesan and Srepok River Basin energy profile Courtney Weatherby, Brian Eyler The designation of geographical entities in this Citation: Weatherby, C., Eyler, B. (2020). report, and the presentation of the materials, do Sekong,Sesan and Srepok Basin Energy Profile. not imply the expression of any opinion Hanoi, Viet Nam: IUCN Viet Nam Country Office.
    [Show full text]
  • CARE Rapid Gender Analysis
    CARE Rapid Gender Analysis An analysis of gender equality and social inclusion among flood-affected communities in Attapeu Province, Lao PDR March 2019, Version 2 1 Elizabeth Cowan CARE International in Lao PDR Acknowledgements This Rapid Gender Analysis is supported by the Australian Government’s Australian Humanitarian Partnerships program. It has benefitted from the valuable contributions from Plan International, Save the Children International, and CARE International colleagues, especially Kinnaphone Sounthongdeng and Phetsakhone Somphongbouthakanh (CARE in Lao PDR), Wilasouk Vongpothong (Save the Children) and Sengthong Keomuanvong (Plan International). Disclaimer This publication has been funded by the Australian Government through the Department of Foreign Affairs and Trade. The views expressed in this publication are the author’s alone and are not necessarily the views of the Australian Government. 2 Contents Executive Summary ................................................................................................................................. 1 Key findings ...................................................................................................................................... 1 Key recommendations ..................................................................................................................... 1 Introduction ........................................................................................................................................ 3 Methodology......................................................................................................................................
    [Show full text]
  • Final Project Report English Pdf 55.09 KB
    OM 4.5.4 (Rev) CEPF FINAL PROJECT COMPLETION REPORT Organization Legal Name: World Wide Fund for Nature Project Title: Co-management of Freshwater Biodiversity in the Sekong Basin Date of Report: 13/9/12 Report Author and Contact Dr Victor Cowling ([email protected]) Information CEPF Region: Indo-Burma Biodiversity Hotspot Strategic Direction: CEPF Investment Priority 3.1 Support Civil Society Efforts to Analyze Development Policies, Plans and Programs, Evaluate their Impact on Biodiversity and Ecosystem Services, and Propose Alternative Development Scenarios and Appropriate Mitigating Measures. Grant Amount: US$200,000.00 Project Dates: 1 Jun, 2010-31 May, 2012 Implementation Partners for this Project (please explain the level of involvement for each partner): Department of Livestock and Fisheries (DLF) - the national agency within the Ministry of Agriculture and Forestry (MAF) responsible for fisheries, aquaculture and livestock development. The role of the DLF is to coordinate with line agencies at the provincial level on implementing the national policies and legal frameworks under its mandate. During this project period the DLF coordinated with WWF and provincial line agencies on disseminating and implementing the new fisheries law, veterinary law and other strategies and policies related to the project work plan. The DLF was also represented as chair of the project steering committee to oversee and monitor the progress of implementation. As such the DLF was a key agency in linking project outcomes to national policies and strategies of the government. This was a key factor in the project’s success towards CEPF Investment Priority 3.1, where analysis of national development policies and plans, via project activities, was coordinated in partnership with a key department (DLF) within the Ministry.
    [Show full text]
  • Briefing Paper for the 10Th EU-Laos Human Rights Dialogue
    FIDH – International Federation for Human Rights and its member organization Lao Movement for Human Rights (LMHR) Briefing paper for the 10th EU-Laos Human Rights Dialogue 14 June 2021 TABLE OF CONTENTS 1 .… Political prisoners remain behind bars 2 .… Failure to cooperate with UN human rights mechanisms 3 .… Third UPR marks a step backward 3 .… Legislative elections fail to meet international standards 5 .… Freedom of expression stifled 6 .… Serious violations of religious freedoms persist 7 .… Negative impact of infrastructure and investment projects 11 .. COVID-19 affects infrastructure projects and their impact 12 .. Dam collapse survivors neglected There has been no improvement in the human rights situation in Laos in 2020-2021. Serious violations of civil and political rights, as well as social, economic, and cultural rights, have continued to occur and have remained unaddressed. This briefing paper provides a summary of key human rights developments during this period. Political prisoners remain behind bars Several individuals who have been imprisoned for the exercise of their right to freedom of opinion and expression remain behind bars. They include: • Ms. Houayheuang Xayabouly, aka Mouay, 32, who has been detained since 12 September 2019, is serving a five-year prison sentence on spurious charges under Article 117 of the Criminal Code (“Propaganda against the Lao People’s Democratic Republic”). Mouay is currently detained in Champasak provincial prison. • Mr. Somphone Phimmasone, 34, Mr. Soukan Chaithad, 37, and Ms. Lodkham Thammavong, approximately 35, who have been detained since March 2016, are serving prison sentences of 20, 16, and 12 years, respectively, on trumped-up charges under Articles 56, 65, and 72 of the Criminal Code.
    [Show full text]
  • WFP Lao PDR Country Brief USA, Australia, Japan, France, Russia, Global Agriculture August 2019 and Food Security Programme, Government of Lao PDR, Private Donors
    WFP Lao PDR In Numbers Country Brief August 2019 US$ 1.58 million six-month (Sept 2019 – Feb 2020) net funding requirements 137.088 mt of food assistance distributed 24,484 people assisted 50% 50% Operational Updates • Flood update: During 29 August – 2 September 2019, heavy rainfall from Tropical Storm PODUL and Operational Context Tropical Depression KAJIKI resulted in widespread Lao PDR is a least developed country, ranking 139 out of flooding being reported in six provinces in southern 189 countries in the 2017 Human Development Index. It Lao PDR (Khammouane, Attapeu, Saravan, Sekong, has one of the lowest population densities in Asia. 23 Savannakhet and Champasack Provinces). As of 9 percent of the population lives below the national September 2019, an estimated 397,000 people have poverty line (USD 1.25/day), with a gross national been affected with 88,000 people displaced and 14 income per capita of USD 2,270 (World Bank 2017). The people have died. WFP is providing logistics support country is ranked 64 out of 144 in the Global Gender for the distribution of 400 mt of rice from the ASEAN Gap Index 2017. Plus Three Emergency Rice Reserve (APTERR) to the While Lao PDR has managed to reduce the proportion affected area. As of 10 September 2019, no official of hungry poor to 23 percent, the 2015 Global Hunger request for assistance from the Government has Index still rates hunger levels as “serious”. been received by the UN Country Team, however, Climate change is a key challenge facing rural livelihoods, and the country is vulnerable to climate WFP is closely monitoring the situation and is ready change due to its low adaptability and its dependence to respond.
    [Show full text]