Ii Jacobs Rp316

Total Page:16

File Type:pdf, Size:1020Kb

Ii Jacobs Rp316 !II JACOBS RP316 RACIBORZ FLOOD RESERVOIR Public Disclosure Authorized Resettlement Action Plan Public Disclosure Authorized DRAFT Public Disclosure Authorized Public Disclosure Authorized March 2005 JACOBS Document control sheet Form IP180/B Client: PCU Project: Odra Flood Mitigation Job No: J24201A Title: Draft Resettlement Action Plan Prepared by Reviewed by Approved by ORIGINAL0 NAME NAME NAME P Devitt L J S Attewill see list of authors H Fiedler-Krukowicz J Loch | DATfE SIGNATURE SIGNATURE SIGNATURE REVISION NAME NAME NAME DATE SIGNATURE SIGNATURE SIGNATURE REVISION NAME NAME NAME DATE SIGNATURE SIGNATURE SIGNATURE REVISION NAME NAME NAME DATE SIGNATURE SIGNATURE SIGNATURE This report, and infonnabon or advice which it contains, is provided by JacobsGIBB Ltd solely for internal use and reliance by its Cient in performance of JacobsGIBB Ltd's duties and liabilities under its contract with the Client Any advice, opinions, or recomrnendatons within this report should be read and retied upon only in the context of the report as a whole. The advice and opinions in this report are based upon the information nmadeavailable to JacobsGIBB Ltd at the date of this report and on current UK standards, codes, technology and constnuction practices as at the date of this report. Folloving final delvery of this report to the Client, JacobsGIBB Ltd will have no further obligations or duty to advise She Client on any mafters, including developrrient affecting the information or advice provided in ths report This report has been prepared by JacobsGIBB Ltd in their professional capaaty as Consuhing Engineers The contents of the report do not, in any way, purport to include any mranner of legal advice or opinion This report is prepared in accordance wrth the terms and conditions of JacobsGIBB Ltd's contract with the Client. Regard should be had to those terrs and conditions when considering and/or plaong any reliance on this report Should the Client wish to release this report to a Third Party for that partVs reliance, JacobsGIBB Ltd may, at its discretion, agree to such release provided that: (a) JacobsGIBB Ltd's wntten agreement is obtained pnor to such release, and (b) By release of the report to the Third Party, that Third Party does not acquire any rghts, contractual or otherwse, whatsoever against JacobsGIBB Ltd, and JacobsGIBB Ltd accordingly assume no duties, liabilities or obligations to that Third Party, and (c) JacobsGIBB Ltd accepts no responsitlity for any loss or darrage incuned by the Client or for any conflict of JacobsGIBB Lttts interests aesing out of the Clienrs release of this report to the Third Party. JACOBS Authors The Report ,,Resettlement Action Plan" for Raciborz flood protection reservoir project has been prepared by consortium of JacobsGIBB Ltd. and JacobsGIBB Polska. Following authors contributed to RAP: * JacobsGIBB Ltd team: - Laurence Attewill - Paul Devitt - Ros Vincent - Karina Zachodni * JacobsGIBB Polska team: -Jakub Loch - Joanna Tomaszkiewicz - Hanna Fiedler- Krukowicz - Julia Cichon - Krzysztof Czechowski * property surveyors team: - Ryszard Szymkiewicz - Leszek Krawczyk - Monika Burghart * lawyers team: - Anna Szczurek - Pawel Kaminski * sociologists team: - Katarzyna Puchalska - Pawet Kuczynski * computer systems and data bases team: - Bartosz Czyzkowski - Aleksandra Paterek - Michat Juda JACOBS Contents I General Information about Raciborz Project 1-1 1.1 Project Description 1-1 1.1.1 Background 1-1 1.1.2 The existing flood protection scheme 1-1 1.1.3 The planned reservoir 1-1 1.1.4 Objective 1-2 1.1.5 Social Impact 1-2 1.2 Project area 1-2 1.2.1 Total reservoir footprint 1-2 1.2.2 Area required for reservoir construction 1-3 1.2.3 Areas of buildings within the reservoir 1-3 1.2.4 Other areas within the reservoir 1-3 1.3 Minimising resettlement 1-3 1.3.1 Alternative embankment alignment 1-3 1.3.2 Other alternatives 1-4 1.3.3 Reservoir area not required for construction 1-4 1.3.4 Summary 1-4 1.4 Decisions already taken 1-4 2 Socio economy 2-1 2.1 Socioeconomic data 2-1 2.1.1 The villages and their past 2-1 2.1.2 Population and demography 2-2 2.1.3 Economy and employment 2-3 2.1.4 Land use and agriculture 2-6 2.1.5 Infrastructure 2-7 2.1.6 Access and transport 2-9 2.1.7 Communal Facilities 2-10 2.1.8 Education and healthcare 2-10 2.1.9 Church and cemetery 2-10 2.1.10 Historical and cultural features 2-10 2.2 Built assets 2-11 2.2.1 General 2-11 2.2.2 Residential buildings 2-11 2.2.3 Farm- and other ancillary buildings 2-12 2.2.4 Commercial buildings 2-12 2.2.5 Community assets 2-12 2.3 Natural assets 2-13 2.3.1 Woodland habitats 2-13 2.3.2 Gravel excavation 2-14 2.3.3 Tourism opportunities 2-14 2.4 Categories of impacts and people affected 2-14 2.4.1 Resident Project-Affected Persons 2-15 2.4.2 Resident Project-Affected Families 2-17 JACOBS 2.4.3 Land owners 2-18 2.4.4 Businesses 2-21 2.4.5 Lubomia Gmina 2-21 2.4.6 The church 2-22 2.4.7 ARKA Hostel for the Homeless 2-22 2.5 Public consultations 2-23 2.5.1 Background 2-23 2.5.2 Residents opinion poll 2-24 2.5.3 Public meetings with Nieboczowy and Ligota Tworkowska residents 2-24 2.5.4 Defence Committee 2-25 2.5.5 Land owners 2-27 2.5.6 Individual consultations with owners of sold property 2-28 2.5.7 Other consultations (local institutions) 2-29 2.6 Conclusions 2-30 3 Legal Framework 3-1 3.1 Introduction 3-1 3.2 Polish law applicable to resettlement 3-1 3.2.1 Definitions 3-1 3.2.2 Legislation 3-1 3.2.3 Voluntary resettlement 3-1 3.2.4 Involuntary resettlement 3-2 3.3 World Bank policies 3-2 3.3.1 Objectives 3-2 3.3.2 Eligibility 3-3 3.3.3 Compensation 3-3 3.4 Gaps between local laws and World Bank policies 3-3 3.4.1 Eligibility 3-3 3.4.2 Compensation 3-3 3.4.3 Adoption of World Bank Policies 3-4 3.5 Proposed entitlement policy 3-4 3.5.1 Eligibility 3-4 3.5.2 Compensation 3-4 3.6 Method of evaluation 3-4 3.6.1 Legal aspects 3-4 3.6.2 Method 3-5 3.6.3 Houses already purchased 3-5 3.7 Compensation entitlements 3-5 3.7.1 Residents 3-5 3.7.2 Land owners 3-6 3.7.3 Other PAP's 3-7 3.7.4 Religious property 3-7 3.7.5 Summary 3-7 4 Implementation 4-1 4.1 House purchase 4-1 4.1.1 Voluntary house purchase 4-1 JACOUS*08 4.1.2 Involuntary house purchase 4-1 4.1.3 Illegal tenants 4-2 4.2 Land acquisition 4-2 4.3 Resettlement village 4-2 4.4 Allocation of responsibilities 4-3 4.4.1 RZGW4-3 4.4.2 Voivodship 4-3 4.4.3 Starosty (Poviat) 4-4 4.4.4 State Poviat Sanitary Inspector 4-4 4.4.5 Gmina 4-4 4.4.6 Agriculture Real Property Agency (ARPA) 4-4 4.4.7 Church authorities (Curia) 4-4 4.4.8 NGO's 4-5 4.5 Coordination and management 4-5 5 Resettlement village 5-1 5.1 Introduction 5-1 5.2 Description of possible sites 5-1 5.2.1 Lubomia - Paprotnik 5-1 5.2.2 Lubomia-Zagrody 5-1 5.2.3 Syrynia-Dabrowa 5-2 5.3 Village layouts 5-2 5.3.1 AGO-Projekt proposals 5-2 5.3.2 Recommended layout 5-3 5.4 Provision of public services 5-3 5.5 Cost of houses and infrastructure 5-3 5.5.1 Land 5-3 5.5.2 Infrastructure 5-4 5.5.3 Buildings 5-4 5.5.4 Summary 5-4 6 Cost estimates 6-1 6.1 General 6-1 6.2 Houses and associated property 6-1 6.3 Resettlement village 6-2 6.4 Other buildings 6-3 6.4.1 Public buildings 6-3 6.4.2 Religious property 6-3 6.4.3 Commercial property 6-4 6.5 Infrastructure 6-4 6.6 Land 6-4 JACOBS 6.7 Legal, evaluation and administration 6-5 6.8 Summary 6-5 6.9 Cash flow and schedule 6-5 6.9.1 Cash flow 6-5 6.9.2 RAP Implementation schedule 6-6 7 Participation and consultation 7-1 7.1 Communication 7-1 7.1.1 Written communication 7-17-2 7.1.2 Media 7-2 7.1.3 New web site 7-3-7-4 7.2 Participation in design of resettlement village 7-37-4 8 Grievance redress 8-1 8.1 Grievance procedure according to Polish regulations 8-1 8.2 Appeals to international bodies 8-1 9 Monitoring and evaluation 9-1 9.1 Monitoring 9-1 9.1.1 Need 9-1 9.1.2 Methodology 9-1 9.2 Independent evaluation 9-1 10 List of sources used 10-1 List of Figures 1.1 Plan of Reservoir 2.1 Land use in the Reservoir Area 5.1 Location of resettlement villages Appendix A - Socio -economic database Appendix B - Legal framework Appendix C - Property evaluation and cost estimates Appendix D - Public opinion documentation Appendix E - Proposals for public related actions JACOBS 1 General Information about Raciborz Project 1.1 Project Description 1.1.1 Background Large floods on the Odra and its tributaries are frequent: four floods were recorded in th the 19 century and twelve in the 2 0 th, that of July 1997 being the largest ever recorded.
Recommended publications
  • Program Ochrony Środowiska Dla Powiatu Wodzisławskiego
    PROGRAM OCHRONY ŚRODOWISKA DLA POWIATU WODZISŁAWSKIEGO ZARZ ĄD POWIATU WODZISŁAWSKIEGO WRZESIE Ń 2013 Program Ochrony Środowiska dla Powiatu Wodzisławskiego SPIS TRE ŚCI 1 WST ĘP .................................................................................................................................... 5 1.1. PRZEDMIOT I ZAKRES OPRACOWANIA ......................................................................................... 5 1.2. PODSTAWA PRAWNA OPRACOWANIA .......................................................................................... 5 2 ZAŁO ŻENIA WYJ ŚCIOWE PROGRAMU .......................................................................... 7 2.1. ZAŁO ŻENIA ZEWN ĘTRZNE ........................................................................................................... 7 2.1.1 Polityka ekologiczna pa ństwa .............................................................................................................. 7 2.1.2 Program ochrony środowiska dla województwa śląskiego do roku 2013 z uwzgl ędnieniem perspektywy do roku 2018 .................................................................................................................... 8 2.1.3 Program ochrony powietrza dla stref województwa śląskiego ............................................................ 9 2.1.4 Strategia Ochrony Przyrody Województwa Śląskiego na lata 2011-2030 ......................................... 10 2.1.5 Strategia Rozwoju Województwa Śląskiego „ Śląskie 2020” ............................................................
    [Show full text]
  • SMTP (Simple Mail Transfer Protocol)
    P1: JsY JWBS001A-60.tex WL041/Bidgoli WL041-Bidgoli.cls May 12, 2005 3:27 Char Count= 0 SMTP (Simple Mail Transfer Protocol) Vladimir V. Riabov, Rivier College Introduction 1 SMTP Security Issues 12 SMTP Fundamentals 1 SMTP Vulnerabilities 12 SMTP Model and Protocol 2 SMTP Server Buffer Overflow Vulnerability 15 User Agent 4 Mail Relaying SMTP Vulnerability 15 Sending e-Mail 4 Mail Relaying SMTP Vulnerability in Microsoft Mail Header Format 4 Windows 2000 15 Receiving e-Mail 4 Encapsulated SMTP Address Vulnerability 15 The SMTP Destination Address 4 Malformed Request Denial of Service 16 Delayed Delivery 4 Extended Verb Request Handling Flaw 16 Aliases 5 Reverse DNS Response Buffer Overflow 16 Mail Transfer Agent 5 Firewall SMTP Filtering Vulnerability 16 SMTP Mail Transaction Flow 5 Spoofing 16 SMTP Commands 6 Bounce Attack 16 Mail Service Types 6 Restricting Access to an Outgoing Mail SMTP Service Extensions 8 Server 17 SMTP Responses 8 Mail Encryption 17 SMTP Server 8 Bastille Hardening System 17 On-Demand Mail Relay 8 POP and IMAP Vulnerabilities 17 Multipurpose Internet Mail Extensions Standards, Organizations, and (MIME) 8 Associations 18 MIME-Version 10 Internet Assigned Numbers Authority 18 Content-Type 10 Internet Engineering Task Force Working Content-Transfer-Encoding 10 Groups 18 Content-Id 11 Internet Mail Consortium 18 Content-Description 11 Mitre Corporation 18 Security Scheme for MIME 11 Conclusion 18 Mail Transmission Types 11 Glossary 18 Mail Access Modes 11 Cross References 19 Mail Access Protocols 11 References 19 POP3 11 Further Reading 22 IMAP4 12 INTRODUCTION and IMAP4), SMTP software, vulnerability and security issues, standards, associations, and organizations.
    [Show full text]
  • Jedyna Taka Szkoła W Kraju Sławskiego Zespołu Szkół Technicznych Placówka Do Niedawna Godniach Wiem, Że to Strzał W Mieszkać Samodzielnie
    WTOREK 12 PAŹDZIERNIKA 2010 W bibliotece Nr 41 (518) Rok X Kret wystąpił Nr indeksu 323942 w kiecy ISSN 1508-8820 Pojawił się w tradycyjnym cena 2,50 zł (7% VAT) indyjskim stroju i przeko- [email protected] nywał, że kraj ten to nie tylko sari i święte krowy 16 Tutaj będą miejsca pracy Park rekreacji w Rydułtowach Od miesiąca w strefie gospodarczej za ponad 4 mln zł otwarty w Skrzyszowie działa nowa firma 13 Inwestycję sfinansowało miasto 8 OŚWIATA: Puchar trafił do Wodzisławia 17 • KULTURA: Szukają żydowskich nagrobków 16• GMINY: 20 Wójt ponagla do szybszej roboty 12 • ParkingParking będziebędzie większywiększy 1010 Ponad 3 mln dla szkoły Dodatkowe zajęcia wyrównawcze i 36 kółek zainteresowań przez dwa lata. To wszystko w ramach projektu, na który Szkoła Podstawowa nr 3 otrzymała ponad Jak radni próbują 3 mln zł. To swoisty rekord. 17 Radiowy internet nie dla Marklowic Radni zrezygnowali z udziału w projekcie rozbudowy internetowej sieci radiowej w wykiwać mieszkańców ramach Subregionu Zachodniego. Uznano, że na projekt WiMAX gminy nie stać. Szamatowicz mówił, że szcze- statutu miasta związane m.in. przewodniczący rady miejskiej, WODZISŁAW W czerwcu 11 2009 r. powstał zespół radnych, góły poznamy jesienią, teraz z wprowadzeniem głosowania wielokrotnie przekładał termin pracujący nad nową siecią szkół. prezydent informuje, że ich nie imiennego (każdy by wiedział zakończenia prac, nigdy nie Młody konkurent pani Minęło blisko półtora roku i nie ujawni. Tylko on dowie się, którą jak konkretny radny głosował) przedstawił propozycji zmian i wiadomo co ustalono. Reprezen- szkołę należy zlikwidować czy i inicjatywy uchwałodawczej przed wyborami tego nie zrobi. burmistrz tanci mieszkańców nie zamierza- zmienić jej charakter.
    [Show full text]
  • Understanding Post Office Protocol (POP3)
    Understanding Post Office Protocol (POP3) Author: Conrad Chung, 2BrightSparks Introduction Most Internet users with email accounts would have used some form of “client” software (Outlook, Thunderbird etc.) to access and manage their email at one point or another. To retrieve emails, these email clients may require the configuration of Post Office Protocol (or POP3) before messages can be downloaded from the server. This article will help readers understand what POP3 is and how it works. What is Post Office Protocol? The Post Office Protocol (POP3) is an Internet standard protocol used by local email software clients to retrieve emails from a remote mail server over a TCP/IP connection. Since the first version was created in 1984, the Post Office Protocol (currently at Version 3) has since became one of the most popular protocols and is used by virtually every email client to date. Its popularity lies in the protocol’s simplicity to configure, operate and maintain. Email servers hosted by Internet service providers also use POP3 to receive and hold emails intended for their subscribers. Periodically, these subscribers will use email client software to check their mailbox on the remote server and download any emails addressed to them. Once the email client has downloaded the emails, they are usually deleted from the server, although some email clients allow users to specify that mails be copied or saved on the server for a period of time. Email clients generally use the well-known TCP port 110 to connect to a POP3 server. If encrypted communication is supported on the POP3 server, users can optionally choose to connect either by using the STLS command after the protocol initiation stage or by using POP3S, which can use the Transport Layer Security (TLS) or Secure Sockets Layer (SSL) on TCP port 995 to connect to the server.
    [Show full text]
  • What Is the Difference Between Email Protocols
    What Is The Difference Between Email Protocols Interactions between email servers and users are governed by email protocols. The most common incoming email protocols are POP, and IMAP. Most email applications/programs support one or more of these. This article is to help users understand and choose which protocol should be selected for each user’s situation. Outgoing Incoming POP (Post Office Protocol): IMAP (Internet Message Access Protocol): SSL (Secure Socket Layer): Differences Between POP and IMAP Backups / Email Loss Outgoing SMTP (Simple Mail Transfer Protocol) is the protocol used in sending (outgoing) emails. SMTP is the protocol always used for sending (outgoing) emails. Incoming POP (Post Office Protocol) and IMAP (Internet Message Access Protocol) are two different protocols that do the same thing differently. They are both used in receiving emails from a mail server and can both are available for standard and secure (?) connections. POP (Post Office Protocol): POP is an email accessing protocol used to download emails from a mail server. Applications like Outlook and Outlook Express using POP will download all emails from the server to the user’s computer, and then delete them on the server. Generally POP server uses port 110 to listen to the POP requests or securely using SSL (Secure Socket Layer) (?) POP uses port number 995. The POP protocol assumes that there is only one client/computer that will be connecting to the mailbox. Even though there is an option in most mail applications to leave the copies of the emails in the server, it is not generally used due to various reasons.
    [Show full text]
  • HTTP Cookie - Wikipedia, the Free Encyclopedia 14/05/2014
    HTTP cookie - Wikipedia, the free encyclopedia 14/05/2014 Create account Log in Article Talk Read Edit View history Search HTTP cookie From Wikipedia, the free encyclopedia Navigation A cookie, also known as an HTTP cookie, web cookie, or browser HTTP Main page cookie, is a small piece of data sent from a website and stored in a Persistence · Compression · HTTPS · Contents user's web browser while the user is browsing that website. Every time Request methods Featured content the user loads the website, the browser sends the cookie back to the OPTIONS · GET · HEAD · POST · PUT · Current events server to notify the website of the user's previous activity.[1] Cookies DELETE · TRACE · CONNECT · PATCH · Random article Donate to Wikipedia were designed to be a reliable mechanism for websites to remember Header fields Wikimedia Shop stateful information (such as items in a shopping cart) or to record the Cookie · ETag · Location · HTTP referer · DNT user's browsing activity (including clicking particular buttons, logging in, · X-Forwarded-For · Interaction or recording which pages were visited by the user as far back as months Status codes or years ago). 301 Moved Permanently · 302 Found · Help 303 See Other · 403 Forbidden · About Wikipedia Although cookies cannot carry viruses, and cannot install malware on 404 Not Found · [2] Community portal the host computer, tracking cookies and especially third-party v · t · e · Recent changes tracking cookies are commonly used as ways to compile long-term Contact page records of individuals' browsing histories—a potential privacy concern that prompted European[3] and U.S.
    [Show full text]
  • Migrationsleitfaden
    Migrationsleitfaden Leitfaden für die Migration der Basissoftwarekomponenten auf Server- und Arbeitsplatz-Systemen Version 1.0 – Juli 2003 Schriftenreihe der KBSt ISSN 0179-7263 Band 57 Juli 2003 Schriftenreihe der KBSt Band 57 ISSN 0179 - 7263 Nachdruck, auch auszugsweise, ist genehmigungspflichtig Dieser Band wurde erstellt von der KBSt im Bundesministeri- um des Innern in Zusammenarbeit mit dem Bundesamt für Sicherheit in der Informationstechnik (BSI), dem Bundesver- waltungsamt (BVA) und der C_sar Consulting, solutions and results AG Redaktion: C_sar AG, Berlin Interessenten erhalten die derzeit lieferbaren Veröffentlichungen der KBSt und weiterführende Informationen zu den Dokumenten bei Bundesministerium des Innern Referat IT 2 (KBSt) 11014 Berlin Tel.: +49 (0) 1888 681 - 2312 Fax.: +49 (0) 1888 681 - 523121 Homepage der KBSt: http://www.kbst.bund.de 1Frau Monika Pfeiffer (mailto: [email protected]) Migrationsleitfaden Leitfaden für die Migration der Basissoftwarekomponenten auf Server- und Arbeitsplatz-Systemen Version 1.0 Juli 2003 Herausgegeben vom Bundesministerium des Innern INHALTSVERZEICHNIS 1 Einleitung ........................................................................ 8 1.1 Über das Vorhaben 8 1.2 Über diesen Leitfaden 9 1.3 Hinweise zur Benutzung des Leitfadens 10 1.4 Hinweise an die Entscheider 12 1.4.1 Grundsätzliche Empfehlungen 12 1.4.2 Fortführende und ablösende Migration 13 1.4.3 Migrationswege 14 1.4.4 Vergleichbarkeit von Alternativen 14 1.4.5 Künftige Schwerpunte 15 1.4.6 Wirtschaftlichkeit 16
    [Show full text]
  • Strategia Rozwiązywania Problemów Społecznych Gminy Lubomia Na Lata 2021-2028
    Załącznik do Uchwały Nr Rady Gminy Lubomia z dnia STRATEGIA ROZWIĄZYWANIA PROBLEMÓW SPOŁECZNYCH GMINY LUBOMIA NA LATA 2021-2028 Strategia Rozwiązywania Problemów Społecznych Gminy Lubomia na lata 2021-2028 Spis treści I. Uwarunkowania zewnętrzne tworzenia strategii ................................................. 6 1. PODSTAWY PRAWNE............................................................................................ 6 2. PODSTAWY STRATEGICZNO-PROGRAMOWE ................................................... 7 3. OCENA WDROŻENIA POPRZEDNIO REALIZOWANEJ STRATEGII................... 15 II. Diagnoza społeczna ............................................................................................ 18 1. CHARAKTERYSTYKA GMINY .............................................................................. 18 2. ATUTY I CZYNNIKI OGRANICZAJĄCE ROZWÓJ ................................................ 18 3. DEMOGRAFIA ...................................................................................................... 19 4. INFRASTRUKTURA TECHNICZNA ...................................................................... 21 5.KOMUNIKACJA I TRANSPORT ............................................................................. 21 6. GOSPODARKA ..................................................................................................... 22 7. ZASOBY I WARUNKI MIESZKANIOWE ................................................................ 24 8. EDUKACJA I KULTURA .......................................................................................
    [Show full text]
  • Sprawozdanie Za 2010 Wersja Ostateczna 9.02.2011 Wydruk
    Powiatowy Zarząd Dróg w Wodzisławiu Śląskim z siedzibą w Syryni SPRAWOZDANIE Z DZIAŁALNO ŚCI POWIATOWEGO ZARZ ĄDU DRÓG W ROKU 2010 44-361 Syrynia, ul. Raciborska 3 tel./fax.: 032/4 51·76·07, 032/451·74·15 e-mail: [email protected] NIP:647-21-8 0-7 74 Powiatowy Zarz ąd Dróg w Wodzisławiu Śląskim z siedzib ą w Syryni – sprawozdanie z działalno ści w 2010 r. Powiatowy Zarz ąd Dróg w imieniu Zarz ądu Powiatu Wodzisławskiego administruje sieci ą dróg powiatowych o ł ącznej długo ści ok. 205 km, z czego w poszczególnych gminach: Godów - 26,1 km, Gorzyce - 47,7 km, Lubomia - 24,0 km, Marklowice - 3,5 km, Mszana - 14,1 km, Pszów 20,3 km, Radlin - 15,7 km, Rydułtowy - 8,1 km oraz Wodzisław Śląski - 45,5 km. W roku 2010 w Powiatowym Zarz ądzie Dróg zatrudnienie wyniosło 30 osób, w tym 19 pracowników merytorycznych i 11 pracowników Działu Słu Ŝby Drogowej. W celu realizacji zada ń ustawowych i statutowych Powiatowy Zarz ąd Dróg w Wodzisławiu Śląskim otrzymał na rok 2010 środki finansowe w wysoko ści 7 073 618,00 zł. W trakcie roku w ramach podziału wolnych środków finansowych, bud Ŝet PZD został zwi ększony o kwot ę 1 524 989,00 zł. I. Wykaz wa Ŝniejszych prac inwestycyjnych, remontowych i utrzymaniowych zrealizowanych na drogach powiatowych w poszczególnych gminach Powiatu Wodzisławskiego. Gmina Godów 1. Budowa chodnika i remont nawierzchni ul. 1 Maja w Gołkowicach – w ramach zadania wykonano remont ok. 4850 m 2 nawierzchni jezdni, wybudowano 1435 mb chodnika i 1137 mb kanalizacji deszczowej – 1 183 859,88 zł ( zadanie realizowane w ramach NPPDL - dofinansowanie z Gminy) 2.
    [Show full text]
  • Plan Przesiedleń
    Regionalny Zarząd Gospodarki Wodnej w Gliwicach Regionalny Zarząd Gospodarki Wodnej w Gliwicach PROJEKT OCHRONY PRZECIWPOWODZIOWEJ DORZECZA ODRY Zadanie: Budowa Zbiornika Przeciwpowodziowego Racibórz Dolny na rzece Odrze w województwie śląskim (polder) Dokument: Plan Pozyskania Nieruchomości i Przesiedleń (Land Acquisition and Resettlement Action Plan) Etap: aktualizacja nr 10 Data: wrzesień 2018r. I Regionalny Zarząd Gospodarki Wodnej w Gliwicach Spis treści Wstęp 1 Plan Przesiedleń. 1 Uzasadnienie dla aktualizacji nr 10 z września 2018r. 1 Budowa zbiornika przeciwpowodziowego Racibórz Dolny (polder); 4 1 Charakterystyka projektu zbiornika przeciwpowodziowego 6 1.1 Opis projektu 6 1.1.1 Rys historyczny 6 1.1.2 Obecny system ochrony przeciwpowodziowej 7 1.1.3 Projektowany zbiornik przeciwpowodziowy Racibórz 7 1.1.4 Cel budowy zbiornika 12 1.1.5 Społeczne skutki budowy zbiornika 12 1.2 Obszar projektowanego zbiornika 13 1.2.1 Całkowita powierzchnia zbiornika 13 1.2.2 Tereny niezbędne do realizacji zbiornika – tereny pod obiekty budowlane 13 1.2.3 Tereny niezbędne do realizacji inwestycji. 14 1.2.4 Tereny niezbędne do funkcjonowania zbiornika – tereny leśne i rolne w czaszy zbiornika 15 1.3 Wydane decyzje administracyjne 17 2 Analizy społeczno - ekonomiczne 18 2.1 Dane społeczno – ekonomiczne 18 2.1.1 Wsie i ich historia 18 2.1.2 Liczba ludności i dane demograficzne 20 2.1.3 Gospodarka i zatrudnienie 21 2.1.4 Użytkowanie terenu 26 2.1.5 Infrastruktura techniczna 27 2.1.6 Dojazd i komunikacja 29 2.1.7 Usługi publiczne 29 2.1.8 Szkolnictwo
    [Show full text]
  • Charles University in Prague Faculty of Social Sciences Institute of Political Studies
    Charles University in Prague Faculty of Social Sciences Institute of Political Studies Master’s Thesis Breaking Down Barriers: Euroregional Cooperation of the Czech Republic Author: Bc. Karen Benko Subject: IEPS Supervisor: PhDr. Zuzana Kasáková, Ph.D Academic Year: 2013/2014 Date of Submission: May 14, 2014 Declaration of Authorship I hereby declare that this thesis is my own work, based on the sources and literature listed in the appended bibliography. The thesis as submitted is 130,962 keystrokes long including spaces, i.e. 51 manuscript pages excluding the initial pages, the list of references and appendices. Prague, 14.05.2014 Bc. Karen Benko 2 Acknowledgement I would like to express my gratitude to my supervisor, PhDr. Zuzana Kasáková, Ph.D, for her guidance during the writing process. 3 Abstract: Cooperation between people of different nations has existed throughout Europe for centuries on an informal basis as borders have shifted and power has found its way into different hands. During the European integration process of the 1950s, this cooperation was formalized with the creation of the Euroregions, or cross-border regions. These regions were formed to promote common interests and cooperation to counteract barriers and benefit the people residing in the area. The Czech Republic is currently a member of 13 different Euroregions either exclusively or with multiple neighboring countries: Poland (7), Austria (3), Germany (4), and Slovakia (2). Of these 13 regions, four – Silva Nortica (Czech-Austrian, 2002), Bílé-Biele Karpaty (Czech- Slovak, 2000), Silesia (Czech-Polish, 1998), and Egrensis (Czech-German, 1993) – have been chosen to further evaluate how the creation of Euroregions has facilitated regional development.
    [Show full text]
  • OJCIEC I MATKA Deputatami Węglowymi
    18 Jak znaleźć Sześciu specjalistę Dziecko odprawione naszych wyświęconych Cotygodniowy 3 dodatek zdrowotny 8 z kwitkiem WTOREK 23 maja 2006 Nr 21 (330) Rok VII Nr indeksu 323942 ISSN 1508-8820 cena 2 zł (w tym 7% VAT) [email protected] www.nowiny.pl POWIATA Koniec prowizorki Kompania Węglowa nie za- mierza dłużej tolerować handlu OJCIEC I MATKA deputatami węglowymi. Poza tym chce ukrócić wydawanie posiłków regeneracyjnych „paniom zza biurka”. Teoretycznie należą się one tylko górnikom pracującym w ciężkich warunkach. W praktyce GŁOSU NIE MAJĄ otrzymuje je prawie 100% załogi. Więcej – s. 4 GORZYCEA Ksiądz Adam Kandziora z pszowskiej bazyliki podczas chrztu bez zgody rodziców zmienił imię dziecka. Nie Są pieniądze spodobał mu się Paskal, więc nazwał go Józef. na basen „Będziecie go sobie wołać, jak chcecie, ale Władze gminy po raz trzeci sta- rały się o dofinansowanie budowy ja go tak ochrzciłem i już” – powiedział krytej pływalni. Za trzecim razem się udało. Ponad 4 mln zł wyłoży kapłan. Kiedy zdarzenie wyszło na jaw Unia Europejska, natomiast kolej- ne 1,8 mln Urząd Marszałkowski. stwierdził, że to „wewnętrzna spra- Więcej – s. 7 wa Kościoła”. Rodzice dziecka PSZÓWA do dzisiaj nie mogą uwierzyć Muzyka i konie w to, co się stało. Izabellę i Dariusza Panków po- łączyła muzyka i miłość do koni. Więcej na str. 21 Założyli zespół Ad Libitum, który zdobył już wiele nagród nie tyl- ko w kraju, ale także za granicą. Muzycy m.in. z naszego powiatu nagrali płytę z udziałem Józefa Brody i Artura Żmijewskiego. Więcej – s. 9 SPORTA PORADYA RADLINA Zasłużeni dla powiatu Gwarancja Wolnoć Tomku Tomasz Sikora oraz piłkarze i Kiedy podbić gwarancję i czy w swoim domku działacze MKS Odra Wodzisław trzeba przechowywać oryginalne Państwo Firutowie sprzeciwia- to wyróżnieni Medalem Hono- opakowanie? Na te i inne pytania ją się budowie za ich płotem pie- rowym „Zasłużony dla Powiatu odpowiada Powiatowy Rzecznik karni.
    [Show full text]