Georgian Wine Infographics

Total Page:16

File Type:pdf, Size:1020Kb

Georgian Wine Infographics KAKHETI WINE MAP Akhmeta, Telavi, Gurjaani, Kvareli, Lagodekhi I GEORGIA o Abkhazia Svaneti 0 10 20 40 KM Racha-Lechkhumi Kvemo Svaneti Mtskheta Samegrelo Tskhinvali Region Mtianeti South Ossetia KUTAISI Guria Imereti Shida Kartli TELAVI BATUMI KAKHETI Ajara Samtskhe TBILISI Javakheti Kvemo kartli Viticultural Districts White Wine vazis gavrcelebis areali TeTri Rvino Winegrowing Centre Amber Wine mevenaxeoba - meRvineobis kera qarvisferi Rvino Qvevri making Centre * NAPAREULI PDO qvevris warmoebis kera Fortified Wine Semagrebuli Rvino Red Wine TELIANI PDO wiTeli Rvino * *Red Semisweet Wine KINDZMARAULI PDO Maghraani wiTeli Pshaveli naxevradtkbili Matani Kvemo Artana Rvino alvani AKHMETA Naphareuli KVARELI PDO Zemo Gremi alvani Shilda Eniseli Ikalto KVARELI Kurdghelauri Vardisubani Kondoli Akhalsopeli KAKHETI PDO TELAVI Tsinandali Akura Chikaani Kalauri Gavazi LAGODEKHI TSINANDALI Protected Vazisubani Velistsikhe Designation of Origin Mukuzani Akhasheni Chumlaki VAZISUBANI PDO GURJAANI KOTEKHI PDO Bakurtsikhe Kardenakhi MUKUZANI PDO Kachreti * Chalaubani AKHASHENI PDO KARDENAKHI PDO * Major Grapes of Kakheti GURJAANI PDO yvelaze gavrcelebuli vazis jiSebi Rkatsiteli, Saperavi, Mtsvane Kakhuri, Khikhvi, Kisi rqawiTeli, saferavi, mwvane kaxuri, xixvi, qisi Saperavi, Rkatsiteli, Mtsvane Kakhuri, Kisi, Khikhvi saferavi, rqawiTeli, wvane kaxuri, qisi, xixvi Rkatsiteli, Kisi, Mtsvane Kakhuri, Saperavi rqawiTeli, qisi, mwvane kaxuri, saferavi Other Varieties sxva jiSebi White: Kakhuri Mtsvivani, Grdzelmtevana, Vardispheri Rkatsiteli, Kurmi, Tetri Mirzaanuli, Ghrubela, Chitistvala, Saphena TeTri: kaxuri mcvivani, grZelmtevana, vardisferi rqawiTeli, kumsi, TeTri mirzaanuli, Rrubela, CitisTvala, safena Red: Tsiteli Budeshuri, Kumsi Tsiteli, Ikaltos Tsiteli, Kharistvala, Zhghia wiTeli: wiTeli budeSuri, kumsi wiTeli, iyalTos wiTeli, xarisTvala, JRia Authors: Zaza Gagua, Paata Dvaladze, Malkhaz Kharbedia Design: Paata Dvaladze Author of Project: Malkhaz Kharbedia © NATIONAL WINE AGENCY © Georgian Wine Club © GEORGIAN WINE INFOGRAPHICS.
Recommended publications
  • World Bank Document
    Public Disclosure Authorized Environmental Management Plan Public Disclosure Authorized for rehabilitation of secondary road Chalaubani-Signagi-Anaga km 16 - km 22 Public Disclosure Authorized Tbilisi, Georgia July 2012 Public Disclosure Authorized 1 PART 1: GENERAL PROJECT AND SITE INFORMATION INSTITUTIONAL & ADMINISTRATIVE Country Georgia Project title Rehabilitation of secondary road Chalaubani-Signagi-Anaga km 16 - km 22 The existing road pavement of the design section is represented as a damaged asphalt concrete (the main damage Scope of project and type is “alligator” cracks, potholes, settled areas, damages edges), longitudinal and cross parameters are violated. activity There is one bridge located at the section that is in fair condition. The design road is crossed by 9 culverts of different lengths, 2 of which need replacement and 7 has to be rehabilitated. The ditches are to be arranged along the road, and the existing road side ditches need cleaning and upgrading to function. Some technical characteristics of the existing road are as follows: • Roadway width 5-9 m • Carriageway width 5 m • Shoulder width 0-2 m. The design alignment follows the existing route. Aiming at avoiding the encroachment upon the property or land occupation, the transitional curves are designed for the densely populated areas improving the safety and traffic comfort. Institutional WB Project Management Local Counterpart and/or Recipient arrangements (Project Team Leader) Giorgi Tsereteli Signagi Municipality (Name and contacts) Joseph Melitauri RDMRDI Implementation Safeguard Supervision Local Counterpart Local Inspectorate Contractor arrangements WB Supervision Supervision Caucasavtomagistrali Technical Supervisor - (Name and contacts) Darejan Kapanadze RRMSD Ltd. SITE DESCRIPTION Name of site Rehabilitation of secondary road Chalaubani-Signagi-Anaga 16Km-22Km, Kakheti Region, Signagi Municipality Describe site location The project is located in the East Georgia.
    [Show full text]
  • World Bank Document
    b Public Disclosure Authorized Roads Department of the Ministry of Regional Development and Infrastructure of Georgia Environmental and Social Impact Assessment of Construction Works for the Bakurtsikhe-Tsnori (16km) Public Disclosure Authorized Road Section Public Disclosure Authorized Public Disclosure Authorized Draft report October 2018 LIST OF ACRONIMS EIA - Environmental Impact Assessment EMP - Environmental Management Plan ESIA - Environmental and Social Impact Assessment ESMP - Environmental and Social Management Plan HSE - Health, Safety, Environment HS - Health and Safety GIS - Geographic Information System GoG - Government of Georgia IPPC - Integrated Pollution Prevention and Control KP - Kilometer Post MESD - Ministry of Economy and Sustainable Development of Georgia MEPA - Ministry of Environment Protection and Agriculture of Georgia MLHSA - Ministry of Labor, Health and Social Affairs of Georgia NGO - Non-Governmental Organization RD - Roads Department of the Ministry of Regional Development and Infrastructure of Georgia MRDI - Ministry of Regional Development and Infrastructure of Georgia ToR - Terms of Reference WB - The World Bank Table of Contents 2.1 Environmental Policies and Laws of Georgia ....................................................................................... 2 2.2 Laws and Regulations Related to Social Aspects and Land Ownership .............................................. 5 2.3 Labor Legislation ...................................................................................................................................
    [Show full text]
  • Economic Prosperity Initiative
    USAID/GEORGIA DO2: Inclusive and Sustainable Economic Growth October 1, 2011 – September 31, 2012 Gagra Municipal (regional) Infrastructure Development (MID) ABKHAZIA # Municipality Region Project Title Gudauta Rehabilitation of Roads 1 Mtskheta 3.852 km; 11 streets : Mtskheta- : Mtanee Rehabilitation of Roads SOKHUMI : : 1$Mestia : 2 Dushet 2.240 km; 7 streets :: : ::: Rehabilitation of Pushkin Gulripshi : 3 Gori street 0.92 km : Chazhashi B l a c k S e a :%, Rehabilitaion of Gorijvari : 4 Gori Shida Kartli road 1.45 km : Lentekhi Rehabilitation of Nationwide Projects: Ochamchire SAMEGRELO- 5 Kareli Sagholasheni-Dvani 12 km : Highway - DCA Basisbank ZEMO SVANETI RACHA-LECHKHUMI rehabilitaiosn Roads in Oni Etseri - DCA Bank Republic Lia*#*# 6 Oni 2.452 km, 5 streets *#Sachino : KVEMO SVANETI Stepantsminda - DCA Alliance Group 1$ Gali *#Mukhuri Tsageri Shatili %, Racha- *#1$ Tsalenjikha Abari Rehabilitation of Headwork Khvanchkara #0#0 Lechkhumi - DCA Crystal Obuji*#*# *#Khabume # 7 Oni of Drinking Water on Oni for Nakipu 0 Likheti 3 400 individuals - Black Sea Regional Transmission ZUGDIDI1$ *# Chkhorotsku1$*# ]^!( Oni Planning Project (Phase 2) Chitatskaro 1$!( Letsurtsume Bareuli #0 - Georgia Education Management Project (EMP) Akhalkhibula AMBROLAURI %,Tsaishi ]^!( *#Lesichine Martvili - Georgia Primary Education Project (G-Pried) MTSKHETA- Khamiskuri%, Kheta Shua*#Zana 1$ - GNEWRC Partnership Program %, Khorshi Perevi SOUTH MTIANETI Khobi *# *#Eki Khoni Tskaltubo Khresili Tkibuli#0 #0 - HICD Plus #0 ]^1$ OSSETIA 1$ 1$!( Menji *#Dzveli
    [Show full text]
  • RBMP SEA Report ENG FINAL
    European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+) STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) OF THE DRAFTALAZANI-IORI RIVER BASIN MANAGEMENT PLAN SEA Report November 2020 2 This SEA report was prepared by the national SEA team established for the pilot project “The Application of a Strategic Environmental Assessment (SEA) for the Draft Alazani-Iori River Basin Management Plan” (hereinafter also the SEA pilot project): Ms. Elina Bakradze (water and soil quality aspects), Ms. Anna Rukhadze (biodiversity, habitats and protected areas), Ms. Lela Serebryakova (health related aspects), Mr. Giorgi Guliashvili (hydrology and natural hazards), Mr. Davit Darsavelidze (socio-economic aspects), Mr. Irakli Kobulia (cultural heritage aspects and GIS) and the UNECE national consultant Ms. Irma Melikishvili (the team leader also covering climate change aspects), under the guidance and supervision of the UNECE international consultant Mr. Martin Smutny. Maps: The thematic maps presented in the SEA Report are produced by Mr. Irakli Kobulia on the basis of the GIS database provided by the EUWI + programme. The SEA Report also includes maps developed in the framework of the EUWI + programme (under result 2) by the REC Caucasus, subcontractor of the EUWI+ programme. The SEA pilot project was carried out under the supervision of Mr. Alisher Mamadzhanov, the EUWI+ programme leader from UNECE with the support provided by Ms. Christine Kitzler and Mr. Alexander Belokurov, UNECE and Ms. Eliso Barnovi, the EUWI+ Country Representative
    [Show full text]
  • Askaneli Wines
    ASKANELI't; BROTHERS 1880 From the very beginning, we decided to not spare money or efforts on using the most current technologies and inviting the best industry professionals with international work ex- perience. It is extremely important for me to be involved in the creation of the modern history of Georgian winemaking. Our country prides with its huge range of endemic grapes, many of which have been lost or simply forgotten. Revival of ancient varieties has become one of the important components for our development and we are continuously working a lot in this direction. We cherish traditions, but don’t fear experimenting, searching for new tastes and imple- menting new technologies. Thanks to this approach, we have created new wines from smaller vineyards that have unique terroir. Contributing to the global winemaking, yet step by step we create our signature style. We want our wines to be exceptional and recognizable, to have individuality and certainly the Georgian spirit. Constant development and quality growth has remained the cornerstone over the 20 years Gocha Chkhaidze of existence for Askaneli Brothers company. President of Askaneli Brothers Askaneli Brothers started in the village Askana in the region of Guria west Georgia near the Black Sea. It is interestingly to note, that even the name of the village is related to the activities of Askaneli since the son of Aeneas descendant of Dionysus was called Ascanius. Legend would have been just a good story if not for the great grandfather of the Askaneli’s, Anthimoz Chkhaidze. There in the winery vault built by him lays a pitcher dated 1880.
    [Show full text]
  • Report, on Municipal Solid Waste Management in Georgia, 2012
    R E P O R T On Municipal Solid Waste Management in Georgia 2012 1 1 . INTRODUCTION 1.1. FOREWORD Wastes are one of the greatest environmental chal- The Report reviews the situation existing in the lenges in Georgia. This applies both to hazardous and do- field of municipal solid waste management in Georgia. mestic wastes. Wastes are disposed in the open air, which It reflects problems and weak points related to munic- creates hazard to human’s health and environment. ipal solid waste management as related to regions in Waste represents a residue of raw materials, semi- the field of collection, transportation, disposal, and re- manufactured articles, other goods or products generat- cycling. The Report also reviews payments/taxes re- ed as a result of the process of economic and domestic lated to the waste in the country and, finally, presents activities as well as consumption of different products. certain recommendations for the improvement of the As for waste management, it generally means distribu- noted field. tion of waste in time and identification of final point of destination. It’s main purpose is reduction of negative impact of waste on environment, human health, or es- 1.2. Modern Approaches to Waste thetic condition. In other words, sustainable waste man- Management agement is a certain practice of resource recovery and reuse, which aims to the reduction of use of natural re- The different waste management practices are ap- sources. The concept of “waste management” includes plied to different geographical or geo-political locations. the whole cycle from the generation of waste to its final It is directly proportional to the level of economic de- disposal.
    [Show full text]
  • An Overview of Ongoing and Completed Projects
    The work of Partnership Fund: An overview of ongoing and completed projects June 2019 Author: Beso Namchavadze Research Supervisor: Levan Natroshvili The report was prepared with the financial support of the Ministry of Foreign Affairs of the Kingdom of Norway Contents Executive Summary 4 Introduction 5 About Partnership Fund 6 1. Financial Statements 7 Ongoing and completed projects of the Partnership Fund 8 1. Completed projects 8 1.1. Three-star hotel Best Western Kutaisi 9 1.2. Expansion of four-star hotel Lopota Lake Resort and Spa 9 1.3. Aerostructure Technologies Cyclone (ATC) 10 1.4. Five-star hotel Radisson Collection Tsinandali 10 2. Ongoing projects 11 2.1. Nenskra HPP 11 2.2. Mountain pig farm 12 2.3. Corn oil plant - Karva 13 2.4. Ceramic brick factory 13 2.5. Concrete Block Factory - YTONG 14 Recommendations 15 Executive Summary Transparency International Georgia (TI Georgia) studied projects funded by LLC Partnership Fund (PF). The PF is a state-owned investment fund that was founded in 2011.The PF is split into two separate business units: a) Asset management and b) investment capacity. The main source of PF’s revenue is the assets of five state-owned enterprises. Total value of projects in PF’s portfolio is over USD 2.5 billion, out of which GEL 330 million is a share of PF’s investment. In 2014-2017, the PF’s total assets grew by 16% and total equity decreased by 13%. The PF completed the financial year 2017 with a loss of GEL 482 million. In 2014-2017, a total loss amounted to GEL 528 million.
    [Show full text]
  • Biological and Technological Characteristics of Georgian Wine and Table Grapes
    BIO Web of Conferences 5, 01012 (2015) DOI: 10.1051/bioconf/20150501012 © Owned by the authors, published by EDP Sciences, 2015 Biological and technological characteristics of Georgian wine and table grapes Levan Ujmajuridze and Londa Mamasakhlisashvili LEPL Scientific-Research Center of Agriculture, 6 Marshal Gelovani Ave., 0159 Tbilisi, and Georgia Abstract. Georgian grapevine germplasm, which has formed for thousands of years, includes white, black, red, pink and grey 525 Vitis vinifera cultivars. In 2009–2014 up to 440 local grapevine varieties Vitis vinifera sativa has been restored. These varieties are cultivated in the LEPL Agriculture Scientific-Research Center grapevine collection GEO 038, Mtskheta Munisipal, village Jighaura, at an altitude 550 m. There are retrieved and recorded in the collection up to 60 forms of Vitis vinifera silvestris. In order to study biological and technological characteristics of Georgian grapevine, in 2012–2014 were investigated 50 Georgian widely cultivated white and colored wine and table grapes varieties, in the seven viticulture regions of Georgia. Description of grapevine varieties implemented through the descriptors for grapevine (IPGRI OIV). Botanical, biological- technological, qualitative and quantitative marks are characterized and evaluated. Investigation conducted during the biologic development phases were studied for chemical and eno-carpological characteristics. History of grapevine culture is strongly connected with Phonological development of phases studied and their the history of Georgian nation. Creation and formation technological properties were studied based on grapes juice of local rich assortment was due to the longest cultivation chemical indicators and eno-carpological characteristics. period that made Georgia one of the leading country. The studied varieties were distinguished for middle and Mobilization and conservation of genetic resources high fertility of basal buds.
    [Show full text]
  • Resettlement Policy Framework Preparation of Feasibility Study for Upgrading of Tbilisi-Bakurtsikhe and Tsnori- Lagodekhi Road
    mail33 Ministry of Regional Development and Infrastructure of Georgia Roads Department of Georgia Resettlement Policy Framework Preparation of Feasibility Study for Upgrading of Tbilisi-Bakurtsikhe and Tsnori- Lagodekhi Road Upgrading and Construction of Tbilsi-Sagaredjo-Bakurtsikhe-Tsnori-Lagodekhi Road (Tbilisi- bakurtsikhe-Tsnori Road two sections 47 km and 41 km long, Tsnori-lagodekhi Road is 120 km long) March 2018 1 Table of Contents GLOSSARY ................................................................................................................................................................... 4 ABBREVIATIONS .......................................................................................................................................................... 5 1. Executive Summary .................................................................................................................................. 6 2. Introduction ............................................................................................................................................. 8 Project Background ................................................................................................................................................... 8 Project Scope of Works ............................................................................................................................................. 8 Magnitude of project impact ...................................................................................................................................
    [Show full text]
  • Diversification and Development in the Kakheti Food and Agriculture Sector
    DIVERSIFICATION AND DEVELOPMENT IN THE KAKHETI FOOD AND AGRICULTURE SECTOR Background and Recommendations Preparation Team: Editor/Author David Land Authors of Background Papers Lasha Dolidze, Team Leader Ana Godabrelidze, Grapes and Wine Konstantin Kobakhidze, Food Processing and Distribution Beka Tagauri, Primary Production, Processing, and Distribution Data Research Assistant Irene Mekerishvili UNDP Sophie Kemkhadze, Assistant Resident Representative George Nanobashvili, Economic Development Team Leader Vakhtang Piranishvili, Kakheti Regional Development Project Manager The views expressed here are those of the authors and not necessarily those of UNDP. This document is prepared and published with UNDP technical and financial support. Preparation of the document made possible with the financial contribution of the Romanian Government CONTENTS Table of Contents MESSAGE FROM UNDP RESIDENT REPRESENTATIVE ....................................................... 4 MESSAGE FROM MINISTER OF AGRICULTURE OF GEORGIA .......................................... 5 SUMMARY OF RECOMMENDATIONS FOR DEVELOPMENT ............................................. 8 CHAPTER 1. INTRODUCTION ................................................................................................ 10 CHAPTER 2. A REVIEW OF PRIMARY AGRICULTURAL PRODUCTION ........................... 12 CHAPTER 3. GRAPES AND WINE PRODUCTION ................................................................. 60 CHAPTER 4. AGRICULTURAL PROCESSING: STATUS AND OUTLOOK FOR GEORGIA .................................................................................................
    [Show full text]
  • How Preparedness Pays Off
    Community early warning systems: Howguiding preparedness principles pays off Evolution, costs, benefits and prospects of disaster risk management in Georgia www.ifrc.org Saving lives, changing minds. The International Federation of Red Cross and Red Crescent Societies (IFRC) is the world’s largest volunteer-based humanitarian network. Together with our 189 member National Red Cross and Red Crescent TheSocieties International worldwide, Federation we reach of 97 Red million Cross people and Red annually Crescent through Societies long- (IFRC)term services is the world’s and development largest volunteer-based programmes humanitarian as well as 85 millionnetwork. people Togetherthrough disasterwith our response 189 member and earlyNational recovery Red Cross programmes. and Red WeCrescent act before, Societiesduring and worldwide, after disasters we reach and 97 health million emergencies people annually to meet through the needs long- and termimprove services the lives and ofdevelopment vulnerable people.programmes We do as so well with as impartiality 85 million peopleas to throughnationality, disaster race, responsegender, religious and early beliefs, recovery class programmes. and political We opinions. act before, during and after disasters and health emergencies to meet the needs and Guided by Strategy 2020 – our collective plan of action to tackle the improve the lives of vulnerable people. We do so with impartiality as to major humanitarian and development challenges of this decade – we are nationality, race, gender, religious beliefs, class and political opinions. committed to ‘saving lives and changing minds’. Guided by Strategy 2020 – our collective plan of action to tackle the Our strength lies in our volunteer network, our community-based major humanitarian and development challenges of this decade – we are expertise and our independence and neutrality.
    [Show full text]
  • Assessment of Agri-Resource Potential of West Georgia and Landscape Zoning for Dissemination Actinidia
    Earth Science s 2015; 4(5-1): 104-107 Published online July 27, 2015 (http://www.sciencepublishinggroup.com/j/earth) doi: 10.11648/j.earth.s.2015040501.29 ISSN: 2328-5974 (Print); ISSN: 2328-5982 (Online) Assessment of Agri-Resource Potential of West Georgia and Landscape Zoning for Dissemination Actinidia Seperteladze Zurab 1, Davitaia Eter 1, Memarne Guram 2, Khalvashi Neli 3, Gaprindashvili George 4 1 Faculty of Exact and Natural Sciences, Tbilisi State University, Tbilisi, Georgia 2Batumi Shota Rustaveli State University, Institute of Phytopathology and Biodiversity, Batumi, Georgia 3Batumi Shota Rustaveli State University, Institute of Phytopathology and Biodiversity, Division of Biodiversity Monitoring and Conservation, Batumi, Georgia 4Faculty of Exact and Natural Sciences, Tbilisi State University, Institute of Geography, Tbilisi, Georgia Email address: [email protected] (S. Zurab), [email protected] (D. Eter), [email protected] (M. Guram), [email protected] (K. Neli), [email protected] (G. George) To cite this article: Seperteladze Zurab, Davitaia Eter, Memarne Guram, Khalvashi Neli, Gaprindashvili George. Assessment of Agri-Resource Potential of West Georgia and Landscape Zoning for Dissemination Actinidia. Earth Sciences. Special Issue: Modern Problems of Geography and Anthropology. Vol. 4, No. 5-1, 2015, pp. 104-107. doi: 10.11648/j.earth.s.2015040501.29 Abstract: The methodology has been developed and established in West Georgia for agro-resource potential spatial distribution regularities for ACTINIDIA (according to hypsometric levels and types of landscapes of Georgia). On the basis of a large amount of data processing and systematization, also different data scattered in various scientific-research organizations agri-resource potential of West Georgia were determined.
    [Show full text]