# District Color Coding Has Isolator? CT Tap Used General ConditionConnection Service Has Interrupter? Has Meter Room? Installed CT Ratio(s) Primary Meter Type? Check Meter Type? Connection Point Name LV/MV ConnectionConnection Point Voltage (kV)Limited Capacity (MW)? Meter Enclosure Type? Check Meter Functions?Kvarh Meter Installed? Has Structure MV VT/CT? Has Room Low Voltage CT? Primary Meter Functions? Has Switchgear MV VT/CT? Meter CommunicationMeter Communication Type? Works?

Conn. Capacity (based on3-Year CT tap Forecasted (MVA) Load Demand (MW) Comment Feeding from PETL S/S with PETL OH/UG to PETL CP Feeding from IEC S/S with IEC OH/UG to PETL CP CP cancelled with PETL to install a new CP Feeding from IEC S/S with IEC OH/UG to IEC CP Feeding from PETL S/S with IEC OH/UG to PETL CP New, Does not exist. Will connect 1 Green Jenin West Jenin N/A N/A MV 22 8.0 5.3 15 ------to PETL S/S? New, Does not exist. Will connect 2 Green Jenin New Ya'Bad N/A N/A MV 33 22.9 15.0 20 ------to PETL S/S? New, Does not exist. Will connect 3 Green Jenin New Qabatya N/A N/A MV 33 22.9 20.0 20 ------to PETL S/S? New, Does not exist. Will connect 4 Green Tubas New Tubas N/A N/A MV 33 22.9 20.0 20 ------to PETL S/S? 5 Green Nablus Sarra1 SAT OH MV 33 22.9 18.0 20 LLB No No Yes Yes S No 200-400 400 Yes 3-E Yes 3-E No G Yes Will connect to PETL S/S and 6 Green Nablus Sarra2 SAT OH MV 33 22.9 18.0 20 LLB ------combined with Sarra #1? 7 Yellow Nablus Sarra Village UNSAT OH LV 33 0.3 0.3 20 LLB 3-CB No No Yes P Yes 400 400 Yes 3-M Yes 3-M No None - 8 Yellow Innab Anabta SAT OH MV 33 11.4 5.0 15 LLB 3-R 3-U No Yes P No 200 200 Yes 3-E Yes 3-E No G Yes CP transferred to PETL. Will 9 Green Jenin Almanyiah NEDCO SAT UG MV 33 22.9 20.0 20 LLB ------connect to PETL S/S?

10 Blue Jenin Jalameh NEDCO SAT UG MV 22 15.2 9.5 15 LLB No No Yes Yes S No 400 400 Yes 3-E Yes 3-E No G Yes

Located behind border wall. 11 Blue Jenin Anin SAT UG MV 22 0.5 0.5 1 ------To be combined with Salem NEDCO CP? 12 Yellow Jenin Fahma UNSAT OH LV 33 0.3 0.3 0.4 LLB F No No Yes P Yes 400 400 Yes 3-M Yes 3-M No None - 13 Yellow Jenin Methalun UNSAT OH MV 33 2.9 1.0 5 LLB 3-R 3-U No Yes P No 50-100 50 Yes 3-M Yes 3-M No None - 14 Yellow Nablus Qouseen Village UNSAT OH LV 33 0.3 0.3 0.5 LLB F No No Yes P Yes 400 400 Yes 3-E Yes 1-M No None - 15 Blue Nablus NEDCO (hewara) SAT OH MV 33 22.9 20.0 20 LLB No No Yes Yes S No 200-400 400 Yes 3-E Yes 3-E No G Yes 16 Blue Nablus NEDCO (askar) UNSAT OH MV 33 22.9 23.0 23 LLB No 3-U No Yes P No 400 400 Yes 3-E Yes 1-E No None - NEDCO (salem azmoot der 17 Blue Nablus SAT OH MV 33 2.9 2.0 6 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No G Yes hatab) Hebron Municipality 1 18 Blue Hebron SAT UG MV 33 2.9 No 5 LLB No 3-U No No P No 25-50 50 Yes 3-E Yes 3-E No None - (Hussien) Hebron Municipality 2 (Um 19 Blue Hebron SAT UG MV 33 22.9 No 20 LLB No 3-U No No P No 400 400 Yes 3-E Yes 3-E No None - Aldalieh) 20 Blue Hebron Hebron Municipality 3 (Fahes) SAT UG MV 33 22.9 No 20 LLB No 3-U No No P No 400 400 Yes 3-E Yes 3-E No None - Hebron Municipality 4 21 Blue Hebron SAT UG MV 33 22.9 No 20 LLB No 3-U No No P No 400 400 Yes 3-E Yes 3-E No None - (Herajq) Hebron Municipality 5 (Al 22 Blue Hebron SAT UG MV 33 22.9 No 20 LLB No 3-U No No P No 400 400 Yes 3-E Yes 3-E No None - Ras) 23 Blue Hebron Rabud UNSAT OH LV 33 0.4 No 5 No F No No Yes P Yes No - No - No None - Hebron Municipality 6 (Al 24 Blue Hebron SAT UG MV 33 22.9 No 20 LLB No 3-U No No P No 400 400 Yes 3-E Yes 3-E No None - Doh Dah) 25 Blue Hebron Hebron Municipality (West) SAT UG MV 33 11.4 No 20 LLB No 3-U No No P No 200-400 200 Yes 3-E Yes 3-E No None -

26 Blue Tulkarm Turkarm Municipality 1 SAT OH MV 22 23.0 16.5 20 ------Located behind Israel border wall.

27 Blue Tulkarm Turkarm Municipality 2 SAT OH MV 22 23.0 16.5 20 ------Located behind Israel border wall. 28 Yellow Tulkarm Kofur Allabad UNSAT OH LV 33 0.3 Yes 3 D F No No Yes P Yes 400 200 Yes 3-M Yes 1-M 3-M None - 29 Blue Tulkarm Shufa Village SAT OH MV 33 2.9 1.5 2 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No G Yes Need capacity. 30 Yellow Tulkarm Bal'a Village UNSAT OH LV 33 0.3 0.3 5 D F No No Yes P Yes 400 400 Yes 3-M Yes 3-M 3-M None - 31 Yellow Tulkarm Bal'a Village West UNSAT OH LV 33 0.3 0.3 D F No No Yes P Yes 400 400 Yes 3-M Yes 1-M 3-M None - 32 Yellow Tulkarm Bal'a Village (beir alm'a) UNSAT OH LV 33 0.3 0.3 D F No No Yes P Yes 400 400 Yes 3-M Yes 3-M 3-M None - 33 Blue Tulkarm Iktaba N/A OH MV 22 N/A N/A ------Being retired? 34 Blue Tulkarm Nour Shams Camp N/A OH MV 22 N/A N/A ------Being retired? 35 Yellow Jenin Beit Qad South UNSAT OH LV 33 0.3 0.3 1 LLB F No No Yes P Yes 400 400 Yes 3-E Yes 3-M No None -

Page 1 of 10 Connection Points As Found Page 2 CONN INSP As Found ssz 2-8-2018

# District Color Coding Has Isolator? CT Tap Used General ConditionConnection Service Has Interrupter? Has Meter Room? Installed CT Ratio(s) Primary Meter Type? Check Meter Type? Connection Point Name LV/MV ConnectionConnection Point Voltage (kV)Limited Capacity (MW)? Meter Enclosure Type? Check Meter Functions?Kvarh Meter Installed? Has Structure MV VT/CT? Has Room Low Voltage CT? Primary Meter Functions? Has Switchgear MV VT/CT? Meter CommunicationMeter Communication Type? Works?

Conn. Capacity (based on3-Year CT tap Forecasted (MVA) Load Demand (MW) Comment Feeding from PETL S/S with PETL OH/UG to PETL CP Feeding from IEC S/S with IEC OH/UG to PETL CP CP cancelled with PETL to install a new CP Feeding from IEC S/S with IEC OH/UG to IEC CP Feeding from PETL S/S with IEC OH/UG to PETL CP 36 Yellow Jenin Beit Qad North UNSAT OH MV 33 1.4 1.0 2 LLB No 3-U No Yes P No 25-100 25 Yes 3-E No - No None - 37 Yellow Jenin Jilbun Village UNSAT UG MV 33 2.9 1.2 4 LLB No 3-U No Yes P No 50-100 50 Yes 3-E Yes 3-M No G Yes 38 Yellow Jenin Faqou'a SAT OH MV 33 2.9 1.0 2 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No G Yes 39 Yellow Jenin Deir Abu Daif SAT OH MV 33 2.9 1.3 3 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-M No G No 40 Yellow Jenin Jalame Municipality SAT OH MV 22 1.9 1.2 2 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No G Yes 41 Blue Jenin Arane Village SAT OH MV 22 1.9 1.2 2 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-M No W Yes 42 Yellow Jenin Deir Ghazala UNSAT OH LV 33 1.0 0.4 1 LLB F No No Yes P Yes Yes 3-E Yes 3-M No None - 43 Yellow Jenin Arabuna SAT OH MV 33 2.9 1.5 2 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-M No W Yes 44 Green Jenin Haddad Tourist Village SAT OH LV 33 1.0 0.6 2 D F No No Yes P Yes Yes 3-M Yes 3-M No None - 45 Pink Jenin Salem Jenin SAT OH MV 22 7.6 6.0 No No No Yes Yes S No 100-200 100 Yes 3-E Yes 3-M No W Yes Cancelled? 46 Pink Jenin Ya'Bad SAT OH MV 33 5.7 9.0 20 LLB No No Yes Yes S No 50-100 100 Yes 3-E Yes 3-M No G Yes Cancelled? 47 Yellow Jenin Sanur Village SAT OH LV 33 0.3 1.0 3 LLB No CT/PT No No P No 600 600 3-E 3-E No G Need capacity & meter access. 48 Yellow Jenin Araba UNSAT OH MV 33 2.9 2.0 5 LLB No 3-U No Yes P No 50 50 Yes 3-M Yes 3-M 3-M None - 49 Pink Jenin Qabatia UNSAT OH MV 33 2.9 Yes No No 3-U No Yes P No 50 50 No - No - No None - Cancelled? 50 Blue Tubas Tubas Company SAT OH MV 33 22.9 20.0 20 LLB No 3-U No Yes P No 200-400 400 Yes 3-E Yes 3-E No G Yes 51 Yellow Jenin M. Jaba Gaz Station UNSAT OH LV 33 0.1 Yes 0.5 LLB F No No Yes P Yes 200 200 Yes 3-M Yes 3-M No None - 52 Yellow Jenin PWA Jaba Water Pump SAT OH LV 33 1.0 0.6 1.5 LLB F No No Yes P Yes Could not access site. 53 Yellow Jenin Anza UNSAT OH LV 33 0.3 Yes 1 LLB F No No Yes P Yes 400 400 Yes 3-M Yes 1-M 3-M None - 54 Yellow Jenin Ajja Village UNSAT OH MV 33 2.9 Yes 4 LLB No 3-U No Yes P No 25-50 50 Could not access site. 55 Yellow Jenin Al-Asa'sa UNSAT OH LV 33 0.2 0.2 1 LLB F No No Yes P Yes 50 50 Yes 3-M No - No None - 56 Yellow Jenin Jaba Village UNSAT OH MV 33 3.0 3.0 5 LLB No 3-U No Yes P No 50 50 Could not access site. 57 Yellow Jenin Zahrat Al Finjan SAT OH MV 33 2.9 Yes 0.5 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No None - 58 Orange Nablus Sabastya Zone SAT UG MV 33 5.7 Yes 7 No No No Yes Yes S No 50-100 100 Yes 3-E Yes 3-E No None - 59 Orange Jenin Al Fandakumiya Village UNSAT OH LV 33 0.6 0.6 1.5 LLB F No No Yes P Yes 400 200 Yes 3-M Yes 1-M 3-M None - 60 Orange Jenin Silat Al-Dhar Village UNSAT OH MV 33 2.0 2.0 3 50-100 50 Could not access site. 61 Orange Nablus Bazariyeh SAT OH MV 33 2.9 0.9 3 No No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No None - 62 Orange Nablus Burqa Village SAT OH MV 33 2.9 1.2 2 LLB No CT/PT No Yes P No Yes 3-E Yes 3-M No None - Need capacity. 63 Orange Nablus Padesco Company SAT OH LV 33 0.2 0.2 0 LLB No No No Yes P Yes ------Business closed over one year. 64 Orange Nablus Mikirout Water Pump Qouseen OH LV 33 0.3 0.3 0 Could not access site. National Company Ltd 65 Orange Nablus SAT OH MV 33 2.9 2.5 5 LLB No CT/PT No Yes P No 50 50 Yes 3-E Yes 3-E No G Yes NAPCO 66 Orange Nablus Pal Gaz SAT OH LV 33 0.1 Yes 0.5 No F No No Yes P Yes 100 100 Yes 3-M No - No None - Shared with CP Zuhar Kimyeh 67 Orange Nablus A - Naqoura SAT OH MV 33 2.9 Yes 2 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-M No W No Intermediate Chemical and 68 Orange Nablus - OH MV 33 1.5 1.2 3 ------Business closed over one year. Plastic Industries 69 Orange Nablus Zuhar Kimhiyeh SAT OH LV 33 0.4 Yes 0 No No No Yes Yes P Yes 600 600 Yes 3-M Yes 1-M 3-E None - Shared with CP Pal Gaz. 70 Orange Nablus Smana Ahmad UNSAT OH LV 33 0.1 Yes 0 D F No No Yes P Yes 400 200 Yes 3-E Yes 3-M No None - 71 Orange Nablus Mikirout Water Well - Beittiba UNSAT OH LV 33 0.3 0.3 0 No F No No Yes P Yes Yes 3-E Yes 3-M No None - 72 Orange Nablus Nablus Nylon and Plastics UNSAT OH LV 33 0.1 Yes 0.5 D F No No Yes P Yes 200 200 Yes 3-M Yes 1-M 3-M None - 73 Orange Nablus Tamimi Abdel Rahim UNSAT OH LV 33 0.1 No 0.25 No F No No Yes P Yes 400 100 Yes 3-M Yes 3-M No None - 74 Orange Nablus National Company Ltd (injaz) UNSAT OH LV 33 0.2 0.2 1 D F No No Yes P Yes Yes 3-M No - 3-M None - 75 Blue Qalqilia Azzoun Council SAT OH MV 33 2.9 Yes 7 LLB No 3-U No Yes P No 50 50 Yes 3-E Yes 3-M No None - 76 Blue Qalqilia Municipality 1 SAT OH MV 22 16.5 14.0 5 LLB No 3-U No Yes P No ------Located behind Israel border wall.

77 Blue Qalqilia Qalqilya Municipality 2 SAT UG MV 22 14.0 7.0 7 ------Located behind Israel border wall. 78 Blue Qalqilia Azbat Salman Village UNSAT OH MV 33 0.6 Yes LLB No CT/PT No Yes P No 20 10 Yes 3-E Yes 3-M No None - 79 Blue Qalqilia SAT UG MV 33 5.7 1.2 4 LLB No CT/PT No Yes P No 50-100 100 Yes 3-E Yes 3-E No None -

Page 2 of 10 Connection Points As Found Page 3 CONN INSP As Found ssz 2-8-2018

# District Color Coding Has Isolator? CT Tap Used General ConditionConnection Service Has Interrupter? Has Meter Room? Installed CT Ratio(s) Primary Meter Type? Check Meter Type? Connection Point Name LV/MV ConnectionConnection Point Voltage (kV)Limited Capacity (MW)? Meter Enclosure Type? Check Meter Functions?Kvarh Meter Installed? Has Structure MV VT/CT? Has Room Low Voltage CT? Primary Meter Functions? Has Switchgear MV VT/CT? Meter CommunicationMeter Communication Type? Works?

Conn. Capacity (based on3-Year CT tap Forecasted (MVA) Load Demand (MW) Comment Feeding from PETL S/S with PETL OH/UG to PETL CP Feeding from IEC S/S with IEC OH/UG to PETL CP CP cancelled with PETL to install a new CP Feeding from IEC S/S with IEC OH/UG to IEC CP Feeding from PETL S/S with IEC OH/UG to PETL CP 80 Blue Qalqilia Atma Village UNSAT OH MV 33 0.6 Yes 1 LLB No CT/PT No Yes P No 20 10 Could not access site. 81 Blue Qalqilia SAT UG MV 22 3.0 2.0 3 ------Located behind Israel border wall. 82 Blue Qalqilia Nabi Elias Village SAT OH LV 33 0.6 0.6 1.5 D F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-M No None -

83 Blue Qalqilia Azzun (Water) SAT OH LV 33 0.7 No 0 LLB F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-M No None - These will be incorporated into CP 84 Blue Qalqilia A'sala village SAT OH LV 33 0.3 No LLB F No No Yes P Yes 400 400 Yes 3-M Yes 1-M 3-M None - #75, Azzoun Council as one CP. 85 Blue Qalqilia Hija-Imatin Village SAT OH MV 33 2.9 2.2 4 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No G Yes 86 Blue Qalqilia Al Funduq Village SAT OH LV 33 0.6 0.6 1.5 LLB F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-E No None - 87 Blue Qalqilia Jat Village SAT OH MV 33 2.9 1.1 2 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No None - 88 Blue Qalqilia Kofor Qaddom 33 2.9 1.1 2 50-100 50 Could not access site. 89 Blue Qalqilia SAT OH MV 33 2.9 1.5 2 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No G Yes 90 Blue Qalqilia Jayyus Village SAT OH MV 33 2.9 2.9 5 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No G Yes

91 Blue Hebron Karame Village UNSAT OH MV 33 0.3 0.3 1.00 LLB No CT/PT No Yes P No Need capacity, unable to access. 92 Orange Hebron Adh Dhahiriya UNSAT OH MV 33 2.9 2.5 9 LLB No 3-U No Yes P No 50 50 No - No - No None - 93 Blue Salfit Marda Village SAT OH LV 33 0.3 0.3 0.5 LLB F No No Yes P Yes 400 400 Yes 3-E Yes 3-E No G Yes 94 Blue Salfit A-Zawiya SAT OH MV 33 2.9 1.2 2 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-M No None - 95 Blue Salfit Village SAT OH MV 33 2.9 1.2 2 LLB No 3-U No Yes P No 50 50 Yes 3-E Yes 3-M No None - 96 Blue Salfit Kafel Hares Village SAT UG MV 33 2.9 2.5 4 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-M No G Yes CP Cancelled; part of Kafel Hares 97 Blue Salfit Haris ------Village. 98 Blue Salfit Salfit Municipality SAT OH MV 33 3.0 3.0 12 LLB No 3-U No Yes P No 100 100 Could not access site. 99 Blue Salfit Yasuf Village SAT OH MV 33 1.4 Yes 2 LLB No 3-U No Yes P No 25-50 25 Yes 3-E Yes 3-E No None - 100 Blue Nablus Aqrabaniya Village SAT OH MV 33 5.7 Yes 8 LLB No No Yes Yes S No 50-100 100 Yes 3-E Yes 3-M No G Yes 101 Blue Nablus Beit Furik Council UNSAT OH MV 33 2.9 2.9 6 LLB No 3-U No Yes P No 50 50 Could not access site. 102 Blue Nablus Rujeib Village UNSAT OH MV 33 2.9 2.0 2 LLB No 3-U No Yes P No 50 50 Yes 3-M Yes 1-M 3-M None - 103 Blue Nablus Odala Village UNSAT OH LV 33 0.3 Yes 0.5 D F No No Yes P Yes 400 400 Yes 3-M No - No None - 104 Blue Nablus Awarta Village SAT OH LV 33 0.4 No 1.5 LLB F No No Yes P Yes 600 600 Yes 3-E Yes 3-M No None - 105 Blue Nablus Bita SAT OH MV 33 2.9 Yes 6 No No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No None - 106 Blue Nablus Jamma'in Council SAT UG MV 33 2.9 Yes 8 LLB No 3-U No Yes P No 50 50 Yes 3-E Yes 3-E No None - 107 Blue Nablus Urif Village SAT OH LV 33 0.3 No 4 LLB F No No Yes P Yes 400 400 Could not access site. 108 Blue Nablus Burin UNSAT OH LV 33 0.3 No 1 LLB F No No Yes P Yes 400 400 Yes 3-M Yes 3-M 3-M None - 109 Blue Nablus Madama SAT OH MV 33 5.7 Yes 6 LLB No 3-U No Yes P No 100 100 Yes 3-E Yes 3-E No G Yes 110 Blue Jehico Al Fasael Village SAT OH LV 33 0.7 No 1.5 No F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-E No None - 111 Blue Nablus Lubban Sharqiya SAT UG MV 33 2.9 Yes 3 No No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No G Yes These CPs will be combined into one 112 Blue Nablus A-Sawiya Village UNSAT OH LV 33 0.3 Yes LLB F No No Yes P Yes 400 400 Yes 3-M Yes 3-M 3-M None - CP. 113 Blue Nablus Qabalan Village SAT OH MV 33 2.9 Yes 4 LLB No 3-U No Yes P No 50 50 Yes 3-E Yes 3-E No None - 114 Blue Nablus Qaryut Village UNSAT OH LV 33 0.1 No 1.5 LLB No No No Yes P Yes 400 200 Yes 3-M Yes 1-M 3-M None - 115 Blue Nablus Qusra Village SAT OH MV 33 1.1 Yes 1.5 LLB No 3-U No Yes P No 20 20 Yes 3-E Yes 3-E No G Yes 116 Blue Nablus Aqraba Village SAT OH MV 33 2.9 Yes 6 LLB No 3-U No Yes P No 50 50 Yes 3-E Yes 3-E No G Yes 117 Blue Nablus Majdal Bani Fadil SAT UG MV 33 1.4 Yes 2 LLB No 3-U No Yes P No 25-50 25 Yes 3-E Yes 3-E No None - 118 Blue Nablus Duma SAT OH LV 33 0.6 0.6 1 D F No No Yes P Yes Yes 3-E Yes 3-E No None - This CP will be incorporated into 119 Blue Nablus Ousrin Village UNSAT OH LV 33 0.3 Yes D No No No Yes P Yes 400 400 Yes 3-M Yes 1-M 3-M None - CP #116, Agraba Village. 120 Blue Tulkarm Kofor Sour UNSAT OH LV 22 0.3 Yes 50 D No No No Yes P Yes 400 400 Yes 3-M Yes 3-M No None - These CPs will be combined into one 121 Blue Tulkarm Alras UNSAT OH MV 22 1.9 Yes LLB No 3-U No Yes P No 50-100 50 Yes 3-M Yes 3-M No G Yes CP. 122 Blue Tulkarm Jabara Village SAT OH LV 22 0.3 No 1 LLB F No No Yes P Yes 500 500 Yes 3-E Yes 3-M No G Yes 123 Blue Tulkarm Far'oun SAT - MV 22 1.0 Yes 2 ------Inside Israel Army Camp.

Page 3 of 10 Connection Points As Found Page 4 CONN INSP As Found ssz 2-8-2018

# District Color Coding Has Isolator? CT Tap Used General ConditionConnection Service Has Interrupter? Has Meter Room? Installed CT Ratio(s) Primary Meter Type? Check Meter Type? Connection Point Name LV/MV ConnectionConnection Point Voltage (kV)Limited Capacity (MW)? Meter Enclosure Type? Check Meter Functions?Kvarh Meter Installed? Has Structure MV VT/CT? Has Room Low Voltage CT? Primary Meter Functions? Has Switchgear MV VT/CT? Meter CommunicationMeter Communication Type? Works?

Conn. Capacity (based on3-Year CT tap Forecasted (MVA) Load Demand (MW) Comment Feeding from PETL S/S with PETL OH/UG to PETL CP Feeding from IEC S/S with IEC OH/UG to PETL CP CP cancelled with PETL to install a new CP Feeding from IEC S/S with IEC OH/UG to IEC CP Feeding from PETL S/S with IEC OH/UG to PETL CP 124 Blue Tulkarm Qaffin UNSAT OH MV 22 1.9 Yes 3 D No 3-U No Yes P No 50 50 Yes 3-M Yes 3-M No None - 125 Blue Tulkarm Al-Nazla Al-Wusta SAT OH MV 22 1.3 Yes 2 LLB No No Yes Yes S No Yes 3-E Yes 3-E No None - 126 Blue Tulkarm Nazlat Issa SAT OH LV 22 0.7 No 1 LLB F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-E No G Yes 127 Blue Tulkarm Baka A-Sharkiya SAT OH MV 22 1.91 Yes 3 LLB No No Yes Yes S No 50 50 Yes 3-E Yes 3-E No None - Located behind Israel border wall. 128 Blue Tulkarm Zeita (Sharawiah 1) UNSAT UG MV 22 9.20 No 14 ------Feeding a main room that feeding clustor of villages (Sharawieh 1) 129 Blue Tulkarm Al-Jariushya UNSAT OH LV 22 0.28 Yes 1 LLB F No No Yes P Yes 400 400 Yes 3-E Yes 3-E No G Yes 130 Orange Hebron Al-Hijra Village SAT OH LV 33 0.69 No 1 LLB F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-E No None - 131 Blue Hebron Imreish UNSAT OH MV 33 0.6 Yes 1 LLB No Yes No Yes P No No - No - No None - 132 Green Hebron Dura SAT OH MV 33 5.72 Yes 12 LLB No 3-U No Yes P No 100 100 Yes 3-E Yes 3-M No None - 133 Blue Hebron Deir Razih SAT OH LV 33 0.2771 Yes 1 LLB No No No Yes P Yes 400 400 Yes 3-E Yes 3-M No None - MV fraud by direct connection of 134 Yellow Hebron Ar rihiya UNSAT OH LV 33 0.25 Yes 2 LLB CB No No Yes P Yes 400 400 Yes 3-E Yes 3-M No None - MV cables to IEC OH line and feeding additional 2 transformers.

1. Dangerous and unsafe . complete rehabilitation of room is required. 2. Fraud of MV llines by adding 12 135 Yellow Hebron Alfawar camp UNSAT OH LV 33 0.25 Yes 2 LLB F No No Yes P Yes 400 400 Yes 3-M Yes 3-M Yes None - transformers. new metering equipment are required . Increase of supply and change to MV connection point enough space for additional metering 136 Yellow Hebron Water Well -Alrihiya SAT UG LV 33 0.25 Yes 0.25 LLB F No No Yes P Yes 400 400 Yes 3-M Yes 3-E No None - and meters. Planned to bart of SELCO New connection point replacing the old one, operation starting from 6 137 Yellow Hebron yatta SAT UG MV 33 20.00 Yes 30 LLB No No Yes Yes S No 200-400 400 Yes 3-E Yes 3-E No G Yes June 2018 - information about IEC meters collected from SELCO Additional place for meters , 138 Blue Hebron as samu' SAT OH MV 33 5.00 Yes 4 LLB No 3-U No Yes P No 100 100 Yes 3-M Yes 3-M yes None - Metering equipment could be installed on pole. space for additional meters and 139 Blue Hebron ar ramadin SAT UG MV 22 4.00 Yes 5 LLB No No Yes Yes S No 100-200 100 Yes 3-E Yes 3-E No G Yes metering elements could be pole mounted type No access to meters room. 140 Yellow Hebron beit alrush alfuqa UNSAT OH LV 33 0.25 Yes 0.63 LLB F No No Yes P Yes 400 400 ------Information from SELCO 141 Yellow Hebron beit alrush altahta SAT OH LV 33 0.25 Yes 0.63 No F No No Yes P Yes 500 500 Yes 3-E Yes 3-E No None - Additional space for meters and new 142 Yellow Hebron beit mirsim SAT UG MV 33 2.5 Yes 5 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-M No None - metering 143 Yellow Hebron deir asal al fauqa UNSAT OH LV 33 0.25 Yes 0.63 LLB F No No Yes P Yes 400 400 Yes 3-E Yes 3-E No None - Unsafe room 144 Yellow Hebron deir asal atahta SAT OH LV 33 0.4 Yes 1 LLB F No No Yes P Yes 630 630 Yes 3-E Yes 3-E No None - 145 Yellow Hebron sikka SAT UG MV 33 2.50 Yes 5 LLB No No Yes Yes S No 50-100 50 Yes 3-M Yes 3-E No W - enough space for additional meters No access to meters room. Customer 146 Yellow Hebron beit 'awwa UNSAT OH MV 33 5.00 Yes 10 LLB No 3-U No Yes P No 100 100 ------has no keys The room is used by municipality as a store for electrical meterials, it 147 Yellow Hebron deir samit SAT UG MV 33 2.5 Yes 5 LLB No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No None - should be cleaned for safety requirments

Page 4 of 10 Connection Points As Found Page 5 CONN INSP As Found ssz 2-8-2018

# District Color Coding Has Isolator? CT Tap Used General ConditionConnection Service Has Interrupter? Has Meter Room? Installed CT Ratio(s) Primary Meter Type? Check Meter Type? Connection Point Name LV/MV ConnectionConnection Point Voltage (kV)Limited Capacity (MW)? Meter Enclosure Type? Check Meter Functions?Kvarh Meter Installed? Has Structure MV VT/CT? Has Room Low Voltage CT? Primary Meter Functions? Has Switchgear MV VT/CT? Meter CommunicationMeter Communication Type? Works?

Conn. Capacity (based on3-Year CT tap Forecasted (MVA) Load Demand (MW) Comment Feeding from PETL S/S with PETL OH/UG to PETL CP Feeding from IEC S/S with IEC OH/UG to PETL CP CP cancelled with PETL to install a new CP Feeding from IEC S/S with IEC OH/UG to IEC CP Feeding from PETL S/S with IEC OH/UG to PETL CP No access to meters room , customer promised to send photos of meters 148 Yellow Hebron beit maqdum UNSAT OH MV 33 1.50 Yes 3 LLB No CT/PT No Yes P No 50-100 50 ------once he has access to room with meters 149 Yellow Hebron idhna UNSAT OH MV 33 2.50 Yes 5 LLB No 3-U No Yes P No 50-100 50 Yes ------No access to metres room should be fed from the neighboring 150 Yellow Hebron Tawwas SAT OH LV 33.0 0.1 Yes 0.25 LLB F No No Yes P Yes Direct connected - Yes 3-E - - - None - Sikka CP (SELCO area)

metering unit should be changed to 151 Yellow Hebron beit ummar UNSAT OH MV 33.0 5.00 Yes 12 LLB No CT/PT No Yes P No 100 100 Yes 3-E Yes 3-E No G Yes meet the demand (actual is 8MVA). enough place for new meters

Require to increase the capacity of 152 Yellow Hebron surif UNSAT OH MV 33.0 2.50 Yes 10 LLB No 3-U No Yes P No 100 100 Yes 3-E Yes 3-M No None - supply to meet the growing demand One CT is faulty. Complete 153 Yellow Hebron beit ula UNSAT OH MV 33.0 2.5 Yes 5 LLB No CT/PT No Yes P No 50 50 Yes 3-E Yes 3-E No None - replacement of CTs and VTs by new set. enough place for new meters after room rehabilitation and 154 Yellow Hebron nuba UNSAT OH MV 33.0 2.50 Yes 5 LLB No 3-U No Yes P No 50 50 Yes 3-E Yes 3-M No None - maintenance. Need to increase the capacity of supply Need to increase the capacity of 155 Yellow Hebron kharas UNSAT OH MV 33.0 2.50 Yes 6 LLB No 3-U No Yes P No 50 50 ------supply.No access to meters room Enough place for new meters. Metering equipment could be 156 Blue Hebron bani naim UNSAT OH MV 33.0 5.0 Yes 10 LLB No 3-U No Yes P No 100 100 Yes 3-E Yes 3-E No None - installed on the IEC or Customer Pole. Need to increase capacity Need to increase capacity. Oil 157 Blue Hebron ash shyoukh UNSAT OH MV 33.0 2.50 Yes 10 LLB No 3-U No Yes P No 50 50 Yes 3-E Yes 3-M No None - leakage Need to increase capacity. Oil 158 Blue Hebron sair UNSAT OH MV 33.0 2.50 Yes 10 LLB No 3-U No Yes P No 50 50 Yes 3-E Yes 3-E No None - leakage 159 Blue Hebron haska UNSAT OH LV 33.0 0.25 Yes 0.63 LLB F No No Yes P Yes 100 100 Yes 3-M Yes 3-M Yes None - require an increase of capacity need to replace transformer to 160 Blue Hebron khallet almaiyya1 SAT OH LV 33.0 0.25 Yes 0.63 No F No No Yes P Yes 200 200 Yes 3-E Yes 3-E No None - 630KVA or to merge this CP with Kallet almayya2 161 Blue Hebron khallet almaiyya2 UNSAT OH MV 33.0 1.00 Yes 3 D No CT/PT No Yes P No ------No access to room. To be connected to PETL S/S? need to change metering equipment to 162 Green Hebron beit kahil SAT OH MV 33.0 2.50 Yes 10 D No 3-U No Yes P No 50 50 Yes 3-E Yes 3-E No None - meet the demand. require an increase of capacity To be connected to PETL S/S? need to change metering equipment to 163 Green Hebron taffuh SAT OH MV 33 1.25 Yes 5 LLB No CT/PT, No Yes P No 25-50 25 Yes 3-E Yes 3-E No None - meet the demand and increase the capacity New, Does not exist. Will connect 164 Green Hebron Halhul N/A N/A MV 33 22.9 15.0 20 ------to PETL S/S?

recommendation to change the metering and meters to indoor of 165 Yellow Hebron tarqumiya UNSAT OH MV 33 2.5 yes 10 LLB No U No Yes - No 50 50 ------200A rating to meet the actual and future demand

Page 5 of 10 Connection Points As Found Page 6 CONN INSP As Found ssz 2-8-2018

# District Color Coding Has Isolator? CT Tap Used General ConditionConnection Service Has Interrupter? Has Meter Room? Installed CT Ratio(s) Primary Meter Type? Check Meter Type? Connection Point Name LV/MV ConnectionConnection Point Voltage (kV)Limited Capacity (MW)? Meter Enclosure Type? Check Meter Functions?Kvarh Meter Installed? Has Structure MV VT/CT? Has Room Low Voltage CT? Primary Meter Functions? Has Switchgear MV VT/CT? Meter CommunicationMeter Communication Type? Works?

Conn. Capacity (based on3-Year CT tap Forecasted (MVA) Load Demand (MW) Comment Feeding from PETL S/S with PETL OH/UG to PETL CP Feeding from IEC S/S with IEC OH/UG to PETL CP CP cancelled with PETL to install a new CP Feeding from IEC S/S with IEC OH/UG to IEC CP Feeding from PETL S/S with IEC OH/UG to PETL CP

This CP was transferd to the administration of culster of towns A'lar village council and villages in the area. No longer 166 Yellow Tulkarm (Tulkarm district assocation SAT OH+UG MV 22 3.8 Yes 6 LLB Yes No Yes Yes P No 100-200 100 Yes 3-E - - No G Yes IEC CP. Need to increase capacity of municipalities) by using the 200 A tapes. and should be transferd to PETL by adding metering and meters

The meter is owned and installed by the customer. Need to increase Deir Al-Ghusun capacity by changing the metering 167 Yellow Tulkarm SAT UG MV 22 3.8 Yes 5 LLP Yes 3-U No Yes P No 100 100 Yes 3-E - - No None - municipality equipment, and should be transferd to PETL by adding metering and meters

The meter is owned and installed by the customer. Need to increase capacity by changing the metering 168 Yellow Tulkarm A'til village UNSAT OH MV 22 2 Yes 4 LLP Yes 3-U No Yes P No 50 50 Yes 3-E - - No None - equipment, and should be transferd to PETL by adding metering and meters

The meter is owned and installed by the customer. Need to increase capacity by changing the metering 169 Yellow Tulkarm Zita village SAT SAT MV 22 4 Yes 6 LLP Yes No Yes Yes S No 50-100 100 Yes 3-E - - no None - equipment, and should be transferd to PETL by adding metering and meters no access to meters.needs new 170 Blue Salfit Bidya village UNSAT OH MV 33 2.8 Yes 10 D No 3-U No Yes P No 50 50 ------indoor connection point 171 Blue Salfit Rafat council SAT UG MV 33 2.8 Yes 3 LLP No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No None - Need to increase capacity. 172 Blue Salfit Sarta viilage council SAT UG MV 33 2.8 Yes No LLP No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No G Yes new connection point (2017) Actual load is 5MVA and need to increase the capacity. For this purpose customer installed 173 Blue Salfit Mas'ha village SAT OH MV 33 1 Yes 8 LLP No CTs/PTs No Yes P No 20 20 Yes 3-E Yes 3-E No None - new switchgear and agreed with the IEC to increase supply soon with indoor equipment

require to replace the CP with 174 Blue Salfit Kafr Al-Deek UNSAT OH MV 33 2.8 Yes 6 LLP No 3-U No Yes P No 50 50 Yes 3-E Yes 3-E No None - indoor new equipment and increase capacity to 6MVA need to increase capacity with indoor 175 Blue Salfit Deir Ballut village UNSAT OH MV 33 1.25 Yes 4 LLP No CTs/PTs No Yes P No 20 20 Yes 3-E Yes 3-E No None - type CT/PT 176 Blue Qalqilia Laqif village -Qlqiliya SAT OH MV 33 1 Yes 2 LLP No No Yes - No 20-10 20 ------No access to room. Customer side is unsafe, very 177 Blue Jericho Zbeidat village SAT UG MV 33 2.8 Yes 4 No No No Yes Yes S No 50-100 50 Yes 3-E Yes 3-E No None - dangerous with open doors (2tramsformers on the same pole) Require to increase of capacity of 178 Blue Jericho Marj Naja SAT OH LV 33 0.63 Yes 2.5 No F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-E No None - supply to 1.5 MVA full rehabilitation of room and 179 Blue Jericho Marj al-Ghazal village UNSAT OH LV 33 0.63 Yes 1 LLP F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-E No None - switchgear

Page 6 of 10 Connection Points As Found Page 7 CONN INSP As Found ssz 2-8-2018

# District Color Coding Has Isolator? CT Tap Used General ConditionConnection Service Has Interrupter? Has Meter Room? Installed CT Ratio(s) Primary Meter Type? Check Meter Type? Connection Point Name LV/MV ConnectionConnection Point Voltage (kV)Limited Capacity (MW)? Meter Enclosure Type? Check Meter Functions?Kvarh Meter Installed? Has Structure MV VT/CT? Has Room Low Voltage CT? Primary Meter Functions? Has Switchgear MV VT/CT? Meter CommunicationMeter Communication Type? Works?

Conn. Capacity (based on3-Year CT tap Forecasted (MVA) Load Demand (MW) Comment Feeding from PETL S/S with PETL OH/UG to PETL CP Feeding from IEC S/S with IEC OH/UG to PETL CP CP cancelled with PETL to install a new CP Feeding from IEC S/S with IEC OH/UG to IEC CP Feeding from PETL S/S with IEC OH/UG to PETL CP no room for additional metering, 180 Blue Jericho UNRWA School (Jiftlak) SAT OH LV 33 0.63 Yes 1.5 LLP F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-E No None - change to MV

Palestinian Authority, no room for additional metering, 181 Blue Jericho UNSAT OH LV 33 0.63 Yes 2.5 LLP F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-E No None - Ministry of Health ( Jiftlak) change to MV

no room for additional metering, 182 Blue Jericho Jiftlak Main street SAT OH LV 33 0.63 Yes 2 No F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-E No None - change to MV Kardala village - near Dangerus and unsafe equipment. All 183 Blue Tubas UNSAT OH LV 33 0.25 Yes 0.63 No F No No Yes P Yes 400 400 Yes 3-E Yes 3-E No None - Meholah must be replaced no room for additional metering, 184 Blue Tubas Bardala village UNSAT OH LV 33 0.63 Yes 2 No F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-E No None - change to MV no room for additional metering, 185 Blue Tubas Ein al Bayda village UNSAT OH LV 33 0.63 Yes 2 No F No No Yes P Yes 1000 1000 Yes 3-E Yes 3-E No None - change to MV no room for additional metering, 186 Blue Nablus frosh bait dajan SAT OH LV 33 0.25 Yes 2 LLP F No No Yes P Yes 500 500 Yes 3-E Yes 3-E No None - change to MV Actual load is 5MVA and need to 187 Blue Jenin East Barta'a association SAT UG MV 22 2 Yes 10 LLP No NO Yes Yes P No 50-100 50 Yes 3-E Yes 3-E No None - increase the capacity by installing new metering equipment 300/5A

no room for additional metering, 188 Blue Jenin Um rehaan SAT UG LV 22 0.16 Yes 0.63 LLP F No No Yes P Yes 200 200 Yes 3-E Yes 3-E No None - need to increase capacity of supply.

IEC metering equipment are pole mounted. Meters inside a small kiosk and no room for additional metering. 189 Blue Ramallah Alnabee Saleh UNSAT OH MV 33 10 Yes 15 LLP No U No Yes P No 200 200 ------No access to IEC room and meters. JDECO has its own MV metering system.

IEC metering equipment are pole mounted. Meters inside a small kiosk and no room for additional metering. 190 Blue Ramallah Ain Samia SAT OH MV 33 10 Yes 15 LLP No U No Yes P No 200 200 ------No access to IEC room and meters. JDECO has its own MV metering system.

Metering equipment are inside the S/S while meters are inside a panel, 191 Blue Ramallah Singel SAT UG MV 33 20 Yes 25 LLP No No Yes Yes P No 200-400 400 Yes 3-E Yes 3-E No G Yes wall recess mounted outside the 33/11KV S/S.

IEC connection point behind the separation wall and inside Beit El settlement. 192 Blue Ramallah Beit El UNSAT OH MV 33 10 Yes 20 LLP No U No Yes P No 200 200 ------JDECO has it independent metering system inside the 33/11KV substation IEC equipment are pole mounted but meters are inside a small concrete kiosk. No room for additional metering 193 Blue Bethlehem Beit Fajjar SAT OH MV 33 14 Yes 20 LLP No U No Yes P No 200-400 400 ------equipment and meters. JDECO equipment are pole mounted including meters.

Page 7 of 10 Connection Points As Found Page 8 CONN INSP As Found ssz 2-8-2018

# District Color Coding Has Isolator? CT Tap Used General ConditionConnection Service Has Interrupter? Has Meter Room? Installed CT Ratio(s) Primary Meter Type? Check Meter Type? Connection Point Name LV/MV ConnectionConnection Point Voltage (kV)Limited Capacity (MW)? Meter Enclosure Type? Check Meter Functions?Kvarh Meter Installed? Has Structure MV VT/CT? Has Room Low Voltage CT? Primary Meter Functions? Has Switchgear MV VT/CT? Meter CommunicationMeter Communication Type? Works?

Conn. Capacity (based on3-Year CT tap Forecasted (MVA) Load Demand (MW) Comment Feeding from PETL S/S with PETL OH/UG to PETL CP Feeding from IEC S/S with IEC OH/UG to PETL CP CP cancelled with PETL to install a new CP Feeding from IEC S/S with IEC OH/UG to IEC CP Feeding from PETL S/S with IEC OH/UG to PETL CP IEC equipment are pole mounted but meters are inside a small concrete kiosk. No room for additional metering 194 Blue Bethlehem Alnshash SAT OH MV 33 10 Yes 15 LLP No U No Yes P No 200 200 ------equipment and meters. JDECO equipment are pole mounted including meters.

IEC connection point outdoor pole mounted 400 A. meters are inside 195 Blue Bethlehem Hossan 1 SAT UG MV 33 20 Yes 23 LLP No U No Yes P No 400 400 ------ground mounted panel . The connection point is next to the 161/33KV Israeli S/S in the area

IEC connection point outdoor pole mounted 400 A. meters are inside 196 Blue Bethlehem Hossan 2 SAT UG MV 33 20 Yes 23 LLP No U No Yes P No 200-400 400 ------ground mounted panel . The connection point is next to the 161/33KV Israeli S/S in the area

IEC equipment are all pole mounted. Meters are inside a concrete room .The pole immediately before the CP is equipped with SF6 DS and a RF communication. 197 Blue Bethlehem Hana SAT OH MV 33 20 Yes 23 LLP No U No Yes P No 400 400 ------JDECO equipment are all pole mounted including the meters in a separate panel with GPRS communication

IEC equipment are pole mounted but meters are inside a small concrete room. No room for additional metering equipment or meters.This 198 Blue Bethlehem Ephrat SAT OH MV 33 10 Yes 15 LLP No U No Yes P No 200-400 400 ------CP usualy limited to 10MVA but can be used to its max of 20 MVA to cover any missing IEC lines that feeding south of Bethlehem area

No room for additional metering or meters. IEC equipment are pole mounted but meters are inside a 199 Blue Bethlehem Taqwa SAT OH MV 33 6 Yes 10 LLP No U No Yes P No 400 400 ------small concrete kiosk.JDECO metering and meter are inside the 33 switching S/S

CP and meters are inside the IEC adjacent 161/33KV S/S. JDECO 200 Blue Jericho Al-khan Al-Ahmar SAT UG MV 33 20 Yes 23 LLP No U No Yes P No 400 400 ------metering and meters are pole mounted and fare away 6 km from the IEC point

Page 8 of 10 Connection Points As Found Page 9 CONN INSP As Found ssz 2-8-2018

# District Color Coding Has Isolator? CT Tap Used General ConditionConnection Service Has Interrupter? Has Meter Room? Installed CT Ratio(s) Primary Meter Type? Check Meter Type? Connection Point Name LV/MV ConnectionConnection Point Voltage (kV)Limited Capacity (MW)? Meter Enclosure Type? Check Meter Functions?Kvarh Meter Installed? Has Structure MV VT/CT? Has Room Low Voltage CT? Primary Meter Functions? Has Switchgear MV VT/CT? Meter CommunicationMeter Communication Type? Works?

Conn. Capacity (based on3-Year CT tap Forecasted (MVA) Load Demand (MW) Comment Feeding from PETL S/S with PETL OH/UG to PETL CP Feeding from IEC S/S with IEC OH/UG to PETL CP CP cancelled with PETL to install a new CP Feeding from IEC S/S with IEC OH/UG to IEC CP Feeding from PETL S/S with IEC OH/UG to PETL CP

IEC equipment are pole mounted but meters are inside a small concrete room. JDECO metering and meters 201 Blue Jericho Aqbat Jaber / Verd SAT OH MV 33 10 Yes 16 LLP No U No Yes P No 200 200 ------are inside the 33 switching S/S but the metering equipment are outdoor U type installed on steel strucure.

IEC equipment are pole mounted but meters are inside a small metal room. No room for additional metering equipment and meters. JDECO 202 Blue Jerusalem Alnabee Samuel SAT OH MV 33 10 Yes 12 LLP No U No Yes P No 200 200 ------equipment are pole mounted on a separate lattice pole including meters.

IEC equipment are pole mounted but meters are inside a small concrete kiosk. No room for additional metering 203 Blue Jerusalem Ofer SAT UG MV 33 20 Yes 23 LLP No U No Yes P No 400 400 ------equipment and meters. JDECO equipment are pole mounted on a separate lattice pole including meters.

IEC equipment are pole mounted but meters are inside a small concrete kiosk. No room for additional metering 204 Blue Jerusalem Al-Dahieh SAT UG MV 33 20 Yes 23 LLP No U No Yes P No 400 400 ------equipment and meters. JDECO equipment are pole mounted on a separate lattice pole including meters.

IEC equipment are pole mounted but meters are inside a small concrete kiosk. No room for additional metering 205 Blue Jerusalem Rama SAT UG MV 33 20 Yes 23 LLP No U No Yes P No 400 400 ------equipment and meters. JDECO equipment are pole mounted on a separate lattice pole including meters.

IEC equipment are pole mounted but meters are inside a small concrete kiosk. No room for additional metering 206 Blue Jerusalem Ramallah SAT UG MV 33 20 Yes 23 LLP No U No Yes P No 400 400 ------equipment and meters. JDECO equipment are pole mounted on a separate lattice pole including meters.

Page 9 of 10 Connection Points As Found Page 10 CONN INSP As Found ssz 2-8-2018

# District Color Coding Has Isolator? CT Tap Used General ConditionConnection Service Has Interrupter? Has Meter Room? Installed CT Ratio(s) Primary Meter Type? Check Meter Type? Connection Point Name LV/MV ConnectionConnection Point Voltage (kV)Limited Capacity (MW)? Meter Enclosure Type? Check Meter Functions?Kvarh Meter Installed? Has Structure MV VT/CT? Has Room Low Voltage CT? Primary Meter Functions? Has Switchgear MV VT/CT? Meter CommunicationMeter Communication Type? Works?

Conn. Capacity (based on3-Year CT tap Forecasted (MVA) Load Demand (MW) Comment Feeding from PETL S/S with PETL OH/UG to PETL CP Feeding from IEC S/S with IEC OH/UG to PETL CP CP cancelled with PETL to install a new CP Feeding from IEC S/S with IEC OH/UG to IEC CP Feeding from PETL S/S with IEC OH/UG to PETL CP IEC equipment are pole mounted but meters are inside a small concrete kiosk. No room for additional metering 207 Blue Jerusalem Berg SAT UG MV 33 20 Yes 23 LLP No U No Yes P No 400 400 ------equipment and meters. JDECO equipment are pole mounted on a separate lattice pole including meters.

IEC equipment are pole mounted but meters are inside a small concrete kiosk. No room for additional metering 208 Blue Jerusalem Qalandia1 SAT UG MV 33 20 Yes 23 LLP No U No Yes P No 600 400 ------equipment and meters. JDECO equipment are pole mounted on a separate lattice pole including meters.

IEC equipment are pole mounted but meters are inside a small concrete kiosk. No room for additional metering 209 Blue Jerusalem Al-Ram SAT UG MV 33 20 Yes 23 LLP No U No Yes P No 400 400 ------equipment and meters. JDECO equipment are pole mounted on a separate lattice pole including meters.

IEC equipment are pole mounted but meters are inside a small concrete kiosk. No room for additional metering 210 Blue Jerusalem Qalandia2 SAT UG MV 33 20 Yes 23 LLP No U No Yes P No 400 400 ------equipment and meters. JDECO equipment are pole mounted on a separate lattice pole including meters.

SAT - Satisfactory LV - Low Voltage F- Fuse U - Combined CT/PT 1 - Single Phase G - GPRS UNSAT - Unsatisfactory MV - Medium R - Recloser CT - Current Transformer 2 - Three Phase W- 2-Wire Conductor OH - Overhead LLB - Limited Load Break CB - Circuit Breaker VT - Voltage Transformer E - Electronic S/S - Substation UG - Underground D - Disconnect S - Switchgear P - Panel M - Electro-Mechanical CP - Control Point

Page 10 of 10