Implementation Ready Study MATZIKAMA MUNICIPALITY IMPLEMENTATION READY STUDY RBIG Report Phase 3: Klawer Bulk Water Infrastructure 262020KD0 June 2012 COMPILED FOR: COMPILED BY: Municipal Manager WorleyParsons RSA (Pty) Ltd Matzikama Municipality Contact person: . Mr HJ Mulder Private Bag 98 31 Allen Drive, Loevenstein 7530 Vredendal PO Box 398, Bellville 7535 8160 South Africa Telephone: +27 (0)21 912 3000 Telephone: +27 (0)27 201 3300 Facsimile: +27 (0)21 912 3222 Facsimile: +27 (0)27 201 2811 email: [email protected] ABN 61 001 279 812 © Copyright 2012 WorleyParsons Incorporating KV3 ENGINEERS MATZIKAMA MUNICIPALITY Disclaimer This report has been prepared on behalf of and for the exclusive use of Matzikama Municipality, and is subject to and issued in accordance with the agreement between Matzikama Municipality and WorleyParsons RSA. WorleyParsons RSA accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this report by any third party. Copying this report without the permission of Matzikama Municipality and WorleyParsons RSA is not permitted. PROJECT 262020KD0 - IMPLEMENTATION READY STUDY WORLEY- CLIENT REV DESCRIPTION ORIG REVIEW PARSONS DATE DATE APPROVAL APPROVAL A Issued for internal review 16-May-12 N/A HJ Mulder JJ Botha JCF Prins B Draft for Approval 8-Jun-12 N/A HJ Mulder JJ Botha JCF Prins p:\waterdept\klawer\262020 kd0 - rbig\g data\rbig reports work files\phase 3 - irs\26202v002rev01.docm (semir)Page i MATZIKAMA MUNICIPALITY IMPLEMENTATION READY STUDY RBIG REPORT PHASE 3: KLAWER BULK WATER INFRASTRUCTURE CONTENTS 1. INTRODUCTION ................................................................................................................ 1 1.1 PURPOSE OF THIS REPORT ........................................................................................... 1 1.2 BACKGROUND .................................................................................................................. 2 1.2.1 LOCALITY .......................................................................................................................... 2 1.2.2 EXISTING BULK WATER SUPPLY ................................................................................... 3 1.2.3 BULK WATER SUPPLY REQUIREMENTS ....................................................................... 4 2. STRATEGIC AND PLANNING ISSUES............................................................................. 4 2.1 ALIGNMENT WITH IDP AND WSDP ................................................................................. 4 2.2 ALIGNMENT WITH PDGDS, WFGD AND TURN AROUND STRATEGY ........................ 5 2.3 ASSOCIATED WATER INFRASTRUCTURE .................................................................... 6 2.4 STRATEGIC IMPORTANCE .............................................................................................. 6 2.5 TECHNICAL OPTION ........................................................................................................ 7 2.6 LEVEL OF SERVICE.......................................................................................................... 8 2.7 ECONOMIC GROWTH REQUIREMENTS ........................................................................ 8 2.8 WATER SCARCITY ........................................................................................................... 8 2.9 PROJECT FUNCTIONALITY ............................................................................................. 9 2.10 CAPITAL AND OPERATING COSTS ................................................................................ 9 2.11 AVAILABLE CO-FUNDING .............................................................................................. 10 3. SOCIAL CRITERIA........................................................................................................... 10 3.1 BASIC SERVICES BACKLOGS ....................................................................................... 10 3.2 POOR HOUSEHOLDS TO BE SERVICED ..................................................................... 11 3.3 JOB CREATION ............................................................................................................... 11 3.4 AFFORDABILITY OF PROPOSED WATER TARIFFS .................................................... 12 3.5 CONTRIBUTION TOWARDS POVERTY ERADICATION............................................... 13 3.6 ASSOCIATED SERVICES ............................................................................................... 14 KLAWER MUNICIPALITY CLINIC ................................................................................................... 14 P:\Waterdept\Klawer\262020 Kd0 - Rbig\G Data\Rbig Reports Work Files\Phase 3 - Irs\26202v002rev01.Docm Page ii 2012-06-07 MATZIKAMA MUNICIPALITY IMPLEMENTATION READY STUDY RBIG REPORT PHASE 3: KLAWER BULK WATER INFRASTRUCTURE 3.7 SOCIO-POLITICAL SUPPORT ........................................................................................ 14 4. ECONOMIC CRITERIA .................................................................................................... 15 4.1 BUSINESS & INDUSTRIES SERVICED.......................................................................... 15 4.2 ECONOMIC STIMULATION AND EFFECT ON GDP ..................................................... 15 4.3 SMME AND BEE ENTERPRISES TO BENEFIT ............................................................. 16 4.4 REGIONAL BENEFIT ....................................................................................................... 16 5. TECHNICAL CRITERIA ................................................................................................... 17 5.1 MASTER PLANNING ....................................................................................................... 17 5.2 APPROPRIATENESS AND ACCEPTABILITY ................................................................ 17 5.3 WATER RESOURCE ....................................................................................................... 17 5.4 WATER DEMAND MANAGEMENT AND CONSERVATION .......................................... 18 5.5 BULK DISTRIBUTION ...................................................................................................... 21 5.6 TECHNOLOGY ................................................................................................................ 21 6. INSTITUTIONAL CRITERIA ............................................................................................. 22 6.1 OWNERSHIP ................................................................................................................... 22 6.2 CAPACITY OF INSTITUTION TO IMPLEMENT .............................................................. 22 6.3 AGREEMENTS ON INFRASTRUCTURE OWNERSHIP ................................................ 23 6.4 AGREEMENT ON IMPLEMENTATION RESPONSIBILITY ............................................ 23 6.5 PROOF OF IMPLEMENTATION CAPACITY .................................................................. 23 6.6 HISTORY OF IMPLEMENTATION CAPACITY ............................................................... 24 6.7 OPERATING RESPONSIBILITY ...................................................................................... 24 6.8 PROOF OF ADEQUATE NUMBERS AND SKILLS LEVELS .......................................... 24 6.9 HISTORY ON WATER SERVICES INTERRUPTIONS ................................................... 25 6.10 COMMITMENT BY INSTITUTIONAL LEADERSHIP ....................................................... 26 6.11 COOPERATION AGREEMENT BETWEEN KEY STAKEHOLDERS ............................. 26 6.12 APPROVAL OF INSTITUTIONAL ARRANGEMENTS .................................................... 27 6.13 COST RECOVERY SYSTEM .......................................................................................... 27 6.14 WATER CONSERVATION AND DEMAND MANAGEMENT PERFORMANCE BY INSTITUTION .................................................................................................................................. 28 P:\Waterdept\Klawer\262020 Kd0 - Rbig\G Data\Rbig Reports Work Files\Phase 3 - Irs\26202v002rev01.Docm Page iii 2012-06-07 MATZIKAMA MUNICIPALITY IMPLEMENTATION READY STUDY RBIG REPORT PHASE 3: KLAWER BULK WATER INFRASTRUCTURE 6.15 RESPONSIBILITY AND ACCOUNTABILITY ................................................................... 29 7. FINANCIAL CRITERIA ..................................................................................................... 29 7.1 AVAILABLE FUNDING ..................................................................................................... 29 7.2 FUNDING CONDITIONS ................................................................................................. 30 7.3 FINANCIAL ANALYSIS OF PROJECTED CASH FLOWS .............................................. 30 7.4 AFFORDABILITY ............................................................................................................. 31 7.5 PROPOSED WATER TARIFFS ....................................................................................... 31 7.6 FINANCIAL VIABILITY ..................................................................................................... 32 7.7 FINANCIAL STATUS AND CREDIT WORTHINESS ....................................................... 32 8. LEGAL CRITERIA ............................................................................................................ 33 8.1 WATER USE LICENSE ...................................................................................................
Recommended publications
  • GTAC/CBPEP/ EU Project on Employment-Intensive Rural Land Reform in South Africa: Policies, Programmes and Capacities
    GTAC/CBPEP/ EU project on employment-intensive rural land reform in South Africa: policies, programmes and capacities Municipal case study Matzikama Local Municipality, Western Cape David Mayson, Rick de Satgé and Ivor Manuel with Bruno Losch Phuhlisani NPC March 2020 Abbreviations and acronyms BEE Black Economic Empowerment CASP Comprehensive Agricultural Support Programme CAWH Community Animal Health Worker CEO Chief Executive Officer CPA Communal Property of Association CPAC Commodity Project Allocation Committee DAAC District Agri-Park Advisory Committee DAPOTT District Agri Park Operational Task Team DoA Department of Agriculture DRDLR Department of Rural Development and Land Reform DWS Department of Water and Sanitation ECPA Ebenhaeser CPA FALA Financial Assistance Land FAO Food and Agriculture Organisation FPSU Farmer Production Support Unit FTE Full-Time Equivalent GGP Gross Geographic Product GDP Gross Domestic Product GVA Gross Value Added HDI Historically Disadvantaged Individual IDP Integrated Development Plan ILO International Labour Organisation LED Local economic development LORWUA Lower Olifants Water Users Association LSU Large stock units NDP National Development Plan PDOA Provincial Department of Agriculture PGWC Provincial Government of the Western Cape PLAS Proactive Land Acquisition Strategy SDF Spatial Development Framework SLAG Settlement and Land Acquisition Grant SSU Small stock unit SPP Surplus People Project TRANCRAA Transformation of Certain Rural Areas Act WUA Water Users Association ii Table of Contents
    [Show full text]
  • West Coast District Municipality Integrated Development Plan 2011
    West Coast District Municipality Integrated Development Plan 2012/2016 Review 2 - Draft 1 This review document to be read in conjunction with the main 5-year 2012-2016 IDP document. February 2014 West Coast District Municipality Office of the Municipal Manager, E-mail: [email protected] Coast District Tel: Municipality +27 22 433 8400 Fax: +27 86 692 6113 1 www.westcoastdm.co.zaIDP 2012-2016 Review 2 2 West Coast District Municipality IDP 2012-2016 Review 2 2 Map: West Coast District List of municipalities 3 Matzikama Cederberg Bergrivier Saldanha Bay Swartland Source: West Coast District Municipality, 2012 West Coast District Municipality IDP 2012-2016 Review 2 3 FOREWORD: EXECUTIVE MAYOR ______________________________________________________________________ To be included in the Final version. 4 John H Cleophas (Executive Mayor) West Coast District Municipality IDP 2012-2016 Review 2 4 PREFACE: MUNICIPAL MANAGER ______________________________________________________________________ To be included in the Final version. 5 Henry F Prins (Municipal Manager) West Coast District Municipality IDP 2012-2016 Review 2 5 REVISION NOTE ______________________________________________________________________ To be included in the Final version. 6 Earl Williams (Senior Manager Strategic Services) West Coast District Municipality IDP 2012-2016 Review 2 6 Table of Contents This review document to be read in conjunction with the main 5-year 2012-2016 IDP document. I West Coast Investment Profile (also on overleaf) 2& II Map 3 III Foreword: Executive Mayor 4 IV Preface: Municipal Manager 5 V Revision note 6 VI Table of contents 7 VII Economic Development Partnership brochure (Centre pages of document) 1. District Overview and Introduction 1.1 West Coast at a glance 8 1.2 Performance Scorecard 9-10 2.
    [Show full text]
  • Dissertation Masters in Development Studies Mds 794
    RESILIENCE AND ADAPTABILITY OF RURAL COMMUNITIES A CASE STUDY OF EBENHAESER James Backhouse visit to Ebenezer, 1840 DISSERTATION MASTERS IN DEVELOPMENT STUDIES MDS 794 Ilma Brink Student number: 2005024092 Centre for Development Support University of the Free State Bloemfontein 2014 Resilience and Adaptability of Rural Communities. A Case Study of Ebenhaeser Ilma Brink Contents TABLE OF FIGURES, MAPS, TABLES AND TRAVEL DEPICTIONS ....................... 4 ABBREVIATIONS ...................................................................................................... 6 INTRODUCTION ........................................................................................................ 7 CHAPTER 1: PROBLEM STATEMENT .................................................................. 10 Introduction ........................................................................................................... 10 1.1 Critical Questions ........................................................................................ 11 1.2 Objectives of the Study ............................................................................... 12 1.3 Significance of the Study ............................................................................. 12 CHAPTER 2: RESEARCH DESIGN ........................................................................ 13 Introduction ........................................................................................................... 13 2.1 Focus area of research ..............................................................................
    [Show full text]
  • Communal Land Tenure in Ebenhaeser, South Africa, 2012 – 2017
    PUTTING JUSTICE INTO PRACTICE: COMMUNAL LAND TENURE IN EBENHAESER, SOUTH AFRICA, 2012 – 2017 SYNOPSIS Following the 1994 transition from racial apartheid to democracy, South Africa’s government aimed to provide tenure security for the estimated 16 million black South Africans living in communal areas. But the lack of a clear legal framework applicable to most communal areas meant that progress was slow. In contrast, a viable legal framework did exist to guide tenure reform in smaller communal areas formerly known as “coloured reserves,” where a series of apartheid laws had settled people of mixed race. In 2009, land reform Minister Gugile Nkwiti designated one such area—Ebenhaeser, on the country’s west coast—as a rural “flagship” project. The aim was both to transfer land held in trust by the government to Ebenhaeser community members and to settle a restitution claim. Provincial officials from Nkwinti’s ministry, working with private consultants, organized a communal association to serve as landowner. They helped negotiate an agreement with white farmers to return land that had originally belonged to coloured residents. The community also developed a land administration plan that would pave the way for Ebenhaeser’s residents to become the legal owners of their communal territory. Leon Schreiber drafted this case study based on interviews conducted in the Western Cape, Gauteng, and Eastern Cape provinces of South Africa, in March 2017. Case published May 2017. INTRODUCTION At a 2009 press conference, Gugile Nkwinti, Jacob Zuma, who had
    [Show full text]
  • Upper Olifants River Survey
    UPPER OLIFANTS RIVER SURVEY An assessment of woody riparian and alien vegetation Sam Jack1, Greg Nicolson2 & Ian Durbach3 January 2016 1. Corresponding author. Plant Conservation Unit, Department of Biological Sciences, University of Cape Town, Private Bag X3, Rondebosch, 7701, Cape Town. T: 021 650 2483, E: [email protected] 2. Greg Nicolson Consulting, 9 Recreation Road, Muizenberg, 7945, Cape Town 3. Centre for Statistics in Ecology, Environment, and Conservation, Department of Statistical Sciences, University of Cape Town, 7701, Cape Town 1 Introduction The perennial Olifants Rivers system arises in the high‐elevation Agter‐Witzenberg Valley north of Ceres and flows for over 250 km in a north‐westerly direction to its mouth near the West Coast town of Papendorp (Figure 1). Along its course to the sea the Olifants is supplemented by several smaller perennial rivers, such as the Thee, Noordhoek, Boontjies, Rondegat, Jan Dissels, and the non‐ perennial Sout. Its main tributary is the Doring River feeding in from the east at around 2/3rd’s of its length. Two significant dams, namely the Clanwilliam and Bulshoek Dams, are situated along the mid‐course of the river. The Olifants River is central to the presence and success of an extensive agricultural industry in the Olifants River basin. This mainly comprises citrus orchards, vineyards and potatoes, which require year round water. The river (and dams) also supplies water to several major towns along its length, namely Citrusdal, Clanwilliam, Vanrhynsdorp, Vredendal and Lutzville, and serves as an important focal point for water‐related recreational activities and tourism in the West Coast District.
    [Show full text]
  • Ar Background and Introduction
    7/18/2011 Power in Place: Protecting living law and local knowledge in coastalAr planning processes Background and Introduction 1) the Olifants River traditional net fishing community illustrates Nico Waldeck and Henk Smith how traditional fishing communities in South Africa are challenging the dominant fisheries and integrated coastal management paradigm 2) they are arguing for an alternative, community‐based approach that recognises customary fisheries systems, values fishers’ knowledges and enables legitimate governance to emerge from local experiences 3) they are claiming their rights to participate in the current planning processes for the estuary 4) living customary law is now recognised as a source of law in the South African legal system and this has implications for the process and content of ICM and fisheries policy and legal frameworks photo by Dirk Trotskie ‐ 1 2 Shilubana Living law and local knowledgesThe Olifants River Estuary at the ..... South Africa Olifants River estuary Johannesburg KwaZulu‐Natal Province Richtersveld Northern Cape Province Durban OlifantsRiver Eastern Cape Province Western Cape Province Cape Town Small‐scale fishing communities Marine Protected Areas photo by Maria Smith and 3 Atlantic Ocean Indian Ocean Jackie Sunde ‐ 4 Nico Waldeck and Niclaas le Oom Sekkie Africa ‐ 6 Roux Junior ‐ 5 1 7/18/2011 Oom Niclaas ler Roux and his photo Merle Sewman ‐ 7 tema of net menders ‐ 8 9Nuwepos home with life Oom Niclaas le Roux – jacket on washing line ‐ Nuwepose Ebenhaeser ‐ 10 Photo Kobus Pienaar, Thursday 28
    [Show full text]
  • Flower Route Map 2017
    K o n k i e p en w R31 Lö Narubis Vredeshoop Gawachub R360 Grünau Karasburg Rosh Pinah R360 Ariamsvlei R32 e N14 ng Ora N10 Upington N10 IAi-IAis/Richtersveld Transfrontier Park Augrabies N14 e g Keimoes Kuboes n a Oranjemund r Flower Hotlines O H a ib R359 Holgat Kakamas Alexander Bay Nababeep N14 Nature Reserve R358 Groblershoop N8 N8 Or a For up-to-date information on where to see the Vioolsdrif nge H R27 VIEWING TIPS best owers, please call: Eksteenfontein a r t e b e e Namakwa +27 (0)72 760 6019 N7 i s Pella t Lekkersing t Brak u Weskus +27 (0)63 724 6203 o N10 Pofadder S R383 R383 Aggeneys Flower Hour i R382 Kenhardt To view the owers at their best, choose the hottest Steinkopf R363 Port Nolloth N14 Marydale time of the day, which is from 11h00 to 15h00. It’s the s in extended ower power hour. Respect the ower Tu McDougall’s Bay paradise: Walk with care and don’t trample plants R358 unnecessarily. Please don’t pick any buds, bulbs or N10 specimens, nor disturb any sensitive dune areas. Concordia R361 R355 Nababeep Okiep DISTANCE TABLE Prieska Goegap Nature Reserve Sun Run fels Molyneux Buf R355 Springbok R27 The owers always face the sun. Try and drive towards Nature Reserve Grootmis R355 the sun to enjoy nature’s dazzling display. When viewing Kleinzee Naries i R357 i owers on foot, stand with the sun behind your back. R361 Copperton Certain owers don’t open when it’s overcast.
    [Show full text]
  • Olifants River Estuarine Management Plan
    Olifants River Estuarine Management Plan Draft June 2017 Olifants Estuary Management Plan i DOCUMENT DESCRIPTION Document title and version: Olifants River Estuarine Management Plan (v.7) Project Name: Western Cape Estuarine Management Framework and Implementation Plan Client: Western Cape Government, Department of Environmental Affairs & Development Planning Royal HaskoningDHV reference number: MD1819 / W01.CPT.000210 Authority reference: EADP 1/2015 Compiled by: Version 1: Anchor Environmental (2009) Version 2: Royal HaskoningDHV (2016) Acknowledgements: Western Cape Government Environmental Affairs & Development Planning Chief Directorate: Environmental Sustainability Directorate: Biodiversity and Coastal Management Email: [email protected] Date: June 2017 Olifants River Estuarine Management Plan DOCUMENT USE The National Estuarine Management Protocol (the Protocol), promulgated in May 2013 under the National Environmental Management: Integrated Coastal Management Act (Act No. 24 of 2008, as amended by Act No. 36 of 2014), sets out the minimum requirements for individual estuarine management plans. In 2014, a review was conducted by the National Department of Environmental Affairs: Oceans and Coasts (DEA, 2014) on management plans existing at the time to ensure, inter alia, the alignment of these plans with the National Protocol. This revision of the Draft Olifants River Estuarine Management Plan, consisting of a Situation Assessment Report and the Management Plan itself, is primarily a response to the DEA review
    [Show full text]
  • (DRAFT REPORT) ESKOM WIND ENERGY FACILITY Tony Barbour
    SOCIAL ASSESSMENT FOR SCOPING REPORT (DRAFT REPORT) ESKOM WIND ENERGY FACILITY July 2007 Prepared for SAVANNAH ENVIRONMENTAL (Pty) Ltd By Tony Barbour Tony Barbour ENVIRONMENTAL CONSULTANT AND RESEARCHER P O Box 1753, Sun Valley, 7975, South Africa (Tel) 27-21-789 1112 - (Fax) 27-21-789 1112 - (Cell) 082 600 8266 (E-Mail) [email protected] TABLE OF CONTENTS SECTION 1: INTRODUCTION........................................................................... 3 1.1 INTRODUCTION ................................................................................... 3 1.2 TERMS OF REFERENCE.......................................................................... 3 1.3 PROJECT LOCATION............................................................................. 4 1.4 PROJECT DESCRIPTION......................................................................... 4 1.5 ASSUMPTIONS AND LIMITATIONS .......................................................... 6 1.5.1 Assumptions.............................................................................. 6 1.5.2 Limitations ................................................................................ 7 1.6 APPROACH TO STUDY ........................................................................... 7 1.7 SPECIALIST DETAILS............................................................................ 7 1.8 DECLARATION OF INDEPENDENCE.......................................................... 7 1.9 REPORT STUCTURE .............................................................................. 8 SECTION
    [Show full text]
  • WES-KAAP | INTSHONA KOLONI I MAP of the WESTERN CAPE MUNICIPALITIES
    WESTERN CAPE | WES-KAAP | INTSHONA KOLONI i MAP of the WESTERN CAPE MUNICIPALITIES The municipalities in the Western Cape consist of: • One metro, • Five district municipalities, and • Twenty four local municipalities. ii CONSOLIDATED ANNUAL MUNICIPAL PERFORMANCE REPORT 2008/09 CONTENT / INDEX FOREWORD BY MEC vi LIST OF TABLES vii EXECUTIVE SUMMARY viii LEGISLATIVE OVERVIEW x RESEARCH METHODOLOGY xii CHAPTER 1: GEOGRAPHIC, DEMOGRAPHIC AND SOCIO ECONOMIC PROFILES OF MUNICIPALITIES 1.1 Introduction 1 1.2 Geographic information 1 1.3 Demographic information 2 1.4 Socio- economic information 3 1.5 Political composition 4 1.6 Classification of municipal capacity by the National Treasury 5 1.7 Assessment of the geographical and demographic data and the socio-economic profiles of municipalities 6 CHAPTER 2: MUNICIPAL INTEGRATED DEVELOPMENT PLANNING 2.1 Introduction 7 2.2 Concise description of the strategic vision of each municipality 8 2.3 Integrated development planning per municipality 11 2.4 Analysis of Integrated development planning processes at municipal level 12 2.5 Summary grid on assessment of credibility of municipal Integrated Development Plans (IDPs) 12 CHAPTER 3: MUNICIPAL TRANSFORMATION AND INSTITUTIONAL DEVELOPMENT 3.1 Introduction 15 3.2 Institutional development and transformation 15 3.2.1 Municipal Organisational Structure 15 3.2.1.1 Filling of posts, transformation and HR policies and systems 15 3.2.1.1.1 Number of approved and vacant posts per municipality 17 3.2.1.1.2 Transformation statistics per municipality 18 3.2.1.1.3
    [Show full text]
  • Papendorp Section 5.18
    page 306 5.18 PAPENDORP (population: + 200) (IDP 2012-2017) 5.18.1 SPATIAL ANALYSIS, see Figures 5.18.1 Sub-regional location • 9km north of Strandfontein, 16kms south of Ebenhaeser; • 22kms from Lutzville and 42kms to Vredendal; • Located in close proximity to the community’s original primary economic resource, namely fishing and near a supply of freshwater; • In 2003 Marine and Coastal Management (MCM) phased out subsistence gill net fishing in the Berg River Estuary but gave 45 permit holders in the Olifants River Estuary exemptions to continue fishing until 2013 (Anchor Environmental, Olifants River Situation Assessment p 69, April 2008); • It is now largely a residential dormitory with some subsistence fishing but social grants and work further afield is Primary economic resource is fishing in the Olifants an important source of income; and, River Estuary • Salt mining occurs further south in the estuary. Layout pattern • The settlement, although very sparse, stretches for almost a kilometre from the historic abandoned church in the north to the guest house and crèche in the south; • The main residential area occupies an approved township accessed by the main north-south route and a series of cul-de sacs; and, • Most of the approved erven to the east, away from the estuary are vacant. Urban quality • The areas is notable for its lack of trees except around the guest house; and, • Most buildings are in a poor state of maintenance and possess little architectural character except for the guest house constructed in west-coast long house
    [Show full text]
  • Second Generation Coastal Management Programme 2019 - 2024
    WEST COAST DISTRICT MUNICIPALITY SECOND GENERATION COASTAL MANAGEMENT PROGRAMME 2019 - 2024 This Report should be cited as follows: West Coast District Municipality (2019). Draft Coastal Management Programme: Second Generation. This report was developed for the West Coast District Municipality by: The Point, Suite 408, 4th Floor Contact: 76 Regent Road, Sea Point Dr Ted Avis CAPE TOWN Tel: 021 045 0900 8060 Email: [email protected] www.cesnet.co.za Also in Grahamstown, Port Amy Lindsay Elizabeth, East London, Tel: 083 554 9229 Johannesburg & Maputo Email: [email protected] West Coast District Municipality: Charles Malherbe Nick de Jongh CES: Ted Avis Amy Lindsay Acknowledgements: Bergrivier Municipality Cederberg Municipality Matzikama Municipality Saldanha Bay Municipality Swartland Municipality TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................................ VIII 1 INTRODUCTION ...................................................................................................................... 1 1.1 Background ........................................................................................................................ 1 1.2 Defining the Coastal Zone ............................................................................................... 1 1.3 Value of the coast ............................................................................................................. 5 1.4 Context of Coastal Management Programmes in South Africa ...............................