Initial Environmental Examination Report Proposed Loan And

Total Page:16

File Type:pdf, Size:1020Kb

Initial Environmental Examination Report Proposed Loan And Initial Environmental Examination Report Project Number: 39399 September 2013 Proposed Loan and Administration of Grant for Additional Financing South Asia Tourism Infrastructure Development Project (Nepal Portion) Prepared by the Government of Nepal (Civil Aviation Authority of Nepal) 2013 CURRENCY EQUIVALENTS (as of 31 August 2013) Currency unit = Nepalese rupee/s (NRe/NRs) NRe1.00 = $0.0102 $1.00 = NRs95.92 ABBREVIATIONS AAQ – Ambient Air Quality ADB – Asian Development Bank AH – Affected Households AP – Affected Persons BOD – Biological Oxygen Demand CAAN – Civil Aviation Authority of Nepal CBS – Central Bureau of Statistics CDO – Chief District Officer CO – Carbon Monoxide DSMC – Design, Supervision, and Management Consultant DSC – Design and Supervision Consultants EA – Executing Agency EIA – Environmental Impact Assessment EMP – Environmental Management Plan EPA – Environment Protection Act, 1997 EPR – Environment Protection Regulation, 1997 GBA – Gautama Buddha Airport GDP – Gross Domestic Product GON – Government of Nepal IA – Implementing Agency ICAO – International Civil Aviation Organization IEE – Initial Environment Examination LDT – Lumbini Development Trust MOCTCA – Ministry of Culture, Tourism and Civil Aviation MOSTE – Ministry of Science, Technology and Environment NGO – Nongovernmental Organization NOx – Nitrogen oxide NPC – National Planning Commission NRs – Nepalese Rupees NRM – Nepal Resident Mission NTB – Nepal Tourism Board PAM – Project Administration Manual PMU – Project Management Unit RP – Resettlement Plan RRP – Report and Recommendation of the President SARD – South Asia Regional Department SASEC – South Asia Subregional Economic Cooperation SO 2 – Sulfur Dioxide TIA – Tribhuvan International Airport UNESCO – United Nations Educational, Scientific and Cultural Organization VDC – Village Development Committee WHS – World Heritage Site Table of Contents Abbreviations 1 Introduction .................................................................................... 1 1.1 Name and Address of the Proponent .................................................................... 1 1.2 Background .......................................................................................................... 1 1.3 History of GBA Project Preparation ...................................................................... 2 1.4 Rationale of the IEE .............................................................................................. 2 1.5 Objectives of the IEE ............................................................................................. 2 2 Policy, Legal and Administrative Framework ................................................................... 3 2.1 Legal Provisions of the Government ..................................................................... 3 2.2 Safeguard Policy Statement of ADB ..................................................................... 5 2.3 ICAO's Norms and Standards ............................................................................... 5 3 Description of the Project .................................................................................... 6 3.1 Relevancy of the GBA Expansion and Upgrading ................................................. 6 3.2 Scope of the Project ............................................................................................. 6 3.3 Location of the Project Area ................................................................................. 7 3.4 Components and Activities of the Project ............................................................. 7 3.5 Introcucing Electrical Vehicles in the Lumbini Area ............................................... 8 3.6 Construction Approach ....................................................................................... 10 4 Description of Environment of the Project Area ............................................................ 10 4.1 Physical Environment ......................................................................................... 10 4.2 Biological Environment ..................................................................................... 144 4.3 Socio-Economic Environment ........................................................................... 155 5 Analysis of Alternatives .................................................................................. 17 5.1 With and Without Project Scenarios ................................................................... 17 5.2 Improvement of Gautam Buddha Airport ............................................................ 18 5.3 Location for Proposed Expansion ....................................................................... 19 5.4 Alternatives for Ghaghara Khola Diversion ......................................................... 19 6 Anticipated Environmental Impacts and Mitigation Measures .................................... 22 6.1 Beneficial Impacts and Benefit Augmentation Measures .................................... 22 6.2 Pre-construction Impacts 244 6.3 Impacts during Construction ............................................................................. 255 6.4 Impacts during Operation ................................................................................... 31 6.5 Impacts from Solar/Electricity Charged Hybrid Electrict Vehicle in Lumbini Area 34 7 Environmental Management Plan .................................................................................. 35 7.1 Plan for Mitigation Measures .............................................................................. 35 7.2 Environmental Monitoring ................................................................................... 35 7.3 Environmental Auditing ..................................................................................... 477 7.4 Institutional Arrangements ................................................................................ 477 7.5 Estimated EMP Budget ...................................................................................... 50 8 Public Consultation and Disclosure ................................................................................. 52 8.1 Public Consultations ........................................................................................... 53 8.2 Public Notification ............................................................................................... 55 9 Grievance Redress Mechanism ................................................................................ 566 10 Conclusion and Recommendations ................................................................................ 57 List of Tables Table 2.1: Review of Environmental Acts, Regulations and Guidelines Table 3.1: Apron Dimension Table 4.1: Soil Property in the Project Area Table 4.2: Land use Pattern of Rupandehi District Table 4.3: Water Quality-Ghaghara Khola Table 4.4: Air Quality Data of Bhairahawa City Table 4.5: Aircraft Emission Data (A330-300) Table 4.6: List of Birds Sited around the Project Site Table 4.7: Educational Levels of AHs Table 4.8: Main Source of Income of AHs Table 4.9: Income Categories of Affected Households Table 5.1: Comparison of Alternatives Table 6.2: Typical Noise Levels of Construction Equipment Table 6.1: Summary of Resettlement Impacts Table 6.3: Proposed Emission Sources and Emission Rate Table 7.1: Proposed Plan for Benefit Augmentation Measure Table 7.2: Environmental Management Plan for GBA Table 7.3: Monitoring Parameters, Location, Schedules and Responsibilities Table 7.4: Training Modules for Institutional Strengthening on Environmental Management Table 7.5: Estimated Cost for Environment Protection Measures Table 7.6: Estimated Cost for Routine Environmental Monitoring and Operation of Safeguard Desk during Construction Stage of the Project Table 7.7: Estimated Cost for Impact Monitoring Table 7.8: Indicative Cost for Environmental Auditing Table 7.9: Summary Cost for EMP Implementation Table 8.1: Summary of Past Consultations List of Figures Figure 3.1: Map of Nepal Showing Location of GBA and Lumbini Figure 4.1: Satellite Image of the GBA and Layout Showing Proposed Expansion Figure 7.1: Organization Arrangement for EMP Implementation Figure 9.1: Grievance Redress Procedure Appendices Appendix 1: REA Checklist Appendix 2: Demographic Profile of the Project Area Appendix 3: Public Hearing at the Project Area Appendix 4: Public Notification on 28 September 2012 Appendix 5: Map of Project Area Including GBA and Lumbini Appendix 6: A Schematic Diagram of Ghaghara Khola Diversion 1 Introduction 1.1 Name and Address of the Proponent 1. The name of the Proposal of this Initial Environmental Examination (IEE) is the “South Asia Tourism Infrastructure Development Project (Nepal Portion)” (the Project). The Civil Aviation Authority of Nepal (CAAN) is the Proponent for the Gaitam Buddha Airport (GBA) upgrading component, whereas the Lumbini Development Trust (LDT) is the Proponent for the Lumbini area improvement component. The Ministry of Culture, Tourism and Civil Aviation (MOCTCA) is the concerned ministry for the Project. 2. Following is the address of the proponents. (i) GBA Component: Civil Aviation Authority of Nepal (CAAN) Babar Mahal, Kathmandu Telephone No: +977-1-4211620 (ii) Lumbini Area Development Component: Lumbini Development Trust Sacred Garden Lumbini, Nepal Telphone:+977-71-580189, 580196, 580200 Fax:+977-71-580181 Email: [email protected] Liaison Office GPO Box: 4072, Babarmahal, Kathmandu, Nepal Tel: +977-1-4268494,
Recommended publications
  • Gautam Buddha International Airport
    GAUTAM BUDDHA INTERNATIONAL AIRPORT Brief Description Gautam Buddha International Airport is a hub Airport situated at Siddhartha Nagar Municipality of Rupandehi District, Lumbini Province. The birth place of Lord Buddha, Lumbini is about 18 Km west from this Airport. The Airport will serve as International Airport in near future. General Information Name GAUTAM BUDDHA INTERNATIONAL Location Indicator VNBW IATA Code BWA Aerodrome Reference Code 3C (upgrading to 4E) Aerodrome Reference Point 273026 N/0832505 E Province/District Lumbini/Rupandehi Distance and Direction from City 2.5 Km West Elevation 105 m./344 ft. Contact Off: 977-71507086 Tower: 977-71507007 Fax: 977-71507053 AFS: VNBWYDYX E-mail: [email protected] Night Operation Facilities Available Operation Hours 16th Feb to 15th Nov 0600LT-1845LT 16th Nov to 15th Feb 0630LT-1800LT Status In Operation Year of Start of Operation 08 July, 1958 Serviceability All Weather Land Approx. 1040301.42 m2 Re-fueling Facility Yes, by Nepal Oil Corporation Service Control Service Instrumental Flight Rule(IFR)/Visual Flight Rule (VFR) Type of Traffic Permitted Upgrading to ILS Category 1 precision Approach Type of Aircraft ATR72, CRJ200/700, DHC8, MA60, ATR42, JS41, B190, D228, DHC6, L410, Y12 Buddha Air, Yeti Airlines, Shree Airlines, Saurya Airlines, Schedule Operating Airlines Nepal Airlines Schedule Connectivity Pokhara, Kathmandu RFF Category V Upgrading to VIII Infrastructure Condition Airside Runway Type of Surface Bituminous Paved (Asphalt Concrete) Runway Dimension 1500 m x 30 m (upgrading to 3000m x 45 m) Runway Designation 10/28 Parking Capacity Domestic: Four ATR72 Types International: Additional 5 Parking bays for C & D category Aircraft after upgrading Size of Apron Domestic: 8600 sq.m.
    [Show full text]
  • NATIONAL AIRPORTS PLAN Current Situation and Diagnostic. DRAFT
    Capacity Development of Civil Aviation Authority of Nepal NATIONAL AIRPORTS PLAN Current Situation and Diagnostic. DRAFT SEPTEMBER 2012 Capacity Development of Civil Aviation Authority of Nepal NATIONAL AIRPORTS PLAN Current Situation and Diagnostic. DRAFT Page 2 of 70 Capacity Development of Civil Aviation Authority of Nepal The present document is embedded into the Project “Capacity Development of Civil Aviation Authority of Nepal“, more specifically into the part “2A- National Plan for Civil Aviation Development”. The main aim of this document is to analyze the current situation of the airport network in Nepal, studying the following: a) Airports distribution and classification b) Individual airport diagnosis c) Network coverage This first diagnostic of the current state of operation will be used to determine the required actions to achieve in the airports, once the future network is defined. A 20- years strategic plan will be defined in this matter. NATIONAL AIRPORTS PLAN Current Situation and Diagnostic. DRAFT Page 3 of 70 Capacity Development of Civil Aviation Authority of Nepal NATIONAL AIRPORTS PLAN Current Situation and Diagnostic. DRAFT Page 4 of 70 Capacity Development of Civil Aviation Authority of Nepal INDEX 1. Airports network in Nepal ................................................................................... 7 1.1. Airports distribution .................................................................................................. 7 1.2. Airports operational classification ............................................................................
    [Show full text]
  • Logistics Capacity Assessment Nepal
    IA LCA – Nepal 2009 Version 1.05 Logistics Capacity Assessment Nepal Country Name Nepal Official Name Federal Democratic Republic of Nepal Regional Bureau Bangkok, Thailand Assessment Assessment Date: From 16 October 2009 To: 6 November 2009 Name of the assessors Rich Moseanko – World Vision International John Jung – World Vision International Rajendra Kumar Lal – World Food Programme, Nepal Country Office Title/position Email contact At HQ: [email protected] 1/105 IA LCA – Nepal 2009 Version 1.05 TABLE OF CONTENTS 1. Country Profile....................................................................................................................................................................3 1.1. Introduction / Background.........................................................................................................................................5 1.2. Humanitarian Background ........................................................................................................................................6 1.3. National Regulatory Departments/Bureau and Quality Control/Relevant Laboratories ......................................16 1.4. Customs Information...............................................................................................................................................18 2. Logistics Infrastructure .....................................................................................................................................................33 2.1. Port Assessment .....................................................................................................................................................33
    [Show full text]
  • 2Nd WORLD BUDDHIST SUMMIT “Lumbini: a Symbol of Unity In
    Our file reference: LAN2 Lumbini Summit Report.doc 1 2nd WORLD BUDDHIST SUMMIT “Lumbini: A Symbol of Unity in Diversity – The Fountain of World Peace” Held at Lumbini - the birthplace of Lord Buddha Nepal 30th November to 2nd December 2004 Peter Boswell, Delegate from Chan Academy Australia a registered trading name of The Buddhist Discussion Centre (Upwey) Ltd, 33 Brooking Street, Upwey, Victoria 3158 Australia Report written by Peter Boswell Assisted by Evelin C. Halls Mr. Peter Boswell represented the Chan Academy Australia as an Observer to the Summit. Chan Academy is a registered trading name of the Buddhist Discussin Centre (Upwey) Ltd. On the 27th November 2004 Mr. Boswell member travelled by Thai Air to Kathmandu where he was met at the airport by the Minister for Culture, Tourism and Civil Aviation, Mr. Deep Kumar Upadhyaya, and a delegation of eight to ten members of the Lumbini Development Trust. Peter then travelled by domestic airline Yeti Air to Gautam Buddha Airport in Bhairawa and was met by three local persons working for the Trust and taken to Bhairawa Township to the hotel. The following day Peter took a taxi to the Lumbini site where he was taken around the Lumbini development area and visited Temples built by the Vietnamese, the People’s Republic of China, Japan and several other Temples under construction. The Japanese Temple workers had also completed a lot of natural restoration around their site to create the wetlands for the return of the Lumbini stork, which had thought to previously been extinct. (The stork had returned and in fact there was a pair in the yard of the local hotel).
    [Show full text]
  • Gautam Buddha Airport
    GAUTAM BUDDHA AIRPORT Brief Description Gautam Buddha (Bhairahawa) Airport is a domestic hub airport situated at Siddhartha Nagar Municipality of Rupandehi District, Province No. 5. The birth place of Lord Buddha Lumbini, is about 18 Km west from this airport. In consideration of its prospects and the existence of Lord Buddha's birth place, Lumbini, CAAN is upgrading this airport. The airport will serve as International Airport within 2020. General Information Name GAUTAM BUDDHA Location Indicator VNBW IATA Code BWA Aerodrome Reference Code 3C Aerodrome Reference Point 273026 N/0832505 E Province/District 5(Five)/Rupandehi Distance and Direction from City 2.5 Km West Elevation 105 m./344 ft. Contact Off: 977-71507086 Tower: 977-71507007 Fax: 977-71507053 AFS: VNBWYDYX E-mail: [email protected] Night Operation Facilities Available Operation Hours 16th Feb to 15th Nov 0600LT-1845LT 16th Nov to 15th Feb 0630LT-1800LT Status Operational Year of Start of Operation 08 July, 1958 Serviceability All Weather Land Approx. 1040311.08 m2 Re-fueling Facility Available, Provided by Nepal Oil Corporation Service Control Service Type of Traffic Permitted Instrumental Flight Rule(IFR) + Visual Flight Rule (VFR) Type of Aircraft ATR72, CRJ200/700, DHC8, MA60, ATR42, JS41, B190, D228, DHC6, L410, Y12 Buddha Air, Yeti Airlines, Shree Airlines, Saurya Airlines, Schedule Operating Airlines Nepal Airlines Schedule Connectivity Pokhara, Kathmandu RFF Category V Infrastructure Condition Airside Runway Type of Surface Bituminous Paved (Asphalt Concrete)
    [Show full text]
  • South Asia Subregional Economic Cooperation Airport Capacity Enhancement Project
    Report and Recommendation of the President to the Board of Directors Project Number: 38349-031 October 2020 Proposed Loan Nepal: South Asia Subregional Economic Cooperation Airport Capacity Enhancement Project Distribution of this document is restricted until it has been approved by the Board of Directors. Following such approval, ADB will disclose the document to the public in accordance with ADB's Access to Information Policy. CURRENCY EQUIVALENTS (as of 7 October 2020) Currency unit – Nepalese rupee/s (NRe/NRs) NRe1.00 = $0.008527 $1.00 = NRs117.27 ABBREVIATIONS ADB – Asian Development Bank CAAN – Civil Aviation Authority of Nepal COVID-19 – coronavirus disease EMP – environmental management plan EMR – environmental monitoring report GASP – Global Aviation Safety Plan GBA – Gautam Buddha Airport GESI – gender equality and social inclusion ha – hectare ICAO – International Civil Aviation Organization MOCTCA – Ministry of Culture, Tourism and Civil Aviation O&M – operation and maintenance PAM – project administration manual SASEC – South Asia Subregional Economic Cooperation TIA – Tribhuvan International Airport NOTES (i) The fiscal year (FY) of the Government of Nepal and its agencies ends on 15 July. “FY” before a calendar year denotes the year in which the fiscal year ends, e.g., FY2020 ends on 15 July 2020. (ii) In this report, "$" refers to United States dollars. Vice-President Shixin Chen, Operations 1 Director General Kenichi Yokoyama, South Asia Department (SARD) Director Ravi Peri, Transport and Communications Division (SATC), SARD Team leader Kai Wei Yeo, Senior Transport Specialist, SATC, SARD Co-Team leader Naresh Pradhan, Senior Project Officer (Transport), Nepal Resident Mission, SARD Team members Arlene Ayson, Senior Operations Assistant, SATC, SARD Sin Wai Chong, Transport Specialist, SATC, SARD Sajid Raza Zaffar Khan, Financial Management Specialist, Portfolio, Results, and Quality Control Unit; Office of the Director General, SARD Vergel M.
    [Show full text]
  • 38349-031: South Asia Subregional Economic Cooperation Airport
    Initial Environmental Examination August 2020 NEP: South Asia Subregional Economic Cooperation Airport Capacity Enhancement Project - Gautam Buddha Airport Prepared by the Ministry of Culture, Tourism and Civil Aviation, Government of Nepal for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 8 July 2020) Currency unit – Nepalese rupee (NPR) NPR1.00 = $ 0.008370 $1.00 = NPR 119.48 ABBREVIATIONS ACEP - Airport Capacity Enhancement Project ADB - Asian Development Bank BOQ - Bill of Quantities CAAN - Civil Aviation Authority of Nepal CSC - Construction Supervision Consultant DoA - Department of Archaeology EIA - Environmental Impact Assessment EMP - Environmental Management Plan EMoP - Environmental Monitoring Plan EPA - Environmental Protection Act GBA - Gautam Buddha Airport GoN - Government of Nepal GRM - Grievance Redress Mechanism GRC - Grievance Redress Committee IEE - Initial Environmental Examination IFC EHS - International Finance Corporation Environmental Health and Safety ITB - International Terminal Building MoFE - Ministry of Forests and Environment MoPE - Ministry of Population and Environment OHS - Occupational Health and Safety PPC - Project Preparatory Consultant PMU - Project Management Unit PPEs - Personal Protective Equipment/s PPTA - Project Preparation Technical Assistance REA - Rapid Environmental Assessment SASEC - South Asia Subregional Economic Cooperation SEMR - Semi-annual Environmental Monitoring Report SPS - Safeguards Policy Statement (ADB) TIA - Tribhuvan International Airport WHO - World Health Organization WEIGHTS AND MEASURES ºC - degree Celcius cm - centimeter dBA - decibels A km - km ppm - parts per million GLOSSARY Bikram Sambat (B. S.) – Nepalese calendar year that runs from mid-April to mid-April. Unless otherwise stated, year ranges written in the form 2015/016 denote a single calendar year. NOTES i.) The fiscal year (FY) of the Government ends on 15 July.
    [Show full text]
  • Volume 18 B. E. 2559 May 2015
    LumbiniLumbiniLumbini J OURNAL O F T HE L UMBINI N EPALESE B UDDHA D HARMA S OCIETY (UK) Volume 18 B. E. 2559 May 2015 Elani Samyek, Patan, Nepal Lumbini Nepalese Buddha Dharma Society (UK) uddha was born more than 2600 years ago at Lumbini in Nepal. His teachings of existence of suffering and Lumbini Bthe way out of the suffering are applicable today as they were Journal of The Lumbini Nepalese Buddha Dharma Society (UK) applicable then. The middle way he preached is more appropriate now than ever before. Lumbini is the journal of LNBDS (UK) and published annually depending upon funds and written material; and distributed free For centuries Buddhism remained the religion of the East. Recently, of charge as Dharma Dana. It is our hope that the journal will serve more and more Westerners are learning about it and practising Dharma as a medium for: for the spiritual and physical well-being and happiness. As a result of this interest many monasteries and Buddhist organisations have been 1.Communication between the society, the members and other established in the West, including in the UK. Most have Asian interested groups. connections but others are unique to the West e.g. Friends of Western Buddhist Order. 2.Publication of news and activities about Buddhism in the United Nepalese, residing in the UK, wishing to practice the Dharma for their Kingdom, Nepal and other countries. spiritual development, turned to them as there were no such Nepalese 3.Explaining various aspects of Dharma in simple and easily organisations. Therefore, a group of Nepalese met in February 1997 understood language for all age groups.
    [Show full text]
  • Environmental Monitoring Report Nepal: Gautam Buddha Airport
    Environmental Monitoring Report Semi-Annual Report No. 3 Loan/Grant Number: 2579 NEP/0179 NEP January-June, 2016 Nepal: Gautam Buddha Airport Upgrading Component Prepared by the Government of Nepal for the Asian Development Bank. This environmental Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ENVIRONMENTAL MONITORING REPORT Third Bi-Annual Report January -June 2016 NEP: Gautam Buddha Airport Upgrading Components South Asia Tourism Infrastructure Development Project (STAIDP) Contract No: CAAN/GAUC/ICB-01/2013 ADB Loan No:2579-NEP(SF) and Grant No: 0179 (SF) Prepared by: Yooshin Engineering Corporation (Korea)/BDAnepal/ERMC/NESS for the Government of Nepal (GoN) and Asian Development Bank(ADB) July, 2016 1 INTRODUCTION - 1 - 1.1 Overall Project Description and Objectives - 1 - 1.2 Project Information and Funding - 4 - 1.3 Details of Site Personnel and/or Consultant’s Personnel Responsible for Environmental Monitoring - 4 - 1.4 Overall Project and Sub-Project Progress and Status - 5 - 2 INCORPORATION OF ENVIRONMENTAL REQUIREMENTS
    [Show full text]
  • ATC Interaction Program on 'ATS
    ATC Interaction Program On ‘ATS Procedure between TIA and Other Domestic Airports and Other Issues’ Date: 7th June 2016 (25thJestha 2073), Tuesday. Venue: Airport Hotel, Kalimatidole, Kathmandu Organizer: Tribhuwan International Airport, Civil Aviation Office Program Coordinator: Director, Mr Sudhir Kumar Chaudhary MOC: Manager Pavan Kumar Gautam Rapporteurs: Manager Rita Shrestha, Dy. Manager Subash Khadka, Dy. Manager Subash Deuja,Sr. Officer Om Thapa 0 Mr. Pavan KumarGautam, being the master of ceremony, commenced the program with a welcome note and alsorequested the participants to switch off their cell phones. Distinguished guests were welcomed with “khada or shawl” by the FOD and Chief ATC. 1.1 At 11:45AM, FOD TIACAO Mr. Sudhir Kumar Choudharywas requested to deliver a welcome speech and highlight the needs for interaction among ATS personnel working at different aerodromes of the country. According to him, this annual program was characterized by dichotomy in structure; one being ATC-ATC interaction and the other being ATC-pilot interaction to be held on the 27th of Jestha. He believed regular interaction between concerned stakeholders, especially among ATCs and pilots, was instrumental in figuring out the deficiencies on prevalent ATS systems and hence, in introduction of suitable and effective improvement measures. FOD Mr. Choudhary laid down the three main objectives of the program as mentioned below: a) To pave a way towards effective implementation of ICAO’s standards and recommended practices (SARPS) in Nepalese ATS system. b) To address various coordination issues between Kathmandu area control center and other domestic aerodromes to make the Nepalese sky safer and more efficient; including coordination enhancement among different ATS units operating in Kathmandu airport.
    [Show full text]
  • Consultant Report: Nepal, Improving Connectivity and Destination
    Technical Assistance Consultant’s Report Project Number: 42470 May 2010 Regional: Improving Connectivity and Destination Management of Cultural and Natural Resources in the South Asia Subregion (Financed by the Regional Cooperation and Integration Fund under the Regional Cooperation and Integration Financing Partnership Facility) Prepared by Nepalconsult (P) Ltd. Kathmandu, Nepal For Ministry of Tourism and Civil Aviation, Government of Nepal Civil Aviation Authority of Nepal/ Lumbini Development Trust This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. ADB ASIAN DEVELOPMENT BANK GOVERNMENT OF NEPAL TA 6504 – REG: IMPROVING CONNECTIVITY AND DESTINATION MANAGEMENT OF CULTURAL AND NATURAL RESOURCES IN THE SOUTH ASIA SUBREGION (PACKAGE T3 – NEPAL) Final Report Part - I (May, 2010) Nepalconsult (P) Ltd. Block No. 47, Kupondole, Lalitpur – 10, Nepal Mailing Address: GPO Box 492, Kathmandu,l Nepal Phone: 977-1-5520153, 5011670 & 5011673; Fax: 977-1-5011671 Email: [email protected]; Website: www.nepalconsult.com.np May 2010 Improving Connectivity and Destination Management of Main Report Part- I Cultural and Natural Resources in the South Asia Subregion TA6504 REG TABLE OF CONTENTS EXECUTIVE SUMMARY 1 A. GENERAL 4 Status of the TA 4 Objective of the TA 5 The Project / Tourism Infrastructure Development Project 6 The Consultants' Team 6 B. APPROACH AND METHODOLOGY 7 C. SECTOR WISE PROGRESS 8 Project Management 8 The Executive and Implementing Agencies 8 Project Management System 9 Establishment of PCU and PMIUs 10 Project Coordination Committee in Lumbini 10 Coordination among PCU and PMIUs 11 Project Agreements 11 Project Management System 11 Investigation and Survey 14 Familiarization of ADB Procedure 14 The Event and the Outcome 14 Community based heritage tourism 16 Project Awareness Program 16 D.
    [Show full text]
  • Noise Level Status in Siddharthanagar Municipality, Rupandehi, Nepal
    Noise Level Status in Siddharthanagar Municipality, Rupandehi, Nepal Lakshmi Nath Bhattarai Department of Physics, Butwal Multiple Campus, Nepal e-mail: [email protected] Abstract: Undesirable sound for human hearing is called as noise. It was measured at the selected locations of silent, residential and commercial zones of Siddharthanagar Municipality by using Dick Smith Digital Sound Level Meter Q 1362 for ‘A’ weighting in day time at 9:00 AM to 6:00 PM in the month of November and December 2012. The result shows that at each location the Leq noise levels are above than the noise level standard prescribed by Government of Nepal and WHO. Maximum Leq of 81.9 dB(A) was observed at the Bus park of commercial area and minimum 54.5 dB(A) was observed at Medical College area of silent zone. In other places, the Leq lie in the range 56.2 dB(A) to 81.9 dB(A). The study showed that the places lying along highways have high level of noise which is due to bad condition of roads, vehicles and unnecessary use of horns. Keywords: Noise pollution, decibel, Noise level, Silent zone, Commercial zone. 1. INTRODUCTION etc. have been observed due to effect of noise Sound that is undesirable for human hearing is pollution. called as noise. When there is lot of noise in the environment it constitutes noise pollution. Noise The major health effect induced by the noise pollution is regarded as technology generated pollution is observed as lack of concentration. problem. The industrialization, scientific and Irritation, fatigue and headache were also other technological developments are contributing to the major health effects caused by noise pollution.
    [Show full text]