<<

Public Disclosure Authorized

C Additional Financing for IDP Revision Date: 20 Living Standards and August 2018 Livelihoods Project PIU Director: Sabir Ahmadov TTL: Robert Wrobel Credit : USD 66.7 mln Proc. Specialist: Emma Mammadkhanova Operations Officer: Nijat Veliyev PAS: Sandro Nozadze Program Assistant: Vusala Asadova Public Disclosure Authorized Contracts,Am Reception Short endments IDP Living Standards and Estimated Cost Contr. Prior / No Objection Company name Note Selection of Listing/RFP Invitation for Proposal Technical Final Contract (Amount, Actual Livelihoods Project Name Procurement Ref. # / Actual (USD) Type LS Post Ad of EOI No Objection No Objection to Sign Start Completion which is awarded

# Method Expression submssion RFP Submission Evaluation Evaluation Signature Days Date and of Assignment / Contract Type- incl VAT / TB Review Contract a contract

Category of Interest to the Bank Execution reason should

Plan Plan / Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval be indicated

Hiring the services of

Public Disclosure Authorized individual consultants for A about 300 contracts for IC-1 250,000.00 IC TB Post technical supervision over contracts implementation

p A- Micro-projects A

P 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Mammadov Local Technical Supervisor SFDI/8627-AZ/080 352.49 Public Disclosure Authorized A 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Farzali Vali P 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Hashimov Local Technical Supervisor SFDI/8627-AZ/081 352.49 Nariman A 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Qahraman

p 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Nabiyev Nasib Local Technical Supervisor SFDI/8627-AZ/082 352.49 A 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Qadim

p 352.49 IC Post 2/3/2017 2/3/2017 60 4/3/2017 Pashayev Qivami Local Technical Supervisor SFDI/8627-AZ/083 352.49 A 352.49 IC Post 2/3/2017 2/3/2017 60 4/3/2017 Hasan

p 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Nabiyev Nasib Local Technical Supervisor SFDI/8627-AZ/084 352.49 A 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Qadim

p 352.49 IC Post 2/3/2017 2/3/2017 60 4/3/2017 Mammadov Local Technical Supervisor SFDI/8627-AZ/085 352.49 A 352.49 IC Post 2/3/2017 2/3/2017 60 4/3/2017 Tariyel Davud

p 352.49 IC Post 3/14/2017 3/14/2017 60 5/15/2017 Huseynov Niyazi Local Technical Supervisor SFDI/8627-AZ/088 352.49 A 352.49 IC Post 3/14/2017 3/14/2017 60 5/15/2017 Bahadur

p 352.49 IC Post 7/14/2017 7/14/2017 60 9/14/2017 Sadighov Local Technical Supervisor SFDI/8627-AZ/164 352.49 A 352.49 IC Post 7/14/2017 7/14/2017 60 9/14/2017 Soltanagha Taghi p 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Mammadov Local Technical Supervisor SFDI/8627-AZ/165 352.49 A 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Tariyel Davud

p 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Nabiyev Nasib Local Technical Supervisor SFDI/8627-AZ/166 352.49 A 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Qadim

p 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Pashayev Qivami Local Technical Supervisor SFDI/8627-AZ/167 352.49 A 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Hasan

p 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Mammadov Local Technical Supervisor SFDI/8627-AZ/168 352.49 A 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Shuriya

p 528.73 IC Post 7/20/2017 7/20/2017 90 10/20/2017 Pashayev Qivami Local Technical Supervisor SFDI/8627-AZ/171 528.73 A 528.73 IC Post 7/20/2017 7/20/2017 90 10/20/2017 Hasan

p 528.73 IC Post 7/20/2017 7/20/2017 90 10/20/2017 Hashimov Local Technical Supervisor SFDI/8627-AZ/172 528.73 Nariman A 528.73 IC Post 7/20/2017 7/20/2017 90 10/20/2017 Qahraman p 528.73 IC Post 7/20/2017 7/20/2017 90 10/20/2017 Aslanov Asgar Local Technical Supervisor SFDI/8627-AZ/173 528.73 A 528.73 IC Post 7/20/2017 7/20/2017 90 10/20/2017 Musa p 528.73 IC Post 7/24/2017 7/24/2017 90 10/24/2017 Hashimov Local Technical Supervisor SFDI/8627-AZ/174 528.73 Nariman A 528.73 IC 7/24/2017 7/24/2017 90 10/24/2017 Post Qahraman p 528.73 IC Post 8/2/2017 8/2/2017 90 11/2/2017 Verdiyev Chingiz Local Technical Supervisor SFDI/8627-AZ/181 528.73 A 528.73 IC Post 8/2/2017 8/2/2017 90 11/2/2017 Seyyaf

p 528.73 IC Post 8/2/2017 8/2/2017 90 11/2/2017 Asadov Vaqif Local Technical Supervisor SFDI/8627-AZ/182 528.73 Boran A A A A A A A A A A A A A A A A A A A P P P P P P P P P P P 1 P P P P P P P P Plan vs./ Actual A- Micro-projects A- Rehabilitationinternallof roads,"Aghjabedi", village, Aran "Aran-2" community,SFDI/8096-AZ/785 Rehabilitation,construction additionalof classrooms equipmentand supply schoolof , Iravanli water,roads,electricity,etc.) micro-projectsSummarythe potable of as works,such (small-valuerehabilitation Constructionadditionalof classrooms forthe school, Goranboy, Kohna Meshali village, school Rehabilitationequipmentand supply, Bakucity, Yasamal district, dormitory2 # Sharifzadeh 4, str., of Rehabilitationequipmentand supply school,of , Chaykand village, Chaykand village, “Tahsil” Rehabilitationequipmentand supply Lachinof region school city,3, # settlement,Sabunchu Installationheatingof system inthe school landscapingand schoolyardof ,Sumgayit, Kimyachilar Boringsub-artesianof well Goranboy, Hamanli village, “” community,SFDI/8096-AZ/745 Rehabilitationequipmentand supply, Sumgayit city, Jorat settlment, region, school #11, Rehabilitationkindergartenof ,, Tazakand village, “Tazakand” community, SFDI/8096- Rehabilitationinternallof roads, , Orujlu village, "Yeddi evler",SFDI/8096-AZ/784, Lot 2 settlement,streetS.Vurgun 3, school “Khudafarin” #6, community, SFDI/8096-AZ/726 Rehabilitationequipment and supply kindergarten,,of Vidadistreet kindergarten 1, #3, Rehabilitationinternallof roads,Barda region, Birinji Gazakhlar village, SFDI/8096-AZ/713 Rehabilitationlocalof roads,Barda, Mollali village, “Mollali” community,SFDI/8096-AZ/694 Cleaningcanalof , Shukurbayli village, “Shukurbayli” community,SFDI/8096-AZ/702 Rehabilitationinternallof roads, region, Husaynli village, SFDI/8096-AZ/724, Lot 1 Rehabilitationlocalof roads,, farmsinthe territory Bayimliof settlement,”Bayimli” ASEU, Aghdam region, ASEU, school "Birlik" , #88 community, SFDI/8096-AZ/774,Lot 2 Rehabilitationwaterof pipeline, Barda region, Əliyanlı village,SFDI/8096-AZ/775 village,Kalbajar Vocational School, “Zaka” community SFDI/8096-AZ/698,Lot 2 #100, “Zaylik” #100, community SFDI/8096-AZ/698,Lot 1 "Zangilan-11"community, SFDI/8096-AZ/792 “Chichak”community SFDI/8096-AZ/712 secondaryschool 68,SFDI/8096-AZ/760# Name of Assignment/Contract Nameof community,SFDI/8096-AZ/749 community,SFDI/8096-AZ/657 9/12/20180:00 AZ/699 Procurement# Ref. SFDI/8627-AZ/028 SFDI/8627-AZ/027 SFDI/8627-AZ/026 SFDI/8627-AZ/024 SFDI/8627-AZ/023 SFDI/8627-AZ/020 SFDI/8627-AZ/019 SFDI/8627-AZ/016 SFDI/8627-AZ/015 SFDI/8627-AZ/013 SFDI/8627-AZ/012 SFDI/8627-AZ/011 SFDI/8627-AZ/008 SFDI/8627-AZ/007 SFDI/8627-AZ/006 SFDI/8627-AZ/004 SFDI/8627-AZ/002 SFDI/8627-AZ/001 3 A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A 4 Type-Category Not e # e NCB/SH NCB/SH Method Proc. NCB NCB SH SH SH SH SH SH SH SH SH SH SH SH SH SH SH SH 9 / Post Review /Post Review /Post Review Prior /Post Review Review Prior Prior Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 10 to the Bank theto Submission 3/3/2017 11

7 Days Interval Objection 3/10/2017 No No 12

7 Days Interval 11/23/2015 12/21/2015 11/30/2015 11/28/2015 11/20/2015 11/29/2015 11/19/2015 12/21/2015 11/30/2015 11/29/2015 11/24/2015 11/29/2015 11/23/2015 11/28/2015 19,04,2016 Invitation 2/19/2016 12/3/2015 2/18/2016 4/22/2016 3/15/2016 2/18/2016 4/20/2016 12/5/2015 2/12/2016 2/19/2016 2/18/2016 4/21/2016 2/22/2016 12/3/2015 12/1/2015 2/18/2016 11/3/2015 12/5/2015 2/18/2016 2/22/2016 3/17/2017 5/2/2016 13

14 14 30 14 14 14 14 14 14 14 14 14 30 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 Days Interval Bid OpeningBid 12/17/2015 12/14/2015 12/12/2015 12/19/2015 12/13/2015 12/17/2015 12/14/2015 12/13/2015 12/15/2015 11/17/2015 12/13/2015 12/19/2015 12/12/2015 03,05,2016 3/18/2016 12/7/2015 12/4/2015 12/3/2015 12/8/2015 5/16/2016 12/7/2015 3/31/2017 3/3/2016 5/6/2016 1/5/2016 4/7/2016 3/2/2015 5/4/2016 3/9/2016 3/3/2016 3/3/2016 5/5/2016 1/5/2016 3/7/2016 3/2/2016 3/2/2016 3/7/2016 14 11 4 2 2 4 2 4 2 1 2 1 2 6 2 1 2 1 2 1 2 3 2 1 2 2 2 2 2 1 2 1 2 2 2 3 2 7 Days Interval Evaluation& 12/19/2015 12/16/2015 12/14/2015 12/21/2015 12/15/2015 12/19/2015 12/15/2015 12/15/2015 12/17/2015 12/10/2015 11/18/2015 12/15/2015 12/21/2015 12/14/2015 3/29/2016 12/9/2015 5/10/2015 4/11/2016 3/15/2016 12/6/2015 12/5/2015 3/10/2016 5/17/2016 12/9/2015 3/10/2016 Recomm. 3/7/2016 1/7/2016 3/3/2016 5/5/2016 3/4/2016 3/4/2016 5/6/2016 1/7/2016 5/5/2016 3/4/2016 3/4/2016 4/7/2017 15

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 Days Interval No Objection No 4/12/2017 + PSC+ 16

5 Days Interval 12/20/2015 12/10/2015 12/17/2015 12/15/2015 12/22/2015 12/16/2015 12/20/2015 12/15/2015 12/16/2015 12/18/2015 12/11/2015 11/19/2015 12/16/2015 12/22/2015 12/10/2015 12/15/2015 3/30/2016 5/10/2016 4/12/2016 3/16/2016 12/7/2015 12/6/2015 3/11/2016 5/18/2016 3/11/2016 4/17/2017 Contract 3/8/2016 1/8/2016 3/4/2016 5/6/2016 3/5/2016 3/5/2016 5/6/2016 1/8/2016 5/6/2016 3/5/2016 3/5/2016 Award 17 10 13 11 27 35 12 13 27 33 23 15 1 5 1 1 2 1 1 1 1 1 1 1 4 1 2 1 1 1 5 1 1 1 1 7 1 3 Days Interval 12/21/2015 12/11/2015 12/18/2015 12/16/2015 12/23/2015 12/17/2015 12/21/2015 12/17/2015 12/17/2015 12/19/2015 12/12/2015 11/24/2015 12/17/2015 12/23/2015 12/11/2015 12/16/2015 Siganture 3/18/2016 4/14/2016 3/15/2016 4/20/2016 12/8/2015 3/18/2016 3/18/2016 12/7/2015 3/15/2016 3/29/2016 3/18/2016 4/20/2017 Contarct 4/5/2016 6/2/2016 1/9/2016 6/2/2016 6/2/2016 1/9/2016 6/8/2016 6/2/2016 3/6/2016 18

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 9 1 1 1 3 Days Interval 12/22/2015 12/12/2015 12/19/2015 12/17/2015 12/24/2015 12/18/2015 12/22/2015 12/18/2015 12/18/2015 12/20/2015 12/13/2015 11/25/2015 12/18/2015 12/24/2015 12/12/2015 12/17/2015 3/19/2016 1/10/2016 4/15/2016 3/16/2016 4/21/2016 12/9/2015 3/19/2016 3/19/2016 12/8/2015 1/10/2016 3/16/2016 3/30/2016 3/15/2016 3/19/2016 4/23/2017 4/6/2016 6/3/2016 6/3/2016 6/3/2016 6/9/2016 5/3/2016 Start 19 P A 11/24/2015 14 12/8/2015 2 12/10/2015 1 12/11/2015 1 12/12/2015 1 12/13/2015

SFDI/8627-AZ/030 SH Post A A 2/22/2016 14 3/7/2016 3 3/10/2016 1 3/11/2016 17 3/28/2016 1 3/29/2016 Rehabilitation and equipment supply of school building Baku, Yasamal district, Sharifzadeh street 1, music school of Aybasanli village of Fizuli, "Aybasanlı" community,SFDI/8096-AZ/716 P A 11/28/2015 14 12/12/2015 2 12/14/2015 1 12/15/2015 1 12/16/2015 1 12/17/2015 SFDI/8627-AZ/031 SH Post A Rehabilitation of local roads,Aghdam, Orta Garvand village, “Najilar” community, SFDI/8096-AZ/691 A 11/26/2015 14 12/10/2015 1 12/11/2015 1 12/12/2015 6 12/18/2015 1 12/19/2015 P A 11/16/2015 14 11/30/2015 2 12/2/2015 1 12/3/2015 1 12/4/2015 1 12/5/2015 Construction of power supply system,Barda, Mammadli village, “Mammadli” community, SFDI/8096- SFDI/8627-AZ/032 NCB Post A AZ/650 A 10/29/2015 30 11/26/2015 4 11/30/2015 1 12/1/2015 14 12/15/2015 1 12/16/2015

P A 12/4/2015 14 12/18/2015 2 12/20/2015 1 12/21/2015 1 12/22/2015 1 12/23/2015 Rehabilitation of internall roads, region, Chinarli settlement, SFDI/8096-AZ/757 SFDI/8627-AZ/033 SH Post A A 3/15/2016 14 4/7/2016 1 4/8/2016 1 4/9/2016 3 4/12/2016 1 4/13/2016 P A 12/1/2015 14 12/15/2015 2 12/17/2015 1 12/18/2015 1 12/19/2015 1 12/20/2015 Repair of school mounting of additional classrooms, Yevlax, Qoyunbinəsi kəndi, Kəlbəcər,42 saylı tam SFDI/8627-AZ/034 SH Post A A 3/16/2016 14 4/8/2016 3 4/11/2016 1 4/12/2016 4/12/2016 1 13,04,2016 orta, "Javid" community,SFDI/8096-AZ/761 P A 12/1/2015 14 12/15/2015 2 12/17/2015 1 12/18/2015 1 12/19/2015 1 12/20/2015 Rehabilitation and equipment supply of Garabulag village school, Garabulag village,Goygol SFDI/8627-AZ/035 SH Post A A 3/15/2016 14 4/7/2016 4 4/11/2016 1 4/12/2016 1 4/13/2016 1 4/14/2016 region,SFDI/8096-AZ/759 P A 11/15/2015 14 11/29/2015 2 12/1/2015 1 12/2/2015 1 12/3/2015 1 12/4/2015

Construction of power supply system,Samukh region, Bozdagh residential area, “Bozdagh” community, SFDI/8627-AZ/036 NCB Post A SFDI/8096-AZ/647 A 10/28/2015 14 11/25/2015 2 11/27/2015 1 11/28/2015 13 12/11/2015 1 12/12/2015

P A 11/21/2015 14 12/5/2015 2 12/7/2015 1 12/8/2015 1 12/9/2015 1 12/10/2015 Construction of drainage channel , Takhtakorpu area, “Rauf” community,SFDI/8096-AZ/748 SFDI/8627-AZ/038 NCB Post A A 2/18/2016 30 3/18/2016 23 4/1/2016 1 4/2/2016 6 4/8/2016 1 4/9/2016 P A SH 11/29/2015 14 12/13/2015 2 12/15/2015 1 12/16/2015 1 12/17/2015 1 12/18/2015 Rehabilitation and equipment supply of Fuzuli region school # 48, Baku city, Binagadi district, SFDI/8627-AZ/039 Post A Darnagul settlement, K.Rahimov street 70,SFDI/8096-AZ/758, Lot 1 A 3/15/2016 14 4/7/2016 1 4/8/2016 1 4/9/2016 5 4/14/2016 1 4/15/2016 P A 12/2/2015 14 12/16/2015 2 12/18/2015 1 12/19/2015 1 12/20/2015 1 12/21/2015

SFDI/8627-AZ/040 Post A Reconstruction of thr additional classrooms and provision with eqipment of Lachin region, high school A NCB 2/20/2016 38 3/28/2016 8 4/5/2016 1 1/6/2016 15 4/21/2016 1 4/22/2016 # 46 located in "Hovsan sudchuluk state farm", Bina settlement, Khazar district, Baku city SFDI/8096- AZ/750 P A 12/2/2015 14 12/16/2015 2 12/18/2015 1 12/19/2015 1 12/20/2015 1 12/21/2015

SFDI/8627-AZ/041 SH Post A A 2/22/2016 14 3/7/2016 3 3/10/2016 1 3/11/2016 7 3/18/2016 1 3/19/2016 Rehabilitation, construction of additional classrooms and equipment supply of Aghdam region, Kichikli village school located in Kichikli village, Aghdam region, SFDI/8096-AZ/725 P A 11/25/2015 14 12/9/2015 2 12/11/2015 1 12/12/2015 1 12/13/2015 1 12/14/2015

Rehabilitation and equipment supply of school Baku, Khatai district, support building of Marine SFDI/8627-AZ/043 SH Post A School, Fizuli region school #46, “Argunash” community, SFDI/8096-AZ/693 A 11/27/2015 14 12/11/2015 3 12/14/2015 1 12/15/2015 6 12/21/2015 1 12/22/2015

P A 12/2/2015 14 12/16/2015 2 12/18/2015 1 12/19/2015 1 12/20/2015 1 12/21/2015

SFDI/8627-AZ/044 SH Post A A 14 1 4/8/2016 1 4/9/2016 5 4/14/2016 1 4/15/2016 Rehabilitation and equipment supply of school Baku, Neapol area ,43, # 2 Baku Vocational Liseum, of Lachin region school #20, “Turan” community, SFDI/8096-AZ/758,Lot 2 3/15/2016 4/7/2016 P A 12/4/2015 14 12/18/2015 2 12/20/2015 1 12/21/2015 1 12/22/2015 1 12/23/2015 SFDI/8627-AZ/046 SH Post A A 2/22/2016 14 3/7/2016 3 3/10/2016 1 3/11/2016 7 3/18/2016 1 3/19/2016 Rehabilitation of internall roads, Goygol region, Mollajalilli village, SFDI/8096-AZ/715 P A 11/22/2015 14 12/6/2015 2 12/8/2015 1 12/9/2015 1 12/10/2015 1 12/11/2015 Rehabilitation of drinking water supply system , Kalband village, “Kalband” community, SFDI/8627-AZ/047 NCB Post A SFDI/8096-AZ/747 A 2/18/2016 30 3/18/2016 12 3/30/2016 1 3/31/2016 15 4/15/2016 1 4/15/2016 P A 12/6/2015 14 12/20/2015 2 12/22/2015 1 12/23/2015 1 12/24/2015 1 12/25/2015 Rehabilitation of internall roads, Yevlax, "Kolani" community, Kolani village,SFDI/8096-AZ/794 SFDI/8627-AZ/048 SH Post A A 5/18/2016 14 6/1/2016 1 6/2/2016 1 6/3/2016 18 6/21/2016 1 6/22/2016 P Rehabilitation, construction of additional classrooms and equipment supply of Sumgayıt city A SH Post 12/2/2015 14 12/16/2015 2 12/18/2015 1 12/19/2015 1 12/20/2015 1 12/21/2015 H.Z.Taghiyev settlement, Lachın region, Jijimli village school, "Qayghı" community SFDI/8627-AZ/055 A A SH Post 14 1 4/14/2016 1 4/15/2016 10 4/25/2016 1 4/26/2016 SFDI/8096-AZ/773 3/31/2016 4/13/2016 P A 12/3/2015 14 12/17/2015 2 12/19/2015 1 12/20/2015 1 12/21/2015 1 12/22/2015

SFDI/8627-AZ/056 SH Post A A 4/21/2016 14 5/5/2016 11 5/6/2016 1 5/7/2016 27 6/3/2016 1 6/4/2016 Rehabilitation of internall roads, Oghuz region, Karimli village, Karimli community, SFDI/8096- AZ/784,Lot 1 P A 12/4/2015 14 12/18/2015 2 12/20/2015 1 12/21/2015 1 12/22/2015 1 12/23/2015 SFDI/8627-AZ/062 SH Post A A 2/18/2016 14 3/2/2016 1 3/3/2016 1 3/4/2016 11 3/15/2016 1 3/16/2016 Rehabilitation of internall roads, Goygol region, Jumshudlu village, SFDI/8096-AZ/700 P A 11/23/2015 14 12/7/2015 2 12/9/2015 1 12/10/2015 1 12/11/2015 1 12/12/2015 Rehabilitation of school, construction of additional classrooms and supply with equipment , SFDI/8627-AZ/063 SH Post Gushchu village, Kalbajar region school #71, “Hopuzlu” community, SFDI/8096-AZ/714 Rehabilitation of school, construction of additional classrooms and supply with equipment Dashkasan, SFDI/8627-AZ/063 SH Post A A 2/22/2016 14 3/7/2016 3 3/10/2016 1 3/11/2016 7 3/18/2016 1 3/19/2016 Gushchu village, Kalbajar region school #71, “Hopuzlu” community, SFDI/8096-AZ/714 P A 11/27/2015 14 12/11/2015 2 12/13/2015 1 12/14/2015 1 12/15/2015 1 12/16/2015

SFDI/8627-AZ/064 SH Post A A 2/12/2016 28 3/9/2016 5 3/14/2016 32 4/11/2016 3 4/15/2016 1 4/16/2016 Rehabilitation of local roads Imishli, Hajirustamli village, "Mughangöl" community,SFDI/8096-AZ/746 P A 12/5/2015 14 12/19/2015 2 12/21/2015 1 12/22/2015 1 12/23/2015 1 12/24/2015 Construction of dyke, Goranboy region, area of Ashaghi Aghjakand village,SFDI/8096-AZ/786 SFDI/8627-AZ/065 SH Post A A 14 4 5/10/2016 1 5/11/2016 23 6/3/2016 1 6/4/2016 4/22/2016 5/6/2016 P A P A Prior P NCB/SH 3/7/2017 7 3/14/2017 7 3/21/2017 14 4/4/2017 7 4/10/2017 5 4/15/2017 5 4/20/2017 3 4/23/2017 3 4/26/2017 Approximately 60 contracts for implementation of micro-projects will be signed / Post Review Prior A during the first 18 months after project effectiveness NCB/SH / Post Review P A SH Post 12/14/2016 14 12/28/2016 2 12/30/2016 1 1/1/2017 3 1/4/2017 11 1/15/2017 Rehabilitation and equipment supply of Zangilan region school # 8, Baku city, Narimanov region, SFDI/8627-AZ/070 A Hidayatzadeh street # 166 A SH Post 2/3/2017 14 2/17/2017 10 2/27/2017 1 2/28/2017 14 3/14/2017 1 3/15/2017

P A SH Post 12/7/2016 14 12/21/2016 5 12/26/2016 1 12/27/2016 3 12/30/2016 11 1/10/2017 Rehabilitation and equipment supply of Zangilan region # 24 school, Baku city,Nizami region,# 5 State SFDI/8627-AZ/071 A chemistry-biology tendentiously school A SH Post 1/6/2017 18 1/24/2017 2 1/26/2017 1 1/27/2017 13 2/9/2017 1 2/10/2017

P Rehabilitation of kindergarten and provision with module type classrooms, Goygol region, Balchili A SH Post 12/7/2016 14 12/21/2016 5 12/26/2016 1 12/27/2016 3 12/30/2016 11 1/10/2017 SFDI/8627-AZ/072 A village A SH Post 1/6/2017 18 1/24/2017 2 1/26/2017 1 1/27/2017 13 2/9/2017 1 2/10/2017 P A SH Post 12/7/2016 14 12/21/2016 5 12/26/2016 1 12/27/2016 3 12/30/2016 11 1/10/2017 Gəncə şəhəri, Gülüstan qəsəbəsi, Qocalar evinin ətrafı, "Şişqaya" icması Daxili yolların bərpası SFDI/8627-AZ/073 A A SH Post 1/10/2017 15 1/25/2017 2 1/27/2017 1 1/28/2017 12 2/9/2017 1 2/10/2017 P A SH Post 12/12/2016 14 12/26/2016 15 1/10/2017 1 1/11/2017 5 1/16/2017 1 1/17/2017 Rehabilitation of internall roads, Goranboy region, Goran settlement, "Goran" community SFDI/8627-AZ/074 A A SH Post 1/6/2017 18 1/24/2017 2 1/26/2017 1 1/27/2017 7 2/3/2017 1 2/4/2017 P A SH Post 12/12/2016 14 12/26/2016 15 1/10/2017 1 1/11/2017 5 1/16/2017 1 1/17/2017 Rehabilitation of internall roads, Gazakh region, Khanliglar village SFDI/8627-AZ/075 A A SH Post 1/6/2017 18 1/24/2017 2 1/26/2017 1 1/27/2017 13 2/9/2017 1 2/10/2017 P Rehabilitation of internall roads, Aghdam region, Uchoghlan municipality,"Baharli and Ballar" A SH Post 12/12/2016 14 12/26/2016 15 1/10/2017 1 1/11/2017 5 1/16/2017 1 1/17/2017 SFDI/8627-AZ/076 A community A SH Post 1/10/2017 15 1/25/2017 2 1/27/2017 1 1/28/2017 6 2/3/2017 1 2/4/2017 P A SH Post 8/5/2017 14 8/19/2017 2 8/21/2017 1 8/22/2017 6 8/28/2017 1 8/29/2017 Rehabilitation and equipment supply of school Yevlakh, new settlement, Kalbajar school #30, “Amil” CW-100 A community,SFDI/8627-AZ/206 A SH Post 8/30/2017 14 9/15/2017 7 9/22/2017 1 9/23/2017 6 9/29/2017 1 9/30/2017

P Rehabilitation of school, construction of additional classrooms and equipment supply Yevlakh, Meyvali A SH Post 8/5/2017 14 8/19/2017 2 8/21/2017 1 8/22/2017 6 8/28/2017 1 8/29/2017 CW-101 A village, Kalbajar school #86, “Malak” community, SFDI/8627-AZ/159, Lot 1 A SH Post 7/11/2017 14 7/25/2017 1 7/26/2017 1 7/27/2017 6 8/2/2017 1 8/3/2017 P Rehabilitation of school, construction of additional classrooms and equipment supply Yevlakh, territory A SH Post 8/5/2017 14 8/19/2017 2 8/21/2017 1 8/22/2017 6 8/28/2017 1 8/29/2017 CW-102 A of cotton gin plant, Kalbajar school #85, “Gochdash”, SFDI/8627-AZ/156 A SH Post 6/20/2017 17 7/7/2017 1 7/8/2017 1 7/9/2017 11 7/20/2017 1 7/21/2017 P Rehabilitation of school, construction of additional classrooms and equipment supply Yevlakh, Aran A SH Post 8/10/2017 14 8/24/2017 2 8/26/2017 1 8/27/2017 6 9/2/2017 1 9/3/2017 CW-103 A settlement, Aghdam school #101, “Goytapa” community, SFDI/8627-AZ/159, Lot 2 A SH Post 7/11/2017 14 7/25/2017 1 7/26/2017 1 7/27/2017 6 8/2/2017 1 8/3/2017 P Rehabilitation of school, construction of additional classrooms and equipment supply , A SH Post 8/10/2017 14 8/24/2017 2 8/26/2017 1 8/27/2017 6 9/2/2017 1 9/3/2017 CW-104 A Shafa garden suburb, Kalbajar school #114, “Soyugbulag” community, SFDI/8627-AZ/188 A SH Post 8/4/2017 14 8/18/2017 4 8/22/2017 1 8/23/2017 8 8/31/2017 1 9/1/2017 P Rehabilitation of school, construction of additional classrooms and equipment supply Mingachevir, A SH Post 8/10/2017 14 8/24/2017 2 8/26/2017 1 8/27/2017 6 9/2/2017 1 9/3/2017 territory of AzDRES, settlement #3, Aghdam school #128, “Shahbulag” community, CW-105 A A SH Post 6/21/2017 19 7/10/2017 1 7/11/2017 1 7/12/2017 8 7/20/2017 1 7/21/2017 SFDI/8627-AZ/157, Lot 1 P A SH Post 8/15/2017 14 8/29/2017 2 8/31/2017 1 9/1/2017 6 9/7/2017 1 9/8/2017 Rehabilitation of school, construction of additional classrooms and equipment supply Mingachevir, CW-106 A Gunashli residential area, Aghdam school #139 “Gunashlii” community, SFDI/8627-AZ/157, Lot 2 A SH Post 6/21/2017 19 7/10/2017 1 7/11/2017 1 7/12/2017 8 7/20/2017 1 7/21/2017

P Construction and equipment supply of additional classrooms Goranboy, New settlement, Kalbajar A SH Post 8/15/2017 14 8/29/2017 2 8/31/2017 1 9/1/2017 6 9/7/2017 1 9/8/2017 CW-107 A school #33, “Bahar” community, SFDI/8627-AZ/160 A SH Post 7/11/2017 14 7/25/2017 1 7/26/2017 1 7/27/2017 7 8/4/2017 1 8/5/2017 P Construction and equipment supply of additional classrooms Ganja, Gizildaya settlement, Kalbajar A SH Post 8/15/2017 14 8/29/2017 2 8/31/2017 1 9/1/2017 6 9/7/2017 1 9/8/2017 CW-108 A school #122, “Mammadoghlu” community, SFDI/8627-AZ/158 A SH Post 6/22/2017 19 7/11/2017 1 7/12/2017 1 7/13/2017 7 7/20/2017 1 7/21/2017 P A SH Post 8/20/2017 14 9/3/2017 2 9/5/2017 1 9/6/2017 6 9/12/2017 1 9/13/2017 Construction and equipment supply of additional classrooms Shamkir, dormitory of the Vocational CW-109 A Lyceum, Kalbajar school #74, “Aykhan” community, SFDI/8627-AZ/189 A SH Post 8/4/2017 14 8/18/2017 4 8/22/2017 1 8/23/2017 3 8/25/2017 1 8/26/2017

P Rehabilitation of school, construction of heating system and equipment supply of school Baku, Khazar A SH Post 8/20/2017 14 9/3/2017 2 9/5/2017 1 9/6/2017 6 9/12/2017 1 9/13/2017 CW-110 A district, Bina settlement, Kalbajar school #37, “Ojag” community, SFDI/8627-AZ/207 A SH Post 8/30/2017 14 9/15/2017 7 9/22/2017 1 9/23/2017 10 10/3/2017 1 10/4/2017 P A SH Post 8/20/2017 14 9/3/2017 2 9/5/2017 1 9/6/2017 6 9/12/2017 1 9/13/2017 Rehabilitation of school, construction of heating system and equipment supply of school Baku, Sabail CW-111 A district, Badamdar settlement, Lachin secondary school, “Sama” community A SH Post

P A SH Post 8/25/2017 14 9/8/2017 2 9/10/2017 1 9/11/2017 6 9/17/2017 1 9/18/2017 Rehabilitation of school, construction of heating system and equipment supply of school , “Nubar” settlement, Atyali residential area, Khanlig village school #3 of Gubadly, “Khanlig-3” CW-112 A A SH Post 7/31/2017 14 8/14/2017 1 8/15/2017 8/16/2017 6 8/22/2017 1 8/23/2017 community, SFDI/8627-AZ/177, Lot 1

P Rehabilitation of school, construction of heating system and equipment supply of school Absheron A SH Post 8/25/2017 14 9/8/2017 2 9/10/2017 1 9/11/2017 6 9/17/2017 1 9/18/2017 district, Masazir settlement, Gazyan village school of Gubadly, “Gazyan” community, SFDI/8627- CW-113 AZ/177, Lot 2 Rehabilitation of school, construction of heating system and equipment supply of school Absheron district, Masazir settlement, Gazyan village school of Gubadly, “Gazyan” community, SFDI/8627- CW-113 A A SH Post 7/31/2017 14 8/14/2017 1 8/15/2017 8/16/2017 6 8/22/2017 1 8/23/2017 AZ/177, Lot 2 P Rehabilitation of school, construction of heating system and equipment supply of school Sumgayit, A SH Post 8/25/2017 14 9/8/2017 2 9/10/2017 1 9/11/2017 6 9/17/2017 1 9/18/2017 Yashildara residential area, Khidirli village school of Gubadly, “Tahsil” community, SFDI/8627- CW-114 A A SH Post 8/1/2017 14 8/15/2017 1 8/16/2017 8/16/2017 6 8/22/2017 1 8/23/2017 AZ/178, Lot 1 P Rehabilitation of school, construction of heating system and equipment supply of school Sumgayit, A SH Post 8/25/2017 14 9/8/2017 2 9/10/2017 1 9/11/2017 6 9/17/2017 1 9/18/2017 Inshaatchilar settlement, yard of the school #9, Lachin school #12, “Lachin” community, SFDI/8627- CW-115 A A SH Post 8/1/2017 14 8/15/2017 1 8/16/2017 1 8/17/2017 4 8/21/2017 1 8/22/2017 AZ/178, Lot 2

P A SH Post 8/30/2017 14 9/13/2017 2 9/15/2017 1 9/16/2017 6 9/22/2017 1 9/23/2017 Construction and equipment supply of the additional classrooms Barda, Guloghlular village, Kalbajar CW-116 A school #45, “Ashiglar” community, SFDI/8627-AZ/208 A SH Post 8/30/2017 14 9/15/2017 7 9/22/2017 1 9/23/2017 6 9/29/2017 1 9/30/2017

P A SH Post 8/30/2017 14 9/13/2017 2 9/15/2017 1 9/16/2017 6 9/22/2017 1 9/23/2017 Rehabilitation of school, construction of heating system and equipment supply of school Barda, Shatirli CW-117 A village, Kalbajar school #43, “Chinarlar” community, SFDI/8627-AZ/190, Lot 1 A SH Post 8/7/2017 14 8/21/2017 1 8/22/2017 1 8/23/2017 8 8/31/2017 1 9/1/2017

P Construction and equipment supply of the additional classrooms Barda, Jayirli village, Kalbajar school A SH Post 8/30/2017 14 9/13/2017 2 9/15/2017 1 9/16/2017 6 9/22/2017 1 9/23/2017 CW-118 A #104, “Jayirli” community, SFDI/8627-AZ/190, Lot 2 A SH Post 8/7/2017 14 8/21/2017 1 8/22/2017 1 8/23/2017 2 8/25/2017 1 8/26/2017 P A SH Post 8/30/2017 14 9/13/2017 2 9/15/2017 1 9/16/2017 6 9/22/2017 1 9/23/2017 Rehabilitation and equipment supply of the hospital Aghdam, Khindiristan, CW-119 A “Sarichoban” community, SFDI/8627-AZ/214 A SH Post 9/8/2017 14 9/22/2017 3 9/25/2017 1 9/26/2017 9 10/5/2017 1 10/6/2017

P A SH Post 9/5/2017 14 9/19/2017 2 9/21/2017 1 9/22/2017 6 9/28/2017 1 9/29/2017 Repair of inner roads Sumgayıt city, “Khazar” gardens residential area, “Khazar” community, CW-121 A SFDI/8627-AZ/179 A SH Post 8/2/2017 14 8/16/2017 5 8/21/2017 1 8/22/2017 2 8/24/2017 1 8/25/2017

P Repair of inner roads Fizuli district, Ashagi Yaglivand village, “Ashagi Yaglivand” community, A SH Post 9/5/2017 14 9/19/2017 2 9/21/2017 1 9/22/2017 6 9/28/2017 1 9/29/2017 CW-122 A SFDI/8627-AZ/152, Lot 1 A SH Post 6/19/2017 17 7/6/2017 1 7/7/2017 1 10 7/18/2017 1 7/19/2017 P Rehabilitation of inner roads Fizuli district, Shukurbayli rural area, “Seyid Akhmadli” community, A SH Post 9/5/2017 14 9/19/2017 2 9/21/2017 1 9/22/2017 6 9/28/2017 1 9/29/2017 CW-123 A SFDI/8627-AZ/152, Lot 2 A SH Post 6/19/2017 17 7/6/2017 1 7/7/2017 1 7/8/2017 10 7/18/2017 1 7/19/2017 P A SH Post 9/5/2017 14 9/19/2017 2 9/21/2017 1 9/22/2017 6 9/28/2017 1 9/29/2017 Rehabilitation of power supply system Aghjabedi district, Aran village, “On uch oba” community, CW-124 A SFDI/8627-AZ/161 A SH Post 7/13/2017 14 7/27/2017 1 7/28/2017 1 7/29/2017 4 8/2/2017 1 8/3/2017

P A SH Post 9/10/2017 14 9/24/2017 2 9/26/2017 1 9/27/2017 6 10/3/2017 1 10/4/2017 Rehabilitation of power supply system Aghjabedi district, Tazakand village, “Tazakand” community, CW-125 A SFDI/8627-AZ/191 A SH Post 8/4/2017 14 8/18/2017 4 8/22/2017 1 8/23/2017 3 8/25/2017 1 8/26/2017

P A SH Post 9/10/2017 14 9/24/2017 2 9/26/2017 1 9/27/2017 6 10/3/2017 1 10/4/2017 Repair of inner roads , Harami plain, “Harami” community,SFDI/8627-AZ/153 CW-126 A A SH Post 6/20/2017 17 7/7/2017 1 7/8/2017 1 7/9/2017 9 7/18/2017 1 7/19/2017 P A SH Post 9/10/2017 14 9/24/2017 2 9/26/2017 1 9/27/2017 6 10/3/2017 1 10/4/2017 Repair of inner roads , Turkman village, “Turkman” community, SFDI/8627- CW-127 A AZ/162 A SH Post 7/12/2017 14 7/26/2017 1 7/27/2017 1 7/28/2017 5 8/2/2017 1 8/3/2017

P Rehabilitation of access and inner roads , Havarli village, “Havarli” A SH Post 9/10/2017 14 9/24/2017 2 9/26/2017 1 9/27/2017 6 10/3/2017 1 10/4/2017 CW-128 A community,SFDI/8627-AZ/155 A SH Post 6/21/2017 19 7/10/2017 1 7/11/2017 1 7/12/2017 6 7/18/2017 1 7/19/2017 P A SH Post 9/15/2017 14 9/29/2017 2 10/1/2017 1 10/2/2017 6 10/8/2017 1 10/9/2017 Rehabilitation of access and inner roads Yevlakh district, Tobacco plant area, “İshıqlı yollar” CW-129 A community, SFDI/8627-AZ/192 A SH Post 8/7/2017 14 8/21/2017 1 8/22/2017 1 8/23/2017 3 8/25/2017 1 8/26/2017

P Rehabilitation of irrigation system , Boru settlement (Khojalilar), “Yeni boru” A NCB Post 9/15/2017 14 9/29/2017 2 10/1/2017 1 10/2/2017 6 10/8/2017 1 10/9/2017 CW-130 A community, SFDI/8627-AZ/237 A NCB Post 12/20/2017 30 1/22/2018 P A SH Post 9/15/2017 14 9/29/2017 2 10/1/2017 1 10/2/2017 6 10/8/2017 1 10/9/2017 Rehabilitation of irrigation water supply Goranboy district, Meshali settlement, “New Meshali” CW-131 A community, SFDI/8627-AZ/215 A SH Post 9/8/2017 14 9/22/2017 3 9/25/2017 1 9/26/2017 8 10/4/2017 1 10/5/2017

P Rehabilitation of inner roads Goranboy district, Ashagi aghjakend, Yuxari aghjakend and Meshali A SH Post 9/15/2017 14 9/29/2017 2 10/1/2017 1 10/2/2017 6 10/8/2017 1 10/9/2017 CW-132 A settlements, “Ashagi aghjakend” community, SFDI/8627-AZ/193 A SH Post 8/7/2017 14 8/21/2017 1 8/22/2017 1 8/23/2017 8 8/31/2017 1 9/1/2017 P Rehabilitation of access and inner roads , Kukal village, “Kukal” community, A SH Post 9/20/2017 14 10/4/2017 2 10/6/2017 1 10/7/2017 6 10/13/2017 1 10/14/2017 CW-133 A SFDI/8627-AZ/163 A SH Post 7/12/2017 14 7/26/2017 1 7/27/2017 1 7/28/2017 5 8/2/2017 1 8/3/2017 P Rehabilitation of access and inner roads Agdash district, Yenikend village, “Yenikend” A SH Post 9/20/2017 14 10/4/2017 2 10/6/2017 1 10/7/2017 6 10/13/2017 1 10/14/2017 CW-134 A community,SFDI/8627-AZ/154 A SH Post 6/20/2017 17 7/7/2017 1 7/8/2017 1 7/9/2017 5 7/14/2017 1 7/14/2017 P Rehabilitation of inner roads , New residential area, “Kochkunlar” A NCB Post 9/20/2017 14 10/4/2017 2 10/6/2017 1 10/7/2017 6 10/13/2017 1 10/14/2017 CW-135 A community,SFDI/8627-AZ/238 A NCB Post 12/20/2017 30 1/22/2018 P Folding tents for public ceremonies in Baku, Darnagul settlement S. Bahlulzadeh-31 for "Dastak" A SH Post 9/25/2017 14 10/9/2017 2 10/11/2017 1 10/12/2017 6 10/18/2017 1 10/19/2017 CW-136 A community, SFDI/8627-AZ/136, Lot 1 A SH Post 5/12/2017 14 5/26/2017 5 5/30/2017 1 5/31/2017 30 6/29/2017 6/29/2017 P Folding tents for public ceremonies in Baku, Masazir settlement,Absheron district, "Chalbayir" A SH Post 9/25/2017 14 10/9/2017 2 10/11/2017 1 10/12/2017 6 10/18/2017 1 10/19/2017 CW-137 A community, SFDI/8627-AZ/136, Lot 2 A SH Post 5/12/2017 14 5/26/2017 5 5/30/2017 1 5/31/2017 14 6/14/2017 6/14/2017 P Folding tents for public ceremonies in region, Yeni IDPs settlement, "Araz" community A SH Post 9/25/2017 14 10/9/2017 2 10/11/2017 1 10/12/2017 6 10/18/2017 1 10/19/2017 CW-138 A SFDI/8627-AZ/136, Lot 3 A SH Post 5/12/2017 14 5/26/2017 5 5/30/2017 1 5/31/2017 30 6/30/2017 1 7/1/2017 P Folding tents for public ceremonies in Saatli region, Alisoltanli villiage, "Alisoltanli" community, A SH Post 9/25/2017 14 10/9/2017 2 10/11/2017 1 10/12/2017 6 10/18/2017 1 10/19/2017 CW-139 A SFDI/8627-AZ/137, Lot 1 A SH Post 5/15/2017 15 5/30/2017 1 5/31/2017 1 6/1/2017 29 6/30/2017 1 7/1/2017 P Folding tents for public ceremonies in Barda region, Alachadirli villiage and Concrete plant area A SH Post 9/30/2017 14 10/14/2017 2 10/16/2017 1 10/17/2017 6 10/23/2017 1 10/24/2017 CW-140 A ,"Aghdere" community, SFDI/8627-AZ/137, Lot 2 A SH Post 5/15/2017 15 5/30/2017 1 5/31/2017 1 6/1/2017 29 6/30/2017 1 7/1/2017 P Folding tents for public ceremonies in Goranboy region, Goranli villiage, "Merhemet" community, A SH Post 9/30/2017 14 10/14/2017 2 10/16/2017 1 10/17/2017 6 10/23/2017 1 10/24/2017 CW-141 A SFDI/8627-AZ/138, Lot 1 A SH Post 5/16/2017 15 5/31/2017 2 6/1/2017 1 6/1/2017 28 6/29/2017 1 6/30/2017 P Folding tents for public ceremonies in region, Ashaghi tala IDPs settlement, "Shimshek" A SH Post 9/30/2017 14 10/14/2017 2 10/16/2017 1 10/17/2017 6 10/23/2017 1 10/24/2017 CW-142 A community, SFDI/8627-AZ/138, Lot 2 A SH Post 5/16/2017 15 5/31/2017 1 6/1/2017 6/1/2017 33 7/3/2017 1 7/4/2017 P Folding tents for public ceremonies in Balaken region, IDPs settlement, "Balaken" community, A SH Post 9/30/2017 14 10/14/2017 2 10/16/2017 1 10/17/2017 6 10/23/2017 1 10/24/2017 CW-143 A SFDI/8627-AZ/139, Lot 1 A SH Post 5/17/2017 15 6/1/2017 1 6/2/2017 6/2/2017 31 7/3/2017 7/4/2017 P Folding tents for public ceremonies in Goygol region, Keremli village, "Keremli" community, A SH Post 10/5/2017 14 10/19/2017 2 10/21/2017 1 10/22/2017 6 10/28/2017 1 10/29/2017 CW-144 A SFDI/8627-AZ/139, Lot 2 A SH Post 5/17/2017 15 6/1/2017 1 6/2/2017 6/2/2017 12 6/14/2017 6/14/2017 P Folding tents for public ceremonies in Yevlakh region, Rustemli village, "Rustemli" community, A SH Post 10/5/2017 14 10/19/2017 2 10/21/2017 1 10/22/2017 6 10/28/2017 1 10/29/2017 CW-145 A SFDI/8627-AZ/139, Lot 3 A SH Post 5/17/2017 15 6/1/2017 1 6/2/2017 6/2/2017 12 6/14/2017 6/14/2017 P A SH Post 10/5/2017 14 10/19/2017 2 10/21/2017 1 10/22/2017 6 10/28/2017 1 10/29/2017 Purchase of vehicles ,SFDI/8627-AZ/148 CW-146 A A SH Post 5/8/2017 14 5/22/2017 1 5/23/2017 1 5/24/2017 8 6/2/2017 1 6/3/2017 P Repair of access and local roads, district, Soltanbud forest, Soltanbud community, SFDI/8627- A SH Post 2/2/2018 14 2/16/2018 2 2/18/2018 1 2/19/2018 6 2/25/2018 1 2/26/2018 CW-147 A AZ/263, Lot 1 A SH Post 2/19/2018 14 3/5/2018 1 3/6/2018 P Repair of local roads, , Arayatlı village, "Arayatlı" community, A SH Post 2/2/2018 14 2/16/2018 2 2/18/2018 1 2/19/2018 6 2/25/2018 1 2/26/2018 CW-148 A SFDI/8627-AZ/240 A SH Post 12/4/2017 14 12/18/2017 1 12/19/2017 1 12/20/2017 8 12/28/2017 1 12/29/2017 P A SH Post 2/2/2018 14 2/16/2018 2 2/18/2018 1 2/19/2018 6 2/25/2018 1 2/26/2018 Repair of local roads Terter region, Khoruzlu village, "Khoruzlu" community, SFDI/8627-AZ/241 CW-149 A A SH Post 12/4/2017 14 12/18/2017 1 12/19/2017 1 12/20/2017 6 12/26/2017 1 12/27/2017 P A SH Post 2/2/2018 14 2/16/2018 2 2/18/2018 1 2/19/2018 6 2/25/2018 1 2/26/2018 Repair of local roads Beylagan district, Imamverdili and Vetaga villages, Vetaga community,SFDI/8627- CW-150 A AZ/242 A SH Post 12/4/2017 14 12/18/2017 1 12/19/2017 1 12/20/2017 8 12/28/2017 1 12/29/2017 P Repair of local roads Beylagan district, Tazakand village, " Tazakand " community, SFDI/8627- A NCB Post 2/20/2018 30 3/22/2018 2 3/24/2018 1 3/25/2018 6 3/31/2018 1 4/1/2018 CW-151 A AZ/262 A NCB Post P Repair of local roads Barda district, “Ikinji Nazırlı village, " Ikinji Nazırli" community, SFDI/8627- A SH Post 2/7/2018 14 2/21/2018 2 2/23/2018 1 2/24/2018 6 3/2/2018 1 3/3/2018 CW-152 A AZ/263,Lot 2 A SH Post 2/19/2018 14 3/5/2018 1 3/6/2018 P Repair of access and local roads Dashkesan district, Zeylik village, "Gulluduzu" community, SFDI/8627- A SH Post 2/7/2018 14 2/21/2018 2 2/23/2018 1 2/24/2018 6 3/2/2018 1 3/3/2018 CW-153 A AZ/264,Lot 1 A SH Post 2/19/2018 14 3/5/2018 1 3/6/2018 P Repair of access and local roads Dashkesan district, Gushchu village, (beshbarmak farm area) A SH Post 2/7/2018 14 2/21/2018 2 2/23/2018 1 2/24/2018 6 3/2/2018 1 3/3/2018 CW-154 A "Yelniche" community, SFDI/8627-AZ/264,Lot 2 A SH Post 2/19/2018 14 3/5/2018 1 3/6/2018 P Repair of local roads Aghcabedi district, " Takhta korpu" area, Garakechdi Aghbulag hamlets, A SH Post 2/7/2018 14 2/21/2018 2 2/23/2018 1 2/24/2018 6 3/2/2018 1 3/3/2018 CW-155 A “Garakechdi Aghbulag” community, SFDI/8627-AZ/243,Lot 1 A SH Post 12/5/2017 14 12/19/2017 1 12/20/2017 1 12/21/2017 5 12/26/2017 1 12/27/2017 P Repair of access and local roads Aghcabedi district, " Takhta korpu" area, Sheylanlı, Ardashavi, Finga A SH Post 2/7/2018 14 2/21/2018 2 2/23/2018 1 2/24/2018 6 3/2/2018 1 3/3/2018 CW-156 A and Mishni hamlets, “Finga” community, SFDI/8627-AZ/244,Lot 1 A SH Post 12/6/2017 14 12/20/2017 1 12/21/2017 1 12/22/2017 4 12/26/2017 1 12/27/2017 P Repair of local roads Aghcabedi district, " Takhta korpu" area, Aghbulag 1 hamlet, “Aghbulag” A SH Post 2/12/2018 14 2/26/2018 2 2/28/2018 1 3/1/2018 6 3/7/2018 1 3/8/2018 CW-157 A community,SFDI/8627-AZ/265,Lot 1 A SH Post 2/20/2018 14 3/6/2018 1 3/7/2018 P Repair of local roads Aghcabedi district, " Takhta korpu" area, Ardashavi hamlet, “Ardashavi -2” A SH Post 2/12/2018 14 2/26/2018 2 2/28/2018 1 3/1/2018 6 3/7/2018 1 3/8/2018 CW-158 A community,SFDI/8627-AZ/243,Lot 2 A SH Post 12/5/2017 14 12/19/2017 1 12/20/2017 1 12/21/2017 5 12/26/2017 1 12/27/2017 P Repair of access and local roads Aghcabedi district, " Takhta korpu" area, Vagazin (Garagach-Cattle A SH Post 2/12/2018 14 2/26/2018 2 2/28/2018 1 3/1/2018 6 3/7/2018 1 3/8/2018 CW-159 A rookery) hamlets, “Vagazin” community,SFDI/8627-AZ/244,Lot 2 A SH Post 12/6/2017 14 12/20/2017 1 12/21/2017 1 12/22/2017 5 12/27/2017 1 12/28/2017 P Repair of access and local roads Aghcabedi district, " Takhta korpu" area, Garıgıshlag-Gilishli hamlets, A SH Post 2/12/2018 14 2/26/2018 2 2/28/2018 1 3/1/2018 6 3/7/2018 1 3/8/2018 CW-160 A “Garıgıshlag - Gilishli” community, SFDI/8627-AZ/265,Lot 2 A SH Post 2/20/2018 14 3/6/2018 1 3/7/2018 P Repair of local roads Aghcabedi district, " Takhta korpu" area, Hacilar village, Hacilar hamlets, A SH Post 2/12/2018 14 2/26/2018 2 2/28/2018 1 3/1/2018 6 3/7/2018 1 3/8/2018 CW-161 A "Hacilar" community, SFDI/8627-AZ/265,Lot 3 A SH Post 2/20/2018 14 3/6/2018 1 3/7/2018 P Repair of access and local roads Ismailli district, Ismayilli village, Niyaz community, SFDI/8627- A SH Post 2/17/2018 14 3/3/2018 2 3/5/2018 1 3/6/2018 6 3/12/2018 1 3/13/2018 CW-162 A AZ/266 A SH Post 2/20/2018 14 3/6/2018 1 3/7/2018 P A SH Post 2/17/2018 14 3/3/2018 2 3/5/2018 1 3/6/2018 6 3/12/2018 1 3/13/2018 Repair and equipment supply of the school Baku city, Yasamal district, Sharifzadeh street 131a, CW-163 A Dormitory of Communication College, Secondary school # 47 of Fuzuli district "Lalatapa" community A SH Post

P A SH Post 2/17/2018 14 3/3/2018 2 3/5/2018 1 3/6/2018 6 3/12/2018 1 3/13/2018 Construction and equipment supply of 3 additional module-type classrooms Baku city Khazar district, CW-164 A Gala settlement, Malibey village secondary school of , “Malibey” community A SH Post

P Repair of school, construction and equipment supply of 2 additional module-type classrooms Aghdam A SH Post 2/17/2018 14 3/3/2018 2 3/5/2018 1 3/6/2018 6 3/12/2018 1 3/13/2018 district, Guzanli settlement "3rd stone houses" Secondary school # 148 of Aghdam district, "3rd stone CW-165 A A SH Post houses" community P A SH Post 2/19/2018 14 3/5/2018 2 3/7/2018 1 3/8/2018 6 3/14/2018 1 3/15/2018 Construction and equipment supply of 4 additional module-type classrooms , Zolgoran CW-166 A village, Zolgoran village secondary school, “Zolgoran” community A SH Post

P A SH Post 2/19/2018 14 3/5/2018 2 3/7/2018 1 3/8/2018 6 3/14/2018 1 3/15/2018 Repair of school, construction and equipment supply of 3 additional module-type classrooms Tartar CW-167 A district, SU-15 settlement, school # 147 of Aghdam district, “SU-15” community A SH Post P A SH Post 2/19/2018 14 3/5/2018 2 3/7/2018 1 3/8/2018 6 3/14/2018 1 3/15/2018 Repair of school, construction and equipment supply of 3 additional module-type classrooms Barda CW-168 A district, Mirzajafarli settlement, school # 105 of Kalbajar district, "Mirzajafarli" community A SH Post

P A SH Post 2/19/2018 14 3/5/2018 2 3/7/2018 1 3/8/2018 6 3/14/2018 1 3/15/2018 Repair and equipment supply of the hospital Ganja city, Gulustan settlement, "Vatan" community CW-169 A A SH Post P SH 2/20/2018 14 3/6/2018 2 3/8/2018 1 3/9/2018 6 3/15/2018 1 3/16/2018 Construction and equipment supply of additional module-type rooms for kindergarden Goygol A Post CW-170 A district, Goychakand village, "Goychakand" community A SH Post P Rehabilitation of inner roads Sumgayit city, "Yashildara" New residential area, "Khidirli-3" A SH Post 2/20/2018 14 3/6/2018 2 3/8/2018 1 3/9/2018 6 3/15/2018 1 3/16/2018 CW-171 A community A SH Post P Rehabilitation of potable water supply line district, Khalanj-Findigan village, "Khizi Mountains" A SH Post 2/20/2018 14 3/6/2018 2 3/8/2018 1 3/9/2018 6 3/15/2018 1 3/16/2018 CW-172 A community A SH Post P A SH Post 2/20/2018 14 3/6/2018 2 3/8/2018 1 3/9/2018 6 3/15/2018 1 3/16/2018 Repair of power supply line Tartar district, Mamirli village, "Mamirli" community CW-173 A A SH Post P A SH Post 2/22/2018 14 3/8/2018 2 3/10/2018 1 3/11/2018 6 3/17/2018 1 3/18/2018 Repair of power supply line Tartar district, Poladli village, Poladli community CW-174 A A SH Post P A SH Post 2/22/2018 14 3/8/2018 2 3/10/2018 1 3/11/2018 6 3/17/2018 1 3/18/2018 Rehabilitation of potable water supply line , Ballar village, "Ballar" community CW-175 A A SH Post P A SH Post 2/22/2018 14 3/8/2018 2 3/10/2018 1 3/11/2018 6 3/17/2018 1 3/18/2018 Rehabilitation of potable water supply line Oguz district, Jalud-1 settlement, "Jalud-1" community CW-176 A A SH Post P Rehabilitation of potable water supply line Oguz district, Boyuk soyudlu village, " Boyuk soyudlu " A SH Post 2/22/2018 14 3/8/2018 2 3/10/2018 1 3/11/2018 6 3/17/2018 1 3/18/2018 CW-177 A community A SH Post P A SH Post 2/22/2018 14 3/8/2018 2 3/10/2018 1 3/11/2018 6 3/17/2018 1 3/18/2018 Rehabilitation of potable water supply line , Narimanli village, “Narimanli” community CW-178 A A SH Post P A P A P A P A P A 2 B- Infrastructure projects

Prior P B NCB 3/20/2017 7 3/27/2017 7 4/3/2017 30 5/3/2017 7 5/10/2017 5 5/15/2017 5 5/20/2017 3 5/23/2017 3 5/26/2017 / Post Review Summary of NCB (Works) packages for Infrastructure projects in IDP settlements Prior A NCB / Post Review P B 11/8/2015 30 12/8/2015 7 12/15/2015 5 12/20/2015 5 12/25/2015 3 12/28/2015 3 12/31/2015 Rehabilitation of dormitory Dormitory of Special housing maintenance union #2 in the Z.Khalilov street SFDI/8627-AZ/003 NCB Post A 14, Yasamal district, Baku,SFDI/8096-AZ/533 B 7/28/2015 30 8/24/2015 4 8/28/2015 18 9/15/2015 1 9/16/2015

P B 11/10/2015 30 12/10/2015 7 12/17/2015 5 12/22/2015 5 12/27/2015 3 12/30/2015 3 1/4/2016 Rehabilitation of dormitory Dormitory of Baku Vocational School #3 in F.Gasimzadeh street 36, Nasimi SFDI/8627-AZ/005 NCB Post A district, Baku,SFDI/8096-AZ/561,Lot 1 B 21.08.2015 30 17.09.2015 4 9/21/2015 15 10/6/2015 1 10/7/2015

P B 10/20/2015 30 11/20/2015 7 11/27/2015 5 12/2/2015 5 12/7/2015 3 12/10/2015 3 12/13/2015

Sumgayit, 15th residential quarter, 20th January street 42B, dormitory #5,SFDI/8096-AZ/427,Lot 1 SFDI/8627-AZ/009 NCB Post A B 4/1/2015 30 5/1/2015 4 5/5/2015 22 6/1/2015 11 6/12/2015 1 6/13/2015

P B 11/12/2015 30 12/12/2015 7 12/19/2015 5 12/24/2015 5 12/29/2015 3 1/1/2016 3 1/5/2016 Rehabilitation of dormitory Dormitory #7 in the N.Narimanov street 7/14, 14th residential quarter, SFDI/8627-AZ/010 NCB Post A Sumgayit,SFDI/8096-AZ/593 B 9/16/2015 30 10/13/2015 3 10/16/2015 5 10/21/2015 1 10/22/2015

P B 10/28/2015 30 11/28/2015 7 12/5/2015 5 12/10/2015 5 12/15/2015 3 12/18/2015 3 12/21/2015

Baku, Binagadi district, "Mughan" rest home,SFDI/8096-AZ/504,Lot 1 SFDI/8627-AZ/014 NCB Post A B 5/25/2015 28 7/23/2015 5 7/28/2015 24 9/22/2015 1 9/23/2015

P B Rehabilitation of dormitory Dormitory #20 in the Natavan street, 26th residential quarter, Sumgayit 11/14/2015 30 12/14/2015 7 12/21/2015 5 12/26/2015 5 1/1/2016 3 1/4/2016 3 1/7/2016 SFDI/8627-AZ/017 NCB Post A SFDI/8096-AZ/617 B 9/22/2015 28 10/20/2015 2 10/22/2015 13 11/5/2015 1 11/6/2015

P Rehabilitation of dormitory Dormitory #6, Special State Security Service in the Gachag Nabi street 3, B 11/12/2015 30 12/12/2015 7 12/19/2015 5 12/24/2015 5 12/29/2015 3 1/1/2016 3 1/5/2016 SFDI/8627-AZ/018 NCB Post A Khatai district, Baku ,SFDI/8096-AZ/561,Lot 2 B 21.08.2015 30 17.09.2015 4 9/21/2015 36 10/27/2015 1 10/28/2015 P B 10/28/2015 30 11/28/2015 7 12/5/2015 5 12/10/2015 5 12/15/2015 3 12/18/2015 3 12/21/2015 Sumqayıt, 42st residential quarter, dormitory #14,SFDI/8096-AZ/462, Lot 1 SFDI/8627-AZ/021 NCB Post A B 5/5/2015 30 6/4/2015 4 6/8/2015 7 6/15/2015 8 6/23/2015 1 6/24/2015

P Rehabilitation of dormitory Dormitory #3 in the Gahramanov street 1a, residential quarter 15, Sumgayit B 11/18/2015 30 12/18/2015 7 12/25/2015 5 12/30/2015 5 1/6/2016 3 1/9/2016 3 1/12/2016 SFDI/8627-AZ/022 NCB Post A SFDI/8096-AZ/651 B 10/29/2015 28 11/26/2015 4 11/30/2015 7 12/7/2015 1 12/8/2015 P B Provision and mounting with fire-control units Rehabilitated Collective Centers, SFDI/8096-AZ/808 SFDI/8627-AZ/025 SH Post A B 6/29/2016 14 7/13/2016 1 7/14/2016 7/14/2016 1 7/15/2016 4 7/19/2016 1 7/20/2016 P B 10/22/2015 30 11/22/2015 7 11/29/2015 5 12/4/2015 5 12/9/2015 3 12/12/2015 3 12/15/2015 Sumgayıt, 15th residential quarter, 20th January street 42A, dormitory #19,FDI/8096-AZ/436 SFDI/8627-AZ/029 NCB Post A B 4/3/2015 31 5/4/2015 3 5/7/2015 24 6/1/2015 8 6/9/2015 1 6/10/2015

P Rehabilitation of dormitory Dormitory #2 in the Gahramanov street 1, residential quarter 15, Sumgayit B 11/18/2015 30 12/18/2015 7 12/25/2015 5 12/30/2015 5 1/6/2016 3 1/9/2016 3 1/12/2016 SFDI/8627-AZ/037 NCB Post A SFDI/8096-AZ/627,Lot 2 B 10/11/2015 30 11/12/2015 4 11/16/2015 11 11/27/2015 1 11/28/2015 P B 11/10/2015 30 12/10/2015 7 12/17/2015 5 12/22/2015 5 12/27/2015 3 12/30/2015 3 1/4/2016 Rehabilitation of dormitory Dormitory #3, SMP-518 in the S.Bahlulzadeh street, Haji Zeynalabdin SFDI/8627-AZ/042 NCB Post A taghiyev settlement, Sumgayit,SFDI/8096-AZ/609 B 9/18/2015 30 10/19/2015 2 10/21/2015 9 10/30/2015 1 10/31/2015

P B 10/22/2015 30 11/22/2015 7 11/29/2015 5 12/4/2015 5 12/9/2015 3 12/12/2015 3 12/15/2015 Sumgayit, 18th residential quarter, H.Aliyev avenue 32, dormitory #2, SFDI/8096-AZ/551 SFDI/8627-AZ/045 NCB Post Sumgayit, 18th residential quarter, H.Aliyev avenue 32, dormitory #2, SFDI/8096-AZ/551 SFDI/8627-AZ/045 NCB Post A B 8/4/2015 27 8/31/2015 7 9/7/2015 10 9/17/2015 1 9/18/2015

P Baku, Nizami district, Nakhchivanski street 100, dormitory #14 of Baku Vocational B 10/12/2015 30 11/12/2015 7 11/19/2015 5 11/24/2015 5 11/29/2015 3 12/2/2015 3 12/5/2015 SFDI/8627-AZ/049 NCB Post A Lyceum,SFDI/8096-AZ/511 B 6/30/2015 30 7/27/2015 4 7/31/2015 32 9/2/2015 7 9/9/2015 1 9/10/2015 P B 11/20/2015 30 12/18/2015 7 12/25/2015 5 12/30/2015 5 1/6/2016 3 1/9/2016 3 1/12/2016 Rehabilitation of dormitory Dormitory #5 in the Gahramanov street 5a, Sumgayit, SFDI/8096- SFDI/8627AZ/050 NCB Post A AZ/652,Lot 1 B 10/30/2015 28 11/27/2015 4 12/1/2015 16 12/17/2015 1 12/18/2015

P B 11/14/2015 30 12/14/2015 7 12/21/2015 5 12/26/2015 5 1/1/2016 3 1/4/2016 3 1/7/2016 Rehabilitation of dormitory Dormitory #11, 42nd residential quarter, Sumgayit, SFDI/8096-AZ/590 SFDI/8627-AZ/051 NCB Post A B 9/5/2015 30 10/5/2015 10 10/15/2015 48 12/3/2015 1 12/4/2015

P B 11/16/2015 30 12/16/2015 7 12/23/2015 5 12/28/2015 7 1/7/2016 3 1/10/2016 3 1/13/2016 Rehabilitation of dormitory Dormitory #1 in the Gahramanov street 5, 15th residential quarter, Sumgayit SFDI/8627-AZ/052 NCB Post A SFDI/8096-AZ/627,Lot 1 B 10/11/2015 30 11/12/2015 1 11/13/2015 24 12/7/2015 1 12/8/2015

P B 9/15/2015 30 10/15/2015 7 10/22/2015 5 10/27/2015 5 11/1/2015 3 11/4/2015 3 11/7/2015 Repair works in 16 Collective Centers with expired defects liability period, SFDI/8096-AZ/809 SFDI/8627-AZ/053 NCB Post A B 7/1/2016 30 8/1/2016 3 8/1/2016 3 8/5/2016 10 8/15/2016 1 8/16/2016

P B Rehabilitation of dormitory Dormitory #4 in the Gahramanov street 3, 15th residential quarter, Sumgayit 11/20/2015 30 12/18/2015 7 12/25/2015 5 12/30/2015 5 1/6/2016 3 1/9/2016 3 1/12/2016 SFDI/8096-AZ/054 NCB Post A SFDI/8096-AZ/652,Lot 2 B 10/30/2015 28 11/27/2015 5 12/2/2015 19 12/21/2015 1 12/22/2015 P B 11/2/2015 30 12/2/2015 7 12/9/2015 5 12/14/2015 5 12/19/2015 3 12/22/2015 3 12/25/2015 Rehabilitation of dormitory Dormitory #2 of “ Caspian Shipping” CJSC, Khatai district, 823 SFDI/8096-AZ/057 NCB Post A passage, 3, Baku, SFDI/8096-AZ/534, Lot 2 B 7/29/2015 30 8/25/2015 2 8/27/2015 18 9/15/2015 1 9/16/2015

P B 10/30/2015 30 11/30/2015 7 12/7/2015 5 12/12/2015 5 12/17/2015 3 12/20/2015 3 12/23/2015 Baku, Binagadi district, 8 microdistrict, H. Huseynov street,19, dormitory of Baku Humanitarian SFDI/8627-AZ/058 NCB Post A College, SFDI/8096-AZ/546,Lot 2 B 8/1/2015 30 8/28/2015 3 9/1/2015 22 9/23/2015 1 9/24/2015

P B 11/8/2015 30 12/8/2015 7 12/15/2015 5 12/20/2015 5 12/25/2015 3 12/28/2015 3 12/31/2015 Rehabilitation of dormitory Dormitory of Absheron Vocational Lyceu, in the A.Isazadeh street 1, Bina SFDI/8627-AZ/059 NCB Post A settlement, Khazar district, Baku,SFDI/8096-AZ/562 B 21.08.2015 30 17.09.2015 5 9/22/2015 35 10/27/2015 1 10/28/2015

P Rehabilitation of dormitory Dormitory of Zardab Vocational Lyceum in the Samad Vurghun street 1, B 11/5/2015 30 12/5/2015 7 12/12/2015 5 12/17/2015 5 12/22/2015 3 12/25/2015 3 12/28/2015 SFDI/8627-AZ/060 NCB Post A Zardab town,SFDI/8096-AZ/608 B 9/17/2015 28 10/15/2015 4 10/19/2015 31 11/19/2015 1 11/20/2015 P B 11/16/2015 30 12/16/2015 7 12/23/2015 5 12/28/2015 7 1/7/2016 3 1/10/2016 3 1/13/2016 Rehabilitation of dormitory Dormitory owned by special housing maintenance union #2 in the A.M. SFDI/8627-AZ/061 NCB Post A Juma street 26, Narimanov district, Baku, SFDI/8096-AZ/626 B 10/13/2015 30 11/10/2015 2 11/12/2015 7 11/19/2015 1 11/20/2015

P B 11/16/2015 30 12/16/2015 7 12/23/2015 5 12/28/2015 7 1/4/2016 3 1/7/2016 3 1/10/2016 NCB Post A B 10/13/2015 30 11/12/2015 2 11/14/2015 7 11/21/2015 1 11/28/2015

Prior B NCB 3/25/2017 7 4/1/2017 7 4/8/2017 30 5/8/2017 7 5/15/2017 5 5/20/2017 5 5/25/2017 3 5/28/2017 3 5/31/2017 Approximately 30 NCB (Works) contracts will be signed during the first 18 months after project / Post Review effectiveness Prior NCB / Post Review P Rehabilitation of local roads and roadside channels, Bilasuvar, Settlement #1, “Bilasuvar-1” community, B 7/20/2017 30 8/19/2017 7 8/26/2017 5 8/31/2017 7 9/7/2017 3 9/10/2017 3 9/13/2017 CW-089 NCB Post A SFDI/8627-AZ/186 B 8/3/2017 28 8/31/2017 19 9/19/2017 13 10/2/2017 3 10/5/2017 1 10/6/2017 P Rehabilitation of local roads and roadside channels Bilasuvar, Settlement #2, “Bilasuvar-2” community, B 7/20/2017 30 8/19/2017 7 8/26/2017 5 8/31/2017 7 9/7/2017 3 9/10/2017 3 9/13/2017 SFDI/8627-AZ/187 CW-090 NCB Post A B 8/4/2017 30 9/5/2017 15 9/20/2017 19 10/9/2017 14 10/23/2017 1 10/24/2017

P Rehabilitation of local roads and roadside channels Bilasuvar, Settlement #3, “Bilasuvar -3” community, B 7/20/2017 30 8/19/2017 7 8/26/2017 5 8/31/2017 7 9/7/2017 3 9/10/2017 3 9/13/2017 CW-091 NCB Post A SFDI/8627-AZ/194 B 8/10/2017 31 9/11/2017 9 9/20/2017 21 10/10/2017 6 10/16/2017 1 10/17/2017 P B 7/25/2017 30 8/24/2017 7 8/31/2017 5 9/5/2017 7 9/12/2017 3 9/15/2017 3 9/18/2017 Rehabilitation of local roads and roadside channels Bilasuvar, Settlement #4, “Bilasuvar-4” community, CW-092 NCB Post A SFDI/8627-AZ/195 B 8/11/2017 30 9/12/2017 9 9/21/2017 18 10/9/2017 18 10/27/2017 1 10/28/2017

P Rehabilitation of local roads and roadside channels Bilasuvar, Settlement #5, “Bilasuvar-5” community, B 7/25/2017 30 8/24/2017 7 8/31/2017 5 9/5/2017 7 9/12/2017 3 9/15/2017 3 9/18/2017 CW-093 NCB Post A SFDI/8627-AZ/196 B 8/15/2017 30 9/14/2017 7 9/21/2017 18 10/9/2017 16 10/25/2017 1 10/26/2017 P Rehabilitation of local roads and roadside channels Bilasuvar, Settlement #6, “Bilasuvar-6” community, B 7/25/2017 30 8/24/2017 7 8/31/2017 5 9/5/2017 7 9/12/2017 3 9/15/2017 3 9/18/2017 CW-094 NCB Post A SFDI/8627-AZ/176 B 7/27/2017 30 8/28/2017 22 9/19/2017 21 10/10/2017 35 11/15/2017 1 11/16/2017 P Rehabilitation of the water supply system Aghdam, Guzanly settlement, “Guzanli” community, SFDI/8627- B 7/30/2017 14 8/13/2017 2 8/15/2017 1 8/16/2017 6 8/22/2017 1 8/23/2017 CW-095 SH Post A AZ/213 B 9/11/2017 14 9/25/2017 2 9/27/2017 1 9/28/2017 5 10/3/2017 1 10/4/2017 P Rehabilitation of the water supply system Aghdam, Banovshalar settlements, “Banovshalar” community, B 7/30/2017 30 8/29/2017 2 8/31/2017 1 9/1/2017 6 9/7/2017 1 9/8/2017 CW-096 NCB Post A SFDI/8627-AZ/212 B 9/7/2017 29 10/6/2017 25 11/1/2017 43 12/14/2017 14 12/28/2017 1 12/29/2017 P Rehabilitation of the water supply system Aghdam, Baharli settlement, “Baharli” community, SFDI/8627- B 7/30/2017 30 8/29/2017 2 8/31/2017 1 9/1/2017 6 9/7/2017 1 9/8/2017 CW-097 NCB Post A AZ/219 B 9/19/2017 30 10/19/2017 13 11/1/2017 29 11/30/2017 5 12/5/2017 1 12/6/2017 P Rehabilitation of the water supply system Aghdam, “Dortyol-1 settlement, “Dortyol-1” community, SFDI/8627- B 8/5/2017 30 9/4/2017 7 9/11/2017 5 9/16/2017 7 9/23/2017 3 9/26/2017 3 9/29/2017 CW-098 NCB Post A AZ/239 B 12/20/2017 30 1/22/2018 P Rehabilitation of drainage system Mingachever, “Yeni Hayat” settlement, “Yeni Hayat” community, SFDI/8627- B 8/5/2017 30 9/4/2017 7 9/11/2017 5 9/16/2017 7 9/23/2017 3 9/26/2017 3 9/29/2017 CW-099 SH Post A AZ/175 B 8/11/2017 14 8/25/2017 4 8/29/2017 1 8/30/2017 10 9/8/2017 1 9/9/2017 P A

P NCB Prior 4/7/2017 7 4/14/2017 7 4/21/2017 30 5/21/2017 7 5/28/2017 5 6/2/2017 5 6/7/2017 3 6/10/2017 3 10/13/2017 Maintenance&Operation Contract for Completed Collective Centers B A NCB Prior

P CW-179 NCB Post 5/21/2018 30 6/21/2018 10 7/2/2018 10 7/12/2018 5 7/17/2018 1 7/18/2018 Maintenance of Collective Centers (CCs) where repair and rehabilitation works were completed B

A P A P A

Total Works and Goods Component A 60 60 90 60 60 60 60 60 60 60 60 60 90 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 Days Execution Extensionperiod Extensionperiod Extensionperiod Extensionperiod Completion 02.09.2016 03.08.2016 19.05.2016 29.05.2016 22.08.2016 20.07.2016 5/16/2016 2/22/2016 2/12/2016 7/28/2016 3/10/2016 6/14/2016 2/19/2016 5/16/2016 2/17/2016 2/24/2016 2/18/2016 3/10/2016 5/16/2016 2/22/2016 2/18/2016 2/18/2016 2/20/2016 2/13/2016 2/18/2016 2/24/2016 2/12/2016 5/19/2016 2/17/2016 6/23/2017 Extension Extension Extension 02.06.2016 19.05.2016 08.09.2016 08.08.2016 28.03.2016 25.01.2016 15.06.2016 15.05.2016 Extension 7/6/2016 2/9/2016 2/8/2016 8/2/2016 8/3/2016 period period period period 20 Amendmen Variation Order ts progress Physical Physical 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% % Payment Payment completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed vendor fully fully fully fully fully fully fully fully fully fully fully fully fully fully fully fully fully fully % to

Amendment Contracts' s "Azertamirgeotekh"LLC "Azertamirgeotex"LLC "Azertamirgeotex"LLC "Aypara İnshaat"LLC "Aypara "HTM Holdinq""HTM MMC "Azertikinti-M"MMC Company name which is is which name Company "HTM Holding""HTM LLC "Azertikinti-M"LLC "IshigliLLC Daghi" "Aghoghlan-I" LLC "Aghoghlan-I" "Elnur LTD" LLC LTD" "Elnur LLC LTD" "Elnur "Ish Inshaat"LLC "Ish "Azertikinti"LLC awarded acontract awarded "Art Proje" "Art LLC "Ilkin -IM"LLC "Ilkin -IM"LLC "Ilkin -IM"LLC "Ilkin 60 2/13/2016 29.05.2016 Extension fully 60 100% "K.E. Inshaat" LLC period completed 28.07.2016 60 2/17/2016 fully 60 2/19/2016 100% "Kanan-N"LLC completed 60 2/5/2016 fully 90 1/28/2016 100% "Kirs" Firm completed 60 2/23/2016 fully 60 6/9/2016 100% "Kirs" Firm completed 60 2/20/2016 fully 60 6/11/2016 100% "Kirs" Firm completed 60 2/20/2016 fully 60 6/17/2016 100% "Kurud Tikinti" LLC completed 60 2/4/2016 12.03.2016 Extension fully 90 period 100% "M.Nazimoghlu" LLC 11.04.2016 completed

60 2/10/2016 fully 60 6/3/2016 100% "Merkuri-Inshaat" LLC completed 60 2/18/2016 fully 60 6/10/2016 100% "Narmin-IM"LLC completed 60 2/21/2016 22.07.2016 Extension 90 100% 5% "NN Group" LLC period 23.09.2016 60 2/21/2016 19.05.2016 Extension fully 60 100% "Perlit" LLC period completed 16.06.2016 60 2/14/2016 22.02.2016 Extension fully 60 100% "Piramida-F.R."LLC period completed 18.05.2016 60 2/21/2016 15.06.2016 Extension fully 60 100% "Piramida-F.R" LLC period completed 14.07.2016 60 2/23/2016 fully 60 5/17/2016 100% "Q.E. Narmin" LLC completed 60 2/11/2016 fully 90 7/15/2016 100% "Q.E. Narmin" LLC completed 60 2/25/2016 fully 60 8/22/2016 100% "Q.E. Nərmin" LLC completed 60 2/21/2016 fully 60 6/25/2016 100% "Yusana LTD" LLC completed 60 2/22/2016 04.08.2016 Extension fully 60 100% "Yusana LTD" LLC period completed 29.07.2016 60 2/23/2016 fully 60 5/13/2016 100% "Lanel" LLC completed 60 2/12/2016 fully 60 5/18/2016 100% "Lanel" LLC completed 60 2/16/2016 fully 60 6/16/2016 100% "Lanel" LLC completed 60 2/24/2016 fully 60 8/2/2016 100% "TH TTSh" completed

60 6/26/2017

60 3/16/2017 Extension 60 5/14/2017 100% 95% period "Kirs" firm 15.06.2017 60 3/11/2017 Extension 60 4/11/2017 100% 95% period "UNL LTD" LLC 10.05.2017 60 3/11/2017 60 4/11/2017 100% 95% "MTM-S" LLC 60 3/11/2017 60 4/11/2017 100% 95% "Lanel" LLC 60 3/18/2017 60 4/5/2017 100% 95% "Ilkin-IM" LLC 60 3/18/2017 60 4/11/2017 100% 95% "Azad Banna" LLC 60 3/18/2017 60 4/5/2017 100% 95% "Ilkin-IM" LLC 60 10/28/2017 Extension 60 11/29/2017 100% period "Aghoghlan-I " LLC 29.12.2017 60 10/28/2017 90 10/14/2017 100% 51% "Dashqala"Small Enterprise 60 10/28/2017 90 10/18/2017 100% 51% "Elnur LTD" LLC 60 11/2/2017 90 10/27/2017 100% "TH Sabirabad TTSh" 60 11/2/2017 90 10/30/2017 100% "Qərazən" LLC 60 11/2/2017 "Kainat Tajhizat Tikinti" 90 10/5/2017 100% 20% LLC 60 11/7/2017 22.10.2017 Extension 90 11536.92 100% 20% period "Azertikinti-M" LLC 22.11.2017 60 11/7/2017 90 10/31/2017 100% 51% "Art Proje" LLC 60 11/7/2017 90 10/18/2017 100% 20% "M. Nazimoghlu" LLC 60 11/12/2017 Extension 22.11.2017 90 81% 8% period "Azertikinti-M" LLC 29.12.2017 60 11/12/2017 90 12/4/2017 51% "Kurud Tikinti" LLC 60 11/12/2017

60 11/17/2017 Extension 22.11.2017 90 7361.11 81% 20% period "Lanel" LLC 22.12.2017 60 11/17/2017 90 11/22/2017 11798.42 81% 20% "Kainat Tajhizat Tikinti" LLC

60 11/17/2017

90 11/22/2017 13702.43 81% 20% "Kral Tamir Tikinti" LLC

60 11/17/2017 Extension 22.11.2017 90 81% 20% period "Teymur" LLC 21.12.2017 60 11/22/2017 Extension 90 12/29/2017 81% period "Zinnur" LLC 05.02.2018 60 11/22/2017 Extension 30.11.2017 90 81% period "HTM Holding" LLC 05.01.2018 60 11/22/2017 90 11/7/2017 100% "Aghoghlan-I" LLC 60 11/22/2017 Extension 90 1/4/2018 51% period "Fige" LLC 05.03.2018 60 11/28/2017 Extension 25.10.2017 60 100% period "Kurud Tikinti" LLC 07.11.2017 60 11/28/2017 60 9/11/2017 100% 51% "Ruslan-P" LLC 60 11/28/2017 60 9/8/2017 100% 51% "Ilkin-IM" LLC 60 11/28/2017 Extension 03.11.2017 90 81% 20% period "Q. E. Narmin" LLC 04.01.2018 60 12/3/2017 Extension 25.11.2017 "Dashqala" Small 90 81% period 27.12.2017 Enterprise 60 12/3/2017 60 9/11/2017 100% "Ishigli Daghi" LLC 60 12/3/2017 Extension 02.10.2017 "TH Sabirabad 60 100% 51% period 02.11.2017 Tamir-Tikinti Sahesi" 60 12/3/2017 60 9/18/2017 100% 51% "MTM-S" LLC 60 12/8/2017 Extension 25.10.2017 60 8331.24 100% period "MTM-S" LLC 24.11.2017 60 12/8/2017

60 12/8/2017 Extension "TH Sabirabad 90 1/4/2018 81% period 05.02.2018 Tamir-Tikinti Sahesi" 60 12/8/2017 60 10/31/2017 100% "Qarazan" LLC 60 12/13/2017 60 10/22/2017 100% 51% "Azad Banna" LLC 60 12/13/2017 60 9/14/2017 100% 51% "Ish Ishaat" LLC 60 12/13/2017

30 11/18/2017 30 7/28/2017 100% "Ilkin-IM"LLC 30 11/18/2017 30 7/14/2017 100% "Ilkin-IM"LLC 30 11/18/2017 30 8/1/2017 100% "Ilkin-IM"LLC 30 11/18/2017 30 8/1/2017 100% "Kurud Tikinti" LLC 30 11/23/2017 30 7/25/2017 100% "Kurud Tikinti" LLC 30 11/23/2017 30 7/24/2017 100% " XTQ" LLC 30 11/23/2017 30 8/3/2017 "Shusha XTQ" LLC 30 11/23/2017 30 8/3/2017 "Perlit" LLC 30 11/28/2017 30 7/14/2017 "Perlit" LLC 30 11/28/2017 30 7/13/2017 100% "Perlit" LLC 60 12/28/2017 60 7/2/2017 100% 100% "Auto Azerbaycan" LLC 60 4/27/2018

60 4/27/2018 60 2/27/2018 51% "Qarazan"LLC 60 4/27/2018 60 2/25/2018 20% "MTM-S" LLC 60 4/27/2018

60 2/27/2018 14% "Elgun-Inshaat-2008"LLC 60 5/31/2018

60 5/2/2018

60 5/2/2018

60 5/2/2018

60 5/2/2018 60 2/25/2018 21% "Inshaatchi-Q" LLC 60 5/2/2018 60 2/25/2018 22% "Aghoghlan-I" LLC 60 5/7/2018

60 5/7/2018 60 2/25/2018 20% "Kanan-N" LLC 60 5/7/2018 60 2/26/2018 20% "Yusana LTD" LLC 60 5/7/2018

60 5/7/2018

60 5/12/2018

60 5/12/2018

60 5/12/2018

60 5/12/2018

60 5/14/2018

60 5/14/2018

60 5/14/2018

60 5/14/2018

60 5/15/2018

60 5/15/2018

60 5/15/2018 60 5/15/2018

60 5/17/2018

60 5/17/2018

60 5/17/2018

60 5/17/2018

60 5/17/2018

120 10/26/2017

120 5/31/2015 fully "Art Proje" LLC 120 1/15/2016 100% completed 120 6/4/2016 fully "Azertikinti-M" LLC 120 2/6/2016 100% completed 120 5/13/2016

12.10.2015 Extension fully "AzerSanaye Inshaat" LLC 120 100% period completed 14.02.2016

120 6/5/2016

22.02.2016 fully "Azertamirgeotekh"LLC 120 Extension period 100% 28.03.2016 completed 120 5/21/2016 23.01.2016 Extension fully "Bak Inshaat"LLC 120 100% period completed 28.03.2016 120 6/7/2016 fully "Fullcom" LLC 120 3/4/2016 100% completed 120 6/5/2016 fully "HTM Holding" LLC 120 2/19/2016 100%

120 5/21/2016 fully "Ilkin-IM" LLC 120 10/23/2015 100% completed 120 6/12/2016 fully "Ilkin-IM"LLC 120 4/7/2016 100%

"Ilkin-IM"LLC 30 8/19/2016 100% 100% 120 5/15/2016 fully "K.E. Inshaat" LLC 120 10/10/2015 100% completed 120 6/12/2016 fully "Merkuri-Inshaat" LLC 120 3/28/2016 100%

120 6/4/2016 fully "Piramida.F.R" LLC 120 2/28/2016 100% completed 120 5/15/2016 "Q.E. Narmin" LLC fully "Q.E. Narmin" LLC 120 1/17/2016 100% completed 120 4/28/2016 fully Qartal Tikinti Firm 120 1/11/2016 100% completed 120 6/12/2016 fully Qartal Tikinti Firm 120 4/17/2016 100% completed 120 6/7/2016 fully "Rabita Tamir Tikinti" LLC 120 4/4/2016 100% completed 120 6/13/2016 fully "Rabita Tamir Tikinti"LLC 120 4/7/2016 100% completed 3 monthes 2/7/2016 "T.T.Sh. Inshaat" LLC 90 11/16/2016 100% 100% 120 6/12/2016 fully "Khimekspress-2000"Firm 120 4/21/2016 100% completed 120 5/25/2016 fully "Lanel" LLC 120 1/15/2016 100% completed 120 5/23/2016 23.01.2016 fully Extension "Lanel" LLC 120 100% period completed 23.02.2016 120 5/31/2015 fully "Lanel"LLC 120 2/29/2016 100% completed 120 5/28/2016 fully "Lanel" LLC 120 3/18/2016 100% completed 120 6/13/2016 fully "Lanel"LLC 120 3/19/2016 100% completed

120 5/9/2016 fully "Lanel"LLC 120 3/27/2016 100% completed

120 10/26/2017

120 1/11/2018 "Farid Firm. R"LLC 120 2/3/2018 51% 120 1/11/2018 "Olimp Muhendis 120 2/21/2018 51% Xidmetleri" LLC 120 1/11/2018 120 2/14/2018 31% "Azertikinti" LLC 120 1/16/2018 "Catena 120 2/25/2018 51% Construction" LLC 120 1/16/2018 120 2/23/2018 31% "Azeri Servis LTD" LLC 120 1/16/2018 120 3/16/2018 31% "Ilkin IM" LLC 60 10/22/2017 90 1/4/2018 81% "Araz-İnşaatchi" LLC 60 11/7/2017 90 3/29/2018 82% "Merkuri-Inshaat" LLC 60 11/7/2017 90 3/6/2018 81% "Azersutajhizattikinti" JSC 120 1/27/2018

120 1/27/2018 90 12/8/2017 100% "Merkuri-Inshaat" LLC 90 1/13/2018

12 7/18/2019 monthes A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A 1 P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P Plan vs./ Actual CommunityMobilization Specialist ManagementInformation System Manager Assistant ManagementInformation System Manager Accountant/ChiefAssistant Accountant SpecialistAccounting SpecialistAccounting ofInfrastructure support RegionalTechnical Supervisor for Implementation the ofInfrastructure support RegionalTechnical Supervisor for Implementation the ofInfrastructure support RegionalTechnical Supervisor for Implementation the ofInfrastructure support RegionalTechnical Supervisor for Implementation the ManagerforAssistant Infrastructure support OfficeManager Assistant AppraisalManager forAssistant infrastructuresupport AppraisalManager forAssistant infrastructuresupport AppraisalManager forAssistant Micro-projects AppraisalManager forAssistant Micro-projects ProcurementManager Assistant ProcurementManager Assistant ProcurementManager Assistant DeputyProcurement Manager Procurement Manager Appraisal Manager Community Senior Mobilization Manager Livelihoods Senior Manager EconomicInfrastructure for IDP Settlements Managerfor Housing Renovation Social and and Micro-projects Manager for Supervision the of Implementation the of Micro-projects Manager for Supervision the of Implementation the of ChiefAccountant OfficeManager TechnicalCoordinator/Chief Engineer DeputyDirector STAFF D- Vehicleoperating costs Insurancefor vehicles Purchaseof vehicles Utilities Bankexpenses Fuel Communication Officeoperation & maintenance training PMT TRAININGAND IOC AdditionalFinancing for IDPLiving Standards and Livelihoods Project Assignment/Contract 9/12/2018 0:00 9/12/2018 Name of ProcurementRef.# OC-40 OC-39 OC-38 OC-37 OC-36 OC-35 OC-34 OC-33 OC-32 OC-31 OC-30 OC-29 OC-28 OC-27 OC-26 OC-25 OC-24 OC-23 OC-22 OC-21 OC-20 OC-19 OC-18 OC-17 OC-16 OC-15 OC-14 OC-13 OC-12 OC-11 OC-10 OC-9 OC-8 OC-7 OC-6 OC-5 OC-4 OC-3 OC-2 OC-1 3 D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D 4 Type-Category 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 5 Months Selection/Proc ureMethod IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC IC 9 BankPrior Review by / Post / Prior Prior Prior Prior Prior Prior Prior Prior Prior Prior Prior Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 10 TORs 11

Days Interval NoObjection 12

Days Interval Adverti-sement Invitation 13

Days Interval Submission 14

Days Interval Evaluation +Shortlist Technical 15

Days Interval NoObjection 16

Days Interval Interviews 17

Days Interval NoObjection Contract to Sign 19

Days Interval Signature Contract 20

Days Interval Start 21

Days Execution Completion 22 Contractaward P 48 IC Post Regional Community Mobilization Consultant OC-41 D A P 48 IC Post Regional Community Mobilization Consultant OC-42 D A P 48 IC Post Regional Community Mobilization Consultant OC-43 D A P 48 IC Post Regional Community Mobilization Consultant OC-44 D A P 48 IC IC Senior Community Mobilization Manager Assistant OC-45 D A P 48 IC Post Senior Community Mobilization Manager Assistant OC-46 D A P 48 IC Post Senior Livelihood Manager Assistant OC-47 D A P 48 IC Post Senior Livelihood Manager Assistant OC-48 D A P 48 IC Post Social and Environmental Protection Specialist OC-49 D A P 48 IC Post Monitoring and Evaluation Specialist OC-50 D A P Manager Assistant for Supervision on Micro-projects 48 IC Post OC-51 D A Implementation P Manager Assistant for Supervision on Micro-projects 48 IC Post OC-52 D A Implementation P 48 IC Post Manager Assistant for housing maintenance OC-53 D A P Deputy Senior Livelihood Manager 48 IC Post OC-54 D A P 48 IC Post Deputy Appraisal Manager OC-55 D A P Deputy Senior Community Mobilization manager/ 48 IC Post OC-56 D A Promotion manager P Regional Technical Supervisor for the Implementation 48 IC Post OC-57 D A of Micro-projects P Regional Technical Supervisor for the Implementation 48 IC Post OC-58 D A of Micro-projects P Regional Technical Supervisor for the Implementation 48 IC Post OC-59 A of Micro-projects P 48 IC Post Housing Maintenance Coordinator OC-60 A P 48 IC Post Housing Maintenance Coordinator OC-61 A P 48 IC Post Housing Maintenance Coordinator OC-62 A P 48 IC Post Translator OC-63 A P 48 IC Post Translator OC-64 A P 48 IC Post Secretary OC-65 A P 48 IC Post Mechanic OC-66 A P 48 IC Post Driver OC-67 A P 48 IC Post Driver OC-68 A P 48 IC Post Driver OC-69 A P 48 IC Post Driver OC-70 A P 48 IC Post Driver OC-71 A P 48 IC Post Economist Specialist OC-72 A P 48 IC Post Housekeeper OC-73 A P 48 IC Post Cleaner OC-74 A P 48 IC Post Cleaner OC-75 A P 48 IC Post Gardener OC-76 A P 48 IC Post Guard OC-77 A P 48 IC Post Guard OC-78 A P A P A P A P A P A P A

Total for Other Cost - PLANNED Red Text Rows: = Actuals Total for Other Cost - ACTUALS Yellow Columns: Cell turns red if Planned Date has passed. Cell turns white again if cell for Actual Date is filled in. Total for Component A Works and goods Note: Every line item represents only one lot. Consultant service Total Total for Component A - ACTUALS Works and goods Consultant service Total Loan Agrmt IBRD (USD) Total for Component B Works and goods Total IBRD Financing Per Category Actual signed/used Usage in USD Current state Consultant service Goods, Works, Cons. Part 1 Total Incr. Operating Costs and PMT training Total for Component B - ACTUALS Works and goods Front-end fee Consultant service Unallocated Total TOTAL AMOUNT Total for Component C Works and goods Consultant service Total Total for Component C - ACTUALS Works and goods Consultant service Total Total for Component D Works and goods Consultant service Total Total for Component D - ACTUALS Works and goods Consultant service Total

GRAND TOTAL - PLAN GRAND TOTAL - ACTUALS

Total Loan #REF! Front-end fee Non-allocated/Contingencies C Revision Date: Additional Financing for IDP Living 12 September 2018 Standards and Livelihoods Project PIU Director: Sabir Ahmadov TTL: Robert Wrobel Proc. Specialist: Emma Mammadkhanova Operations Officer: Nijat Veliyev

Contr. Short Prior / Reception of No Objection Procurement Ref. Not Selection Type Listing/RFP Invitation for Proposal Technical No Final Contract Actual Name of Assignment / Contract Post Ad of EOI Expression No Objection to Sign Start Completion # e # Method LS / submssion RFP Submission Evaluation Objection Evaluation Signature Review of Interest Contract TB to the Bank

Plan /

Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval

Type-Category

Days Execution

9/12/2018 0:00 3 4 5 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 A- Micro-projects 1

Hiring the services of consultants for the design of micro-projects (approximately 15 Prior / packages consisting of 14-15 micro- CS-1 A CQS LS Post 11/20/2016 14 12/4/2016 7 12/11/2016 3 12/14/2016 1 12/15/2016 14 12/29/2016 3 1/1/2017 5 1/6/2017 2 1/8/2017 5 1/13/2017 1 1/14/2017 1 1/15/2017 150 6/14/2017 projects; average size amount of each Review package is about USD 60 000)

P A CQS LS Post 2/8/2017 14 2/22/2017 4 2/26/2017 1 2/27/2017 7 3/6/2017 3 3/9/2017 3 3/14/2017 1 3/15/2017 120 7/13/2017 Consulting services for preparation design/tender documentation of the micro- SFDI/8627-AZ/086 A projects (CMP 008-017) -(schools) A CQS LS Post 3/29/2017 9 4/6/2017 1 4/7/2017 4/7/2017 3 4/10/2017 9 4/19/2017 1 4/20/2017 1 4/21/2017 120 8/20/2017

P A CQS LS Post 2/10/2017 14 2/24/2017 4 2/28/2017 1 3/1/2017 7 3/8/2017 3 3/11/2017 3 3/14/2017 1 3/15/2017 120 7/13/2017 Consulting services for preparation design/tender documentation of the micro- SFDI/8627-AZ/087 A projects (CMP 018-027) -(schools) A CQS LS Post 3/31/2017 10 4/10/2017 1 4/11/2017 4/11/2017 3 4/14/2017 6 4/20/2017 1 4/21/2017 1 4/22/2017 120 8/21/2017

P A CQS LS Post 2/13/2017 14 2/27/2017 4 3/3/2017 1 3/4/2017 7 3/11/2017 3 3/14/2017 3 3/14/2017 1 3/15/2017 120 7/13/2017 Consulting services for preparation design/tender documentation of the micro- SFDI/8627-AZ/120 A projects projects (CMP 028-042) -(roads) A CQS LS Post 4/4/2017 10 4/13/2017 1 4/14/2017 4/14/2017 8 4/22/2017 2 4/24/2017 2 4/26/2017 1 4/27/2017 120 8/28/2017

P Consulting services for preparation A CQS LS Post 7/24/2017 14 8/7/2017 4 8/11/2017 1 8/12/2017 7 8/19/2017 3 8/22/2017 2 8/24/2017 1 8/25/2017 120 12/23/2017 design/tender documentation of the micro- SFDI/8627-AZ/169 A projects projects (CMP 053-060) -(roads) A CQS LS Post 8/18/2017 14 8/31/2017 5 9/5/2017 1 9/6/2017 12 9/18/2017 1 9/19/2017 10 9/29/2017 1 9/30/2017 120 1/29/2018

P Consulting services for preparation A CQS LS Post 7/26/2017 14 8/9/2017 4 8/13/2017 1 8/14/2017 7 8/21/2017 3 8/24/2017 2 8/26/2017 1 8/27/2017 120 12/25/2017 design/tender documentation of the micro- SFDI/8627-AZ/170 A projects projects (CMP 061-068) -(roads) A CQS LS Post 8/22/2017 14 9/6/2017 1 9/7/2017 1 9/8/2017 11 9/19/2017 1 9/20/2017 9 9/29/2017 1 9/30/2017 120 1/29/2018

P A CQS LS Post 9/15/2017 14 9/29/2017 4 10/3/2017 1 10/3/2017 7 10/10/2017 3 10/13/2017 2 10/13/2017 1 10/14/2017 120 2/11/2018 Consulting services for preparation SFDI/8627- design/tender documentation of the micro- AZ/222 A projects projects (CMP 069-077) A CQS LS Post 10/3/2017 14 10/17/2017 1 10/18/2017 1 10/19/2017 14 11/3/2017 3 11/6/2017 4 11/10/2017 1 11/11/2017 120 4/10/2018

P A CQS LS Post 9/15/2017 14 9/29/2017 4 10/3/2017 1 10/3/2017 7 10/10/2017 3 10/13/2017 2 10/13/2017 1 10/14/2017 120 2/11/2018 Consulting services for preparation SFDI/8627- design/tender documentation of the micro- AZ/224 A projects projects (CMP 078-085) (roads) A CQS LS Post 10/4/2017 14 10/18/2017 1 10/19/2017 1 10/20/2017 14 11/6/2017 1 11/7/2017 9 11/16/2017 1 11/17/2017 120 4/16/2018

Consulting services for preparation design P SFDI/8627- A CQS TB Post 2/14/2018 14 2/28/2018 7 3/7/2018 3 3/10/2018 1 3/11/2018 14 3/25/2018 3 3/28/2018 5 4/2/2018 2 4/4/2018 5 4/9/2018 1 4/10/2018 1 4/11/2018 33 4/2/2020 documentation of the micro-projects and AZ/247 infrastructure projects (power supply) A A CQS TB Post 2/20/2018 14 3/5/2018

P Consulting services for preparation design A CQS TB Post 2/16/2018 14 3/2/2018 7 3/9/2018 3 3/12/2018 1 3/13/2018 14 3/27/2018 3 3/30/2018 5 4/4/2018 2 4/6/2018 5 4/11/2018 1 4/12/2018 1 4/13/2018 33 4/2/2020 documentation of the micro-projects and SFDI/8627- infrastructure projects (water supply, AZ/256 A drainage networkconstruction of artesian A CQS TB Post 2/21/2018 14 3/6/2018 wells system)

P Consulting services for preparation design A CQS TB Post 2/14/2018 14 2/28/2018 7 3/7/2018 3 3/10/2018 1 3/11/2018 14 3/25/2018 3 3/28/2018 5 4/2/2018 2 4/4/2018 5 4/9/2018 1 4/10/2018 1 4/11/2018 33 4/2/2020 documentation of the micro-projects and SFDI/8627- infrastructure projects (social facilities AZ/257 A A CQS TB Post 2/20/2018 14 3/5/2018 (schools, gardens, hospitals etc.)

P Consulting services for preparation design A CQS TB Post 2/16/2018 14 3/2/2018 7 3/9/2018 3 3/12/2018 1 3/13/2018 14 3/27/2018 3 3/30/2018 5 4/4/2018 2 4/6/2018 5 4/11/2018 1 4/12/2018 1 4/13/2018 33 4/2/2020 documentation of the micro-projects and SFDI/8627- infrastructure projects (social facilities AZ/258 A (schools, gardens, hospitals etc.) A CQS TB Post 2/21/2018 14 3/6/2018

P Consulting services for preparation design A CQS TB Post 2/14/2018 14 2/28/2018 7 3/7/2018 3 3/10/2018 1 3/11/2018 14 3/25/2018 3 3/28/2018 5 4/2/2018 2 4/4/2018 5 4/9/2018 1 4/10/2018 1 4/11/2018 33 4/2/2020 documentation of the micro-projects and SFDI/8627- infrastructure projects (access and local AZ/259 A roads) A CQS TB Post 2/20/2018 14 3/5/2018

Consulting services for preparation design P A CQS TB Post 2/16/2018 14 3/2/2018 7 3/9/2018 3 3/12/2018 1 3/13/2018 14 3/27/2018 3 3/30/2018 5 4/4/2018 2 4/6/2018 5 4/11/2018 1 4/12/2018 1 4/13/2018 33 4/2/2020 documentation of the micro-projects and SFDI/8627- infrastructure projects (access and local AZ/260 roads) Consulting services for preparation design documentation of the micro-projects and SFDI/8627- infrastructure projects (access and local AZ/260 A roads) A CQS TB Post 2/21/2018 14 3/6/2018

2 B - Infrastructure projects

Hiring the services of consultants for the design of IP (approximately 9 packages Prior / consisting of 9-10 infrastructure projects; CS-2 B CQS LS Post 2/3/2017 14 2/17/2017 7 2/24/2017 3 2/27/2017 1 2/28/2017 14 3/14/2017 3 3/17/2017 5 3/22/2017 2 3/24/2017 5 3/26/2017 1 3/27/2017 1 3/28/2017 150 8/25/2017 average size amount of each package is Review about USD 90 000) Consulting services for preparation P B CQS LS Post 2/6/2017 14 2/20/2017 4 2/24/2017 3 2/27/2017 7 3/6/2017 3 3/9/2017 3 3/14/2017 1 3/15/2017 90 6/13/2017 design/tender documentation of the infrastructure projects (CIP 001-006) - SFDI/8627-AZ/077 A (roads) B CQS LS Post 2/4/2017 14 2/17/2017 6 2/23/2017 1 2/24/2017 6 3/2/2017 5 3/7/2017 2 3/9/2017 1 3/10/2017 90 6/8/2017

Consulting services for preparation P B CQS LS Post 2/6/2017 14 2/20/2017 4 2/24/2017 3 2/27/2017 7 3/6/2017 3 3/9/2017 3 3/14/2017 1 3/15/2017 90 6/13/2017 design/tender documentation of the infrastructure projects (CIP 007-011)- SFDI/8627-AZ/078 A (water supply) B CQS LS Post 3/17/2017 14 4/3/2017 2 4/5/2017 4/5/2017 9 4/14/2017 3 4/17/2017 1 4/18/2017 1 4/19/2017 90 7/18/2017

P

A

P

A

P

A p Hiring the services of consultant for QCBS TB Post 7/10/2017 14 7/24/2017 7 8/1/2017 7 8/8/2017 2 8/10/2017 20 8/30/2017 10 9/11/2017 6 9/18/2017 10 9/28/2017 5 10/3/2017 7 10/10/2017 1 10/11/2017 43 months 10/11/2020 Monitoring, evaluation and impact CS-3 C A assesment QCBS TB Post p IC LS Post 2/10/2017 14 2/24/2017 7 3/3/2017 3 3/6/2017 1 3/7/2017 43 months 3/7/2020 Impact Evaluation Field Coordinator CS-10 A IC LS Post 2/28/2017 14 3/9/2017 p CS-10 IC TB Post 3/1/2017 14 3/14/2017 3 3/17/2017 10 3/27/2017 1 3/28/2017 43 months 3/28/2020 Impact Evaluation Field Coordinator SFDI/8627- (readvertisement) A AZ/151 IC TB Post 5/17/2017 14 6/1/2017 8 6/9/2017 6/9/2017 2 6/12/2017 1 6/13/2017 43 months 12/30/2020

P CS-4 LCS LS Post 7/25/2017 30 8/25/2017 10 9/11/2017 25 9/25/2017 10 10/5/2017 10 10/16/2017 9 10/25/2017 1 10/26/2017 36 months 10/25/2020 Hiring the services of an Audit firm SFDI/8627- C A AZ/146 LCS LS Post 1/8/2018 14 1/22/2018 46 4-Apr-18

P Hiring the services of an Audit firm Post SFDI/8627- (Amendment under Contract # SFDI/8096- C AZ/147 A AZ/090) Post

P

A

P SFDI/8627- SSS LS Post Hiring the services of Individual AZ/180 C Livelihood Consultant A CS-11 SSS LS Post 1-Oct-17 1-Oct-17 39 months 30-Dec-20

P SFDI/8627- CQS LS Post 12/15/2017 14 12/29/2017 5 1/11/2018 10 1/21/2018 10 1/31/2018 2 2/2/2018 10 2/20/2018 1 2/21/2018 35 months 12/30/2020 Hiring the services of Institutional capacity AZ/221 C building of micro-finance team A CS-12 1/9/2018 14 1/22/2018 23 2/14/2018

P CQS TB Post 12/12/2017 14 12/26/2016 4 12/30/2016 10 1/10/2017 8 1/18/2017 5 1/23/2017 1 1/24/2017 45 months 9/24/2020

CS-5 Hiring the services of consultant for SFDI/8627- C Community Mobilization A AZ/069 CQS TB Post 1/19/2017 14 2/8/2017 16 2/24/2017 10 3/6/2017 8 3/14/2017 2 3/16/2017 27 4/12/2017 1 4/13/2017 45 months 12/13/2020 P CQS 10/14/2017 14 10/28/2017 7 11/4/2017 7 11/11/2017 1 11/12/2017 30 12/12/2017 10 12/22/2017 10 1/1/2018 10 1/11/2018 5 1/16/2018 3 1/19/2018 1 1/20/2018 38 months 12/20/2020 Technical services on software for CS-9 SFDI/8627- TB Post Financial Management System AZ/149 A CQS TB Post 10/13/2017 14 10/26/2017 1 10/26/2017 10/26/2017 4 10/30/2017 1 10/31/2017 11/8/2018 11/8/2018 38 months 12/8/2020

3 C - Livelihood Support

P Hiring the services of Implementing Partner CS-6 SSS TB Prior 4/3/2017 14 4/17/2017 7 4/24/2017 7 5/1/2017 1 5/2/2017 30 6/1/2017 10 6/11/2017 10 6/21/2017 10 7/1/2017 5 7/6/2017 3 7/9/2017 1 7/10/2017 36 months 9/11/2020 for Component C,Livelihoods,Sub- SFDI/8627- C Component:Youth Support AZ/067 A SSS TB Prior 3/27/2017 13 4/10/2017 1 4/11/2017 36 months 4/10/2020

P SSS TB Prior 4/3/2017 14 4/17/2017 7 4/24/2017 7 5/1/2017 1 5/2/2017 30 6/1/2017 10 6/11/2017 10 6/21/2017 10 7/1/2017 5 7/6/2017 3 7/9/2017 1 7/10/2017 45 months 12/11/2020

Hiring the services of Implementing Partner CS-7 for Component C,Livelihoods,Sub- SFDI/8627- C A Component:Income Generating Activites AZ/068 SSS TB Prior 3/27/2017 13 4/10/2017 1 4/11/2017 45 months 12/10/2020

p QCBS TB Prior 4/10/2017 14 4/24/2017 7 5/1/2017 7 5/8/2017 1 5/9/2017 30 6/8/2017 10 6/18/2017 10 6/28/2017 10 7/8/2017 5 7/13/2017 3 7/16/2017 1 7/16/2017 45 months 9/16/2020

Hiring the services of Implementing Partner CS-8 for Component C,Livelihoods, İntergrated SFDI/8627- C A Economic Support Pilot AZ/066 QCBS TB Prior 1/14/2017 30 2/14/2017 30 3/15/2017 7/5/2017 7 6/12/2017 30 7/12/2017 48 8/30/2017 23 9/22/2017 30 10/23/2017 24 11/13/2017 2 11/15/2017 1 11/16/2017 41 months 12/30/2020

p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/263 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/264 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/265 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/266 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/267 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/268 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/269 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/270 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/271 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/272 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/273 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/274 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/275 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/276 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/277 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/278 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/279 Grand Contract SFDI/IGP/279 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/280 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/281 Contracts' Company name which is Amendments awarded a contract

"Inshaatchi -Tamir" LLC

"RAARCHITECH ltd" LLC

"AM.M Line" LLC

"AY Consulting" LLC

"Billur" Layiha-İstehsalat Firm

"AM.M Line" LLC

"RAARCHİTECT Ltd" MMC "Billur" Layiha-İstehsalat Extension Firm period 10.07.2017

"AY Consulting" LLC

Amin Ahmad Charkazov

Moore Stephens Azerbaijan Limited

Peter Reid

"Support to Socio-Economic Development Public Union (Azerbaijan,leading organization) and "Progress" Social Development Public Union (Azerbaijan)" "Akbis" LLC

Ganja Regional Economic Advisory Center Social Union (Azerbaijan) and "Tamas" Regional Develpoment Public Union (Azerbaijan)

Azerbaijan Community Development Research,Training and Resource Center (Azerbaijan) and ASR Consulting and Research Group LLC (Azerbaijan) and Regional Gender Center NGO (Azerbaijan) and "Social Progress" Public Union (Azerbaijan)

Joint Venture “Social Progress” Public Union (SPPU) with “Women of the XXI Century” Public Union and “Support for Economic Development of Regions” Public Union

“TEK CHİNAR-2017 KENDLİ FERMER TESERRUFATI” LLC “QARAQOYUNLU-2017 KENDLİ FERMER TESERRUFATI” LLC “EVOGHLU-2017 KENDLİ FERMER TESERRUFATI” LLC “MESHELİ-2017 KENDLİ FERMER TESERRUFATI” LLC “VUQARLI 2017 KENDLİ FERMER TESERRUFATI” LLC “QARAGOL-2017 KENDLİ FERMER TESERRUFATI” LLC “SADƏGUL 2017 KENDLİ FERMER TESERRUFATI” LLC “DASHBULAQ-2017 KENDLİ FERMER TESERRUFATI” LLC “DEMİRCHİLER-2017 KENDLİ FERMER TESERRUFATI” LLC “ZERTİ-2017 KENDLİ FERMER TESERRUFATI” LLC “TEK PALID-2017 KENDLİ FERMER TESERRUFATI” LLC “SEYDİMLİ-2017 KENDLİ FERMER TESERRUFATI” LLC “ELEKCHİ-2017 KENDLİ FERMER TESERRUFATI” LLC “NEMİRLİ-2017 KENDLİ FERMER TESERRUFATI” LLC

“ELİ-2017 KENDLİ FERMER TESERRUFATI” LLC

“YAQUT-1968 KENDLİ FERMER TESERRUFATI” LLC “EMİRALLAR-2017 KENDLİ FERMER TESERRUFATI” LLC “EMİRALLAR-2017 KENDLİ FERMER TESERRUFATI” LLC

“YAQUB 2014” LLC

“ZEYNEB 2009” LLC C IDP Living Standards and Revision Date: Livelihoods Project 12 September 2018

Credit : USD 66.70 mln EmmaDeepal MammadkhanovaFernando OperationsProgram Assistant: Officer: NijatYagut Veliyev Ertenlice Contracts,Amen dments Short Contr. Prior / Reception of (Amount, Date Estimated Cost / Listing/RFP Invitation Proposal Technical No Objection to Contract Company name which is Actual Name of Assignment / Contract Procurement Ref. # Note # Type LS Post Ad of EOI Expression of No Objection No Objection Final Evaluation Start Completion and reason Actual (USD) submssion to for RFP Submission Evaluation Sign Contract Signature awarded a contract / TB Review Interest should be the Bank

Plan / Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval indicated in the

Type-Category

Days Execution Comments) 1 9/12/2018 0:00 3 4 5 6 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Micro-finance agreements

P TB Prior 5/28/2017 14 6/11/2017 20 6/1/2017 5 6/6/2017 6 6/12/2017 2 6/14/2017 5 6/19/2017 20 6/9/2017 20 6/29/2017 9 7/8/2017 7/10/2017 7/10/2017 7/10/2020 Loan Agreement MF-1 A