41121-033: CAREC Transport Corridor

Total Page:16

File Type:pdf, Size:1020Kb

41121-033: CAREC Transport Corridor Bi-Annual Social Monitoring Report # 6 Bi-Annual Social Report (July–December 2013) Loan 2562-KAZ March 2014 KAZ: Multitranche Financing Facility CAREC Transport Corridor 1 (Zhambyl Oblast Section) [Western Europe–Western People’s Republic of China International Transit Corridor] Investment Program, Tranche 2 Prepared by DOHWA Engineering Co. Ltd. for the Ministry of Transport and Communications of the Republic of Kazakhstan and the Asian Development Bank. Dohwa Engineering Co., Ltd TABLE OF CONTENTS ACRONYMS & ABBREVIATIONS .................................................................................................. 4 DEFINITION OF SELECTED TERMS .......................................................................................... 5-7 1: INTRODUCTION AND BACKGROUND ...................................................................................... 8 1.1 Introduction ................................................................................................................. ……8 1.2 Project Background ....................................................................................................... ..8-9 1.3 Project Location ............................................................................................................ 9-10 1.4 Physical progress of project activities .......................................................................... 10-11 2: COMPENSATION PAYMENT FOR LAND ACQUISITION AND RESETTLEMENT ................... 12 2.1 Process of land Acquisition .............................................................................................. 12 2.2 Summary Impacts of the project .................................................................................. 12-13 2.3 Status of Land Acquisition .......................................................................................... 13-21 2.4 Other impacts .............................................................................................................. 22-26 3. MONITORING DATA COLLECTION ......................................................................................... 27 3.1 Scope of Monitoring ......................................................................................................... 27 3.2 Methodologies adopted during monitoring ........................................................................ 28 3.3 Monitoring indicators as per LARP .............................................................................. 28-30 3.4 Effectiveness of Resettlement Planning ....................................................................... 30-31 3.5 People’s complaints .......................................................................................................... 31 4: REDRESS OF GRIEVANCES .................................................................................................. 32 4.1 Grievance Redress Mechanism ....................................................................................... 32 4.2 Observation on grievance resolution ................................................................................ 33 5. HEALTH AND SAFETY ............................................................................................................ 34 5.1 Accidents occurred in the project ................................................................................ 34-35 6. CONCLUSION AND RECOMMENDATION ............................................................................. 36 6.1 Conclusion ....................................................................................................................... 36 6.2 Recommendation ............................................................................................................. 37 International Transport Corridor CAREC 1, Taraz-Korday Section in Zhambyl oblast (Project Two) Loan 2562-Kaz Bi-Annual Social Monitoring Report Page 2 Dohwa Engineering Co., Ltd TABLES Table 1.1: Scheduled and actual date of completion of civil works by KCC and KDS.………….....10 Table 2.1: Summary Impact of LARPs.......……………………………………………………………...13 Table 2.2: Loss of land by category in three LARPs.……………………….………………………….14 Table 2.3: Temporary Land use by Kazakhdorstroy LLP.................................………………….15-16 Table 2.4: Temporary Land use by KCC E&C............................................................................17-18 Table 2.5: List of owners with land parcels including additional land acquisition…………….....20-21 Table 2.6: Summary progress of payment of compensation and other assistance...................25-26 Table 3.1: LARP Implementation Monitoring Indicators…..………..…..………………………….28-30 Table 4.1: Steps of redressing grievances ………………………………………………………..........32 Table 4.2: LARP wise number of grievances received and resolved …………………………..........33 FIGURES Figure-1.1: Location Map of the project ……………….…………………………………………….….09 Annexes Annex I Monitoring Survey Questionnaire …………………………………………………………..38-39 Annex II Temporary land handover certificates of KDS ............................................................40-45 Annex III Work Acceptance certificate of KDS...........................................................................46-50 Annex IV Summary report on grievance resolution ………………………………………………..51-70 Annex V Minutes of the meeting about relocation of Honey Vendors........................................71-73 CURRENCY EQUIVALENTS (As of February 2014) Currency unit – Kazakhstan Tenge (KZT) $1.00 = KZT 184 WEIGHTS AND MEASURES 1ha (Hectare) = 10000sq.m (square meter) 1 km (kilometer) = 1000 m (Meter) 1 Metric Ton = 1000 kg (kilogram) NOTE In this report $ refers to US Dollar International Transport Corridor CAREC 1, Taraz-Korday Section in Zhambyl oblast (Project Two) Loan 2562-Kaz Bi-Annual Social Monitoring Report Page 3 Dohwa Engineering Co., Ltd ACRONYMS & ABBREVIATIONS ADB Asian Development Bank AIDS Acquired Immune Deficiency Syndrome APs Affected Persons CAREC Central Asia Regional Economic Cooperation CoR Committee of Roads EA Environmental Assessment EMA External Monitoring Agency FS Feasibility Study GosNPTsZem Zhambyl Land State Scientific and Production Center for Land Management GRC Grievance Redress Committee GRM Grievance Redress Mechanism IFIs International Financial Institutions LAR Land Acquisition and Resettlement LARF Land Acquisition and Resettlement Framework LARP Land Acquisition and Resettlement Plan LARU Land Acquisition and Resettlement Unit LE Legal Entity LLP Limited Liability Partnership MFF Multi-Tranche Financing Facility MIS Management Information System MOTC Ministry of Transportation and Communication PFR Periodic Financing Request PMC Project Management Consultants RCM Road Construction Material RD Road Department, Zhambyl oblast Branch “Kazavtozhol” JSC RK Republic of Kazakhstan ROW Right of Way TSA Targeted Social Assistance TSL Top Soil Layer International Transport Corridor CAREC 1, Taraz-Korday Section in Zhambyl oblast (Project Two) Loan 2562-Kaz Bi-Annual Social Monitoring Report Page 4 Dohwa Engineering Co., Ltd DEFINITION OF SELECTED TERMS Compensation: Payment made in cash or kind to the project affected persons/households at replacement cost for the assets acquired for the project, which includes the compensation provided under the Land Code of the Republic of Kazakhstan (RK Code No. 442-II of 20 June 2003 and amended on 6 July 2007, Article 87.1 that refers stipulated in the Land Acquisition and Resettlement Plan (LARP). Cut-off Dates: These are the dates on which censuses of the project affected persons and their assets to be affected are commenced in a particular area. Assets like houses/structures and others which are created after the cut-off dates, and the persons or groups claiming to be affected, become ineligible for compensation and assistance. This is defined as the date of approval of the Feasibility Study by the Government of Kazakhstan for upgrading the Western Europe - Western China Transit Corridor on 31st March 2008. Entitlement: Refers to mitigation measures, which includes cash payments at replacement cost or through replacement land equal in value/productivity to the plot lost and at location acceptable to APs where feasible as stipulated in the LARP. Entitlements include compensation for structure (permanent & temporary), crops, trees, business, wage, etc. (allowing the project affected persons to keep felled trees, salvageable building materials, etc.), for which compensation is already paid. Household: A household is a group of persons who commonly live together with common incomes and take their meals from a common kitchen. Income Restoration: Refers to re-building the capacity of the project affected households to re- establish income sources at least to restore their living standards to the pre-acquisition levels. Indigenous Peoples: Indigenous Peoples are those who are identified in particular geographic areas based on these four characteristics: (i) self-identification as members of a distinct indigenous cultural group and recognition of this identity by others; (ii) collective attachment to geographically distinct habitats or ancestral territories in the project area and to the natural resources in these habitats and territories; (iii) customary cultural, economic, social, or political institutions that are separate from those of the dominant society and culture; and (iv) an indigenous language, often different from the official language of the country or region. Involuntary Resettlement: The situation arises where
Recommended publications
  • Almaty–Issyk-Kul Alternative Road Economic Impact Assessment
    Almaty–Issyk-Kul Alternative Road Economic Impact Assessment Almaty, a vibrant metropolis in Kazakhstan, is only kilometers away from lake Issyk-Kul in the Kyrgyz Republic, renowned for its mountains and moderate summers. However, the two destinations are separated by two magnificent mountain ranges. To bypass these mountains, the existing road stretches over ­ kilometers, leading to long travel times. This economic impact assessment analyzes what impact a more direct road between the two destinations would have for tourism and economic development in both Kazakhstan and the Kyrgyz Republic. The report provides economically viable solutions that, within a supportive policy environment, would lead to strong economic development within the region. About Almaty–Bishkek Economic Corridor The Almaty–Bishkek Economic Corridor (ABEC) is the pilot economic corridor under the Central Asia Regional Economic Cooperation (CAREC) Program. The motivation for ABEC is that Almaty and Bishkek can achieve far more together than either can achieve alone. The two cities are only ­ kilometers apart with relatively high economic density concentrated in services in the cities and agriculture in their hinterlands. Both Kazakhstan and the Kyrgyz Republic have acceded to the Eurasian Economic Union and the World Trade Organization. CAREC corridors and Belt and Road Initiative routes cross ABEC. The historic Silk Route, mountain ranges, and Lake lssyk-Kul underline the potential for tourism. But trade, especially in agricultural goods and services, between the two countries is below potential, and the region does not yet benefit from being one economic space. About the Central Asia Regional Economic Cooperation Program The Central Asia Regional Economic Cooperation (CAREC) Program is a partnership of member countries and development partners working together to promote development through cooperation, leading to accelerated economic growth and poverty reduction.
    [Show full text]
  • Mercuryaddressing Primary Mercury Mining in Kyrgyzstan
    The use of mercury is being reduced throughout the world due to its effects on human health and the environment. Certain forms of mercury and its compounds can damage neurological development and affect internal organs. Mercury can spread far and wide through air and water. It is Khaidarkan ingested by fish and other marine life, Addressing primary where it becomes concentrated as it moves up the food chain. mercury mining mercury in Kyrgyzstan There is now only one known mercury mine in the world which continues to sell its output abroad: Khaidarkan, in the remote mountains of southern Kyrgyzstan. What will happen to this “kombinat” is still far from clear. For the international community, continuing mercury mining raises significant concerns. Limiting mercury supply is one of the key elements to any comprehensive global approach to address mercury. www.unep.org United Nations Environment Programme P.O. Box 30552 - 00100 Nairobi, Kenya Tel.: +254 20 762 1234 Fax: +254 20 762 3927 e-mail: [email protected] www.unep.org Produced by Zoï Environment Network www.zoinet.org This is a joint publication by the United Nations Environment Pro- gramme (UNEP) and the United Nations Institute of Training and Re- search (UNITAR) produced by Zoï Environment Network. The project to address primary Mercury Mining in Kyrgyzstan has been generously supported by the Governments of Switzerland, the United States of America and Norway. Printed on 100 % recycled paper at Imprimerie Nouvelle Gonnet, F-01303 Belley, France Copyright © 2009 ISBN: 978-82-7701-071-7 Cover artwork: Mural in the palace of culture, Khaidarkan This publication may be reproduced in whole or in part in any form for A climate Neutral publication educational or non-profit purposes without special permission from The production and transport of each copy of this booklet has re- the copyright holders, provided acknowledgement of the source is leased about 0.4 kilogram’s of CO2-equivalent into the atmosphere.
    [Show full text]
  • O Tro S D O Cu M En to S
    Oficina Económica y Comercial de la Embajada de España en Almaty Infraestructuras de transportes en Kazajstán Otros Documentos 1 Infraestructuras de transportes en Kazajstán Otros Documentos Esta nota ha sido elaborada por Adolfo Romero de Marcelo bajo la supervisión de la Oficina EconómEconómiiiica y Comercial de la Embajada de España en AAllllmaty.maty. Febrero 2011 2 LAS INFRAESTRUCTURAS DE TRANSPORTES EN KAZAJSTÁN ÍNDICE CONCLUSIONES 555 I. INTRODUCCIÓN 777 1. LAS INFRAESTRUCTURAS DE TRANSPORTE EN KAZAJSTÁN 7 2. SITUACIÓN ECONÓMICA EN KAZAJSTÁN 10 II. INFRAESTRUCTURAS DE CARRETERAS 111111 1. INTRODUCCIÓN 11 2. MARCO INSTITUCIONAL 12 3. INFRAESTRUCTURAS DE CARRETERAS ACTUALES 14 4. PROYECTOS Y OPORTUNIDADES DE INVERSIÓN 16 5. PROBLEMAS DE LA RED DE CARRETERAS EN KAZAJSTÁN 25 III. INFRAESTRUCTURAINFRAESTRUCTURASS FERROVIARIAS 292929 1. INTRODUCCIÓN 29 2. MARCO INSTITUCIONAL 36 3. INFRAESTRUCTURAS ACTUALES DE FERROCARRIL 37 4. PROYETOS Y OPORTUNIDADES DE INVERSIÓN 40 5. TENDENCIAS DEL SECTOR FERROVIARIO EN MATERIA DE INVERSIÓN 43 IV. INFRAESTRUCTURAS AÉREAS 464646 1. INTRODUCCIÓN 46 2. OPERADORA NACIONAL “AIR ASTANA” 47 3. OTROS OPERADORES 49 4. TRÁNSITO DE MERCANCÍAS 49 5. PROYECTOS 50 V. INFRAESTRUCTURAS MARÍTIMAS Y FLUVIALEFLUVIALESSSS 525252 1. INTRODUCCIÓN 52 2. EL PUERTO DE AKTAU – PROYECTO DE AMPLIACIÓN 53 3. COMPAÑÍA ESTATAL KAZMORTRANSFLOT 55 4. PROYECTOS 56 VI. CAREC CORRIDORS 575757 Oficina Económica y Comercial de la Embajada de España en Almaty 3 LAS INFRAESTRUCTURAS DE TRANSPORTES EN KAZAJSTÁN VIVIVII.VI I. PERCEPCIÓN DEL MAMADEDE IN SPAIN 606060 VIII. EMPRESAS INVOLINVOLUCRADASUCRADAS EN PROYECTPROYECTOSOS DE INFRAESTRUCTURINFRAESTRUCTURASAS EN KAZAJSTÁN 616161 IX. ANEXOS 646464 1. FERIAS 64 2. PUBLICACIONES DEL SECTOR 65 3. ASOCIACIONES 65 4. OTROS PROYECTOS PUBLICADOS 67 5.
    [Show full text]
  • ILF Dokument
    Almaty–Bishkek Economic Corridor Almaty-Issyk-Kul Alternative Road EIA Supplementary Document: Analysis of Alignments 31 October 2020 Prepared for: Asian Development Bank (ADB) Prepared by: ILF Kazakhstan LLC, in support of EDR Group / EBP team Disclaimer: The views expressed in this report are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. The mention of specific companies or products of manufacturers does not imply that they are endorsed or recommended by ADB in preference to others of a similar nature that are not mentioned. EDR Group / EBP team members: EBP US (formerly EDR Group), USA EBP Schweiz AG ILF Kazakhstan LLC Elvira Ennazarova, Kyrgyz Republic TABLE OF CONTENTS 1. INTRODUCTION 4 1.1 Brief Description of the Project 4 1.2 Road Alignments under Consideration 4 1.3 Criteria for Road Characterization 5 1.3.1 Road categories 5 1.3.2 Construction Effort 5 1.4 Tunnel Standard and Cost Assumptions 6 1.5 Operation and Maintenance Cost Assumptions 7 1.6 Border Crossing Point Cost Assumptions 7 2. WESTERN ALIGNMENT 8 2.1 Common Segment: Almaty to Uzynagash and Karakastek 8 2.1.1 Almaty to Uzynagash 8 2.1.2 Uzynagash to Kainazar 8 2.1.3 Kainazar to Karakastek 9 2.1.4 Summary of the Common Segment with Existing Roads 10 2.2 Western Route by Gravel or Asphalt Road 10 2.2.1 Karakastek - Kastek 10 2.2.2 Beyond Kastek 11 2.2.3 Summary of the Routes by Gravel or Asphalt Road 15 2.3 Western Route by Asphalt Road with Tunnel 18 2.3.1 Karakastek - Tunnel 18 2.3.2 Tunnel Options 19 2.3.3 Tunnel – Kyrgyz Side 19 2.3.4 Summary of the Routes with Asphalt Road and Tunnel 20 2.4 Summary of Western Alignments 21 3.
    [Show full text]
  • Dungans Appeal
    To UN Human Rights Treaty Bodies and Special Procedures, To international non-governmental human rights organisations Appeal On behalf of the representatives of the Dungan community, living in the Republic of Kazakhstan and Kyrgyzstan, we express our respect and ask for your intervention and reaction to the ongoing persecution of the Dungans by the state bodies (especially law enforcement) of Kazakstan following the conflict that took place on February 7-8, 2020 in Korday district, Jambyl region, Kazakhstan. Till this day the Dungans experience arbitrary detentions, arrests, torture and other inhuman treatment by the law enforcement agents. As of May 13, 2020 out of 25 persons1 arrested for the events in February 2020, 17 are the Dungans. 5 out of 17 have been already sentenced: 3 persons have been sentenced to 1,5 years of imprisonment for the conflict with the police2 (article 380 of the Criminal code of Kazakhstan, resistance to police), and 2 persons are sentenced to 2,5 year and fined for the conflict with the Kazakh elderly person on the eve of the conflict3 (article 293 of the Criminal code, hooliganism, and article 107 of the Criminal code, injury). The other 12 detainees are arrested, and being under investigation. The arrests and detentions continue. According to the attorney D. Mombayev, who presented the interests of the Yukhnu family (sentenced for the conflict with the Kazakh elderly person), the trial was biased and the sentence was based on false information.4 Moreover, the residents of the villages Bular Batyr and Sortobe experience continued intimidation and harassment. The police regularly conduct searches and arrests.
    [Show full text]
  • Strong Mediaeval Earthquake in the Chuy Basin, Kyrgyzstan A
    ISSN 00168521, Geotectonics, 2012, Vol. 46, No. 4, pp. 303–314. © Pleiades Publishing, Inc., 2012. Original Russian Text © A.M. Korjenkov, V.A. Kol’chenko, Ph.G. Rott, S.V. Abdieva, 2012, published in Geotektonika, 2012, Vol. 46, No. 4, pp. 62–74. Strong Mediaeval Earthquake in the Chuy Basin, Kyrgyzstan A. M. Korjenkova, b, V. A. Kol’chenkoc, Ph. G. Rottd, and S. V. Abdievaa a Institute of Seismology, National Academy of Sciences of Kyrgyz Republic, Asanbay microraion 52/1, Bishkek, 720060 Kyrgyzstan email: [email protected] b Schmidt Institute of Physics of the Earth, Russian Academy of Sciences, ul. Bol’shaya Gruzinskaya 10, Moscow, 123995 Russia c Institute of History and Cultural Herritage, National Academy of Sciences of Kyrgyz Republic, pr. Chuy 265a, Bishkek, 720071 Kyrgyzstan d Philosophische Facultaet, Universitaet Bonn, Am Hof 1, Bonn, D53113 Germany Received December 16, 2010 Abstract—The data presented in this paper show that in historical time the Chuy Basin in Kyrgyzstan was repeatedly subjected to strong earthquakes, which affected the inhabitants and the economic and political sit uation at that time. The deformed buildings in the Novopokrovka site of ancient settlements situated in the central part of the basin unequivocally indicate seismic damage and subsequent abandonment of the settle ment. The earthquake happened at the end of the Karakhanid epoch (the end of the 12th century A.D.). The intensity of seismic oscillations (I = VIII–IX) at the site was reinforced by unfavorable engineering geology conditions. The source of the earthquake was probably related to displacements along the piedmont YsykAta Fault located to the south of the site.
    [Show full text]
  • CAREC TOURISM STRATEGY 2030 DECEMBER 2020 Creative Commons Attribution 3.0 IGO License (CC by 3.0 IGO)
    CARECCAREC TOURISMTOURISM STRATEGYSTRATEGY 2030 DECEMBER 20202020 CAREC TOURISM STRATEGY 2030 DECEMBER 2020 Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) © 2020 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 8632 4444; Fax +63 2 8636 2444 www.adb.org Some rights reserved. Published in 2020. ISBN 978-92-9262-565-8 (print); 978-92-9262-566-5 (electronic); 978-92-9262-567-2 (ebook) Publication Stock No. TCS200382-2 DOI: http://dx.doi.org/10.22617/TCS200382-2 The views expressed in this publication are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. The mention of specific companies or products of manufacturers does not imply that they are endorsed or recommended by ADB in preference to others of a similar nature that are not mentioned. By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area. This work is available under the Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) https://creativecommons.org/licenses/by/3.0/igo/. By using the content of this publication, you agree to be bound by the terms of this license.
    [Show full text]
  • Invisible and Exploited in Kazakhstan: the Plight of Kyrgyz Migrant Workers and Members of Their Families
    Invisible and exploited in Kazakhstan: the plight of Kyrgyz migrant workers and members of their families June 2018 / N° 713a TABLE OF CONTENTS Methodology ......................................................................................................................................................3 Acknowledgements .........................................................................................................................................4 Introduction ............................................................................................................................ 6 I. Human rights violations of Kyrgyz migrant workers in Kazakhstan ....................................... 14 1. Problems arising due to a lack of registration at the place of stay ................................. 14 2. Sub-standard or exploitative working conditions: practices that may lead to forced or compulsory labour ............................................................................................................ 16 a) The illegal business of intermediaries that take advantage of the vulnerable position of migrants ............................................................................................................................................... 16 b) Absence of a work contract and other violations of work conditions by employers ....... 18 c) Risks with implications for the occupational safety and health of migrant workers ...... 20 d) Withholding and non-payment of wages .................................................................................
    [Show full text]
  • Taxonomic Corrections and New Records in Vascular Plants of Kyrgyzstan, 4
    Memoranda Soc. Soc. Fauna Fauna Flora Flora Fennica Fennica 91, 91: 2015 67–83. • Lazkov 2015 & Sennikov 67 Taxonomic corrections and new records in vascular plants of Kyrgyzstan, 4 Georgy A. Lazkov & Alexander N. Sennikov* Lazkov, G.A., Laboratory of Flora, Institute of Biology and Soil Science, Kyrgyz Academy of Sciences, 720071 Bishkek, Kyrgyzstan. E-mail: [email protected] Sennikov, A.N., Botanical Museum, Finnish Museum of Natural History, P.O. Box 7, 00014 University of Helsinki, Finland; & Herbarium, Komarov Botanical Institute of Russian Academy of Sciences, Prof. Popov str. 2, 197376 St Petersburg, Russia. E-mail: alexander.sennikov@ helsinki.fi (*Author for correspondence) A new series of notes on distribution, taxonomy, morphology and nomenclature of some vascular plants in Kyrgyzstan is presented. Carex subphysodes Popov ex V.Krecz., Astragalus sogdianus Bunge, Oxytropis ferganensis Vass. and Iris maracandica (Vved.) Wendelbo (all native), and also Delphinium orientalis J.Gay (alien) are reported as new to Kyrgyzstan. Sedum tetramerum Trautv. is new to Northern Tian-Shan, and Scirpoides holoschoenus (L.) Soják is new to Chatkal Range and Western Tian-Shan within Kyrgyzstan. The distribution area of Torilis arvensis (Huds.) Link is revised and expanded, and the distribution of Eremurus zoae Vved. (endemic to Kyrgyzstan) is verified and mapped. New names and combinations, Betonica sect. Foliosae (Krestovsk. & Laz- kov) Lazkov, Eriophyton anomalum (Juz.) Lazkov & Sennikov, Kudrjaschevia sect. Jacubianae Lazkov, Lagochilus sect. Chlainanthus (Briq.) Lazkov, Leonurus sect. Panzerioidei (Krestovsk.) Lazkov, Phlomoides sect. Pseuderemostachys (Popov) Lazkov, and Scutellaria sect. Ramosissi- mae Lazkov, are provided as a result of the forthcoming monographic revision of Lamiaceae. Two hybrids are described in Eremurus, E.
    [Show full text]
  • Annual Reports 2020
    Fostering SUSTAINABILITY driving GROWTH ANNUAL REPORT 2020 STRATEGIC REPORT 6 COMPANY OVERVIEW 44 Performance 81 Costs 6 Scope of operation under investment projects 81 Other expenses 7 Geography 46 Transformation 81 Impairment of assets 6 Capital structure and digitalisation 82 Net profit 8 Asset structure 49 OPERATING OVERVIEW 82 CAPEX 9 Key markets 49 Reserves 85 Сash and cash equivalents 04 10 Business model 49 Exploration 85 Dividends received 12 Competitive advantages 52 Upstream 85 Dividends paid 16 Performance highlights 62 Oil transportation 86 Debt management 18 STATEMENT 67 Gas transportation 89 ENSURING SUSTAINABLE • Fostering FROM THE CHAIRMAN and marketing DEVELOPMENT OF THE BOARD 71 Downstream 93 Health, safety OF DIRECTORS 75 Service projects and environment (HSE) 22 STATEMENT 77 FINANCIAL OVERVIEW 112 Personnel development SUSTAINABILITY FROM THE CHAIRMAN 77 Statement from the Deputy 118 Supplier relations OF THE MANAGEMENT Chairman of the Management BOARD Board for Economics and Finance driving 26 STRATEGY 78 Credit ratings 26 Market overview 79 Consolidated financial results 37 Strategic priorities according to IFRS 40 Impact of COVID-19 81 Revenue GROWTH and anti-crisis response 81 Share in profit from joint 43 KPI system ventures and associates CORPORATE GOVERNANCE 126 CORPORATE GOVERNANCE FRAMEWORK 143 COMMITTEES 165 RESPONSIBILITY OF THE BOARD STATEMENT 127 CORPORATE GOVERNANCE OF DIRECTORS DEVELOPMENT REPORT 144 Nomination and Remuneration 166 CORPORATE CONTROL Committee 166 Internal Audit Service 129 BOARD OF DIRECTORS
    [Show full text]
  • Regulatory and Procedural Barriers to Trade in Kyrgyzstan
    UNECE UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE Regulatory and Procedural Barriers to Trade in Kyrgyzstan Needs Assessment al Regulatory and procedural barriers to trade in Kyrgystan edur gyzstan c yr o r ade in K t r y and P T o or t t ssessmen arriers Needs A Regula B Information Service United Nations Economic Commission for Europe Palais des Nations UNITED NA CH - 1211 Geneva 10, Switzerland Telephone: +41(0)22 917 44 44 Fax: +41(0)22 917 05 05 E-mail: [email protected] Website: http://www.unece.org TIONS UNITED NATIONS Layout and Printing at United Nations, Geneva – 1515116 (E) – August 2015 – 307 – ECE/TRADE/412 UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE Regulatory and Procedural Barriers to Trade in Kyrgyzstan Needs Assessment United Nations New York and Geneva, 2015 2 Regulatory and Procedural Barriers to Trade in Kyrgyzstan Needs Assessment Note The designation employed and the presentation of the material in this publication do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city or area, or of its authorities, or concerning the delimitation of its frontiers of bounda- ries. This study is issued in English and Russian. ECE/TRADE/412 Copyright © 2015 United Nations All rights reserved Foreword 3 Foreword With an annual turnover amounting to 130 per cent of Kyrgyzstan’s gross domestic product (GDP), the powerful role of trade in determining the economy’s development trajectory cannot be over-empha- sized. However, the trade sector is yet to be exploited to its full potential.
    [Show full text]
  • Operationalizing Economic Corridor Development in CAREC: a Case Study of Almaty–Bishkek Corridor
    Reference Document for Session 1 Operationalizing Economic Corridor Development in CAREC: A Case Study of Almaty–Bishkek Corridor Consultation Meeting with the CAREC National Focal Points 25–26 September 2014 Issyk Kul, Kyrgyz Republic TABLE OF CONTENTS Page I. Introduction and Summary 1 II. CAREC Corridor Development: Three Tracks 5 III. Track 2: Transit and CAREC Corridor 1 11 IV. Almaty–Bishkek Corridor: An Exploration 20 V. Conclusions 40 Next steps 43 References 44 I. Introduction and Summary 1. At the close of a decade of regional cooperation, member countries of the Central Asia Regional Economic Cooperation (CAREC) Program adopted a new, long-term strategic framework in 2011, the CAREC 2020.1 While outlining the vision and goals of the CAREC Program, CAREC 2020 also underlined the operational priorities over the next decade, with a key innovation being the introduction of Economic Corridors as a core priority for the CAREC Program, in addition to the four priority sectors of CAREC: Transport, Trade Facilitation, Trade Policy, and Energy (Fig 1.1). Figure 1.1: CAREC Strategic Agenda 2011–20 Source: CAREC 2020 2. As a long-term strategy document, CAREC 2020 sought to look over the immediate horizon, opening the possibility of second-tier areas and emphasizing too the need for knowledge component of CAREC cooperation through the CAREC Institute (CI). Some progress has been made on the CI since the adoption of CAREC 2020 with the member countries agreeing at the 12th CAREC Ministerial Conference in Astana in 2013 to its physical establishment in Urumqui, People’s Republic of China (PRC).
    [Show full text]