Contents

1.0 INTRODUCTION ...... 1

1.1 Sabina Environmental Policy ...... 1

1.2 Site Location and Description ...... 1

1.3 Associated Permits, Licences and Authorizations ...... 2

2.0 SUMMARY OF ACTIVITIES ...... 3

2.1 Goose Lake ...... 3

2.2 George Lake ...... 4

3.0 WORK PLAN ...... 4

4.0 ENVIRONMENTAL STUDIES ...... 6

5.0 WILDLIFE ...... 6

5.1 Goose Lake ...... 6

5.2 George Lake ...... 6

6.0 INUIT EMPLOYEES ...... 6

7.0 COMMUNITY CONSULTATIONS ...... 7

8.0 ANNUAL INSPECTION ACTIVITIES ...... 7

9.0 SITE VISITS WITH COMMUNITY MEMBERS...... 7

10.0 SITE PHOTOS...... 8

11.0 TAKE-OFFS AND LANDINGS ...... 9

12.0 HELICOPTER TOUCH-DOWNS ...... 10

13.0 PROGRESSIVE RECLAMATION WORK ...... 10

14.0 PROJECT TERMS AND CONDITIONS ...... 10

Page 2 of 12

Sabina Gold & Silver Corp. Back River Project Annual Report N2016C0011 2016 Annual Report

1.0 INTRODUCTION

This report summarizes 2016 activities completed by Sabina related to land use permit #N2016C0011.

1.1 Sabina Environmental Policy

Sabina Gold & Silver Corp. takes very seriously its responsibility to act as a steward of the environment. In meeting this responsibility, Sabina acts to:  Ensure that we design our activities and operate in compliance with all environmental regulations to minimize our impact on the environment.  Promote responsibility and accountability of managers, employees and contractors to the protection of the environment, and make environmental performance an important factor in the management/contractor review process.  Provide resources, personnel and training to enhance the capacity of management, employees and contractors to implement programs and policies to protect the environment.  Communicate openly with employees, contractors, local stakeholders and government on our environmental protection and sustainability programs and performance and address concerns pertaining to potential hazards and impacts.  Promote the development and implementation of systems and technologies to minimize risks to the environment.  Establish and maintain appropriate emergency response plans for all activities and facilities  Maintain a self-monitoring program at each facility to ensure compliance and to proactively address plans to correct potential deficiencies.  Work cooperatively with government agencies, local communities and contractors to develop and enhance systems and technologies to improve environmental and sustainability practices.  Encourage all employees, contractors or stakeholders to report to management any known or suspicious departure from this policy or its related procedures.

1.2 Site Location and Description

The Back River exploration project is located in western , south of Bathurst Inlet within the Slave Structural Province. It lies approximately 525 kilometres northeast of Yellowknife and 400 kilometres south of , NU (Figure 1). The project area is within the zone of continuous permafrost, with the primary camp at Goose Lake and a satellite camp at George Lake. Coordinates for the camps are as follows:  Goose 65º32’ north 106º25’ west (UTM zone 13, 434034E, 7269928N)  George 65º55’ north 107º27’ west (UTM zone 13, 388032E, 7313438N)

• 1 of 10 •

Sabina Gold & Silver Corp. Back River Project Annual Report N2016C0011 2016 Annual Report

The Goose camp is located on the slope of the western bank of Goose Lake and consists of a 158-person camp constructed for support services directed towards exploration activities (Figures 2 and 3). The lakeshore is approximately 50 m toward the north and the regional topographical gradient surrounding the camp ranges from 2% to 6% towards the north. The camp is approximately 500 metres (m) in length from east to west and 100 m wide from north to south, covering an area of 50,000 m2. A small but visible creek runs east northeast on the eastern side of the camp. The camp facilities are located on natural tundra underlain by a of layer overlying silt-sand material. The George camp is located at the southern end of George Lake and improvements were made during the 2012 season including construction to improve the camp to support a 60 person camp and exploration drill program (Figure 4). Additional improvements in 2013 included the construction of two helicopter pads and a berm for the gray water discharge. Regionally this exploration area lies within the Takijuq Lake Uplands ecoregion, which covers the south central portion of the West . This area is made up of broad, sloping uplands, plateaus, and lowlands (WKRLUP, 2005). Much of the area is largely composed of unvegetated rock outcrops and boulder fields. The landscape is characterized by higher elevations, which are moderated by open water during the late summer and early fall. The exploration properties occur within the Bathurst Inlet-Burnside Watershed and the area is dotted by thousands of lakes, collected by streams or by one of the major rivers in the area (e.g., Burnside, Mara). The exploration area lies within two geological provinces; the Slave Province and the Bear Province. The Slave Geological Province is underlain by granite and related gneisses, as well as by sedimentary and volcanic rocks (more than 2.5 billion years old). The Bear Geological Province contains mainly volcanic and sedimentary rocks ranging in age from about two billion years. The mean annual temperature is approximately -10.5ºC with a summer mean of 6ºC and a winter mean of -26.5ºC. The mean annual precipitation range is 200-300 mm (Environment Canada website). The ground is covered in snow from late October to June most years. Lakes are ice-covered from approximately October to June most years, with ice thickness reaching depths of at least 2.0 metres.

1.3 Associated Permits, Licences and Authorizations

Sabina is actively exploring the Goose and George area under valid land use, quarry, and water permits seen in Tables 1 and 2 respectively.

• 2 of 10 •

Sabina Gold & Silver Corp. Back River Project Annual Report N2016C0011 2016 Annual Report

Table 1. List of Licences and Permits issued for Goose Project Issuing Permit No. Permit Name Expiry Agency N2016C0011 Mineral Exploration 2021-10-26 INAC KTL304C017 Goose Exploration 2017-12-12 KIA 2BE-GOO1520 Goose Camp 2020-02-18 NWB KTP11Q001 Rock quarry area 2017-12-12 KIA Sand/gravel quarry area KTP12Q001 2017-12-12 KIA adjacent to airstrip KTL204C012 Boulder exploration 2017-12-12 KIA KTL204C020 Boot exploration 2017-12-12 KIA

Table 2. List of Licences and Permits issued for George Project Permit No. Permit Name Expiry Issuing Agency N2016C0011 Mineral Exploration 2021-10-26 INAC KTL304C018 George Exploration 2017-12-12 KIA KTP12Q002 George Quarry 2017-12-12 KIA 2BE-GEO1520 George Camp 2020-05-29 NWB

2.0 SUMMARY OF ACTIVITIES

2.1 Goose Lake

During the 2016 season, planes arriving in and out of the Goose Lake property utilized both the ice and all-weather strip during the March 15th to April 22nd opening as well as solely the all-weather airstrip during both the June 14th to June 29th and August 16th to 31st openings. Personnel arrived at the Goose Lake site on March 15th to open the camp and prepare the ice strip for larger aircraft. By March 26th all work crews had arrived at Goose with drilling activities initiated. Once the ice airstrip was developed enough to receive freighter aircraft, 737 type aircraft were used to deliver 13 bulk fuel and 1 bulk supply freight load to Goose site. The camp can accommodate a maximum of 158 people, however, the average daily occupancy throughout the 2016 season was 16 people with a peak of 41 people in the March/April opening. The Goose Lake Quarry east of camp was not operational during the 2016 season. The 2016 field season consisted of three camp opening events: March 15th- April 22nd, June 14th – 29th and August 16th – 31st for a total of 71 operating days. Within the March/April camp opening, 19 diamond drill holes were drilled for exploration purposes for a total of 2,746 metres; all water was sourced from Goose Lake. Detailed geological mapping and sampling were done in sections of Goose, Boulder, Bath, and George properties, in June and August, 2016. Samples were collected and submitted for assay and for trace element analysis. At Goose, Boulder, and George, areas of current exploration interest were targeted, to advance understanding of potential prospects, and to follow up soil and rock sampling done in previous years. Some mapping in June, 2016

• 3 of 10 •

Sabina Gold & Silver Corp. Back River Project Annual Report N2016C0011 2016 Annual Report

at Goose and at Bath was done to support engineering work in areas of planned or possible future infrastructure development. Till sampling was done at Goose and Boulder properties in August, 2016. In total, 401 samples at Goose and 288 samples at Boulder were collected for gold and arsenic analysis to advance exploration efforts in these areas. Del Property was visited briefly in June, 2016 to confirm locations of historical drill collars and samples.

2.2 George Lake

The George camp was not operational during the 2016 season.

3.0 WORK PLAN

Possible 2017 activities may include, but are not limited to:

 March 29th to mid-May: o Approximate 6 week winter exploration drilling program at Goose camp. Limited personnel will be on site for the first week; with initial activity limited to camp opening tasks, such as snow clearing, warming up buildings, starting equipment, etc. o Potential mobilization of a drill to Bathurst Inlet for future geotechnical program.

 Mid-June to mid-July: o Approximate 2-3 week summer field based exploration program at Goose camp.

 August to mid-September: o Approximate 6 week fall exploration drilling program at Goose camp.

• 4 of 10 •

Sabina Gold & Silver Corp. Back River Project Annual Report N2016C0011 2016 Annual Report

Figure 1. Sabina Properties in the Kitikmeot Region.

• 5 of 10 •

Sabina Gold & Silver Corp. Back River Project Annual Report N2016C0011 2016 Annual Report

4.0 ENVIRONMENTAL STUDIES

The weather station required resetting on its base (after being upset) in order to collect rainfall, temperature, wind (speed and direction), solar radiation and barometric pressure data. Permafrost monitoring via an automated system continued which included data collection from thermistors. This 2016 data will be incorporated into the existing environmental baseline data.

5.0 WILDLIFE

5.1 Goose Lake

In August, several small groups of caribou were identified as they moved through the Project area. The caribou were monitored and no interactions with vehicles occurred.

Several wolves and wolverines were spotted transiting through the Project area. A lone wolf in August was deterred utilizing bear bangers. No further interaction occurred.

5.2 George Lake

George Lake was not operational in 2016 however Geologists, based out of Goose Lake, spent time soil and rock sampling. Like Goose, in August, several small groups of caribou were identified.

A lone wolverine and muskox were also spotted.

6.0 INUIT EMPLOYEES

The following table identifies the Nunavut Land Claim Agreement (NLCA) beneficiaries employed by Sabina and total days worked on the Back River Exploration Project. The table does not include those workers employed by contractors or suppliers. During 2016, 7 Inuit workers were employed by Sabina with a gross payroll value of approximately $171,096.00.

Table 3. NLCA beneficiary employees of Back River Project, 2016.

Number of Employees Community

• 6 of 10 •

Sabina Gold & Silver Corp. Back River Project Annual Report N2016C0011 2016 Annual Report

3 Cambridge Bay 3 1 Yellowknife

Total Approximate Gross Payroll $171,096.00

7.0 COMMUNITY CONSULTATIONS

Sabina has conducted numerous community engagement sessions throughout the Kitikmeot region providing updates on current exploration activities and future proposed Project development. Please see Appendix A for details on dates, communities visited and topics discussed.

8.0 ANNUAL INSPECTION ACTIVITIES

Inspections that occurred during the 2016 exploration programs include:

 August 10th, INAC Lands Inspector Baba Pedersen visited Back River to inspect legacy drill sites and fuel caches on Crown Land. No findings were reported on these areas by the inspector.  August 23rd, KIA Inspector Tannis Bolt completed an inspection of Goose Lake camp. There were no drilling activities underway during this inspection. No findings were identified and the inspection of the camp was found to be in compliance with the permits. Sabina will continue to backhaul waste items from site as the opportunities arise.

9.0 SITE VISITS WITH COMMUNITY MEMBERS

In addition to the 2016 work programs, two, one day tours took place at Goose:  Community tour on April 12th  Engineering tour on August 24th

• 7 of 10 •

Sabina Gold & Silver Corp. Back River Project Annual Report N2016C0011 2016 Annual Report

10.0 SITE PHOTOS

Figure 2. Aerial image of Goose camp looking west. Photograph taken August, 2013.

• 8 of 10 •

Sabina Gold & Silver Corp. Back River Project Annual Report N2016C0011 2016 Annual Report

Figure 3. Aerial image of Goose camp looking east. Photograph taken August, 2013

Figure 4. Aerial image of George camp looking east. Photograph taken October, 2013.

11.0 TAKE-OFFS AND LANDINGS

• 9 of 10 •

Sabina Gold & Silver Corp. Back River Project Annual Report N2016C0011 2016 Annual Report

For all the 2016 openings, personnel, equipment and supplies were mobilized to the property by fixed wing aircraft including Twin Otter (on skis for the opening crew and floats for the engineering tour), Dornier 228 and Dash-8 types.

Once the ice airstrip was developed enough to receive freighter aircraft, 737 type aircraft were used to deliver 13 bulk fuel and 1 bulk supply freight load to Goose site.

Table 4. Goose Lake Flight Inventory.

Aircraft Twin Dornier Dash-6 Dash-8 Buffalo Electra 737 Hercules King Air Quantity 1 6 4 11 0 0 14 0 0 Total 36

12.0 HELICOPTER TOUCH-DOWNS

Helicopter support included one 206 Jet Ranger type during the June opening and one 206 Long Ranger type during the August opening. These aircraft were stationed at Goose and mobilized field crews when required throughout the openings. Records were not kept of every individual touchdown, however it would be reasonable to estimate an overall average of 7-9 landings per day including drill crew shift changes, drill support, as well as geological, survey and environmental crews. This estimate would result in approximately 250 landings.

13.0 PROGRESSIVE RECLAMATION WORK

During the 2016 season, reclamation activities were focused on current drilling activities.

14.0 PROJECT TERMS AND CONDITIONS

Sabina has, to the best of our knowledge, conducted this operation in full compliance with the terms and conditions annexed to the permits, and we are actively working with inspectors and regulators to address any issues or concerns which arise and to improve the way in which we operate. We strive to maintain a high standard of performance in the course of all of our operations.

• 10 of 10 •

Sabina Gold & Silver Corp

Appendix A: Records of Meetings and Major Correspondence with Community and Stakeholder Groups

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity Cambridge Bay February 14, 2012 Brenda Sitatak Introductions and information sharing. HTO Manager February 14, 2012 Renee Krucas Introductions and information sharing. Executive Director, Kitikmeot Heritage Society February 14, 2012 Connie Kapolak Introductions and information sharing. High School Principal March 27, 2012 Brenda Sitatak Introductions and update. HTO Manager March 27, 2012 Stephen King, Senior Administrative Officer Project introduction. Jim McEchrean, Economic Development Officer Hamlet of Cambridge Bay April 5, 2012 Renee Krucas Letter / invitation to nominate representatives to the Executive Director, Kitikmeot Heritage Society Cambridge Bay Community Advisory Group. April 5, 2012 Stephen King, Senior Administrative Officer Letter / invitation to nominate representative to the Hamlet of Cambridge Bay Cambridge Bay Community Advisory Group. April 5, 2012 Brenda Sitatak Letter / invitation to nominate representative to the HTO Manager Cambridge Bay Community Advisory Group. June 14, 2012 General public Call-in radio show. June 14, 2012 Jessie Lyall, HTO Board Member Project introduction. Brenda Sitatak, HTO Manager June 14, 2012 General public Public meeting - Project overview. June 14, 2012 Hamlet Council and administration Project introduction. June 15, 2012 Cambridge Bay Community Advisory Group Project introduction. September 11-12, 2012 Cambridge Bay Community Advisory Group Sabina hosted a dinner and meeting for the Cambridge Bay and Community Advisory Groups (CAGs) in Cambridge Bay on September 11, 2012. The CAGs also visited the Back River Project site on September 12, 2012. September 27-29, 2012 Interviews conducted with a number of individuals Socio-economic baseline data collection; documentation of representing a variety of interests in the community expected Project benefits, Project concerns, and suggested including: government administration; health, wellness mitigation measures. and social services; safety and protection services; business and economic development; and education and training November 19, 2012 General public Call-in radio show.

Page 1 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity November 19, 2012 High school students and staff Mining and geology presentation. November 19, 2012 General public Public open house. November 19, 2012 Cambridge Bay Community Advisory Group Project update. November 30 - December 1, 2012 Local hunters from Cambridge Bay Land use focus group. February 5-6, 2013 General public Sabina representatives participated in NIRB's scoping meetings for the Project and were available to the public for questions and information sharing. February 5, 2013 Cambridge Bay Community Advisory Group Project update. April 23, 2013 General public Public meeting - Project overview/update. April 23, 2013 Cambridge Bay HTO Project overview/update. August 20, 2013 General public Sabina provided an overview of the Back River Project and its traditional knowledge study. August 20, 2013 General public The Kitikmeot Inuit Association provided an overview of the Naonaiyaotit Traditional Knowledge Project (NTKP) report completed for the Back River Project and additional traditional knowledge workshops being conducted. August 21, 2013 Cambridge Bay Community Advisory Group Project update and review of Inuinnaqtun terminology for traditional seasons. August 21-23, 2013 Selected elders and knowledge holders A series of traditional knowledge workshops were held with selected elders and local knowledge holders for Sabina’s traditional knowledge study. These workshops focused on the topics of ‘heritage and land use’, ‘terrestrial environment’ and ‘marine environment’. November 19, 2013 General public Public meeting - Project overview/update & DEIS submission overview. November 19, 2013 Cambridge Bay Community Advisory Group Project update. November 19, 2013 Cambridge Bay high school students Project overview and discussion of future employment opportunities. November 19, 2013 General public Radio update. January 23, 2014 General public Career fair participation. February 2014 Kitikmeot Heritage Society Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included. February 2014 Cambridge Bay Community Advisory Group Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included.

Page 2 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity February 2014 Hamlet of Cambridge Bay Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included. February 2014 Cambridge Bay HTO Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included. March 25, 2014 General public NIRB held community information sessions for the Project’s DEIS and were available to the public for questions and information sharing. Note – Sabina representatives were unable to attend due to flight cancellations. March 28, 2014 Cambridge Bay Community Advisory Group Project update. April 27, 2014 General public Radio update / call-in radio show. April 28, 2014 Jim McEchrean, Economic Development Officer, Project update. Hamlet of Cambridge Bay April 28, 2014 Brendan Griebel, Executive Director, Kitikmeot Heritage Introductions and Project update/overview. Society April 28, 2014 General public Radio update / call-in radio show. June 7-10, 2014 Selected elders and knowledge holders A series of traditional knowledge interviews were held with selected elders and local knowledge holders as a component of proposed fish offsetting activities in the Bernard Harbour, Nunavut area. July 14-15, 2014 Cambridge Bay Community Advisory Group Sabina hosted the Cambridge Bay and Kugluktuk Community Advisory Groups at the Back River Project site on July 14-15. Site tours were provided and Project information was shared. October 28,2014 Hamlet of Cambridge Bay Project update. November 20, 2014 Cambridge Bay Community Readiness Initiative Sabina met with Cambridge Bay’s Community Readiness Committee Initiative Committee. December 18, 2014 Cambridge Bay Community Readiness Initiative Sabina met with Cambridge Bay’s Community Readiness Committee Initiative Committee. February 5, 2015 Cambridge Bay high school students Project overview and discussion of future employment opportunities. February 9, 2015 Kitikmeot Heritage Society representatives Project update and discussion of potential future donations. February 9, 2015 Gordon Bligh, Arctic College Project update and discussion of mine-related training/education. March 10, 2015 Cambridge Bay Community Readiness Initiative Sabina met with Cambridge Bay’s Community Readiness Committee Initiative Committee. April 7, 2015 Cambridge Bay Community Readiness Initiative Sabina met with Cambridge Bay’s Community Readiness Committee Initiative Committee.

Page 3 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity May 10, 2015 Cambridge Bay Community Readiness Initiative Sabina met with Cambridge Bay’s Community Readiness Committee Initiative Committee. June 15, 2015 Cambridge Bay Community Advisory Group Project update and FEIS submission overview. June 16, 2015 Hamlet of Cambridge Bay Representatives Project update and FEIS submission overview. June 16, 2015 General public Public meeting – Project update and FEIS submission overview. October 7, 2015 Cambridge Bay HTO Project update and FEIS submission overview. February 10, 2016 Cambridge Bay Community Advisory Group Project update and FEIS submission/NIRB final hearings overview. March 5, 2016 Hamlet of Cambridge Bay Emailed letter re: Sabina’s FEIS submission. Cambridge Bay HTO April 11-12, 2016 Cambridge Bay HTO Representative Representatives from the Cambridge Bay HTO and Community Cambridge Bay Community Wellness Centre Wellness Centre participated in meetings and a Back River Representative Project site visit hosted by Sabina. July 6, 2016 Cambridge Bay Community Advisory Group Project update re: NIRB final hearing report. July 6, 2016 General Public Public Meeting – Project update re: NIRB final hearing report. July 7, 2016 Cambridge Bay HTO Project update re: NIRB final hearing report. September 15, 2016 General Public Sabina participated in the Cambridge Bay portion of the 2016 Kitikmeot Career Fair. September 19, 2016 Hamlet of Cambridge Bay Project update re: NIRB final hearing report (Sabina representatives participated in-person and via teleconference). November 30, 2016 General Public Project update and update on revised Wildlife Mitigation and Monitoring Program. December 1, 2016 Cambridge Bay HTO Project update and update on revised Wildlife Mitigation and Monitoring Program. December 1, 2016 General Public Sabina representatives set up an informational table at the Co-op regarding the revised Wildlife Mitigation and Monitoring Program. December 1, 2016 Cambridge Bay Community Advisory Group Project update and update on revised Wildlife Mitigation and Monitoring Program. January 23, 2017 Cambridge Bay Community Advisory Group members Letter – Update on January 12, 2017 INAC Minister’s decision (various) and thank you for providing letter of support. Past Project employee

Page 4 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity Kugluktuk April 11, 2012 Barbara Adjun Letter / invitation to nominate representative to the HTO Manager Kugluktuk Community Advisory Group. April 26, 2013 Donald LeBlanc, Senior Administrative Officer Letter / invitation to nominate representative to the Hamlet of Kugluktuk Kugluktuk Community Advisory Group. June 12, 2012 Kugluktuk HTO Project introduction. June 12, 2012 General public Public meeting - Project overview. June 13, 2012 Donald LeBlanc, Senior Administrative Officer Project introduction. Hamlet of Kugluktuk June 13, 2012 Kugluktuk Community Advisory Group Project introduction. September 11-12, 2012 Kugluktuk Community Advisory Group Sabina hosted a dinner and meeting for the Kugluktuk and Cambridge Bay Community Advisory Groups (CAGs) in Cambridge Bay on September 11, 2012. The CAGs also visited the Back River Project site on September 12, 2012. October 1-3, 2012 Interviews conducted with a number of individuals Socio-economic baseline data collection; documentation of representing a variety of interests in the community expected Project benefits, Project concerns, and suggested including: government administration; health, wellness mitigation measures. and social services; safety and protection services; business and economic development; and education and training November 21, 2012 High school students and staff Mining and geology presentation. November 21, 2012 General public Public meeting - Project overview/update. November 21, 2012 Kugluktuk Community Advisory Group Project update. November 27, 2012 Local hunters from Kugluktuk Land use focus group. February 7-8, 2013 General public Sabina representatives participated in NIRB's scoping meetings for the Project and were available to the public for questions and information sharing. February 8, 2013 Kugluktuk Community Advisory Group Project update. April 22, 2013 General public Public meeting - Project overview/update. April 22, 2013 Kugluktuk Community Advisory Group Project update. August 12, 2013 General public Sabina provided an overview of the Back River Project and its traditional knowledge study. August 13, 2013 General public The Kitikmeot Inuit Association provided an overview of the Naonaiyaotit Traditional Knowledge Project (NTKP) report completed for the Back River Project and additional

Page 5 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity traditional knowledge workshops being conducted. August 14-16, 2013 Selected elders and knowledge holders A series of traditional knowledge workshops were held with selected elders and local knowledge holders for Sabina’s traditional knowledge study. These workshops focused on the topics of ‘heritage and land use’, ‘terrestrial environment’ and ‘marine environment’. November 18, 2013 General public Public meeting - Project overview/update & DEIS submission overview. November 18, 2013 Kugluktuk Hamlet Council Project update. November 18, 2013 Kugluktuk Community Advisory Group Project update. November 18, 2013 Kugluktuk high school students Project overview and discussion of future employment opportunities. January 24, 2014 General public Career fair participation. February 12, 2014 Donald LeBlanc, Senior Administrative Officer Letter / invitation to nominate representative to the Hamlet of Kugluktuk Kugluktuk Community Advisory Group. February 2014 Kugluktuk Community Advisory Group Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included. February 2014 Hamlet of Kugluktuk Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included. February 2014 Kugluktuk HTO Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included. March 19, 2014 David Nivingalok (Chairperson) and Kevin Klengenberg Teleconference to discuss proposed fish offsetting work to be (Secretary-Treasurer), Kugluktuk HTO conducted at Bernard Harbour. March 24, 2014 General public Sabina representatives participated in NIRB's community information sessions for the Project’s DEIS and were available to the public for questions and information sharing. March 24, 2014 Kugluktuk Community Advisory Group Project update. March 25, 2014 Kugluktuk HTO Meeting to discuss proposed fish offsetting work to be conducted at Bernard Harbour and the associated TK study. April 29, 2014 Kugluktuk HTO Meeting to discuss Kugluktuk HTO-Sabina Bernard Harbour Restoration Project Agreement. April 30, 2014 Kugluktuk Community Readiness Initiative Committee Sabina met with Kugluktuk’s Community Readiness Initiative Committee in Kugluktuk to discuss the plans and goals of the committee and how Sabina might contribute. April 30, 2014 Donald LeBlanc, SAO, Hamlet of Kugluktuk Project update.

Page 6 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity May 2, 2014 Kugluktuk Community Readiness Initiative Committee Sabina met with Kugluktuk’s Community Readiness Initiative Committee in Yellowknife to discuss the plans and goals of the committee and how Sabina might contribute. June 1-6, 2014 Selected elders and knowledge holders A series of traditional knowledge interviews were held with selected elders and local knowledge holders as a component of proposed fish offsetting activities in the Bernard Harbour, Nunavut area. A project overview meeting/presentation was also held with local study participants prior to the interviews commencing. July 13, 2014 Bernard Harbour TK study participants, HTO chairperson, A TK study results verification meeting was held with and acting HTO manager participants in the Bernard Harbour TK study and with the Kugluktuk HTO chairperson and acting manager. Various clarifications were made by the participants, which were later incorporated into the final TK study report. July 14-15, 2014 Kugluktuk Community Advisory Group Sabina hosted the Cambridge Bay and Kugluktuk Community Advisory Groups at the Back River Project site on July 14-15. Site tours were provided and Project information was shared. July 17, 2014 Kugluktuk HTO chairperson The chairperson of the Kugluktuk HTO accompanied Sabina representatives and various other attendees during a day- long site visit to the Bernard Harbour stream restoration project. February 12, 2015 Kugluktuk Community Advisory Group Sabina provided a Project update and administered a country food consumption questionnaire. February 12, 2015 Kugluktuk HTO representatives Sabina met with the Kugluktuk HTO chairperson, treasurer, and manager to provide an update on the Bernard Harbour restoration project and Bernard Harbour TK study. February 17, 2015 Kugluktuk HTO Letter and copy of the draft ‘Traditional Knowledge Study Report on the Arctic Char Fishery in the Nulahugyuk Creek – Hingittok Lake Area (Bernard Harbour), Nunavut’ provided to the HTO. April 21, 2015 Kugluktuk HTO Final copy of the ‘Traditional Knowledge Study Report on the Arctic Char Fishery in the Nulahugyuk Creek – Hingittok Lake Area (Bernard Harbour), Nunavut’ provided to the HTO. May 8, 2015 Barbara Adjun, Kugluktuk HTO Manager Phone update on the Bernard Harbour restoration project. May 21, 2015 David Nivingalok, Kugluktuk HTO Chairperson Phone update on the Bernard Harbour restoration project. May 27, 2015 Hamlet of Kugluktuk Sabina participated (via teleconference) in a multi- stakeholder information session hosted on Kugluktuk’s Community Readiness Initiative where feedback was sought on the draft Kugluktuk Community Readiness Report.

Page 7 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity June 17, 2015 General public Public meeting – Project update and FEIS submission overview. The results of the Bernard Harbour TK study and plans for the Bernard Harbour restoration project were also reviewed. June 18, 2015 Kugluktuk Community Advisory Group Project update and FEIS submission overview. June 18, 2015 Kugluktuk HTO Project update and FEIS submission overview. The results of the Bernard Harbour TK study and plans for the Bernard Harbour restoration project were also reviewed. June 19, 2015 Hamlet of Kugluktuk Project update and FEIS submission overview. July 8, 2015 David Nivingalok, Kugluktuk HTO Chairperson Letter providing information on the 2015 Bernard Harbour work proposal. February 11, 2016 Kugluktuk HTO Project update and FEIS submission/NIRB final hearings overview. Bernard Harbour project update. February 12, 2016 Kugluktuk Community Advisory Group Project update and FEIS submission/NIRB final hearings overview. March 5, 2016 Hamlet of Kugluktuk Emailed letter re: Sabina’s FEIS submission. Kugluktuk HTO March 16-17, 2016 Kugluktuk Job Fair and Graduation Ceremony Sabina participated in a job fair and graduation ceremonies in Kugluktuk. April 11-12, 2016 Kugluktuk HTO Representatives Representatives from the Kugluktuk HTO participated in meetings and a Back River Project site visit hosted by Sabina. June 7, 2016 General Public Public Meeting on the Bernard Harbour Restoration Project June 8-9, 2016 Kugluktuk HTO and Invited Participants Bernard Harbour Restoration Project Workshop June 17, 2016 Kugluktuk HTO Teleconference Project update re: NIRB final hearing report. July 5, 2016 Hamlet of Kugluktuk Project update re: NIRB final hearing report. July 5, 2016 General Public Public meeting – Project update re: NIRB final hearing report. July 6, 2016 Kugluktuk Community Advisory Group Project update re: NIRB final hearing report. September 16, 2016 General Public Sabina participated in the Kugluktuk portion of the 2016 Kitikmeot Career Fair. November 9, 2016 Kugluktuk HTO Sabina provided a Bernard Harbour Restoration Project update by teleconference. December 2, 2016 Kugluktuk HTO Project update, Bernard Harbour project update, and update on revised Wildlife Mitigation and Monitoring Program December 3, 2016 General Public Call-in radio show - Project update and update on revised Wildlife Mitigation and Monitoring Program

Page 8 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity December 3, 2016 General Public Project update and update on revised Wildlife Mitigation and Monitoring Program December 4, 2016 Kugluktuk Community Advisory Group Project update and update on revised Wildlife Mitigation and Monitoring Program January 23, 2017 Hamlet of Kugluktuk Letter – Update on January 12, 2017 INAC Minister’s decision Kugluktuk HTO and thank you for providing letter of support. Three elders Community member Kingaok and Omingmaktok April 5, 2012 Sam Kapolak, Chairperson Letter / invitation to nominate representative to the Bathurst Inlet HTO Cambridge Bay Community Advisory Group. April 5, 2012 Peter Kapolak, Chairperson Letter / invitation to nominate representative to the Omingmaktok HTO Cambridge Bay Community Advisory Group. November 18, 2012 Various residents of Kingaok and Omingmaktok Sabina hosted a Project information meeting in Cambridge Bay specifically for residents of Kingaok and Omingmaktok. November 30 - December 1, 2012 Local hunters from the Bathurst Inlet area Land use focus group. Fall 2012 Interviews conducted with selected individuals from the Socio-economic baseline data collection; documentation of Bathurst Inlet area for Sabina’s socio-economic study expected Project benefits, Project concerns, and suggested mitigation measures. January 1, 2013 Boyd Warner Project discussion (via phone). President, Bathurst Inlet Lodge August 14-16, 2013 (in Kugluktuk) Selected elders and knowledge holders from or familiar A series of traditional knowledge workshops were held with August 21-23 (in Cambridge Bay) with the Bathurst Inlet area selected elders and local knowledge holders for Sabina’s traditional knowledge study. These workshops focused on the topics of ‘heritage and land use’, ‘terrestrial environment’ and ‘marine environment’. November 19, 2013 Various residents of Kingaok and Omingmaktok Project update in Cambridge Bay specifically for residents of Kingaok and Omingmaktok and the Cambridge Bay community advisory group. February 2014 Omingmaktok HTO Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included. September 24, 2014 Residents of Kingaok and Omingmaktok Letter / invitation to attend October 28, 2014 dinner and meeting on the Back River Project in Cambridge Bay, specifically for residents of Kingaok and Omingmaktok. October 28, 2014 Residents of Kingaok and Omingmaktok Dinner and meeting on the Back River Project in Cambridge Bay, specifically for residents of Kingaok and Omingmaktok.

Page 9 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity January 21, 2015 Residents of Kingaok and Omingmaktok Letter / invitation to attend February 8, 2015 dinner and meeting on the Back River Project in Cambridge Bay, specifically for residents of Kingaok and Omingmaktok. May 21, 2015 Residents of Kingaok and Omingmaktok Letter / invitation to attend June 15, 2015 dinner and meeting on the Back River Project in Cambridge Bay, specifically for residents of Kingaok and Omingmaktok. June 15, 2015 Residents of Kingaok and Omingmaktok Dinner and meeting on the Back River Project (re: Project update and FEIS submission overview) in Cambridge Bay, specifically for residents of Kingaok and Omingmaktok. February 9, 2016 Residents of Kingaok and Omingmaktok Dinner and meeting on the Back River Project (re: Project update, FEIS submission, and NIRB final hearings overview) in Cambridge Bay, specifically for residents of Kingaok and Omingmaktok. March 5, 2016 Bathurst Inlet HTO Emailed letter re: Sabina’s FEIS submission. Bay Chimo HTO April 11-12, 2016 Bathurst Inlet HTO Representative Representatives from the Bathurst Inlet HTO and Bay Chimo Bay Chimo HTO Representative HTO participated in meetings and a Back River Project site visit hosted by Sabina. December 1, 2016 Residents of Kingaok and Omingmaktok Project update and update on revised Wildlife Mitigation and Monitoring Program Gjoa Haven June 20, 2012 Hamlet Council members and staff Project introduction. June 20, 2012 General public Public meeting - Project overview. September 17-19, 2012 Interviews conducted with a number of individuals Socio-economic baseline data collection; documentation of representing a variety of interests in the community expected Project benefits, Project concerns, and suggested including: government administration; health, wellness mitigation measures. and social services; business and economic development; and education and training February 12, 2013 General public Sabina representatives participated in NIRB's scoping meeting for the Project and were available to the public for questions and information sharing. February 13, 2013 General public Radio Show - Project update and notice of upcoming Actua educational program for Kitikmeot youth. April 24, 2013 General public Public meeting - Project overview/update. April 24, 2013 Gjoa Haven HTO Project overview/update. April 24, 2013 General public Radio Show - Project update.

Page 10 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity November 20, 2013 General public Public meeting - Project overview/update & DEIS submission overview. November 20, 2013 Gjoa Haven HTO Project update. November 20, 2013 Hamlet of Gjoa Haven representatives Project update. November 20, 2013 Gjoa Haven high school students Project overview and discussion of future employment opportunities. November 20, 2013 General public Radio update. January 21, 2014 General public Career fair participation. February 2014 Hamlet of Gjoa Haven Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included. February 2014 Gjoa Haven HTO Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included. March 26, 2014 General public NIRB held community information sessions for the Project’s DEIS and were available to the public for questions and information sharing. Note – Sabina representatives were unable to attend due to flight cancellations. March 5, 2016 Hamlet of Gjoa Haven Emailed letter re: Sabina’s FEIS submission. Gjoa Haven HTO March 7, 2016 Hamlet of Gjoa Haven Emailed letter re: recent attempts by Sabina to host a public Gjoa Haven HTO meeting in Gjoa Haven. Residents of Gjoa Haven April 11-12, 2016 Hamlet of Gjoa Haven Representative Representatives from the Hamlet of Gjoa Haven and Kitikmeot Inuit Association (Gjoa Haven) Representative Kitikmeot Inuit Association (Gjoa Haven) participated in meetings and a Back River Project site visit hosted by Sabina. July 8, 2016 Hamlet of Gjoa Haven representatives Project update re: NIRB final hearing report. July 8, 2016 General Public Public meeting - Project update re: NIRB final hearing report. January 23, 2017 Hamlet of Gjoa Haven Letter – Update on January 12, 2017 INAC Minister’s decision Past Project employees (various) and thank you for providing letter of support. June 19, 2012 General public Public meeting - Project overview. June 19, 2012 Taloyoak HTO Project overview. June 19, 2012 Tommy Aiyout, Mayor of Taloyoak Project overview. David Irqquit, Assistant SAO Hamlet of Taloyoak

Page 11 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity September 25-26, 2012 Interviews conducted with a number of individuals Socio-economic baseline data collection; documentation of representing a variety of interests in the community expected Project benefits, Project concerns, and suggested including: government administration; health, wellness mitigation measures. and social services; safety and protection services; business and economic development; and education and training February 13, 2013 General public Sabina representatives participated in NIRB's scoping meeting for the Project and were available to the public for questions and information sharing. February 14, 2013 General public Radio Show - Project update and notice of upcoming Actua educational program for Kitikmeot youth. April 25, 2013 General public Public meeting - Project overview/update. April 25, 2013 General public Radio Show - Project update. November 21, 2013 General public Public meeting - Project overview/update & DEIS submission overview. November 21, 2013 Taloyoak HTO Project update. November 21, 2013 Taloyoak Hamlet Council Project update. November 21, 2013 Taloyoak high school students Project overview and discussion of future employment opportunities. November 21, 2013 General public Radio update. January 20, 2014 General public Career fair participation. February 2014 Hamlet of Taloyoak Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included. February 2014 Taloyoak HTO Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included. March 28, 2014 General public NIRB held community information sessions for the Project’s DEIS and were available to the public for questions and information sharing. Note – Sabina representatives were unable to attend due to flight cancellations. June 17, 2015 General public Public meeting – Project update and FEIS submission overview. June 17, 2015 Hamlet of Taloyoak Project update and FEIS submission overview. March 5, 2016 Hamlet of Taloyoak Emailed letter re: Sabina’s FEIS submission. Taloyoak HTO

Page 12 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity April 11-12, 2016 Hamlet of Taloyoak Representative Representatives from the Hamlet of Taloyoak and Taloyoak Taloyoak HTO Representative HTO participated in meetings and a Back River Project site visit hosted by Sabina. July 7, 2016 Taloyoak HTO Project update re: NIRB final hearing report. July 7, 2016 Hamlet of Taloyoak representatives Project update re: NIRB final hearing report. July 7, 2016 General Public Public meeting - Project update re: NIRB final hearing report. January 23, 2017 Hamlet of Taloyoak Letter – Update on January 12, 2017 INAC Minister’s decision and thank you for providing letter of support. June 18, 2012 General public Public meeting - Project overview. September 20-21, 2012 Interviews conducted with a number of individuals Socio-economic baseline data collection; documentation of representing a variety of interests in the community expected Project benefits, Project concerns, and suggested including: government administration; health, wellness and mitigation measures. social services; safety and protection services; business and economic development; and education and training February 11, 2013 General public Sabina representatives participated in NIRB's scoping meeting for the Project and were available to the public for questions and information sharing. February 11, 2013 General public Radio Show - Project update and notice of upcoming Actua educational program for Kitikmeot youth. April 26, 2013 General public Public meeting - Project overview/update. April 26, 2013 General public Radio Show - Project update. April 26, 2013 Kugaaruk Hamlet Council Project overview/update. November 22, 2013 General public Public meeting - Project overview/update & DEIS submission overview. November 22, 2013 Kugaaruk Hamlet Council Project update. November 22, 2013 Kugaaruk high school students Project overview and discussion of future employment opportunities. November 22, 2013 General public Radio update. January 22, 2014 General public Career fair participation. February 2014 Hamlet of Kugaaruk Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included. February 2014 Kugaaruk HTO Letter – Update on January 2014 DEIS submission to NIRB and NWB. DEIS Plain Language Summary included.

Page 13 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity March 27, 2014 General public NIRB held community information sessions for the Project’s DEIS and were available to the public for questions and information sharing. Note – Sabina representatives were unable to attend due to flight cancellations. June 16, 2015 General public Public meeting – Project update and FEIS submission overview. March 5, 2016 Hamlet of Kugaaruk Emailed letter re: Sabina’s FEIS submission. Kugaaruk HTO April 11-12, 2016 Hamlet of Kugaaruk Representative Representatives from the Hamlet of Kugaaruk and Kugaaruk Kugaaruk HTO Representative HTO participated in meetings and a Back River Project site visit hosted by Sabina. July 6, 2016 Kugaaruk HTO Project update re: NIRB final hearing report. July 6, 2016 Hamlet of Kugaaruk Project update re: NIRB final hearing report. July 6, 2016 General Public Public meeting - Project update re: NIRB final hearing report. January 23, 2017 Hamlet of Kugaaruk Letter – Update on January 12, 2017 INAC Minister’s decision and thank you for providing letter of support. Yellowknife / Other Locations in the Northwest Territories November 15, 2012 Yellowknives Dene First Nation representatives Project overview. November 16, 2012 General public Public meeting – Project overview. February 20, 2013 General public Sabina representatives participated in NIRB's scoping meeting for the Project and were available to the public for questions and information sharing. November 12, 2013 Tlicho Government / Kwe Beh Working Group Project overview. representatives November 13, 2013 Deninu K’ue First Nation representatives Project overview. November 13, 2013 General public Public meeting - Project overview/update. November 14, 2013 Yellowknives Dene First Nation representative (T. Slack) Project update. November 15, 2013 North Slave Métis Alliance representatives Project overview. January 24, 2013 Yellowknives Dene First Nation (Attn: Todd Slack) Delivery of two USB memory sticks with full digital versions of Sabina’s DEIS submission included on each. January 24, 2013 Tlicho Government / Kwe Beh Working Group (Attn: Delivery of two USB memory sticks with full digital versions Henry Zoe and Sonny Zoe) of Sabina’s DEIS submission included on each. January 24, 2013 North Slave Métis Alliance (Attn: Eric Binion) Delivery of two USB memory sticks with full digital versions of Sabina’s DEIS submission included on each.

Page 14 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity January 24, 2013 Deninu K’ue First Nation (Attn: Chief Louis Balsillie and Delivery of two USB memory sticks with full digital versions Stephen Cuthbert) of Sabina’s DEIS submission included on each. April 1, 2014 General public Sabina representatives participated in NIRB's community information sessions for the Project’s DEIS and were available to the public for questions and information sharing. May 8, 2014 Yellowknives Dene First Nation Email update re: DEIS / NIRB regulatory process. May 8, 2014 Tlicho Government / Kwe Beh Working Group Email update re: DEIS / NIRB regulatory process. May 8, 2014 North Slave Métis Alliance Email update re: DEIS / NIRB regulatory process. May 8, 2014 Lutsel K’e Dene First Nation Email update re: DEIS / NIRB regulatory process. May 8, 2014 Deninu K’ue First Nation Email update re: DEIS / NIRB regulatory process. May 8, 2014 Dene Nation Email update re: DEIS / NIRB regulatory process. July 24, 2014 Yellowknives Dene First Nation Email update re: Sabina’s DEIS IR responses. July 24, 2014 Tlicho Government / Kwe Beh Working Group Email update re: Sabina’s DEIS IR responses. July 24, 2014 North Slave Métis Alliance Email update re: Sabina’s DEIS IR responses. July 24, 2014 Lutsel K’e Dene First Nation Email update re: Sabina’s DEIS IR responses. July 24, 2014 Deninu K’ue First Nation Email update re: Sabina’s DEIS IR responses. July 24, 2014 Dene Nation Email update re: Sabina’s DEIS IR responses. July 25, 2014 North Slave Métis Alliance representative (Matt Hoover) Phone call to discuss Sabina’s DEIS Information Request responses and future regulatory timelines/requirements. May 28, 2015 Yellowknives Dene First Nation Emailed letter and notice of June 15, 2015 public meeting in Yellowknife. May 28, 2015 Tlicho Government Emailed letter and notice of June 15, 2015 public meeting in Yellowknife. May 28, 2015 Deninu Kue First Nation Emailed letter and notice of June 15, 2015 public meeting in Yellowknife. May 28, 2015 North Slave Métis Alliance Emailed letter and notice of June 15, 2015 public meeting in Yellowknife. May 28, 2015 Lutsel K’e Dene First Nation Emailed letter and notice of June 15, 2015 public meeting in Yellowknife. June 15, 2015 General public Public meeting - Project update and FEIS submission overview. February 8, 2016 North Slave Métis Alliance Project / FEIS update meeting. March 5, 2016 Yellowknives Dene First Nation Emailed letter re: Sabina’s FEIS submission. March 5, 2016 Tlicho Government / Kwe Beh Working Group Emailed letter re: Sabina’s FEIS submission.

Page 15 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity March 5, 2016 North Slave Métis Alliance Emailed letter re: Sabina’s FEIS submission. March 5, 2016 Lutsel K’e Dene First Nation Emailed letter re: Sabina’s FEIS submission. July 8, 2016 North Slave Métis Alliance Project update re: NIRB final hearing report. July 8, 2016 General Public Public meeting - Project update re: NIRB final hearing report. Other February 13-15, 2012 Various community, government, and industry Sabina participated in the Kitikmeot Trade Show in stakeholders participated Cambridge Bay. March 28, 2012 Various community, government, and industry Sabina participated in the Kitikmeot Socio-Economic stakeholders participated Monitoring Committee meeting in Cambridge Bay. April 16-19, 2012 Various community, government, and industry Sabina participated in the Nunavut Mining Symposium in stakeholders participated . September 25-27, 2012 Various community, government, and industry Sabina participated in the Nunavut Trade Show in Iqaluit. stakeholders participated October 30-31, 2012 Various community, government, and industry Sabina participated in the Kitikmeot Stakeholders Meeting in stakeholders participated Cambridge Bay to discuss training and labour market needs in the Kitikmeot Region. November 13-15, 2012 Various community, government, and industry Sabina participated in the Yellowknife Geoscience Forum. stakeholders participated March 30, 2013 Various community, government, industry, and other Sabina issued the winter 2013 edition of its Project stakeholders newsletter ‘Back River News’ via email and at various locations in the Kitikmeot communities. February 11-13, 2013 Various community, government, and industry Sabina participated in the Kitikmeot Trade Show in stakeholders participated Cambridge Bay. April 8-11, 2013 Various community, government, and industry Sabina participated in the Nunavut Mining Symposium in stakeholders participated Iqaluit. June 28, 2013 Various community, government, industry, and other Sabina issued the summer 2013 edition of its Project stakeholders newsletter ‘Back River News’ via email and at various locations in the Kitikmeot communities. September 12, 2013 Various community, government, and industry Sabina participated in a meeting on Community Readiness in stakeholders participated the Kitikmeot Region, hosted by the Kitikmeot Inuit Association and Canadian Northern Economic Development Agency, in Cambridge Bay. September 24-26, 2013 Various community, government, and industry Sabina participated in the Nunavut Trade Show in Iqaluit. stakeholders participated October 9, 2013 Various community, government, industry, and other Sabina provided an email update on the results of its pre- stakeholders feasibility study for the Back River Project.

Page 16 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity October 18, 2013 Various community, government, and industry Sabina participated (via teleconference) in the Kitikmeot stakeholders participated Stakeholders Working Group meeting in Cambridge Bay to discuss training and employment activities and opportunities in the Kitikmeot Region. November 15, 2013 Various community, government, industry, and other Sabina issued the fall 2013 edition of its Project newsletter stakeholders ‘Back River News’ via email and at various locations in the Kitikmeot communities. November 19-21, 2013 Various community, government, and industry Sabina participated in the Yellowknife Geoscience Forum. stakeholders participated November 20-21, 2013 Various community, government, and industry Sabina participated in the Kitikmeot Socio-Economic stakeholders participated Monitoring Committee meeting in Cambridge Bay. December 3, 2013 Various community, government, and industry Sabina participated (via teleconference) in the Kitikmeot stakeholders participated Stakeholders Working Group meeting in Cambridge Bay to discuss training and employment activities and opportunities in the Kitikmeot Region. January 22, 2014 Various community, government, industry, and other Sabina issued the spring 2014 edition of its Project stakeholders newsletter ‘Back River News’ via email and at various locations in the Kitikmeot communities. February 10-12, 2014 Various community, government, and industry Sabina participated in the Kitikmeot Trade Show in stakeholders participated Cambridge Bay. February 12, 2014 Various community, government, industry, and other Sabina provided an email update on the DEIS conformity stakeholders decision it received for the Back River Project. February 18, 2014 Various community, government, and industry Sabina participated (via teleconference) in the Kitikmeot stakeholders participated Stakeholders Working Group meeting in Cambridge Bay to discuss training and employment activities and opportunities in the Kitikmeot Region. March 4, 2014 Various community, government, industry, and other Sabina provided an email update on the updated mineral stakeholders resource estimate it produced for the Back River Project. April 7-10, 2014 Various community, government, and industry Sabina participated in the Nunavut Mining Symposium in stakeholders participated Iqaluit. April 28, 2014 Various community, government, industry, and other Sabina provided an email update on recent agreements stakeholders signed between Sabina and the KIA for the Back River Project. June 5, 2014 Various community, government, and industry Sabina participated (via teleconference) in the Kitikmeot stakeholders participated Stakeholders Working Group meeting in Cambridge Bay to discuss training and employment activities and opportunities in the Kitikmeot Region.

Page 17 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity October 7-9, 2014 Various community, government, and industry Sabina participated in the Nunavut Trade Show in Iqaluit. stakeholders participated October 22, 2014 Various community, government, and industry Sabina participated (via teleconference) in the Kitikmeot stakeholders participated Stakeholders Working Group meeting in Cambridge Bay to discuss training and employment activities and opportunities in the Kitikmeot Region. November 13-19, 2014 Various community and government stakeholders Sabina participated in the Nunavut Impact Review Board’s participated Technical Meeting and Pre-Hearing Conference for the Back River Project in Cambridge Bay. November 25-27, 2014 Various community, government, and industry Sabina participated in the Yellowknife Geoscience Forum. stakeholders participated January 13, 2015 Various community, government, industry, and other Email update to Sabina email distribution list re: stakeholders environmental assessment progress and anticipated FEIS submission. January 27, 2015 Various community, government, industry, and other Sabina issued the winter 2015 edition of its Project stakeholders newsletter ‘Back River News’ via email and at various locations in the Kitikmeot communities. February 4, 2015 Various government and KIA representatives participated Sabina participated in a meeting in Cambridge Bay to establish a Terms of Reference for the Back River Socio- Economic Monitoring Committee Working Group. February 9-11, 2015 Various community, government, and industry Sabina participated in the Kitikmeot Trade Show in stakeholders participated Cambridge Bay. April 13-16, 2015 Various community, government, and industry Sabina participated in the Nunavut Mining Symposium in stakeholders participated Iqaluit. April 21-23, 2015 Various community, government, and industry Sabina participated in the Kitikmeot Mayors’ Conference in stakeholders participated Cambridge Bay. September 14, 2015 Various community, government, industry, and other Email update to Sabina email distribution list re: Initial stakeholders Project Feasibility Study. November 3-4, 2015 Various community, government, and industry Sabina participated in the Kitikmeot Socio-Economic stakeholders participated Monitoring Committee meeting in Cambridge Bay. December 9, 2015 Various community, government, industry, and other Email update to Sabina email distribution list re: FEIS stakeholders submission. February 9, 2016 Selected youth from the Kitikmeot Region Sabina met with selected youth from the Kitikmeot Region who were participating in the Kitikmeot Trade Show, to discuss education and career opportunities. February 9-10, 2016 Various community, government, and industry Sabina participated in and presented a Project update at the stakeholders participated Kitikmeot Trade Show in Cambridge Bay.

Page 18 of 19

Appendix A. Record of Meetings and Major Correspondence with Community and Stakeholder Groups

Date Individual(s) / Organization Type of Activity February 17, 2016 Various community, government, industry, and other Sabina issued the winter 2016 edition of its Project stakeholders newsletter ‘Back River News’ via email and at various locations in the Kitikmeot communities. April 4-6, 2016 Various community, government, and industry Sabina participated in the Nunavut Mining Symposium in stakeholders participated Iqaluit. April 19-21, 2016 Various community, government, and industry Sabina participated in the Kitikmeot Mayors’ Conference in stakeholders participated Cambridge Bay. April 25-30, 2016 Various community and government stakeholders Sabina participated in the Nunavut Impact Review Board’s participated Final Hearing for the Back River Project in Cambridge Bay. November 15-17, 2016 Various community, government, and industry Sabina participated in the Yellowknife Geoscience Forum in stakeholders participated Yellowknife. November 30-December 1, 2016 Various community, government, and industry Sabina participated in the Kitikmeot Socio-Economic stakeholders participated Monitoring Committee meeting in Cambridge Bay. December 2, 2016 Back River Socio-Economic Monitoring Working Group Sabina participated in a Back River Socio-Economic Members Monitoring Working Group meeting in Cambridge Bay. February 6-8, 2017 Various community, government, and industry Sabina participated in the Kitikmeot Trade Show in stakeholders participated Cambridge Bay.

Page 19 of 19