World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document RP1258 V4 DRAFT RAP Stage 1: Volume 2 - Annex ПДП Стадия 1: Том 2 - Приложение Ref. No. 9A000304.01 Public Disclosure Authorized 2014-08-28 Public Disclosure Authorized Public Disclosure Authorized OSHPC “Barki Tojik” ОАХК «Барки Точик» Republic of Tajikistan Республика Таджикистан Rogun HPP ESIA ОЭСВ РОГУНСКОЙ ГЭС Environmental and Social Оценка экологического и Impact Assessment for социального воздействия для Public Disclosure Authorized Rogun Hydro Power Plant Рогунской ГЭС Resettelement Action Plan План действий по for Stage 1 переселению на Этапе 1 Report prepared by/ Отчет подготовлен: Contact: Контактные лица: Dr. Robert Zwahlen Dr. Роберт Звален Environment and Social Development Специалист по окружающей среде и Specialist социальному развитию Pöyry Energy Ltd. «Pöyry Energy Ltd.» Hardturmstrasse 161, P.O. Box Hardturmstrasse 161, P.O. Box CH-8037 Zurich/Switzerland CH-8037 Zurich/Switzerland Tel. +41 44 355 55 54 Тел. +41 44 355 55 54 Mobile +41 76 356 21 13 Моб. +41 76 356 21 13 Fax +41 44 355 55 56 Факс +41 44 355 55 56 e-mail [email protected] e-мейл [email protected] http://www.poyry.com http://www.poyry.com Фотография на первой странице: новые поселения в Дангаре; сделана 2011-05-04 Picture on front page: New settlement in Dangara; picture taken 2011-05-04 Copyright © Pöyry Energy AG / Авторское право: © Pöyry Energy AG This report has been prepared by Pöyry Energy AG (“Pöyry”) for OSHPC Barki Tojik (the “Recipient”). No representation or warranty is made by Pöyry as to the accuracy and completeness of any of the information contained in the report and nothing in the report is or shall be relied upon as a promise or representation as to the future. All information contained in this report is of confidential nature and intended for the exclusive use of the Recipient. The Recipient may transmit the information contained in the report to its directors, officers, employees or professional advisors, provided that they are informed by the recipient of its confidential nature. Данный отчет был подготовлен Pöyry Energy AG («Pöyry») для ОАХК Барки Тоджик («Получатель»). Никаких гарантий не предоставляется со стороны Pöyry в точности и полноте информации, содержащейся в отчете, и никакая информация в отчете не является и не может рассматриваться как обещание или гарантии на будущее. Вся информация, содержащаяся в настоящем отчете, носит конфиденциальный характер и предназначена для использования исключительно Получателем. Получатель может передавать информацию, содержащуюся в отчете, своим директорам, должностным лицам, сотрудникам или профессиональным консультантам, при условии, что они проинформированы получателем о конфиденциальном характере данной информации. All rights are reserved. This document or any part thereof may not be copied or reproduced without permission in writing from Pöyry Energy AG Все права защищены. Этот документ или любая его часть не могут быть скопированы или воспроизведены без письменного разрешения «Pöyry Energy AG» OSHPC “Barki Tojik” / ОАХК «Барки Точик» PÖYRY ENERGY LTD. Rogun HPP ESIA / ОЭСВ РОГУНСКОЙ ГЭС Date 2014-08-28 DRAFT RAP Stage 1: Volume 2 - Annex ПДП Стадия 1: Том 2 - Приложение Page i Contents STRUCTURE OF VOLUME 1: TEXT / СТРУКТУРА ТОМА 1: ТЕКСТ ................................. 1 ANNEXES / ПРИЛОЖЕНИЯ ........................................................................................................... 2 A/П 1 INTRODUCTION / ВВЕДЕНИЕ .............................................................................. 3 A/П 1.1 Team / Команда ............................................................................................................. 3 A/П 1.2 Meetings Held / Проведенные встречи ........................................................................ 4 A/П 2 THE PROJECT/ ПРОЕКТ ....................................................................................... 15 A/П 3 THE AFFECTED POPULATION / ПОДВЕРЖЕННОЕ ВОЗДЕЙСТВИЮ ПРОЕКТА .................................................................................................................. 17 A/П 3.1 FGD Questionnaire / Вопросник фокус групп .......................................................... 17 A/П 3.2 Household Questionnaire / Вопросник Домохозяйства ............................................ 26 A/П 3.3 Basic Socio-Economic Indicators for Tajikistan / Основные социально- экономические показатели по Таджикистану ......................................................... 33 A/П 3.4 Major Ethnic Groups in Tajikistan / Основные этнические группы в Таджикистане ...................................................................................................................................... 38 A/П 4 RESETTLEMENT ACTIVITIES UNDER WAY / МЕРОПРИЯТИЯ ПО ПЕРЕСЕЛЕНИЮ ИДУТ ПОЛНЫМ ХОДОМ ................................................... 40 A/П 4.1 Short Report on Visit to Rudaki / Краткий отчет о результатах визита в Рудаки ... 40 A/П 4.1.1 Inhabitants / Местные жители .................................................................................... 40 A/П 4.1.2 Infrastructure / Инфраструктура ................................................................................. 40 A/П 4.1.3 Host Communities / Принимающие общины ............................................................ 42 A/П 5 CONSULTATIONS AND PARTICIPATION / КОНСУЛЬТАЦИИ И УЧАСТИЕ .................................................................................................................. 44 A/П 5.1 FGDs in Stage 1 Villages / ДФГ кишлаков Стадии 1 ............................................... 44 A/П 5.1.1 Kishrog and Mirog: Women / Кишрог, Мирог: Женщины ....................................... 44 A/П 5.1.2 Kishrog and Mirog: Men / Киштчарог и Мирог: Мужчины ..................................... 53 A/П 5.1.3 Tagi Kamar: Women / Таги Камар: Женщины ......................................................... 61 A/П 5.1.4 Sech: Women / Сеч: Женщины .................................................................................. 70 A/П 5.1.5 Sech and Tagi Kamar: Men / Сеч и Таги камар: Мужчины ..................................... 80 A/П 5.1.6 Talkhakchasma: Women / Талхакчашма: Женщины ................................................ 89 A/П 5.1.7 Talkhakchashma: Men / Талхакчашма: Мужчины .................................................... 99 A/П 5.1.8 Chorsada: Men / Чорсада: Мужчины ....................................................................... 109 A/П 5.1.9 Chorsada: Youth / Чорсада: Молодёжь.................................................................... 118 A/П 5.1.10 Chorsada: Women / Чорсада: Женщины ................................................................. 126 A/П 5.1.11 Chorsada: Mixed Group / Чорсада: Смешанная группа ......................................... 137 A/П 5.1.12 Meeting Sicharog / Сичарог ...................................................................................... 146 A/П 5.2 FGDs in Host Villages / ДФГ в принимающих кишлаках ..................................... 166 A/П 5.2.1 Dangara / Фокус Группа Дангара ............................................................................ 166 OSHPC “Barki Tojik” / ОАХК «Барки Точик» PÖYRY ENERGY LTD. Rogun HPP ESIA / ОЭСВ РОГУНСКОЙ ГЭС Date 2014-08-28 DRAFT RAP Stage 1: Volume 2 - Annex ПДП Стадия 1: Том 2 - Приложение Page ii A/П 5.2.2 Darband / ФГ ДАРБАНД .......................................................................................... 171 A/П 5.2.3 Tursunzade / ТУРСУНЗАДЕ .................................................................................... 176 A/П 5.2.4 Consultation Rudaki / КОНСУЛЬТАЦИЯ РУДАКИ .............................................. 181 A/П 6 RESETTLEMENT CONDITIONS / УСЛОВИЯ ПЕРЕСЕЛЕНИЯ ................ 184 A/П 6.1 Rogun Resettlement Law / Закон переселения в результате строительства Рогунской ГЭС ......................................................................................................... 184 A/П 6.2 National Resettlement Policy / Национальная политика переселения .................. 187 A/П 6.3 Resettlement Leaflet / Листовка Переселение ......................................................... 200 A/П 7 INSTITUTIONAL ARRANGEMENT / ИНСТИТУЦИОНАЛЬНЫЕ МЕХАНИЗМЫ ........................................................................................................ 202 A/П 7.1 RU Set-up on Operational Procedure on Relocation / Установленные цп оперативные процедуры по переселению .............................................................. 206 A/П 7.2 TOR for Legal Counsel / Тз для юриста ................................................................... 209 A/П 7.3 TOR for Witness NGO / Проект технического задания для НПО свидетеля ...... 212 A/П 8 RESETTLEMENT PLAN IMPLEMENTATION / ПЛАН ПЕРЕСЕЛЕНИЯ РЕАЛИЗАЦИЯ ........................................................................................................ 214 A/П 9 MONITORING AND REPORTING / МОНИТОРИНГ И ОТЧЕТНОСТЬ ... 215 A/П 10 BUDGET AND FUNDING / БЮДЖЕТ И ФИНАНСИРОВАНИЕ ................. 216 A/П 11 STAGE 1 RESETTLEMENT: STATUS AS OF MID-2013 / ЭТАП 1 ПЕРЕСЕЛЕНИЕ; СТАТУС СОСТОЯНИЕ НА СЕРЕДИНУ 2013 ............... 217 A/П 12 LIST OF REFERENCES / ПЕРЕЧЕНЬ ИСПОЛЬЗОВАННОЙ ЛИТЕРАТУРЫ ....................................................................................................... 218 List of Tables / Список таблиц Table 1: Team / Команда ............................................................................................................... 3 Table 2: Socio-economic Indicators, Tajikistan ..........................................................................
Recommended publications
  • The Republic of Tajikistan Ministry of Energy and Industry
    The Republic of Tajikistan Ministry of Energy and Industry DATA COLLECTION SURVEY ON THE INSTALLMENT OF SMALL HYDROPOWER STATIONS FOR THE COMMUNITIES OF KHATLON OBLAST IN THE REPUBLIC OF TAJIKISTAN FINAL REPORT September 2012 Japan International Cooperation Agency NEWJEC Inc. E C C CR (1) 12-005 Final Report Contents, List of Figures, Abbreviations Data Collection Survey on the Installment of Small Hydropower Stations for the Communities of Khatlon Oblast in the Republic of Tajikistan FINAL REPORT Table of Contents Summary Chapter 1 Preface 1.1 Objectives and Scope of the Study .................................................................................. 1 - 1 1.2 Arrangement of Small Hydropower Potential Sites ......................................................... 1 - 2 1.3 Flowchart of the Study Implementation ........................................................................... 1 - 7 Chapter 2 Overview of Energy Situation in Tajikistan 2.1 Economic Activities and Electricity ................................................................................ 2 - 1 2.1.1 Social and Economic situation in Tajikistan ....................................................... 2 - 1 2.1.2 Energy and Electricity ......................................................................................... 2 - 2 2.1.3 Current Situation and Planning for Power Development .................................... 2 - 9 2.2 Natural Condition ............................................................................................................
    [Show full text]
  • Analysis of the Situation on Inclusive Education for People with Disabilities in the Republic of Tajikistan Report on the Results of the Baseline Research
    Public Organization - League of women with disabilities «Ishtirok» April - July 2018 Analysis of the situation on inclusive education for people with disabilities in the Republic of Tajikistan Report on the results of the baseline research 1 EXPRESSION OF APPRECIATION A basic study on the inclusive education of people with disabilities in the Republic of Tajikistan (RT) conducted by the Public Organization Disabled Women's League “Ishtirok”. This study was conducted under financial support from ASIA SOUTH PACIFIC ASSOCIATION FOR BASIC AND ADULT EDUCATION (ASPBAE) The research team expresses special thanks to the Executive Office of the President of the RT for assistance in collecting data at the national, regional, and district levels. In addition, we express our gratitude for the timely provision of data to the Centre for adult education of Tajikistan of the Ministry of labor, migration, and employment of population of RT, the Ministry of education and science of RT. We express our deep gratitude to all public organizations, departments of social protection and education in the cities of Dushanbe, Bokhtar, Khujand, Konibodom, and Vahdat. Moreover, we are grateful to all parents of children with disabilities, secondary school teachers, teachers of primary and secondary vocational education, who have made a significant contribution to the collection of high-quality data on the development of the situation of inclusive education for persons with disabilities in the country. Research team: Saida Inoyatova – coordinator, director, Public Organization - League of women with disabilities «Ishtirok»; Salomat Asoeva – Assistant Coordinator, Public Organization - League of women with disabilities «Ishtirok»; Larisa Alexandrova – lawyer, director of the Public Foundation “Your Choice”; Margarita Khegay – socio-economist, candidate of economic sciences.
    [Show full text]
  • Emergency Plan of Action Final Report Tajikistan: Floods
    Emergency Plan of Action Final Report Tajikistan: Floods DREF operation no. MDRTJ028 Glide number: FL-2019-000058-TJK Date of issue: 17 December 2019 Operation start date: 17 June 2019 Operation end date: 17 September 2019 Host National Society: Red Crescent Society of Tajikistan Operation budget: CHF 147,688 (RCST) Number of people affected: 6,750 people Number of people assisted: 2,750 people (1,350 households) (550 households) Red Cross Red Crescent Movement partners currently actively involved in the operation: IFRC, German RC and ICRC Other partner organizations actively involved in the operation: Local and National Government of the Republic of Tajikistan, Rapid Emergency Assessment and Coordination Team (REACT) partners A. SITUATION ANALYSIS Description of the disaster Description of the disaster Continuous heavy rains resulted in mudflows and floods countrywide between 1 and 7 June 2019. In total, 10 mid- scale mudflows and floods had occurred throughout Tajikistan. 1,350 households (6,750 people) were heavily affected in Khatlon province (Vose, Farkhor, Temurmalik, Pyanj and Khuroson districts), Sughd province (Devashtich, Isfara, Penjikent and Konibodom districts) and in Direct Ruled Districts (DRD) Rudaky and Fayzobod. At least 4 persons were killed in Khuroson, Penjikent and Pyanj. The mudflows repeatedly hit the same locations (in Farkhor and Vose) on 6 June 2019. Around 650 households were evacuated to neighbouring villages into safe places i.e. schools, mosques and relatives’ houses. The Government commenced relief operations
    [Show full text]
  • World Bank Document
    Section 4 – Financial Proposal – Standard Forms1 Section 5. Terms of Reference Public Disclosure Authorized for the Preparation of an Environmental and Social Impact Assessment (ESIA) 1. PROJECT DESCRIPTION 1. The prospective site of Rogun hydro power plant (HPP) is located about 110 km (by road on M41) ENE of Dushanbe, the capital of Tajikistan. Construction at an existing site was started during Soviet times, thus the proposed location is defined by already existing built assets (esp. underground works) and auxiliary infrastructure, such as office buildings, construction camps and access roads, some of which have deteriorated since construction was halted in the early 1990s. Public Disclosure Authorized 2. The World Bank has accepted the request of the Government of Republic of Tajikistan (the Government) to finance an assessment of the Completion of the Rogun Hydroelectric Project (HPP), which the Government considers as an important element of the country‘s economic development strategy. 3. The Assessment would comprise two complementary parts – (i) Technical-Economic and (ii) Environmental-Social including riparian issues and cross border impacts. Consulting services will be rendered by two separate firms for these two parts, while the work is to be carried out in parallel and in an interactive manner. The two sets of Assessment studies would be professionally reviewed on a running basis by two International Independent Panels of Experts (PoE), one for techno-economic and Public Disclosure Authorized dam safety, the other for environmental/social aspects. 4. The work would include assessment of all the previous work done to date. The most relevant reports/documents that need to be reviewed are: Rogun HEP Technical Project, 1980, by Hydroproject Tashkent, technical projects/documents done in 2008-2009 by design institutes Hydroproject and Moshydrostal.
    [Show full text]
  • Environmental Impact Assessment FINAL
    Environmental Impact Assessment Project: ADB TA-9530 TAJ July 2020 Central Asia Regional Economic Cooperation Corridors 2, 3, and 5 (Obigarm-Nurobod) Road Project Volume 1 – Environmental Impact Assessment (Volume 2 comprises Annexes to the EIA document) FINAL Prepared by the Ministry of Transport. The Environmental Assessments contained in this document have been prepared based on the policy requirements of several International financial institutions who will fund the Project. However the reporting in this document follows the requirements of the ADB Safeguards Policy Statement (2009). This Environmental Impact Assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status or any territory or area. i TAJ - Obigam Nurobod EIA Volume 1 text FINAL.docx REPUBLIC OF TAJIKISTAN MINISTRY OF TRANSPORT Looking towards Bridge #8 at Km36 (looking from Tunnel 2 north portal) (August 2018) Snowfall, Kandak, Obigarm looking north. Alignment mid picture (November 2018) Environmental Impact Assessment OBIGARM-NUROBOD ROAD Dushanbe, July 2020 Date Notes Created Checked Approved Document code 1 Jul 2020 Final issue document AJT FINAL Funding Agency Implementing Agency: Project Implementation Unit for Roads Rehabilitation Executing Agency: Asian Development Bank Ministry of Transport ii TAJ - Obigam Nurobod EIA Volume 1 text FINAL.docx Contents Executive Summary 1 Introduction ......................................................................................................................
    [Show full text]
  • Highlights Situation Overview
    RAPID EMERGENCY ASSESSMENT AND COORDINATION TEAM (REACT) Floods/mudflow countrywide, Tajikistan (GLIDE: MS-2016-000049-TJK) Situation Report No. 4 (as of 3 June 2016) This report is produced by REACT in collaboration with Government and humanitarian partners. It covers the period of 26 May to 3 June 2016. Highlights One person, injured as a result of floods/mudflow in Rudaki District, died in local hospital, bringing the total number of killed by the 9-13 May disasters to six in all affected districts. The Government, with support of REACT partners, has addressed most critical needs of the affected population in two severely affected districts. The European Commission’s Humanitarian Aid and Civil Protection Department (ECHO) and the Swiss Cooperation Office (SCO) in Tajikistan have pledged more than US$ 110,000 altogether to support humanitarian relief. The majority of affected families have cleaned debris from their houses with support from the soldiers, paving the way for a full-scale recovery intervention. The Government started providing construction materials to families whose Drinking water delivered to affected communities. Rudaki. Credit: REACT houses have been either damaged or destroyed. 5,500 1,350 To be confirmed Estimated people in need of assistance Households potentially affected Displaced Situation Overview A person injured by the floods on 12 May in Rudaki District has died following 15 days in a local hospital. As of 3 June, the total number of killed by the emergency stands at six people (Aini, Panjakent, Rasht and Rudaki). Continuous rains have caused some additional local mudflows in several districts of Rasht Valley.
    [Show full text]
  • GUIDELINES of DEVELOPMENT PUBLIC PRIVATE DIALOGUE The
    GUIDELINES OF DEVELOPMENT PUBLIC PRIVATE DIALOGUE The first new electronic information publication of the Consultative Council on Improvement of Investment Climate under the President of the Republic of Tajikistan under title “Guidelines of Development” is published. The materials of the publication cover the issues of entrepreneurship and investment, the process and the results of reform in investment and entrepreneurship activity through public-private dialogue. A distinctive feature of this publication from other Council’ publications in the fact that all published materials, held events devoted to one issue or reform, the readers will familiarize about this process. We are confidence expression that dear reader will familiarize with interesting issues for them in this publication. The issues of this publication: The Meeting of First Deputy Prime Minister with Entrepreneurs of the Hisor Valley The Meeting of the First Deputy Prime Minister with the Entrepreneurs of Khatlon Region The Meeting of the First Deputy Prime Minister with the Entrepreneurs of Sughd Region The Meeting of First Deputy Prime Minister with Entrepreneurs of the Hisor Valley On February 13, 2016, First Deputy Prime Minister of the Republic of Tajikistan, esteemed Davlatali Said, met with the entrepreneurs of Hisor and Tursunzoda cities and Shahrinav and Rudaki districts. During the meeting, the First Prime Minister spoke about the policy of Leader of Nation, President of the Republic of Tajikistan, His Excellency Emomali Rahmon to develop the private sector and noted that as the result of implemented reforms, the business and investment activity has been growing annually. Furthermore, by instructions of the President, regular meeting of officials with entrepreneurs is holding in Hisor and Tursunzoda cities, and also in Shahrinav and Rudaki districts.
    [Show full text]
  • I. the Rogun Dam in Context
    HUMAN RIGHTS “We Suffered When We Came Here” Rights Violations Linked to Resettlements for Tajikistan’s Rogun Dam WATCH “We Suffered When We Came Here” Rights Violations Linked to Resettlements for Tajikistan’s Rogun Dam Copyright © 2014 Human Rights Watch All rights reserved. Printed in the United States of America ISBN: 978-1-62313-1470 Cover design by Rafael Jimenez Human Rights Watch defends the rights of people worldwide. We scrupulously investigate abuses, expose the facts widely, and pressure those with power to respect rights and secure justice. Human Rights Watch is an independent, international organization that works as part of a vibrant movement to uphold human dignity and advance the cause of human rights for all. Human Rights Watch is an international organization with staff in more than 40 countries, and offices in Amsterdam, Beirut, Berlin, Brussels, Chicago, Geneva, Goma, Johannesburg, London, Los Angeles, Moscow, Nairobi, New York, Paris, San Francisco, Sydney, Tokyo, Toronto, Tunis, Washington DC, and Zurich. For more information, please visit our website: http://www.hrw.org JUNE 2014 978-1-62313-1470 “We Suffered When We Came Here” Rights Violations Linked to Resettlements for Tajikistan’s Rogun Dam Summary and Key Recommendations .............................................................................. 1 Methodology ................................................................................................................ 17 I. The Rogun Dam in Context ........................................................................................
    [Show full text]
  • Tajikistan: Cold Wave
    Emergency appeal n° MDRTJ004 Tajikistan: Cold GLIDE n° CW-2008-000015-TJK Operations update n° 1 10 April 2008 Wave Period covered by this Ops Update: 6 March to 7 April, 2008 Appeal target (current): CHF 572,678 (USD 545,408 or EUR 357,924) Appeal coverage: 78 per cent with a DREF allocation of CHF 172,062 Appeal history: • This Emergency Appeal was initially launched on 6 March 2008 seeking an amount of CHF 572,678 (USD 572,678 or EUR 363,836) to assist some 2,003 families or 5,097 beneficiaries during a period of six months. • Disaster Relief Emergency Fund (DREF): CHF 172,062 was initially allocated from the International Not to lose the planting season, the priority of Federation’s DREF to support the National Society in the current operation has been the distribution delivering immediate assistance to 2,149 beneficiaries of seeds, fertilizers and food. through the distribution of non-food items and around Photo: Red Crescent Society of Tajikistan 3,000 families through hygiene promotion. Summary: With support from the International Federation of Red Cross and Red Crescent Societies the Red Crescent Society of Tajikistan continued providing relief assistance to the most vulnerable groups affected by the cold wave that hit the country in January and February 2008. To date, more than 1,000 female-headed households in Wahdat and Rudaki districts have received seeds, fertilizers and food to sustain them as they work. Priority was given to the distribution of seeds and food items by mid April so as not to miss the planting season.
    [Show full text]
  • Monitoring & Early Warning in Tajikistan
    Tajikistan Monitoring & Early Warning Monthly Report Monitoring & Early Warning in Tajikistan MONTHLY REPORT APRIL 2012 1 Tajikistan Monitoring & Early Warning Report – April 2012 GENERAL TRENDS NATURAL HAZARDS During April, avalanches, mudflows and floods can be expected. Floods can be triggered by rain on snow and mudflows triggered by locally heavy precipitation or rapid snow melt. WEATHER Average precipitation but above average temperatures are forecasted for April for most of Tajikistan. ENERGY SECURITY Increased flows into the Nurek Cascade have resulted in the lifting of restrictions on electricity. Reports indicate that an agreement has been reached with Uzbekistan on the supply of natural gas, and deliveries restarted on 16 April. FOOD SECURITY Wheat flour prices in Khujand continue to drop while prices in Kurgan-Tube and Dushanbe remain stable, possible reflecting rail delivery delays (Kurgan-Tube) and limited roads access to the north due to heavy snow and avalanches (Dushanbe). Fuel prices have dropped slightly. The Ministry of Agriculture reports damage to crops and livestock due to severe weather in the fall of 2011/winter 2011-2012, as well as a delay in spring planting. MIGRATION AND REMITTANCES Reported migration rates for the first three months of 2012 are significantly above 2011 levels. Reported remittances are 25% above 2011 in March. These increases may indicate a reaction to shocks during the fall 2011 and winter 2011-2012. ECONOMY GDP increased from January to February by 6.9% and totaled 3,334.5 million Tajik Somoni (701 million USD). In January - February 2012, the foreign trade turnover equaled 827.1 million USD, with a negative trade balance of 415.3 million USD.
    [Show full text]
  • Final Report April 2007
    JFPR Grant No. 9078-TAJ Community-based Rural Road Maintenance Project Baseline Survey and Poverty Impact Assessment Report Draft Final Report April 2007 Gregory R. Gajewski, Ph.D. Poverty Impact Specialist and Principal in Charge Project Implementation Unit Ministry of Transport Republic of Tajikistan The Louis Berger Group, Inc. THE LOUIS BERGER GROUP, INC. TABLE OF CONTENTS LIST OF ACRONYMS / ABBREVIATIONS / TAJIK WORDS ...........................................................................4 EXECUTIVE SUMMARY .........................................................................................................................................5 KEY FINDINGS ..........................................................................................................................................................6 1. INTRODUCTION...............................................................................................................................................8 1.1. PROJECT DESCRIPTION ..................................................................................................................................8 1.2. OBJECTIVE OF BASELINE SURVEY AND POVERTY IMPACT ASSESSMENT REPORT..........................................9 1.2.1. Unique Feature – Development Impact Study with a Control Group ..................................................9 2. PRIMARY DATA COLLECTION ...................................................................................................................9 2.1. DATA/INFORMATION COLLECTION
    [Show full text]
  • Environmental Degradation, Migration, Internal Displacement, and Rural Vulnerabilities in Tajikistan
    Environmental Degradation, Migration, Internal Displacement, and Rural Vulnerabilities in Tajikistan May 2012 This study was conducted with financial support from the International Organization for Migration Development Fund. In its activities, IOM believes that a humane and orderly migration responds to the interests of migrants and society, as a whole. As a leading intergovernmental organization IOM is working with its partners in the international community, guided by the following objectives: to promote the solution of urgent migration problems, improve understanding of the problems in the area of migration; encourage social and economic development through migration; assert the dignity and well-being of migrants. Publisher: International Organization for Migration (IOM) Mission in the Republic of Tajikistan Dushanbe, 734013 22-A Vtoroy Proezd, Azizbekov Street Telephone: +992 (37) 221-03-02 Fax: +992 (37) 251-00-62 Email: [email protected] Website: http://www.iom.tj © 2012 International Organization for Migration (IOM) All rights reserved. No part of this publication may be reproduced or distributed in any way - through electronic and mechanical means, photocopying, recording, or otherwise without the prior written permission of the publisher. The opinions expressed in this report represent those of individual authors and unless clearly labeled as such do not rep- resent the opinions of the International Organization for Migration. Environmental Degradation, Migration, Internal Displacement, and Rural Vulnerabilities in Tajikistan May 2012 Saodat Olimova Muzaffar Olimov ACKNOWLEDGEMENTS The authors of this report express their deepest gratitude to Zeynal Hajiyev, Chief of IOM Mission in Tajikistan and the employees of the IOM country office, especially Moyonsho Mahmadbekov, Patrik Shirak and Zohir Navjavonov for their invaluable advice on improving the structure and content of this report.
    [Show full text]