Community Meeting - April 15, 2021

BB&N’s mission is to promote scholarship, in- tegrity, and kindness in diverse, curious, and motivated students. The school prepares stu- dents for lives of principled engagement in their communities and the world.

1

70 Milton Street | Dedham, MA 02026-2915 (781) 326-2600 | activitas.com

NOVEMBER 11, 2020 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

Agenda & Introductions

Welcome

Project Background

Site History Dr. Jennifer Price Dr. Tara Gohlmann Ms. Cynthia Westerman Buckingham Browne & Nichols Buckingham Browne & Nichols Buckingham Browne & Nichols New Athletic Complex Head of School Chief Operating / Chief Financial Officer Owner’s Project Manager Project

Discussion

Ms. Megan Buczynski, P.E. Mr. Jay Peters Ms. Ruth Bonsignore, P.E. Activitas Inc. Haley & Aldrich Flink Consulting Principal Civil Engineer Senior Associate Risk Assessor Transportation Engineer

2 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

PROJECT BACKGROUND

3 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

PROJECT BACKGROUND

BB&N Upper School Campus

BB&N New Athletic Complex Mt. Auburn Cemetery Athletic Complex

Watertown’s Filippello Park

Arsenal Yards

Daly Field

4 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

PROJECT BACKGROUND

5 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

PROJECT BACKGROUND

6 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

MEMORANDUM OF UNDERSTANDING BB&N AND OF WATERTOWN

• Each party will maintain their own facility at their cost • Watertown will use BB&N’s fields during evenings, Saturday (when BB&N is not playing) and Sundays • Watertown will have scheduling rights in the summer • Watertown may need to use Filippello during construction of its school buildings • BB&N will use Filippello fields immediately after school • BB&N will have full-day access in late August and over March break (pre-season for field sports) • Watertown has access to the fieldhouse when complete

7 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

SITE HISTORY

8 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

SITE HISTORY TODAY

(please note change in orientation)

9

BB&N Athletic Complex - Existing Conditions 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

SITE HISTORY TODAY

PARCEL 1

PARCEL PARCEL 3 2

10

BB&N Athletic Complex - Existing Conditions 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, Massachusetts (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

SITE HISTORY PROPOSED PROJECT SITE COOLIDGE HILL ROAD GROVE STREET 1940s

11 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

SITE HISTORY 1995

12 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

SITE HISTORY 2001

13 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

SITE HISTORY 2008

14 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

SITE HISTORY 2013

15 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

SITE HISTORY 2021

16

BB&N Athletic Complex - Existing Conditions 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, Massachusetts (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC COMPLEX PROJECT

17 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC COMPLEX PROJECT 22

Project Elements 25’ SIDE YARD SETBACK 8 Athletic Fields 8 Future Building

Parking, Access,

and Landscape 22

30’ REAR YARD SETBACK

Spectator Viewing 15

Storage

Site & Athletic Lighting 25’ SIDE YARD SETBACK

18

BB&N Athletic Complex - Proposed Site Plan 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, Massachusetts (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC COMPLEX PROJECT 22 SPECTATOR VIEWING Project Elements 25’ SIDE YARD SETBACK 8 Athletic Fields

8 PARKING Future Building FUTURE BUILDING Parking, Access, ATHLETIC FIELDS

and Landscape 22

30’ REAR YARD SETBACK

Spectator Viewing 15

PARKING Storage STORAGE & Site & Athletic GATHERING Lighting 25’ SIDE YARD SETBACK SPECTATOR VIEWING

19

BB&N Athletic Complex - Proposed Site Plan 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, Massachusetts (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC COMPLEX PROJECT 22

Project Elements 25’ SIDE YARD SETBACK 8 Athletic Fields 8 Future Building

Parking, Access, ATHLETIC FIELDS

and Landscape (note: fall season lay- 22 outs shown for refer-

30’ REAR YARD SETBACK ence)

Spectator Viewing 15

Storage

Site & Athletic Lighting 25’ SIDE YARD SETBACK

20

BB&N Athletic Complex - Proposed Site Plan 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, Massachusetts (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC COMPLEX PROJECT 22

Project Elements 25’ SIDE YARD SETBACK 8 Athletic Fields Netting Example 8 Future Building

Parking, Access, ATHLETIC FIELDS

and Landscape (note: fall season lay- 22 outs shown for refer-

30’ REAR YARD SETBACK ence)

Spectator Viewing 15

Storage

Site & Athletic Lighting 25’ SIDE YARD SETBACK

21

BB&N Athletic Complex - Proposed Site Plan 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, Massachusetts (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC COMPLEX PROJECT Project Elements Athletic Fields Polyethylene Fiber Carpet

Future Building Sand and Encapsulated Rubber Infill

Parking, Access, Resilient Underlayment (aka Pad) and Landscape

Spectator Viewing Recent projects with similar systems using Institutions with similar systems using traditional SBR rubber encapsulated rubber Storage BB&N’s Franke Field College Boston College’s Alumni Field Dartmouth College Colby College’s Bill Alfond Field Site & Athletic Harvard Dexter Southfield’s Main Field Lighting MIT Harvard Field UMass Amherst (this is a small representation of projects) Towns of Carver, Dedham, Lexington, Scituate, Weston, and Weymouth (among many others!) 22 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

“The safety of our field users is paramount to BB&N’s mission and values. NEW ATHLETIC Through research and experience we’ve determined that synthetic turf is COMPLEX PROJECT the right choice for the New Athletic Complex field surfaces” - Dr. Jennifer Price, Head of School Project Elements Athletic Fields Surface Considerations Concerns Raised Regarding Turf • Surface Playability • Heavy Metals and PAHs Polyethylene Fiber Carpet • Surface Usage • MRSA (aka Staph) • Water Conservation • Heat Future Building KEY TERMS Sand and Encapsulated Rubber Infill • Stormwater Benefits • PFAS BIOAVAILABILITY & Parking, Access, EXPOSURE Resilient Underlayment (aka Pad) and Landscape “… these findings support the premise that while many chemicals are present in the recycled tire crumb rubber, exposure may be limited based on what is released into air Spectator Viewing or biological fluids.” - EPA’s Final Report Part 1 – Tire Crumb Rubber Characterization Volume 1, dated July 25, 2019. Institutions with similar systems using “Consequently, overall building design cooling loads near encapsulated rubber Storage Artificial Turf (AT) decrease by 15%–20%. In addition, the BB&N’s Franke Field irrigation water conservation with AT causes an embodied Boston College’s Alumni Field energy savings of 10 W h m−2 day−1. Locally, this study Colby College’s Bill Alfond Field Site & Athletic points to a win–win situation for AT use for urban landscap- Dexter Southfield’s Main Field Lighting ing as it results in water and energy conservation.” -Yag- Harvard Stadium Field hoobian N, Kleissl J, Krayenhoff E. Modeling the Thermal (this is a small representation of projects) Effects of Artificial Turf on the Urban Environment. Journal of Applied Meteorology and Climatology 49: 2010. 23 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC CAMPUS RAISES THE BAR ON SUSTAINABLE LAND DEVELOPMENT COMPLEX PROJECT COLBY COLLEGE ATHLETIC FIELDS

Waterville, Maine | Project Size: 30 acres | Certification: SITES Certified Project Elements

Athletic Fields

Future Building

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed tincidunt est et lorem elementum, ac facilisis dolor viverra. Nunc pretium ante justo, dapibus feugiat diam aliquam ac. Sed ut rhoncus ligula. Aenean gravida tincidunt erat a posuere. Mauris placerat dictum odio eget ultricies. Etiam ut ultrices massa. Pellentesque non arcu gravida, dictum augue ut, pharetra dolor. Nam dictum molestie ipsum. Maecenas mollis elit a erat tempus, Parking, Access, ut dignissim nibh gravida. Pellentesque molestie est quis nisi convallis, vitae tristique nisi sollicitudin. Home to 2,000 students, Colby College is a private liberal arts school located in Waterville, Maine. With more than 80 percent of Colby students participating in organized athletics, being outdoors or connected to nature is a key part of the Colby experience. and Landscape The three new, tiered fields provide outstanding facilities for soccer, field hockey, lacrosse, and many other recreational uses, including national camps, competitions, and trainings. The Colby athletic fields project consists of three varsity athletic fields, making up a new, 70-acre-plus outdoor competition center that is on track to be among the finest in the NCAA’s Division III.

. WATER Spectator Viewing Basins beneath the fields were implemented to slow and clean runoff. An irrigation system was incorporated to conserve water by automatically adjusting to precipitation and evaporation rates with the use of rain and soil sensors

to ensure watering only occurs when necessary. Previous existing playing surfaces consisted of two natural grass surfaces and one knitted nylon artificial field. The new surface has no watering requirements, which has helped the college save 15,000 gallons of water representing $4,511.25 per use. Institutions with similar systems using

PLANTS encapsulated rubber Storage The college engages biology students to identify and remove invasive plant species from defined vegetation and soil protection zones. This is an on-going initiative to protect native plant communities and support wildlife habitats. BB&N’s Franke Field SOIL Boston College’s Alumni Field All of the topsoil from the pre-existing playing fields was reused onsite. This helped minimize the need to import materials from offsite. Colby College’s Bill Alfond Field Site & Athletic MATERIALS Dexter Southfield’s Main Field Sixty-one percent of the total materials costs included materials and products that were manufactured and extracted locally, helping minimize the total distance traveled to bring materials onsite. Harvard Stadium Field Lighting HUMAN HEALTH AND WELLBEING Students and the larger community are connected to nature through varsity sports, intramurals, and health and wellness classes. The site has plenty of seating and viewing space to encourage groups to come to the fields and spend time enjoying all the games. In addition, the fields were constructed on a slope to provide unobstructed views of the surrounding nature, making a quiet place for visitors to relax and recharge while watching the game or just visiting the site. 24 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC COMPLEX PROJECT 22

Project Elements 25’ SIDE YARD SETBACK 8 Athletic Fields 8 Future Building FUTURE BUILDING Parking, Access,

and Landscape 22

30’ REAR YARD SETBACK

Spectator Viewing 15

Storage

Site & Athletic Lighting 25’ SIDE YARD SETBACK

25

BB&N Athletic Complex - Proposed Site Plan 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, Massachusetts (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC COMPLEX PROJECT 22

Project Elements 25’ SIDE YARD SETBACK 8 Athletic Fields 8 Future Building

Parking, Access,

and Landscape 22

30’ REAR YARD SETBACK

Spectator Viewing 15

Storage

Site & Athletic Lighting 25’ SIDE YARD SETBACK

26

BB&N Athletic Complex - Proposed Site Plan 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, Massachusetts (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC COMPLEX PROJECT 22

Project Elements 25’ SIDE YARD SETBACK 8 Athletic Fields 8 Future Building

Parking, Access,

and Landscape 22

30’ REAR YARD SETBACK

Spectator Viewing 15

Storage

Site & Athletic Lighting 25’ SIDE YARD SETBACK

27

BB&N Athletic Complex - Proposed Site Plan 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, Massachusetts (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC COMPLEX PROJECT 22 SPECTATOR VIEWING Project Elements 25’ SIDE YARD SETBACK 8 Athletic Fields 8

Future Building STORAGE & GATHERING PRIOR TO BLDG Parking, Access, CONSTRUCTION

and Landscape 22

30’ REAR YARD SETBACK

Spectator Viewing 15

Storage STORAGE & Site & Athletic GATHERING Lighting 25’ SIDE YARD SETBACK SPECTATOR VIEWING

28

BB&N Athletic Complex - Proposed Site Plan 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, Massachusetts (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC COMPLEX PROJECT 22

Project Elements 25’ SIDE YARD SETBACK 8 Athletic Fields 8 Future Building

Parking, Access,

and Landscape 22

30’ REAR YARD SETBACK

Spectator Viewing 15

Storage

Site & Athletic Lighting 25’ SIDE YARD SETBACK

29

BB&N Athletic Complex - Proposed Site Plan 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, Massachusetts (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC COMPLEX PROJECT Project Elements Athletic Fields

Future Building

Parking, Access, Dexter Southfield Main Field Wellesley College Butler Stadium and Landscape

Spectator Viewing

Storage

Site & Athletic Lighting Town of Weymouth - Lovell Playground Dexter Southfield Main Field Shown to help understand limited spill and glare of lighting system 30 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

DISCUSSION

31 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

Discussion

22

25’ SIDE YARD SETBACK

8

8

22

30’ REAR YARD SETBACK

15

25’ SIDE YARD SETBACK

32

BB&N Athletic Complex - Proposed Site Plan 70 Milton Street | Dedham, MA 02026-2915 Buckingham Browne & Nichols School | Watertown, Massachusetts (781) 326-2600 | activitas.com MARCH 18, 2021 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

THANK YOU & GOODNIGHT

33 Buckingham Browne & Nichols

New Athletic Complex| Community Meeting N

S D

1. S DS MA S M S AD M D AD DA , AD A 150 WA D, S 101, W, 70 Milton Street | Dedham, MA 02026-2915 MA, AD DAD DM 3, 2020 AD SD AA 8, 2020. D AD AA DA (781) 326-2600 | activitas.com • •• • • • •• • • •• •• • • •••• • ••••••••••••••••••••••• 2. SA A AA , AD A AS S, A SA DSA AD DD W A DSA M DA A A S S A AD AD AD D S SAS MAD. • • • • •• • • •• •• • • • • • • • • • • • • • • A D . 3. AS S DD S A SW A A - AMA WA AD A DD D SW SW MA ASSAS W S SA. A SA DM A S - A A S S MM W, AD AS WA WA •• • • • •• •••• • ••• •• • •••••••••••••••••••• SS A AD A DAMAS W MA D AD M ASD AS A A A AD S DA SW MAS D S A DD S.

SM S . A(S) SA AMA MSS W A ••• • • • • • • • S DMS, SAS, AD S DS WA A W DD AD S.

5. W A S S D W SD W, A, A, AD S SA AA DMD W DA A, AD MA SD

WS SA S . 53 52

51

50 5 6. A SA MA A AAMS AA AD

9 ADSM A AS, , , AD A A S 53 MAS.

8 7. A SA MAA, ADS W S AD, AS SSA

7

A AD S SS S AS A S S, ., M 6 MAAD AD S SSMS, SS WS D DD WS SA.

8. AAS SD MS SD W DSD AS AS SA SD A A D, A AS S.

9. A SA MA A AAMS AA AD ADSM A AS, , AD A S 53 MAS A S. 52 10. AD MAA S -S DAA SS AD S SS WS D. AD DA S D 1 11. MS AS A A ASS A M A SW A.

AD D S W A

AD DA W D AD AA , A S DD

S51 W

SA

W

9 8

50 SW WA

10

M. 51.00 Watertown, Massachusetts ew Athletic omle AM W S S

50S Develoers onerence 5 March , 2021 A DS M S SS D S S M . DA DS DMD

AD DA

A AA, 9 A S D 51 WA

D S

AD DA

6 D AD AA , A

W SW 50 SA 130-0 . 21003.00 AW AD M 21003-3.1-A.dw 7 DAW

W D M 8 W SA

9

W

W

W W

8 W DD MA W D A DAD W W AD W MA ( MM)

W S ••• • ••• •••••••• •• • •••••••••••••••••••••••••••••••••••• W • •• ••••••••••• S SW S S A S D, D AD WWA S S MA W W W WS W W W W W W W W W W W W 34 W W W W A

D SM W W

A DSA 0 15 30 60 90 S DD S SW A A MD M AS AD D S. AS SD SDD AMA . DSA AD S MAS SA AD 72 SSS S ADA S AS. DSA 1-888-3-7233. S 3.1 Buckingham Browne & Nichols New Athletic Complex| Community Meeting

NEW ATHLETIC FIELD WEAR COMPLEX PROJECT ANALYSIS New Athletic Complex Usage Project Elements Calculations Field Wear Index Handout Activity Rating Athletic Fields Typical BB&N Use will be 5 days per week Level 1 – Light Maintenance Below 250 hrs. AWIV Activity Multipliers Two or less Hollow Core Aerations a year. during the spring and fall (about 13 weeks Activity Multiplier Level 2 – Light to Medium Maintenance 251 - 300 hrs. AWIV per season) from 2-6pm Between two and four Hollow Core Aerations a year. Walking and/or Standing on a field. 1 One top-dressing a year. Future Building Baseball and/or Softball 1.25 An Activity Multiplier of 2.25 is being used Parked Cars 1.5 Level 3 – Medium Maintenance 301 - 350 hrs. AWIV to represent the typical use to generate Sport Camp: Baseball/Softball 1.5 Hollow Core Aeration once a month. Marching Band Practice 1.75 One Deep Tine Aeration a year. the Activity Wear Index Value (AWIV) Soccer wo/cleats 2 One top-dressing a year. Field Hockey 2.25 One Over-seeding a year. Parking & Access Football wo/cleats 2.25 4 hrs/day x 5 days/wk x 13 wk/ssn x 2.25 Lacrosse & Team Practice 2.25 Level 4 – Medium to Heavy Maintenance 351 - 400 hrs. AWIV Rugby 2.5 Hollow core aeration once a month. = 585 hrs. AWIV Two Deep Tine Aeration a year. Soccer w/cleats & Team Practices 2.5 Two top-dressings a year. Sport Camp: Lacrosse 2.5 Two or less Over-seeding a year. Spectator Viewing Grass fields cannot handle this use Tournaments 2.5 Ultimate Frisbee 2.5 Level 5 – Heavy Maintenance 401 - 450 hrs. AWIV and this does not take into account Football w/cleats 2.75 Hollow Core Aeration once a month. Sport Camp: Soccer 2.75 Two or more Deep Tine Aeration a year, or One Deep Tine Aeration and one any Town use of the fields during Sport Camp: Football 3 Deep Hollow Tine Aeration a year. Storage Football Team Practice 3.25 Two or more top-dressings a year. the week or on the weekends. Activity before/after Turf Dormancy 3.75 Two or more Over-seeding a year. Activity during/after Rain 4 Renovation, having to do field repairs by plugging Another important consideration Level 6 – Renovation Over 451 hrs. AWIV Turf Species Multiplier Hollow Core Aeration once a month. is that turf field use can be year Two or more Deep Tine Aeration a year, or one or more Deep Tine Aeration and Site & Athletic Certain types of turf grass grow more aggressively then others. The Turfone Species or more Deep Hollow Tine Aeration a year. round in New England, where nat- Multiplier takes this fact into account. Multiply the Adjusted Wear Value Total Twoby the or more top-dressings a year. Lighting below multiplier. Two or more Over-seeding a year. ural grass use is typically limited to Renovation, having to do field repairs by Sodding and Plugging.

April-November. Species Multiplier Kentucky Bluegrass 1 Presented By David Schlotthauer at STMA Convention 2008 in Phoenix, AZ Perennial Rye Grass 1.25 For further information contact me at [email protected]. Bermuda Grass 1.5

35