Business Standard Private Both Residing at :- 44 PREM NIWAS 3RD BKADAM MARG BHATWADI GHATKOPAR Thousand One Hundred Limitedand Printed at M/S

Total Page:16

File Type:pdf, Size:1020Kb

Business Standard Private Both Residing at :- 44 PREM NIWAS 3RD BKADAM MARG BHATWADI GHATKOPAR Thousand One Hundred Limitedand Printed at M/S MUMBAI | WEDNESDAY, 12 MAY 2021 5 . < TM Hinduja Global Solutions Limited (CIN: L92199MH1995PLC084610) Regd. Office :Hinduja House,171, Dr.Annie Besant Road, Worli, Mumbai -400018 Contact no.: 022 -2496 0707| Fax: 022-2497 4208 Website: www.teamhgs.com |E-mail: [email protected] NOTICE Transfer of equity shares of the Company to Investor Education and Protection Fund NOTICE is hereby given that pursuant to Section 124(6) of the Companies Act, 2013 (“the Act”) read with the Investor Education and Protection Fund Authority (Accounting, Audit, Transfer and Refund) Rules, 2016, as amended from time to time (“the Rules”), Hinduja Global Solutions Limited (“the Company”) is required to transfer equity shares in respect of which dividend has not been claimed/ encashed by the Member(s) for seven consecutive years (from the date of its transfer to the Unpaid DividendAccount) to the Investor Education and Protection FundAuthority (“IEPF”). Accordingly,the equity shares which corresponds to the final dividend for the Financial Year 2013-14 paid by the Company and which remained unpaid /unclaimed for aperiod of seven consecutive years (from the date of its transfer to the Unpaid DividendAccount) would be transferred to IEPF in the second week ofAugust, 2021. In compliance with the Rules, relevant communication has been sent to the concerned Members, requesting them to claim said unpaid/ unclaimed final dividend for the Financial Year 2013-14, failing which related equity shares will be transferred to the IEPF in the second week ofAugust, 2021. The Company has also uploaded details of such Members Public Notice in Form XIII of MOFA(Rule 11(9) (e)) Public Notice in Form XIII of MOFA (Rule 11(9)(e)) whose shares are liable to be transferred to IEPF on its website at www.teamhgs.com under the ‘Investors tab’. District Deputy Registrar,Co-operative Societies, District Deputy Registrar,Co-operative Societies, Mumbai City (4) Shareholders may verify the details of unencashed dividend and equity shares liable to be transferred to the demat Mumbai City (4) Bhandari Co-op. Bank building,2nd floor,P.L. Kale Guruji Marg, account of IEPFAuthority. Bhandari Co-op.Bank building, 2nd floor,P.L.Kale Guruji Marg, Dadar(West), Mumbai-400 028. In case, the Company does not receive any response for encashment of aforementioned dividend from the concerned Dadar (West), Mumbai-400028. No.DDR-4/Mum./Deemed Conveyance/Notice/1201/2021Date: 5/5/2021 Members on or before July 31, 2021, the Company shall transfer the related equity shares to IEPF in the second week Application u/s 11ofMaharashtra Ownership Flats ofAugust, 2021, in compliance with the Rules. No.DDR-4/Mumbai/ Deemed Conveyance/Notice/1176/2021 Date: -04/05/2021 Application u/s 11 of Maharashtra Ownership Flats (Regulation of the Promotion of construction, Sale, Management and The members may further note that the details made available by the Company on its website should be regarded as (Regulation of the Promotion of construction, Sale, Management and Transfer) Act, 1963 Transfer) Act, 1963 and shall be deemed adequate notice in respect of Issue of duplicate share certificate(s) by the Company for the Public Notice PUBLIC NOTICE purpose of transfer of shares to IEPF. Deemed Conveyance Application No. 119of2021 Application No. 128 of 2021. The concerned Members may note that upon transfer of such equity shares to the IEPF,noclaim shall lie against the Riddhi Gardens Building Ml-M2-M3Co-operative Housing Society Limited, Bldg. M1-M2-M3, Shri Gokul Nagari CHS Ltd. (G-H-1) Having itsaddress at C.T.S. No. 703, 90 Company in respect of unpaid /unclaimed dividend amounts and the equity shares transferred by the Company to Riddhi Gardens, CTS No. 653A/1B/1, General A.K. Vaidya Marg(Film City Road), Malad (East), Mumbai- 400097. ...Applicant, Versus, 1) Shri. Krishnaji Mahadeo Tikekar,2)Shri. Vasant FeetRoad, Thakur Complex, Kandivali (East), Mumbai-400 101 ---- Applicant IEPF.However,pursuant to the provisions of the Act and the Rules, the concerned Member(s)' can claim the Mahadeo Tikekar,3)Shri. Arvind Mahadeo Tikekar,4)Smt. Shanta Parshuram Mahajan, 5) Versus 1) M/s. Dharti Builders &Developers Pvt. Ltd., Having Last known transferred shares along with the unpaid /unclaimed dividend amount(s) from the IEPFAuthority for which details are/ Smt. Kamla Narayan Saprealias Kamal Sapre, 6) Smt. Kusum Narayan Keskar,7)Smt. Alka addressat:-Gokul Residency,Ground floor,Near Dattani Partk, Thakur Village, will be available at www.iepf.gov.in Megheshyam Naik Desai, 8) Smt. Snehaprabha Krishnaji Tikekar,9)Dhananjay K. Tikekar, 10) Ravindra K. Tikekar,11) Kum. Jyoti K. Tikekar All having common address at:-1st Floor, Western Express Highway,Kandivali (East), Mumbai-400 101. And Having Head In case of any clarification /assistance in this regard, the concerned Member(s) may contact the Company's Registrar Tikekar Building, Kisan Cross Road, Malad (West), Mumbai- 400064. AND C/o. 1, Bapuji Niwas, Office at :- Ganesh Maharshi CHSL., Near Hotel Sahyadri, G.A.V.Road, Kandivali and Transfer Agent, i.e., KFin Technologies Private Limited at 1800 309 4001 or [email protected] or the 6th Road, Santacruz (East), Mumbai- 400055. 12) Messers. Mukul Construction Corporation, The (West), Mumbai-400 067. 2) Gulabrai Shamji Girdhar, Being the land owner Company at [email protected] partners of Messers. Mukul Construction Corporation. 12 (a) Shobha Pratabchandra Patel, 12(b) as per 7/12 extract, Having address at Gokul Residency,Thakur Village, Western Manubhai Shakarchand Shah. 12(c) Mukund Pratapchandra Patel, All having common address Express Highway,Kandivali (East), Mumbai-400 101. ---- Opponents, and those, For Hinduja Global Solutions Limited at:- 1, Bapuji Niwas, 6th Road, Santacruz (East), Mumbai- 400055. AND 13, Sardar Patel Society, 144, Nehru Road, Santacruz (East), Bombay- 400029. 13) Riddhi Garden Building A1-A2 Co- whose interestshave been vested in the said property may submit their say at operative Housing Society Limited, General A. K. Vaidya Marg(Film City Road), Malad (East), the time of hearing at the venue mentioned above. Failure to submit any say Sd/- Mumbai- 400097. ...Opponents, and those, whose interests have been vested in the said property may shall be presumed that nobody has any objection to this regard and further Place: Mumbai submit their say at the time of hearing at the venue mentioned above. Failure to submit any say shall be Narendra Singh action will be taken accordingly. Date: May 11,2020 Company Secretary presumed that nobody has any objection to this regard and further action will be taken accordingly. Description of the Property,:- Description of the Property :- Claimed Area ClaimedArea Unilateral conveyance of said SUIT PREMISES i.e.areaadmeasuring 3981.36 sq. meters, out of total Unilateral Conveyance of all that piece and parcel of land &building land area admeasuring 4055.2 sq. meters bearing C.T.S. Nos. 653/A/1/B/1 of Village- Malad (E), Tal- admeasuring 1928.70sq.meters (whichisasper latest P. R.C. Record) area Malad, on Sub Plot C, bearing correspondence Survey No.256, Hissa No.4, of Bombay Suburban being Survey No. 21 (part),Survey No. 22, Hissa No. 30 (part) corresponding District and Registrication Sub District, situated at Goregaon Mulund Link Rd., Gen. A.K.Vaidya to Old C.T.S. Nos. 703, 704 &705 However now new Amalgamated/Sub- Marg(Film City Rd), Malad (E), Mumbai-400097 along with the said buildingstanding thereon in divided C.T.S. No. 703/A of Village-Poisar,Tal -Borivali, City Survey office favour of the Applicant Society. GoregaoninMumbai Suburban District as per the Latest Architect Certificate The hearing in the above case has been fixed on 24/05/2021 at 2.00 p.m. District Deputy Registrar, dated24/12/2020 in favour of the Applicant Society. Co-operative Societies, Mumbai City (4). Bhandari Co-op.Bank building, 2nd floor,P.L.Kale Guruji BAJAJ FINANCE LIMITED Thehearing in the above Address case has been fixed on 27/05/2021 at 2.00 p.m. CORPORATE OFFICE: 3FRD LOOR, PANCHSHIL TECH PARK, VIMAN NAGAR, PUNE-411014,MAHARASHTRA. Marg, Dadar (West), Mumbai-400028. Sd/- Branch Office:- 3rd Floor ,271 Business Park ,Model Industrial Estate Off.Western Express Highway, Sd/- Goregaon ,(E)Mumbai -400063. (Dr.Kishor Mande) (Dr.Kishor Mande) Demand Notice Under Section 13 (2) of Securitization and Reconstruction of Financial SEAL Assets and Enforcement of Security Interest Act, 2002. District Deputy Registrar, District Deputy Registrar, Undersigned being the Authorized officer of M/s Bajaj Finance Limited, hereby gives the following notice to the Seal Co-operative Societies, Mumbai City (4) Co-operative Societies, Mumbai City (4) Borrower(s)/Co-Borrower(s) who have failed to discharge their liabilityi.e. defaulted in the repayment of principal as Competent Authority,U/s 5A of the MOFA, 1963. CompetentAuthority.U/s 5A of the MOFA, 1963 well as the interest and other charges accrued there-on forHome loan(s)/Loan(s) against Propertyadvanced to them by Bajaj Finance Limited and as aconsequence the loan(s) have become Non Performing Assets (N.P.A's) . Accordingly,notices were issued to them under Section 13 (2) of Securitization and Reconstruction of Financial Assets and Enforcement of SecurityInterest Act, 2002 and rules there-to,ontheir last known addresses, however the same have been returned un-served/undelivered, as such the Borrower(s)/Co-Borrower(s) are hereby intimated/informed by wayofthis publication notice to clear their outstanding dues under the loan facilities availed by them from time to time. Loan Account No./Name of the Borrower(s)/ Address of the Secured/Mortgaged Demand Notice Date Co-Borrower(s)/Guarantor(s) &Addresses Immovable Asset /Property to be enforced and Amount (LAN No. 405LAP07169112) Schedule of property 1: All that piece and 28 April 2021 1.
Recommended publications
  • CTRI Trial Data
    PDF of Trial CTRI Website URL - http://ctri.nic.in Clinical Trial Details (PDF Generation Date :- Fri, 01 Oct 2021 12:04:30 GMT) CTRI Number CTRI/2020/07/026671 [Registered on: 18/07/2020] - Trial Registered Prospectively Last Modified On 18/07/2020 Post Graduate Thesis No Type of Trial Interventional Type of Study Other (Specify) [Ozone therapy] Study Design Single Arm Trial Public Title of Study Ozone Therapy for Covid 19 patients Scientific Title of A pilot study for treatment of COVID-19 patients in moderate stage using intravenous administration Study of ozonized saline as an adjuvant treatment Secondary IDs if Any Secondary ID Identifier NIL NIL Details of Principal Details of Principal Investigator Investigator or overall Name Dr Alok Sharma Trial Coordinator (multi-center study) Designation Director Affiliation NeuroGen Brain and Spine Institute Address Chairmans room, 2nd floor, Plot 19, Sector 40, Nerul (W), Next Seawoods Grand Central Station. Off Palm Beach Road. Navi Mumbai, India. Thane MAHARASHTRA 400706. India Phone 9820046663 Fax Email [email protected] Details Contact Details Contact Person (Scientific Query) Person (Scientific Name Dr Mili Arpan Shah Query) Designation President Affiliation Ozone Forum of India Address President of ozone forum of India, Training and education. 3rd Flr Bisleri Tower Off Western Express Highway, Andheri - Kurla Rd, Mumbai Mumbai (Suburban) MAHARASHTRA 400099 India Phone 9819376454 Fax Email [email protected] Details Contact Details Contact Person (Public Query) Person (Public Query)
    [Show full text]
  • Redharavi1.Pdf
    Acknowledgements This document has emerged from a partnership of disparate groups of concerned individuals and organizations who have been engaged with the issue of exploring sustainable housing solutions in the city of Mumbai. The Kamala Raheja Vidyanidhi Institute of Architecture (KRVIA), which has compiled this document, contributed its professional expertise to a collaborative endeavour with Society for Promotion of Area Resource Centres (SPARC), an NGO involved with urban poverty. The discussion is an attempt to create a new language of sustainable urbanism and architecture for this metropolis. Thanks to the Dharavi Redevelopment Project (DRP) authorities for sharing all the drawings and information related to Dharavi. This project has been actively guided and supported by members of the National Slum Dwellers Federation (NSDF) and Dharavi Bachao Andolan: especially Jockin, John, Anand, Savita, Anjali, Raju Korde and residents’ associations who helped with on-site documentation and data collection, and also participated in the design process by giving regular inputs. The project has evolved in stages during which different teams of researchers have contributed. Researchers and professionals of KRVIA’s Design Cell who worked on the Dharavi Redevelopment Project were Deepti Talpade, Ninad Pandit and Namrata Kapoor, in the first phase; Aditya Sawant and Namrata Rao in the second phase; and Sujay Kumarji, Kairavi Dua and Bindi Vasavada in the third phase. Thanks to all of them. We express our gratitude to Sweden’s Royal University College of Fine Arts, Stockholm, (DHARAVI: Documenting Informalities ) and Kalpana Sharma (Rediscovering Dharavi ) as also Sundar Burra and Shirish Patel for permitting the use of their writings.
    [Show full text]
  • World Bank Document
    E507 Volume 13 MUMBI METROPOLITAN REGION DEVELOMENT AUTIORllY (MMRDA) MUMBU UtIBAN TRANSPORTATION PROJECT (MUiiP) Public Disclosure Authorized COMMUNITY ENVIRONMENTAL MANAGEMENT PLAN (CEMP) FMR PERMANENT RESETTLEMENT SITE AT PLOT NO. CIS190 (pL) MAJAS VILLAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JUNE 2002 Public Disclosure Authorized ItCON POLLUTION CONOL CONULTAI 44, DIAMOND COUIT, 142, IAYSTJASEDJ ROAD, MAM MUMAI - 430 016 PHONE: 444 33 444 33 Public Disclosure Authorized Z-MAEL u1m4v.s ii i rPnpv Public Disclosure Authorized Public Disclosure Authorized CONTENTS CHAPTER Pg. No EXECUTIVE SUMMARY I l. INTRODUCTION 3 Annexure 1.1 Map of Mumbai I1 Annexure 1.2 Applicable Indian Laws and World Bank Safeguard Policies 12 2. SUB-PROJECT DESCRIPTION, ANALYSIS OF ALTERNATIVES AND SELECTION OF SITE 2() Annexure 2.1 Key Plan for Various Alternative Sites 27 Annexure 2.2 Site Layout Plan 28 Annexure 2.3 Exhibits of Majas Resettlement Site 29 3. BASELINE ENVIRONMENT 33 4. IDENTIFICATION OF ENVIRONMENTAL IMPACTS 38 5. COMMUNITY ENVIRONMENT MANAGEMENT PLAN 44 Annexure 5.1 Majas Resettlement Site CEMP Phase - I During Construction 49 Annexure 5.1 Majas Resettlement Site CEMP Phase - 11 Post-Implementation 52 Annexure 5.2A Do's And Don'ts to be Circulated Amongst EMC 54 CONTENTS CHAPTER Pg. No Annexure 5.2 B Do's And Don'ts to be Circulated Amongst Inhabitants 56 Annexure 5.3 A Translation of "Synopsis" of Annexure 5.2 A and 5.2B In Local Language 57 Annexure 5.4 Monitoring Indicators at Majas Resettlement
    [Show full text]
  • The Politics of Road Safety in Mumbai.Pdf
    Making in-roads The politics of road safety in Mumbai Tanushri Gupte Case study March 2018 This project was generously supported by: The views expressed in this report and the accuracy of its findings do not necessarily represent the views of or confer liability on the FIA Foundation. Overseas Development Institute World Resources Institute: Ross Center for Sustainable Cities 203 Blackfriars Road 10 G Street, NE Suite 800 London SE1 8NJ Washington, DC 20002 Tel: +44 (0) 20 7922 0300 Tel: +1 (202) 729 7600 Fax: +44 (0) 20 7922 0399 Fax: +1 (202) 729 7610 Email: [email protected] Email: [email protected] www.odi.org www.wri.org www.odi.org/facebook www.facebook.com/worldresources www.odi.org/twitter www.twitter.com/worldresources Readers are encouraged to reproduce material from ODI publications for their This document contains preliminary research, analysis, findings and own outputs, as long as they are not being sold commercially. As copyright recommendations. It is being circulated to stimulate timely discussion and holder, ODI requests due acknowledgement and a copy of the publication. For critical feedback, and to influence ongoing debate on the emerging issue of online use, we ask readers to link to the original resource on the ODI website. the political economy analysis of road safety. The views presented in this paper are those of the author(s) and do not necessarily represent the views of ODI. © Overseas Development Institute 2018. This work is licensed under a Creative Commons Attribution-NonCommercial Licence (CC BY-NC 4.0). Cover photo: Pedestrians try to cross the Bharatmata Intersection in busy traffic in the Island City of Mumbai © Prasad Shekhar/WRI India, 2018 About this case study This study examines the political economy of road safety in India, with a focus on Mumbai.
    [Show full text]
  • Mumbai Infrastructure: What Is and What Will Be?
    MUMBAI INFRASTRUCTURE: WHAT IS AND WHAT WILL BE? Infrastructure development acts as a cornerstone for any city in order to determine the growth trajectory and to become an economic and real estate powerhouse. While Mumbai is the financial capital of India, its infrastructure has not been able to keep pace with the sharp rise in its demographic and economic profile. The city’s road and rail infrastructure is under tremendous pressure from serving a population of more than 25 million people. This report outlines major upcoming infrastructure projects and analyses their impact on the Mumbai real estate market. This report is interactive CBRE RESEARCH DECEMBER 2018 Bhiwandi Dahisar Towards Nasik What is Mumbai’s Virar Towards Sanjay Borivali Gandhi Thane Dombivli National current infrastructure Park framework like? Andheri Mumbai not only has a thriving commercial segment, but the residential real estate development has spread rapidly to the peripheral areas of Thane, Navi Mumbai, Vasai-Virar, Dombivli, Kalyan, Versova Ghatkopar etc. due to their affordability quotient. Commuting is an inevitable pain for most Mumbai citizens and on an average, a Mumbai resident Vashi spends at least 4 hours a day in commuting. As a result, a physical Chembur infrastructure upgrade has become the top priority for the citizens and the government. Bandra Mankhurd Panvel Bandra Worli Monorail Metro Western Suburban Central Rail Sea Link Phase 1 Line 1 Rail Network Network Wadala P D’Mello Road Harbour Rail Thane – Vashi – Mumbai Major Metro Major Railway WESTERN
    [Show full text]
  • Project Summary 1
    Proposed Road Tunnel between Tikujiniwadi (Thane) & Borivali (Mumbai) in Maharashtra, India PROJECT SUMMARY 1. INTRODUCTION Thane Ghodbundar Road (SH-42) is a major link road connecting Mumbai-Ahmadabad Road (NH-8) part of Golden Quadrilateral near Ghodbundar to Mumbai-Agra Road (NH-3) near Kapurbawadi. This link passes through Municipal Limits of Mira Bhayander Municipal Corporation area from Ch.00/000 to Ch.04/400 and thereafter it passes through Thane city urban area from Ch.04/400 to Ch.14/900. This is an important East-West link and carries heavy commercial traffic between NH-3 and NH-8. This road faces massive traffic congestion at various spots during peak traffic time. Congestion of traffic causes undesired burning of automobile fuel, which is a national loss in addition to the contribution of pollution, which would be a contributing factor for air quality in the adjacent Sanjay Gandhi National Park. Keeping in view, these factors in addition to reducing travel time and easy access between Thane and Western suburbs of Mumbai, it is proposed to construct twin tube 3 lane tunnel between Thane and Borivali under Sanjay Gandhi National Park. The Maharashtra State Road development Corporation (MSRDC) is proposing to construct Twin tube, 3 Lanes (each side) highway tunnel of about 10.8 km, which passes through below the Sanjay Gandhi National Park (SGNP), connecting Western Express Highway (WEH) near Borivali and Ghodbunder road (of Thane) Near Tikujiniwadi. The feasibility of tunnel boring machine technology will be explored for doing the tunneling work as it causes very low vibrations and will have minimal impact on the surface environment.
    [Show full text]
  • Mumbai's Open Spaces Data
    MUMBAI’S OPEN SPACES Maps & A Preliminary Listing Document Prepared by Contents Introduction........................................................2 H(W) ward........................................................54 Mumbai's Open Spaces Data..............................4 K(E) ward.........................................................60 Mumbai's Open Spaces Map...............................5 K(W) ward........................................................66 Mumbai's Wards Map..........................................7 P(N) ward.........................................................72 P(S) ward.........................................................78 City - Maps & Open Spaces List ----------------------------------------------------------------- R(N) ward.........................................................84 A ward................................................................8 R(C) ward.........................................................90 B ward..............................................................12 R(S) ward.........................................................96 C ward..............................................................16 D ward..............................................................20 Central & Eastern - Maps & Open Spaces List ----------------------------------------------------------------- E ward..............................................................24 L ward............................................................100 F(N) ward.........................................................30
    [Show full text]
  • Mumbai Report.Cdr
    MUMBAI For more details Please Contact : R E A L E S T A T E 1800 208 3344 (India) E-Mail: [email protected] O V E R V I E W Web: www.squareyards.com JULY 2015 Disclaimer : Information cumulated in this report is for your reference only. This report is put together by Square Yards’ research team with some exhaustive research and closely studying market trends. Square Yards however takes no responsibility or ownership for changes in market prices or facts with the constantly changing volatile market. No warranty or representation, express or implied is made to the accuracy of completeness of the information contained herein, the same is subject to errors, omissions, change of price, rental or other conditions withdrawals without notice, and to any special listing conditions. MUMBAI THE FINANCIAL CAPITAL OF INDIA KEY INFRASTRUCTURE DEVELOPMENT IN MUMBAI Western Express Highway begins from near the Mahim creek and extends to the Mira-Dahisar, connecting Bandra, Andheri, up to Dahisar. Passing beyond the city border, the 25 KM road continues as the National Highway (NH) - 8. Eastern Express Highway, serves as a link to the NH- 3 and it connects all the suburbs of North Mumbai with South Mumbai. CST is the starting point of the expressway and continues up to Thane. The Sion Panvel Highway cuts the Eastern Expressway at the RCF junction, connecting it to the outer areas of the city. Mumbai, formerly known as Bombay is the financial capital of India. It Santacruz – Chembur Link Road (SCLR) links Western Highway at Santa spreads across an area of 600 sq kms (including suburbs), making it roughly Cruz to Eastern Highway at Chembur.
    [Show full text]
  • Infrastructure - Construction MSRDC – Setting a Precedent for Infrastructure Construction in the Country
    EVENT UPDATE Infrastructure - Construction MSRDC – Setting a precedent for infrastructure construction in the country Summary We had recently organized a meeting of investors with Maharashtra State Road Development Corporation (MSRDC) senior officials on “Discussion on Mega Infrastructure Projects in Maharashtra”. We discussed four key projects that MSRDC is executing and came out with positive vibes on the innovative, time bound and result oriented approach of the corporation in executing these projects. What impressed us most is that despite the humongous scope of the projects, myriad obstacles and political intervention, these projects are likely to set a precedent in the history of infrastructure building in the country on how to plan and execute a mega infrastructure project. The cumulative cost of these projects is Rs750bn to be executed over the next 3 to 5 years. In this report we look at the details of these projects and EPC opportunity therein. Introduction of MSRDC: MSRDC is a Maharashtra state owned entity responsible for planning, designing, constructing and managing road projects, flyovers, bridges, light rail transit, sea links and water transport in the state of Maharashtra. At present Mr. Eknath Shinde is the Chairman of the corporation and Mr R. L. Mopalwar (IAS) is Vice Chairman and Managing Director. Current projects under MSRDCL are Mumbai Nagpur Samruddhi Mahamarg, Versova-Bandra Sea Link Project, Mumbai-Pune Expressway- Missing Link, Thane Creek Bridge-3 etc. Mumbai Nagpur Expressway-big on scope, big on execution: This project was the main point of discussion with the investors as it one of the largest greenfield expressway in the country spanning 700 kms with EPC cost of Rs554bn.
    [Show full text]
  • Stadium View Brochure Final 05-11-14
    A life in perfect harmony A LIFE IN PERFECT HARMONY Site Address: Head Office: The Balanced Life Long working hours, longer commuting time and no time for your family. The story of our lives. You trudge through the day as all of it takes a toll on your mind and body. Who doesn’t yearn for enough time after work to indulge in what they love, or speed past congested traffic or for that matter even a quiet evening stroll in the park. What if you could strike the perfect balance in life? Welcome to Stadium View. Premium residences. Thoughtfully adorned. Strategically located at Andheri West, the heart of the city. An abode that takes you away from the hassles of a fast paced life. Life, balanced at Stadium View. Travel and Comfort, in harmony. Traffic jams are a thing of the past. Now, experience hassle-free travel in the city’s new lifeline, The Mumbai Metro. The Versova-Ghatkopar metro corridor will allow easy and quick access to the Eastern Suburbs and the International Airport. Stadium View is located at a walking distance from the D.N Nagar Metro Station. Routines and Passion, in harmony. Enough time after work to enjoy your favorite sport, is a privilege bestowed only to a few. Proximity to the Andheri Sports Complex ensures that you get a chance to indulge in many exhilarating sports. So sweat it out in the squash arena or dole out a few punches in the boxing ring or have a smashing time at the badminton court, the choice is all yours.
    [Show full text]
  • Comprehensive Mobility Plan for Greater Mumbai
    बहन्ृ मԂबई ्हानगरपालिका MUNICIPAL CORPORATE OF GREATER MUMBAI Comprehensive Mobility Plan (CMP) for Greater Mumbai FINAL REPORT April 2016 Executive Summary LEA Associates South Asia Pvt. Ltd., India बहन्ृ मԂबई ्हानगरपालिका MUNICIPAL CORPORATE OF GREATER MUMBAI Comprehensive Mobility Plan (CMP) for Greater Mumbai FINAL REPORT April 2016 Executive Summary LEA Associates South Asia Pvt. Ltd., India Foreword Greater Mumbai is the vibrant commercial capital of India. It is one of the world's top ten centres of commerce in terms of global financial flow, generating 6.16% of India's Gross Domestic Product (GDP) and accounting for 22% of GDP of urban India, 10% factory employment, 25% of industrial output, 30% pf income tax collection, 60% of custom duty collections, 20% of central exercise collections, 40% of foreign trade and 70% of capital transactions to India's economy, etc. The city houses important financial institutions such as the Reserve Bank of India, the Bombay Stock Exchange, the National Stock Exchange of India, the SEBI and the corporate headquarters of numerous Indian companies and multinational corporations. It is also home to some of India's premier scientific and nuclear institutes like BARC, NPCL, TIFR, AERB, AECI, IREL and the Department of Atomic Energy. The city also houses India's Hindi (Bollywood) and Marathi film and television industry. Mumbai's business opportunities, as well as its potential to offer a higher standard of living, attract migrants from all over India, making the city a melting pot of many communities and cultures. As per census 2011, Greater Mumbai’s population is about 12.44 million (about 51% of the Mumbai Metropolitan Region’s population) is India’s most populous city.
    [Show full text]
  • 16264591.Pdf
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by UCL Discovery CITY, 2013 VOL. 17, NO. 3, 343–360, http://dx.doi.org/10.1080/13604813.2013.798884 Concrete geographies Assembling global Mumbai through transport infrastructure Andrew Harris Through a focus on the concrete geographies of transport infrastructure in contemporary Mumbai, this paper develops a critical engagement with assemblage theory and the global city. It details how international consultants, contractors, investors and investment, as well as materials, techniques and technologies, have helped sustain and strengthen Mumbai’s relations, associations and flows of global reach. In so doing, it demonstrates how ‘global city-ness’ is generated and articulated through diverse human and non- human components. However, the paper argues this exploration of socio-material assem- blages needs to be combined with an analytical probing of the comparative imaginations, discursive categories, elite coalitions and uneven geographies involved. By drawing on post-structuralist theories of globalisation while emphasising the practices, visions and agendas of specific social groups in Mumbai, the paper aims not only to provoke new empiri- cally grounded dialogue between assemblage thinking and critical urbanism, but also to encourage alternative ways of imagining and planning the global city. Key words: global city, assemblage, Mumbai, transport planning, comparisons Introduction lights, and an array of flyover piers. Some of these bear concrete segments of the rriving at Mumbai’s Chhatrapati new ‘Sahar Elevated Road’ while others Shivaji International airport in are still in steel skeletal form. Beyond the ADecember 2009, the immediate road, large piling rigs marked Bauer and experience of the city outside the main the silhouetted cranes and mixing units of terminal is one of concrete blocks, dust Larsen and Toubro’s casting yard can be and construction.
    [Show full text]