Canadian Version
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Social Sustainability of Transit: an Overview of the Literature and Findings from Expert Interviews
Social Sustainability of Transit: An Overview of the Literature and Findings from Expert Interviews Kelly Bennett1 and Manish Shirgaokar2 Planning Program, Department of Earth and Atmospheric Sciences, 1-26 Earth Sciences Building, University of Alberta, Edmonton, AB Canada T6G 2E3 1 Research Assistant/Student: [email protected] 2 Principal Investigator/Assistant Professor: [email protected] Phone: (780) 492-2802 Date of publication: 29th February, 2016 Bennett and Shirgaokar Intentionally left blank Page 2 of 45 Bennett and Shirgaokar TABLE OF CONTENTS Funding Statement and Declaration of Conflicting Interests p. 5 ABSTRACT p. 6 EXECUTIVE SUMMARY p. 7 1. Introduction p. 12 2. Methodology p. 12 3. Measuring Equity p. 13 3.1 Basic Analysis 3.2 Surveys 3.3 Models 3.4 Lorenz Curve and Gini Coefficient 3.5 Evaluating Fare Structure 4. Literature Review p. 16 4.1 Age 4.1.1 Seniors’ Travel Behaviors 4.1.2 Universal Design 4.1.3 Fare Structures 4.1.4 Spatial Distribution and Demand Responsive Service 4.2 Race and Ethnicity 4.2.1 Immigrants 4.2.2 Transit Fares 4.2.3 Non-work Accessibility 4.2.4 Bus versus Light Rail 4.3 Income 4.3.1 Fare Structure 4.3.2 Spatial Distribution 4.3.3 Access to Employment 4.3.4 Non-work Accessibility 4.3.5 Bus versus Light Rail 4.4 Ability 4.4.1 Comfort and Safety 4.4.2 Demand Responsive Service 4.4.3 Universal Design 4.5 Gender 4.5.1 Differences Between Men and Women’s Travel Needs 4.5.2 Safety Page 3 of 45 Bennett and Shirgaokar 5. -
Canada's Natural Gas Vehicle (NGV) Industry Recognizes Transit
Canada’s Natural Gas Vehicle (NGV) Industry Recognizes Transit Agencies for NGV Leadership: Calgary Transit – for North America’s largest indoor refueling and maintenance facility BC Transit – for supporting NGVs in three communities Hamilton Street Railway – for Canada’s longest operating NGV transit fleet November 10, 2019 Calgary, Alberta Canadian Natural Gas Vehicle Alliance The Canadian Natural Gas Vehicle Alliance (CNGVA) is pleased to award its inaugural NGV Leadership Awards to Calgary Transit, BC Transit and Hamilton Street Railway. CNGVA’s first NGV Leadership Awards build on the collaborative efforts of industry and government in support of the NGV Deployment Roadmap: Natural Gas Use in the Medium and Heavy-Duty Transportation Sector – updated and recently released in collaboration with Natural Resources Canada. The awards celebrate market leadership in adopting natural gas as a fleet fuel and recognizing its environmental, economic and operational benefits. They recognize an operator’s investment in natural gas buses, training and infrastructure that has improved regional air quality, reduced greenhouse gas emissions and created local green jobs with an abundant, domestic resource. CNGVA applauds these fleet operators for their leadership and commitment to affordable, cleaner, quieter transportation. Calgary Transit Calgary Transit operates the public transit system in Alberta’s largest municipality. Operating a mixed fleet of LRT and bus vehicles, Calgary Transit is the first choice for getting around Calgary. The Stoney Transit Facility is a leading example of public-private partnerships (P3). The 44,300 square metre facility is the largest of its kind in North America, with the ability to simultaneously fuel six buses indoors from empty to full in about four minutes. -
Making Transit Functional
MAKING TRANSIT FUNCTIONAL A guide to a frequent, affordable, and accessible system in Winnipeg Prepared by FUNCTIONAL TRANSIT WINNIPEG March 16, 2015 [email protected] www.functionaltransit.com “Transit works best where there are many destinations along something that feels like a straight line.” – Jarrett Walker, Human Transit 1 PREFACE This report was compiled by Functional Transit Winnipeg Functional Transit Winnipeg is a grassroots group of Winnipeggers who volunteer their time to research and advocate for improved public transit. This group came together over the concern that the Southwest Corridor will make public transit worse for Winnipeggers. We advocate for improving bus frequency within Winnipeg Transit’s existing service. This report was compiled in order to explain the deficiencies of the current plan for the Southwest Corridor in Winnipeg, and to lay out an alternative strategy that would have a far more positive impact on public transit for the same price as the current project being undertaken by the City of Winnipeg. Our conclusions are drawn from publicly available data, reports from the City of Winnipeg and transit research. We have made every effort to be factually accurate in our assessment of transit service and investment in Winnipeg. The views expressed in this document are those of the author and contributors only. We welcome response and input from those individuals who may have a different interpretation or access to more information. We can be reached at [email protected]. Lead author: Joseph -
Translink Efficiency Review for Translink Commission
TransLink Efficiency Review for TransLink Commission ACKNOWLEDGEMENTS Shirocca Consulting gratefully acknowledges the assistance and cooperation in providing data and information for this report from Coast Mountain Bus Company and TransLink as well as: • BC Transit Victoria • Calgary Transit • Edmonton Transit System • King County Metro (Seattle) • OC Transpo (Ottawa) San Francisco Municipal Transportation Agency (MUNI) • Toronto Transit Commission (TTC) • Winnipeg Transit Contents EXECUTIVE SUMMARY i 1. INTRODUCTION I Role of the TransLink Commission 1 This Assignment 2 2. TRANSLINK OVERVIEW 3 2010 10-Year Base Plan and Funding Stabilization Plan 3 3. TRANSLINK'S FINANCIAL PLAN AND PERFORMANCE 5 Revenue and Expenditure Growth 6 Revenue Growth 6 Expenditure Growth 6 Budget to Actual Performance 7 Targeted Efficiency Initiatives 8 Cumulative Funded Surplus 8 Capital Projects 9 Variance in Project Cost 9 Cash Flow Variance 10 2012 Budget 11 Economic Assumptions 11 Annual Budget Process 13 Review of 2012 Budget 13 2012 Bus Division Budget 18 Summary of Findings 18 4. TRANSIT SYSTEM PERFORMANCE 19 Performance Indicators Used 21 Conventional Transit Services 21 Five-Year Trend 22 System Performance 24 How does TransLink’s Performance Compare to its Peers? 25 Summary of Findings 32 Custom Transit Services 33 Five-Year Trend 33 Custom Transit Performance 36 How Does TransLink’s Performance Compare to its Peers? 37 Summary of Findings 42 5. BUS DIVISION PERFORMANCE 43 Performance Indicators Used 44 Conventional Bus Service 45 Five-Year Trend -
Town of Cochrane Transit Task Force Local Transit
TOWN OF COCHRANE TRANSIT TASK FORCE LOCAL TRANSIT SERVICE RECOMMENDATION TO TOWN COUNCIL August 30, 2018 Contents Section 1: INTRODUCTION .......................................................................................................................... 3 Section 2: THE TRANSIT TASK FORCE ....................................................................................................... 8 Section 3: BACKGROUND.......................................................................................................................... 10 3.1 GreenTRIP Funding & Allocation .................................................................................................... 10 3.2 GreenTRIP Funding Conditions ....................................................................................................... 11 Section 4: FINANCIAL RISK ASSESSMENT .............................................................................................. 12 Section 5: PREVIOUS FIXED ROUTE OPTIONS ......................................................................................... 15 Section 6: THE RATIONAL OF PUBLIC TRANSIT ...................................................................................... 18 6.1 Local Transit Initial Assessment of Other Municipalities .............................................................. 18 6.2 Economic Rational for Transit ........................................................................................................ 21 6.3 Regional Traffic Congestion & Time and Fuel Savings ................................................................ -
Steadfast Nyc School Bus Members Continue to Fight to Preserve Employee Protections International Officers Lawrence J
OFFICIAL JOURNAL OF THE AMALGAMATED TRANSIT UNION | AFL-CIO/CLC MARCH / APRIL 2015 STEADFAST NYC SCHOOL BUS MEMBERS CONTINUE TO FIGHT TO PRESERVE EMPLOYEE PROTECTIONS INTERNATIONAL OFFICERS LAWRENCE J. HANLEY International President JAVIER M. PEREZ, JR. NEWSBRIEFS International Executive Vice President OSCAR OWENS International Secretary-Treasurer Iowa bus driver quits after threats INTERNATIONAL VICE PRESIDENTS Fed up with rowdy behavior and threats from students, a Davenport, LARRY R. KINNEAR IA, bus driver has called it quits. The City offers its CitiBus transit Ashburn, ON – [email protected] service for free to all Davenport students. Drivers and riders say the RICHARD M. MURPHY problem with students has gotten worse. The mayor is urging the Newburyport, MA – [email protected] transit system to clamp down on problem riders by removing them BOB M. HYKAWAY Calgary, AB – [email protected] from buses. JANIS M. BORCHARDT Madison, WI – [email protected] Detroit to hire 100 new bus drivers PAUL BOWEN In some good news out of Motown, Detroit says it wants to hire Canton, MI – [email protected] KENNETH R. KIRK more than 100 bus drivers as part of its efforts to improve public transit Lancaster, TX – [email protected] service across the region. Local 26 welcomed the announcement GARY RAUEN saying it should “definitely take some of the stress off the existing Clayton, NC – [email protected] manpower” and hopes it leads to restoring service that had been cut. MARCELLUS BARNES Flossmore, IL – [email protected] RAY RIVERA Lilburn, GA – [email protected] Enter First Annual ATU Photo Contest! YVETTE TRUJILLO Have a great photo of ATU members on the job, at a protest, rally, or Thornton, CO – [email protected] other event – showing what makes ATU the great union it is today? GARY JOHNSON, SR. -
A Tale of 40 Cities: a Preliminary Analysis of Equity Impacts of COVID-19 Service Adjustments Across North America July 2020 Mc
A tale of 40 cities: A preliminary analysis of equity impacts of COVID-19 service adjustments across North America James DeWeese, Leila Hawa, Hanna Demyk, Zane Davey, Anastasia Belikow, and Ahmed El-Geneidy July 2020 McGill University Abstract To cope with COVID-19 confinement measures and precipitous declines in ridership, public transport agencies across North America have made significant adjustments to their services, slashing trip frequency in many areas while increasing it in others. These adjustments, especially service cuts, appear to have disproportionately affected areas where lower income and more- vulnerable groups reside in North American Cities. This paper compares changes in service frequency across 30 U.S. and 10 Canadian cities, linking these changes to average income levels and a vulnerability index. The study highlights the wide range of service outcomes while underscoring the potential for best practices that explicitly account for vertical equity, or social justice, in their impacts when adjusting service levels. Research Question and Data Public transport ridership in North American Cities declined dramatically by the end of March 2020 as governments applied confinement measures in response to COVID-19 pandemic (Hart, 2020; Vijaya, 2020). In an industry that depends heavily on fare-box recovery to pay for operations and sometimes infrastructure loans (Verbich, Badami, & El-Geneidy, 2017), transport agencies faced major financial strains, even as the pandemic magnified their role as a critical public service, ferrying essential, often low-income, workers with limited alternatives to their jobs (Deng, Morissette, & Messacar, 2020). Public transport agencies also faced major operating difficulties due to absenteeism among operators (Hamilton Spectator, 2020) and enhanced cleaning protocols. -
Transit Agency Responses to COVID-19: a Review of Challenges and Opportunities for Continued Service Delivery
Transit Agency Responses to COVID-19: A review of challenges and opportunities for continued service delivery By: Ellen McGowan April 2021 School of Urban and Regional Planning Queen’s University, Kingston, Ontario, Canada Supervisor: Dr. Ajay Agarwal Copyright © Ellen McGowan 2021 Acknowledgements I would first like to acknowledge my supervisor, Dr. Ajay Agarwal, whose expertise was invaluable in formulating the research questions and methodology. Thank you for your support and generosity over the last two years. I would like to thank the Norman D. Wilson Fellowship for funding this research. I would also like to thank my parents and Mark for their endless encouragement. Finally, I could not have completed this report without the support of my friends at SURP. Although our time together was cut short, I’m grateful for all that first year brought us. 2 Executive Summary Background & Context The coronavirus disease 2019 (COVID-19) has radically impacted public transport ridership and service provision across the country. Since the outbreak of the virus, transit agencies have had to adapt to new and rapidly evolving conditions. Many agencies modified services to reflect lower ridership levels and to ensure the safety of both riders and operators. These changes in service were guided by public health agencies, as well as major transit associations like the Canadian Urban Transit Association (CUTA) and International Association of Public Transport (UITP). Other agencies implemented precautionary measures like rear door boarding, temporary fare suspension, and reduced capacity limits to enable the safe continuity of operations. As the COVID-19 pandemic continues, transit agencies are having to strike a balance between providing enough transportation options for essential travel and reducing service offerings to match the declining overall demand for mobility services. -
The Routeahead for Calgary Transit's Network
CITY OF RECEIVED IN ENGINEERING TRADITIONS R A Strategic Plan for Transit in Calgary March 2013 about RouteAhead --\ In 2011 , Calgary's City Council directed that a new long-term plan for Calgary Transit be created in ~ jiii) accordance with the principles and objectives ~ WALKIBIKE ~TRANSIT AUTO of the Calgary Transportation Plan . Early in 2012, a 2011 (24-hour, team was established to develop this plan, all purpose, 14% 9% 77% now called RouteAhead. city wide) Targets 20-25% 15-20% 55-65% RouteAhead follows other forward-looking initiatives at The City of Calgary (The City), including RouteAhead identifies the investment in transit imagineCALGARY, Plan It Calgary (the backbone service required to meet these targets. behind both the Calgary Transportation Plan (CTP) and the Municipal Development Plan (MOP)), and The RouteAhead provides strategic direction for transit in City's 2020 Sustainability Direction. Calgary for the next 30 years. The plan was approved by Council in March 2013, and will guide the To support the goals and targets for land use and development of future business plans and budgets. mobility in the MOP and CTp, Council reaffirmed its support for the following targets for travel mode share as part of its 2011 Fiscal Plan for Calgary. Public engagement RouteAhead engaged many stakeholder groups, Every bit of the feedback received was considered in citizens, customers and employees. The team developing the core principles that would ultimately met face-to-face with more than 4 ,000 Calgarians, inform the visions, directions and strategies in the asking questions and gathering thousands of RouteAhead plan. -
Accessible Transit Services (ATS) Review (PW05075(A)) (City Wide)
CITY WIDE IMPLICATIONS CITY OF HAMILTON ACCESSIBLE TRANSIT SERVICES (ATS) STEERING COMMITTEE Report to: Mayor and Members Submitted by: Councillor Terry Whitehead Chair Committee of the Whole ATS Steering Committee Date: June 15, 2006 Prepared by: Connie Wheeler Extension 5779 SUBJECT: Accessible Transit Services (ATS) Review - (PW05075a) - (City Wide) RECOMMENDATION: (a) That a Task Force be established to review improvements, look for efficiencies and make recommendations quarterly, to the General Manager of Public Works respecting Accessible Transit Services. (b) That the Accessible Transit Services governance structure attached as Appendix A to Report PW05075(a), be approved for a period of three months upon Council approval, at which time the Accessible Transit Services Steering Committee will reconvene to determine the appropriateness of the new model and/or revise the model based on a report from the Task Force outlining their initial success or further recommendations. (c) That the above results be incorporated into a competitive RFP process which will be compiled in 2007 with the approved vendor(s) beginning work in 2008. (d) That the City program be re-branded which, in turn, would allow both DARTS and Vets the opportunity to individually brand their services. (e) That there are to be no additional costs as a result of any changes made to the program. (f) That any savings be applied to enhancing the service. (g) That a Business Analyst (Trapeze software) be hired, subject to acceptance of this review (currently in Budget, awaiting conclusion of review). (h) That the Director of Transit and the Manager of Transit Fare Administration & ATS be reaffirmed as Public Works staff representatives on the DARTS Board of Directors as non-voting members. -
Operating & Capital Budget Summary
Table of Contents Operating & Capital Budget Summary 2004 TORONTO Table of Contents Toronto at a Glance 2004 Budget Overview–Corporate Profile of Toronto 1 2004 Operating Budget 17 Council-Committee Structure and Mandates 2 2004 Property Taxes and Assessment 27 City of Toronto Electoral Wards 3 2004 Capital Budget and 10-Year Capital Plan 29 Councillors 4 2004 Council Approved Capital Budget Administrative Organization Chart 8 2004 Capital Budget and Future Year Commitments– Including 2003 City of Toronto Special Purpose Bodies 9 Carry Forwards 36 Capital Market Financing Activities during 2004 38 Budget Summary by Program Council Direction Adjusted 2004 Council Approved Operating Budget Council’s Strategic Plan 11 –Net Expenditures 40 Council’s Priorities for the 2003–2006 Term 12 Adjusted 2004 Council Approved Operating Budget Listening to Toronto 14 – Gross Expenditures 43 Toronto Official Plan 15 Adjusted 2004 Council Approved Operating Budget –Revenues 46 Municipal Performance Measurement Program Toronto’s 2003 Results 49 Program Summaries Community & Neighbourhood Services 59 Children's Services 61 Human Resources 180 Homes for the Aged 66 Information & Technology 184 Shelter, Housing & Support 70 Legal 187 Social Development & Administration 74 Service Improvement & Innovation 190 Social Services 77 Union Station 191 Information & Technology–End of Lease Strategy 192 Works and Emergency Services Department 81 Emergency Medical Services 83 Special Purpose Bodies Emergency Management Plan 86 Arena Boards of Management 193 Fire Services -
A Case for Edmonton to Explore Bus Rapid Transit
6. A Case for Edmonton to Explore Bus Rapid 2 Transit Edmonton Transit System Advisory Board Recommendation: That Administration provide a report on the feasibility, implications and details on the potential of adopting bus rapid transit in Edmonton as both an interim method of servicing routes earmarked for future LRT expansion (LRT Network Plan) as well as other high-traffic corridors that are suitable for high-speed, high-frequency transit services. Report Summary The Edmonton Transit System Advisory Board has explored the characteristics of bus rapid transit and the benefits of implementing bus rapid transit in cities similar to Edmonton. Based on this analysis the Board believes there is value in the City of Edmonton exploring bus rapid transit as an alternate mode of transit to complement LRT and regular bus service. Report Bus rapid transit is a high-speed, high frequency bus-based mode of transit that delivers fast, high-capacity, and cost-effective transit services in urban areas. Bus rapid transit differs from regular bus service based on several key characteristics: • The use of dedicated busways lanes (exclusive street-level lanes, often fully segregated from mixed traffic). • Off-board fare collection for less idle time at stations (simultaneous boarding at all doors). • Platform-level boarding for improved accessibility. • High frequency (focus is on ridership, not coverage; service is based on a pre- determined frequency rather than a schedule). • High capacity; bus rapid transit often uses articulated buses capable of transporting 80+ passengers. • High quality stations. Compared to a regular bus service, bus rapid transit is faster, has a higher ridership capacity, runs more frequently, and offers greater reliability and convenience.