2ND ANNUAL ENVIRONMENTAL MANAGEMENT REPORT Period covered 01.01.2009 until 31.12.2009 JANUARY 2010 Environment Department OLYMPIA ODOS S.A. Olympia Odos Contents Introduction 4 1 General 5 2 Permits - Designs related to construction 7 3 Environmental management, hazardous 9 and non hazardous materials and waste management 4 Environmental parameters, monitoring 11 programme (noise, traffic load vibrations, air quality, water) 5 Energy conservation and efficiency 13 6 Vegetation, planting and road cleaning 15 7 Environmental accidents,green area fires 17 8 Training, raising awareness and corporate 18 social responsibility activities 2 3 Rio Psathopyrgos Tunnel Arachovitika Panagopoula K1 Patra Bypas Arachovitika Patra Egio Nikoleika VIPE Selianitika Akrata Bridge West Derveni Lykoporia Egio Tunnel Akrata Tunnel Tunnel Platanos Kareika K7 Mintilogli Derveni East Kalavryta Egio Tunnel Mavra Kato Litharia Achaia Thiva Tunnel Elefsina Xylokastro Nea Kiato Peramos Varda Kalavryta Xylokastro Ag. Kineta Elefsina Kiato Theodori Korinthos Loutraki Athens Andravida- Kyllini Zevgolatio Zevgolatio Megara Pachi Bridge Pinios River Gastouni Isthmus Epidavros Ancient Amaliada Korinthos Tripoli Chanakia Pyrgos Tunnel Tunnel Koliri Agios Georgios Ancient Olympia Alphios Pyrgos Bridge Alphios Ancient Olympia River Argos Anemochori Nafplio Samiko Tripoli Zacharo Figalia Megalopoli Tunnel Elia Kalo Nero Tsakona Dorio Zevgolatio Interchange Sparta Scale 1:250000 Kilometers 0 5 10 15 20 Messini Kalamata 4 5 Progress of the Environmental Agenda Olympia Odos Introduction Based on the Concession During the motorway’s A synopsis of the financial Agreement (article 11.2.2), construction and operation, both information related to OLYMPIA ODOS S.A. is obliged, the constructor as well as the environmental studies and throughout the entire Concession operator comply with all pertinent environment protection projects Period to deliver to the Service, provisions, as they are recorded is presented in appendix 14 of the a semester environmental in the Greek Legislation, ensuring Report. report. This is the second annual the same for their contractors Environmental Management and subcontractors. Note: all appendices of the Report and covers the period present report have been 01.01.2009 to 31.12.2009. Within this framework and as submitted to the Special a part of its Environmental Environment Service of the The annual report incorporates Management System, JV Ministry of Environment, Energy the data of the two semester APION KLEOS has developed and Climate Change, responsible environmental management the “Environmental Legislation for the environmental supervision reports and is submitted to EYPE/ Monitoring Procedure”, of the OLYMPIA ODOS project and MEPPW until January 31st of each incorporating all existing are available upon request. year and throughout the entire pertinent legislation and updated Concession Period. in case the latter is amended or updated. The specific procedure The above six-month and annual is copied to all parties who are reports shall be publicized obliged to then copy it to all in the internet site cooperating sub-contractors. www.olympiaodos.gr created and maintained by the Concessionaire, in accordance with the Concession Agreement. 6 7 Olympia Odos 1 General Appendix A of Annex 2 of the Concession Agreement states the Common Ministerial Decisions (CMD) and the Law comprising the Project’s environmental licensing and forming the main framework for the monitoring of the progress of the Project’s environmental issues. The EMP constitutes the More specifically: basic and general framework for the management of Law 2338/1995 environmental issues, whereas 1 Thiva I/C – Elefsina Toll Plaza the procedures and directives CMD 126393/16.02.2007 refer to the rational means and 2 Elefsina – Korinthos (excluding Kakia Skala section) handling/ management of each environmental issue, taking into CMD 108569/18.10.2006 3 account the pertinent legislation Kakia Skala and the decisions applicable to CMD 92073/16.05.1994 each case. 4 Isthmos – Ancient Korinthos I/C Along the same direction, CMD 104892/16.06.2006 5 The Operator, Olympia Odos Ancient Korinthos I/C – Patra By-Pass K1 I/C Operation S.A. is constantly CMD 106321/28.07.2006 trying to improve the level of the 6 Patra By-Pass K1 I/C – Mydilogli Semi-I/C Services provided to the Users in such a way so as to contribute CMD 102696/30.05.2006 7 to sustainable development and Mydilogli I/C - Amaliada maximize their contribution to society. CMD 100163/30.05.2006 8 Amaliada – Tsakona Both in the construction as Within the framework of the well as in operation phase, contractual obligations the the procedures and directives Constructor has developed an for the works’ environmental Environmental Management management are implemented Plan (EMP) for the Project in by the Constructor, aiming at the accordance with ISO 14001:2004. in compliance with the terms The EMP includes the and constraints of the above organizational structure, planning decisions. APION KLEOS submits actions, duties allocation, to OLYMPIA ODOS S.A. monthly technical methods, procedures reports regarding the progress of as well as processes for the the construction related works. development, implementation, achievement, revision and support of the Constructor’s environmental policy as well as the compliance with the Project’s environmental terms. 8 9 Olympia Odos 2 Permits - Within the framework of complying with the environmental terms and the required Designs related environmental licensing, Special Technical Implementation Designs (STID) accompanying to construction the specific works are elaborated and submitted for approval and licensing to EYPE/MEECC. Such designs are presented in detail in the appendices 1, 2, 3 and 4. “Elefsina – Korinthos” road 332/B), pursuant to the approved Appendix 6 contains the positive section is an existing part of the environmental terms. recommendation by Achaia Pref. National Road Network. Thus, Admin./ Directorate for Urban the foreseen structures pertain Appendix 10 states the positive Planning and Environment/ mainly to its maintenance and recommendations by EYPE/ EPAE on the submitted design file the creation of the safest possible MEECC pertaining to: pertaining to the Krathis traffic conditions as well as the river bridge. servicing of the motorway users. a. The assessment of the The following structures are environmental differentiations Regarding the archaeological foreseen, among others, during caused by the installation and surveys that take place within the project’s operation: operation of ramp toll stations the limits of the project, along Elefsina – Korinthos the Constructor is in direct • Operation of Elefsina Toll motorway and contact and cooperation with Station around K.P. 27+000, and b. The environmental licensing the competent archaeological • Construction and operation of of the project: “Alignment services. According to the parking and rest areas roughly modification in the area of Concession Agreement and the every 10km (taking into account Xylokastro (from K.P. 31+000 to Design – Construction Contract, the MSS locations as well). The IK.P. 33+000 along Korinthos – the CJV is responsible for the areas shall be developed in Patra motorway”. execution of archaeological locations where expropriated investigations pursuing a land is available. Following the aforementioned recommendation by the pertinent measures to address the archaeological service. The The final arrangement of the environmental impact stated in progress of the archaeological above mentioned technical the EIS (ch. 9) and with respect surveys is presented in appendix 7 projects as presented in appendix to Ancient Korinthos I/C – Patra of the present Report. 11 of this Report shall be derived By-Pass K1 I/C section, the after the finalization of the Constructor is submitting a full A halt of all works is imposed by necessary designs, currently file for approval to the competent the 5th Section of the Supreme under elaboration. EPAE in order to integrate the State Court, which has released Kerinitis, Selinountas, Meganitis, an order for the pausing of Already in this direction, the Foinikas, Krathis, Sithas and the enforcement of JMD modification of project sections, Elissonas river bridges as best 100163/30.5.2006 regarding the as they are described in the EIS, as possible into the landscape approval of the environmental is conducted according to the of particular aesthetic value (the terms at the section Pyrgos necessary process foreseen by file also contains the bridges’ (Alfeios)-Tsakona, 18+700 article 13 of CMD No 11014/703/ architectural design). to 23+000. F104/14.3.2003 (Gov. Gaz. 10 11 Olympia Odos 3 Environmental management, During the construction and the operation of the project, waste of any nature is managed based hazardous and non hazardous on the pertinent legislation and the constraints/ requirements imposed by the approved materials and waste management environmental terms, both for the Project’s existing and new sections. JV APION KLEOS in the frame of As a result of the implementation its Environmental Management of the project’s Environmental Plan has developed procedures Management Plan, and the regarding: respective procedures, all environmental parameters for Waste Management which waste management, hazardous has been prepared for the material management as well as management of waste, recording energy and material usage for the existing legislative framework the construction of the