Admiral Court

Total Page:16

File Type:pdf, Size:1020Kb

Admiral Court Cheshire Business Park Northwich Cheshire ADMIRAL COURT FOR SALE / TO LET NEW HIGH QUALITY OFFICE BUILDINGS FROM 3,085 - 7,082 SQ FT (286.6 - 657.9 SQ M) WITH ON-SITE PARKING www.cheshirebusinesspark.com J19 / M6 Phase One Cheshire has established itself as one of the UK’s most desirable regions for business occupiers thanks to the combination of its strategic TO MANCHESTER location and excellent lifestyle qualities. J19 M6/M56 Cheshire Business Park is a prime development which has been master-planned to offer an unrivalled environment providing high quality MANCHESTER RD bespoke office accommodation in a rural setting yet still within the North West Transport infrastructure. The developer, Commercial Development Projects Ltd, is committed to the expansion of an already thriving community embracing the best components of the surrounding social and economic infrastructure. ADMIRAL www.cheshirebusinesspark.com COURT Cheshire Business Park No 2b 2a 11 1 Manchester Road A556 TO NORTHWICH, WINSFORD Schedule of Accommodation Unit sq ft sq m car spaces 2a 4,085 379.51 12 2b 4,088 379.79 14 3 7,073 657.1 23 4 6,115 568.1 22 5a 3,086 286.7 11 5b 3,088 286.88 11 6 5,181 481.33 17 7 5,179 481.14 17 8 7,082 657.94 23 9 6,110 567.64 20 10a 3,085 286.61 11 10b 3,088 286.88 11 Total 57,260 5,319.63 392 TO CHESTER JCT 10 M56 orthwich Cheshire Tailored Specification Amenities Cheshire Business Park will be host to a series of elegant It is envisaged that Cheshire Business well-designed office buildings offering the following Grade Park will provide an unrivalled business A specification: environment which will benefit from: 4 7 9 • Full height glazed entrance foyer • On Site Hotel 5b 10b • Full access raised floors • Coffee Shop • Budget Hotel • Suspended ceilings with LG3 or LG7 compliant lighting • Leisure Facilities 5a • Solar tinted glazing 10a • Convenience Store • Carpeted throughout 3 • Public House 6 8 • Shower facilities and bicycle parking • Nursery • Fully air conditioned • On Site Car Parking • Design to BREEAM very good minimum • Conference Facilities A Strategic Location Drive Times Approximate drive times to Cheshire Business Park. Cheshire Business Park benefits from both its rural Cheshire setting and its ability to benefit from the regions transport infrastructure within minutes: From Mileage Travel Times M6 Jct 19 1 3 mins • Located within minutes of Junction 19 of the M6. Chester 20 32 mins • The M56 and M60 motorways provide a journey time of less than Manchester 20 34 mins 30 minutes to Chester, Liverpool and Manchester. Leeds 68 1 hr 10 mins • Within 15 minutes drive of Manchester International Airport (the Birmingham 73 1 hr 20 mins world’s 10th largest airport) serving 220 locations. London 186 3hrs 30 mins • Within 30 minutes drive of Liverpool John Lennon Airport. Glasgow 224 3hrs 40 mins • Approximately 5 minutes from Lostock Gralam train station on the West Coast Intercity line. Source: theaa.com 19 NORTHWICH RD E KNUTSFORD N M A A L ADMIRAL R E T S R O TO E N M F K T C I L R COURT A P N O HIGHER E A D WINCHAM H A E L 6 N L 5 A LANE 5 L A W A H Cheshire Life Disposal Terms S R AD E RO L Cheshire is one of the most affluent counties in the The buildings are available either by way of W CHESTER ROAD H WINNINGTON L MAN IC IN O W E United Kingdom which benefits from a whole host of freehold or leasehold transactions. N LOSTOCK L IN AY D G W D GRALAM ID TO STE A N HE R M thriving business communities and market towns. LAN C O E M R M6 NORTHWICH ID S A556 DL STATION ’ H E T WI I C F H RO The quality of the local environment and strong labour A F D I A R pool aligned to its location at the heart of the North West 5 G 3 3 NORTHWICH D P has enabled it to become a much sought after business Further Information BEACH R AY GREENBANK EN W D KING STREET NY’ R RAIL E R S T L location being able to draw upon the region’s transport For further information or to make an S N A E NE H O C hub and the amenities associated with the surrounding appointment please contact either of the ND A556 HOL O ME L S CH LACH A thriving business community. joint agents. P DENNIS EL A556 R O AD DAVENHAM Cheshire Business Park Northwich Cheshire WWW.MARSHALLCDP.COM ADMIRAL COURT www.cheshirebusinesspark.com MISREPRESENTATION ACT: The agents for themselves and for the vendors or lessors of this property whose agents they are, give notice that (i) these particulars are produced in good faith, are set out as a general guide only and do not constitute any part of an offer or contract. They are believed to be correct but any intending purchasers or tenants should not rely on them as statements or representations of fact but must satisfy themselves as to the correctness of each of them. (ii) no person in the employment of the agents has any authority to make or give any representation or warranty in relation to this property. September 2009. Masterplan may be subject to change prior to construction. Designed and Produced by CW Advertising Ltd. Tel: 01282 858200..
Recommended publications
  • Cum House Name Given Name Surname Age Gender Occupation
    Househ Estimated Birth Birth Cum House name Township Given Name Surname Relationship Age Gender Occupation Birth City old Birth Year County Country 1 Nook House Antrobus 1 James Robinson Head 75 1786 Male farmer Antrobus Cheshire England 2 Nook House Antrobus 1 Ann Robinson Wife 66 1795 Female Antrobus Cheshire England 3 Nook House Antrobus 1 Elizabeth Robinson Daughter 34 1827 Female Antrobus Cheshire England 4 Nook House Antrobus 1 Jane Robinson Daughter 26 1835 Female Antrobus Cheshire England 5 Nook House Antrobus 1 John Hignett Grandson 12 1849 Male Antrobus Cheshire England 6 Nook House Antrobus 1 Mary J Hindley Granddaughter 3 1858 Female Antrobus Cheshire England 7 Nook House Antrobus 1 James V Robinson Grandson 11m 1860 Male Antrobus Cheshire England 8 Antrobus 2 Isaac Thomason Head 38 1823 Male ag lab Antrobus Cheshire England 9 Antrobus 2 Ann Thomason Wife 36 1825 Female Antrobus Cheshire England 10 Antrobus 2 George Thomason Son 3 1858 Male Antrobus Cheshire England 11 Antrobus 2 Alice Thomason Daughter 1 1860 Female Antrobus Cheshire England 12 Antrobus 2 Caroline Mills Stepdaughter 8 1853 Female Antrobus Cheshire England 13 Bob's Lane Antrobus 3 Robert Longshaw Head 55 1806 Male ag lab Antrobus Cheshire England 14 Antrobus 3 William Robinson Head 29 1832 Male ag lab Antrobus Cheshire England 15 Antrobus 4 Ellen Robinson Wife 29 1832 Female Antrobus Cheshire England 16 Antrobus 4 George Robinson Son 7 1854 Male Antrobus Cheshire England 17 Flash Farm Antrobus 5 John Fryer Head 54 1807 Male farmer 53 acresCrowton Cheshire
    [Show full text]
  • SHEET 5, MAP 5 Ward Boundaries in Northwich
    SHEET 5, MAP 5 Ward boundaries in Northwich A 5 1 5 9 9 3 5 Stone Leigh B House Farm 5 7 M 0 A Marbury Country Park 5 School R T B E CO S G T E SH Farm R The Cheshire West and Chester (Electoral Changes) Order 2011 A O L T L S LA N NE Hopyards Wood S Hopley's Pipes T L H O A C N N R E E U Sheet 5 of 7 H H C C E H Big Wood Manor Y E E E S T Farm N S N A L U L E A T D N N N G A A E E Barnton Community R L E O O Dairy House Meadows E R W R V Bank Farm Primary School V Anderton Marina A E G A Y H H E R E O S R U U R T B E G R L Y H L R R A UN This map is based upon Ordnance Survey material with the permissionR of Ordnance Survey on behalf of L O C M M OR E A N R H N a O the Controller of Her Majesty's Stationery Office © Crown copyright.C E r AD b A L u S IM r T y Unauthorised reproduction infringesB Crown copyright and may lead to prosecution or civil proceedings.E U D W B New Cheshire LITTLE LEIGH CP A R A r MARSTON CP L Y O O o The Local Government BoundaryA Commission for England GD100049926 2011.
    [Show full text]
  • Wincham Word Winter 2013/14
    Winter 2014 Starlings over Neumann’s Flash photographed by Joanne Redley of the Friends of Anderton and Marbury (FoAM). Chairman’s Words by Councillor Pete O’Halloran, Chairman of Wincham Parish Council Gosh February 2014 already, it seems like only yesterday we were celebrating Christmas. By the looks of things we’re going to have a busy year this year with some interesting opportunities, challenges and plans coming through. Firstly I have to say a big thank you to one of our Ward Councillors Don Hammond who has secured us substantial funding for the planned toddler area on the Linnards Lane Playing Fields. This and the large grant from the QEII fund along with a contribution from Thor Chemicals which Naomi our Parish Clerk obtained means that work can commence. Running in parallel to this we are also looking at obtaining funding for a permanent War Memorial for the village to coincide with the commemorative events of the Great War. Speeding through the village is an issue raised by a lot of people, and some of you may have noticed villagers out and about with interactive speed equipment. The purpose for this was to collect evidence to obtain a permanent interactive sign. We would be required to part fund this but I feel this could be worthwhile as our observations show that when people see the sign they slow down. Also starting this year will be “Village Strolls”, where Wincham Parish Councillors walk through sections of Wincham with CWaC representatives. This will give us an opportunity to highlight issues directly with the relevant CWaC officials.
    [Show full text]
  • Lostock Gralam Parish Council Currently Consists October 2018
    The Mid Cheshire line has had an interim Transport timetable since May 2018. The main changes are LOSTOCK GRALAM some earlier and later trains, with morning peak PARISH COUNCIL trains towards Chester doubling to two an hour HS2 from Lostock Gralam to Greenbank, and more even Welcome to the first Lostock Gralam Parish interval service from Chester towards Manchester Council newsletter aimed at keeping you up to date HS2 has recently held local information events in the evenings. on what is happening in the Parish. which included the proposed construction site locations, infrastructure associated with the It is expected the full new timetable will be Who are we? railway and the realignment of major roads and introduced in December 2018 if Network Rail pubic rights of way. complete the electrification through Bolton by Lostock Gralam Parish Council currently consists October 2018. of eight parish councillors, with two vacancies. All If you were unable to attend one of the events councillors are locally elected volunteers. The please feel free to come along to the September With thanks to John Oates – Chairman of the Mid Parish Council meets on the first Monday of each Parish Council meeting where HS2 representatives Cheshire Rail Users Association– mcrua.org.uk month with the exception of August. A 15 minute will deliver an update specific to Lostock Gralam. public forum is held before each meeting where PCSO any public concerns or questions can be raised. Speeding Meetings are held in the Church Hall and start at 7.30pm. Members of the public are always Speeding remains an issue, particularly as drivers The Lostock Gralam PCSO is Phil Hambleton.
    [Show full text]
  • Strategic Growth Sites E N E
    n o i t a r Assessing climate risks and opportunities for e n e g y g r strategic growth sites e n E • k The effects of climate change are already s i R being felt in Cheshire & Warrington (C&W) g through an increase in frequency of severe n i g weather events such as intense rainfall, high a n winds and prolonged periods of ice and snow. a M • We have also seen an increase in flooding, both from rivers bursting their banks and from surface water caused by y t i periods of high rainfall. Such incidents pose a threat not only u n to homes and people, but also to businesses, with a i t consequent threat to economic growth and prosperity. n o C s s e n i s u B • e c I d n a w o n S At the same time such events also present opportunities for / local companies to develop products and systems to combat d o the effects of climate change as well as installing measures that o l reduce carbon dioxide (CO ) emissions and reduce energy bills. F 2 • Recognising these threats and opportunities, the Cheshire & e Warrington Local Economic Partnership (LEP) commissioned a g study to assess the risks and opportunities at the strategic growth a t r sites and sectors in the region. These sites include both existing o employment sites and those earmarked for future development. h S l The second phase, which is about to commence, will involve e engagement with businesses and site developers to encourage u F them to take action to combat the risks and seize the opportunities.
    [Show full text]
  • C17 Land Disposal Notice for Lostock Works Site, Lostock Gralam, Northwich, Cheshire-12 April 2021
    Les Waters Senior Manager, Licensing Email: [email protected] 12 April 2021 Company Secretary Network Rail Infrastructure Limited 1 Eversholt Street London NW1 2DN Network licence Condition 17 (land disposal): Former railway works site, Lostock Gralam, Northwich 1. On 19 February 2021, Network Rail gave notice of its intention to dispose of land at Lostock Gralam, Northwich, Cheshire (“the land”), in accordance with Condition 17 of its network licence. The land is described in more detail in the notice (copy attached). 2. We have considered the information supplied by Network Rail including the responses received from third parties consulted. For the purposes of Condition 17 of Network Rail’s network licence, ORR consents to the disposal of the land in accordance with the particulars set out in its notice. Reasons for decision 3. We are satisfied that Network Rail has consulted relevant stakeholders with current information and left no relevant objection unresolved. In considering the proposed disposal, we note that: • there is no evidence that current or future railway operations would be affected adversely; in particular • Network Rail confirmed the proposed disposal would not impact the re- opening of the Northwich to Sandbach line; and • the proposed disposal would facilitate new rail access rights for Network Rail, subject to the purchaser obtaining planning permission within the conditional three year option agreement. 4. Based on all the evidence we have received and taking into account all the material facts and views relevant to our consideration under Condition 17, we are satisfied that there are no issues for us to address.
    [Show full text]
  • Jnliversio. Of
    41‘,CA11 et Jnliversio. of + .1 Aik• , i 0 • '. !. " !"I". l- e• • I I.- . 1..4 hti 1 , ...! C h0( tier IIERITAGE SOCIETY 010 TATA TATA CHEMICALS EUROPE Aliens in Mid Cheshire. The Story of the Belgian Refugees during the Great War. By Alan Lowe. Aliens in Mid Cheshire. The story of the Belgian refugees. A fact that is not widely known is that a few hundred Belgian refugees found their way to Mid Cheshire in the first months of WWI. They were welcomed with open arms at first with the people of the area organising places for them to stay, finding or making clothes for them and putting on shows and entertainment to help pay for their welfare. But as might be expected that welcome wore thin as the months and years went by, and after an initial rush to organise fund raisers and entertainment for the visitors they slowly disappeared from the pages of the local press only to reappear when they were involved in some minor fracas or a baptism or in two sad cases, funerals. As many as 250,000 made it to Britain. They came to escape the German hordes who had invaded their country. Many more that had entered Holland for the same reason were denied access to Britain because the Dutch government felt that allowing them to go might affect their neutral status. In Mid Cheshire they were housed at the Grange in Hartford, (Not the present school but a building further back.) at Wharton Lodge in Winsford (kindly donated by Miss Aspinall-Dudly.) and at Bachelor's Hall in the Avenue at Winnington, the latter thanks to the generosity of Sir John Brunner who also donated £1,000 towards their upkeep.
    [Show full text]
  • Identification of Key Settlement Gaps Outside the Green Belt in Cheshire West and Chester
    Cheshire West and Chester Local Plan (Part Two) Local Landscape Designation Review Advisory Position Paper February 2016 Part 2: Identification of Key Settlement Gaps Outside the Green Belt in Cheshire West and Chester Advisory Position Paper (Part 2) Key Settlement Gaps February 2016 The Planning and Environment BAYOU BLUEnvironment Limited. Studio Ltd. Cottage Lane Farm, Cottage Lane 69 New Road, Wingerworth, Chesterfield, Collingham, Newark Derbyshire. S42 6UJ Nottinghamshire. NG23 7LJ Office: 01246 386555 T. +44(0)1636 555006 Mobile: 07813 172453 M. +44(0)7866 587108 [email protected] [email protected] PES Document Ref. PES1502: KSG Study Issue 1 Drafted by: Graham Bradford Checked by: Anthony Brown Authorised by: Graham Bradford 2 Advisory Position Paper (Part 2) Key Settlement Gaps February 2016 Contents Section Page 1. Introduction 5 2. Context 5 3. Key Settlement Gaps: Value, Functions and Attributes 7 4. Study Method 10 5. Findings 20 6. Towards a Key Settlement Gap Policy Approach 44 Tables Table 1 KSG Primary Functionality Tests 9 Table 2 Potential Local Service Centres Outside the Green Belt 11 Table 3 Potential Local Service Centres Screened Out from PKSGA 14 Inclusion Table 4 Settlements between which PKSGAs are identified 15 Table 5 Candidate Key Settlement Gaps (CKSG): Assessment and 21 Selection. Appendices Appendix 1 CWaC identified small settlements examined for potential 48 Local Service Centre status Appendix 2 Key Settlement Gap Field Sheets 49 Appendix 3 Former Vale Royal ASLEV ‘Open Space’ Designations falling 91 within the Green Belt. Cover photograph: St Winifred’s Parish Church, Davenham, © PES Ltd 3 Advisory Position Paper (Part 2) Key Settlement Gaps February 2016 Page left blank 4 Advisory Position Paper (Part 2) Key Settlement Gaps February 2016 Advisory Position Paper PART 2: Identification of Key Settlement Gaps Outside the Green Belt 1.
    [Show full text]
  • Wincham Word
    WINCHAM WORD Edition 2 – 2020 to cover May, June and July 2020 From Wincham Parish Council Delivered free to every home & business in Wincham News and information about our village and close neighbours Chairman’s Words by Councillor Ian Parr Wincham Parish Council As I write this, in the first days of April, the effects of the Covid-19 pandemic are really starting to bite in the UK. It is too soon to tell how effective lockdown measures are going to be against the spread of the virus. It isn’t clear whether our health system will be able to cope with the escalating number of cases. Many of us are worried about loved ones, friends, relations and colleagues who are at risk. Members of my family are still working in school and the food industry. My friends in the midst of cancer and other medical treatments are at high risk. Those who are alone face worse isolation than ever before. As daunting and unprecedented as this situation is, it is important to realise that we are not powerless in the face of this threat. There are things that all of us can and must do to keep ourselves and our community as safe as possible. Follow the latest government advice on staying safe. When you do have to go out, drive carefully. Be kind to each other. Just because we have to be apart physically does not mean that we have to be far apart mentally and emotionally. Already, people are finding new ways to support each other and to stand together (while keeping 2 metres apart) against this threat.
    [Show full text]
  • Stublach Gas Storage Project Minutes
    STUBLACH GAS STORAGE PROJECT MINUTES OF LOCAL LIAISON COMMITTEE MEETING HELD THURSDAY 20th SEPTEMBER 2018 AT STUBLACH GAS STORAGE SITE Elected as Chairperson: Mark Simmons Cheshire West and Chester Council Attendees: Alan Leadbetter Storengy UK Ltd John O’Donnell Storengy UK Ltd Kathy O’Donoghue Lach Dennis Frank Still Allostock Lyndsey Sandison Lostock Gralam Richard Stevenson Inovyn Apologies/ Non-attendees: John Beecroft Byley Gaye Billington Rudheath Fiona Dunning Cheshire West and Chester Council Storengy UK Limited King street, Northwich, Cheshire, CW9 7SE Tel: 00 44 1606 814 680 – Fax: 00 44 1606 4 44 67 Registered in England 6311795 1. INTRODUCTIONS M. Simmons welcomed everyone to the Storengy Local Liaison Committee (LLC). A. Leadbetter described the LLC meeting agenda. 2. PROGRESS AT STUBLACH AND WHAT IS HAPPENING ON SITE OVER THE NEXT 3 MONTHS J. O’Donnell presented an overview of the progress of the Stublach Phase 2 development together with a description of the planned work for the next three months. In Quarter 2 2018 all the main equipment has been delivered to site (compressors and dehydration units). There is now a team of close to 100 workers assembling the equipment and installing all the interconnecting pipework, and cabling. The pipeline and cables connecting the final five caverns has been laid and will the tested at the end of September. This completes all the work installing underground pipelines across the site. For the last few weeks a snubbing rig has been on site to remove equipment from inside the cavern to enable the cavern to become commercially operational. In October caverns 11, 12 and 13 will be operation.
    [Show full text]
  • Cheshire Area Rail Services
    Merseyrail Merseyrail Northern Rail Northern Rail Virgin Trains Northern Rail Transpennine Express Northern Rail Metrolink Northern Rail Transpennine to Southport to Ormskirk to Wigan to Wigan, Preston, Blackpool to Preston, Carlisle, to Wigan,Kirby to Scotland, to Blackburn to Bury to Bradford Leeds, Selby Express Glasgow,Edinburgh Southport Lake District The North to Leeds, Marsden Scarborough M Seaforth Aintree North East M Garswood & Litherland M Swinton Greenfield Kirkby St Helens Central M Mossley Bootle MOrrell M Salford Ashton-under Park Manchester M New Strand Thatto Heath Salford Central Victoria -Lyne Fazakerley M Crescent Stalybridge M Eccleston ParkM M Bootle Walton M M Oriel Road Rice Lane MPrescot M M Lea M Newton-le M Guide Whiston Green -Willows Patricroft Eccles Ardwick Ashburys Gorton Fairfield Earlestown ManchesterOxford Rd M M Huyton Deansgate Bridge New Flowery Field Brighton MBank Hall Kirkdale Rainhill St Helens M M Roby Eccles Manchester Belle Newton for Hyde M Junction M Wallasey Piccadilly Vue Hyde Ryder North Grove Rd M M Media City Godley M Broad Brow M M Sandhills Green Hyde Hattersley M Wallasey M Wavertree Trafford LiverpoolM Reddish Central Village Technology Park Park Broadbottom South North M Lime M Warrington Humphrey Levenshulme M Moorfields Parkway Mauldeth Hadfield St M Central Park Rd Woodley Merseyrail M Bidston BirkenheadConway Park ParkBirkenhead Brinnington to Hoylake/West Kirby Birkenhead North Hamilton Sq Urmston Heaton Dinting Burnage Moreton Leasowe Chapel Bredbury Birkenhead HuntsHalewood Hough
    [Show full text]
  • Meadowcroft,Lostock Gralam.Pages
    Meadowcroft Lostock Gralam Meadowcroft is a large traditional four bedroom detached bungalow, sitting within stunning landscaped gardens on a quiet residential road on the outskirts of Northwich Town. Meadowcroft is a large detached bungalow, occupying a superb plot of well tended lawns and stocked landscaped grounds, including an abundance of mature planting and a fabulous vegetable garden. The property sits in an attractive setting on a quiet residential road on the outskirts of Northwich town, conveniently positioned for the A556 link road, with the prestigious town of Knutsford only 10 minutes away. The property has been refurbished and is presented in excellent decorative condition throughout, offering spacious accommodation astride a spacious central reception hall with beautiful parquet flooring. The generous breakfast kitchen is fitted with an extensive range of quality cabinets and integrated appliances with integral access beyond to a separate utility room and a cloakroom. From the kitchen a connecting doors leads to a dining room and at the rear of the house is a large sitting room with direct access onto the gardens. At the opposite side of the house there are four bedrooms in total, two of which are large double bedrooms sharing access to a recently refitted jack-n-jill bathroom. The two smaller rooms both served by a family bathroom which again is refitted to a particularly fine standard. The property is accessed via a gated entrance which leads to a wide tarmac driveway, providing ample parking and turning space. There is a brick built detached garage, complimented by two timber frame garden sheds offering excellent secure storage.
    [Show full text]