Flp) Fy:(2018-2019)
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
LIST of REPORTS SENT to the SPONSORER from 1ST JANUARY, 2016 to 14Th JULY, 2021
LIST OF REPORTS SENT TO THE SPONSORER FROM 1ST JANUARY, 2016 TO 14th JULY, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”. -
Sl No Area Colliery Name Designation EIS No Mobile No EMAIL ID
List of Nodal Officers of Public Grievances in BCCL Sl No Area Colliery Name Designation EIS No Mobile No EMAIL ID. 1 Koyla Bhawan HQ S K Singh GM(P)VIP/CPGRAM/Legal 90183591 7547835164 [email protected] 2 Koyla Bhawan HQ B K Das Dy Manager(P)VIP/CPGRAM 90295379 6287695458 [email protected] 3 Sijua SIJUA AREA SUNIL KUMAR CHIEF MGR (PERS.)/APM 90077751 6287697496 [email protected] 4 LOYABAD COLLIERY RAKESH MACHAL MANAGER (PERS.) 90210055 6287697305 [email protected] 5 REGIONAL HOSPITAL LOYABAD RAKESH MACHAL MANAGER (PERS.) 90210055 6287697305 [email protected] 6 SIJUA AREA CHANDAN KR SRIVASTAVA DY.MGR (PERS.) 90293994 9438877160 [email protected] 7 SENDRA BANSJRA COLLIERY NILESH JOSHI DY.MGR (PERS.) 90294224 9470596699 [email protected] 8 BASDEOPUR COLLIERY NILESH JOSHI DY.MGR (PERS.) 90294224 9470596699 [email protected] 9 NICHTPUR COLLIERY MUKESH KUMAR ASSTT.MGER (PERS.) 90311762 6287698708 [email protected] 10 MUDIDIH COLLIERY TARA SINGH MT(HR) 90368085 7310096226 [email protected] 11 KANKANEE COLLIERY TARA SINGH MT(HR) 90368085 7310096226 [email protected] 12 TETULMARI COLLIERY JOHN SINGH ASSTT.MGER (PERS.) 90294950 6287695898 [email protected] 13 Govindpur Area Office Manoj Kumar Saha CM(P)/APM 90042060 6287696411 [email protected] 14 Area Office O P Singh Dy Manager(P) 90292491 6287695891 [email protected] 15 New Akashkinree Colliery Rajesh Kumar Kar Manager(P) 90216466 6287696885 [email protected] 16 Area Office (Legal) Anant mishra Dy Manager(P) 90267659 -
Coalmine Methane Under Indian Mining Scenario
Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations. -
Master Plan for Dealing with Fire, Subsidence and Rehabilitation in the Leasehold of Bccl
STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The Information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government BHARAT COKING COAL LIMITED MASTER PLAN FOR DEALING WITH FIRE, SUBSIDENCE AND REHABILITATION IN THE LEASEHOLD OF BCCL UPDATED MARCH’ 2008. CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD REGIONAL INSTITUTE – 2 DHANBAD - 1 - C O N T E N T SL PARTICULARS PAGE NO. NO. SUMMARISED DATA 4 1 INTRODUCTION 11 2 BRIEF OF MASTER PLAN ‘1999 16 3 BRIEF OF MASTER PLAN ‘2004 16 CHRONOLOGICAL EVENTS AND NECESSITY OF 4 17 REVISION OF MASTER PLAN 5 SCOPE OF WORK OF MASTER PLAN 2006 19 MASTER PLAN FOR DEALING WITH FIRE 6 21 MASTER PLAN FOR REHABILITATION OF 7 UNCONTROLLABLE SUBSIDENCE PRONE 49 INHABITATED AREAS 8 DIVERSION OF RAILS & ROADS 77 9 TOTAL INDICATIVE FUND REQUIREMENT 81 10 SOURCE OF FUNDING 82 ` - 2 - LIST OF PLATES SL. PLATE PARTICULARS NO. NO. 1 LOCATION OF JHARIA COALFIELD 1 2 COLLIERY WISE TENTATIVE LOCATIONS OF FIRE AREAS 2 3 PLAN SHOWING UNSTABLE UNCONTROLLABLE SITES 3 4 LOCATION OF PROPOSED RESETTLEMENT SITES 4 5 PROPOSED DIVERSION OF RAIL AND ROADS 5 - 3 - SUMMARISED DATA - 4 - SUMMARISED DATA SL PARTICULARS MASTER PLAN’04 MASTER PLAN’06 MASTER PLAN’08 NO A Dealing with fire 1 Total nos. of fires 70 70 70 identified at the time of nationalisation 2 Additional fires identified 6 7 7 after nationalisation 3 No. of fires extinguished 10 10 10 till date 4 Total no. -
Annexure-III Details of Tenders Awarded from CMC for Hired HEMM Contracts (From FY 2008-09) Sl
Annexure-III Details of Tenders Awarded from CMC for Hired HEMM Contracts (from FY 2008-09) Sl. Concerned Date of Name of Award Value Likely Period Name of the Work NIT No. LOA No. No. Area LOA Agency (Rs.) of Contract 1 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM(CMC)/HEMM/2008 16-06-2008 M/s Ujjal extraction and transportation of coal with OS/2008/21 dtd. 11.01.2008 /487 dtd. 16.06.2008 Transport firefighting from VIIIA, VIII, VII, V/VI & IV Katras 68,84,48,000/- 36 months Agency, seams of Chandore Patch Phase-II of Katras Burdwan. Area. 2 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM(CMC)/HEMM/2008 16-06-2008 M/s Ujjal extraction and transportation of coal from V, OS/2008/37 dtd. 19.01.2008 Bastacolla/ /488 dtd. 14/16.06.2008 Transport 11,18,72,000/- 12 months VI, VII, VIII & VIIIA Seams of L-3 Patch of Kustore Agency, ROCP under Kustore Area. Burdwan. 3 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM:CMC:HEMM- 15-12-2008 M/s Dhansar extraction and transportation of coal from IV OS/2008/502 dtd. 17.06.2008 OS:Gondudih:2008:1100 Kusunda Engg. Co. Pvt. 64,53,68,560/- 36 months Top, IV Bottom, III and II seams of Gondudih dtd. 15.12.2008 Ltd., Dhanbad. P Patch of Kusunda Area. 4 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 13-03-2009 extraction and transportation of coal from OS/2008/1159 dtd. -
Bharat Coking Coal Limited Sijua Area Ref
Bharat Coking Coal Limited Sijua Area Ref. No. GM/SA/CIVIL/ 397/2013 Dated 31.01/01.02 .2013 OPEN TENDER NOTICE Sealed tenders on percentage basis in two bids system (Tech./Com.Bid and Price Bid) are hereby invited from bonafide experienced eligible contractors for the under mentioned works:- ---------------------------------------------------------------------------------------------------------------------------------- Sl. Name of work & Estimated Earnest Cost of Time of No. Location cost money tender paper completion 1. Repair & maintenance of Qtr. no.121 to 124 occupied by Ramgopal Singh Shifting from Tetulmari fire area to Nichitpur township. `33,868=23 `339=00 `100=00 15 Days 2. Distempering w/washing, painting ‘D’ type bunglow newly allotted to Project Officer Nichitpur colliery. `45,569=40 `456=00 `100=00 20 Days 3. Repair & maintenance Qtr. no. B-40,44 & 47 at ‘B’ type campus of Nichitpur townmship. `34,563=10 `346=00 `100=00 15 Days 4. Repair & maintenance of Qtr. no. A/269,B/4,2,2/5 total 4 units Qtr. of Nichitpur colliery employee. `71,191=83 `722=00 `100=00 20 Days 5. Repair & maintenance of Qtr. no. SQ-86 at Sijua Area (Shifting of CISF company commander of area-V) under Sijua Area. `31,595=45 `316=00 `100=00 15 Days 6. White washing, colour washing & misc. work of Tetulmari OCP, store room, boundary wall etc. `71,080=75 `711=00 `100=00 20 Days 7. Repairing of drain for Qtr. of Sri Pramod Battra to Basudew Chouhan centre at ‘O’ seam of Tetulmari colliery. `69,068=85 `691=00 `100=00 -do- 8. -
Bharat Coking Coal Limited
Bharat Coking Coal Limited (A Mini Ratna Company) (A Subsidiary of Coal India Ltd.) EoI Ref. No. : BCCL/IA/App./2019-20/255/N Date:18.12.19 Open e-Tender EoI Document For Appointment of Internal Auditor for a period of 3 years from 2020-21 Bharat Coking Coal Limited Regd. Off: Koyla Bhawan, Koyla Nagar, Dhanbad – 826005, Jharkhand, India Page 1 of 55 Invitation for EoI 1. Bharat Coking Coal Limited, a Miniratna Company (A Subsidiary of Coal India Limited & Govt. of India Undertaking) having its registered office at Koyla Bhawan, Koyla Nagar, Dhanbad – 826005, Jharkhand, India, invites online applications through e-tender on CIL’s e-procurement portal (https://coalindiatenders.nic.in) for empanelment of practicing Chartered Accountant or Cost Accountant or a Firm / LLP of Chartered Accountants / Cost Accountants registered with the Institute of Chartered Accountants of India / Institute of Cost Accountants of India for conducting Internal Audit in respect of different Areas/ units/ HQ of BCCL i.e. (i) BCCL (HQ) (ii) Barora Area (iii) Block-II Area (iv) Govindpur Area (v) Katras Area (vi) Sijua Area (vii) Kusunda Area (viii) P.B. Area (ix) Bastacolla Area (x) Lodna Area (xi) E.J. Area (xii) C.V. Area (xiii) W.J. Area and (xiv) Washery Division from which 14 Auditors will be selected for a period of 3 years from 2020-21. The selected candidates have to conduct monthly audit as specified in Scope of Audit (Annexure-A) and Terms of Reference (Annexure- B). 2. All supporting documents regarding Application Format (Annexure- C), such as Firm Profile, Constitution Certificate, Certificate of Practice, Membership Certificate, Mark Sheets/Certificate of IPCC/Inter Examination, Appointment letters and Statement of Accounts (in respect of SI. -
Alumni Directory Department of Mining
ALUMNI DIRECTORY DEPARTMENT OF MINING ENGINEERING INDIAN INSTITUTION OF TECHNOLOGY (BANARAS HINDU UNIVERSITY) VARANASI-221005 Sl. Contact & Details Year of Sl. Contact & Details Year of No. Graduation No. Graduation 1. Shri S.P. Dandona 1927 16. Shri C.S. Mukherjee 1933 2. Shri B.L. Saxena 1927 17. Shri S.V. Pai 1933 3. Shri S.K. Chatterjee 1927 18. Shri P. Satyanarayana 1933 4. Shri A.K. Chakraborty 1928 19. Shri K.C. Mathur 1933 5. Shri S.K. Dey 1928 20. Shri B.R. Rai 1934 6. Shri A.N. Verma 1928 21. Shri K. Sen Gupta 1934 7. Shri Ram Avtar 1928 22. Shri H.K. Bhatt 1934 8. Shri D.R Sabharwal 1929 23. Shri K.C. Roy 1935 9. Shri M. Mukherjee 1929 24. Shri B.M. Prasad 1935 10. Shri R.A. Sarana 1929 25. Shri R.D. Bhatnagar 1935 11. Shri R.L. Sharma 1930 26. Shri G.M. Mehta 1935 12. Shri S.K. Gupta 1931 27. Shri T. V. George 1936 13. Shri R.L. Agarwal, Udaipur 1931 28. Shri F.S. Watcha 1936 (Expired) Cuffe Castle, Cuffe Parade, Colaba, Bombay-l. 14. Shri V.V.RK. Rao 1932 29. Dr. M.P. Netarwala (Expired) 1936 15. Shri V. Nagarathanam 1932 Mehradad, Fit No. 112, (Expired in 1975) Cuffe Parade, Colaba, Bombay-400 005. 1 1 Sl. Contact & Details Year of Sl. Contact & Details Year of No. Graduation No. Graduation Shri D.G. Lothe 1937 44. Shri R. Venkataraman 1941 Mls D.G. Lothe Dhantoli, Nagpur 45. Shri P.B. Malla 1941 21/538, Dilli Bazar, Shri V.K. -
Annual Report & Accounts 2018-19
ANNUAL REPORT & ACCOUNTS 2018-19 EASTERN COALFIELDS LIMITED (A subsidiary of Coal India Limited) CIN-U10101WB1975GOI030295 www.easterncoal.nic.in 3 3 CONTENTS Sl.No. Contents Page No. 1. Mission/Vision Statement .......................................................................... 01 2. Management ........................................................................................... 02 3. Bankers/Auditors ...................................................................................... 04 4. Notice of Annual General Meeting .............................................................. 07 5. Chairman’s Statement ............................................................................... 11 6. Operational Statistics/Financial Position ...................................................... 21 7. Profile of Directors .................................................................................... 23 8. Boards’ Report ......................................................................................... 26 9. Comments of the Comptroller and Auditor General of India ............................ 108 10. Auditors Report and Management’s Reply ................................................... 110 11. Balance Sheet as on 31st March, 2019 ..................................................... 125 12. Statement of Profit & Loss for the year ended 31st March, 2019 ................... 127 13. Statement of Changes in Equity for the year ended 31st March, 2019 ........... 129 14. Cash Flow Statement for the year ended 31st -
Repairing of One No. 100 HP Star Delta Starter Make Mine Line 550
BHARAT COKING COAL LIMITED ( A Subsidiary of Coal India limited) Office of the General Manager, P.B.Area, P.O.Kusunda,PinCode No.828116 Dist.Dhanbad,(Jharkhand) Camp office:Quarter NoC-2-32,Koyla Nagar Dhanbad. Ref.No.Nodal Officer(E&M)/Camp office/2013/NIT/52 date:26.07.2013 NOTICE FOR INVITING TENDER Sealed tenders are invited from reputed /reliable/experienced contractors for the work given below:- Sl Name of the work Estimated Earnest Cost of Time of No Amount money. Tender Compl. paper 1 Repairing of one no. 100 HP 28,595=00 286/- 50/- 10 days Star delta starter make mine line 550 volt S/D-20 type of Bhagaband colliery. 2) pre-qualification/ eligibility critera: i) Average annual financial turn over of work during the last 3(Three)years ending 31 st March of the previous financial year should be at least 30% of estimated cost. ii) During last seven years experience of having successfully completed: a) Three similar completed works each costing not less than the amount equal to 40% of the estimated cost. OR b) Two similar completed works each costing not less than the amount equal to 50% of the estimated cost. OR c) One similar completed work costing not less than the amount equal to 80% of the estimated cost. 3) Earnest money : @ 1% of the estimated value of Rs.28,595=00 is to be deposited either in cash to the cashier, P.B. Area, or in the form of Bank draft drawn in favor of Bharat Coking Coal Limited of any nationalized Bank payable at its Branch at Dhanbad and attached to tender(Part-I). -
Annual Report 2019-20
ANNUAL REPORT 2019-20 BHARAT COKING COAL LIMITED A MINI RATNA COMPANY CONTENT 005 006 008 009 Vision & Mission Management Notice Statement During the year Bankers & Auditors 011 012 015 Board of Directors Chairman’s Statement Operational Statistics 016 025 123 130 Financial R&D and Report on Directors’ Report CSR Report Statistics Corporate Governance 135 144 146 Management Discussion CEO And CFO Statutory Auditor’s Report and Analysis Report Certification and replies of Management 192 194 197 Comptroller & Auditor Secretarial General of India Report Auditor’s Report Balance Sheet 199 201 203 Profit & Loss Statement of flow of Cash Statement of Account and Cash Equivalent changes in equity 205 206 230 Corporate Significant Accounting Notes to Balance Information Policy Sheet 255 264 297 299 Notes to Profit &Loss Additional Notes Regulation 33 of Other Details Account on Accounts SEBI (Enclosures) BHARAT COKING COAL A MINI RATNA LIMITED COMPANY Vision The vision of Bharat Coking Coal Limited (BCCL) is to emerge as a global player in the primary energy sector committed to provide energy security to the country by attaining environmentally & socially sustainable growth through best practices from mine to market. Mission The mission of Bharat Coking Coal Limited (BCCL) is to produce and market the planned quantity of coal and coal products efficiently and economically in an eco-friendly manner with due regard to safety, conservation and quality. Annual Report 2019-20 5 A MINI RATNA BHARAT COKING COAL COMPANY LIMITED पं.का.:-कोयला भवन कोयला नगर, भारत कोककं ग कोल कलकिटेड धनबाद- 826005 BHARAT COKING COAL LIMITED Regd. -
Bharat Coking Coal Limited Sijua Area
Bharat Coking Coal Limited Sijua Area Ref. No. GM/SA/CIVIL/3758 /2013 Dated 30.09/01.10.2013 OPEN TENDER NOTICE Sealed tenders on percentage basis in two bids system (Tech./Com.Bid and Price Bid) are hereby invited from bonafide experienced eligible contractors for the under mentioned works:- -------------------------------------------------------------------------------------------------------------------------------------- Sl. Name of work & Estimated Earnest Cost of Time of No. Location cost money tender paper completion 1. Repairing of damaged branch drain at Shyam Bazar colony of Mudidih colliery.`41,400=55 `414=00 `100=00 15 Days 2. Repairing of 3 units quarters occupied by Ashok Kr. Shaw and 2 others at Mudidih colliery. `44,448=24 `444=00 `100=00 -do- 3. Repairing of quarter for Sri Ram Swarup Singh, Basant Kumar Nonia and Jai Kishor Chouhan at Tetulmari colliery. `98,523=45 `985=00 `100=00 -do- 4. Repair & maintenance Qtr. no. SA/E/7 occupied by Sri S.R.Mahato to Engineer incharge of Sijua Area. `35,759=65 `358=00 `100=00 -do- 5. Repair & maintenance Qtr. of Sri Raju Mallah and Sri Punit Mallah shifting from west chandor to MAP-5 (Qtr. no.4 & 1098) of Tetulmari colliery. `41,168=10 `412=00 `100=00 -do- 6. Repairing and maintenance of NHS Qtr. no.12 at new dhawrah,Basdeopur colliery under Loyabad Regional Hospital , Sijua Area. `31,383=00 `314=00 `100=00 -do- 7. Repairing of 2 units Arch type Qtr. occupied by Smt. Jasmati Devi at Gandhi Maidan, 6 no. at Loyabad colliery under R/Hospital Loyabad. `32,151=05 `321=00 `100=00 -do- 8.