FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

Total Page:16

File Type:pdf, Size:1020Kb

FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office National Capital Region 2,045 projects 51,299,970,000 Las Piñas-Muntinlupa District Engineering Office 138 projects 4,300,308,000 OO1: Ensure Safe and Reliable National Road System 19 projects 738,933,000 Asset Preservation - Preventive Maintenance - Primary Roads 5,789,000 1. P00400888LZ 310101100282000 MYOA 1,478,000 Daang Maharlika (LZ) - K0026 + (-446.80) - K0026 +(-120) P00400888LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.308 1,448,440 Las Asphalt Overlay - along Daang Maintenance of Piñas-Muntinlupa Maharlika (LZ) (S03285LZ) K0026 + Road: Asphalt District (-446.80) - K0026 + (-120) Overlay Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00400888LZ-EAO 29,560 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 2. P00505481LZ 310101100412000 4,311,000 Paranaque-Sucat Rd - Chainage 0 - Chainage 158 P00505481LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 0.632 4,224,780 Las Asphalt Overlay - at Specific Maintenance of Piñas-Muntinlupa Locations along Paranaque-Sucat Road: Asphalt District Rd (S03293LZ) 0 - 158 Overlay Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00505481LZ-EAO 86,220 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office Asset Preservation - Preventive Maintenance - Secondary Roads 87,799,000 3. P00400884LZ 310102100433000 MYOA 1,326,000 PPTA Rd - K0024 + (-416) - K0024 + 141 MYPS: 03/29/2021 09:58:12 am Page 1 of 675 IO Report FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00400884LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.114 1,299,480 Las Asphalt Overlay - at Specific Maintenance of Piñas-Muntinlupa Locations along PPTA Rd Road: Asphalt District (S03284LZ) K0024 + (-416) - K0024 Overlay Engineering Office + 141 / Las Piñas-Muntinlupa District Engineering Office P00400884LZ-EAO 26,520 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 4. P00505479LZ 310102100574000 77,773,000 Zapote-Alabang Rd - K0016 + 000 - K0016 + 424 P00505479LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.696 75,050,945 Central Office / Las Asphalt Overlay - along Maintenance of Piñas-Muntinlupa Zapote-Alabang Rd (S03497LZ) Road: Asphalt District K0016 + 000 - K0016 + 424 Overlay Engineering Office P00505479LZ-EAO 2,722,055 Central Office / Las Piñas-Muntinlupa District Engineering Office 5. P00505480LZ 310102100598000 8,700,000 Zapote-Alabang Rd - K0019 + 319 - K0019 + 689, K0019 + 691 - K0019 + 813 P00505480LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.968 8,526,000 Las Asphalt Overlay - at Specific Maintenance of Piñas-Muntinlupa Locations along Zapote-Alabang Rd Road: Asphalt District (S03497LZ) K0019 + 319 - K0019 + Overlay Engineering Office 813 / Las Piñas-Muntinlupa District Engineering Office P00505480LZ-EAO 174,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office Asset Preservation - Preventive Maintenance - Tertiary Roads 1,078,000 MYPS: 03/29/2021 09:58:12 am Page 2 of 675 IO Report FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office 6. P00400887LZ 310103100471000 MYOA 1,078,000 South Super H-way West Service Rd - K0021 + 000 - K0021 + 465 P00400887LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 0.930 1,056,440 Las Asphalt Overlay - along South Maintenance of Piñas-Muntinlupa Super H-way West Service Rd Road: Asphalt District (S03298LZ) K0021 + 000 - K0021 + Overlay Engineering Office 465 / Las Piñas-Muntinlupa District Engineering Office P00400887LZ-EAO 21,560 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 40,000,000 National Roads - Primary Roads 7. P00505331LZ 310110100204000 40,000,000 Quirino Avenue - K0012 + 176 - K0013 + 044 P00505331LZ-CW1 Construction of Drainage Structure Construction of Lineal 1,722.000 39,200,000 Las along Road - at Specific Locations Drainage meters Piñas-Muntinlupa along Quirino Avenue (S03225LZ) Structure along District K0012 + 176 - K0013 + 044 Road Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00505331LZ-EAO 800,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 17,339,000 National Roads - Secondary Roads 8. P00505332LZ 310111100269000 17,339,000 PPTA Rd - K0024 + (-416) - K0024 + 384, K0024 + 391 - K0024 + 840 MYPS: 03/29/2021 09:58:12 am Page 3 of 675 IO Report FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00505332LZ-CW1 Construction of Drainage Structure Construction of Lineal 1,249.000 16,992,220 Las along Road - at Specific Locations Drainage meters Piñas-Muntinlupa along PPTA Rd (S03284LZ) K0024 + Structure along District (-416) - K0024 + 840 Road Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00505332LZ-EAO 346,780 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 25,000,000 National Roads - Tertiary Roads 9. P00505345LZ 310112100238000 25,000,000 International Receiver Rd - K0019 + (-330) - K0019 + 607 P00505345LZ-CW1 Construction of Drainage Structure Construction of Lineal 1,874.000 24,500,000 Las along Road - along International Drainage meters Piñas-Muntinlupa Receiver Rd (S03289LZ) K0019 + Structure along District (-330) - K0019 + 607 Road Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00505345LZ-EAO 500,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office Network Development - Construction of By-Pass and Diversion Roads 145,000,000 10. P00515589LZ 310204100982000 145,000,000 Alabang-Zapote Diversion Road, Las Piñas City P00515589LZ-CW1 Construction of Concrete Road - Construction of Lane Km 7.250 139,925,000 Central Office / Alabang-Zapote Diversion Road, Concrete Road National Capital Las Piñas City Region P00515589LZ-EAO 5,075,000 Central Office / National Capital Region Network Development - Construction of Missing Links/ New Roads 240,000,000 MYPS: 03/29/2021 09:58:12 am Page 4 of 675 IO Report FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office 11. P00506025LZ 310205100510000 120,000,000 Laguna Lake Highway Extension (Phase 1), Muntinlupa City P00506025LZ-CW1 Construction of Concrete Road - Construction of Lane Km 10.800 115,800,000 Central Office / Laguna Lake Highway Extension Concrete Road National Capital (Phase 1), Muntinlupa City Region P00506025LZ-EAO 4,200,000 Central Office / National Capital Region 12. P00506026LZ 310205100512000 120,000,000 Laguna Lake Highway Extension (Phase 2), Muntinlupa City P00506026LZ-CW1 Construction of Concrete Road - Construction of Lane Km 10.800 115,800,000 Central Office / Laguna Lake Highway Extension Concrete Road National Capital (Phase 2), Muntinlupa City Region P00506026LZ-EAO 4,200,000 Central Office / National Capital Region Network Development - Construction of Flyovers/ Interchanges/ Underpasses/ Long 71,428,000 Span Bridges 13. P00402135LZ 310206100029000 MYOA 71,428,000 C-5-Quirino Flyover, Parañaque City P00402135LZ-CW1 Construction of Flyover - Construction of Square 4,900.000 68,928,020 Central Office / C-5-Quirino Flyover, Parañaque Flyover meters National Capital City Region P00402135LZ-EAO 2,499,980 Central Office / National Capital Region Bridge - Replacement of Permanent Weak Bridges 70,000,000 14. P00506375LZ 310302100281000 30,000,000 Marcos Alvarez Br. 1 (B04848LZ) along Marcos Alvarez Rd P00506375LZ-CW1 Replacement of Bridge - Marcos Replacement of Square 174.582 29,400,000 Las Alvarez Br. 1 (B04848LZ) along Bridge meters Piñas-Muntinlupa Marcos Alvarez Rd District Engineering Office / Las Piñas-Muntinlupa District Engineering Office MYPS: 03/29/2021 09:58:12 am Page 5 of 675 IO Report FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00506375LZ-EAO 600,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 15. P00506376LZ 310302100282000 40,000,000 Marcos Alvarez Br. 3 (B04850LZ) along Marcos Alvarez Rd P00506376LZ-CW1 Replacement of Bridge - Marcos Replacement of Square 66.780
Recommended publications
  • FACT SHEET [Barangay Tangos, Navotas City]
    FACT SHEET [Barangay Tangos, Navotas City] QUICK FIGURES* Total population: 35,427 No. of families: 7,560 Total land area: 33.31 Ha. *Based on the Barangay profile Contact persons: Tangos North – Brgy. Secretary Olive Cagalingan, (+63 927 400 9542) Tangos South – Brgy. Capt. Wilfredo Mariano (+632 351 5290) FIGURE 1. Division of Tangos North and Tangos South 1. Location and general description oF community • Tangos is an urban coastal community located in the northern portion of Navotas City • On 25 July 2018, Tangos is divided into two barangays: Tangos North and Tangos South (See Figure 1). • It is bordered by San Roque to the South, Tangos River and Barangay Tanza to the East, and Manila Bay to the West and North (See Figure 2) • About 80% of the residents live at the riverside and seaside, on land that they do not own. The remaining 20 % are tenants or have their own houses. • As an urban coastal community, the primary livelihoods are related to the fishing industry. FIGURE 2. Map showing location and boundaries of Barangay Tangos, Navotas 2. Economic activities • Livelihood: o Fishing, driving public utility vehicles, and laborers (80%) o Small-scale business owners or those described as belonging to higher income brackets (20%) o Local fishing activities are further subdivided depending on ownership of livelihood assets (boat owners, fish laborers, shellfish gatherers, shrimp paste makers). Page 1 of 2 • The Barangay acknowledges that pollution and environmental degradation have negatively impacted the livelihood of many residents. The Barangay profile notes that the drop-in fish catch has decreased the earnings of residents and has forced some businesses to close down.
    [Show full text]
  • Page 1 AMOUNT of MEDICAL SERVICES LABORATORIES, DATE CONTROL MEDICINES TOTAL NAME of PATIENTS ADDRESS DENTAL & GRANTED NO
    Republic of the Philippines Department of Health JOSE R. REYES MEMORIAL MEDICAL CENTER LIST OF PATIENTS MEDICAL ASSISTANCE TO INDIGENT PATIENTS FOR THE PERIOD FEBUARY 1 TO 29, 2020 AMOUNT OF MEDICAL SERVICES LABORATORIES, DATE CONTROL MEDICINES TOTAL NAME OF PATIENTS ADDRESS DENTAL & GRANTED NO. AND MED HOSPITAL FEES ASSISTANCE DIAGNOSTICS SUPPLIES PROCEDURES 10-Oct-19 20-01 MALINAO, EDWIN M. 106 PH2 LETRE ROAD ST. BRGY TONSUYA MALABON - CITY 3,870.00 - 3,870.00 8-Nov-19 20-02 SERRANO, ANGELIE ROSE B. 782 J. PLANAS ST. BRGY 163 TONDO MANILA - 585.00 - 585.00 11-Nov-19 20-03 BAWISAN, LUCITA B. 809 I MERCADO ST. BRGY 50 TONDO MANILA - 570.00 - 570.00 13-Nov-19 20-04 LEGARTO, IMELDA 1254 C SAN ANDRES ST MALATE MANILA 312.00 - - 312.00 21-Nov-19 20-05 ROQUE, CRISTINA B. BLK 6 L33 PH3D TAWILIS ST. BRGY 28 DAGAT-DAGATAN - CALOOCAN CITY 157.50 - 157.50 25-Nov-19 20-06 ROQUE, MA. TERESA D. 8 AGNO ST. BRGY DOÑA JOSEFA QUEZON CITY 1,134.00 360.00 - 1,494.00 26-Nov-19 20-07 MANARANG, ROSALYN M. 2418 SULU ST. BRGY 364 STA. CRUZ MANILA - 210.00 - 210.00 27-Nov-19 20-08 BASAL, ALFREDO V. BLK20 LOT19 PH1B ALUMAHAN ST. BRGY KAUNLARAN - NAVOTAS CITY 1,590.00 - 1,590.00 28-Nov-19 20-09 ESCORIAL, ESTER M. 143 CRESPO ST. BRGY GUILID LIGAO ALBAY - 3,560.00 - 3,560.00 28-Nov-19 20-10 RIVERA, LEONARD S. BRGY 331 STA. CRUZ MANILA 624.00 360.00 - 984.00 29-Nov-19 20-11 OREO, EUGENIA P.
    [Show full text]
  • 2019 Iiee Metro Manila Region Return to Sender
    2019 IIEE METRO MANILA REGION RETURN TO SENDER STATUS firstName midName lastname EDITED ADDRESS chapterName RTS UNKNOWN ADDRESS ANSELMO FETALVERO ROSARIO Zone 2 Boulevard St. Brgy. May-Iba Teresa Metro East Chapter RTS UNKNOWN ADDRESS JULIUS CESAR AGUINALDO ABANCIO 133 MC GUINTO ST. MALASAGA, PINAGBUHATAN PASIG . Metro Central Chapter RTS UNKNOWN ADDRESS ALVIN JOHN CLEMENTE ABANO NARRA STA. ELENA IRIGA Metro Central Chapter RTS INSUFFICIENT ADDRESS Gerald Albelda Abantao NO.19 . BRGY. KRUS NA LIGAS. DILIMAN QUEZON CITY Metro East Chapter RTS NO RECEIVER JEAN MIGHTY DECIERDO ABAO HOLCIM PHILIPPINES INC. MATICTIC NORZAGARAY BULACAN Metro Central Chapter RTS INSUFFICIENT ADDRESS MICHAEL HUGO ABARCA avida towers centera edsa cor. reliance st. mandaluyong city Metro West Chapter RTS UNLOCATED ADDRESS Jeffrey Cabagoa ABAWAG 59 Gumamela Sta. Cruz Antipolo Rizal Metro East Chapter RTS NO RECEIVER Angelbert Marvin Dolinso ABELLA Road 12 Nagtinig San Juan Taytay Rizal Metro East Chapter RTS INSUFFICIENT ADDRESS AHERN SATENTES ABELLA NAGA-NAGA BRGY. 71 TACLOBAN Metro South Chapter RTS UNKNOWN ADDRESS JOSUE DANTE ABELLA JR. 12 CHIVES DRIVE ROBINSONS HOMES EAST SAN JOSE ANTIPOLO CITY Metro East Chapter RTS INSUFFICIENT ADDRESS ANDREW JULARBAL ABENOJA 601 ACACIA ESTATE TAGUIG CITY METRO MANILA Metro West Chapter RTS UNKNOWN ADDRESS LEONARDO MARQUEZ ABESAMIS, JR. POBLACION PENARANDA Metro Central Chapter RTS UNKNOWN ADDRESS ELONA VALDEZ ABETCHUELA 558 M. de Jesus St. San Roque Pasay City Metro South Chapter RTS UNLOCATED ADDRESS Franklin Mapa Abila LOT 3B ATIS ST ADMIRAL VILLAGE TALON TRES LAS PINAS CITY METRO MANILA Metro South Chapter RTS MOVED OUT Marie Sharon Segovia Abilay blk 10 lot 37 Alicante St.
    [Show full text]
  • Securities and Exchange Commission Sec Form 17-A, As Amended
    4/22/2021 [Amend-1]Annual Report CR02749-2021 SECURITIES AND EXCHANGE COMMISSION SEC FORM 17-A, AS AMENDED ANNUAL REPORT PURSUANT TO SECTION 17 OF THE SECURITIES REGULATION CODE AND SECTION 141 OF THE CORPORATION CODE OF THE PHILIPPINES 1. For the fiscal year ended Dec 31, 2020 2. SEC Identification Number 11840 3. BIR Tax Identification No. 000-100-341-000 4. Exact name of issuer as specified in its charter SAN MIGUEL FOOD AND BEVERAGE, INC. 5. Province, country or other jurisdiction of incorporation or organization Philippines 6. Industry Classification Code(SEC Use Only) 7. Address of principal office 100 E. Rodriguez Jr. Avenue (C-5 Road), Barangay Ugong, Pasig City, Metro Manila Postal Code 1604 8. Issuer's telephone number, including area code (632) 5317-5000 9. Former name or former address, and former fiscal year, if changed since last report N/A 10. Securities registered pursuant to Sections 8 and 12 of the SRC or Sections 4 and 8 of the RSA Number of Shares of Common Stock Outstanding and Amount Title of Each Class of Debt Outstanding COMMON SHARES (FB) 5,909,220,090 SERIES A BONDS DUE MARCH 2025 (IN 8,000,000,000.00 PESO) SERIES B BONDS DUE MARCH 2027 (IN 7,000,000,000.00 PESO) TOTAL DEBT as of Dec. 31, 2020 (IN MIL 144,463 PESO-CONSO) 11. Are any or all of registrant's securities listed on a Stock Exchange? Yes No https://edge.pse.com.ph/openDiscViewer.do?edge_no=b3e88bf8a8cd0d095d542af6f1e997b9 1/4 4/22/2021 [Amend-1]Annual Report If yes, state the name of such stock exchange and the classes of securities listed therein: PHILIPPINE STOCK EXCHANGE, INC.
    [Show full text]
  • View, Read, and Download the Full Thesis Here
    Zoom in, zoom out Scalar politics, master planning, and environmental justice concerns A case-study connecting the Manila Bay Sustainable Development Masterplan to the small-scale fisherfolk and urban poor living along the coastline of Manila Bay Figure 1. Fisherfolk boats, openings in the dyke are to be closed denying access to Manila Bay (picture made by author). MSc thesis by Lieke Brackel, July 2019 Water Resources Management Group Zoom in, zoom out MSc Thesis Zoom in, zoom out: scalar politics, master planning, and environmental justice concerns A case-study connecting the Manila Bay Sustainable Development Masterplan to the small-scale fisherfolk and urban poor living along the coastline of Manila Bay MSc thesis Water Resources Management Group submitted in partial fulfilment of the degree of the Master of Science International Land and Water Management Wageningen University, the Netherlands Date: July 9th, 2019 Student: A.K.C. Brackel (Lieke) Registration number: 950920116120 Thesis code: WRM-80436 Supervisor: Bert Bruins, Wageningen University Second Reader: Prof. Dr. Ir. R.A. Boelens, Wageningen University & University of Amsterdam Examination: Prof. dr. ir. PJGJ Hellegers , Wageningen University Study program: MSc International Land and Water Management Group: Water Resource Management Group Nota Bene: All statements in this thesis are the full and only responsibility of the author. They cannot be attributed to others or affiliated organizations. 2 Wageningen University Abstract Inhabitants of Metro Manila are confronted with ‘How does high-level, ecological delineated, and challenges such as the overall congestion of the long-term planning relate to locally expressed fast-growing city, ecological degradation, and environmental justice concerns?’ aggravated exposure to natural hazards due to climate change.
    [Show full text]
  • 17Th Congress SUMMARY of LAWS PASSED (DUTERTE Administration)
    17th Congress SUMMARY OF LAWS PASSED (DUTERTE Administration) RA / JR No. S T I T L E No. 2 0 1 6 (17th CONGRESS) 1 10923 N AN ACT POSTPONING THE OCTOBER 2016 BARANGAY AND SANGGUNIANG KABATAAN ELECTIONS, AMENDING FOR THE PURPOSE REPUBLIC ACT NO. 9164, AS AMENDED BY REPUBLIC ACT NO. 9340 AND REPUBLIC ACT NO. 10656, PRESCRIBING ADDITIONAL RULES GOVERNING THE CONDUCT OF BARANGAY AND SANGGUNIANG KABATAAN ELECTIONS AND FOR OTHER PURPOSES (SB No. 1112 AND HB No. 3504, PASSED BY THE SENATE AND THE HOUSE OF REPRESENTATIVES ON SEPTEMBER 13, 2016) (APPROVED BY THE PRESIDENT ON OCTOBER 15, 2016) 2 10924 N GENERAL APPROPRIATIONS ACT (GAA) FOR FISCAL YEAR (FY) 2017, ENTITLED “AN ACT **** APPRORPRIATING FUNDS FOR THE OPERATION OF THE GOVERNMENT OF THE REPUBLIC OF THE PHILIPINES FROM JANUARY ONE TO DECEMBER THIRTY ONE, TWO THOUAND AND SEVENTEEN, AND FOR OTHER PURPOSES” (HB No. 3408, WAS PASSED BY THE HOUSE OF REPRESENTATIVES AND THE SENATE ON OCTOBER 19, 2016 AND NOVEMBER 28, 2016, RESPECTIVELY) (APPROVED BY THE PRESIDENT ON DECEMBER 22, 2016) 2 0 1 7 (17th CONGRESS) 3 10925 N AN ACT RENEWING FOR ANOTHER TWENTY-FIVE (25) YEARS THE FRANCHISE GRANTED TO REPUBLIC BROADCASTING SYSTEM, INC., PRESENTLY KNOWN AS GMA NETWORK, INC., AMENDING FOR THE PURPOSE REPUBLIC ACT NO. 7252, ENTITLED “AN ACT GRANTING THE REPUBLIC BROADCASTING SYSTEM, INC. A FRANCHISE TO CONSTRUCT, INSTALL, OPERATE AND MAINTAIN RADIO AND TELEVISION BROADCASTING STATIONS IN THE PHILIPPINES” (HB No. 4631, WHICH ORIGINATED IN THE HOUSE OF REPRESENTATIVES, WAS PASSED BY THE HOUSE OF REPRESENTATIVES ON JANUARY 16, 2017, AMENDED BY THE SENATE ON MARCH 13, 2017, AND WHICH AMENDMENTS WERE CONCURRED IN BY THE HOUSE OF REPRESENTATIVES ON MARCH 14, 2017) (APPROVED BY THE PRESIDENT ON APRIL 21, 2017) 4 10926 N AN ACT EXTENDING FOR TWENTY-FIVE (25) YEARS THE FRANCHISE GRANTED TO SMART COMMUNICATIONS, INC.
    [Show full text]
  • 17 APRIL 2021, Saturday Headline STRATEGIC April 17, 2021 COMMUNICATION & Editorial Date INITIATIVES Column SERVICE 1 of 2 Opinion Page Feature Article
    17 APRIL 2021, Saturday Headline STRATEGIC April 17, 2021 COMMUNICATION & Editorial Date INITIATIVES Column SERVICE 1 of 2 Opinion Page Feature Article PH vows to cut gas emissions by 75 percent By: Krissy Aguilar - Reporter / @KAguilarINQ INQUIRER.net / 04:36 PM April 16, 2021 Screengrab from RTVM’s Facebook page MANILA, Philippines — The Philippines has committed to the United Nations its target to reduce greenhouse gas (GHG) emissions by 75 percent between 2020 and 2030. The Philippines submitted its first Nationally Determined Contribution (NDC) to the UN Framework Convention on Climate Change (UNFCCC) on April 15, as seen on the latter’s website. “The Philippines commits to a projected GHG emissions reduction and avoidance of 75%, of which 2.71% is unconditional and 72.29% is conditional, representing the country’s ambition for GHG mitigation for the period 2020 to 2030 for the sectors of agriculture, wastes, industry, transport, and energy,” the country’s NDC stated. The unconditional target of 2.71 percent means the government is undertaking this “using nationally mobilized resources” while the remaining 72.29 percent conditional target relies on support from the international community. “The Philippines shall undertake adaptation measures across but not limited to, the sectors of agriculture, forestry, coastal and marine ecosystems, and biodiversity, health, and human security, to preempt, reduce and address residual loss and damage,” the NDC read. The UNFCCC said 192 of 16 parties to the Paris Agreement have submitted their first
    [Show full text]
  • MAIP AUGUST 2019.Pdf
    Republic of the Philippines Department of Health JOSE R. REYES MEMORIAL MEDICAL CENTER LIST OF PATIENTS MEDICAL ASSISTANCE TO INDIGENT PATIENTS FOR THE PERIOD AUGUST 1 TO 31, 2019 AMOUNT OF MEDICAL SERVICES LABORATORIES, DATE CONTROL NAME OF PATIENTS ADDRESS MEDICINES AND DENTAL & TOTAL ASSISTANCE GRANTED NO. HOSPITAL FEES MED SUPPLIES DIAGNOSTICS PROCEDURES 8-Mar-19 19-01 CATALAN, ROSELA L. 042 ST. JOHN SAN PAULO SUBDV. BRGY NAGKAISANG 3,120.00 NAYON NOVALICHES, - QC QUEZON CITY - 3,120.00 25-Mar-19 19-02 TAMBONG, CARLITO S. 1529 DAGUPAN ST. BRGY 51 TONDO MANILA 3,120.00 - - 3,120.00 26-Mar-19 19-03 VIRAY, SHAYNE LORAINE C. 47 BAL\KAWAN ST ST. BRGY VETERANS VILL. 3,120.00QUEZON CITY - - 3,120.00 26-Mar-19 19-04 CARAIG, MOISES B. BALAYAN ST. BRGY LANATAN BALAYAN BATANGAS 3,120.00 - - 3,120.00 27-Mar-19 19-05 PIANG, SHIRELYN T. 167 RUBY ST. BRGY 122 TONDO MANILA 3,120.00 - - 3,120.00 29-Mar-19 19-06 Estrada, Manuel Jr E. 115 R. SANTIAGO ST. 9TH AVE ST. BRGY NONE 3,120.00CALOOCAN CITY - - 3,120.00 29-Mar-19 19-07 BRILLANTES, CHARMAINE N. 54 BARTOLOME ST. BRGY VIENTE REALES VALENZUELA 3,120.00 CITY - - 3,120.00 20-Mar-19 19-08 SABDAO, ARLENE M. BLK. 11 LOR 37 CELINA HOMES ST. BRGY 168 DEPARO 910.00 CALOOCAN CITY - - 910.00 1-Apr-19 19-09 CORTEZ, ANDRES M. 1300 ACAPITA ST ST. BRGY GEN. T. DE LEON VALENZUELA - CITY 985.00 - 985.00 1-Apr-19 19-10 IBAY, GLORIA V.
    [Show full text]
  • FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act
    FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office National Capital Region 1,651 projects 44,524,084,000 Las Piñas-Muntinlupa District Engineering Office 127 projects 2,935,899,000 CITY OF LAS PIÑAS 88 projects 1,857,184,000 OO1: Ensure Safe and Reliable National Road System 3 projects 154,500,000 Network Development - Construction of Flyovers/ Interchanges/ Underpasses/ Long 150,000,000 Span Bridges 1. P00402135LZ 310206100029000 150,000,000 C-5-Quirino Flyover P00402135LZ-CW1 Construction of Flyover - Construction of Square 1,050.000 144,750,000 Central Office / C-5-Quirino Flyover Flyover meters National Capital Region P00402135LZ-EAO 5,250,000 Central Office / National Capital Region Bridge - Retrofitting/ Strengthening of Permanent Bridges 4,500,000 2. P00401578LZ 310303100807000 2,000,000 Zapote Br. 2 (EB) (B01798LZ) along Zapote-Alabang Rd P00401578LZ-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 1,960,000 Las Bridge - Zapote Br. 2 (EB) Strengthening of Bridges Piñas-Muntinlupa (B01798LZ) along Zapote-Alabang Bridge District Rd Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00401578LZ-EAO 40,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 3. P00401579LZ 310303100808000 2,500,000 Zapote Br. 3 (WB) (B01799LZ) along Zapote-Alabang Rd P00401579LZ-CW1 Retrofitting
    [Show full text]
  • Republic of the Philippines
    Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE DISTRICT ENGINEER Malabon Navotas District Engineering Office C4 Road, Bagumbayan North, Navotas City February 21, 2019 BID BULLETIN NO. 06-2019 SUBJECT: Push Through with the Submission/Opening of Bids Notice is hereby announced to all Participating Bidders that the listed projects below will push through with the Submission/Opening of Bids, to wit, From: Schedule of Bidding as Contract ID Description Advertise No. Rehabilitation of Road, Francisco St., 19OA0028 Brgy. San Rafael Village, Navotas City January 30, 2018 (10:00AM) Contract Duration: 150 CD Rehabilitation of Road, Bagong Kalsada, 19OA0029 Brgy. Tangos South, Navotas City January 30, 2018 (10:00AM) Contract Duration: 150 CD Rehabilitation of Road, Tuazon St. Brgy. 19OA0030 Potrero, Malabon City February 06, 2019 (10:00AM) Contract Duration: 150 CD Rehabilitation of Road, Paezville, Brgy. 19OA0031 Dampalit, Malabon City February 6, 2019 (10:00AM) Contract Duration: 90 CD Rehabilitation of Road, B. Rivera St. 19OA0032 Brgy. Tinajeros, Malabon City February 6, 2019 (10:00AM) Contract Duration: 150 CD Construction of Riverwall along South 19OA0033 Pinagkabalian River, Brgy. Muzon, February 6, 2019 (10:00AM) Malabon City Contract Duration: 150 CD Construction of Road including Drainage 19OA0034 Canal within Tanza Socialized Housing February 6, 2019 (10:00AM) (Interior I), Navotas City Contract Duration: 90 CD Construction of Riverwall along Malabon- 19OA0035 Tullahan River (Phase II) Brgy. NBBS February 6, 2019 (10:00AM) Dagat-Dagatan, Navotas City Contract Duration: 156 CD Construction of Tanza Road Dike 19OA0036 (Phase I) Brgy. Tanza 2, Navotas City February 6, 2019 (10:00AM) Contract Duration: 161 CD Construction of Tanza Road Dike 19OA0037 (Phase II) Brgy.
    [Show full text]
  • Grabexpress Per City Rate Card
    Metro Manila Pick up Point Drop off points 4h Serviceable Areas Bagong Barrio, Malolos Ave 79 DOLE NCR Maligaya St. Bagong Silang, 99 Caloocan City Malate, Manila Merry Homes 2, Everlasting 99 Adeline Homes, Quirino Ave 99 Dona Eusebia, Elias Aldana 79 DOLE NCR Maligaya St. Pamplona Uno, Alabang Zapote Rd 79 Las Pinas Malate, Manila MDC Pilar, 99 Almanza Dos 99 West Rembo 79 AUB Bagkal , 79 DOLE NCR Maligaya St. Makati APC Magallanes, 79 Malate, Manila Levi Mariano St Rizal, 79 Sampaguita Pembo 99 Potrero 79 Gabriel Subd2 Tanza 99 DOLE NCR Maligaya St. Malabon Tugatog 99 Malate, Manila Panghulo, 99 Muzon 99 Highway Hills, 79 Daang Bakal 79 DOLE NCR Maligaya St. Mandaluyong TIvoli, 79 Malate, Manila Hulo, 79 Wack Wack 79 Tondo, 79 Malate, 79 DOLE NCR Maligaya St. Manila Landcome Vill1, 79 Malate, Manila Sampaloc, 79 Sta. Ana 79 Calumpang 79 DOLE NCR Maligaya St. Birmingham Heights, , Tumana 99 Marikina Malate, Manila Nangka, 99 concecption2 99 Cupang 99 DOLE NCR Maligaya St. ,AAV, 99 Muntinlupa Malate, Manila Putatan, 99 Victoria Homes Tunasan 99 San Jose, Navotas West 79 DOLE NCR Maligaya St. Tanza Brgy HAll, 99 Navotas Malate, Manila Tangos North 99 Bagumbayan Navotas Merville, Moonwalk, Marcelo Green, San Isidro 79 DOLE NCR Maligaya St. BF 99 Paranaque Malate, Manila Ninoy Aquino Ave. San Dionisio Paranaques City 79 WWCF,Quirino St. San Antonio Paranaque City 79 NAIA, 79 DOLE NCR Maligaya St. Villamor, 79 Pasay Malate, Manila The Radiance, 79 Seascape 79 Kapitolyo, Bagong Ilog, 79 DOLE NCR Maligaya St. Pinagbuhatan, 99 Pasig Malate, Manila Sto Rosari kanluran brgy hall 79 Carucho Ave,Pasig City 79 San Roque, 79 DOLE NCR Maligaya St.
    [Show full text]
  • Acas Update 2020.Xlsx
    PHILIPPINE BUSINESS BANK, INC. List of Branches as of January 2020 NO. BRANCH NAME ADDRESS 1 Adriatico-Malate Branch G/F Hostel 1632 Adriatico St., Malate, Manila 2 Angeles Branch Lot 5 Blk 1 McArthur H-way Angeles City 3 Antipolo Branch Unit 3&4 Megathon Bldg,Circumferential Rd. Antipolo, Riza 4 Aseana Branch Ground Floor Commercial Space GO1,Ri-Rance Corporate Center I, Aseana City, Paranaque 5 Bacolod City Branch G/F PhilamLife Bldg. Lacson cor.Galo St., Bacolod City, Neg. Occ 6 Baguio City Branch G/F CTTL Bldg.Abanaw Ext.,Baguio City 7 Bajada, Davao Branch GF DCCCII Jp Laurel Ave., Davao City 8 Balanga Branch Don Manuel Banzon Avenue, Balanga City, Bataan 9 Baliuag Branch Bo. Fo Bagong Nayon Benigno Aquino St.,Poblacion Baliuag Bulacan 10 Baliuag BS Aquino C.S. Building, 783 Benigno S. Aquino Ave., Bagong Nayon, Baliuag, Bulacan 11 Banawe Branch 84 Dapitan cor Banawe St., Q.C. 12 Banawe-Kaliraya Branch Motorex Philippines, Inc. Building 148 Banawe cor. Kaliraya St., Barangay Tatalon, Quezon City 13 Banilad Branch A.S. Fortuna St., Banilad, Mandaue City, Cebu 14 Batangas City Branch #22 P Genato St., Batangas City 15 Better Living Branch Ground floor, 156 Dona solidad avenue betterliving subd., Brgy. Don Bosco, Sucat, Paranaque City 16 BGC Net Plaza G/F Net Plaza 31st St., Bonifacio Global City, Taguig, Metro Manila 17 Binakayan Branch Tirona Hi-way, Binakayan Kawit, Cavite 18 Binan Laguna Branch G/F S.A.P. Building 5230 National Highway Brgy. San Vicente, Biñan City, Laguna 19 Binondo Corporate Center 1126 Soler St., Binondo, Manila 20 Bocaue Branch Mac Arthur Highway, Barangay Wakas, Bocaue, Bulacan Stall CS 152 and 153, MC Home Depot, 32nd Street corner Bonifacio Blvd., Bonifacio Global City, 21 Bonifacio Global City Branch Taguig 22 Boracay Branch Barangay Balabag, Boracay Island, Malay Aklan 23 Butuan Branch Montilla Boulevard cor.
    [Show full text]