FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office National Capital Region 2,045 projects 51,299,970,000 Las Piñas-Muntinlupa District Engineering Office 138 projects 4,300,308,000 OO1: Ensure Safe and Reliable National Road System 19 projects 738,933,000 Asset Preservation - Preventive Maintenance - Primary Roads 5,789,000 1. P00400888LZ 310101100282000 MYOA 1,478,000 Daang Maharlika (LZ) - K0026 + (-446.80) - K0026 +(-120) P00400888LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.308 1,448,440 Las Asphalt Overlay - along Daang Maintenance of Piñas-Muntinlupa Maharlika (LZ) (S03285LZ) K0026 + Road: Asphalt District (-446.80) - K0026 + (-120) Overlay Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00400888LZ-EAO 29,560 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 2. P00505481LZ 310101100412000 4,311,000 Paranaque-Sucat Rd - Chainage 0 - Chainage 158 P00505481LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 0.632 4,224,780 Las Asphalt Overlay - at Specific Maintenance of Piñas-Muntinlupa Locations along Paranaque-Sucat Road: Asphalt District Rd (S03293LZ) 0 - 158 Overlay Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00505481LZ-EAO 86,220 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office Asset Preservation - Preventive Maintenance - Secondary Roads 87,799,000 3. P00400884LZ 310102100433000 MYOA 1,326,000 PPTA Rd - K0024 + (-416) - K0024 + 141 MYPS: 03/29/2021 09:58:12 am Page 1 of 675 IO Report FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00400884LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.114 1,299,480 Las Asphalt Overlay - at Specific Maintenance of Piñas-Muntinlupa Locations along PPTA Rd Road: Asphalt District (S03284LZ) K0024 + (-416) - K0024 Overlay Engineering Office + 141 / Las Piñas-Muntinlupa District Engineering Office P00400884LZ-EAO 26,520 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 4. P00505479LZ 310102100574000 77,773,000 Zapote-Alabang Rd - K0016 + 000 - K0016 + 424 P00505479LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.696 75,050,945 Central Office / Las Asphalt Overlay - along Maintenance of Piñas-Muntinlupa Zapote-Alabang Rd (S03497LZ) Road: Asphalt District K0016 + 000 - K0016 + 424 Overlay Engineering Office P00505479LZ-EAO 2,722,055 Central Office / Las Piñas-Muntinlupa District Engineering Office 5. P00505480LZ 310102100598000 8,700,000 Zapote-Alabang Rd - K0019 + 319 - K0019 + 689, K0019 + 691 - K0019 + 813 P00505480LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.968 8,526,000 Las Asphalt Overlay - at Specific Maintenance of Piñas-Muntinlupa Locations along Zapote-Alabang Rd Road: Asphalt District (S03497LZ) K0019 + 319 - K0019 + Overlay Engineering Office 813 / Las Piñas-Muntinlupa District Engineering Office P00505480LZ-EAO 174,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office Asset Preservation - Preventive Maintenance - Tertiary Roads 1,078,000 MYPS: 03/29/2021 09:58:12 am Page 2 of 675 IO Report FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office 6. P00400887LZ 310103100471000 MYOA 1,078,000 South Super H-way West Service Rd - K0021 + 000 - K0021 + 465 P00400887LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 0.930 1,056,440 Las Asphalt Overlay - along South Maintenance of Piñas-Muntinlupa Super H-way West Service Rd Road: Asphalt District (S03298LZ) K0021 + 000 - K0021 + Overlay Engineering Office 465 / Las Piñas-Muntinlupa District Engineering Office P00400887LZ-EAO 21,560 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 40,000,000 National Roads - Primary Roads 7. P00505331LZ 310110100204000 40,000,000 Quirino Avenue - K0012 + 176 - K0013 + 044 P00505331LZ-CW1 Construction of Drainage Structure Construction of Lineal 1,722.000 39,200,000 Las along Road - at Specific Locations Drainage meters Piñas-Muntinlupa along Quirino Avenue (S03225LZ) Structure along District K0012 + 176 - K0013 + 044 Road Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00505331LZ-EAO 800,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 17,339,000 National Roads - Secondary Roads 8. P00505332LZ 310111100269000 17,339,000 PPTA Rd - K0024 + (-416) - K0024 + 384, K0024 + 391 - K0024 + 840 MYPS: 03/29/2021 09:58:12 am Page 3 of 675 IO Report FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00505332LZ-CW1 Construction of Drainage Structure Construction of Lineal 1,249.000 16,992,220 Las along Road - at Specific Locations Drainage meters Piñas-Muntinlupa along PPTA Rd (S03284LZ) K0024 + Structure along District (-416) - K0024 + 840 Road Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00505332LZ-EAO 346,780 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 25,000,000 National Roads - Tertiary Roads 9. P00505345LZ 310112100238000 25,000,000 International Receiver Rd - K0019 + (-330) - K0019 + 607 P00505345LZ-CW1 Construction of Drainage Structure Construction of Lineal 1,874.000 24,500,000 Las along Road - along International Drainage meters Piñas-Muntinlupa Receiver Rd (S03289LZ) K0019 + Structure along District (-330) - K0019 + 607 Road Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00505345LZ-EAO 500,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office Network Development - Construction of By-Pass and Diversion Roads 145,000,000 10. P00515589LZ 310204100982000 145,000,000 Alabang-Zapote Diversion Road, Las Piñas City P00515589LZ-CW1 Construction of Concrete Road - Construction of Lane Km 7.250 139,925,000 Central Office / Alabang-Zapote Diversion Road, Concrete Road National Capital Las Piñas City Region P00515589LZ-EAO 5,075,000 Central Office / National Capital Region Network Development - Construction of Missing Links/ New Roads 240,000,000 MYPS: 03/29/2021 09:58:12 am Page 4 of 675 IO Report FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office 11. P00506025LZ 310205100510000 120,000,000 Laguna Lake Highway Extension (Phase 1), Muntinlupa City P00506025LZ-CW1 Construction of Concrete Road - Construction of Lane Km 10.800 115,800,000 Central Office / Laguna Lake Highway Extension Concrete Road National Capital (Phase 1), Muntinlupa City Region P00506025LZ-EAO 4,200,000 Central Office / National Capital Region 12. P00506026LZ 310205100512000 120,000,000 Laguna Lake Highway Extension (Phase 2), Muntinlupa City P00506026LZ-CW1 Construction of Concrete Road - Construction of Lane Km 10.800 115,800,000 Central Office / Laguna Lake Highway Extension Concrete Road National Capital (Phase 2), Muntinlupa City Region P00506026LZ-EAO 4,200,000 Central Office / National Capital Region Network Development - Construction of Flyovers/ Interchanges/ Underpasses/ Long 71,428,000 Span Bridges 13. P00402135LZ 310206100029000 MYOA 71,428,000 C-5-Quirino Flyover, Parañaque City P00402135LZ-CW1 Construction of Flyover - Construction of Square 4,900.000 68,928,020 Central Office / C-5-Quirino Flyover, Parañaque Flyover meters National Capital City Region P00402135LZ-EAO 2,499,980 Central Office / National Capital Region Bridge - Replacement of Permanent Weak Bridges 70,000,000 14. P00506375LZ 310302100281000 30,000,000 Marcos Alvarez Br. 1 (B04848LZ) along Marcos Alvarez Rd P00506375LZ-CW1 Replacement of Bridge - Marcos Replacement of Square 174.582 29,400,000 Las Alvarez Br. 1 (B04848LZ) along Bridge meters Piñas-Muntinlupa Marcos Alvarez Rd District Engineering Office / Las Piñas-Muntinlupa District Engineering Office MYPS: 03/29/2021 09:58:12 am Page 5 of 675 IO Report FY 2021 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00506375LZ-EAO 600,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 15. P00506376LZ 310302100282000 40,000,000 Marcos Alvarez Br. 3 (B04850LZ) along Marcos Alvarez Rd P00506376LZ-CW1 Replacement of Bridge - Marcos Replacement of Square 66.780
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages675 Page
-
File Size-