2016 Facilities Master Plan
2016 Facilities Master Plan SBCCD Board of Trustees SAN BERNARDINO VALLEY COLLEGE John Longville, President Joseph Williams, Vice President SAN BERNARDINO COMMUNITY COLLEGE DISTRICT Gloria Macías Harrison, Clerk Donna Ferracone, Trustee Dr. Donald L. Singer, Trustee Dr. Anne L. Viricel, Trustee Nickolas W. Zoumbos, Trustee Beverly Rapouw, CHC Student Trustee Pablo Machado, SBVC Student Trustee SBVC-Main Campus 701 S Mt Vernon Ave. San Bernardino, CA 92410 September 12, 2016 DRAFT 3.2 Facilities Master Plan / San Bernardino Valley College Introduction PROCESS THE 5 STEPS The 2016 Facilities Master Plan was developed through a single team of educational and facilities planning an inclusive, participatory, and transparent process consultants. When it was practical, stakeholders were that engaged and sought input from the College’s engaged in joint educational and facilities planning 01 many constituencies. San Bernardino Valley College interviews and forums. Discussions were framed by a Council (Valley College Council)—which represents holistic perspective that acknowledges the connection PREPARE the committees within Valley College’s collegiate between the quality of the campus environment and the Planning began in fall 2015 with the consultation structure and includes faculty, staff, success of the students. development of the timeline of planning students, and administrators—played a key role as the activities. Measures of success for the working committee that participated most closely in the As part of the integration and alignment of long-range master planning process and outcomes development and review of this document. Additional planning across the district, a five-step facilities planning were gathered from stakeholders. venues for dialogue included one-on-one interviews, process was followed within the same timeframe at Educational and facilities planning presentations, open forums, community meetings, and both San Bernardino Valley College and Crafton Hills information was requested.
[Show full text]