Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Alexander (BAND-438)

1905 Surrender Alleged 1905 surrender of 9,518 acres of Reserve No. 134, near Edmonton, was improperly taken and that land sales were Date Received by SCB: 1990/12/17 improperly administered. Current Status: SET Registry File Number: B8260-268

Mismanagement of Trust Fund - Relief and Medical The FN alleges mismanagement of its Trust Fund from 1905-1950. Assistance The FN alleges that the crown spent money from the FN's Trust fund during this time on food, supplies, relief and medical Date Received by SCB: 2004/06/17 assistance. The FN alleges that under Treaty 6, it was entitled to Current Status: DOJ receive relief and medical assistance free of charge. The FN Registry File Number: B8260-826 alleges that the Crown failed to fulfill the relief and medicine chest provisions of Treaty 6.

Oil and Gas Claim linked to Treaty Land Entitlement. Date Received by SCB: 1992/02/07 Current Status: AR Registry File Number: B8260-605

TLE Alleged shortfall of land under Treaty No. 6. Date Received by SCB: 1987/03/03 Current Status: SET Registry File Number: B8265/A5

Alexis Nakota Sioux Nation (BAND-437)

Oil and Gas Claim linked to Treaty Land Entitlement. Date Received by SCB: 1991/11/13 Current Status: SET Registry File Number: B8260-578

TLE Substance of Claim Not Defined Date Received by SCB: 1980/05/02 Current Status: SET Registry File Number: B8265/A3

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 2 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Alexis Nakota Sioux Nation (BAND-437)

TransAlta Utilities Right-of-Way Alleged federal government breached its fiduciary obligation when it allowed the construction of transmission lines across the reserve. Date Received by SCB: 1995/10/11 Current Status: FCL Registry File Number: B8260-580

Athabasca Chipewyan First Nation (BAND-463)

Fort Chipewyan - Bennett Dam Alleged construction of the Bennett Dam in north-eastern BC changed water flow in its reserve, affecting traditional trapping and Date Received by SCB: 1992/12/21 fishing activities. Current Status: FCL Registry File Number: B8260-470

Treaty 8 Benefits Alleged Crown has an obligation to provide agricultural benefits pursuant to Treaty 8. Date Received by SCB: 1994/02/06 Current Status: ACT Registry File Number: B8260-591

Beaver First Nation (BAND-445)

Lands Taken For Road Purposes Alleges that the transfer of land to Alberta in 1941 and 1972 for road purposes lacked legal validity. The First Nation did not provide Date Received by SCB: 2007/05/22 informed consent, was inadequately compensated, and lands Current Status: RES continue to be trespassed. Registry File Number: B8260-928

Treaty Land Entitlement The FN alleges a Date Of First Survey shortfall under Treaty 8. Date Received by SCB: 2004/08/18 Current Status: BA Registry File Number: B8265/B10

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 3 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Beaver Lake Cree Nation (BAND-460)

TLE Substance of Claim Not Defined Date Received by SCB: 1985/04/15 Current Status: FCL Registry File Number: B8265/B11

Big point-Misteye Mineewatim Group (ASSCTN)

TLE Substance of Claim Not Defined Date Received by SCB: 1991/04/24 Current Status: NLO Registry File Number: B8265-B13

Bigstone Cree Nation (BAND-458)

Ammunition and Twine The Band states that Canada failed to provide ammunition and twine benefits prior to 1973, as outlined in Treaty 8. Date Received by SCB: 2000/02/04 Current Status: ACT Registry File Number: B8260-709

Survey Discrepancy Alleged discrepancy in the survey of its reserve. Date Received by SCB: 1976/06/18 Current Status: FCL Registry File Number: B8260-160

TLE The FN claims that the total amount of land set aside as reserve for the band is not sufficient under the Treaty No. 8 formula. Date Received by SCB: 1989/08/17 Current Status: ACT Registry File Number: B8265/W2+P14

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 4 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Bigstone Cree Nation (BAND-458)

Treaty 8 Agricultural Benefits / Tools The Band alleges that Canada failed to provide the First Nation with Treaty Benefits, outlined in Treaty 8. Date Received by SCB: 2000/02/04 Current Status: ACT Registry File Number: B8260-709

Blood (BAND-435)

1889 Akers Surrender - Mismanagement Surrender of reserve land without compensation. Date Received by SCB: 1995/04/13 Current Status: SET Registry File Number: B8260-157-1

1889 Akers Surrender-Validity (Akers II) Validity of the 1889 surrender. Date Received by SCB: 1995/04/13 Current Status: SET Registry File Number: B8260-157-1

Big Claim This is a TLE/Specific Claim, wherein the FN alleged that the reserve was created in 1880 based on a description given by the Date Received by SCB: 1996/04/12 chief at the time. Alternatively, that its reserve was set aside by an Current Status: ISCC 1882 survey. The current area of the reserve is based on an 1883 Registry File Number: B8260-157 survey. The difference in area between the two surveys is 102 square miles. Further in the alternative, the Band alleges a TLE.

Cattle & Bulls - Treaty 7 Alleged crown breached obligation by not providing cattle & bulls pursuant to Treaty 7, despite requests made. The Blood Tribe Date Received by SCB: 1998/05/07 alleges that they were provided with none of the cattle promised Current Status: BA under Treaty, and that all cattle owned by the Band was acquired in Registry File Number: B8260-644 exchange for horses.

Mismanagement of Assets Alleges the mismanagement of the FN's assets and resources related to cattle ranching on the Blood Tribe Reserve during the Date Received by SCB: 2001/01/05 period of 1894 to 1923. The claim also alleges the Crown failed to Current Status: BA assist in the building and maintenance of an alternate economy. Registry File Number: B8260-740

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 5 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Blood (BAND-435)

Timber Limit Reserve 148 A The First Nation alleges that the Crown promised to assist the First Nation with the transition to a different way of life, including the Date Received by SCB: 2001/01/15 provision of sufficient timber resources. The Blood Tribe further Current Status: BA alleges that the Reserve lands set aside for the benefit of the Blood Registry File Number: B8260-734 Tribe contained insufficient resources to meet the needs of the Blood Tribe. The Blood Tribe also alleges that DIAND did not protect Reserve 148 A when it was included in the Waterton Lakes National Park and parts of Reserve 148 A were illegally used and occupied by what is now Parks Canada.

TLE FN alleges the final survey of their reserve in 1883 didn't accurately reflect their population, resulting in a shortfall of reserve land Date Received by SCB: 1976/03/03 totalling 102 square miles. Current Status: FCL Registry File Number: B8265/B6

World War II Bombing and Gunnery Range Claimant First Nation alleges that 55,000 acres of Reserve taken without a surrender for lease to Department of Defence as a Date Received by SCB: 2003/06/03 bombing and gunnery range. Current Status: BA Registry File Number: B8260-801

Chipewyan Prairie First Nation (BAND-470)

Treaty 8 Agricultural Benefits (Band previous name: Janvier) Alleged Crown has an obligation to provide agricultural benefits according to Treaty 8. Date Received by SCB: 1995/09/05 Current Status: ACT Registry File Number: B8260-629

Treaty Land Entitlement (Band previous name: Janvier) Date Received by SCB: 1985/10/18 Current Status: SET Registry File Number: B8265/J3

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 6 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Cold Lake First Nations (BAND-464)

Primrose Lake - Interest Relates to Primrose claims and is a claim to an entitlement to the interest that had accrued on compensation payments to FNs Date Received by SCB: 1989/09/28 affected by the range. Current Status: NLO Registry File Number: B8260-143

Primrose Lake Air Weapons Range-PLAWR I Alleged inadequate compensation for loss of traditional harvesting lands (trapping, hunting, fishing, etc.) due to the establishment of Date Received by SCB: 1975/04/01 the Primrose Lake Air Weapons Range. Current Status: AR Registry File Number: B8260-143/1

Dene Tha' (BAND-448)

Ammunition/Twine Provisions of Treaty 8 Alleged Crown had obligations to provide Ammunition, Twine and other provisions pursuant to Treaty 8. Date Received by SCB: 1997/04/24 Current Status: LIT Registry File Number: B8260-561

TLE First Nation alleges it did not receive its full land entitlement when reserves were set aside in 1950 and 1960. Date Received by SCB: 1998/11/06 Current Status: LIT Registry File Number: B8265/D1

Driftpile First Nation (BAND-450)

Ammunition & Twine Provisions inTreaty 8 The FN alleges that an outstanding lawful obligation exists on the part of the Crown for not having provided sufficient amounts of Date Received by SCB: 2001/01/24 ammunition and twine from 1899-1952. Current Status: BA Registry File Number: B8260-737

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 7 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Driftpile First Nation (BAND-450)

Lands Taken for Public Purposes Lands within Driftpile IR# 150 surrendered for lease by the Crown in 1919 were transferred to Alberta in 1931 and 1971granting a fee Date Received by SCB: 2006/11/02 simple interest. FN claims Canada acted without statutory authority Current Status: RES under the Indian Act, and breach of its fiduciary duties, and that the Registry File Number: B8260-910 surrendered lands remain under the administration and control of the Crown in Right of Canada for the use and benefit of the FN. The FN seeks a negotiated settlement of restitution and compensation for breach of the Crown's fiduciary duty.

Treaty Land Entitlement The First Nation alleges a shortfall of land provided in 1901, the alleged Date of First Survey. The First Nation alleges a shortfall Date Received by SCB: 2004/02/02 under Calculation 1 and a shortfall under Calculation 2. Current Status: FCL Registry File Number: B8265/D3

Duncan's First Nation (BAND-451)

1928 and 1943 Surrenders- I.R. 151H Alleged surrender of Reserve No. 151H was improper. Date Received by SCB: 1991/08/29 Current Status: SET Registry File Number: B8260-278

1928 and 1943 Surrenders-Compensation Alleged invalid surrender taken in 1928 and 1943. Date Received by SCB: 1989/02/10 Current Status: SET Registry File Number: B8260-278

1928 and 1943 Surrenders-Validity Alleged two surrenders taken in 1928 and 1943 were invalid. This claim was split off from Claim 1, which was accepted on the basis Date Received by SCB: 1996/02/22 of the improper application of the FCAA to the land sales proceeds. Current Status: LIT Registry File Number: B8260-278

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 8 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Duncan's First Nation (BAND-451)

1955 Roadway Alienation Band alleges that the Province of Alberta was unauthorized to use the land that was taken for the McKenzie roadway. They allege Date Received by SCB: 2000/02/07 that Alberta continues to use the land without compensatiion to the Current Status: FCL band. Registry File Number: B8260-708

Treaty 8 Agricultural Benefits Alleges Canada did not provide agricultural benefits, ammunition and twine pursuant to Treaty 8. Date Received by SCB: 1998/08/18 Current Status: BA Registry File Number: B8260-657

Enoch Cree Nation #440 (BAND-440)

1888 Passpasschase Surrender Alleged illegal surrender of 1888. Date Received by SCB: 1974/04/05 Current Status: NLO Registry File Number: B8260-111

1902 Surrender Alleges Canada has an unfulfilled, lawful obligation to compensate for the wrongful surrender of 9,000 acres of Enoch Reserve in 1902 Date Received by SCB: 2007/02/28 and the loss of use and benefits therefrom. Current Status: SUB/REV Registry File Number: B8260-112

1908 Surrender Alleged illegal surrender. Date Received by SCB: 1974/04/02 Current Status: FCL Registry File Number: B8260-113

Treaty 6 Agricultural Implements The FN alleges it did not receive the agricultural implements which it was promised pursuant to Treaty 6, including agricultural Date Received by SCB: 2004/10/04 implements, stock and farming assistance. Current Status: RES Registry File Number: B8260-833

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 9 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Enoch Cree Nation #440 (BAND-440)

Treaty Land Entitlement The FN alleges that it did not receive sufficient land under Treaty 6. Date Received by SCB: 2005/06/29 Current Status: RES Registry File Number: B8265/E5

Fort McKay First Nation (BAND-467)

TLE Substance of Claim Not Defined Date Received by SCB: 1987/05/01 Current Status: SET Registry File Number: B8265/F7

Treaty 8 Agricultural Benefits Alleged Crown has an obligation to provide agricultural benefits pursuant to Treaty 8. Date Received by SCB: 1994/02/08 Current Status: SET Registry File Number: B8260-643

Fort McMurray #468 First Nation (BAND-468)

1927 Surrender Related to the FN's TLE claim and the Ft. McKay claim. Date Received by SCB: 1990/03/08 Current Status: NLO Registry File Number: B8260-374

TLE Substance of Claim Not Defined Date Received by SCB: 1987/08/28 Current Status: ACT Registry File Number: B8265/F8

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 10 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Fort McMurray #468 First Nation (BAND-468)

Treaty 8 Agricultural and Other Benefits Alleged that it did not receive various articles, promised in Treaty 8, namely: farming implements, stock, flags and medals, triennial Date Received by SCB: 1998/02/18 clothing, ammunition and twine. Current Status: LOS Registry File Number: B8260-621

Frog Lake (BAND-465)

1889 Wrongful Surrender FN alleges that Canada illegally deducted ten acres from Reserve No. 121 in 1889, ten years after the Reserve had been created. Date Received by SCB: 1998/07/22 The deduction was allegedly made without consent and without a Current Status: FCL surrender. Registry File Number: B8260-656

Illegal Withholding of Treaty Payments The Department of Indian Affairs unlawfully terminated the Treaty Annuities owed to Frog Lake FN in the aftermath of the Date Received by SCB: 1998/07/22 Rebellion. Current Status: BA Registry File Number: B8260-655

Heart Lake (BAND-469)

Primrose Lake Air Weapons Range (PLAWR) The band seeks monetary damages and an agreement allowing Heart Lake members access to their traditional lands. Date Received by SCB: 2002/03/07 Current Status: RES Registry File Number: B8260-759

TLE Substance of Claim Not Defined Date Received by SCB: 1993/01/13 Current Status: NLO Registry File Number: B8265/H1

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 11 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Horse Lake First Nation (BAND-449)

1928 Surrender Alleged 1928 surrender of its reserve was improper. Date Received by SCB: 1991/10/30 Current Status: SET Registry File Number: B8260-296

1932 Transfer of Road Allowances Alleged improper transfer of land in 1932 to Province of Alberta for road purposes. Transfered land had been surrendered in 1928 Date Received by SCB: 1997/11/25 (Surrender is at issue in another claim). Current Status: SET Registry File Number: B8260-612

Kapawe'no First Nation (BAND-452)

Ammunition and Twine (Band previous name: Grouard) The FN is claiming insufficient provision of ammunition and twine according to Treaty 8. Date Received by SCB: 1993/11/23 Current Status: DOJ Registry File Number: B8260-585

Deficiencies in Delivery of Programs (Band previous name: Grouard) Alleged unfair delivery of health, housing, social services, employment, band governance, and Date Received by SCB: 1993/11/23 economic development programs due to inadequate reserve Current Status: FCL lands. Registry File Number: B8260-585

TLE (Band previous name: Grouard). Date Received by SCB: 1980/09/18 Current Status: SET Registry File Number: B8265/G5

Treaty 8 Agricultural Benefits (Band previous name: Grouard) Alleged unfulfilled treaty benefits under Treaty 8. Date Received by SCB: 1993/12/08 Current Status: ACT Registry File Number: B8260-585

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 12 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Kehewin Cree Nation (BAND-466)

TLE Also known as Kehewin #123. Date Received by SCB: 1992/10/20 Current Status: NLO Registry File Number: B8265/K4

Little Red River Cree Nation (BAND-447)

Agricultural Land Entitlement The FN alleges that there was a shortfall in reserve lands received under Treaty 8. The FN received additional lands in 1965 to Date Received by SCB: 1999/07/12 compensate for an increase in population and poor quality lands. Current Status: NLO This additional land was surveyed in 1958 and the FN feels they Registry File Number: B8265/L14 should have been compensated based on the 1958 band population, not the 1955 population. FN asserts that Canada has misapplied the terms of Treaty 8; a breach of fiduciary duty on the part of the Crown resulting from its failure to advise individuals of the severalty option in Treaty 8; and a shortfall in land entitlement since members of the FN were not given the option of taking land in severalty at 160 acres per person.

Ammunition/Twine Provisions of Treaty 8 Alleged Crown has an obligation to provide Ammunition/Twine, according to Treaty 8. Date Received by SCB: 1997/05/27 Current Status: DOJ Registry File Number: B8260-571

Hunting - Trapping and Fishing Rights - Treaty 8 The crown has breached its fiduciary duty and its solemn promise that the Indians would be as free to hunt, trap and fish after the Date Received by SCB: 2002/10/28 treaty as they would if they never entered into it. Current Status: BA Registry File Number: B8260-780

Treaty 8 Agricultural Benefits Alleged Crown has an obligation to provide agricultural benefits, according to Treaty 8. Date Received by SCB: 1994/03/22 Current Status: ACT Registry File Number: B8260-584

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 13 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Loon River Cree (BAND-476)

TLE FN requested that Canada fulfill its outstanding obligation for lands and economic benefits pursuant to Treaty No. 8. Date Received by SCB: 1991/12/04 Current Status: SET Registry File Number: B8265/L11

Louis Bull (BAND-439)

1909 Surrender Alleged 1909 land surrender was illegal. Date Received by SCB: 1987/01/30 Current Status: LIT Registry File Number: B8260-303

Lubicon Lake (BAND-453)

Severalty 11/L1 + L7 Members of the Lubicon FN received land in severalty allowed under Treaty 8 in the province of Alberta. Date Received by SCB: 1991/07/31 Current Status: SET Registry File Number: 8265-11/L1 +L7

Michel Band Members (ASSCTN)

Enfranchisement Alleged improper enfranchisement of some of the FN members in 1928 and the remainder in 1958. Date Received by SCB: 1985/02/11 Current Status: FCL Registry File Number: B8260-209

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 14 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Mikisew Cree First Nation (BAND-461)

Severalty 11-B1 Members of the Mikisew FN, (Previously known as the Cree Chip) received land in severalty allowed under Treaty 8 in Fort McMurray, Date Received by SCB: 1981/12/15 Alberta area. Current Status: SET Registry File Number: B8265-11-B1

TLE (Band previous name: Cree Chip) Date Received by SCB: 1978/02/01 Current Status: SET Registry File Number: B8265-C4,M11

Treaty 8 Agricultural Benefits (Band previous name: Cree Chip) Alleged Crown has obligation to provide agricultural benefits pursuant to Treaty 8. Date Received by SCB: 1993/01/12 Current Status: ACT Registry File Number: B8260-582

Montana (BAND-442)

Bobtail Reserve Alleged ownership and wrongful alienation of the Bobtail Reserve. Date Received by SCB: 1984/04/17 Current Status: LIT Registry File Number: B8260-234

O'Chiese (BAND-431)

1951 Land Exchange Submitted February 19/1987 and closed February 28/1994. Resubmitted in 1995. Alleged shortfall in a land exchange which Date Received by SCB: 1996/02/08 was intended to provide FN with the reserve lands it preferred. Current Status: FCL Registry File Number: B8260-348

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 15 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Paul (BAND-441)

1906 Wrongful Surrender of Reserve Lands Allege that the Paul Band's surrender of Reserve 133B (635 acres total) in 1906 is invalid because it violated the surrender Date Received by SCB: 2000/06/05 requirements stipulated by the Indian Act. The claim also alleges Current Status: ISCC that the Crown breached its pre-surrender fiduciary duties. Registry File Number: B8260-713

Duffield Townsite Aug 1911 Surrender Alleged mismanagement of townsite land sales arising from August 5/1911 surrender of 198.6 acres. Date Received by SCB: 1992/12/21 Current Status: SET Registry File Number: B8260-331

Farmlands - May 13 - 1911 Surrender Alleged mismanagement of farmland land sales arising from May 13, 1911 surrender of 4,500 acres. Date Received by SCB: 1992/08/18 Current Status: SET Registry File Number: B8260-331

Grand Trunk Pacific Railway Rail Line Expropriation The FN alleges that the Crown failed to comply with the Railway Act when it authorized the expropriation. Section 46 of the Indian Date Received by SCB: 2004/12/01 Act alone was not sufficient to expropriate reserve lands. The FN Current Status: RES was then deprived of the use of the right of way lands for the entire Registry File Number: B8260-836 period from 1908 to the present day without lawful reason.

Mismanagement of Capital Account Alleged certain expenditures from FN's trust accounts were made by Department without authorization as required by the Indian Act. Date Received by SCB: 1996/06/14 Current Status: DOJ Registry File Number: 8260-532/577

Mismanagement of Sale - IR 133B - 1906 Surrender Alleged lots surrendered in 1906 were not put up for sale for another four years; that sale was contrary to terms of surrender; Date Received by SCB: 1996/07/12 that prices were under value; and that auction was not advertised. Current Status: ISCC Registry File Number: B8260-529

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 16 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Paul (BAND-441)

Streets and Lanes Related to unclear title to streets and lanes in Duffield townsite. Date Received by SCB: 1992/12/21 Current Status: FCL Registry File Number: 8260-331/529

Piikani Nation (BAND-436)

1909 Surrender (Band previous name: Peigan Nation). Alleged unlawful surrender of part of reserve in 1909. Date Received by SCB: 1976/06/28 Current Status: SET Registry File Number: 8260-579/117

1930 Road Transfer Allowance - Hwy 3 (Band previous name: Peigan Nation). Claimant alleges Canada wrongfully transferred road allowances to Alberta without the Date Received by SCB: 1998/05/12 Band's consent and without compensation in 1930, and contrary to Current Status: SET the Indian Act in 1950/51. Registry File Number: B8260-645

1981 Permit (Band previous name: Peigan Nation). Alleged Crown did not act in the FN best interests during negotiations for an irrigation canal Date Received by SCB: 1994/03/01 on the reserve. Current Status: SET Registry File Number: B8260-575

Borrow Pits Claim (Band previous name: Peigan Nation). Alleged Canada failed to prevent the unlawful alienation of six acres of land by the Date Received by SCB: 1995/05/29 Lethbridge Northern Irrigation Division (LNID). Current Status: SET Registry File Number: B8260-581

CPR Claim 1 - Unlawful Expropriation (Band previous name: Peigan Nation). Alleged taking of 543.3 acres for railway purposes was contrary to Treaty 7, the Indian Act, Date Received by SCB: 1990/10/10 and the Railway Act. Current Status: FCL Registry File Number: B8260-361

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 17 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Piikani Nation (BAND-436)

CPR Claim 2 - Mineral Rights (Band previous name: Peigan Nation). Alleged minerals were illegally transferred to CPR contrary to the Railway Act. Date Received by SCB: 1990/10/10 Current Status: FCL Registry File Number: B8260-361

CPR Claim 3 - Re-Purchased lands (Band previous name: Peigan Nation). Alleged Crown breached its fiduciary duty when (a) 71.75 acres of the expropriated lands were Date Received by SCB: 1990/10/10 re-purchased, and; (b) Third Parties used the lands without Current Status: SET conforming to the Indian Act. Registry File Number: B8260-361

Grain Elevator Claim (Band previous name: Peigan Nation). Alleged Canada acted fraudulently and in breach of its fiduciary obligations in the Date Received by SCB: 1995/05/02 operation and maintenance of a grain elevator constructed for the Current Status: SET Peigan Nation in 1911, in Brooks, Alberta. Registry File Number: B8260-567

Grazing Leases The FN alleges that the Crown's administration of the Piikani reserve land and cattle in the years 1877 to 1943 was not Date Received by SCB: 2005/03/15 consistent with its Treaty obligations or with its fiduciary duties to Current Status: BA the FN. The FN alleges: two grazing leases were issued without Registry File Number: B8260-859 the consent of the FN, and one of the two leases was issued contrary to the Indian Act; the leases were exploitative; their cattle herd was mismanaged; and the grazing & hay lands available to the FN was reduced.

LNID Claim (Band previous name: Peigan Nation). Alleged illegal expropriation of lands and minerals by Lethbridge Northern Irrigation District. Date Received by SCB: 1993/12/01 Current Status: SET Registry File Number: B8260-574

Telephone Line Claim (Band previous name: Peigan Nation). Alleged Canada failed to prevent the unlawful alienation of a right of way by the Lethbridge Date Received by SCB: 1995/07/07 Northern Irrigation District. Current Status: SET Registry File Number: B8260-576

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 18 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Saddle Lake (BAND-462)

1925 Surrender Alleged wrongful 1925 surrender of 18,720 acres of reserve. Date Received by SCB: 1994/07/13 Current Status: INACT Registry File Number: B8260-327

Siksika Nation (BAND-430)

1910 Land Surrender Alleged improprieties around the surrender of 1910 and that the sale proceeds were used contrary to treaty and surrender terms. Date Received by SCB: 1985/05/02 Claims includes allegations concerning: ration, sales, collection of Current Status: LOS sales, fiduciary, oil and gas-lease and sales, oil and gas-OIC. Registry File Number: B8260-101-2 These were initially submitted as individual claims.

Acreage Discrepancy - Mineral Alleged acreage discrepancy in the surrender of 1910. Date Received by SCB: 1985/05/02 Current Status: SET Registry File Number: B8260-101-2/8

Acreage Discrepancy - Surface Alleged acreage discrepancy in the surrender of 1910. Date Received by SCB: 1985/05/02 Current Status: SET Registry File Number: 8260-101-2+8

Agricultural Provisions Alleged treaty livestock entitlement. Date Received by SCB: 1980/11/05 Current Status: SET Registry File Number: B8260-101-6

Bassano Dam Challenged validity of expropriation of Bassano Dam. Date Received by SCB: 1984/06/07 Current Status: ACT Registry File Number: B8260-101-4

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 19 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Siksika Nation (BAND-430)

Bassano Dam Minerals Alleged wrongful alienation of minerals. Date Received by SCB: 1984/06/07 Current Status: SET Registry File Number: B8260-101-4

Castle Mtn. Land and Timber Alleged Timber limit was a reserve and was wrongfully alienated without compensation or consent. Date Received by SCB: 1983/01/10 Current Status: ACT Registry File Number: B8260-101-3

CPR General claim related to all CPR surface expropriations. Date Received by SCB: 1991/02/26 Current Status: DOJ Registry File Number: B8260-101-5

Stobart Drain Alleged wrongful alienation by CPR of the Stobart Drain property to a third party (W.I.D.). Date Received by SCB: 1991/02/26 Current Status: FCL Registry File Number: B8260-101-5

Subsurface Rights This is a general claim related to the alienation of subsurface rights. Date Received by SCB: 1991/02/26 Current Status: FCL Registry File Number: B8260-101-5

TLE Substance of Claim Not Defined Date Received by SCB: 1980/02/11 Current Status: NLO Registry File Number: B8265/B5

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 20 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Stoney (BAND-471)

Alienation of Indian Reserve 142A Alleges unlawful alienation of certain lands designated as Reserve 142A and that the Crown falied to have Reserve 142A confirmed Date Received by SCB: 2007/05/17 by Order in Council and take into account the Stoneys' needs by Current Status: RES putting the requirements of settlers and ranchers ahead of its Registry File Number: B8260-931 duties to protect the Stoneys and their land.

Bighorn - TLE The Stoney First Nations allege that they were provided with less land than was owed to them under the terms of Treaty 7. Date Received by SCB: 1972/04/07 Current Status: BA Registry File Number: 107+8265/S24

Highway 1A Claimant alleges unlawful expropriation of reserve land for highway purposes. Date Received by SCB: 1995/06/29 Current Status: LIT Registry File Number: B8260-560

Horseshoe Falls and the Kananaskis Lands Alleges failure to protect residual benefits and title to Horseshoe - Bearspaw (BAND-473) Falls and Kananaskis Falls lands. - Chiniki (BAND-433) - Wesley (BAND-475) Date Received by SCB: 2007/05/17 Current Status: SUB/REV Registry File Number: B8260-930

Mineral-Hydro Claim - Ghost Lake Dam FN alleges that the expropriations at Ghost Lake and Kananaskis Falls for Calgary Power Company are unlawful and Canada Date Received by SCB: 1984/06/07 breached its fiduciary obligation when Canada failed to secure Current Status: SET exclusive mineral rights to the Ghost Lake and Kananaskis Falls Registry File Number: B8260-237 strips of land for the FN.

United Church Property Alleged church lands were wrongfully alienated from the reserve. Date Received by SCB: 1991/12/18 Current Status: SET Registry File Number: B8260-583

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 21 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Sturgeon Lake Cree Nation (BAND-455)

Improper Transfer-Reserve Lands I.R. 154 The First Nation alleges that a section of Reserve 154 was misappropriated in 1935 for the purposes of building a road. Date Received by SCB: 2001/11/28 Current Status: LIT Registry File Number: B8260-751

TLE Substance of Claim Not Defined Date Received by SCB: 1980/09/18 Current Status: SET Registry File Number: B8265/S10

Treaty 8 Agricultural Benefits Alleges has yet to receive agricultural benefits pursuant to Treaty 8. Date Received by SCB: 2007/11/29 Current Status: LIT Registry File Number: B8260-948

Treaty 8 Ammunition & Twine Provisions The First Nation alleges that the Crown failed both to perform its obligations with respect to the ammunition and twine provisions of Date Received by SCB: 2001/12/04 Treaty 8, and to acknowledge a commitment in this respect until Current Status: LIT 1952. They claim both that the ammunition and twine provided for Registry File Number: B8260-750 relief purposes do not constitute fulfilment of Treaty provisions and the one dollar amount promised in Treaty 8 for ammunition and twine provision is completely insufficient by current terms, and therefore the amount and the treaty itself is "meaningless."

Sucker Creek (BAND-456)

Ammunition and Twine Provisions Treaty 8 The FN alleges that an outstanding lawful obligation exists on the part of the Crown for not having provided insufficient amounts of Date Received by SCB: 2000/12/08 ammunition and twine from the signing of the treaty to today. Current Status: LIT Registry File Number: B8260-736

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 22 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Sucker Creek (BAND-456)

Treaty 8 Land Entitlement The FN alleges a shortfall of land provided in 1901, the alleged Date of First Survey. The FN alleges a shortfall under Calculation 1 Date Received by SCB: 2004/08/18 and a shortfall under Calculation 2. Current Status: LIT Registry File Number: B8265/S19

Sunchild First Nation (BAND-434)

Treaty Land Entitlement Alleges a treaty land entitlement shortfall of 1,954 acres. Date Received by SCB: 2006/11/10 Current Status: SUB/REV Registry File Number: B8265/S33

Swan River First Nation (BAND-457)

Ammunition and Twine Provisions in Treaty 8 The FN alleges that an outstanding lawful obligation exists on the part of the Crown for not having provided sufficient amounts of Date Received by SCB: 2001/01/02 ammunition and twine from 1899-1952. Current Status: BA Registry File Number: B8260-733

IR 150E - Road Rights of Way Alleges that the transfer of lands for five roads in 1917 - 1918 - 1932 and 1965 lacked legal validity. The First Nation did not Date Received by SCB: 2007/05/23 provide informed consent, and was inadequately compensated. Current Status: RES Registry File Number: B8260-929

Kinuso Townsite Alienation The FN alleges that a portion of Swan River Reserve 150E was sold and patented by Canada in 1919 without having been Date Received by SCB: 2006/12/12 surrendered by the Band; Indian Affairs discovered the situation in Current Status: SUB/REV 1956, but deliberately failed to notify the Band of its oversight. Registry File Number: B8260-909

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 23 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Swan River First Nation (BAND-457)

Treaty 8 Land Entitlement The FN alleges a shortfall of land provided in 1901, the alleged Date of First Survey. The FN alleges a shortfall under Calculation 1 Date Received by SCB: 2004/08/18 and a shortfall under Calculation 2. Current Status: FCL Registry File Number: B8265/S18

Trespass on Road Allowances Alleged Canada breached its legal and fiduciary obligations in allowing Province of Alberta to construct, establish and maintain Date Received by SCB: 1996/11/05 eight road allowances within Reserve No. 150E without Current Status: DOJ authorization by Governor General in Council, and without Registry File Number: B8260-546 compensation.

Tallcree (BAND-446)

TLE (SPLIT #1) TLE Substance of Claim Not Defined Date Received by SCB: Current Status: SET Registry File Number: B8265/T1

TLE (SPLIT #2) Loss of Use Substance of Claim Not Defined Date Received by SCB: Current Status: SET Registry File Number: B8265/T1

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 24 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Treaty 7 Ammunition Claim (ASSCTN)

Treaty 7 Ammunition Alleged failure to provide ammmunition under Treaty 7. - Blood (BAND-435) - Piikani Nation (BAND-436) - Siksika Nation (BAND-430) - Stoney (BAND-471) - Tsuu T'Ina Nation (BAND-432) Date Received by SCB: 1972/04/06 Current Status: SET Registry File Number: B8260-101

Tsuu T'Ina Nation (BAND-432)

Calgary Irrigation Company Concerned expropriation of 107 acres of reserve land in June 1893. Date Received by SCB: 1994/10/12 Current Status: SET Registry File Number: B8260-627

DND Lease Concerned leasing of 4,780 hectares of reserve lands for Department of National Defense use. Date Received by SCB: 1984/12/12 Current Status: SET Registry File Number: B8260-244

Glenmore Reservoir Claim Alleged that both the surrender of land in 1913 and the surrender of land in 1931 were not valid because the federal government Date Received by SCB: 1996/03/26 breached its fiduciary obligation to the First Nation due to the Current Status: LOS presence of duress, undue influence and negligent Registry File Number: B8260-543 misrepresentation and because the surrender bargains were unconscionable. It is further alleged that the federal government failed to follow the terms and conditions associated with the 1913 surrender and unlawfully transferred approximately 193.5 acres of land in question to the City of Calgary in 1931.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 25 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Alberta

Claimant Substance of Claim

Whitefish Lake (BAND-459)

TLE Substance of Claim Not Defined Date Received by SCB: 1980/05/01 Current Status: SET Registry File Number: B8265/W6

Treaty 8 Agricultural Benefits Alleged Crown has an obligation to provide agricultural benefits, according to Treaty 8. Date Received by SCB: 1994/02/07 Current Status: ACT Registry File Number: B8260-637

Woodland Cree First Nation (BAND-474)

TLE FN requested that Canada fulfill its outstanding obligation for lands and economic benefits pursuant to Treaty No. 8. Date Received by SCB: 1989/08/28 Current Status: SET Registry File Number: B8265/W9

Total of Claims for Alberta: 130

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 26 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31

Claimant Substance of Claim

?Akisq'nuk First Nation (BAND-604)

Elkhorn Ranch (Brand previous name: ) FN Alleges lands were part of its traditional village and should have been reserved. Date Received by SCB: 1994/02/14 Current Status: DOJ Registry File Number: BC604-C01

Madias & Tatley Lands (Brand previous name: Columbia Lake) FN alleges alienation of the Madias and Tatley lands. Date Received by SCB: 1999/04/26 Current Status: DOJ Registry File Number: BC604-C02

Adams Lake (BAND-684)

Forest Access Road Alleges that an Order-In-Council transferred a limited interest in a forest access road and not fee simple title. Date Received by SCB: 2002/02/27 Current Status: DOJ Registry File Number: BC684-C02

Ahousaht (BAND-659)

Allotment of Marktosis I.R. 15 Inadequate reserve allotment of Marktosis I.R. 15 in the 1880s. Date Received by SCB: 2002/05/22 Current Status: DOJ Registry File Number: BC659-C01

Aitchelitz (BAND-558)

Aitchelitz I.R. 9 - Road Right-of-Way Alleged improper expropriation and inadequate compensation for road right of way through Aitchelitz I.R. 9. Date Received by SCB: 1999/10/28 Current Status: DOJ Registry File Number: BC558-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 27 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Aitchelitz (BAND-558)

Commonage I.R. No. 17 Alleged surrender of Commonage I.R. No. 17 in 1922 was unlawful and that it did not involve a majority of eligible voters. Date Received by SCB: 1985/08/22 Current Status: SET Registry File Number: BC558-C01

Alexandria (BAND-709)

BC Cut-Off Lands (SPLIT #01) One of twenty-two cut-off claims arising from decisions of the Date Received by SCB: McKenna-McBride Commission in 1916, which resulted in the reduction or discontinuance of thirty-three Indian reserves without Current Status: SET surrender. Registry File Number: BC709-C02

Graveyard Alleged parcel of land containing an Indian graveyard was alienated to a third party. FN wants graveyard returned to reserve Date Received by SCB: 1982/11/23 status or guaranteed access. Current Status: SET Registry File Number: BC709-C01

Alexis Creek (BAND-710)

Alienation of Lots 1531 & 1532 Alleged failure to protect Lots 1531 & 1532 from encroachment and failure to prepare the Band for making land applications to the Date Received by SCB: 1999/11/08 McKenna- McBride Commission. Current Status: BA Registry File Number: BC710 - C03

Alienation of Settlement at Alexis Creek Alleged failure to protect Indian settlements at Alexis Creek from alienation and failure to prepare the Band for making land Date Received by SCB: 1999/11/08 application to the the McKenna-McBride Commission. Current Status: BA Registry File Number: BC710-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 28 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Alexis Creek (BAND-710)

Inadequacy of Cemetery Allotments Seeks compensation for harm resulting from the Crown's failure to set aside ancient burial sites or to provide adequate graveyard Date Received by SCB: 2001/08/17 lands. Current Status: BA Registry File Number: BC710-C06

Inadequacy of Redstone IR No. 1 Claim is the third of an expected thirteen separate legal responses to the rejection of claim BC-710-C1. Date Received by SCB: 2000/08/21 Current Status: BA Registry File Number: BC710-C04

Omnibus - Redstone Flats Alleged certain lands at Alexis Creek and Redstone Flats were not set apart as reserves. Date Received by SCB: 1991/10/16 Current Status: NLO Registry File Number: BC710-C01

Puntzi Lake and Puntzi Creek Alleges that the fishing station applied for by the Band was surveyed in the wrong location. Date Received by SCB: 2001/05/16 Current Status: BA Registry File Number: BC710-C05

Water Rights Failure of the Crown to obtain adequate water rights or irrigation for the Band. Date Received by SCB: 2001/08/23 Current Status: BA Registry File Number: BC710-C07

Ashcroft (BAND-685)

Ashcroft I. R. No. 3 Water Rights Alleged failure to protect water rights sufficient to realize the purposes for which I.R. No. 3 was set aside. Date Received by SCB: 1999/04/07 Current Status: DOJ Registry File Number: BC685-C04

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 29 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Ashcroft (BAND-685)

Ashcroft I.R. No. 4 Pre-emption & Water Alleged unlawful preemption of Indian settlement; issues relating to land exchange Lot. 17, Lot 446 and Southdown Hill; issues relating Date Received by SCB: 1992/12/21 to water rights and boundaries of I.R. No. 4. Current Status: INACT Registry File Number: BC685-C02

CNR Right of Way on Ashcroft IR's 1 & 2 Alleged unlawful taking and inadequate compensation regarding CNR right of way across Ashcroft IR's 1 and 2. Date Received by SCB: 2001/10/31 Current Status: DOJ Registry File Number: BC685-C05

McLean's Lake I.R. No. 3 Alleged unlawful taking of a half of McLean's Lake I.R. No. 3 in 1939. Date Received by SCB: 1990/03/06 Current Status: ACT Registry File Number: BC685-C01

Water claim on 105 Mile Post I.R. No. 2 Alleged failure to protect water rights sufficient to realize the purposes for which I.R. No. 2 was set aside. Date Received by SCB: 1999/04/07 Current Status: DOJ Registry File Number: BC685-C03

Beecher Bay (BAND-640)

Alienation of 1.5 acres / Partial Lot 49 Alleged that 1.5 acres of land (part of lot 49) was unlawfully alienated from the FN's I.R. No. 1. Date Received by SCB: 2000/12/28 Current Status: BA Registry File Number: BC640-C02

BC Cut-Off Lands (SPLIT #02) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC640-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 30 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Beecher Bay (BAND-640)

Rocky Islets and Land Opposite Sec. 1 Alleged that the Rocky Islets in Beecher Bay and the land opposite Section 1 were unlawfully alienated from the FN's I.R. No. 1. Date Received by SCB: 2000/12/28 Current Status: BA Registry File Number: BC640-C03

Blueberry River First Nations (BAND-547)

Mineral Rights to IR Nos. 204 - 205 - 206 Alleges that Canada failed in the performance of its legal and fiduciary obligations to secure subsurface rights to IR Nos. 204, Date Received by SCB: 2002/10/23 205, and 206. Current Status: DOJ Registry File Number: BC547-C1

Non-fulfilment of Terms of Surrender of IR #172 Alleges that Canada did not adhere to terms of the Surrender of Fort St John IR No. 172 and failed to set aside additional reserve Date Received by SCB: 2003/08/28 lands as requested by the FN. Current Status: DOJ Registry File Number: BC547-C3

Treaty 8 Agricultural Benefits Alleges that Canada has neither extinguished nor performed its obligations under the agricultural benefits of Treaty 8. Date Received by SCB: 2002/10/23 Current Status: RES Registry File Number: BC547-C2

Treaty 8 Land Entitlement Alleges that Canada's obligation to provide the FN with land has not yet been met. Date Received by SCB: 2002/10/23 Current Status: ACT Registry File Number: B8265/B16

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 31 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Bonaparte (BAND-686)

Cache Creek I.R. No. 3A - Lease Alleged breach of trust in the negotiation of land lease on I.R. No. 3A. Date Received by SCB: 1985/04/12 Current Status: LIT Registry File Number: BC686-C02

Cache Creek I.R. No. 3A-Surrender Alleged some 48.69 acres of I.R. No. 3A lands were unlawfully alienated in 1903. Date Received by SCB: 1980/01/02 Current Status: FCL Registry File Number: BC686-C01

Mauvais Rocher I.R. No. 5 Presented by the Alliance of Tribal Councils. Alleged improper alienation of land from Mauvais Rocher I.R. No. 5 for CNR Date Received by SCB: 1987/05/22 right-of-way. Current Status: NLO Registry File Number: BC686-C03

Sproat Allotment Alleged 200 acre reserve was unlawfully alienated. Date Received by SCB: 1993/07/29 Current Status: NLO Registry File Number: BC686-C05

Trutch Reduction Alleged a large reserve allotted to the FN in 1862 was later unlawfully reduced in size. Date Received by SCB: 1993/07/29 Current Status: NLO Registry File Number: BC686-C04

Boothroyd (BAND-700)

Boothroyd I.R. No. 5B Alliance of Tribal Councils. Alleged improper alienation of land from Boothroyd I.R. No. 5B for CNR right-of-way. Date Received by SCB: 1987/05/22 Current Status: SET Registry File Number: BC700-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 32 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Boothroyd (BAND-700)

Chukcheestso IR No 7 Alleged inadequate compensation paid and excessive width taken for CPR right-of-way across Chukcheetso I.R. No. 7. Date Received by SCB: 1991/05/15 Current Status: DOJ Registry File Number: BC700-C02

Expropriation from IRs 1 - 2 - 6 - 8 - 10 Alleges insufficient compensation for a railway taking. Date Received by SCB: 2000/12/04 Current Status: DOJ Registry File Number: BC700-C05

Lands Taken for Public Purposes Alleges that Canada did not consider the cumulative effect of the public rights-of-way taken from reserve lands and should have Date Received by SCB: 2006/12/15 provided reserve lands in lieu of the lands taken for these Current Status: RES rights-of-way. Registry File Number: BC700-C06

Lot 933 - Lot 3 Pre-emptions Alleged unlawful preemption of portions of Boothroyd settlements and subsequent loss of water rights. Date Received by SCB: 2000/10/20 Current Status: DOJ Registry File Number: BC700-C04

Speyum IR No 3 Alleged inadequate compensation and excess width taken for CPR right-of-way through Speyum I. R. No. 3. Date Received by SCB: 1991/05/15 Current Status: DOJ Registry File Number: BC700-C03

Boston Bar First Nation (BAND-701)

Austen Flats I.R. #3 Alleged the Department of Fisheries and Oceans, and the International Pacific Salmon Fisheries Commission have used a Date Received by SCB: 1996/05/21 part of Austen Flats IR #3 without proper authority and without Current Status: DOJ compensation to the FN. Registry File Number: BC701-C5

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 33 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Boston Bar First Nation (BAND-701)

CNPR Right of Way Through IR #s 1 - 3 &4 The Band alleges negligence and inadequate compensation with respect to the taking of reserve land by the CNPR. Date Received by SCB: 2003/12/01 Current Status: BA Registry File Number: BC701-C7

Hell's Gate I.R. #3 Undertakings that land used as fishing stations in Hell's Gate would be reserved for the FN were never fulfilled. Date Received by SCB: 1996/05/21 Current Status: BA Registry File Number: BC701-C6

Kopchitchin I.R. No. 2 Alleged excessive right-of-way taken for CPR and inadequate compensation with respect to Kopchitchin I.R. No. 2. Date Received by SCB: 1990/12/10 Current Status: DOJ Registry File Number: BC701-C1

Kopchitchin IR No. 2 Water Rights Alleged improper omission of water rights when reserve was allotted. Date Received by SCB: 1994/08/29 Current Status: DOJ Registry File Number: BC701-C4

Lands in Lieu Alleges failure to provide replacement reserve lands for expropriated rights of way in order to minimally impair the Band's Date Received by SCB: 2007/09/05 reserve land base. Current Status: SUB/REV Registry File Number: BC701-C8

Scaucy I.R. No. 5 Alleged excessive right-of-way taken for CPR and inadequate compensation with respect to Scaucy I.R. No. 5. Date Received by SCB: 1990/12/10 Current Status: DOJ Registry File Number: BC701-C2

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 34 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Boston Bar First Nation (BAND-701)

Shrypttahook I.R. No. 7 Alleged excessive right-of-way taken for CPR and inadequate compensation with respect to Shrypttahook I.R. No. 7. Date Received by SCB: 1990/12/10 Current Status: DOJ Registry File Number: BC701-C3

Bridge River (BAND-590)

Moha Highway IR #1 Alleges a breach of fiduciary duty in allowing the Province to expropriate lands for highway purposes without compensation for Date Received by SCB: 2003/03/04 the First Nation. Current Status: DOJ Registry File Number: BC590-C01

Burns Lake (BAND-619)

Burns Lake I.R. No. 18 Alleged improper reduction of I.R. No. 18 by the McKenna-McBride Commission in 1916. Date Received by SCB: 1994/03/03 Current Status: LOS Registry File Number: BC619-C01

IR #18 - Burns Lake Cemetery Alleged the alienation of three acres of IR #18 for a cemetery for non-Indians, in 1923, was unlawful. Date Received by SCB: 1995/05/03 Current Status: LOS Registry File Number: BC619-C02

IR #18 - CNR Right-of-Way Alleged approximately 48 acres taken from the FN's IR's #18 & 19 for the CNR right-of-way in 1914-18 was unlawful. Date Received by SCB: 1995/05/29 Current Status: LOS Registry File Number: BC619-C03

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 35 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Burns Lake (BAND-619)

Sale of Burns Lake IR 18 Land (Surrender Project) Improper surrenders for sale of Burns Lake I.R. 18 land in 1950`s and 1960`s and inadequate compensation. Date Received by SCB: 2002/08/16 Current Status: DOJ Registry File Number: BC619-C04

Burrard (BAND-549)

Ambleside - IR#5 Also known as Tsleil Waututh Nation. Alleged historic association with the Squamish FN and relationship to the Reserve, it Date Received by SCB: 1995/09/07 is owed a share of the settlement of the Squamish cut-off claim. Current Status: FCL Registry File Number: BC549-C1

Bouillon Claim (Band previous name: Tsleil Waututh Nation) Alienation of a reserve interest in Capilano IR5 reserve (Squamish FN). Date Received by SCB: 1996/01/20 Current Status: SET Registry File Number: BC549-C2

Burrard I.R. 3 Foreshore Also known as Tsleil Waututh Nation. Alleged foreshore to Burrard I.R. #3 was legally part of the reserve and was improperly Date Received by SCB: 1997/05/13 alienated. Current Status: DOJ Registry File Number: BC549-C3

Dollarton Hwy. I.R. No. 3 Also known as Tsleil Waututh Nation. Alleges Canada failed to obtain compensation for land taken from Burrard Inlet Reserve No. Date Received by SCB: 2000/06/08 3 for purposes of the Dollarton Highway. Alleges Dollarton Current Status: ACT Highway injuriously affected I. R. No. 3. Registry File Number: BC599-C5

Surrender of IR No. 4 Also known as Tsleil Waututh Nation. Substance of Claim Not Defined Date Received by SCB: 1998/09/29 Current Status: DOJ Registry File Number: BC549-C4

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 36 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Campbell River (BAND-622)

1920-1922 Surrenders for Dryland Sort and Road r/w Alleges a breach of lawful obligations with respect to the surrender on IR 11 of approximately 81 acres from Campbell River IR No. 11 to build a mill and piling grounds. Date Received by SCB: 2004/05/17 Current Status: BA Registry File Number: BC622-C02

Quinsam IR 12 Alleged one of its traditional village sites was erroneously allotted to a neighbouring Band as a reserve in 1888. Date Received by SCB: 1984/04/30 Current Status: FCL Registry File Number: BC622-C01

Canoe Creek (BAND-723)

I.R. #4 - O'Reilly Cancellation Alleged I.R. #4 was lawfully established in 1881 and was later unlawfully cancelled. Date Received by SCB: 1996/10/22 Current Status: BA Registry File Number: BC723-C03

Graveyard Alleged unlawful alienation of graveyard reserves. Date Received by SCB: 1993/03/29 Current Status: ACT Registry File Number: BC723-C01

Lot 5 - Pre-Confederation Alleged land was reserved for the Canoe Creek Band in 1864, but was later unlawfully alienated to third parties. Date Received by SCB: 1996/10/22 Current Status: DOJ Registry File Number: BC723-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 37 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Canoe Creek (BAND-723)

Toby Lake I.R. No. 6 Survey Error Alleged survey error resulting in loss of land set aside as Toby Lake I.R. No. 6. Date Received by SCB: 2004/12/15 Current Status: BA Registry File Number: BC723-C04

Cape Mudge (BAND-623)

Colonial Reserve Allotment Cape Mudge FN (also known as Wewaikai Nation) alleges that the Cape Mudge IR #10 reserve set aside by Peter O'Reilly in 1886 Date Received by SCB: 2007/11/01 was reduced from the original 2,550 acres set aside in 1863 by B. Current Status: SUB/REV W. Pearse. Registry File Number: BC623-C8

Hyacinthe Bay Cape Mudge FN (also known as Wewaikai Nation) alleges failure to set aside allotted lands as a reserve. Date Received by SCB: 2001/04/12 Current Status: DOJ Registry File Number: BC-623-C05

Lighthouse - Cape Mudge I. R. 10 Cape Mudge FN (also known as Wewaikai Nation) alleged improper sale and expropriation & inadequate compensation for Date Received by SCB: 1999/12/07 lighthouse site and access road on Cape Mudge IR 10. Current Status: DOJ Registry File Number: BC623-C01/04

Quinsam IR 12 Tree Nursery Cape Mudge FN (also known as Wewaikai Nation) alleges trespass; inadequate compensation; irregular surrender; improper Date Received by SCB: 2007/05/07 lease renewal; delays in return of land; addition of improvement Current Status: RES without compensation; use of chemical fertilizers - health risk; and Registry File Number: BC623-C07 failure to provide full disclosure.

Rebecca Spit - Drew Harbour I.R. 9 Cape Mudge FN (also known as Wewaikai Nation) alleged improper alienation of a portion of Drew Harbour I. R. 9 at time of Date Received by SCB: 1998/12/11 first survey. Current Status: DOJ Registry File Number: BC-623-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 38 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Cape Mudge (BAND-623)

Tekya Village Site Cape Mudge FN (also known as Wewaikai Nation) alleges failure by Canada to set aside Tekya Village. Date Received by SCB: 2002/09/17 Current Status: DOJ Registry File Number: BC-623-C06

Timber Surr & logging road-Quinsam IR 12 Cape Mudge FN (also known as Wewaikai Nation) alleged improper 1937 timber surrender and logging road right of way Date Received by SCB: 1999/11/23 taking on Quinsam I. R. 12, with inadequate compensation. Current Status: DOJ Registry File Number: BC-623-C03

Cayoose Creek (BAND-591)

Graveyard Alleged unlawful alienation of graveyard reserves. Date Received by SCB: 1993/03/09 Current Status: ACT Registry File Number: BC591-C01

Village Pre-emptions Claim Originally submitted as part 7 of Graveyard claim. Claim alleges that a village site on lot 3 was unlawfully alienated to a third party in Date Received by SCB: 1993/03/09 1870. Current Status: DOJ Registry File Number: BC591-C02

Chawathil (BAND-583)

Chawathil I.R. Nos. 2 and 4 Alleged improper expropriation of several parcels of reserve lands. Date Received by SCB: 1994/04/05 Current Status: DOJ Registry File Number: BC583-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 39 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Cheam (BAND-584)

Cheam I.R. No. 1 Presented by the Alliance of Tribal Councils. Alleged improper alienation of land from Cheam I.R. No. 1 for CNR right-of-way. Date Received by SCB: 1987/05/22 Current Status: INACT Registry File Number: BC584-C01

Chehalis (BAND-559)

Chehalis I. R. No. 5 Alleged improper taking of a road right-of-way. Date Received by SCB: 1993/12/10 Current Status: NLO Registry File Number: BC559-C01

Chemainus First Nation (BAND-641)

BC Cut-Off Lands (SPLIT #03) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC641-C01

Dunsmuir Islands Dunsmuir Islands not set aside as Indian Reserve by JRC in 1877 or later. Date Received by SCB: 2004/07/08 Current Status: BA Registry File Number: BC641-C06

E & N Railway on Chemainus I.R. No. 12 Alleged improper alienation of I.R. No. 12 land for E & N Railway right of way and inadequate compensation. Date Received by SCB: 2001/08/31 Current Status: DOJ Registry File Number: BC641-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 40 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Chemainus First Nation (BAND-641)

Establishment of Chemainus I. R. No. 13 Lands not included as part of Chemainus IR 13 when reserve set aside in 1876. Date Received by SCB: 2002/07/30 Current Status: DOJ Registry File Number: BC641-C03

IR# 13 Powerline RoW The FN alleges that Canada failed to seek adequate compensation for a BC hydro power line through IR# 13. Date Received by SCB: 2006/10/19 Current Status: BA Registry File Number: BC641-C07

Lomas Misappropriation of Timber Revenue Misappropriation of timber revenues from Kulleet IR by Indian agent. Date Received by SCB: 2003/11/12 Current Status: LOS Registry File Number: BC641-C04

Squay-Hay-One Transmission Line ROW on IR 11 Inadequate compensation for a transmission line ROW on IR 11 and failure to return land to reserve when no longer required for Date Received by SCB: 2003/12/18 road. Current Status: DOJ Registry File Number: BC641-C05

Cheslatta Carrier Nation (BAND-620)

1952 Surrender (SPLIT #01) - 1952 Surrender Alleged it was coerced into surrendering ten of its reserves in 1952 Date Received by SCB: for a hydro-electric project; that the surrender was void; and that it did not receive full compensation. Current Status: SET Registry File Number: BC620-C01

1952 Surrender (SPLIT #02) - Trust Account Alleged FN trust accounts were improperly managed. Date Received by SCB: Current Status: SET Registry File Number: BC620-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 41 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Cheslatta Carrier Nation (BAND-620)

Scilchola I.R. No. 3 Alleged improper reduction of Scilchola Reserve by McKenna-McBride Commission in 1913-1916. Date Received by SCB: 1994/03/08 Current Status: NLO Registry File Number: BC620-C03

Comox (BAND-624)

Comox and Back Road Alleges that reserve land was unlawfully taken by the Province of BC for road purposes. Date Received by SCB: 2002/07/18 Current Status: DOJ Registry File Number: BC624-C03

Condensory Road Alleges that reserve land was unlawfully taken by the Province of BC for road purposes. Date Received by SCB: 2002/07/18 Current Status: DOJ Registry File Number: BC624-C02

Goose Spit IR 3 Inadequate compensation for occupation of land on Goose Spit IR 3 for military purposes from 1896 to 1980. Date Received by SCB: 2003/09/12 Current Status: DOJ Registry File Number: BC624-C04

Pentledge I.R. 2 Logging Right of Way The FN alleged that Canada breached its lawful obligation with respect to the creation and monitoring of two loggings right of way Date Received by SCB: 2000/10/12 on Pentledge I.R. 2. Current Status: DOJ Registry File Number: BC624-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 42 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Cook's Ferry (BAND-694)

CNPR Right of Way on IR Nos. 2 and 8 Alleges inadequate compensation for land taken and for damages to the Reserves. Date Received by SCB: 2001/03/02 Current Status: DOJ Registry File Number: BC694-C08

Kumcheen I.R. No. 1 Alleged excessive width was taken and inadequate compensation paid for CPR right-of-way through Kumcheen I.R. No. 1. Date Received by SCB: 1992/02/03 Current Status: DOJ Registry File Number: BC694-C03

Pemynoos I.R.No. 9 Alleged excessive width was taken and inadequate compensation paid for CPR right-of-way through Pemynoos I.R. No. 9. Date Received by SCB: 1992/02/03 Current Status: DOJ Registry File Number: BC694-C02

Pokheitsk I.R. No. 10 Alleged excessive width was taken and inadequate compensation paid for CPR right-of-way through Pokheitsk I.R. No. 10. Date Received by SCB: 1992/02/11 Current Status: DOJ Registry File Number: BC694-C01

Shawniken I.R.No. 3 Claim 1 of 6 forwarded to SCB by the Alliance of Tribal Councils on behalf of the Band. Alleged right-of-way and loss of water rights. Date Received by SCB: 1987/05/22 Current Status: FCL Registry File Number: BC694-C06

Shawniken Water Rights Alleged unlawful loss of water rights from Shawniken I.R. #3. Date Received by SCB: 1996/09/12 Current Status: DOJ Registry File Number: BC694-C07

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 43 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Cook's Ferry (BAND-694)

Spatsum I.R. No. 11 and 11A Alleged excessive width was taken and inadequate compensation paid for CPR right-of-way through Spatsum I.R. No. 11 and 11A. Date Received by SCB: 1992/02/03 Current Status: DOJ Registry File Number: BC694-C04

Spences Br. I.R. No. 4 and I.R. No. 4A Alleged excessive width was taken and inadequate compensation paid for CPR right-of-way through Spences Bridge I.R. No. 4 and Date Received by SCB: 1992/04/13 Lower Shawniken I.R. No. 4A. Current Status: DOJ Registry File Number: BC694-C05

Cowichan (BAND-642)

Lomas Misappropriation of Funds Alleged misappropriation of band funds by Indian Agent in the 1920's. Date Received by SCB: 2002/04/02 Current Status: LOS Registry File Number: BC642-C15

Brennan Claim Alienation of a portion of the IR # 1 without compensation in 1867. Date Received by SCB: 1995/02/15 Current Status: INACT Registry File Number: BC642-C07

Church Lands Concerned lands acquired by church which should have been part of reserve. Date Received by SCB: 1991/08/02 Current Status: AR Registry File Number: BC642-C06

Cowichan I.R. No. 1 - Mahoney Alleged unlawful alienation of land from Cowichan I.R. # 1 in 1886. Date Received by SCB: 1990/01/04 Current Status: SET Registry File Number: BC642-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 44 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Cowichan (BAND-642)

Cowichan I.R. No. 1 - Marriner Invalid surrender of lands from IR# 1. Date Received by SCB: 1991/05/02 Current Status: SET Registry File Number: BC642-C04

Cowichan I.R. No. 1 - Sutton Alleged unlawful alienation of 66 acres of Cowichan I.R. No. 1 in 1878. Date Received by SCB: 1990/01/05 Current Status: NLO Registry File Number: BC642-C03

Cowichan IR No. 1-Agric.Soc.Lease Concerned compensation for improper management of lease of reserve land. Date Received by SCB: 1991/05/07 Current Status: SET Registry File Number: BC642-C05

David Lyall Pre-emption The First Nation alleges that a Crown grant issued in 1872 was invalid because it was set aside as an Indian Reserve in 1856. Date Received by SCB: 2005/04/01 Current Status: BA Registry File Number: BC642-C18

Graveyard Alleged failure to set apart graveyard as reserve. Date Received by SCB: 1994/07/07 Current Status: ACT Registry File Number: BC642-C12

Green Point Alleged federal responsibility in omission of 1.7 acres known as Green Point at the time of Cowichan I.R. No.1 allottment. Date Received by SCB: 1987/10/19 Current Status: FCL Registry File Number: BC642-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 45 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Cowichan (BAND-642)

Green Point - Loss of Use Alleged loss of use re: Green Point. Date Received by SCB: 1993/08/20 Current Status: SET Registry File Number: BC642-C11

McLay Grant Alleged alienation of Cowichan I.R. 1 land due to failure to formalize reserve prior to settlement. Date Received by SCB: 2004/12/20 Current Status: BA Registry File Number: BC642-C17

Munro Claim Alleged sections 15 and 16, Range VII, Quamichan District, were unlawfully alienated from the reserve lands of the Cowichan Date Received by SCB: 1994/12/12 peoples. Current Status: BA Registry File Number: BC642-C13

Red Cap The claim asserts that Canada breached its duty when lands promised to be reserved by the Joint Reserve Commission near Date Received by SCB: 2001/03/02 Maple Bay, Island in 1877, were not reserved. Current Status: DOJ Registry File Number: BC642-C14

Theik I.R. No. 2 - Highway Alienation of road right-of-way on Theik IR No. 2. Date Received by SCB: 1993/10/29 Current Status: ACT Registry File Number: BC642-C09

Theik I.R. No. 2 - Pre-emption Alleged loss of land from a colonial reserve. Date Received by SCB: 1993/10/29 Current Status: NLO Registry File Number: BC642-C08

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 46 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Cowichan (BAND-642)

Theik I.R. No. 2 - Water Lot Alleged unlawful loss of foreshore in 1920s. Date Received by SCB: 1993/10/29 Current Status: NLO Registry File Number: BC642-C10

W. A. Robertson Preemption Alleged unlawful preemption of Cowichan IR 1 land. Date Received by SCB: 2004/04/05 Current Status: BA Registry File Number: BC642-C16

Da'naxda'xw First Nation (BAND-635)

Disallowance of G.M. Sproat's Allotments Alleged that the disallowance of the 1879 reserve allotments was unlawful. Date Received by SCB: 1999/07/27 Current Status: DOJ Registry File Number: BC635-C01

McKenna-McBride Land Applications Alleged breach of duty by Indian Agent for failure to protect 5 settlements from timber lease alienation and for failure to Date Received by SCB: 2000/06/16 recommend 7 other settlements as additional reserve lands to the Current Status: DOJ McKenna-McBride Commission. Registry File Number: BC635-C02

O'Reilly Reserve Allotments Alleged breach of duty by failing to provide an adequate allotment of reserve land. Date Received by SCB: 2000/06/21 Current Status: DOJ Registry File Number: BC635-C03

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 47 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Dease River (BAND-504)

Dease River McDame site The FN alleges that Canada failed to set aside the McDame site as an Indian Reserve and failed to protect it from an alleged Date Received by SCB: 2006/10/13 pre-emption in 1879 and Crown grant in 1889. Current Status: BA Registry File Number: BC504-C02

Dease River / Liard FN (ASSCTN)

One Mile Point Concerned highway through One Mile Point Reserve in 1950s. - Dease River (BAND-504) - Liard First Nation (BAND-502) Date Received by SCB: 1990/10/02 Current Status: SET Registry File Number: BC504-C01

Ditidaht (BAND-662)

West Coast Trail The right-of-way for the West Coast Trail across IR No's 2, 3, 4, and 6 was not properly taken and as such represents a trespass. Date Received by SCB: 1992/07/27 Current Status: SET Registry File Number: BC662-C01

Zukaous Alleged the traditional village site at Zukaous should have been alloted to the FN as an Indian Reserve. Date Received by SCB: 1995/07/25 Current Status: LOS Registry File Number: BC662-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 48 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Doig River (BAND-548)

BC Trapline Registration Alleged failure by Canada to protect traplines in light of BC Trapline Registration process. Date Received by SCB: 2005/11/04 Current Status: RES Registry File Number: BC548-C5

Commercial Hunting, Fishing & Trapping Rights Alleged failure by Canada to protect Treaty 8 hunting, fishing and trapping rights from restrictions imposed by provincial regulations. Date Received by SCB: 2005/11/04 Current Status: RES Registry File Number: BC548-C4

Mineral Rights I.R. Nos. 204 - 205 - 206 Alleges that Canada breached its fiduciary obligations in failing to reserve sub-surface mineral rights when purchasing the Nation's Date Received by SCB: 1999/04/12 new reserves. Current Status: DOJ Registry File Number: BC548-C1

Peterson's Crossing Alleges that Canada failed to acquire land at Peterson's Crossing after the FN, formerly part of the Fort St. John Band, surrendered Date Received by SCB: 2003/03/31 its IR No. 172. Current Status: DOJ Registry File Number: BC548-C3

Treaty 8 Agricultural Benefits Alleges that the Crown has neither extinguished nor performed its obligations to the First Nation pursuant to the agricultural benefits Date Received by SCB: 2002/03/19 of Treaty No. 8. Current Status: RES Registry File Number: BC548-C2

Treaty 8 Land Entitlement Alleged entitlement to additional reserve land under the terms of Treaty 8. Date Received by SCB: 1999/06/21 Current Status: ACT Registry File Number: BW8265/D2

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 49 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Douglas Reserve Claimants (ASSCTN)

Douglas Reserve - Trutch Reduction The FNs allege the unlawful reduction of the original Neskolith - (BAND-684) Reserve in the 1860's. - Little (BAND-689) - Neskonlith (BAND-690) Date Received by SCB: 1996/03/12 Current Status: ISCC Registry File Number: BC684-C01

Ehattesaht (BAND-634)

McKenna-McBride Addit. Land Applications Alleged failure by Canada to protect settlement lands from unlawful encroachment and by failing to adequately represent band interests Date Received by SCB: 2001/04/04 before the McKenna-McBride Commission. Current Status: DOJ Registry File Number: BC634-C01

Esketemc (BAND-711)

Ditchburn Clark - Reduction of IRs 15 - 17 & 18 (Alkali Lake) Alleged unlawful reduction of McKenna-McBride Commission reserve allotments. Date Received by SCB: 1992/11/25 Current Status: FCL Registry File Number: BC711-C01

Water Rights Alien.- Wycott's Flat IR #6 (Alkali Lake) FN alleges unlawful alienation of water rights on Wycott's Flat IR #6. Date Received by SCB: 2003/02/19 Current Status: DOJ Registry File Number: BC711-C03

Wrights Meadow (Alkali Lake) Alleged that land it created by draining a lake and which it had subsequently used for many years and had built on, Date Received by SCB: 1995/03/15 was unlawfully alienated to a third party, and that Canada failed to Current Status: ISCC challenge this alienation. Registry File Number: BC711-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 50 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Fort Nelson First Nation (BAND-543)

BC Trapline Registration Alleged failure by Canada to protect traplines in light of BC Trapline Registration process. Date Received by SCB: 2007/10/18 Current Status: SUB/REV Registry File Number: BC543-C1

Gitanmaax (BAND-531)

Loss of Part of Tsitsk IR #3 FN alleges that the reallocation of a portion of Tsitsk IR #3 to the Hagwilget Band was illegal and done without the consent of the Date Received by SCB: 2005/06/06 Band. Current Status: DOJ Registry File Number: BC531-C03

Surrender of IR No. 1 (Surrender Project) The FN alleges that Canada breached various obligations with respect to the surrender of reserve land. Date Received by SCB: 2001/04/11 Current Status: LOS Registry File Number: BC531-C01

Surrender to the BC Forest Service (Surrender Alleges breach of statutory and fiduciary duty with respect to the Project) surrender of land for use as a ranger's station. Date Received by SCB: 2002/09/19 Current Status: DOJ Registry File Number: BC531-C02

Gitsegukla (BAND-535)

GTPR on Andimaul Reserve - Railway Takings Alleges improper taking and inadequate compensation re: GTPR railway right of way on the Andimaul Reserve. Date Received by SCB: 2004/09/22 Current Status: DOJ Registry File Number: BC535-C1

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 51 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Gitsegukla (BAND-535)

GTPR on Gitsegukla IR #1 & 2 - Railway Takings Alleged improper taking and inadequate compensation re: GTPR railway right of way on Gitsegukla IRs No. 1 and 2. Date Received by SCB: 2004/09/22 Current Status: DOJ Registry File Number: BC535-C2

Gitwangak (BAND-536)

BC Cut-Off Lands (SPLIT #04) (Band previous name: Kitwanga) In 1916, 22 bands lost land from Date Received by SCB: 33 separate reserves without proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: ACT Registry File Number: BC536-C1

Grand Trunk Pacific Railway RoWs - IR#s 1 - 3 - 8 FN alleges inadequate compensation for the GTPR Railway RoW's, relating to loss of revenue, trespass, injurious affection, Date Received by SCB: 2006/02/21 wrongful alienation, and other damages, not limited to burial Current Status: DOJ grounds, from 1908 to the present. Registry File Number: BC536-C02

Substitution of IRs 4 - 5 and 7 Alleged unlawful substitution of 3 allotted reserves with other lands. Date Received by SCB: 2007/03/30 Current Status: RES Registry File Number: BC536-C03

Gwa'Sala-Nakwaxda'xw (BAND-724)

Loss of Coho Bay Reserve Alleges failure to establish a 500 acre reserve at Coho Bay and protect it from alienation. Date Received by SCB: 2007/06/19 Current Status: RES Registry File Number: BC724-C05

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 52 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Gwa'Sala-Nakwaxda'xw (BAND-724)

Relocation Alleged non-fulfilment of promises in relation to relocation of FN in new area. Date Received by SCB: 1997/07/02 Current Status: FCL Registry File Number: B-479+8275/G3

Smiths Inlet Fishery Failure to protect and properly administer the Band's fishery at Wy-clese IR# 1. Date Received by SCB: 2006/05/01 Current Status: RES Registry File Number: BC724-C04

Timber Surrenders IR 12 The FN submits that Canada breached statutory and fiduciary obligation with regard to timber surrenders on IR# 12. Date Received by SCB: 2005/11/04 Current Status: DOJ Registry File Number: BC724-C02

Timber Surrenders IR 14-15-16 The FN submits that Canada breached statutory and fiduciary obligation with regard to timber surrenders on IR #s 14-15-16. Date Received by SCB: 2005/11/04 Current Status: DOJ Registry File Number: BC724-C03

Gwawaenuk Tribe (BAND-627)

Logging of Kadis IR 11 from 1936 to 1945 Failed to properly manage and compensate for the logging of timber from Kadis IR 11, from 1936 to 1945. Date Received by SCB: 2003/09/22 Current Status: DOJ Registry File Number: BC627-C14

Logging on Kunstamis IRs 2 & 2A in 1935 Claim alleges that compensation received from sale of timber was inadequate. Date Received by SCB: 2001/12/05 Current Status: DOJ Registry File Number: BC627-C13

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 53 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Gwawaenuk Tribe (BAND-627)

RCLA - Addition to Keo IR #3 Alleged failure of Indian agent to protect Indian settlement. Date Received by SCB: 1997/10/20 Current Status: DOJ Registry File Number: BC627-C08

RCLA - Addition to Quay Reserve #4 Alienation of Indian Settlement by timber limit and failure of Indian agent to represent band interests to the McKenna-McBride Date Received by SCB: 1997/10/20 Commission. Current Status: DOJ Registry File Number: BC627-C09

RCLA - Timber Lease No. 27349 Alleged failure of Indian agent to protect Indian settlement. Date Received by SCB: 1997/10/20 Current Status: DOJ Registry File Number: BC627-C06

Royal Commission - Dove Island Alleged mis-allotment of Dove Island as a new reserve, instead of Moosehead Island in 1916. Date Received by SCB: 2000/08/10 Current Status: LOS Registry File Number: BC627-C12

Royal Commission Land App - Gagayukwalas Alleged failure of Indian Agent to protect Indian settlement. Date Received by SCB: 1997/10/20 Current Status: DOJ Registry File Number: BC627-C11

Royal Commission Land App - Kilwadi Alleged failure of Indian agent to protect Indian settlement. Date Received by SCB: 1997/10/20 Current Status: DOJ Registry File Number: BC627-C07

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 54 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Gwawaenuk Tribe (BAND-627)

Royal Commission Land App - Kisinazis Alleged failure of Indian agent to protect Indian settlement. Date Received by SCB: 1997/10/20 Current Status: DOJ Registry File Number: BC627-C02

Royal Commission Land Application- Awagi Alleged failure of Indian Agent to protect indian settlement. Date Received by SCB: 1997/09/20 Current Status: DOJ Registry File Number: BC627-C01

Royal Commission Land Application- Sinku Alleged failure of Indian Agent to protect Idian settlement Date Received by SCB: 1997/10/20 Current Status: DOJ Registry File Number: BC627-C04

Royal Commission Land Application-Dailus Alleged failure of Indian Agent to protect Indian Settlement as applied for to the McKenna-McBride Commission. Date Received by SCB: 1997/10/20 Current Status: DOJ Registry File Number: BC627-C05

Royal Commission Land Application-Gleyka Alienation of Indian Settlement by timber limit and failure of Indian agent to represent the band interests to the McKenna-McBride Date Received by SCB: 1997/10/20 Commission. Current Status: DOJ Registry File Number: BC627-C10

Royal Commission Land Application-Hikums Alleged failure of Indian Agent to protect Indian Settlement as applied for to the McKenna-McBride Commission. Date Received by SCB: 1997/10/20 Current Status: DOJ Registry File Number: BC627-C03

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 55 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Hagwilget Village (BAND-534)

Destruction of the Hagwilget Fishery Alleged breach of fiduciary duty by Canada resulting in the destruction of the Hagwilget Band's fishery. Date Received by SCB: 2001/05/29 Current Status: LIT Registry File Number: BC534-C1

Halalt (BAND-645)

Misappropriation of Timber Harvesting Revenues by Alleged misapproriation of timber revenues in 1920. Indian Agent Lomas Date Received by SCB: 2003/07/16 Current Status: BA Registry File Number: BC645-C02

Railway Across IR No. 2 Alleged unlawful taking of reserve land for railway purposes and inadequate compensation. Date Received by SCB: 1998/10/09 Current Status: DOJ Registry File Number: BC645-C01

Scott Preemption of Halalt Band Winter Settlement Alleged failure to protect Halalt winter settlement from preemption in 1865 and failure to include the land as Indian reserve by Joint Date Received by SCB: 2004/09/17 Reserve Commission in 1877. Current Status: BA Registry File Number: BC645-C03

Halfway River First Nation (BAND-546)

BC Trapline Registration Alleged failure by Canada to protect traplines in light of BC Trapline Registration process. Date Received by SCB: 2006/04/19 Current Status: RES Registry File Number: BC546-C3

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 56 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Halfway River First Nation (BAND-546)

Commercial Hunting, Fishing & Trapping Rights Alleged failure by Canada to protect Treaty 8 hunting, fishing, and trapping rights from restrictions imposed by provincial regulations. Date Received by SCB: 2006/04/19 Current Status: RES Registry File Number: BC546-C4

IR #168 - Highway 117 Expropriation Alleged that although 53.5 acres are contained within current Provincial Highway 117, only 33.55 acres were properly taken and Date Received by SCB: 1995/08/17 paid for, leaving a shorfall of 19.9 acres. Current Status: ACT Registry File Number: BC546-C1

TLE The Halfway River TLE claim goes beyond DOFS shortfall. The Band also alleges; Canada discouraged FN's from choosing Date Received by SCB: 1996/01/26 severalty, Canada failed to take a census of the Indians in the Current Status: ACT Treaty 8 area, paylists are not the appropriate way of calculating Registry File Number: BW8265/H3 DOFS shortfall, Canada has an ongoing obligation to provide land as populations grow, and Canada should not have signed an agreement requiring Provincial co-operation to fulfill its obligations.

Treaty 8 Agricultural Benefits Alleges that the Crown has neither extinguished nor performed its obligations to the First Nation pursuant to the agricultural benefits Date Received by SCB: 2002/03/19 of Treaty No. 8. Current Status: RES Registry File Number: BC546-C2

Heiltsuk (BAND-538)

Drag Seining Licences Claimant alleges that the drag seining licences issued to Robert Draney constituted a trespass on these reserves. Date Received by SCB: 1999/05/25 Current Status: DOJ Registry File Number: BC538-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 57 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Heiltsuk (BAND-538)

Strom Bay Alleged breach of federal fiduciary duty to protect Indian settlement land. Date Received by SCB: 1990/04/11 Current Status: SET Registry File Number: BC538-C01

Hesquiaht (BAND-661)

Surrender of Iusuk IR 5 (Surrender Project) Alleged unlawful surrender of Iusuk IR 5 in 1959 for land exchange. Date Received by SCB: 2003/03/31 Current Status: DOJ Registry File Number: BC661-C01

High Bar (BAND-703)

Graveyard Reserve Alienation Alienation of Graveyard Indian Reserve. Date Received by SCB: 2004/05/21 Current Status: LOS Registry File Number: BC703-C01

Homalco (BAND-552)

Aupe I.R. No. 6 and 6A Alleged unlawful alienation of land from Aupe I.R. No. 6 and No. 6A Date Received by SCB: 1992/07/07 Current Status: FCL Registry File Number: BC552-C1

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 58 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Huu-ay-aht First Nations (BAND-663)

BC Cut-Off Lands (SPLIT #05) (Band previous name: Ohiet) In 1916, 22 bands lost land from 33 Date Received by SCB: separate reserves without proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC663-C1

Keeshan IR #9 Timber (Band previous name: Ohiet) Alleges statutory and fiduciary breaches with respect to the taking of timber from IR No. 9 in the Date Received by SCB: 2004/05/11 1950s and 1960s. Current Status: DOJ Registry File Number: BC663-C3

Numukamis I.R. 1 - Timber Licence The First Nation alleges that Canada breached statutory and fiduciary obligations when it authorized a timber harvesting licence. Date Received by SCB: 2005/04/06 Current Status: LOS Registry File Number: BC663-C5

Numukamis IR #1 (Band previous name: Ohiet) Alleges statutory and fiduciary breaches stemming from the surrender of part of IR No. 1 for the Date Received by SCB: 2004/05/11 purposes of a logging road right of way. Current Status: LOS Registry File Number: BC663-C4

West Coast Trail (Band previous name: Ohiet) Alleged unlawful taking of land from five indian reserves for trail purposes. I.R. 9 - Kichha I.R. 10 - Date Received by SCB: 1997/08/05 Clutus I.R. 11 - Anaela I.R. 12 and Masit I.R. 13. The FN also Current Status: SET alleges trespass by DND and continued presence of bunker since Registry File Number: BC663-C2 WW2.

Ka:'yu:'k't'h'/Che:k:tles7et'h' First Nations (BAND-638)

Allotment of Mission Island I.R. 2 Alleged failure by Indian Reserve Commissioner to allot western portion of Mission Island as part of Mission Island I.R. 2. Date Received by SCB: 2000/05/03 Current Status: NLO Registry File Number: BC638-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 59 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Ka:'yu:'k't'h'/Che:k:tles7et'h' First Nations (BAND-638)

Checkleset Additional Land Applications Alleges that Canada failed to adecuately support the band`s application for additional reserve lands to the McKenna McBride Date Received by SCB: 2001/09/17 Commission. Current Status: NLO Registry File Number: BC638-C03

ECHAS Village Site Alleged failure by Canada to allot ECHAS village site as an Indian Reserve. Date Received by SCB: 2006/06/15 Current Status: BA Registry File Number: BC638-C05

Kyuquot Additional Land Applications Alleges that Canada failed to adequately support the band's application for additional reserve lands to the McKenna-McBride Date Received by SCB: 2001/09/17 Commission. Current Status: NLO Registry File Number: BC638-C02

O'Reilly Reserve Allotments Alleged that Indian Reserve Commissioner failed to reserve 5 settlement sites in the course of his visit with the Kyuquot people in Date Received by SCB: 2004/11/22 1889. Current Status: DOJ Registry File Number: BC638-C04

Kamloops (BAND-688)

Trutch Reduction Revision of 1986 submission. Alleged the BC government unlawfully took approximately 6,000 acres of Kamloops I.R. No. 1 Date Received by SCB: 1993/01/27 in 1866. Current Status: LOS Registry File Number: BC688-C1

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 60 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Kanaka Bar (BAND-704)

CNPR ROW across Kanaka Bar IR 1A Alleged unlawful taking of reserve land for railway right-of-way and inadequate compensation. Date Received by SCB: 1998/10/15 Current Status: DOJ Registry File Number: BC704-C03

Expropriation from IR No. 2 Alleges insufficient compensation for a railway taking. Date Received by SCB: 2000/12/04 Current Status: DOJ Registry File Number: BC704-C04

Lands Taken for Public Purposes Canada's alleged failure to provide replacement reserve lands for railway and highway and transmission line rights of way in order to Date Received by SCB: 2004/11/30 minimally impair the Band's reserve land base. Current Status: DOJ Registry File Number: BC704-C05

Reserve 1A & 2 Lot 4 Alleged illegal pre-emption of Indian land that should have been reserved between I.R. No. 1A and I.R. No. 2. Date Received by SCB: 2000/10/24 Current Status: DOJ Registry File Number: BC704-C02

Whyeek I.R. No. 4 Alleged excessive right-of-way taken for CPR and inadequate compensation with respect to Whyeek I.R. No. 4. Date Received by SCB: 1990/12/10 Current Status: DOJ Registry File Number: BC704-C01

Katzie (BAND-563)

Katzie I.R. No. 1 and No. 3 Alleged unlawful dykes on Katzie I.R. No. 1 and Katzie I.R. No. 3, resulting in an illegal trespass and damages. Date Received by SCB: 1993/05/10 Current Status: DOJ Registry File Number: BC563-C1

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 61 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Katzie (BAND-563)

Pitt Lake IR #4 Leases The FN submits that Canada owes an outstanding lawful obligation with respect to the development of IR #4 for recreational Date Received by SCB: 2005/01/24 purposes. Current Status: BA Registry File Number: BC563-C2

Kitamaat (BAND-676)

1889 Reserve Allotments (Also known as Haisla) Alleged failure of Indian Reserve Commissioner and Indian Agent to reserve Indian Settlement sites Date Received by SCB: 1998/08/13 in the 1880's. Current Status: DOJ Registry File Number: BC676-C07

1952 Surrender - Kildala Arm I.R. No. 10 (Also known as Haisla) The Band alleges Canada breached its fiduciary duty by failing to set lot 3059 apart and designate it Date Received by SCB: 1984/03/27 reserve land for the use and benefit of the band, as required by the Current Status: SET terms of Kildala I.R. No.10 surrender. Registry File Number: BC676-C02

Alcan Easements IRs No. 2-4 & 11 (Also known as Haisla) Alleged inadequate process and compensation for transmission line Easements on IRs No. 2, 4 and Date Received by SCB: 2004/06/24 11. Current Status: DOJ Registry File Number: BC676-C11

Bishop's Cove (Also known as Haisla) With additional submissions on June 27/1987. Alleged that DIA failed to protect its interests at the time Date Received by SCB: 2001/04/11 of the McKenna-McBride Commission by providing Current Status: DOJ disadvantageous testimony before Commission which resulted in Registry File Number: BC676-C04+9 an unaccepted application for additional reserve lands; and failure by Canada to protect settlement lands from unlawful encroachment.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 62 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Kitamaat (BAND-676)

Crab River I.R. No. 4 - Indian Settlement (Also known as Haisla) Re-submission of C-05. The FN alleged that DIA failed to protect the boundaries of Crab River I.R. No. 4 as Date Received by SCB: 1998/01/15 confirmed by Order in Council 1625, which resulted in an improper Current Status: DOJ survey of the reserve and an illegal alienation of a portion thereof, Registry File Number: BC676-C05+6 and to represent FN interests to the McKenna-McBride Commission.

John Bolton (Also known as Haisla) Alleged that DIA failed to protect its interests in obtaining additional lands through pre-emptions in the Date Received by SCB: 1984/03/27 face of discriminatory provincial legislation in 1916. Current Status: NLO Registry File Number: BC676-C03

Kitlope Pole (Also known as Haisla) Alleges that the Kitlope Pole was taken from the Nation without consent or compensation. Date Received by SCB: 2002/06/10 Current Status: DOJ Registry File Number: BC676-C10

Klak-ak-siouks I.R. No. 9 (Also known as Haisla) Amended claim received in 1985. Alleged failure of Canada to implement the terms of a 1952 surrender of Date Received by SCB: 1984/03/27 Klak-ak-siouks I.R. No. 9 in 1952. Current Status: SET Registry File Number: BC676-C01

Lots 305 & 306 (Also known as Haisla) Alleged failure by Canada to ensure that Lots 305 and 306 were obtained for the use and benefit of the Date Received by SCB: 2000/01/20 Haisla when they were available for purchase in 1948. Current Status: DOJ Registry File Number: BC676-C08

Survey of Jugwees IR# 5 Alleged improper survey of Jugwees IR# 5. Date Received by SCB: 2005/12/16 Current Status: DOJ Registry File Number: BC676-12

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 63 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Kitasoo (BAND-540)

Logging on Canoona IR 2 in 1970's Inadequate terms of compensation for timber. Date Received by SCB: 2004/06/30 Current Status: DOJ Registry File Number: BC540-C5

McKenna-McBride Applications Alleged government of Canada failed to adequateley protect the FN's interests before the BC Royal Commission on Indian Affairs Date Received by SCB: 1995/08/31 (the McKenna-McBride Commission). Current Status: DOJ Registry File Number: BC540-C1

O'Reilly Reserve Allotments The FN asserts that Canada breached its duty in that the Commissioner's reserve allotments in 1882 were inadequate and Date Received by SCB: 2001/02/16 did not meet the band's requirements. Current Status: DOJ Registry File Number: BC540-C3

Reserve Surveys Alleged that new reserves allotted by the McKenna-McBride Commission were subsequently mis-surveyed. Date Received by SCB: 2001/04/02 Current Status: DOJ Registry File Number: BC540-C4

Water Supply IR #1 Alleged unlawful lease of land and failure to provide water supply to Kitasoo I.R. No. 1 as a condition of lease. Date Received by SCB: 1998/10/27 Current Status: DOJ Registry File Number: BC540-C2

Kitselas (BAND-680)

Grand Trunk Pacific Railway Alleged that lands taken through the FN's Kitselas, Chimdemash and Kshish IRs for the Grand Trunk Pacific Railway were Date Received by SCB: 1996/06/04 improperly taken, and the FN did not receive adequate Current Status: ISCC compensation for these lands. Registry File Number: BC680-C03

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 64 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Kitselas (BAND-680)

Highway Alleged inadequate compensation and other issues around the expropriation of highway rights-of-way through nine of its reserves Date Received by SCB: 1996/03/07 (Kitselas IR#1, Chimdimash IR# 2 and 2A, Ikshenigwolk IR# 3, Current Status: ACT Kshish IRs 4 and 4A, Zaimoetz IR# 5, Kulspai IR# 6 and Ketoneda Registry File Number: BC680-C02 IR# 7).

Kitselas IR No. 1 Reserve Creation Alleges 10 acres adjacent to Kitselas IR No. 1 should have been set aside as reserve. Date Received by SCB: 2000/04/13 Current Status: DOJ Registry File Number: BC680-C09

O'Reilly Reduction of Kitselas I. R. 1 Alleged unlawful reduction of Kitselas I. R. 1 by 640 acres, in exchange for 490 acres as Kshish I. R. 4A in 1893. Date Received by SCB: 2000/04/13 Current Status: DOJ Registry File Number: BC680-C04

Reserve Reduction Resulting from Surveys Alleged discrepancies between the allotments of Kitselas Reserves and the subsequent surveys of these reserves in 1901. Date Received by SCB: 2000/04/13 Current Status: DOJ Registry File Number: BC680-C05

Royal Comm.'s Disall. App. for Add. Land Alleged failure to uphold band applications for additional reserve lands in light of Royal Commission's disallowance of these Date Received by SCB: 2000/04/13 applications. Current Status: DOJ Registry File Number: BC680-C06

Timber Alleged inadequate compensation and other issues around the harvesting of timber through several of the FN's reserves (Kitselas, Date Received by SCB: 1996/02/23 Chimdimash and Zaimoetz). Current Status: INACT Registry File Number: BC680-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 65 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Kitsumkalum (BAND-681)

Claim 1: I.R. No 1 - Zimagord I.R. No. 3 Alleged compensation for Yellowhead Highway right-of-way across Kitsumkalum I.R. No. 1. Date Received by SCB: 1972/05/11 Current Status: SET Registry File Number: BC681-C01

Claim 2: I.R. No 1 - Zimagord I.R. No. 3 Alleged that the GTP Railway built through Kitsumkalum I.R. No. 1 and Zimagord I.R. No. 3 in 1910 was done without proper authority Date Received by SCB: 1984/10/04 and without adequate compensation. Current Status: SET Registry File Number: BC681-C02

Claim 3: I.R. No 1 - Zimagord I.R. No. 3 This claim is a re-presentation of the 1972 claim & amendment of the March 30/1984 claim. Alleged that the Yellowhead Highway Date Received by SCB: 1984/12/07 built through Kitsumkalum I.R. No. 1 and Zimagord I.R. No. 3 in Current Status: SET 1942 as a war measure was done without proper authority and Registry File Number: BC681-C03 without adequate compensation. The new claim included land not compensated in 1972 and also challenges the 1974 settlement.

Klahoose First Nation (BAND-553)

Cortes Island Burial Site Alleged that this site is a traditional burial site for the Klahoose FN, and should have been protected from alienation to non-natives. Date Received by SCB: 1995/08/18 Current Status: NLO Registry File Number: BC553-C1

Klahoose IR# 1 Logging 1945 to 1950 Alleged failure by Canada of statutory duty, fidiciary duty and duty of care in relation to the sale of timber on Klahoose IR# 1 in the Date Received by SCB: 2006/05/23 years 1945 to 1950. Current Status: RES Registry File Number: BC553-C2

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 66 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Klahoose First Nation (BAND-553)

Tork IR 7 Road Right of Way Alleges loss of 1.73 acres of IR 7 without compensation and wrongful payment by FN for construction of road. Date Received by SCB: 2007/07/30 Current Status: RES Registry File Number: BC553-C3

Kluskus (BAND-721)

Upper Kluskus Lake I.R. No. 9 Alleged that IR #9 (Upper Kluskus Lake) should have been confirmed at 160 acres, rather than 20, pursuant to the minute of Date Received by SCB: 1995/04/12 decision of the McKenna-McBride Commision. Current Status: NLO Registry File Number: BC721-C01

Kwakiutl (BAND-626)

Deer Island Alleged that Deer Island should have been reserved pursuant to Douglas Treaty. Date Received by SCB: 1992/08/27 Current Status: SET Registry File Number: BC626-C2

Tsulquate Amalgamation of FNs to Tsulquate Reserve. Compensation is being requested by the FN for loss of the Tsulquate reserve. Date Received by SCB: 1989/10/31 Current Status: SET Registry File Number: BC626-C1

Kwiakah (BAND-628)

I.R. #5 - F & R Logging and Right-of-Way Alleged improper timber lease, inadequate compensation, and illegal logging road right of way on Matsayno I.R. 5 by a logging Date Received by SCB: 2000/03/15 company in the 1940's. Current Status: DOJ Registry File Number: BC628-C1

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 67 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Kwiakah (BAND-628)

I.R. #5 - Fox Logging and Right-of-Way Alleged improper timber lease, inadequate compensation, and illegal logging road right of way on Matsayno I. R. 5 by a logging Date Received by SCB: 2000/04/13 company in the 1920's. Current Status: DOJ Registry File Number: BC628-C2

IR# 6 - Rolandi Bros. Logging Alleges breach of lawful obligation by Canada in it negotiation and administration of privileges granted to a logging company, in or Date Received by SCB: 2006/03/20 about 1964 and 1970, for the use and logging of Saaiyouck IR# 6. Current Status: RES Registry File Number: BC628-C04

Reserve Allotment Omission by O'Reilly Alleged omission to re-allot 2 reserves by the Reserve Commissioner in 1880. Date Received by SCB: 2004/09/20 Current Status: DOJ Registry File Number: BC628-C3

Lake Babine Nation (BAND-607)

Donald's Landing Alleged failure to reserve lands sought by the First Nation. Date Received by SCB: 1998/08/21 Current Status: DOJ Registry File Number: BC607-C02

Tachek I.R. 25 Alleged lands approved as a new reserve buy the McKenna-McBride Commission were alienated as the result of Date Received by SCB: 1997/06/27 improper survey. Current Status: DOJ Registry File Number: BC607-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 68 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Lake Cowichan First Nation (BAND-643)

Alienation of IR # 1 Alleged that a reserve of some 800 acres was originally set aside for it, and since then has on several occasions been unlawfully Date Received by SCB: 1996/04/17 reduced in size. Current Status: DOJ Registry File Number: BC643-C01

Aquot Reserve Alleged unlawful alienation of the entire Aquot Reserve in 1899. Date Received by SCB: 2000/01/13 Current Status: DOJ Registry File Number: BC643-C02

Lax-kw'alaams (BAND-674)

BC Cut-Off Lands (SPLIT #06) (Band previous name: Port Simpson) In 1916, 22 bands lost land Date Received by SCB: from 33 separate reserves without proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: ACT Registry File Number: BC674-C01

Housing (Band previous name: Port Simpson) Alleged DIA failure to secure repayment of monies paid from FN funds. Date Received by SCB: 1985/03/25 Current Status: AR Registry File Number: BC674-C03

Khyex I.R. No. 8 (Band previous name: Port Simpson) Alleged that Yellowhead Highway, built through Khyes I.R. No. 8 in 1942 as a war measure, Date Received by SCB: 1985/09/18 was done without adequate compensation. Current Status: FCL Registry File Number: BC674-C04

Tsimpsean I.R. No. 2 (Band previous name: Port Simpson) Invalid surrender of the Tsimpsean Indian Reserve No. 2 held jointly with the Metlakatla Date Received by SCB: 1980/01/03 FN, by Indian Reserve Commissioner in 1888. Current Status: SET Registry File Number: BC674-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 69 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Leq' a: mel First Nation (BAND-579)

CPR R/W on IRs 8 & 11 (Band previous name: Lakahahmen). Band alleges that the taking of 4 parcels of land from the FN's Holachten IR # 8 and Date Received by SCB: 2001/01/25 Lakahamen IR # 11 for the CPR was done improperly. Current Status: DOJ Registry File Number: BC579-C01

Lougheed Highway ROW on Holachten IR 8 (Band previous name: Lakahahmen). Improper taking of reserve land for highway right of way on Holachten IR 8 and inadequate Date Received by SCB: 2003/08/13 compensation. Current Status: DOJ Registry File Number: BC579-C03

North Nicomen Road (Band previous name: Lakahahmen). Improper taking of reserve land for road right of way without compensation. Date Received by SCB: 2002/02/01 Current Status: DOJ Registry File Number: BC579-C02

Lheidli T'enneh (BAND-611)

Fort George I.R. No. 1 Alleged unlawful alienation of Fort George I.R. No. 1 to the G.T.P. Railway in 1913 and inadequate compensation. Date Received by SCB: 1992/04/30 Current Status: ISCC Registry File Number: BC611-C01

Little Shuswap Lake (BAND-689)

CPR Right of Way on Chum IR 2 The FN alleges breaches of Canada's statutory duty, fiduciary duty and duty of care to the Little Shuswap Indian Band through 1) the Date Received by SCB: 2007/05/29 unlawful taking of 32.92 acres of reserve land for CPR right of way Current Status: RES and station grounds, 2) improper lease of land for a gravel crushing Registry File Number: BC689-C08 plant, 3) failure to require a surrender for the railway taking, and 4) failure to secure adequate compensation.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 70 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Little Shuswap Lake (BAND-689)

Hwy Expropriation IR's 1 - 2 - 4 Alleged unlawful taking of reserve land for highway purposes. Date Received by SCB: 1998/06/19 Current Status: DOJ Registry File Number: BC689-C02

I. R. No. 5 Highway Expropriation Alleged improper taking and compensation regarding provincial highway across North Bay I.R. No. 5. Date Received by SCB: 1999/03/12 Current Status: DOJ Registry File Number: BC689-C03

North Bay IR #5 Alleges that an improper survey led to a failure to include a large portion of land which had been allotted by the Joint Reserve Date Received by SCB: 2004/04/21 Commission in 1877. Current Status: DOJ Registry File Number: BC689-C05

North Bay IR #5 CPR The Band submits that Canada owes an outstanding lawful obligation to compensate the Band for the disposition of its reserve Date Received by SCB: 2005/01/19 land to CPR. Current Status: DOJ Registry File Number: BC689-C07

Salmon Arm Reserves - Subdivision Alleged unlawful subdivision of two reserves established by the Joint Indian Reserve Commission to be held in common by the Date Received by SCB: 2000/04/18 Little Shuswap Band and two other bands. Current Status: DOJ Registry File Number: BC689-C04

Scotch Creek IR 4 Survey Scotch Creek IR 4 survey error. Date Received by SCB: 2004/07/07 Current Status: DOJ Registry File Number: BC689-C06

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 71 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Lower Kootenay (BAND-606)

Land Reclamation Revised in June, 1985, alleged Canada breached its fiduciary obligation concerning a 50 year lease of 1,800 acres of reserve Date Received by SCB: 1984/07/27 land in 1934. Current Status: FCL Registry File Number: BC606-C02

Lower Kootenay I.R. No. 1A Alleged lands promised to it in 1908 were never set aside for its use and benefit. Date Received by SCB: 1984/01/27 Current Status: SET Registry File Number: BC606-C01

Lower Nicola (BAND-695)

Graveyard and Setttlements Claim alleges that several graveyards and settlements were not set aside as indian reserves. Date Received by SCB: 2001/11/23 Current Status: DOJ Registry File Number: BC695-C01

Lower Similkameen (BAND-598)

Alienation of I.R. No. 13 Alleges 2600 acres was allotted by the BC Royal Commission as a grazing reserve, and was thereafter wrongfully alienated. Date Received by SCB: 2001/08/24 Current Status: DOJ Registry File Number: BC598-C04

Alienation of IR # 1 Alleged that a reserve of some 1,350 acres was alloted to the FN by Reserve Commissioner, and parts of this reserve were illegally Date Received by SCB: 1996/08/08 sold to third parties, leaving a total of only 381 acres. This reserve, Current Status: NLO too, was later cancelled. Registry File Number: BC598-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 72 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Lower Similkameen (BAND-598)

Burlington Railway Alleged that the compensation it received for the expropriation of reserve lands for a railway in 1905 was inadequate. Date Received by SCB: 1995/12/21 Current Status: ISCC Registry File Number: BC598-C01

River Erosion of Six Reserves Alleged failure to protect six reserves from loss of land due to river erosion. Date Received by SCB: 2000/04/13 Current Status: DOJ Registry File Number: BC598-C03

Lytton (BAND-705)

Alienation of 35.82 Acres - IR 27B Alleged unlawful alienation of reserve lands in 1911 and by the actions of the McKenna-McBride Commission in 1916. Date Received by SCB: 2001/10/31 Current Status: DOJ Registry File Number: BC705-C6

Alienation of Maka IR 8 Land The FN alleges unlawful alienation of Maka IR 8 land. Date Received by SCB: 2002/11/29 Current Status: LOS Registry File Number: BC705-C8

CNR right-of-way across Lytton IR No.26A Alleges Federal Government breached its fiduciary obligations to the FN by failing to confirm IR No. 26A as a reserve in a timely Date Received by SCB: 1998/05/13 fashion and by failing to protect the FN's interests in relation to the Current Status: DOJ development of the CNPR right-of-way. Allegations also include Registry File Number: BC705-C3 excessive width issues.

CPR right-of-way Lytton IR Nos. 16 & 18 Alleged unlawful right-of-way and inadequate compensation. Date Received by SCB: 1998/05/15 Current Status: DOJ Registry File Number: BC705-C4

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 73 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Lytton (BAND-705)

Expropriation from IRs 19- 24- 25- 26 Alleges insufficient compensation for a railway taking. Date Received by SCB: 2000/12/04 Current Status: DOJ Registry File Number: BC705-C5

Hospital Lands Claim Alleged failure on the part of Canada to protect lands intended to be reserved for the Lytton FN from alienation by third parties. Date Received by SCB: 2001/10/31 Current Status: DOJ Registry File Number: BC705-C7

Nohomeen Alleged Indian settlement at Nohomeen should have been reserved. Date Received by SCB: 1993/07/27 Current Status: BA Registry File Number: BC705-C2

Papyum Alleged Indian settlement at Papyum should have been reserved. Date Received by SCB: 1993/07/27 Current Status: BA Registry File Number: BC705-C1

Pipeline ROW on IRs 16A - 17 & 18 Alleged unlawful water pipeline rights of way on Two Mile Creek IR 16A, Klahkamich IR 17 and Klickkumcheen IR18. Date Received by SCB: 2004/03/05 Current Status: DOJ Registry File Number: BC705-C9

Malahat First Nation (BAND-647)

Malahat I.R. No. 1 Alleged unlawful expropriation and inadequate compensation regarding 18 acre Malahat Highway right-of-way across Malahat Date Received by SCB: 1993/06/23 I.R. No. 11 in 1911. Current Status: DOJ Registry File Number: BC647-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 74 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Mamalilikulla-Qwe'Qwa'Sot'Em (BAND-629)

1886 Reserve Allotments The Band alleges, as a result of the Indian Reserve Commissioner's breach of duty of care, the band lost the Date Received by SCB: 1999/02/10 opportunity to acquire as reserves, additional lands upon which Current Status: DOJ villages, settlements, burial places, and hunting and fishing places Registry File Number: BC629-C03 were located.

Additional Lands Application Alleged DIA failed to represent its interests in applying for additional lands to the McKenna-McBride Commission. Date Received by SCB: 1993/12/08 Current Status: AR Registry File Number: BC629-C01

Compton Island IR 6 Timber in 1936-1939 Management of timber lease by Canada on Compton Island IR 6 in the 1930s. Inadequate compensation for timber taken from Date Received by SCB: 2001/04/02 Compton Island I.R. No. 6 in 1936-1939. Current Status: DOJ Registry File Number: BC629-C06

Compton Island IR 6 Timber in 1950-1954 Management of timber lease by Canada on Compton Island I.R. No. 6 between 1950-1954. Date Received by SCB: 2003/11/06 Current Status: DOJ Registry File Number: BC629-C07

Dead Point Reserve Alleged that Canada allowed a trespass to occurr on the Dead Point Indian Reserve and that the surrendered of the reserve in Date Received by SCB: 1995/12/22 1934 was unlawful. The Band also claimed no compensation was Current Status: SET ever paid to the band for the loss of the Dead point Indian Reserve. Registry File Number: BC629-C02

Logging Donkey and Timber The Band alleges Canada breached its fiduciary obligation to the band by; approving and implementing a logging operation on I.R. Date Received by SCB: 2000/02/23 No. 1 without obtaining a proper surrender, by failing to obtain an Current Status: DOJ OIC for the purchase of a logging donkey, and by failing to credit Registry File Number: BC629-C04 the proceeds from the sale of timber to the band.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 75 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Matsqui (BAND-565)

CPR Expropriation IR No. 1 and 2 Alleged improper taking of Matsqui I.R.'s 1 and 2 for a railway and transmission line right-of-way. Date Received by SCB: 1999/03/18 Current Status: BA Registry File Number: BC565-C01

McLeod Lake (BAND-618)

50 acres Alleged approximately 50 acres were omitted from two reserves in the 1920s due to survey errors. Date Received by SCB: 1986/12/15 Current Status: SET Registry File Number: BC618-C01

Severalty - B8265M8-14-10 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/18 Current Status: SET Registry File Number: 8265M8-14-10

Severalty - B8265M8-14-10 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/18 Current Status: SET Registry File Number: 8265M8-14-10

Severalty - B8265M8-14-11 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/30 Current Status: ACT Registry File Number: 8265M8-14-11

Severalty - B8265M8-14-13 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/30 Current Status: LIT Registry File Number: 8265M8-14-13

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 76 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

McLeod Lake (BAND-618)

Severalty - B8265M8-14-14 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/30 Current Status: SET Registry File Number: 8265M8-14-14

Severalty - B8265M8-14-15 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/30 Current Status: SET Registry File Number: 8265M8-14-15

Severalty - B8265M8-14-16 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/30 Current Status: LIT Registry File Number: 8265M8-14-16

Severalty - B8265M8-14-18 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/29 Current Status: SET Registry File Number: 8265M8-14-18

Severalty - B8265M8-14-18 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/29 Current Status: SET Registry File Number: 8265M8-14-18

Severalty - B8265M8-14-18 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/29 Current Status: SET Registry File Number: 8265M8-14-18

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 77 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

McLeod Lake (BAND-618)

Severalty - B8265M8-14-18 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/29 Current Status: SET Registry File Number: 8265M8-14-18

Severalty - B8265M8-14-2 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/28 Current Status: INACT Registry File Number: 8265M8-14-2

Severalty - B8265M8-14-28 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 2006/04/24 Current Status: ACT Registry File Number: 8265M8-14-28

Severalty - B8265M8-14-3 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/28 Current Status: SET Registry File Number: 8265M8-14-3

Severalty - B8265M8-14-6 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/29 Current Status: SET Registry File Number: 8265M8-14-6

Severalty - B8265M8-14-7 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/30 Current Status: ACT Registry File Number: 8265M8-14-7

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 78 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

McLeod Lake (BAND-618)

Severalty - B8265M8-14-9 Band member enacted severalty land option pursuant to MLIB's adhesion to Treaty 8 in 1999/2000. Date Received by SCB: 1999/01/30 Current Status: SET Registry File Number: 8265M8-14-9

TLE For formal adherence to treaty and treaty benefits including TLE. Date Received by SCB: 1993/03/24 Current Status: SET Registry File Number: BC618-C1

Metlakatla (BAND-673)

1906 Surrender Alleged Government of Canada breached its fiduciary duty to the FN in the 1906 surrender of the southern half of IR#2 for sale to the Date Received by SCB: 1996/02/22 GTP Railway. Current Status: NLO Registry File Number: BC673-C3

BC Cut-Off Lands (SPLIT #07) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: ACT Registry File Number: BC673-C1

Showahtlans I.R. No. 4 Alleged parts of Showahtlans I.R. No. 4 were improperly alienated in 1913. Date Received by SCB: 1996/01/23 Current Status: DOJ Registry File Number: BC673-C2

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 79 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Moricetown (BAND-530)

Moricetown IR 2 - Grand Trunk Pacific CNR Alleges Canada breached fiduciary duty when it granted a R/W and status ground to GTP in 1909, as well, alleges breach of fiduciary Date Received by SCB: 2005/06/07 duty when it allowed a pipeline easement on IR #2 in 1921. Current Status: DOJ Registry File Number: BC530-C1

Mount Currie (BAND-557)

I. R. No. 6 Timber Lease Alleged failure of the Federal Crown to meet its lawful obligation to the Band in the course of renewal of a timber lease on I.R. No. 6 Date Received by SCB: 2000/07/05 beginning in 1924, and a reinstatement of that lease in 1933. Current Status: DOJ Registry File Number: BC557-C01

Lokla IR No. 4 ROW Alleges that the granting of rights of way for railway and power line purposes over Lokla IR No. 4 was in breach of fiduciary and Date Received by SCB: 2004/06/21 statutory duties, as well as the duty of care owed to the Mount Current Status: DOJ Currie FN. Registry File Number: BC557-C04

Long Point Blue Cross Graveyards FN alleges that graveyard IR 9 was surveyed in an incorrect location. Date Received by SCB: 2003/01/31 Current Status: DOJ Registry File Number: BC557-C02

Nesuch IR# 3 Accretions Alleged failure to protect accreted land from alienation and to protect reserve land from flooding. Date Received by SCB: 2006/02/23 Current Status: DOJ Registry File Number: BC557-C05

Power Line Easements on IRs 1-6-7 & 10 FN alleges improper taking of power line easements; failure to inform the Band; and inadequate compensation. Date Received by SCB: 2007/05/07 Current Status: RES Registry File Number: BC557-C06

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 80 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Mount Currie (BAND-557)

Road on Mount Currie IR 10 Construction of a road on IR 10 without authorization. Date Received by SCB: 2003/10/06 Current Status: DOJ Registry File Number: BC557-C03

Mowachaht/Muchalaht (BAND-630)

Yuquot I.R. No. 1 FN alleges that the surveyor erred in surveying the FN's Reserve No. 1. Date Received by SCB: 2001/12/07 Current Status: DOJ Registry File Number: BC630-C01

Musqueam (BAND-550)

Capilano I.R. #5 -Bouillon Lands Alleged unextinguished rights to the Capilano I.R. #5, allotted to the Squamish FN, and should share in any settlement. Date Received by SCB: 1996/09/04 Current Status: FCL Registry File Number: BC550-C01

Nadleh Whuten (BAND-612)

GTPR Hospital on Nautley I.R. 1 The claim asserts an unauthorized trespass by the Grand Trunk Pacific Railway on I.R. 1 in 1913-1914. Date Received by SCB: 2002/03/11 Current Status: DOJ Registry File Number: BC612-C04

Lejac Hay Fields I.R. No. 4 Alleged unlawful loss of income from hay fields on Seaspunket I.R. No. 5 between 1958 and 1969. Date Received by SCB: 1993/05/10 Current Status: SET Registry File Number: BC612-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 81 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Nadleh Whuten (BAND-612)

Lejac Residential School Alleged unlawful taking and use of reserve lands for the Lejac Residential School, with no compensation to the FN. Date Received by SCB: 1993/05/01 Current Status: ISCC Registry File Number: BC612-C03

Seaspunket I.R. No. 4 Concerned terms and conditions of lease. Date Received by SCB: 1992/10/01 Current Status: SET Registry File Number: BC612-C01

Nak'azdli (BAND-614)

1911 Barricade Agre. & Battleship Island Alleged breach of lawful obligation by Canada by failing to set aside Battleship Island as a fishing station reserve under the terms Date Received by SCB: 2000/12/29 of the Fort St. James Barricade Agreement by 1911. Current Status: BA Registry File Number: BC614-C08

1911 Barricade Agre. & Pinchi Lake IR 10 Alleged breach of lawful obligation by Canada by failing to set aside Pinchi Lake I.R. 10, currently held by the Tl'azt'en First Date Received by SCB: 2000/12/29 Nation, to the Nak'azdli FN. Current Status: BA Registry File Number: BC614-C09

Aht-len-jees I.R. No. 5 Alleged alienation of Aht-len-jees I.R. No. 5 in 1923. Date Received by SCB: 1993/05/18 Current Status: FCL Registry File Number: BC614-C02

Camp 24 Alleged breach of lawful obligation by Canada as the result of the alienation of a village site, which in 1968 was a special reserve. Date Received by SCB: 2000/12/29 Current Status: BA Registry File Number: BC614-C07

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 82 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Nak'azdli (BAND-614)

Carp Lake Alleged that Indian Agent made a factual error in denying the Band's claim for a fishing station. Date Received by SCB: 1998/08/24 Current Status: DOJ Registry File Number: BC614-C04

Church Site on Necoscie I.R. 1 Alleged breach of lawful obligation by Canada for failing to prevent the alienation of Necoscie I.R. 1 land as a church site. Date Received by SCB: 2000/12/29 Current Status: BA Registry File Number: BC614-C06

Honeymoon Island- I.R. No.10 Alleges Canada breached its duty to the band by failing to set aside Honeymoon Island as Stuart Lake I.R. No. 10 as set out in the Date Received by SCB: 1991/10/31 McKenna-McBride Commission's final report. Current Status: SET Registry File Number: BC614-C01

Mission Lands Alleged Mission Lands (District Lot 1266) are the traditional village site of the Nak'Azdli FN and should not have been alienated to a Date Received by SCB: 2000/12/29 third party. FN also alleges that Canada has a fiduciary obligation Current Status: DOJ to provide for the education and well-being of the FN's children. Registry File Number: BC614-C03

RCLA - Tchentlo Lake IR No. 11 Alleged unlawful alienation of Tchentlo Lake I.R. No. 11 and breach of Barricade "Treaty". Date Received by SCB: 1998/11/03 Current Status: DOJ Registry File Number: BC614-C05

Sowchea IR #3 Alleged omission of 25 acres following the survey of Sowchea IR 3. Date Received by SCB: 2005/09/01 Current Status: BA Registry File Number: BC614-C10

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 83 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Namgis First Nation (BAND-631)

Cheslakee I.R. No. 3 Alleged unlawful expropriation of 12.38 acres of Cheslakee I.R. No. 3 for highway purposes. Date Received by SCB: 1987/09/10 Current Status: SET Registry File Number: BC631-C02

Cormorant Island Alleged negligence by Canada in protecting Indian Reserve Commissioner's allotment of reserve land on Cormorant Island in Date Received by SCB: 1987/09/03 1882. Current Status: FCL Registry File Number: BC631-C04

I.R. No. 1 Road Expropriation Alleged one half acre of Namgis I.R. #1 was unlawfully taken for road purposes in 1934 and that the FN was never compensated for Date Received by SCB: 1998/01/22 the loss of this land. Current Status: DOJ Registry File Number: BC631-C05

McKenna-McBride Application Alleged DIA failed to represent its interests in applying for additional lands to the McKenna-McBride Commission. Date Received by SCB: 1987/09/03 Current Status: FCL Registry File Number: BC631-C03

Nimpkish IR #2 - Cemetery Site Road Right of Way Alleged unlawful expropriatioon of .25 acre of Nimpkish I.R. No. 2 (cemetery) for road right-of-way. Date Received by SCB: 1987/09/10 Current Status: SET Registry File Number: BC631-C01

Nanoose First Nation (BAND-649)

E & N Railway Right of Way Alleges insufficient compensation for a railway taking. Date Received by SCB: 2000/12/29 Current Status: BA Registry File Number: BC649-C03

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 84 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Nanoose First Nation (BAND-649)

Nanoose I.R. No. 1 Alleged unlawful alienation of a portion of Nanoose I.R. No. 1 in 1933 and breach of surrender provisions. Date Received by SCB: 1987/11/16 Current Status: SET Registry File Number: BC649-C01

Pre-Confederation Reserve Alleges a reserve was alloted to the FN in the colonial era (1863) and later unlawfully alienated. Date Received by SCB: 1999/08/05 Current Status: BA Registry File Number: BC649-C02

Nazko (BAND-720)

BC Cut-Off Lands (SPLIT #08) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC720-C1

Fishpot Lake Reserve Allotment Alleges breach of fiduciary duty and duty of care in that Canada used the Nazko FN's interest in the Fishpot reserve as a Date Received by SCB: 2007/06/22 negotiating tool with the province, resulting in a reduction of the Current Status: RES reserve by Ditchburn-Clark. Registry File Number: BC720-C02

Nee-Tahi-Buhn (BAND-726)

Wrongful Amalgamation Alleged it was wrongfully amalgamated with the Skin Tyee Maxim Lake, and Decker Lake FNs in 1960, and seeks compensation for Date Received by SCB: 1995/03/03 loss of infrastructure and for other losses. Current Status: DOJ Registry File Number: BC726-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 85 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Nicomen (BAND-696)

Illegal Pre-emption Alleged the land at the mouth of the Nicomen River was part of the traditional settlement of the Nicomen people and was unlawfully Date Received by SCB: 1996/12/31 alienated to third parties. Current Status: BA Registry File Number: BC696-C04

Lands taken for Public Purposes Failure to provide replacement reserve land for lands taken from Indian reserves for public rights-of-way. Date Received by SCB: 2005/12/15 Current Status: RES Registry File Number: BC696-C06

Nicomen IR No 1 CPR Right-of-way Alleged excessive right-of-way taken for CPR and inadequate compensation with respect to Nicomen I.R. No. 1. Date Received by SCB: 1990/12/10 Current Status: DOJ Registry File Number: BC696-C01

Nicomen IR Nos 4-5-6-7-8-14 and 15 Alleged excessive right-of-way taken and inadequate compensation paid for CNR rights-of-way through 7 reserves. Date Received by SCB: 1992/09/29 Current Status: DOJ Registry File Number: BC696-C02

Reserved Fishery The FN alleges that Canada failed to protect the FN's access to a fishery that runs along both sides of the through Date Received by SCB: 2006/12/15 IR #'s 7 and 8 and was reserved in 1878 by Indian Reserve Current Status: RES Commissioner. Registry File Number: BC696-C07

Sackum IR No 3 and Gulada IR No 3A Alleged excessive width taken and inadequate compensation paid for CPR right-of-way taken through Sackum I.R. No. 3 and Gulada Date Received by SCB: 1992/12/21 I.R. No. 3A Current Status: DOJ Registry File Number: BC696-C03

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 86 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Nicomen (BAND-696)

Water Rights & Supply on Nicomen IR No 1 Alleges a failure to adequately allot, protect and preserve water rights sufficient for the purposes for which the Reserve was set Date Received by SCB: 2000/06/09 aside. Current Status: DOJ Registry File Number: BC696-C05

Nisga'a Village of Gingolx (BAND-671)

BC Cut-Off Lands (SPLIT #09) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC671-C01

Nisga'a Village of Laxgalt'sap (BAND-678)

Dogfish Bay IR 42 & Pearse Island IR 43 (SPLIT #01) - (Band also known as: Laxga'lts'ap FN) Alleged failure to record Dogfish Bay I.R.'s 42 and 43 as jointly owned by the Lakalsap Band and the Date Received by SCB: Kincolith Band, resulting in the loss of timber revenues to the Lakalzap Band. Current Status: NLO Registry File Number: BC678-C01

Dogfish Bay IR 42 & Pearse Island IR 43 (SPLIT #02) - (Band also known as: Laxga'lts'ap FN) Alleged failure to record Pearse Island I.R.'s 42 and 43 as jointly owned by the Lakalsap Band and the Date Received by SCB: Kincolith Band, resulting in the loss of timber revenues to the Lakalzap Band. Current Status: SET Registry File Number: BC678-C01

Nisga'a Village of New Aiyansh (BAND-677)

19 Reserves (Previous Band name: Gitlakdamix FN) Canada's failure to set aside 19 (5 acre) reserves allotted to the FN in 1916, resulted in Date Received by SCB: 1998/02/20 the FN being deprived of the use, benefit and enjoyment of the Current Status: SET reserves for over 80 years. Registry File Number: BC677-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 87 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Nisga'a Village of New Aiyansh (BAND-677)

Trespass IR No. 1 (Previous Band name: Gitlakdamix FN) Band alleges Canada breached its fiduciary duty by failing to keep an accurate record of Date Received by SCB: 1998/10/28 the boundaries of I.R. No. 1, which in turn, led to a conflict with the Current Status: NLO Province's Ministry of forestry, trespass charges, and a financial Registry File Number: BC677-C01 loss to the band.

N'Quatqua (BAND-556)

District Lot 100 (Also known as Anderson Lake FN and In-SHUCK-ch Council). The FN alleged breach of duty related to alienation of the Date Received by SCB: 1991/01/18 settlement lands in the 1860s (District Lot 100). Current Status: FCL Registry File Number: BC556-C1

Graveyard Claim separated from District Lot 100 claim. Alleged that the graveyard allotted by O'Reilly was unlawfully alienated. Date Received by SCB: 1991/01/18 Current Status: ACT Registry File Number: BC556-C02

Okanagan (BAND-616)

Alienation of Arrow Lake Reserve Alleged failure by Canada to complete the amalgamation of the Arrow Lake and Lake Indian bands resulting in the Date Received by SCB: 2000/12/07 reversion of the Arrow Lake reserve to the province of British Current Status: DOJ Columbia. Registry File Number: BC616-C4

BC Cut-Off Lands (SPLIT #10) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC616-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 88 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Okanagan (BAND-616)

Colonial Reserve - Okanagan IR 1 Alleged unlawful alienation of Okanagan IR 1 land in 1865. Date Received by SCB: 2004/01/28 Current Status: DOJ Registry File Number: BC616-C6

Commonage This claim involves the alienation of the North Okanagan Commonage, which the Joint Indian Reserve Commission allotted Date Received by SCB: 1989/04/25 for the joint use of the Okanagan Indians and non-Indian settlers. Current Status: INACT Registry File Number: BC616-C3

Duck Lake IR #7 - Highway 97 FN Alleges that lands taken for the establishment of Highway 97 was illegal; that Canada had a duty of care to ensure relevant Date Received by SCB: 2005/05/27 sections of the Indian Act were followed; that adequate Current Status: BA compensation was paid and a fiduciary duty to safeguard the Registry File Number: BC616-C07 Band's interest in IR #7.

Okanagan I.R. No. 1 Boundary Alleged 1,540 hectares of Okanagan I.R. No. 1, as allotted by the Joint Reserve Commission in 1877, were illegally omitted from the Date Received by SCB: 1985/09/18 reserve in 1880. Current Status: SET Registry File Number: BC616-C2

Priest's Valley IR 6 survey error and road right of way Alleges failure to prevent trespass of SW corner of IR 6 in 1911 and failure to regain possession of it in 1922, 1934, 1967 and 1984. Date Received by SCB: 2007/08/16 Alleges illegal use and occupation of reserve lands pursuant to BC Current Status: SUB/REV OiC 1036 in the establishment and improvements to Lakeshore Registry File Number: BC616-C8 Road.

West Side Road Province of British Columbia illegally acquired land on Okanagan IR for the Westside Road. Date Received by SCB: 2001/07/25 Current Status: DOJ Registry File Number: BC616-C5

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 89 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

OKANAGAN NATION ALLIANCE (TC-1016)

Spotted Lake Alleged that Canada has a lawful obligation to the Okanagan - Lower Similkameen (BAND-598) Nation to contribute money to the purchase of so that - Okanagan (BAND-616) it can be protected as a reserve land within the meaning of the - Osoyoos (BAND-596) Indian Act. - (BAND-597) - Upper Nicola (BAND-697) - Upper Similkameen (BAND-599) - Westbank First Nation (BAND-601) Date Received by SCB: 2000/10/31 Current Status: AR Registry File Number: BC2153-C1

Oregon Jack Creek (BAND-692)

CNR R/W on Oregon Jack Creek IR 5 The FN alleges unlawful expropriation and inadequate compensation for CNR R/W on IR 5. Date Received by SCB: 2002/11/29 Current Status: DOJ Registry File Number: BC692-C05

IRs 3 & 5 - Water Rights Alleged water rights on Oregon Jack Creek IRs Number 3 and 5 were unlawfully alienated. Date Received by SCB: 1996/12/31 Current Status: DOJ Registry File Number: BC692-C03

Nepa I.R. No. 4 Alleged unlawful surrender and sale of Nepa I.R. No. 4. Date Received by SCB: 1990/01/26 Current Status: SET Registry File Number: BC692-C01

NTE'KUM Settlement Lands Alleged Lots 788, 789, 17, 18 and 375 were part of the traditional Nte'Kum Indian Village/settlement and should not have been Date Received by SCB: 1996/03/22 alienated. Current Status: BA Registry File Number: BC692-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 90 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Oregon Jack Creek (BAND-692)

Water Rights on Nepa IR Nos. 6 and 7 Alleges an inadequate water supply, loss of water rights, and water easement through both Reserves without consent or Date Received by SCB: 2000/07/17 compensation. Current Status: DOJ Registry File Number: BC692-C04

Osoyoos (BAND-596)

BC Cut-Off Lands (SPLIT #11) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC596-C1

Canal Right of Way Band argues that the taking of land for an irrigation canal was done without authority under the Indian Act. Date Received by SCB: 2005/08/23 Current Status: BA Registry File Number: BC596-C6

Kettle Valley Railway R/W Band argues that land taken by the in 1922 should have reverted to the Band in 1981. Date Received by SCB: 2005/08/18 Current Status: DOJ Registry File Number: BC596-C5

Lot 58 Alleged loss of access to 8.5 acres of reserve due to expropriation for river channel. Date Received by SCB: 1985/07/16 Current Status: SET Registry File Number: BC596-C4

Osoyoos I.R. No. 1 and Zosel Dam Alleged flooding of parts of Osoyoos I.R. No. 1 due to the Zosel Dam, which raised the level of . Date Received by SCB: 1989/07/25 Current Status: SET Registry File Number: BC596-C3

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 91 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Osoyoos (BAND-596)

Osoyoos I.R. No. 1 Haynes Claim Alleged portion of I.R. No. 1 allotted by the Joint Reserve Commission in 1877 was unlawfully alienated from the FN without Date Received by SCB: 1985/07/16 surrender. Current Status: SET Registry File Number: BC596-C2

Oweekeno/Wuikinuxv Nation (BAND-541)

Logging Roads over Katit IR No. 1 Unlawful construction of logging roads on Katit I.R. 1 and failure to compensate band. Date Received by SCB: 2002/04/02 Current Status: BA Registry File Number: BC541-C01

Pacheedaht First Nation (BAND-658)

San Juan Settlement Alleged lands were part of its traditional village site and grave site and should have been reserved. Date Received by SCB: 1994/02/08 Current Status: SET Registry File Number: BC658-C01

Pauquachin (BAND-652)

Cole Bay I.R. No. 3 Road Right of Way Alleged improper taking of road right-of-way and inadequate compensation for land taken on Cole Bay I.R. No. 3. Date Received by SCB: 2004/12/16 Current Status: DOJ Registry File Number: BC652-C3

Hatch Point I. R. #12 Alleged survey error of Joint Reserve Commission Minute of Decision resulting in the loss of 55 acres from Hatch Point I.R. 12. Date Received by SCB: 2000/02/21 Current Status: DOJ Registry File Number: BC652-C1

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 92 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Penelakut (BAND-650)

Interest on Timber Royalties Alleged Canada failed to pay interest on FN funds which had been misappropriated by the Indian agent and reimbursed 5 years later. Date Received by SCB: 1997/12/01 Current Status: LOS Registry File Number: BC650-C02

Kuper Island Claim - Conn Alienation The FN alleges that 100 acres of land on Kuper Island, occupied by Indians, was alienated in 1870. Date Received by SCB: 1996/08/14 Current Status: DOJ Registry File Number: BC650-C01

Penticton (BAND-597)

BC Cut-Off Lands (SPLIT #12) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC597-C01

Commonage Alleged unlawful alienation of lands reserved as commonage lands for Indians and white settlers. Date Received by SCB: 1987/03/09 Current Status: FCL Registry File Number: BC597-C02

Kruger: CPR - Airport and Flood Control Highway The Band alleges; an excessive amount of reserve land was taken ROW for flood control, land taken for the CPR right of way and the Penticton Airport were illegally taken, and that Canada breached its Date Received by SCB: 1976/12/14 fiduciary duty to the band by failing to ensure lands taken for the Current Status: AR CPR Right of way were returned when no longer needed. Registry File Number: BC597-C04

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 93 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Penticton (BAND-597)

Timber Reserve Alleged unlawful creation of a part of I.R. No. 2. Date Received by SCB: 1998/08/30 Current Status: DOJ Registry File Number: BC597-C03

Peters (BAND-586)

Railway Expropriation - IR Nos 1 & 1A Alleged breach of fiduciary obligation by the federal government: failure to obtain the FN's consent regarding CNPR right-of-way and Date Received by SCB: 1991/01/09 inadequate compensation. Current Status: FCL Registry File Number: BC586-C01

Popkum (BAND-585)

Seabird Island Alleges dispossession of their reserve interests in the Seabird Island reserve which they held in common with seven other bands. Date Received by SCB: 2007/08/22 Current Status: SUB/REV Registry File Number: BC585-C1

Prophet River First Nation (BAND-544)

BC Trapline Registration Alleged failure by Canada to protect traplines in light of BC Trapline Registration process. Date Received by SCB: 2005/11/04 Current Status: RES Registry File Number: BC544-C5

Commercial Hunting, Fishing & Trapping Rights Alleged failure by Canada to protect Treaty 8 hunting, fishing, and trapping rights from restrictions imposed by provincial regulations. Date Received by SCB: 2005/11/04 Current Status: RES Registry File Number: BC544-C4

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 94 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Prophet River First Nation (BAND-544)

Oil & Gas SPLIT #1-Sep. from Ft Nelson B Alleged inequitable division of land and assets when the prophet River FN separated from the Ft. Nelson FN. Date Received by SCB: 1995/08/17 Current Status: LIT Registry File Number: BC544-C2

Oil & Gas SPLIT #2 - TLE Alleges an insufficient quantity of reserve land set aside pursuant to the terms of Treaty 8. Date Received by SCB: 2001/10/10 Current Status: LIT Registry File Number: B8265/P15

Treaty 8 Agricultural Benefits Alleges that the Crown has neither extinguished nor performed its obligations to the First Nation pursuant to the agricultural benefits Date Received by SCB: 2002/03/19 of Treaty No. 8. Current Status: RES Registry File Number: BC544-C2

Qualicum First Nation (BAND-651)

I.R. 1 Boundary Alleged unlawful alienation of part of Qualicum I.R. #1 caused by survey error. Date Received by SCB: 1997/04/29 Current Status: ACT Registry File Number: BC651-C01

Quatsino (BAND-633)

BC Cut-Off Lands (SPLIT #13) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC633-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 95 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Quatsino (BAND-633)

Surrender of I.R. No. 10 (Surrender Project) Alleges that an improper surrender vote of I.R. No. 10 led to a financially inadequate exchange of land. Date Received by SCB: 2001/12/17 Current Status: RES Registry File Number: BC633-C02

Red Bluff (BAND-715)

Graveyard Reserves Alleged graveyard reserves were not protected by DIA. Date Received by SCB: 1988/05/13 Current Status: SET Registry File Number: BC715-C01

Saanich First Nations (ASSCTN)

Goldstream - IR#13 Claim submitted by Malahat, Tsartlip, Tsawout, Tseycum and - Malahat First Nation (BAND-647) Pauquachin FNs (the Saanich Indian FNs). Alleged 10 acres of the - Pauquachin (BAND-652) reserve, as defined in the Reserve Commission Minute of Decision, - Tsartlip (BAND-653) has been unlawfully alienated as a result of a survey error in 1962. - Tsawout First Nation (BAND-654) - Tseycum (BAND-655) Date Received by SCB: 1995/11/23 Current Status: DOJ Registry File Number: BC654-C1

Saik'uz First Nation (BAND-615)

Cluculz Lake Fishing Station The FN alleges failure by Canada to set aside Cluculz Lake fishing station as an Indian Reserve. Date Received by SCB: 2002/10/02 Current Status: BA Registry File Number: BC615-C04

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 96 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Saik'uz First Nation (BAND-615)

Hydro Line on I.R. 3 Improper taking of I.R. 3 lands for Hydro R/W without compensation. Date Received by SCB: 2002/10/02 Current Status: BA Registry File Number: BC615-C05

IR # 1 Boundary Alleged 570 acres of the bed of Tachic Lake was lawfully allotted to the Sai'kuz FN as part of Stoney Creek I.R. #1, but was unlawfully Date Received by SCB: 1996/12/20 alienated from the reserve by survey error. Current Status: NLO Registry File Number: BC615-C01

Noonla Indian Reserve #6 Reduction Alleged alienation of 15 acres from Noonla I. R. 6 due to survey error in 1893. Also, alleged improper expropriation, and payment Date Received by SCB: 2000/03/03 of inadequate compensation, for GTP railway right of way in 1913. Current Status: BA Registry File Number: BC615-C02

Sinkut Lake I.R. 8 Reduction of Sinkut Lake I.R. 8 by 5 acres, established as a new reserve by the McKenna-McBride Commission. Date Received by SCB: 2000/12/29 Current Status: BA Registry File Number: BC615-C03

Saulteau First Nations (BAND-542)

BC Trapline Registration Alleged failure by Canada to protect traplines in light of BC Trapline Registration process. Date Received by SCB: 2005/11/04 Current Status: RES Registry File Number: BC542-C5

Commercial Hunting, Fishing & Trapping Rights Alleged failure by Canada to protect Treaty 8 hunting, fishing and trapping rights from restrictions imposed by provincial regulations. Date Received by SCB: 2005/11/04 Current Status: RES Registry File Number: BC542-C4

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 97 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Saulteau First Nations (BAND-542)

East Moberly I.R. No. 169 Alleged improper procedure and compensation for highway through East Moberly I.R. No. 169. Date Received by SCB: 1991/05/03 Current Status: SET Registry File Number: BC542-C1

East Moberly I.R. No. 169 - Hydro Line Alleged improper procedure and compensation for lands taken for hydro transmission line. Date Received by SCB: 1992/03/15 Current Status: NLO Registry File Number: BC542-C2

Lands in severalty Alleged failure to fulfill the land in severalty provisions of Treaty 8. Date Received by SCB: 1997/08/21 Current Status: FCL Registry File Number: B8265/LL-S27

Treaty 8 - TLE Alleged Federal Crown breached its legal and fiduciary duty by failing to perform its obligations under the land entitlement Date Received by SCB: 1997/08/21 provisions of Treaty 8. Saulteau FN are claiming a shortfall of 4898 Current Status: ACT acres. Registry File Number: B8265/LL-S26

Treaty 8 Agricultural Benefits Alleges that the Crown has neither extinguished nor performed its obligations to the First Nation pursuant to the agricultural benefits Date Received by SCB: 2002/03/26 of Treaty No. 8. Current Status: RES Registry File Number: BC542-C3

Scowlitz (BAND-568)

I.R. No. 1 Surrender of 354 Acres Alleges that Canada should not have sold the surrendered land. Date Received by SCB: 2002/02/15 Current Status: DOJ Registry File Number: BC568-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 98 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Scowlitz (BAND-568)

Logging on Squawkum Creek IR 3 Improper process in the taking of timber from the reserve and inadequate compensation. Date Received by SCB: 2007/04/05 Current Status: RES Registry File Number: BC568-C04

Scowlitz I.R. No. 1 Alleged improper expropriation of land on I.R. No. 1 for the CPR Date Received by SCB: 1994/02/23 Current Status: DOJ Registry File Number: BC568-C01

Squawkum IR 3 Roads The FN alleges that lands were illegally taken from its IR No. 3 for road purposes. Date Received by SCB: 2003/10/01 Current Status: DOJ Registry File Number: BC568-C03

Seabird Island (BAND-581)

Lougheed Highway ROW Improper taking of Seabird Island reserve land for the Lougheed Highway. Date Received by SCB: 2003/12/04 Current Status: BA Registry File Number: BC581-C02

Wahleach Road Right of Way Unlawful road taking on Seabird Island Reserve, and failure to compensate band. Date Received by SCB: 2002/04/09 Current Status: BA Registry File Number: BC581-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 99 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Sechelt (BAND-551)

Additional Reserves Alleged negligence by DIAND resulting in the FN not receiving 10 additional reserves. Date Received by SCB: 1988/02/09 Current Status: SET Registry File Number: BC551-C06

CokQueNeets Alleged Canada failed to take action to prevent the loss of 20 acres of land intended to be part of CokQueNeets I.R. No. 23. Date Received by SCB: 1987/03/06 Current Status: SET Registry File Number: BC551-C04

Preemption Alleged Canada failed to take action to prevent a preemption of 70 acres of provincially owned lands which included a village site of Date Received by SCB: 1987/02/04 the FN. Current Status: SET Registry File Number: BC551-C03

Right of Way Alleged Sechelt I.R. No. 2 lands were illegally taken for highway right-of-way purposes in 1929. Date Received by SCB: 1986/04/10 Current Status: SET Registry File Number: BC551-C01

Timber Leases Alleged negligence by DIAND which caused it to not receive 2 timber leases. Date Received by SCB: 1988/03/25 Current Status: SET Registry File Number: BC551-C07

Trail Island Alleged Canada failed to obtain additional land at Trail Island for the FN. Date Received by SCB: 1987/08/31 Current Status: SET Registry File Number: BC551-C05

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 100 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Sechelt (BAND-551)

Tsonai Reserve Alleged improper surrender and lease of 304 acres of Tsonai I.R. No. 15 in 1891 for the purpose of establishing a rock quarry. Date Received by SCB: 1986/12/23 Current Status: SET Registry File Number: BC551-C02

Seton Lake (BAND-595)

BC Cut-Off Lands (SPLIT #14) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: ACT Registry File Number: BC595-C01

Shuswap (BAND-605)

CPR Right of Way IR # 1 Alleged Canada breached its lawful obligations to the FN in the alienation of 23.75 acres of the Shuswap reserve for railway Date Received by SCB: 1995/04/12 purposes in 1914. Also alleges inadequate compensation. Current Status: ISCC Registry File Number: BC605-C01

Grazing Lands Alleged 1940 acres of land, recommended as an addition to the FN's reserver by the McKenna-McBride Commission should have Date Received by SCB: 1995/04/12 been confirmed as reserve lands. Current Status: ISCC Registry File Number: BC605-C02

Shxwhá:y Village (BAND-570)

Dyke & Road Right-of-Way on Skway IR # 5 (Band previous name: Aka Skway) In 1949, without the proper consent of the Band, the Fraser Valley Dyking Board built a dyke Date Received by SCB: 2000/01/18 and dyke top road across Skway I.R. No. 5. Current Status: ACT Registry File Number: BC570-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 101 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Simpcw First Nation (BAND-691)

Loss of Reserve Land at Tete Jaune cache (Band previous name: North Thompson). The FN alleges failure to set aside Indian reserve land at Tête Jaune Cache. Date Received by SCB: 2002/11/19 Current Status: DOJ Registry File Number: BC691-C01

Siska (BAND-706)

CNR R/W Across Siska I.R. 5A Alleged improper taking of reserve land for CNR R/W and inadequate compensation. Date Received by SCB: 2002/06/25 Current Status: BA Registry File Number: BC706-C05

Kupchynalth Alleged 3 acre parcel of land was lawfully allotted by Reserve Commissioner Sproat as a reserve for the FN, and unlawfully Date Received by SCB: 1996/03/21 omitted from later reserve lists due to a surveyer's error. Current Status: LOS Registry File Number: BC706-C04

Nahamanak I.R. No. 7 Alleged excessive right-of-way taken for CPR and inadequate compensation with respect to Nahamanak No. 7. Date Received by SCB: 1990/12/10 Current Status: DOJ Registry File Number: BC706-C02

Siska I.R. No. 5A Concerned lease and subsequent sale, in 1955, of 42 acres of Siska I.R. No. 5A. Date Received by SCB: 1989/04/14 Current Status: SET Registry File Number: BC706-C01

Zacht I.R. No. 5 Alleged inadequate compensation of lands taken; no compensation for alienation of fishing station and subsequent damage to fishery; Date Received by SCB: 1991/05/15 excess width taken re: CPR right-of-way across Zacht I.R. No. 5. Current Status: DOJ Registry File Number: BC706-C03

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 102 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Skeetchestn (BAND-687)

Deadman's Creek CNR / Smith-Curtis Presented by the Alliance of Tribal Councils. Alleged improper alienation of land for Deadman's Creek I.R. for CNR right-of-way. Date Received by SCB: 1989/02/06 Improper handling of Smith/Curtis Lease. Current Status: SET Registry File Number: BC687-C02

Deadman's Creek I.R. - Alienation Alleged loss of 240 acres of a 1877 reserve allotment by the Joint Indian Reserve Commission. Date Received by SCB: 1989/02/01 Current Status: SET Registry File Number: BC687-C03

Merryfield Cattle Company Lease Alleged DIA inaction on lease. Date Received by SCB: 1985/05/13 Current Status: FCL Registry File Number: BC687-C01

Savona Roads Alleges that Canada failed to obtain compensation for the FN when reserve lands were transfered to the province for highway Date Received by SCB: 2003/03/28 purposes. Current Status: DOJ Registry File Number: BC687-C04

Skuppah (BAND-707)

Lands Taken for Public Purposes Canada's alleged failure to provide replacement reserve lands for railway and highway and transmission lines right of way in order to Date Received by SCB: 2004/11/30 minimally impair the Band's reserve land base. Current Status: DOJ Registry File Number: BC707-C04

Skuppah I.R. No. 2 and 2A Presented by the Alliance of Tribal Councils. Alleged improper alienation of land from Skuppah I.R. No. 2 and 2A for CPR Date Received by SCB: 1987/05/22 right-of-way. Current Status: AR Registry File Number: BC707-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 103 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Skuppah (BAND-707)

Skuppah IR No 2 and 4 Alleged excessive right-of-way taken for CPR and inadequate compensation. Date Received by SCB: 1990/12/10 Current Status: DOJ Registry File Number: BC707-C02

Water Rights IRs 1- 2- 2A and 4 Alleged water rights for the Skuppah Indian Band's I.R.s 1, 2, 2A, and 4 have been unlawfully alienated. Date Received by SCB: 1997/01/24 Current Status: DOJ Registry File Number: BC707-C03

Sliammon (BAND-554)

IR #1-Leases-Southview Beach/Scuttle Bay Alleged improper management of leases to lands on the reserve. Date Received by SCB: 1994/10/20 Current Status: FCL Registry File Number: BC554-C1

Klahanie Subdivision Alleged mismanagement of 66 residential leases on Sliammon IR# 1 resulting in lost revenue. Date Received by SCB: 2006/07/24 Current Status: DOJ Registry File Number: BC554-C3

Wilde Road - IR#1 Alleged the 1932 taking of this road right of way was improper. Date Received by SCB: 1996/02/07 Current Status: NLO Registry File Number: BC554-C2

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 104 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Snuneymuxw First Nation (BAND-648)

Coal Royalties (Band previous name: Nanaimo) Alleged Canada breached terms of surrender regarding sale of coal. Date Received by SCB: 1990/11/20 Current Status: SET Registry File Number: BC648-C2

Departure Bay Village (Band previous name: Nanaimo) "Alleges that under the 1854 Douglas Treaty, the historic village located at Departure Bay should Date Received by SCB: 2000/02/15 have been protected and maintained for the use and benefit of the Current Status: ACT FN. Registry File Number: BC648-C4

Douglas Treaty Reserve (Band previous name: Nanaimo) Alleged unlawful alienation of 79 acre reserve in downtown Nanaimo. Date Received by SCB: 1993/02/22 Current Status: ACT Registry File Number: BC648-C3

Exchange Lands Village and Compensation (Band previous name: Nanaimo) "Alleges failure to set aside a village site with enclosed fields as a reserve under the 1854 Date Received by SCB: 2000/07/28 Douglas Treaty and alleges failure exchange land which had been Current Status: DOJ agreed to by the the Band and the Vancouver Coal Company in the Registry File Number: BC648-C7 1880s."

False Narrows Village Site (Band previous name: Nanaimo) Seeks the return of the FN's village site, surrounding fields and a clam bed on Gabriola Island, Date Received by SCB: 2000/07/17 which the FN alleges was guaranteed to it by the terms of the 1854 Current Status: ACT Douglas Treaty. Registry File Number: BC648-C6

Harbour Park Village (Band previous name: Nanaimo) Claim for the Return of the FN's "Harbour Village Site" allegedly guaranteed to them by the terms of Date Received by SCB: 2000/02/15 the 1854 Douglas Treaty. Current Status: ACT Registry File Number: BC648-C5

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 105 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Snuneymuxw First Nation (BAND-648)

Millstone River Village (Band previous name: Nanaimo) FN alleges that the village, enclosed fields and burial sites should have been reserved to the Date Received by SCB: 2002/04/23 First Nation pursuant to the Douglas Treaty. Current Status: ACT Registry File Number: BC648-C9

Nanaimo Town I.R. No. 1 (Band previous name: Nanaimo) Alleged 2.76 acres of land used as a right-of-way through Nanaimo Town I.R. No. 1 since 1883 has Date Received by SCB: 1985/09/10 never been lawfully surrendered by the FN. Current Status: SET Registry File Number: BC648-C1

Teytexen Village (Band previous name: Nanaimo) FN alleges that parts of the Teytexen village, its enclosed fields and burial and fishing sights Date Received by SCB: 2001/06/11 were not reserved as they should have been pursuant to the Current Status: ACT Douglas Treaty. Registry File Number: BC648-C8

Soda Creek (BAND-716)

Trutch Reduction (SPLIT #01) - Reserve Reduction Alleged alienation by the BC colonial Government of Soda Creek Date Received by SCB: reserve land which had been set apart in 1864. Current Status: BA Registry File Number: BC716-C01

Trutch Reduction (SPLIT #02) - District Lot 49 Canada's failure to secure District Lot 49 as reserve on behalf of Date Received by SCB: Soda Creek Band during McKenna/McBride Process. Current Status: BA Registry File Number: BC716-C02

Trutch Reduction (SPLIT #03) - Peavine Valley Canada's failure to secure hay lands in Peavine Valley as reserve Date Received by SCB: on behalf of Soda Creek Band during McKenna/McBride Process. Current Status: BA Registry File Number: BC716-C03

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 106 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Soda Creek (BAND-716)

Trutch Reduction (SPLIT #04) - Whiskey Creek Canada's failure to secure Whiskey Creek Reserve on behalf of Date Received by SCB: Soda Creek Band. Current Status: BA Registry File Number: BC716-C01

Trutch Reduction (SPLIT #05) - Tyee Lake Canada's failure to secure a fishing station on Tyee Lake despite Date Received by SCB: the First Nation's dependance on the lake as a source of food. Current Status: BA Registry File Number: BC716-C01

Songhees First Nation (BAND-656)

BC Cut-Off Lands (SPLIT #15) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC656-C01

Chatham Island Claimed small islands in Chatham Island group should have been included in reserve. Date Received by SCB: 1993/08/06 Current Status: SET Registry File Number: BC656-C02

I.R. No 1A - Railway Spur Alleged unlawful alienation of 1.13 acres from the reserve. Date Received by SCB: 1994/10/14 Current Status: SET Registry File Number: BC656-C03

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 107 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Spallumcheen (BAND-600)

Fortune's Field Graveyard Alleged alienation of reserved graveyard. Date Received by SCB: 1997/04/02 Current Status: LOS Registry File Number: BC600-C01

Spuzzum (BAND-708)

Chapman's Bar I.R. No. 10 Alleged illegal pre-emption, failure to confirm reserve and failure to obtain compensation for CNPR right-of-way through Chapman's Date Received by SCB: 1991/07/15 Bar I.R. No. 10. Current Status: LOS Registry File Number: BC708-C1

CPR Through I. R. No. 1 Alleged inadequate compensation was paid for CPR right-of-way taken through Spuzzum I.R. No. 1. Date Received by SCB: 1999/11/05 Current Status: DOJ Registry File Number: BC708-C4

Lands Taken for Public Purposes Alleged failure by Canada to provide replacement lands for railway, highway and transmission line rights of way in order to minimally Date Received by SCB: 2004/12/17 impair the Band's Indian reserve land base. Current Status: BA Registry File Number: BC708-C5

Long Tunnel I.R. No. 5 Alleged inadequate compensation was paid for CPR right-of-way taken through Long Tunnel I.R. No. 5 and for damages suffered. Date Received by SCB: 1992/11/16 Current Status: DOJ Registry File Number: BC708-C2

Schwimp Alleged unlawful pre-emption of village site at Schwimp. Date Received by SCB: 2000/10/24 Current Status: DOJ Registry File Number: BC708-C3

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 108 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Squamish (BAND-555)

BC Cut-Off Lands (SPLIT #16) "Ambleside" In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC555-C01

Capilano I.R. No. 5 - Bouillon Lands Alleged 74 acres of Capilano I.R. No. 5, as allotted by the Joint Reserve Commission in 1877, was subsequently alienated from the Date Received by SCB: 1985/08/09 FN. Current Status: SET Registry File Number: BC555-C02

Mission I.R. No. 1 - 1910 Surrender First Nation alleges the 1910 surrender was invalid because it did not comply with sections 49 and 51 of the Indian Act. Date Received by SCB: 1976/08/05 Current Status: FCL Registry File Number: BC555-C03

Squiala First Nation (BAND-574)

Chilliwack River Diversion on Squiala IR# 7 Alleges failure: to obtain adequate compensation for the land taken; to obtain compensation for severing the reserve and taking Date Received by SCB: 2007/06/06 gravel and soil; to minimally impair by selling the lands; to ensure Current Status: RES compliance with the conditions of the expropriation. Registry File Number: BC574-C3

DVA Drainage Ditch on Squiala IR 7 Improper lease of land and lease renewals and inadequate compensation, damages and delays. Date Received by SCB: 2007/04/12 Current Status: RES Registry File Number: BC574-C2

I.R. #7 CN Right of Way Concerned the CNR Right of Way across the Squiala reserve. Date Received by SCB: 1994/11/23 Current Status: LOS Registry File Number: BC574-C1

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 109 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Stellat'en First Nation (BAND-613)

Hydro Right-of-Way Alleged wrongful alienation of land for transmission line. Date Received by SCB: 1994/04/14 Current Status: SET Registry File Number: BC613-C01

STO:LO NATION (TC-1126)

Trutch Reduction Sto:lo Nation represents several FNs in this claim. Alleged - Aitchelitz (BAND-558) reserves were illegally reduced in the 1860s. - Kwaw-kwaw-Apilt (BAND-580) - Leq' a: mel First Nation (BAND-579) - Matsqui (BAND-565) - Scowlitz (BAND-568) - Skowkale (BAND-571) - Skwah (BAND-573) - Soowahlie (BAND-572) - Squiala First Nation (BAND-574) - Sumas First Nation (BAND-578) - Tzeachten (BAND-575) - Yakweakwioose (BAND-576) Date Received by SCB: 1988/04/22 Current Status: LIT Registry File Number: BC2146-C1

Stone (BAND-717)

Graveyard Alleged unlawful alienation of a graveyard. Date Received by SCB: 1993/11/29 Current Status: ACT Registry File Number: BC717-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 110 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Stone (BAND-717)

IR # 1A - Boundary Error & Timber Lands Alleged incorrect survey of boundaries of reserve, and non-inclusion of timber lands south of the reserve. Date Received by SCB: 1994/10/28 Current Status: INACT Registry File Number: BC717-C02

Sumas First Nation (BAND-578)

Sumas I.R. # 7 Alleged improper surrender of Sumas I.R. # 7 in 1919 for sale to the Soldier Settlement Board. Date Received by SCB: 1987/12/17 Current Status: SET Registry File Number: BC578-C2

Upper Sumas I.R. No. 6 - 1.26 Acres Alleged 1.26 acres of and taken from Upper Sumas I.R. No. 6 by V. V. & E. Railway. Date Received by SCB: 1984/01/26 Current Status: SET Registry File Number: BC578-C3

Upper Sumas I.R. No. 6 - 28.83 Acres Alleged 28.83 acres of and taken from Upper Sumas I.R. No. 6 by V. V. & E. Railway. Date Received by SCB: 1984/01/26 Current Status: ACT Registry File Number: BC578-C1

Takla Lake First Nation (BAND-608)

Moose Valley Failure of the McKenna McBride Commission to set aside reserve lands for the FN in Moose Valley. Date Received by SCB: 2003/10/01 Current Status: BA Registry File Number: BC608-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 111 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Taku River Tlingit (BAND-501)

Tlingit Village Site-Wenah Alleged Canada failed to set aside the Wenah Village site as an indian reserve. Date Received by SCB: 1997/08/22 Current Status: ISCC Registry File Number: BC501-C01

T'it'q'et (BAND-593)

Graveyard Alleged unlawful alienation of graveyard reserves. Date Received by SCB: 1992/11/06 Current Status: ACT Registry File Number: BC593-C01

Tla-o-qui-aht First Nations (BAND-660)

Logging on Kootowis IR 4 FN alleges unlawful logging on Kootowis IR 4. Date Received by SCB: 2003/10/03 Current Status: DOJ Registry File Number: BC660-C01

Tlatlasikwala (BAND-632)

BC Cut-Off Lands (SPLIT #17) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC632-C01

Hope Island I.R. No. 1 (Band previous name: Nuwitti) Alleged unlawful expropriation of 23 acres of reserve land on Hope Island for a wireless station in 1921. Date Received by SCB: 1987/02/09 Current Status: SET Registry File Number: BC632-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 112 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Tl'azt'en Nation (BAND-617)

Caesar's Point and Caesar's Island Alleged unlawful preemption of Caesar's point and Caesar's Island which were traditional hunting and fishing sites and sacred lands of Date Received by SCB: 2004/10/01 the Tl'azt'en FN. Current Status: BA Registry File Number: BC617-C05

Fishing Stations Alleged Fishing Stations which were to be set aside as reserve as a condition of the barricade agreement were not set aside. Date Received by SCB: 1996/11/29 Current Status: BA Registry File Number: BC617-C03

Fort St. James Barricade Agreement & Lot 4705A Alleged breach of lawful obligation by Canada by failing to set aside Lot 4705A as a fishing station reserve under the terms of the Date Received by SCB: 2000/12/29 Fort St. James Barricade Agreement of 1911. Current Status: BA Registry File Number: BC617-C04

Pinche Lake I.R. #2 Alleged Pinche Lake I.R. #2 was allotted at 102 acres smaller than it should have been. Date Received by SCB: 1996/11/29 Current Status: DOJ Registry File Number: BC617-C01

Tezzeron Lake I.R. #9 Alleged Tezzeron Lake I.R. #9 was lawfully established as a reserve by the Royal Commission on Indian Affairs for BC in 1916, Date Received by SCB: 1996/11/29 and later unlawfully cancelled. Current Status: DOJ Registry File Number: BC617-C02

Tobacco Plains (BAND-603)

1922 Timber Surrender Revised claim with supporting research resubmitted on February 1/1993. Alleged monies earned from the sale of timber Date Received by SCB: 1993/02/01 surrendered in 1922 were never paid to it, and that the land was Current Status: SET later damaged when logged. Registry File Number: BC603-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 113 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Tobacco Plains (BAND-603)

1940 Brown Timber Lease Alleged invalid timber lease in the 1940s. Date Received by SCB: 1995/08/03 Current Status: NLO Registry File Number: BC603-C03

Land Lease Alleged breach of contract, trust and fiduciary duty concerning the leasing of the southern portion of its reserve, following a surrender Date Received by SCB: 1985/05/27 in 1929. Current Status: FCL Registry File Number: N/A

Toosey (BAND-718)

Forestry Access Road I.R. Nos. 1 & 1A Alleged improper taking of Toosey I.R. No. 1 and 1A lands for logging road purposes. Date Received by SCB: 1998/06/18 Current Status: DOJ Registry File Number: BC718-C03

I.R. 1A Boundary dispute Alleged exclusion of 11 acres of lands allotted by McKenna-McBride commission as new reserve I.R. 1A at time of Date Received by SCB: 1997/07/24 survey. Current Status: DOJ Registry File Number: BC718-C02

Water Rights Alleged negligence of federal government in securing and protecting water rights for the FN. Date Received by SCB: 1987/05/13 Current Status: SET Registry File Number: BC718-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 114 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

TREATY 8 TRIBAL ASSOCIATION (TC-1072)

Ammunition and Twine Alleged breach of Treaty by Canada in the provision of Twine and - Blueberry River First Nations (BAND-547) ammunition to Blueberry River, , Halfway River, Profet - Doig River (BAND-548) River - Dene Tsaa Tse K'Nai, and Saulteau FNs. - Halfway River First Nation (BAND-546) - Prophet River First Nation (BAND-544) - Saulteau First Nations (BAND-542) Date Received by SCB: 2000/11/06 Current Status: DOJ Registry File Number: BC2494-C3

Annuity Arrears Alleged seven FNs were owed Treaty Annuities from date Treaty 8 - Blueberry River First Nations (BAND-547) was first signed (1899) rather than from the date of adhesion. - Doig River (BAND-548) - Fort Nelson First Nation (BAND-543) - Halfway River First Nation (BAND-546) - Prophet River First Nation (BAND-544) - Saulteau First Nations (BAND-542) - West Moberly First Nations (BAND-545) Date Received by SCB: 1993/06/08 Current Status: ISCC Registry File Number: BC2494-C1

Highway Right-of-Way on IR # 172 Alleged Crown breached its legal and fiduciary obligations to the - Blueberry River First Nations (BAND-547) then Fort St. John FN by agreeing to the transfer of lands within - Doig River (BAND-548) Fort St. John Indian Reserve No. 172 to the Province of BC in 1934, without consent of, or compensation to, the FN. Date Received by SCB: 1995/02/13 Current Status: INACT Registry File Number: BC2494-C2

Tsartlip (BAND-653)

Lot A Alleged part of Lot A not provided pursuant to treaty. Date Received by SCB: 1991/10/28 Current Status: SET Registry File Number: BC653-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 115 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Tsartlip (BAND-653)

Tod Inlet Alleged Tod Inlet was part of its traditional winter village and should have been reserved. Date Received by SCB: 1994/02/08 Current Status: NLO Registry File Number: BC653-C02

Tsawout First Nation (BAND-654)

Cordova Spit Seeks damages for loss of an alleged Pre-confederation Reserve. Date Received by SCB: 2000/12/29 Current Status: DOJ Registry File Number: BC654-C02

Tsawwassen First Nation (BAND-577)

Bluff Lands Alleged surrender and sale of some 95 acres of the Tsawwassen Indian Reserve in 1957 was improper and that the FN did not Date Received by SCB: 1995/06/09 receive the value it should have received from this sale. Current Status: ISCC Registry File Number: BC577-C1

McKenna-McBride Additional Land Applications Alleges Canada and Indian Agent breached its fiduciary obligation and duty of care before the McKenna-McBride Commission when Date Received by SCB: 2007/07/30 five applications for additional reserve lands were rejected. Current Status: RES Registry File Number: BC577-C2

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 116 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Tsay Keh Dene (BAND-609)

Finlay Forks IR No. 1 Expropriation Band alleges Canada breached its fiduciary duty by failing; to represent the Band's interests to BC Hydro and the Water Date Received by SCB: 1987/07/17 controller in respect of its traditional lands, and the amount of Current Status: AR compensation received; to keep the Band fully informed of Registry File Number: BC609-C02 developments; to prevent BC Hydro from flooding the reserve before the reserve was transferred; to establish a reserve at Ingenika and to provide services at Ingenika; to obtain the consent of the majority of the Band members; and that DIA used duress and undue influence to obtain the consent of some Band members.

Police Meadows Alleged 640 acres not set aside as reserve at Police Meadows, leaving a shortfall of 320 acres. Date Received by SCB: 1996/07/23 Current Status: NLO Registry File Number: BC609-C01

Tseshaht (BAND-665)

BC Cut-Off Lands (SPLIT #18) (Band previous name: Sheshaht) In 1916, 22 bands lost land from Date Received by SCB: 33 separate reserves without proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC665-C01

Tseycum (BAND-655)

Graveyard and Road Alleged land taken for the West Saanich Road through Union Bay IR #4 was unlawfully taken, that adequate compensation was never Date Received by SCB: 1996/06/17 paid, and that the road disrupted the FN's cemetary. Current Status: SET Registry File Number: BC655-C01

Tseycum Harbour Village & Gravesite Alleged failure to set aside Indian reserve at Tsehum Harbour under Douglas Treaty. Date Received by SCB: 1998/05/11 Current Status: DOJ Registry File Number: BC655-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 117 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

TSILHQOT'IN NATIONAL GOVERNMENT (TC-9097)

Hunting Reserve Alleged hunting reserve allotted to Ts'ilhqot'in FNs unilaterally - Alexandria (BAND-709) abandoned. Transfered to Claims Research and Assessment. - Alexis Creek (BAND-710) - Stone (BAND-717) - Toosey (BAND-718) Date Received by SCB: 1994/06/03 Current Status: FCL Registry File Number: BC10069-C01

Ts'kw'aylaxw First Nation (BAND-594)

Four Graveyards (Band previous name: Pavilion). Alleged four graveyard reserves allotted by Indian Reserve Commissioner Peter O'Reilly in 1881 Date Received by SCB: 1995/09/19 have been illegally alienated. Current Status: ACT Registry File Number: BC594-C01

Lot 18 (Band previous name: Pavilion). FN alleges that Canada did not protect grave site on Lot 18 from preemption and did not negotiate Date Received by SCB: 2002/12/23 with the Province to obtain this land for the FN after the Current Status: BA preemption. Registry File Number: BC594-C02

T'Sou-ke First Nation (BAND-657)

Alien. of Graveyard IR 3 (Billings Spit) Alleged unlawful alienation of Graveyard I.R. 3 as the result of it being erroneously cancelled in the 1920's for allegedly being Date Received by SCB: 2000/12/19 eroded away. Current Status: DOJ Registry File Number: BC657-C2

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 118 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

T'Sou-ke First Nation (BAND-657)

Graveyard IR #4 Alleged land set aside under treaty in 1850, and subsequently allotted as I.R. No. 4 by the Joint Reserve Commission in 1877, Date Received by SCB: 1985/10/07 was unlawfully alienated from the FN without surrender. Current Status: ACT Registry File Number: BC657-C1

Ulkatcho (BAND-722)

BC Cut-Off Lands (SPLIT #19) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC722-C01

U'Mista Cultural Centre (ASSCTN)

Artifacts Alleged improper prosecution and seizure of artifacts in 1922. - Campbell River (BAND-622) - Cape Mudge (BAND-623) - Gwa'Sala-Nakwaxda'xw (BAND-724) - Gwawaenuk Tribe (BAND-627) - Kwakiutl (BAND-626) - Kwicksutaineuk-ah-kwaw-ah-mish (BAND-625) - Mamalilikulla-Qwe'Qwa'Sot'Em (BAND-629) - Namgis First Nation (BAND-631) - Tlatlasikwala (BAND-632) - Tlowitsis Tribe (BAND-637) - Tsawataineuk (BAND-636) Date Received by SCB: 1988/03/16 Current Status: FCL Registry File Number: BC2230-C1

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 119 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

U'Mista Cultural Centre (ASSCTN)

Prohibition of the Potlatch Alleged government of Canada breached its duty of care to the 15 - Campbell River (BAND-622) Kwakwaka'waku FN in allowing the seizure of realia and artifacts - Cape Mudge (BAND-623) from the potlatch by its agents, and in allowing the sale and export - Gwa'Sala-Nakwaxda'xw (BAND-724) of some of these items. - Gwawaenuk Tribe (BAND-627) - Kwakiutl (BAND-626) - Kwicksutaineuk-ah-kwaw-ah-mish (BAND-625) - Mamalilikulla-Qwe'Qwa'Sot'Em (BAND-629) - Namgis First Nation (BAND-631) - Tlatlasikwala (BAND-632) - Tlowitsis Tribe (BAND-637) - Tsawataineuk (BAND-636) Date Received by SCB: 1998/01/30 Current Status: AR Registry File Number: BC2230-C2

Union Bar (BAND-588)

Trans Canada Highway on IR 11 Alleged inadequate compensation for a 1952 expansion of the Trans-Canada highway on Puckatholetchin IR #11. Date Received by SCB: 2007/07/19 Current Status: RES Registry File Number: BC588-C01

Upper Nicola (BAND-697)

Commonage Alleged unlawful alienation of Commonage Reserve. Date Received by SCB: 1993/02/02 Current Status: FCL Registry File Number: BC697-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 120 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Upper Similkameen (BAND-599)

B.C. Gas Alleged invalid permit because permit included no definite date of termination (section 28(2)). Date Received by SCB: 1993/07/26 Current Status: FCL Registry File Number: BC599-C02

BC Cut-Off Lands (SPLIT #20) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: BC599-C01

West Moberly First Nations (BAND-545)

BC Trapline Registration Alleged failure by Canada to protect traplines in light of BC Trapline Registration process. Date Received by SCB: 2006/03/02 Current Status: RES Registry File Number: BC545-C02

Commercial Hunting, Fishing & Trapping Rights Alleged failure by Canada to protect Treaty 8 hunting, fishing, and trapping rights from restrictions imposed by provincial regulations. Date Received by SCB: 2006/03/02 Current Status: RES Registry File Number: BC545-C01

TLE The West Moberly First TLE claim goes beyond DOFS shortfall. The Band also alleges: Canada discouraged FN's from choosing Date Received by SCB: 1996/02/23 severalty, Canada failed to take a census on the Indians in the Current Status: ACT Treaty 8 area, paylists are not the appropriate way of calculating Registry File Number: B8265-W13 DOFS shortfall, Canada has an ongoing abligation to provide land as populations grow, and Canada should not have signed an agreement requiring Provincial co-operation to fulfill its obligations.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 121 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

West Moberly First Nations (BAND-545)

Treaty 8 Agricultural Benefits Alleges Canada has failed to provide economic and agricultural benefits guaranteed under Treaty 8. Date Received by SCB: 2007/09/04 Current Status: SUB/REV Registry File Number: BC545-C3

Westbank First Nation (BAND-601)

BC Cut-Off Lands (SPLIT #21) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: B8260-102

North Okanagan Commonage FN alleges an interest in the North Okanagan Commonage and asserts that Canada breached its duty to the Band by not having Date Received by SCB: 2006/01/11 the land set aside as an Indian reserve. Current Status: BA Registry File Number: BC601-C03

Reduction of Okanagan IR in 1865 Alleged alienation of Okanagan IR 1 land in 1865. Date Received by SCB: 2003/11/25 Current Status: DOJ Registry File Number: BC601-C02

South Okanagan Commonage FN alleges an interest in the South Okanagan Commonage and asserts that Canada breached its duty to the Band by not having Date Received by SCB: 2006/01/11 the land set aside as an Indian reserve. Current Status: BA Registry File Number: BC601-C04

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 122 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Wet'suwet'en First Nation (BAND-725)

Charles I.R. #1 Alleged that Charles I.R. #1 (aka Burns Lake #1), alloted to the Burns Lake Band, ought to be a reserve of the Broman Lake F.N. Date Received by SCB: 1997/12/12 Current Status: BA Registry File Number: BC725-C01

Whispering Pines/Clinton (BAND-702)

BC Cut-Off Lands (SPLIT #22) In 1916, 22 bands lost land from 33 separate reserves without Date Received by SCB: proper surrenders as a result of decisions made by the McKenna/McBride Commission. Current Status: SET Registry File Number: B8260-102

Fishing Stations Alleged that the reserve at Kelly Creek is located in the wrong place, and that the reserve known as Hihium (alotted jointly to the Date Received by SCB: 1997/12/23 Nicola, Bonaparte and Kamloops FNs) should have been alloted to Current Status: DOJ the Whispering Pines FN as well. Registry File Number: BC702-C03

PGE Right-of-Way IRs # 1 & 2 Alleged that the land taken for the Pacific Great Eastern (non BC Rail) right-of-way accross I.R.'s #1 and #2 was unlawfully taken, Date Received by SCB: 1997/12/23 and that the compensation paid for these lands was inadequate. Current Status: DOJ Registry File Number: BC702-C02

Williams Lake (BAND-719)

Graveyard Reserves Alleged unlawful alienation of graveyard reserves. Date Received by SCB: 1992/11/06 Current Status: ACT Registry File Number: BC719-C02

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 123 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 British Columbia

Claimant Substance of Claim

Williams Lake (BAND-719)

Indian Settlement Alleged traditional villages of the FN were unlawfully alienated to non-Indians. Date Received by SCB: 1994/02/08 Current Status: FCL Registry File Number: BC719-C03

Starlight Drive-In Lease Alleged breach of duty in lease of land. Date Received by SCB: 1988/06/20 Current Status: AR Registry File Number: BC719-C01

Wiumasgum-Qwe'Qwa'Sot'Em (ASSCTN)

Wrongful Alienation of Reserves Alleged that the Nation was a Band pursuant to the terms of the Indian Act and that its Reserves were wrongfully alienated. Also Date Received by SCB: 2000/04/17 alleges that the Nation was wrongfully amalgamated with the Current Status: DOJ Mamalilikulla-Qwe'Qwa'Sot'Em. Registry File Number: BC629-C05

Yale First Nation (BAND-589)

Fisheries I. R. 17 (Surrender Project) Allege that Fisheries I.R. 17 has not been recognized with reserve status. Date Received by SCB: 2001/06/21 Current Status: LOS Registry File Number: BC589-C04

Kuthlalth I. R. 3 (Surrender Project) The FN asserts that Kuthlalth I.R. 3 was originally allotted to the Yale Band and that the Yale FN may continue to have an interest in Date Received by SCB: 2001/06/21 the reserve which is now held by the Ohamil Band. Current Status: DOJ Registry File Number: BC589-C01

Total of Claims for British Columbia: 524

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 124 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Barren Lands (BAND-308)

Flooding Alleged flooding of reserve land. Date Received by SCB: 1986/10/15 Current Status: ACT Registry File Number: B8260-318

TLE Alleged shortfall of land under Treaty 10. This First Nation is a signatory to the Manitoba TLE Framework Agreement. A Date Received by SCB: 1978/03/08 settlement agreement was reached on June 23, 1999. Current Status: SET Registry File Number: B8265/B2

Bloodvein (BAND-267)

Navigation Aid Situated on Reserve Land The Bloodvein First Nation contend that Canada has operated and maintained an aid to navigation on Reserve lands without a formal Date Received by SCB: 2002/07/19 agreement since 1966. Current Status: DOJ Registry File Number: B8260-723

Brokenhead Ojibway Nation (BAND-261)

1890 Surrender for Exchange The FN alleges that Canada alienated a triangular portion of reserve land, approximately 15 acres, depriving the FN the Date Received by SCB: 2007/04/10 possession and use of this area. Also alleges that there was no Current Status: RES valid surrender, and that, unknown to the FN, Canada wrongfully Registry File Number: B8260-923 alienated the lands to the Province of Manitoba in 1895.

Hydro Transmission Line Right-of-Way The FN alleges it received inadequate compensation for land leased to the province for a hydro transmission line right-of-way; Date Received by SCB: 2006/04/19 and that Canada didn't have the FN's best interests in mind when it Current Status: RES permitted the leasing of the land. Registry File Number: B8260-895

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 125 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Brokenhead Ojibway Nation (BAND-261)

I.R. No. 4 Alleged unfulfilled land exchange. Date Received by SCB: 1980/12/04 Current Status: SET Registry File Number: B8260-199

Railway ROW and Station Ground Canada failed in its fiduciary and treaty obligations to protect the best interest of the First Nation land rights in regard to the Date Received by SCB: 2002/10/17 expropriation of lands for a railway right of way and station grounds Current Status: DOJ by the CNR. Registry File Number: B8260-779

TLE Alleged shortfall of land under Treaty 1. This First Nation is a signatory to the Manitoba TLE Framework Agreement. A Date Received by SCB: 1978/06/01 settlement agreement was reached on September 9, 1998. Current Status: SET Registry File Number: B8265-B8

Buffalo Point First Nation (BAND-265)

Flooding (Tr3 Flooding Project) Alleges failure to prevent or protect the interests of the band, allowing flooding of reserve land by a lumber company, beginning Date Received by SCB: 1999/04/12 in 1887 without compensation for losses. Current Status: DOJ Registry File Number: B8260-687

Navigation Aid Situated on Reserve Land The FN alleges an unlawful trespass by the Canadian Coast Guard for the establishment, operation and maintenance of a navigation Date Received by SCB: 2002/02/18 aid on reserve land. Current Status: DOJ Registry File Number: B8260-756

TLE Alleged shortfall of land under Treaty 3. This FN is a signatory to the Manitoba TLE Framework Agreement. The settlement Date Received by SCB: 1988/06/22 agreement was reached on March 24, 1998. Current Status: SET Registry File Number: B8265/B12

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 126 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Bunibonibee Cree Nation (BAND-301)

TLE Alleged shortfall of land under Treaty 5. This First Nation is a signatory to the Manitoba TLE Framework Agreement. A Date Received by SCB: 1981/02/01 settlement agreement was reached on February 17, 1999. Current Status: SET Registry File Number: B8265/O5

Canupawakpa Dakota First Nation (BAND-289)

Turtle Mountain Reserve (Band previous name: Oak Lake) Alleged wrongful 1909 surrender of Turtle Mountain Indian Reserve No. 60. Date Received by SCB: 1993/04/26 Current Status: FCL Registry File Number: B8260-332

Cross Lake First Nation (BAND-276)

Lot 1 - 1931 Surrender Alleged improper alienation of reserve land in 1931. Date Received by SCB: 1989/05/19 Current Status: INACT Registry File Number: B8260-162-1

Lot 3 Alienation Alleged Lot 3 was surveyed as part of the Cross Lake Indian Reserve #19 in 1877, but was subsequently improperly alienated. Date Received by SCB: 1994/12/21 Current Status: LOS Registry File Number: B8260-539

Lots 2 and 4 - 1885 Surrender Alleged improper surrender of reserve land in 1885. Date Received by SCB: 1990/01/19 Current Status: LOS Registry File Number: B8260-162-2

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 127 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Cross Lake First Nation (BAND-276)

Survey of Reserve 19 - 19A & 19D Alleged illegal transactions, allowed to occur on reserves no. 19, 19A and 19D, and FNs interests not protected in 1930 Manitoba Date Received by SCB: 1977/02/28 Natural Resources Agreement. Current Status: AR Registry File Number: B8260-162

Fisher River (BAND-264)

1896 Alienation Alleged that, as a result of an erroneous survey, 1,722.6 acres were not added to the South East Addition of reserve #44, and that Date Received by SCB: 1994/12/13 1,040 acres were not added to the South West Addition. Current Status: ISCC Registry File Number: B8260-538

Fort Alexander (BAND-262)

Alienation of Lot 7A Alleged alienation of Lot 7A (formerly Fort Alexander Band FN also known as Sagkeeng. Date Received by SCB: 1981/01/14 Current Status: FCL Registry File Number: B8260-201

Outstanding Treaty Land Entitlement The FN (also known as Sagkeeng FN) maintains that there is a TLE shortfall, plus outstanding obligations arising from the "outside Date Received by SCB: 2000/05/26 promises" of treaty 1. Current Status: RES Registry File Number: B8265/F5

Fox Lake (BAND-305)

TLE Alleged shortfall of land under Treaty 5. This First Nation is a signatory to the Manitoba TLE Framework Agreement. Date Received by SCB: 1981/05/13 Current Status: INACT Registry File Number: B8265-10/F6

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 128 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Gamblers (BAND-294)

Road Allowances Alleged alienation of road allowances. Date Received by SCB: 1987/02/04 Current Status: DOJ Registry File Number: B8260-293-1

TLE Substance of Claim Not Defined Date Received by SCB: 1978/06/23 Current Status: FCL Registry File Number: B8265/G2

Trust Account Mismanagement Alleged mismanagement of land sales proceeds. Date Received by SCB: 1987/02/09 Current Status: ACT Registry File Number: B8260-293

Garden Hill First Nations (BAND-297)

TLE Substance of Claim Not Defined Date Received by SCB: 1970/08/25 Current Status: SET Registry File Number: B8265/I2

God's Lake First Nation (BAND-296)

TLE Alleged shortfall of land under Treaty 5. This First Nation is a signatory to the Manitoba TLE Framework Agreement. A Date Received by SCB: 1978/03/08 settlement agreement was reached on May 28, 1999. Current Status: SET Registry File Number: B8265/G4

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 129 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Grand Rapids First Nation (BAND-310)

Navigation Aid Grand Rapids FN claims that since 1954, there has been no formal agreement between the FN and the Coast Guard for the use of Date Received by SCB: 2002/07/22 Reserve Lands for the purpose of the navigational aid. Current Status: DOJ Registry File Number: B8260-628

Treaty Land Entitlement Based on a calculation of the number of FN members entitled to be counted for Treaty Land Entitlement (TLE) purposes and the Date Received by SCB: 2006/11/14 amount of reserve land received for TLE purposes, the Grand Current Status: SUB/REV Rapids FN alleges that it did not receive the full amount of land Registry File Number: B8265/G8 promised in the Grand Rapids adhesion to Treaty 5. The claim submission alleges a shortfall of 213 acres.

Keeseekoowenin (BAND-286)

1896 Lands Alleged wrongful alienation of reserve lands in 1896 within Riding Mountain National Park. Date Received by SCB: 1980/06/26 Current Status: SET Registry File Number: B8260-196

1906 Lands The claim relates to the expropriation in 1935 of the 1906 lands. Date Received by SCB: 1993/09/07 Current Status: SET Registry File Number: B8260-540

Kinonjeoshtegon First Nation (BAND-268)

Jackhead River Dam (Band previous name: Jackhead) Seeks compensation for flooding on I.R. #43 & I.R. #43A, & for cutting & using logs for dam Date Received by SCB: 1997/12/11 construction without consent of the FN. Current Status: DOJ Registry File Number: B8260-613

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 130 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Lake Manitoba (BAND-271)

North-South Public Roads Alleged expropriation of part of its reserve for north-south public roads. Date Received by SCB: 1993/06/01 Current Status: RES Registry File Number: B8260-586

P.T.H. No. 68 Alleged expropriation of part of its reserve for P.T.H. No. 68. Date Received by SCB: 1993/05/25 Current Status: RES Registry File Number: B8260-587

Little Black River (BAND-260)

TLE Substance of Claim Not Defined Date Received by SCB: 1990/08/30 Current Status: AR Registry File Number: B8265/L13

Long Plain (BAND-287)

1916 Surrender - Mismanagement of Sales The First Nation alleges that the Crown breached its fiduciary obligation in its failure to adhere to the terms of the 1916 surrender. Date Received by SCB: 1999/11/04 The FN alleges nine specific instances where Canada failed to Current Status: DOJ discharge its duty. Registry File Number: B8260-300

Loss of Use FN alleges loss of use of the shortfall land, from 1876 to 1994, promised under Treaty 1. Date Received by SCB: 1994/11/30 Current Status: ACT Registry File Number: B8265/L6

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 131 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Long Plain (BAND-287)

TLE Substance of Claim Not Defined Date Received by SCB: 1977/07/09 Current Status: SET Registry File Number: B8265/L6

Manto Sipi Cree Nation (BAND-302)

TLE (Band previous name: God's River). Alleged shortfall of land under Treaty 5. This First Nation is a signatory to the Manitoba TLE Date Received by SCB: 1978/03/08 Framework Agreement. A settlement agreement was reached on Current Status: SET May 28, 1999. Registry File Number: B8265/G4

Marcel Colomb First Nation (BAND-328)

TLE (SPLIT #02) TLE - Marcel Colomb Alleged shortfall of land under Treaty 6. This First Nation separated Date Received by SCB: from a signatory FN of the Manitoba TLE Framework Agreement. Current Status: ACT Registry File Number: B8265/10/M2

Mathias Colomb (BAND-311)

TLE (SPLIT #01) TLE - Mathias Colomb Alleged shortfall of land under Treaty 6. This First Nation is a Date Received by SCB: signatory to the Manitoba TLE Framework Agreement. Current Status: SET Registry File Number: B8265/10/M2

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 132 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Mosakahiken / Chemawawin (ASSCTN)

Land Exchange Also known as the Moose Lake Indian Band. Alleged breach of - Chemawawin Cree Nation (BAND-309) contract in a land exchange. - Mosakahiken Cree Nation (BAND-312) Date Received by SCB: 1985/11/05 Current Status: SET Registry File Number: B8260-276

Mosakahiken Cree Nation (BAND-312)

Moose Lake IR #31A - 22.2 Acre Expropriation The FN claims an outstanding lawful obligation by Canada in respect of Canada's consenting to the taking of the most southerly Date Received by SCB: 2004/04/30 22.2 acres of Indian Reserve #31A by the Province of Manitoba Current Status: DOJ (Manitoba Hydro) between 1962 and 1970 for water control Registry File Number: B8260-823 purposes, and to provide land to Métis families dislocated by the flooding project.

Nisichawayasihk Cree Nation (BAND-313)

TLE (Band previous name: Nelson House). Alleged shortfall of land under Treaty 5. This First Nation is a signatory to the Manitoba Date Received by SCB: 1981/06/03 TLE Framework Agreement. Current Status: SET Registry File Number: B8265/N6

Northlands (BAND-317)

TLE Alleged shortfall of land under Treaty 10. This First Nation is a signatory to the Manitoba TLE Framework Agreement. A Date Received by SCB: 1978/03/08 settlement agreement was reached on November 9, 1999. Current Status: SET Registry File Number: B8265/B2-N3

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 133 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Norway House Cree Nation (BAND-278)

Norway House Indian Reserve #17 Chiefs Island The FN alleges that in August of 1928 the FN surrendered "Chiefs (Surrender Project) Island". In exchange they were promised, by the Indian Agent, land equivalent in acreage for the area lost. To date the FN has not Date Received by SCB: 2004/12/07 received the acreage for the area surrendered in 1928. Current Status: ACT Registry File Number: B8260-837

TLE Alleged shortfall of land under Treaty 5. This First Nation is a signatory to the Manitoba TLE Framework Agreement. A Date Received by SCB: 1978/03/06 settlement agreement was reached on November 12, 1998. Current Status: SET Registry File Number: B8265/N7

O-Chi-Chak-Ko-Sipi First Nation (BAND-279)

Expropriation for Provincial Road #481 (Band previous name: Crane River) The FN alleges that the Federal Government did not exercise its fiduciary duty in obtaining Date Received by SCB: 2002/03/01 proper compensation for the band. Current Status: DOJ Registry File Number: B8260-758

Opaskwayak Cree Nation (BAND-315)

Agency Grounds Alleged inappropriate administration of surrender. Date Received by SCB: 1987/07/24 Current Status: ACT Registry File Number: B8260-164-4

Birch River Reserve Alleged unfulfilled land exchange related to surrender of Birch River Reserve in 1918. Date Received by SCB: 1989/12/20 Current Status: ACT Registry File Number: B8260-164-5

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 134 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Opaskwayak Cree Nation (BAND-315)

Block 23 Alleged outstanding debt owed on terms of original sale of Block 23. Date Received by SCB: 1991/06/07 Current Status: SET Registry File Number: B8260-164-8

Block 43 Alleged inadequate price for the south half of Block 43 compared to the north half. Date Received by SCB: 1991/06/07 Current Status: SET Registry File Number: B8260-164-7

Block 49 Lots 1& 2 Alleged loss of use of Block 49, Lots 1 and 2, due to its free grant to the town and the loss of the sale. Date Received by SCB: 1991/06/07 Current Status: SET Registry File Number: B8260-164-6

Block 61 Alleged loss of compensation and the lost sale opportunity for Block 61. Date Received by SCB: 1991/06/07 Current Status: SET Registry File Number: B8260-164-9

Block 62-1; Lots 1-4 Alleged losses due to loss of the sale opportunity for Block 62-1, Lots 1 - 4. Date Received by SCB: 1992/01/15 Current Status: SET Registry File Number: B8260-164-11

Pasquia Dyke Alleged taking of lands for dam. Date Received by SCB: 1984/08/24 Current Status: SET Registry File Number: B8260-164-1

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 135 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Opaskwayak Cree Nation (BAND-315)

Railway Lands Seeks the return of the abandoned railway lands on its reserve. Date Received by SCB: 1993/06/15 Current Status: NLO Registry File Number: B8260-164-12

Streets & Lanes Alleged $2,000 improperly expended from account in 1912 for streets and lanes improvements. Date Received by SCB: 1986/05/14 Current Status: FCL Registry File Number: B8260-164-2

TLE Alleged shortfall of land under Treaty 5. this FN is a signatory to the Manitoba TLE Framework Agreement. The settlement Date Received by SCB: 1978/03/08 agreement was reached on January 22, 1999. Current Status: SET Registry File Number: B8265/T2

Town Cemetery Alleged failure to collect total payment for surrendered land and right-of-way compensation. Date Received by SCB: 1986/07/14 Current Status: SET Registry File Number: B8260-164-3

Townsite Land Sales Block 81-5; 82-4 & 5 This claim has been re-submitted. The First Nation alleges that instead of securing fair market value for surrendered lands, the Date Received by SCB: 2001/02/22 land was conveyed to the Town of The Pas for a nominal price, Current Status: DOJ $1.00. The land was acquired for the purpose of widening certain Registry File Number: B8260-164-10 portions of the road system. The FN seeks compensation based on (a) the payment of the real value of the subject land and (b) payment of accumulative interest on part (a) from the time of original alienation in 1933 to the present day.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 136 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Peguis (BAND-269)

1907 Surrender Canada failed to comply with certain obligations under the surrender provisions of the 1906 Indian Act, rendering the 1907 Date Received by SCB: 1995/06/19 surrender of the St. Perter's Reserve invalid. Current Status: ACT Registry File Number: 8260-156+541

TLE Resubmission There is an outstanding TLE shortfall arising from the fact that not all the members of the Peguis First Nation appear to have been Date Received by SCB: 1984/02/23 counted at the date of the first survey (DOFS), and/or from the Current Status: ACT erroneous inclusion of the St. Peter's Parish river lots in calculating Registry File Number: B8265/P3 the acreage of the St. Peter's Reserve.

Pine Creek (BAND-282)

Expropriation Road Right-of-Way Alleged wrongful alienation of 94 acres of reserve land for a road right-of-way. Date Received by SCB: 1987/09/02 Current Status: SET Registry File Number: B8260-344

Navigation Aid Situated on Reserve Land The FN alleges an unlawful trespass by the Canadian Coast Guard for the establishment, operation and maintenance of navigation Date Received by SCB: 2002/02/20 aids on reserve land. Current Status: DOJ Registry File Number: B8260-757

TLE Substance of Claim Not Defined Date Received by SCB: 1978/03/08 Current Status: NLO Registry File Number: B8265/P7

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 137 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Pine Creek (BAND-282)

Wrongful Surrender of Duck Bay Reserve (Surrender The FN alleges that the 1886 surrender of the Duck Bay Reserve Project) was invalid, since the Government had wrongfully advised several band members to withdraw from Treaty before the signing of the Date Received by SCB: 2005/06/23 surrender; and that these "withdrawn" band members whould in Current Status: LOS fact have been allowed to vote on the surrender agreement. Registry File Number: B8260-867

Red Sucker Lake (BAND-300)

TLE Substance of Claim Not Defined Date Received by SCB: 1970/08/25 Current Status: SET Registry File Number: B8265/I2

Rolling River (BAND-291)

Encroachment - Hydro Trans. Line Alleged unlawful encroachment by hydro transmission line since 1959 and inadequate compensation. Date Received by SCB: 1997/08/18 Current Status: AR Registry File Number: B8260-596

Road Right-of-Way Expropriation Alleged improper expropriation for a road right of way. Date Received by SCB: 1992/06/24 Current Status: ACT Registry File Number: B8260-311

TLE Alleged shortfall of land under Treaty 4. This First Nation is a signatory to the Manitoba TLE Framework Agreement. A Date Received by SCB: 1978/06/23 settlement agreement was reached on March 6, 1998. Current Status: SET Registry File Number: B8265/R5

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 138 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Roseau River Anishinabe First Nation Government (BAND-273)

1903 Surrender - Band Funds Mismanagement Concerns the validity of the 1903 surrender of a portion of Roseau River reserve No. 2 involving a joint research project under the Date Received by SCB: 1982/08/30 auspices of the ISCC. Originally the claim dealt with illegal Current Status: ISCC improper administration of the proceeds of the surrender. Registry File Number: 8260-206+601

Medical Benefits - Treaty 1 Claimed for compensation of medical aid promised in the Treaty. Date Received by SCB: 1981/10/15 Current Status: FCL Registry File Number: B8260-206-1

TLE Substance of Claim Not Defined Date Received by SCB: 1978/03/08 Current Status: SET Registry File Number: B8265/R6

Sandy Bay (BAND-283)

TLE Substance of Claim Not Defined Date Received by SCB: 1983/02/14 Current Status: ISCC Registry File Number: B8265/S4

Sapotaweyak Cree Nation (BAND-314)

1954 & 1955 Surrenders (Formerly: Shoal River Indian Band) Alleged a failure to compensate for lands surrendered for public purposes in 1954 and Date Received by SCB: 1989/12/13 1955. Current Status: SET Registry File Number: B8260-384

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 139 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Sapotaweyak Cree Nation (BAND-314)

Navigation Aid on Reserve Land (Formerly: Shoal River Indian Band) Land taken for use of navigation aid without permission by the Canadian Coast Guard. Date Received by SCB: 2002/04/12 No compensation given. Canada alleged to have breached lawful Current Status: DOJ and fiduciary duties and obligations. First Nation seeks Registry File Number: B8260-768 compensation for loss and/or damages.

TLE (Formerly: Shoal River Indian Band) Alleged shortfall of land under Treaty 4. Signatory to the Manitoba TLE Framework Agreement. Date Received by SCB: 1978/03/08 A settlement agreement was reached on July 30, 1998. Current Status: SET Registry File Number: B8265/S7

Sayisi Dene First Nation (BAND-303)

TLE Alleged shortfall of land under Treaty 5. This First Nation is a signatory to the Manitoba TLE Framework Agreement. Date Received by SCB: 1977/07/08 Current Status: INACT Registry File Number: B8265/C3

Shamattawa First Nation (BAND-307)

TLE Alleged shortfall of land under Treaty 5. This First Nation is a signatory to the Manitoba TLE Framework Agreement. Date Received by SCB: 1978/03/03 Current Status: INACT Registry File Number: B8265/S6

Sioux Valley Dakota Nation (BAND-290)

Woodlot Claim Alleged unlawful alienation of wood lot 'reserve'. Date Received by SCB: 1992/07/13 Current Status: NLO Registry File Number: B-8260-380

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 140 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Skownan First Nation (BAND-281)

1938 Surrender (Band previous name: Waterhen) Alleged improper use of reserve land without compensation and improper surrender of reserve land Date Received by SCB: 1988/02/03 in 1938. Current Status: FCL Registry File Number: B8260-362

St. Theresa Point (BAND-298)

TLE Substance of Claim Not Defined Date Received by SCB: 1970/08/25 Current Status: SET Registry File Number: B8265/I2

Swan Lake (BAND-293)

TLE Substance of Claim Not Defined Date Received by SCB: 1978/03/08 Current Status: SET Registry File Number: B8265/S11

Tataskweyak Cree Nation (BAND-306)

TLE (Band previous name: Split Lake Cree - name change on April 3, 2001). Claimant alleges a Treaty Land Entitlement shortfall. Date Received by SCB: 1999/02/22 Current Status: BA Registry File Number: B8265/S14

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 141 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Tootinaowaziibeeng Treaty Reserve (BAND-292)

1905 Railway Expropriation FN claims that it did not consent to nor receive adequate compensation for lands taken by CNR in 1905 & 1908 for railway Date Received by SCB: 1999/04/01 purposes (ballast pit and station grounds). Claim land was sold Current Status: BA rather than returned to FN when no longer required for railway Registry File Number: B8260-598 purposes in 1939. No allegations concerning the 82.5 railway r-o-w also taken (may follow).

War Lake First Nation (BAND-323)

TLE Alleged shortfall of land under Treaty 5. Signatory to the Manitoba TLE Framework Agreement. A settlement agreement was reached Date Received by SCB: 1982/11/30 on May 28, 1999. Current Status: SET Registry File Number: B8265/W8

Wasagamack First Nation (BAND-299)

TLE Substance of Claim Not Defined Date Received by SCB: 1970/08/25 Current Status: SET Registry File Number: B8265/I2

Waywayseecappo First Nation Treaty Four - 1874 (BAND-285)

1881 Surrender (Surrender Project) Alleged 1881 surrender of reserve is invalid based on analysis suggesting an insufficient number of eligible members voted. Date Received by SCB: 2004/10/28 Current Status: INACT Registry File Number: B8260-588

Location of Reserve Alleged reserve lands were improperly located. Date Received by SCB: 1995/09/28 Current Status: DOJ Registry File Number: B8260-603

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 142 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Manitoba

Claimant Substance of Claim

Waywayseecappo First Nation Treaty Four - 1874 (BAND-285)

Sufficiency of Reserve Lands Alleged reserve lands are insufficient. Date Received by SCB: 1995/09/28 Current Status: FCL Registry File Number: B8260-602

Wuskwi Sipihk First Nation (BAND-324)

TLE (Band previous name: Indian Birch). Alleged shortfall of land under Treaty 4. Signatory to the Manitoba TLE Framework Agreement. Date Received by SCB: 1978/03/08 A settlement agreement was reached on July 17, 1998. Current Status: SET Registry File Number: B8265/S7

York Factory First Nation (BAND-304)

TLE Alleged shortfall of land under Treaty 5. This First Nation is a signatory to the Manitoba TLE Framework Agreement. Date Received by SCB: 1978/03/01 Current Status: INACT Registry File Number: B8265/Y2

Total of Claims for Manitoba: 92

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 143 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 New Brunswick

Claimant Substance of Claim

Buctouche (BAND-004)

Aboushagan Reserve The Crown breached its fiduciary duty and lawful obligation by failing to prevent dismemberment of reserve through private sales Date Received by SCB: 2004/07/21 and squatting; and by failing to either recover the reserve or Current Status: DOJ compensate beneficiaries for its loss. Registry File Number: B8260-906

Cocagne Island Alleged illegal disposition of the Cocagne Island Reserve by the Crown in 1850. Date Received by SCB: 2004/07/21 Current Status: DOJ Registry File Number: B8260-818

Establishment of Buctouche Indian Reserve This claim relates to the original creation date and size of the Buctouche IR No. 16. The FN alleges the reserve was originally a 4 Date Received by SCB: 2003/05/01 mile by 8 mile tract in 1802. Current Status: DOJ Registry File Number: B8260-775

Eel Ground (BAND-007)

1946 Surrender - Pipeline Right of Way The FN made a general submission in 1976 and a more detailed submission in 1984. The FN decided to re-submit in 1997. The Date Received by SCB: 1997/03/21 claimant alleges that the surrender was invalid as certain Current Status: ACT procedures were not complied with, and even if the surrender was Registry File Number: 8260-155/566 valid, its conditions were not fulfilled such that the transactions pursuant there to were null and void. The FN also alleged in the 1997 submission that DIAND breached its fiduciary duty to the FN and is liable for the damages. This last allegation was not part of the previous submissions.

Eel River Bar First Nation (BAND-008)

Loss of 180 acres Claimants allege that between 1842 and 1867, some 180 acres were alienated from the Eel River Bar Reserve without surrender. Date Received by SCB: 1996/12/10 Current Status: DOJ Registry File Number: B8260-551

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 144 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 New Brunswick

Claimant Substance of Claim

Eel River Bar First Nation (BAND-008)

Sand and gravel Claimants allege that removal of sand and gravel from the reserve in 1910 and again between 1925-30, caused damage to the Date Received by SCB: 1998/05/26 reserve and was done without proper consent; also allege that Current Status: DOJ 1929 surrender of rights to sand on the reserve was null and void. Registry File Number: B8260-650

UNBI - Flooding This claim was originally submitted in 1987 and resubmitted in 1992 and 1995. FN alleges the following: an outstanding land Date Received by SCB: 1995/02/28 entitlement of 180 acres, delay in adding lands to the reserve, fraud Current Status: FCL by DIA officials in obtaining the 1970 compensation agreement, Registry File Number: B8260-285 invalid expropriation of lands for the dam, and a further invalid expropriation of 4.86 acres in 1978. As a result of the construction of the dam, the NF further alleges they suffered social, psychological and economic damage.

Fort Folly (BAND-009)

IR #27 - 1966 FN alleges that the sale of IR #27 in 1966 was unlawful without first obtaining a surrender. Date Received by SCB: 1994/08/22 Current Status: NLO Registry File Number: B8260-480

Indian Island (BAND-010)

Richibucto Island Alleged ownership of Richibucto Island on the basis of long unchallenged occupancy, that the island is the traditional camping Date Received by SCB: 1975/09/16 ground for the FN and it has been reclaimed by the FN with no Current Status: FCL objection made by anyone regarding the said occupation. Registry File Number: B8260-151

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 145 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 New Brunswick

Claimant Substance of Claim

Kingsclear (BAND-011)

1.08 Acres Land Alleged that the St. John & Quebec Railway Co. took possession of 1.08 acres of land prior to the 1914 Order-in-Council which Date Received by SCB: 1984/10/03 authorized sale of land. This, allegedly, contravened the 1906 Current Status: NLO Indian Act. Further, the FN alleged that it had rights in the water Registry File Number: B8260-243 contained in the pipeline running across the abandoned railway right-of-way by virture of the 'savings' clause in the Letters Patent and this should be reverted to the FN.

Madawaska Maliseet First Nation (BAND-006)

Alienation of Reserve Lands Claimants allege reserve land was illegally alienated from the reserve between the 1790s and 1850s. Date Received by SCB: 1998/04/16 Current Status: ISCC Registry File Number: B8260-648

St-Basile - Pipeline R/W Claimants allege that 7.88 acres of reserve land taken in 1870 by NB Railway (succeeded by CPR), then abandoned as railway land Date Received by SCB: 1998/07/24 in 1936, should have been returned to the FN and not leased (in Current Status: ACT 1970) to Fraser Co. for pipeline and 3.8 acres of reserve land taken Registry File Number: 8260-659+110 for a Railway should have been returned to the FN.

Metepenagiag Mi'kmaq Nation (BAND-014)

1844 Act (Band previous name: Red Bank). The 1844 claim was chosen as the subject of a pilot joint research project in May 1996. The issue Date Received by SCB: 1996/05/22 involves the enactment in 1844, by the Colonial Government, of a Current Status: NLO statute which allowed for the sale of reserve lands to squatters. Registry File Number: B8260-698

1895 Surrender (Band previous name: Red Bank). The second claim of the Red Bank Joint Research pilot project. This joint research pilot project Date Received by SCB: 1996/05/22 will re-examine the terms and conditions of the 1895 surrender of Current Status: ACT parts of IR #4, IR #7, Big Hole Tract and Indian Point. Registry File Number: 8260-255+699

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 146 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 New Brunswick

Claimant Substance of Claim

Metepenagiag Mi'kmaq Nation (BAND-014)

1974 Squatter Removal (Band previous name: Red Bank). The fourth claim in the Red Bank Joint Research Pilot Project. This project will provide Date Received by SCB: 1999/10/01 research and analysis on approximately 29 non-Indian families who Current Status: LOS were removed from unsurrendered lands located at Red Bank Registry File Number: B8260-701 Reserve No. 4.

Addit. Removals to 1974 Squatter Removal (Band previous name: Red Bank). The sixth claim in the Red Bank Joint Research pilot Project. This joint research project will collect Date Received by SCB: 2000/12/11 and complete research as an addendum to the 1974 Removal Current Status: LOS report. It will cover the history of the non-Indian occupation of Registry File Number: B8260-701-1 village lots at Red Bank and the removal of those parties.

Fishing Lease (Band previous name: Red Bank). Alleged breach of trust concerning the management and letting of portions of Big Hole Date Received by SCB: 1986/09/05 Tract reserve for fishing purposes from 1892 - 1986. Current Status: SET Registry File Number: B8260-255-1

Hosford Lot (Band previous name: Red Bank). The third claim in the Red Bank Joint Research pilot project. The Hosford Lot was allegedly never Date Received by SCB: 1999/01/26 surrendered, but patented to a non-Indian in 1906, and thus Current Status: SET unlawfully alienated from the FN. Registry File Number: B8260-700

I.R. #7 (Band previous name: Red Bank). Alleged that approximately 64.2 acres were illegally alienated from Lots 1 to 7, located on I.R.#7 , in Date Received by SCB: 1996/07/19 1904 and seeking the return of the lands, or compensation and loss Current Status: SET of use. Registry File Number: B8260-557

Loss of Use - Big Hole Tract (Band previous name: Red Bank). Alleged loss of use of land (1843 and 1877) owing to long term non-Indian occupation of Big Date Received by SCB: 1993/02/12 Hole Tract I.R. No. 8. Current Status: SET Registry File Number: B8260-442

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 147 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 New Brunswick

Claimant Substance of Claim

Metepenagiag Mi'kmaq Nation (BAND-014)

Lots A - B - 1 (Band previous name: Red Bank). Alleged invalid Grant for Lot A and invalid Letters Patent for Lots B and 1. Date Received by SCB: 2000/01/13 Current Status: NLO Registry File Number: B8260-729

Public Roads and Utilities: ROW (Band previous name: Red Bank). Alleged breach of Canada's fiduciary obligation to protect FN's interests in pre- and Date Received by SCB: 2001/03/27 post-confederation takings of reserve lands for public roads and Current Status: DOJ utilities right-of-ways without authority and compensation to the FN. Registry File Number: B8260-744

Oromocto (BAND-012)

Camp Gagetown - Oromocto Point 1953 Alleged improper surrender of 29 HA. at Oromocto Point in 1953 for DND use (Camp Gagetown). Date Received by SCB: 1979/11/23 Current Status: SET Registry File Number: B8260-194-1

Pabineau (BAND-013)

Gould Island FN alleges that Gould Island was always part of Pabineau Reserve, at least 30 years before its purchase by federal govt for Date Received by SCB: 1998/04/23 Bathurst Band. FN also alleges that 1927 surrender and Current Status: BA subsequent sale were void since no OinC was issued to establish Registry File Number: B8260-691 the reserve, or in the alternative, that the conditions of the Indian Act were not met in this surrender.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 148 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 New Brunswick

Claimant Substance of Claim

Tobique (BAND-016)

1892 Surrender (Surrender Project) This is the first claim submitted in a Joint Research Project that comenced on July 3, 2002, between SCB, Region and the First Date Received by SCB: 2002/08/30 Nation. This claim involves the validity of an 1892 Surrender for Current Status: LOS 12,000 acres below the Tobique River. The First Nation claims that Registry File Number: B8260-772 the surrender is void because: 1. There was no Order in Council accepting the surrender, and 2. The signatures were forged.

Union of New Brunswick Indians (ASSCTN)

1879 Surrender - 1880 Order in Council (Band previous name: Big Cove) Alleged alienation of 203 HA. of - Elsipogtog First Nation (BAND-003) reserve land without adherence to land sales stipulations of the 1879 surrender and 1880 order in council. Date Received by SCB: 1973/12/04 Current Status: SET Registry File Number: B8260-121

Bouctouche I.R. #16 - Squatters UNBI requested eviction of squatters occupying and using land - Buctouche (BAND-004) reserved for FN. Date Received by SCB: 1977/05/19 Current Status: AR Registry File Number: B8260-169

St Croix and Canous Indian Reserves It is alleged that the Canous and St Croix reserves were unlawfully sold without surrender. The Department maintained that there were Date Received by SCB: 1993/09/03 no longer any Indians living in the area from which to take a Current Status: FCL surrender. The Canous Reserve was sold in 1936 and the St. Registry File Number: 8260-136+464 Croix Reserve was transferred to New Brunswick in 1944. It is also alleged that Timber was unlawfully taken from the reserves.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 149 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 New Brunswick

Claimant Substance of Claim

Union of New Brunswick Indians (ASSCTN)

St. Ann's Point - UNBI UNBI sought return of 1.6 HA. of land originally reserved in 1779 as - Kingsclear (BAND-011) Indian burial ground. - Oromocto (BAND-012) - Saint Mary's (BAND-015) Date Received by SCB: 1973/01/08 Current Status: AR Registry File Number: B8260-116

Woodstock (BAND-017)

1904 Surrender - I.R. 23 Alleged 1904 land surrender invalid, and claimed damages for land flooded in 1966. Date Received by SCB: 1984/02/22 Current Status: ACT Registry File Number: B8260-228

Total of Claims for New Brunswick: 30

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 150 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Northwest Territories

Claimant Substance of Claim

Deninu K'ue First Nation (BAND-762)

TLE Substance of Claim Not Defined Date Received by SCB: 1992/02/04 Current Status: AR Registry File Number: N/A

K'atlodeeche First Nation (BAND-761)

M. O. T. Site Hay River Band has raised issues relating to compensation, access, reduction of area and contracts issued by MOT relating to Date Received by SCB: 1996/04/26 the site. Current Status: LIT Registry File Number: B8260-558

Private Lots First Nation alleges that when the reserve was created in 1973, DIAND promised that Canada would acquire twenty privately Date Received by SCB: 1999/07/06 owned lots and Canada would add those lots to reserve. From Current Status: FCL 1974 to 1976, Canada acquired nine lots, but the First Nation Registry File Number: B8260-693 alleges that no further action has been taken to acquire the remaining eleven lots. FN's request to have special sites preserved solely for FN use, at the time of reserve creation, was ignored.

Reserve Creation The First Nation alleges it requested certain fishing and camping sites to be set aside at the time of reserve creation. The First Date Received by SCB: 1999/07/06 Nation maintains that those sites were meant to be part of its Current Status: LOS reserve; however, none of those specific sites have been set aside Registry File Number: B8260-693 for the First Nation's benefit.

TLE Allege that the Crown failed to set aside the full land entitlement and as the land entitlement has not been satisfied, the Treaty Land Date Received by SCB: 2000/03/23 Entitlement should be based on current population. Also allege Current Status: ACT that an additional area of 200 sq. miles would be allotted to the FN; Registry File Number: B8265/H2-1 certain traditional sites would be included in these lands.

Treaty 8 Agricultural Benefits The FN alleges it did not receive any of the agricultural benefits to which it was entitled under Treaty 8, and that the Crown's failure to Date Received by SCB: 2006/03/14 provide livestock and implements and its policies that discouraged Current Status: RES agriculture as an economic alternative to traditional hunting and Registry File Number: B8260-889 gathering, have frustrated the intent and purpose of Treaty 8.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 151 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Northwest Territories

Claimant Substance of Claim

K'atlodeeche First Nation (BAND-761)

Vale Island First Nation alleges that between the years of 1947 - 1949, the department of Mines and Resources forced the First Nation to Date Received by SCB: 1999/05/28 become dispossessed of 397 acres of land deemed reserved for Current Status: LOS them by the surveyor general in 1926. Registry File Number: B8260-692

Lutsel K'e Dene First Nation (BAND-764)

TLE Substance of Claim Not Defined Date Received by SCB: 1992/02/04 Current Status: AR Registry File Number: N/A

Salt River First Nation #195 (BAND-759)

TLE FN requested that Canada fulfills its Treaty 8 obligations for land and economic benefits. Date Received by SCB: 1998/11/04 Current Status: SET Registry File Number: B8265/T4+S30

Smith's Landing First Nation (BAND-477)

TLE Salt River FN requested Band creation of Smith's Landing and that Canada fulfills its Treaty 8 obligations for land and economic Date Received by SCB: 1998/09/17 benefits to the new Band. Current Status: SET Registry File Number: B8265/T4

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 152 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Northwest Territories

Claimant Substance of Claim

Yellowknives Dene First Nation (BAND-763)

TLE Substance of Claim Not Defined Date Received by SCB: 1992/02/04 Current Status: AR Registry File Number: N/A

Total of Claims for Northwest Territories: 11

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 153 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Nova Scotia

Claimant Substance of Claim

Acadia (BAND-018)

Ponhook I.R. #10 Alleged illegal alienation of two reserve lots (1 and 2 in 1871), including a burial ground which was flooded & alleged intermittent Date Received by SCB: 1982/10/27 loss of use of two other lots (lots 3 and 4) and breach of trust. Current Status: SET Registry File Number: B8260-216

Annapolis Valley (BAND-020)

423 Acres - 1985 FN sought the recovery of 423 acres of land of Horton I.R. allegedly lost when FN separated in 1985 from Horton FN. Date Received by SCB: 1986/07/29 Current Status: NLO Registry File Number: B8260-314

Bear River (BAND-021)

5.69 Acres - 1922 Alleged illegal surrender of 5.69 acres to the NS Power Commission in 1922. Date Received by SCB: 1977/07/06 Current Status: AR Registry File Number: B8260-173

Bear River Pipeline - Aqua duct - ROW Alleges that Canada breached its fiduciary and legal obligations to the FN with respect to events surrounding the expropriation of Date Received by SCB: 2006/08/02 approx. 6 acres of Reserve land in 1952 for the construction of a Current Status: BA pipeline by the Nova Scotia Power Commission Ltd. Registry File Number: B8260-885

Chapel Island First Nation (BAND-022)

1867 Surrender Alleged alienation of 48 acres of land from Chapel Island I.R. 5 without surrender in 1867. Date Received by SCB: 1981/08/18 Current Status: FCL Registry File Number: B8260-212

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 154 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Nova Scotia

Claimant Substance of Claim

Chapel Island First Nation (BAND-022)

1923 lease from 1922 to present Alleged loss of lease revenues resulting from cancellation, for non-payment of rent, of 1923 lease from 1922 to present. Date Received by SCB: 1981/08/18 Current Status: FCL Registry File Number: B8260-212

200 Acres Lot Alleged 200 acre lot purchased by the FN in 1964, should have reserve status and be exempt from taxes. Date Received by SCB: 1981/08/18 Current Status: AR Registry File Number: B8260-212

Expropriation Claimed compensation for alleged losses (expropriated non-Indian lands), resulting from the maritime centralization program. Date Received by SCB: 1981/08/18 Current Status: FCL Registry File Number: B8260-212

Right-of-Way FN alleges that no final settlement or ongoing compensation was paid for a right-of-way permit issued to the NS Commission in Date Received by SCB: 1981/08/18 1966. Current Status: AR Registry File Number: B8260-212

Trespass FN alleged that the NS Power Corporation established a sub-power station on the Chapel Island Reserve without its authorization and Date Received by SCB: 1981/08/18 is in trespass. FN claimed compensation for loss of use and Current Status: AR occupancy of land. Registry File Number: B8260-212

Membertou (BAND-026)

Sydney - DND Expropriation Alleged reserves lands (2.6 acres) were appropriated by DND for defense purposes without compensation. Date Received by SCB: 1973/11/05 Current Status: FCL Registry File Number: B8260-118

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 155 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Nova Scotia

Claimant Substance of Claim

Membertou (BAND-026)

Sydney - Railway FN alleges they did not receive compensation, between 1888 - 1903, for a .66 acre railway right-of-way across their reserve. Date Received by SCB: 1973/11/05 Current Status: NLO Registry File Number: B8260-118

Millbrook (BAND-027)

Duncan MacMillan / Sheet Harbour The FN alleges: incorrect survey of Sheet Harbour IR# 36, resulting in a loss of 5.75-6 acres; failure to remove trespassers and restore Date Received by SCB: 2002/06/05 land to reserve status; timber trespass and removal of fill; failure to Current Status: DOJ provide funding for legal services. Registry File Number: B8260-769

Paq'tnkek First Nation (BAND-019)

Highway (Band previous name: Afton) Alleged loss of use of lands from Afton and Pomquet I.R. taken in 1965 for highway right-of-way. FN Date Received by SCB: 1973/12/19 alleged province did not meet conditions required to provide access Current Status: BA roads when reserve lands were made available for highway Registry File Number: B8260-123 purposes.

Pomquet - CMM (Band previous name: Afton) CMM on behalf of Paq'tnkek First Nation alleged unlawful granting of 250 acres of reserve land in Date Received by SCB: 1988/12/30 1827 without surrender. Current Status: BA Registry File Number: B8260-370

Railway (Band previous name: Afton) Alleged illegal alienation of land in 1879/80, to Eastern Extension Railway(now part of CNR on Lot B Date Received by SCB: 1973/12/19 of I.R. #23) Current Status: NLO Registry File Number: B8260-123

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 156 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Nova Scotia

Claimant Substance of Claim

Paq'tnkek First Nation (BAND-019)

Summerside (Band previous name: Afton) FN requested that 100 acres of land, known as the Summerside property, be returned (in possession of Date Received by SCB: 1973/12/19 FN at Confederation, but not included among the Indian Reserves Current Status: AR transferred to Canada) to the Paq'tnkek First Nation, with Registry File Number: B8260-123 compensation for loss of use.

Shubenacadie (BAND-025)

Ship Harbour Lake Alleged illegal alienation in 1919, of 200 acres of reserve land. File carried by Millbrook and Shubenacadie FN in 1986. UNSI Date Received by SCB: 1974/03/07 originally submitted this claim. Current Status: FCL Registry File Number: B8260-115

Shubenacadie / Millbrook Claimants (ASSCTN)

1919 Surrender - CMM (Surrender Project) CMM on behalf of Shubenacadie and Millbrook FN alleged unlawful - Millbrook (BAND-027) surrender and sale of Sambro, Ingram River and Ship Harbour - Shubenacadie (BAND-025) Lake Indian Reserves in 1919. Date Received by SCB: 2005/09/21 Current Status: INACT Registry File Number: B8260-345

Middle Stewiacke Licence of Occupation A licence of occupation for 2560 acres was granted to certain - Millbrook (BAND-027) Mi'kmaq at Middle Stewiacke in the late 18th century. The - Shubenacadie (BAND-025) claimants allege that these lands were subsequently unlawfully alienated. Date Received by SCB: 2000/01/27 Current Status: DOJ Registry File Number: B8260-674

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 157 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Nova Scotia

Claimant Substance of Claim

UNION OF NOVA SCOTIA INDIANS-ADVISORY SERVICES (TC-9113)

Clyde River Involved the removal of squatters and restoration of reserve lands - Acadia (BAND-018) allegedly conveyed to Canada in 1867 by S. Fairbanks. Date Received by SCB: 1977/07/06 Current Status: BA Registry File Number: 8260-172+763

Eleven Surrenders Claimed that all surrenders of Indian Reserve lands in NS between - Acadia (BAND-018) July 1/1867 and March 3/1960 were illegal because said - Chapel Island First Nation (BAND-022) surrenders did not receive the approval of the proper proportion of - Eskasoni (BAND-023) the whole Micmac FN. Union wished that the land illegally - Membertou (BAND-026) surrendered be restored as Indian Reserve land. They also - Shubenacadie (BAND-025) claimed that Provincial Highway Allowances were granted illegally - Wagmatcook (BAND-028) for the same reasons. The following are the 11 reserves involved: - Waycobah First Nation (BAND-029) Kedgemakooge, Sambro Lake, Ship Harbour Lakd, St. Margaret's Bay, New Germany, Bear River, Pomquet, Sydney, Gold River Date Received by SCB: 1981/02/26 Whycocomgh, New Liverpool Rd. Current Status: FCL Registry File Number: B8260-106

Kejimkujik Land Claim - UNSI UNSI asked the Crown returns 3 unsold surrendered lots to - Acadia (BAND-018) reserve status, and compensates the Micmacs of NS for loss of - Annapolis Valley (BAND-020) use from either 1906 when the land was taken by surrender, or - Bear River (BAND-021) 1963, when it was expropriated for the Kejimkujik National Park. - Chapel Island First Nation (BAND-022) - Eskasoni (BAND-023) - Glooscap First Nation (BAND-030) - Membertou (BAND-026) - Millbrook (BAND-027) - Paq'tnkek First Nation (BAND-019) - Pictou Landing (BAND-024) - Shubenacadie (BAND-025) - Wagmatcook (BAND-028) - Waycobah First Nation (BAND-029) Date Received by SCB: 1973/05/01 Current Status: INACT Registry File Number: B8260-105

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 158 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Nova Scotia

Claimant Substance of Claim

UNION OF NOVA SCOTIA INDIANS-ADVISORY SERVICES (TC-9113)

Kejimkujik Timber Claim - UNSI Alleged inadequate compensation for sale of timber on lands - Acadia (BAND-018) surrendered for leasing in 1908. Timber resources surrendered in - Annapolis Valley (BAND-020) 1917. - Bear River (BAND-021) - Chapel Island First Nation (BAND-022) - Eskasoni (BAND-023) - Glooscap First Nation (BAND-030) - Membertou (BAND-026) - Millbrook (BAND-027) - Paq'tnkek First Nation (BAND-019) - Pictou Landing (BAND-024) - Shubenacadie (BAND-025) - Wagmatcook (BAND-028) - Waycobah First Nation (BAND-029) Date Received by SCB: 1974/06/04 Current Status: INACT Registry File Number: B8260-105-1

Roseway Alleged that some 300 acres of land, lost through various actions, - Acadia (BAND-018) should still retain reserve status. Date Received by SCB: 1977/07/06 Current Status: BA Registry File Number: B8260-172

Wagmatcook (BAND-028)

3800 Acres The Wagmatcook (Middle River) FN, residing near Baddeck, sought restoration of some 3,800 acres of their original reserve Date Received by SCB: 1972/04/13 which were allegedly alienated without their consent in 1892. Current Status: SET These lands were either sold under the provisions of Registry File Number: B8260-104 pre-Confederation NS statutes, settled upon by non-Indians without proper authorization or sold in violation of post-Confederation Federal legislation.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 159 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Nova Scotia

Claimant Substance of Claim

Waycobah First Nation (BAND-029)

1862 Alienation FN seeking the return of reserve lands, most of which were alienated around 1862, and for which, the FN alleged, Canada has Date Received by SCB: 1980/02/18 not accepted responsibility. Current Status: DOJ Registry File Number: B8260-119

Port Hood IR 26 FN agreed to exchange Margaree Reserve with Wagmatcook for the Port Hood Reserve. The claimant alleges that Canada never Date Received by SCB: 2003/10/27 surveyed the Port Hood Reserve, that its actual location and value Current Status: DOJ are unknown and that Canada has effected an illegal disposition of Registry File Number: B8260-809 the land. The FN is seeking relief, restitution and damages.

Total of Claims for Nova Scotia: 28

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 160 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Aamjiwnaang (BAND-172)

Clench Defalcation Misappropriation of sale proceeds. Date Received by SCB: 2007/11/09 Current Status: SUB/REV Registry File Number: B8260-944

Enniskillen (SPLIT #01) Aamjiwnaang (Band previous name: Chippewas of Sarnia). Alleged that certain Date Received by SCB: lands in Enniskillen Township were sold without surrender between 1866 and 1918. Current Status: SET Registry File Number: B8260-174

Alderville First Nation (BAND-160)

Loss of Bay of Quinte Reserve Lands FN alleges that four reserves, totalling 2,350 acres were set aside at the Bay of Quinte for the Mississaugas of Alderville First Nation Date Received by SCB: 1996/05/06 (originally Alnwick), and these lands were alienated without proper Current Status: DOJ surrender and compensation. The four reserves involved in the Registry File Number: B8260-520 claim were located in Prince Edward County at Mississauga Point, Grassy Point, Cape Vessey and Bald Head.

Algonquins of Pikwakanagan (BAND-163)

Aboriginal Title Alleged unextinguished aboriginal interest in some 3.4 million hectares of land in Ottawa Valley, as per provisions of the Royal Date Received by SCB: 1983/02/02 Proclamation of 1763. This is a comprehensive land claim based Current Status: AR on Aboriginal title. Registry File Number: B8260-175

Anishinabe of Wauzhushk Onigum (BAND-153)

Flooding of Kenora IR 38B-Lake of the Woods (Tr3 (Band Previous name: Rat Portage). The FN claims that Canada Flooding Project) breached its fiduciary duty to protect the interests of FN. This breach stems from the flooding of the Lake of the Woods and the Date Received by SCB: 2001/02/19 subsequent damage to the FN's Reserve lands and the waters Current Status: LIT surrounding Reserve 38B. Registry File Number: B8260-738

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 161 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Anishinabe of Wauzhushk Onigum (BAND-153)

Headlands Breach of fiduciary obligations regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1980/03/21 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: LIT Boundary Dispute); involves IR# 38B Registry File Number: B8260-843

Sultana Island (Rat Portage) (Band previous name: Rat Portage). Alleged inadequate compensation for Sultana Island. Date Received by SCB: 1980/03/21 Current Status: LIT Registry File Number: B8260-192

Anishnaabeg of Naongashiing (BAND-125)

Headlands Breach of fiduciary obligations regarding the 1894 agreemtn between Canada and Ontario, and the later revocation of this Date Received by SCB: 1996/12/05 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 31A - H and J. Registry File Number: B8260-844

Lake of the Woods Watershed - Flooding (Tr3 Alleged Crown failed to protect their interest when the reserves Flooding Project) were flooded as the result of the construction of various dams in the Winnipeg River Drainage Basin. Date Received by SCB: 1996/12/05 Current Status: DOJ Registry File Number: B8260-550

Treaty Land Entitlement Claim prepared for First Nation by TARR. First Nation alleges that the land received is insufficient to meet their treaty entitlement and Date Received by SCB: 2002/04/03 that there is an outstanding lawful obligation on the grounds that Current Status: RES when the reserve was first surveyed the land provided to the First Registry File Number: B8265/A8 Nation was insufficient according to the terms of Treaty 3.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 162 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Attawapiskat (BAND-143)

Akimiski Island Reserve Claim Land not set aside as a reserve. Entitled to loss of use for the time that reserve was not recognized by Canada. Retention of aboriginal Date Received by SCB: 2002/03/31 and treaty rights to hunt, trap, fish on Akimiski Island. Current Status: FCL Registry File Number: B8260-786

Batchewana First Nation (BAND-198)

Whitefish Island Alleged improper taking (surrender) of Whitefish Island in St. Mary's River. ICO process. Date Received by SCB: 1980/09/26 Current Status: SET Registry File Number: B8260-129

Whitefish Island Loss of Use Alleged compensation is owed for loss of use of the reserve land at Whitefish Island. Date Received by SCB: 1997/05/08 Current Status: FCL Registry File Number: B8260-563

Big Grassy (BAND-124)

Flooding of IR 35 (Tr3 Flooding Project) Alleged damage from flooding attributed to dams located at the outlet of the Lake of the Woods. Date Received by SCB: 1996/07/26 Current Status: DOJ Registry File Number: B8260-535

Headlands Breach of fiduciary obligations regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1996/07/26 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 35 A, B, G and J Registry File Number: B8260-845

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 163 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Big Grassy (BAND-124)

Riverbed / Highway (SPLIT #01) - Riverbed / Bridge (previous name: Mishkosiimiiniiziibing) The FN alleges that a Date Received by SCB: bridge forming part of provincial highway 621 is trespassing through IR# 35G because the FN claims that the Big Grassy River Current Status: SET forms part of the reserve. Registry File Number: B8260-261

Riverbed / Highway (SPLIT #02) - Highway (previous name: Mishkosiimiiniiziibing) The FN alleges that Date Received by SCB: Canada breached its fiduciary obligation by failing to obtain adequate compensation between 1933 and 1941 for lands Current Status: ACT expropriated for highway purposes. Registry File Number: B8260-599

Big Grassy / Ojibways of Onigaming (ASSCTN)

Assabaska Shoreline Alleged illegal alienation of 1,600 acres (648 HA.) along Lake of the - Big Grassy (BAND-124) Woods shoreline. The claim is located in the area of the - Ojibways of Onigaming First Nation (BAND-131) Townships of Morson, McCrossen, Spohn. Date Received by SCB: 1977/04/15 Current Status: SET Registry File Number: B8260-167

Joint Timber Claim - 2 Bands Claim concerning a timber trespass on Lake of the Woods IR 35J - Big Grassy (BAND-124) also known as Mink Portage. Canada secured a partial settlement - Ojibways of Onigaming First Nation (BAND-131) in 1922. This is a joint claim with Big Grassy FN and Ojibways of Onigaming FN. Date Received by SCB: 1996/05/08 Current Status: DOJ Registry File Number: B8260-522

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 164 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Bingwi Neyaashi Anishinaabek (BAND-196)

Boundary (Band previous name: Sandpoint). Alleged that the FN has yet to receive land under the terms of the Robinson-Superior Treaty or Date Received by SCB: 1994/06/20 any other treaty. The claim is located in the south-eastern section Current Status: LIT of Lake Nipigon. Registry File Number: B8260-423

Brunswick House (BAND-228)

Chapleau Game Reserve Alleged FN suffered damages during its relocation upon creation of Chapleau Game Preserve in 1926 by province. ICO process. Date Received by SCB: 1985/08/14 Current Status: SET Registry File Number: B8260-159

Caldwell (BAND-165)

Land Entitlement Alleged members are the original inhabitants, occupants and owners of Point Pelee & Pelee Island, that it never surrendered Date Received by SCB: 1987/12/09 Point Pelee in 1790, & that the 999 year lease to Pelee Island was Current Status: ACT invalid. Registry File Number: B8260-120

Cat Lake (BAND-216)

TLE Unfulfilled TLE. Date Received by SCB: 2002/03/31 Current Status: LIT Registry File Number: B8265/C11

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 165 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Chapleau Cree First Nation (BAND-221)

Treaty Land Entitlement Alleged outstanding treaty land entitlement. The claim is located in the area S-W of the Township of Timmins, close to Chapleau on Date Received by SCB: 1992/05/25 the Kerebesquashesing River. Current Status: INACT Registry File Number: B8260-437

Chapleau Ojibway (BAND-229)

Treaty Land Entitlement Alleges shortfall of reserve land pursuant to Treaty 9. Date Received by SCB: 2007/10/04 Current Status: RES Registry File Number: B8260-506

Chippewa Tri-Council (ASSCTN)

Collins Treaty Failure to provide clothing in lieu of payment for passage between - Beausoleil (BAND-141) Lake Simcoe and Lake Huron pursuant to the 1785 Treaty. - Chippewas of Georgina Island (BAND-138) - Chippewas of Mnjikaning First Nation (BAND-139) Date Received by SCB: 1986/06/10 Current Status: SET Registry File Number: B8260-394

1815 Treaty Payments Alleged Canada failed to honour terms of treaty regarding - Beausoleil (BAND-141) compensation for lands. CTC is composed of Chippewas of - Chippewas of Georgina Island (BAND-138) Beausoleil, Rama & Goergina Island. - Chippewas of Mnjikaning First Nation (BAND-139) Date Received by SCB: 1990/12/11 Current Status: NLO Registry File Number: B8260-410

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 166 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Chippewa Tri-Council (ASSCTN)

Awenda FN allege that a 50,000 acre tract in Simcoe County was no - Beausoleil (BAND-141) included in the Penetanguishene Treaty of 1798 and thus remained - Chippewas of Georgina Island (BAND-138) in control of the band. However, this tract was allegedly taken - Chippewas of Mnjikaning First Nation (BAND-139) without consent by the provisional agreement of 1811. Date Received by SCB: 1990/02/26 Current Status: NLO Registry File Number: B8260-386

Coldwater Narrows Alleged illegal taking of reserve lands in 1836 and inadequate - Beausoleil (BAND-141) compensation. CTC is composed of Chippewas of Beausoleil, - Chippewas of Georgina Island (BAND-138) Rama & Georgina Island. - Chippewas of Mnjikaning First Nation (BAND-139) Date Received by SCB: 1991/11/04 Current Status: ACT Registry File Number: B8260-426

Notawasaga Alleged improper cession of lands in Simcoe county by the - Beausoleil (BAND-141) Notawasaga treaty of 1815 & inadequate compensation. CTC is - Chippewas of Georgina Island (BAND-138) composed of Chippewas of Beausoleil, Rama & Georgina Island. - Chippewas of Mnjikaning First Nation (BAND-139) Date Received by SCB: 1986/06/10 Current Status: NLO Registry File Number: B8260-396

Penetanguishene and Matchedash Bays Alleged lands covered by the Penetanguishene & Matchedash - Beausoleil (BAND-141) Bays treaty of 1798 were never properly ceded, were wrongfully - Chippewas of Georgina Island (BAND-138) included in the Robinson Huron treaty of 1850, & the Chippewa - Chippewas of Mnjikaning First Nation (BAND-139) Nation was never adequately compensated. CTC is composed of Chippewas of Beausoleil, Rama & Georgina Island. Date Received by SCB: 1986/06/10 Current Status: NLO Registry File Number: B8260-395

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 167 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Chippewas of Kettle and Stony Point (BAND-171)

1927 Surrender Alleged 1927 surrender of part of the Kettle Point Indian reserve no.44 & its subsequent sale in 1929 is invalid. Date Received by SCB: 1993/02/12 Current Status: LIT Registry File Number: B8260-451

1928 Surrender at Stoney Point Alleged 1928 Surrender & Sale of 377 acres of the Stoney Point Reserve is invalid. 1928 Surrender at Stoney Point (Ipperwash Date Received by SCB: 1996/12/13 Provincial Park). Current Status: INACT Registry File Number: B8260-554

Clench Defalcation Misappropriation of sale proceeds. Date Received by SCB: 2007/06/26 Current Status: SUB/REV Registry File Number: B8260-934

Enniskillen (SPLIT #02) Chippewas of Kettle and Alleged that certain lands in Enniskillen Township were sold Stony Point without surrender between 1866 and 1918. Date Received by SCB: Current Status: SET Registry File Number: B8260-174

Lot 27 - Bosanquet Lands Misappropriation of sale proceeds of Lot 27, Concession 6, Township of Bosanquet. Date Received by SCB: 2007/07/04 Current Status: SUB/REV Registry File Number: B8260-935

Chippewas of the Thames First Nation (BAND-166)

Big Bear Creek Reserve Alleged that the 5,120 acre Big Bear Cree Reserve was patented and sold by the Crown in the 1830s without a proper surrender by Date Received by SCB: 1999/08/02 the FN. Furthermore, the compensation paid by the Crown for the Current Status: DOJ loss of the reserve in 1849-50 was inadequate. The land in Registry File Number: B8260-694 question was reserved for the FN under the Longwoods Treaties (1819-1822).

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 168 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Chippewas of the Thames First Nation (BAND-166)

Clench Defalcation Misappropriation of sale proceeds from 1845-1854. Date Received by SCB: 1974/11/27 Current Status: SET Registry File Number: B8260-135

Hydro - Right-Of-Way Alleged breach of fiduciary obligations by the Crown for wrongfully renewing a Hydro easement in 1956 after the option to renew Date Received by SCB: 1998/03/04 expired, and for failing to obtain appropriate compensation for the Current Status: ISCC renewal of the easement. Fast Track. The claim is located in the Registry File Number: B8260-626 townships of Caradoc and Deleware.

Muncey Alleged lots 12 & 13 of Caradock Township were illegally patented in 1831, on the basis that no surrender was obtained from the Date Received by SCB: 1980/09/30 Chippewa Indians for those lots. Current Status: SET Registry File Number: B8260-138

Couchiching First Nation (BAND-126)

Flooding (Tr3 Flooding Project) Alleged Crown failed to protect their interests when their land was flooded. Date Received by SCB: 1996/01/17 Current Status: LIT Registry File Number: B8260-514

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1994/01/31 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: LIT Boundary Dispute); involves IR# 16 A, D and 18B Registry File Number: B8260-846

Joint Interest in Rainy Lake I.R. 18C FN claims a joint interest in Stanjikoming FN I.R. 18C. At time of treaty, Stanjikoming and Couchinching took their reserves of 18B Date Received by SCB: 2001/01/02 and 18C in common. In 1990, Stanjikoming surrendered its Current Status: NLO interest in 18B, but Couchiching did not surrender its interest in Registry File Number: B8260-728 18C.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 169 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Couchiching First Nation (BAND-126)

Railway Alleged illegal taking of lands for railway purposes and failure to provide proper compensation. Date Received by SCB: 1994/01/31 Current Status: DOJ Registry File Number: B8260-467

TLE Alleged outstanding treaty land entitlement under the terms of Treaty 3, FN alleges that there is a shortfall of 224,000 acres. In Date Received by SCB: 1999/12/01 addition, the FN alleges the failure to provide the proper treaty land Current Status: BA entitlement constitutes a breach of Canada's fiduciary duty. Registry File Number: B8265/C10

Curve Lake (BAND-161)

Flooding of I. R. No. 35 FN alleges that between 300 - 600 acres of reserve land, set aside in 1837 for the Mud Lake Indian Band (now Curve Lake), was Date Received by SCB: 1999/08/03 flooded when dams constructed for the Trent-Severn Waterway Current Status: ACT (TSW) raised water levels in the Buckhorn section of the TSW in Registry File Number: B8260-702 1838.

Eagle Lake (BAND-148)

Timber Trespass Alleged Canada failed to prevent timber trespasses of Eagle Lake I.R. 27 in 1882-1883, and that compensation was never paid. Date Received by SCB: 1984/01/20 Current Status: SET Registry File Number: B8260-230

Flying Post (BAND-227)

Reserve Location Alleges denial of the right to live on a reserve of their choosing, to benefit from the services provided on reserves and to be part of an Date Received by SCB: 2007/04/01 Indian community. Current Status: RES Registry File Number: B8260-825

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 170 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Flying Post (BAND-227)

Unoccupied Reserve - Treaty Land Entitlement The FN alleges outstanding treaty land entitlement pursuant to Treaty 9. Date Received by SCB: 2002/08/21 Current Status: FCL Registry File Number: B8260-825

Fort William (BAND-187)

Chippewa Park (Surrender Project) The FN alleges that the taking of 270 acres should have been an expropriation for a public work, not a surrender; the Crown failed to Date Received by SCB: 1998/06/01 ensure minimal impairment; the Crown permitted the use of the Current Status: LOS lands for railway purposes (GTP); and that the land was Registry File Number: B8260-690 undervalued.

Hydro Right-of-Way Alleged unlawful expropriation of lands for Hydro Right-of-way and inadequate compensation. Date Received by SCB: 1995/12/04 Current Status: FCL Registry File Number: B8260-512

Mining Location (Surrender Project) The FN alleges that the surrender of the mining locations is invalid; the FN only intended to surrender mining rights; the Crown failed to Date Received by SCB: 1998/06/01 carry out any valuation of the lands; the 120 acres were Current Status: RES undervalued; and the conditions of the sale were not carried out. Registry File Number: B8260-666

Neebing Surrender Alleged invalid surrender and breach of fiduciary obligations to the FN with respect to the surrender and sale in 1859 of approx. 5,000 Date Received by SCB: 1998/06/01 acres on the western section of the reserve. Current Status: ACT Registry File Number: B8260-565

Northern Boundary Alleged boundaries of reserve were incorrectly surveyed resulting in loss of land to FN. Date Received by SCB: 1986/01/16 Current Status: ACT Registry File Number: B8260-282

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 171 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Fort William (BAND-187)

Railway Alleged wrongful expropriation and breach of fiduciary obligations to the FN when the Grand Trunk Pacific Railway Company Date Received by SCB: 1998/02/26 expropriated 1600 acres in 1905. Current Status: INACT Registry File Number: B8260-661

Rifle Range Alleged reserve lands were not taken in accordance with the provisions of the Indian Act. Date Received by SCB: 1996/03/15 Current Status: SET Registry File Number: B8260-517

Timber The FWFN alleges that the 1871Timber Surrender is invalid, and that subsequently, there was mismanagement in the timber Date Received by SCB: 2002/03/25 operations on the Fort William Reserve. Current Status: FCL Registry File Number: B8260-764

Water Pipeline (Surrender Project) The First Nation alleges that the 1906 surrender pertains to the pipeline, not the watershed. Date Received by SCB: 2002/08/19 Current Status: DOJ Registry File Number: B8260-781

Garden River First Nation (BAND-199)

Great Lakes Power Company Alleged federal government failed to take steps to ensure that FN receive proper rental compensation in return for the erection & Date Received by SCB: 1996/04/26 location of the 33 K.v. line across the Garden River Reserve in or Current Status: NLO around 1930 & the issuing of a License of Occupation in 1940. Registry File Number: B8260-521 Also, alleged fed. gov't didn't safe-guard its interests by failing to seek proper compensation and payment for the issuing of two long-term permits in 1959 & 1968.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 172 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Garden River First Nation (BAND-199)

Squirrel Island Alleged that Squirrel Island, adjacent to reserve and sold by Canada in 1871, was incorrectly included in land surrender of Date Received by SCB: 1976/06/28 1859. Current Status: SET Registry File Number: B8260-103

Ginoogaming First Nation (BAND-185)

Erosion Alleged loss of land and resources as a result of a water diversion project on Long Lake in 1937. Date Received by SCB: 1993/01/04 Current Status: NLO Registry File Number: B8260-443

Long Lake Water Diversion Project Alleged that Canada's failure to intervene and protect the interest of the FN during the construction of the Kendogami Dam by Ontario Date Received by SCB: 1996/03/29 Hydro in 1938, which subsequently led to the flooding and erosion Current Status: BA of 384 acres of reserve land, constitutes a breach of fiduciary duty. Registry File Number: B8260-443 The land in question is located within the Treaty 9 area. This claim is based upon a previous fast track claim rejected by the SCB on August 12, 1994.

Timber Alleged inadequate compensation for timber removed from reserve. Date Received by SCB: 1990/12/01 Current Status: SET Registry File Number: B8260-409

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 173 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Grand Council of Treaty #3 (ASSCTN)

Anicinabe Park Alleged that in 1959, the Department of Indian Affairs sold - Anishinabe of Wauzhushk Onigum (BAND-153) Anicinabe Park belonging to them, to Kenora Township, without - Anishnaabeg of Naongashiing (BAND-125) consultation and without fulfilling several agreements. - Big Grassy (BAND-124) - Couchiching First Nation (BAND-126) - Eagle Lake (BAND-148) - Grassy Narrows First Nation (BAND-149) - Iskatewizaagegan #39 Independent First Nation (BAND-154) - Lac La Croix (BAND-127) - Lac Seul (BAND-205) - Naicatchewenin (BAND-128) - Naotkamegwanning (BAND-158) - Nicickousemenecaning (BAND-129) - Northwest Angle No.33 (BAND-151) - Northwest Angle No.37 (BAND-152) - Obashkaandagaang (BAND-235) - Ochiichagwe'babigo'ining First Nation (BAND-147) - Ojibways of Onigaming First Nation (BAND-131) - Rainy River First Nations (BAND-130) - Seine River First Nation (BAND-132) - Shoal Lake No.40 (BAND-155) - Stanjikoming First Nation (BAND-133) - Wabauskang First Nation (BAND-156) - Wabigoon Lake Ojibway Nation (BAND-157) Date Received by SCB: 1974/11/07 Current Status: NLO Registry File Number: B8260-131

Grassy Narr./Wabauskang Claimant (ASSCTN)

Treaty Land Entitlement FN alleges a 1883 survey did not provide the band with its proper - Grassy Narrows First Nation (BAND-149) land entitlement under the terms of Treaty 3; FN alleges a shortfall - Wabauskang First Nation (BAND-156) of 11.43 square miles (7,314 acres). Furthermore, FN alleges the Crown's failure to set aside the proper amount of reserve land Date Received by SCB: 1994/01/13 constitutes a breach of fiduciary duty. This is a joint claim with the Current Status: RES Wabauskang First Nation. Registry File Number: B8265/W11

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 174 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Grassy Narrows First Nation (BAND-149)

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1994/01/13 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 21. Registry File Number: B8260-877

Gull Bay (BAND-188)

Boundary Claim Leagues to miles. Non-fulfillment of Robinson Superior treaty with respect to the boundaries of Gull River Reserve. Date Received by SCB: 2001/10/03 Current Status: DOJ Registry File Number: B8260-313

Highway 527 FN alleges that Canada failed to protect the best interests of the claimants during the expropriation of portions of IR #55 by Ontario Date Received by SCB: 2005/04/04 for the construction of Highway 527. Current Status: BA Registry File Number: B8260-862

Hydro FN alleges breach of fiduciary obligation relating to damages caused by flooding of the reserve IR #55 as a result of the Date Received by SCB: 2005/02/28 damming of the Nipigon River by the Hydro Electric Power Current Status: RES Company of Ontario. Registry File Number: B8260-858

Timber Royalties Breaches of fiduciary obligation related to timber harvesting on the Gull River I.R. No. 55 from approximately 1919 to 1926: failure to Date Received by SCB: 2005/11/08 secure surrender for timber harvesting, to secure best price and Current Status: BA appropriate compensation, ensure FN had clear understanding of Registry File Number: B8260-874 terms of licenses, and best represent the FN in negotiations.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 175 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Henvey Inlet First Nation (BAND-231)

James Bay Railway Alleged illegal appropriation of land from the Henvey Inlet Reserve No. 2. Date Received by SCB: 1995/02/20 Current Status: DOJ Registry File Number: B8260-493

Hiawatha First Nation (BAND-162)

Serpent Mounds Alleged federal government in breach of statute for failing to set aside Serpent Mounds as an addition to reserve (43 year delay). Date Received by SCB: 1992/12/21 Also alleged improper granting of a lease to the lands persuant to Current Status: SET the Public Lands Grants Act. Allegation of a breach of fiduciary Registry File Number: B8260-439 obligation as a result of mismagement by the federal government from 1933-1992.

Iskatewizaagegan #39 Independent First Nation (BAND-154)

Flooding (Tr3 Flooding Project) Improper surrender and a continuing breach of fiduciary obligations regarding the protection of the Shoal Lake Indian Reserves 39, 39A Date Received by SCB: 2001/12/04 and 34B2 from flooding. Current Status: DOJ Registry File Number: B8260-807

Garden Islands FN alleges that 32 islands in Indian Bay, comprising approximately 403 acres, were not surveyed and confirmed as reserves in Date Received by SCB: 1990/06/04 accordance with the terms of Treaty 3. Furthermore, the FN Current Status: ACT alleges loss of use of the benefits of the islands (e.g. timber, Registry File Number: B8260-375 agriculture, minerals, fishing, hunting, land development)

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1990/06/04 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 34 B-2, 39 and 39A. Registry File Number: B8260-831

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 176 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Kitchenuhmaykoosib Inninuwug (BAND-209)

Treaty Land Entitlement First Nation has not received the full amount of reserve land to which they are entitled under the terms of adhesion to Treaty 9. Date Received by SCB: 2000/05/10 (Formerly known as the Big Trout Lake First Nation) Current Status: RES Registry File Number: B8265/K9

Lac Des Mille Lacs (BAND-189)

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1996/01/04 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); Involves IR# 22A Registry File Number: B8260-853

Lac des Mille Lacs Watershed - Flooding (Tr3 Alleged Crown breached its fiduciary duty originating in 1872, Flooding Project) following the construction of a dam and the subsequent flooding of reserve lands. Date Received by SCB: 1996/01/04 Current Status: DOJ Registry File Number: B8260-511

Lac La Croix (BAND-127)

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 2002/05/20 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 25D. Registry File Number: B8260-880

Sturgeon Lake Reserve Alleged Canada failed to prevent the inclusion of the unsurrendered Sturgeon Lake Reserve No. 24C in Quetico Date Received by SCB: 1980/01/31 Provincial Park in 1950. The Lac La Croix FN succeeded the Current Status: LIT Sturgeon Lake FN. Registry File Number: B8260-186

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 177 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Lac La Croix (BAND-127)

Treaty Land Entitlement Canada's failure to set aside sufficient land under the terms of Treaty 3. Per capita land allocation stipulated in 1873 by treaty 3 Date Received by SCB: 2002/05/20 has never been met. Current Status: RES Registry File Number: B8265/L15

Lac Seul (BAND-205)

Flooding 1936 Alleged illegal flooding of reserve land and inadequate compensation paid for flooding damages. The claim is located Date Received by SCB: 1985/10/07 N-W of Sioux Lookout. Current Status: ACT Registry File Number: B8260-265

Long Lake No.58 First Nation (BAND-184)

Highway Alleged illegal taking of land for highway purposes in 1915 and 1923, and failure to compensate for taking. Date Received by SCB: 1979/09/17 Current Status: SET Registry File Number: B8260-183

Railway Alleged illegal taking of land for railway purposes in 1913, and failure to compensate for taking. Date Received by SCB: 1986/01/14 Current Status: NLO Registry File Number: B8260-281

Robinson Superior Treaty Alleged that ancestors never adhered to Robinson Superior treaty of 1850, and still retain aboriginal title to lands covered by it. Not Date Received by SCB: 1983/03/02 submitted to DIAND as either Comprehensive or Specific claim. Current Status: NLO Given to SCB for research only. Concluded that there was no Registry File Number: B8260-215 lawful obligation under the Comp. claim policy and the bands were advised that they could formally submit the claim under the Specific Claims Policy. 8 claimants involved: Pays Plat FN, Sand Point FN, Whitesand FN, Rocky Bay FN, Pic Mobert FN, Red Rock FN, Ojibways of the Pic River.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 178 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Magnetawan (BAND-174)

Highways Alleges the Crown breached its obligations to the claimant with respect to the construction of four roads on reserve land between Date Received by SCB: 2005/03/21 1883 and 1958, the construction of a parking lot in 1936, a Current Status: BA drainage ditch in 1959, and a ¿visibility triangle' in 1963. Registry File Number: B8260-861

Mattagami (BAND-226)

Timber Alleged flooding of 1340 acres of Mattagami I.R. No. 71 (Treaty 9 area), and damage to and loss of use of resources (timber) and Date Received by SCB: 1985/09/10 graveyard due to flooding caused by the operation of the Current Status: SET Mattagami Dam in 1922. Registry File Number: B8260-262 Alleged breach of lawull obligation for granting a timber licence in 1928 for a period of 5 years although the surrender expired in 1930.

M'Chigeeng First Nation (BAND-181)

Flooding of Lake Mindemoya FN alleges unlawful damming of Lake Mindemoya on Manitoulin Island IR #22, by a private milling company, caused flooding Date Received by SCB: 2005/02/28 damage on reserve land along the lakeshore. Current Status: DOJ Registry File Number: B8260-856

Land Purchases (Surrender Project) FN alleges breach of fiduciary obligation relating to sales of surrendered land that did not conform to the Crown's directives Date Received by SCB: 2005/02/28 regarding how the sales were to be conducted. Current Status: NLO Registry File Number: B8260-857

Sanfield Sugar Bush FN alleges desired land, known as the 'Sugar Bush Lands' were never properly set aside for them, and were sold without the Date Received by SCB: 2005/01/24 notification or consultation of the FN in 1943. Also alleges loss of Current Status: DOJ use of Sugar Bush. Registry File Number: B8260-842

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 179 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

M'Chigeeng First Nation (BAND-181)

Treasure Island FN alleges breach of fiduciary obligation as a result of a failure to observe the FN requests regarding the selection of their reserve Date Received by SCB: 2005/01/24 lands. Current Status: DOJ Registry File Number: B8260-839

Michipicoten (BAND-225)

1855 Surrender FN alleges the 1855 surrender of 640 acres of Gros Cap I.R. 49 for a mining location was invalid because the taking failed to comply Date Received by SCB: 1996/11/08 with the conditions as set out in the Royal Proclamation of 1763. Current Status: SET Specifically, the FN alleges that there was no public meeting Registry File Number: B8260-678 convened for the taking of the surrender. The land in question was set aside for the FN under the terms of the Robinson-Superior Treaty.

1898 Survey Alleged FN funds were wrongfully taken to pay for the 1898 survey of a mining location they had surrendered in 1855. Date Received by SCB: 1996/11/08 Current Status: SET Registry File Number: B8260-676

1899 and 1900 Surrender of Reserve 49 Alleged majority of eligible voters did not attend the meeting held for the taking of the surrender and the surrender is, therefore, Date Received by SCB: 1998/01/14 invalid. Current Status: SET Registry File Number: B8260-677

1899 Survey Alleged FN funds were wrongfully taken to pay for the 1899 survey of their reserve. Date Received by SCB: 1996/11/08 Current Status: SET Registry File Number: B8260-676

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 180 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Michipicoten (BAND-225)

Boundary Claim FN Alleges that Gros Cap Reserve #49 set aside for them, as per the terms of the Robinson Superior Treaty, is smaller than that Date Received by SCB: 1996/11/01 which the adherents to the Treaty intended and understood they Current Status: ACT were to receive. The FN alleges that they were promised that their Registry File Number: B8260-680 reserve would extend from the mouth of the Doree River to the mouth of the Magpie and Michipicoten Rivers.

Hydro Right of Way FN alleges unlawful expropriation and inadequate compensation for 4.2 acres of I.R. 49 taken in 1943 by the Great Lakes Power Date Received by SCB: 1996/02/13 Company for a hydro right-of-way. The land in question was set Current Status: FCL aside for the FN under the terms of the Robinson-Superior Treaty. Registry File Number: B8260-515

Missanabie Res. 62 & Chapleau Res. 61 In the early 1900's these two reserves were purchased using funds from Michipicoten trust fund account. The lands have never been Date Received by SCB: 1996/11/01 set aside for the Michipicoten FN. Current Status: AR Registry File Number: B8260-684

Ontario Hydro Right of Way FN alleges unlawful expropriation and inadequate compensation for 70 acres of I.R. 49 taken in 1968, by Ontario Hydro for a Hydro Date Received by SCB: 1996/05/01 right-of-way. The land in question was set aside for the FN under Current Status: FCL the terms of the Robinson-Superior Treaty. Registry File Number: B8260-536

Railway Right-of-Way FN alleges the Algoma Central Railway Company failed to lawfully acquire a 13.6 acre railway right-of-way and therefore trespassed Date Received by SCB: 1996/11/01 on Gros Cap I.R. 49 for 30 years. The FN alleges, therefore, that Current Status: AR Canada breached their fiduciary obligation by failing to ensure the Registry File Number: B8260-681 lands were taken in accordance with the requirements under Indian Act and that the First Nation was adequately compensated. The land in question was set aside for the FN under the terms of the Robinson-Superior Treaty.

Relocation Claim In 1935, DIA purchased 55.6 acres from the Algoma Central Railway. The lands were purchased with FN funds and not set Date Received by SCB: 1996/11/01 aside as a reserve. In 1955 Algoma exchanged this land for 13.9 Current Status: FCL acres north of the harbour. The FN alleges that the exchange was Registry File Number: B8260-679 not consented to by all the voting members.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 181 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Michipicoten (BAND-225)

Timber Claim Alleged Crown failed to act in the interest of the FN in the 1925 sale of timber from Gros Cap I. R. 49. Date Received by SCB: 1996/11/01 Current Status: FCL Registry File Number: B8260-682

Mishkeegogamang (BAND-203)

1935 Flooding - Osnaburgh Alleged breach of fiduciary duty, damages and inadequate compensation for flooding, timber loss and tresspass in respect to Date Received by SCB: 1990/06/14 the flooding, in 1934, of aproximately 650 acres of I.R. 63A and Current Status: LIT 63B. Registry File Number: B8260-402

Highway - Savant Lake Road ROW FN alleges trespass and inadequate compensation between 1936-1944 for lands taken for the construction of road and terminal Date Received by SCB: 1990/06/14 site through I. R. 63 B. The FN further alleges that contractors Current Status: LIT responsible for the construction of the road took gravel and timber Registry File Number: B8260-404 without authorization and that the compensation amount of $7,800 was inadequate and represents a breach of the Crown's fiduciary duty.

Hydro Line ROW - Osnaburgh FN alleges trespass and inadequate compensation for a 24.4 acre hydro right-of-way expropriated in 1934. Furthermore, FN alleges Date Received by SCB: 1990/07/14 the Crown breached its fiduciary obligation by failing to renegotiate Current Status: LIT the amount of compensation paid to the band for the 1964 hydro Registry File Number: B8260-403 right-of-way renewal.

TLE Unfulfilled TLE. Date Received by SCB: 2002/03/31 Current Status: LIT Registry File Number: B8265/M16

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 182 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Mishkeegogamang (BAND-203)

Trespass - Mining Road and Terminal Site Surrender FN alleges trespass for lands taken for a roadway in I.R. 63A in 1949. FN also alleges that the absence of compensation paid for Date Received by SCB: 1990/06/14 the land and timber removal represents a breach of the Crown's Current Status: LIT fiduciary obligation. Registry File Number: B8260-405

Missanabie Cree (BAND-223)

Treaty Land Entitlement FN alleges that it was a separate and distinct band at the time of treaty in 1906, and thus should have received their full land Date Received by SCB: 1993/11/16 entitlement under the terms of Treaty 9. The FN further alleges Current Status: ACT that the failure to provide the proper entitlement constitutes a Registry File Number: B8265/M10 breach of Canada's fiduciary duty.

Mississauga (BAND-200)

Flooding FN claims that the 643 acres of land set aside under the Robinson Huron Treaty were flooded as a result of the construction of dams Date Received by SCB: 1996/08/29 on the Penewabecong River in 1852. The FN alleges that the Current Status: DOJ Crown has failed to provide compensation for the flooding of their Registry File Number: B8260-534 reserve land.

Highway Alleged that between 1909 & 1938, a trunk road/highway was built through their reserve by the government of Ontario without legal Date Received by SCB: 1986/06/27 authority, and no compensation was paid. This land had been Current Status: SET surrendered to the Crown in 1909, in trust for sale, and was, Registry File Number: B8260-312 instead, transferred to the government of Ontario.

Northern Boundary Alleged location of the Northern boundary of I.R. #8 not surveyed in 1852 in accordance with the provisions of the Robinson-Huron Date Received by SCB: 1983/09/29 Treaty of 1850, resulting in loss of land to FN. Current Status: SET Registry File Number: B8260-227

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 183 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Mississauga (BAND-200)

Southern Boundary Alleged that the Crown failed in its fiduciary obligations to the FN by the illegal taking of Island No. 9 and Marshy Bay and is entitled Date Received by SCB: 2001/10/05 to compensation for it. Current Status: DOJ Registry File Number: B8260-749

Mississauga Tribal Claims Council (ASSCTN)

Brant Tract Purchase Alleged that 1797 treaty for cession of lands at Burlington Bay was - Alderville First Nation (BAND-160) illegal, and that the Mississauga Nation retained rights and title to - Curve Lake (BAND-161) lakeshore at Burlington Bay and 200 acres at Burlington Heights. - Hiawatha First Nation (BAND-162) (FN involved: Curve Lake, New Credit, Alderville, Scugog and - Mississauga's of Scugog Island First Nation (BAND-140) Hiawatha). - Mississaugas of the Credit (BAND-120) Date Received by SCB: 1988/08/30 Current Status: INACT Registry File Number: B8260-368

Crawford Purchase Alleged that the purchase of 1783-1784 covering lands in - Alderville First Nation (BAND-160) Frontenac, Prince Edward, Hastings counties and United county of - Curve Lake (BAND-161) Lennox Addington was illegal. - Hiawatha First Nation (BAND-162) - Mississauga's of Scugog Island First Nation (BAND-140) - Mississaugas of the Credit (BAND-120) Date Received by SCB: 1986/06/10 Current Status: NLO Registry File Number: B8260-391

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 184 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Mississauga Tribal Claims Council (ASSCTN)

Damages to Wild Rice Alleged Mississauga title to wild rice, traditional economy, waters - Alderville First Nation (BAND-160) and lands beneath the waters, and destruction of the wild rice and - Curve Lake (BAND-161) traditional economy due to flooding by the Trent canal. - Hiawatha First Nation (BAND-162) - Mississauga's of Scugog Island First Nation (BAND-140) - Mississaugas of the Credit (BAND-120) Date Received by SCB: 1988/08/30 Current Status: NLO Registry File Number: B8260-356

Gunshot Treaty Alleged the Gunshot Treaty of 1788 covering lands in Prince - Alderville First Nation (BAND-160) Edward and Northumberland counties and regional municipality of - Curve Lake (BAND-161) Durham was illegal. (FN involved: Curve Lake, New Credit, - Hiawatha First Nation (BAND-162) Alderville, Scugog and Hiawatha) - Mississauga's of Scugog Island First Nation (BAND-140) - Mississaugas of the Credit (BAND-120) Date Received by SCB: 1986/06/10 Current Status: NLO Registry File Number: B8260-392

Islands in the Trent System Alleged continuing Mississauga. Title to certain islands in regional - Curve Lake (BAND-161) municipality of Durham, county of Peterborough and - Hiawatha First Nation (BAND-162) Northumberland and loss of some of these islands due to flooding - Mississauga's of Scugog Island First Nation (BAND-140) by Trent canal and illegal sale. (FN involved: Curve Lake, New Credit, Alderville, Scugog and Hiawatha) Date Received by SCB: 1988/03/24 Current Status: ACT Registry File Number: B8260-355

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 185 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Mississauga Tribal Claims Council (ASSCTN)

Lake Ontario Lakeshore Alleged that part of lakeshore in the townships of Oakville - Alderville First Nation (BAND-160) Burlington, Mississauga and Etobicoke were never ceded by treaty - Curve Lake (BAND-161) or otherwise. (FN involved: Curve Lake, New Credit, Alderville, - Hiawatha First Nation (BAND-162) Scugog and Hiawatha) - Mississauga's of Scugog Island First Nation (BAND-140) - Mississaugas of the Credit (BAND-120) Date Received by SCB: 1988/08/01 Current Status: NLO Registry File Number: B8260-357

Navy Island Alleged islands were never ceded in the Niagara treaty of 1781. - Alderville First Nation (BAND-160) (FN involved: Curve Lake, New Credit, Alderville, Scugog and - Curve Lake (BAND-161) Hiawatha) - Hiawatha First Nation (BAND-162) - Mississauga's of Scugog Island First Nation (BAND-140) - Mississaugas of the Credit (BAND-120) Date Received by SCB: 1991/08/28 Current Status: NLO Registry File Number: B8260-424

Niagara Treaty Lands Alleged lands covered by the Niagara treaty of 1781 in the - Alderville First Nation (BAND-160) Regional Municipality of Niagara were never properly ceded & that - Curve Lake (BAND-161) the Mississauga were not compensated for them. This claim was - Hiawatha First Nation (BAND-162) originally submitted in 1986 by the MTCC (Mississauga Tribal - Mississauga's of Scugog Island First Nation (BAND-140) Claims Council) as a component of the Williams Treaty claim & - Mississaugas of the Credit (BAND-120) was subsequently hived off as a separate claim in 1990. (FN involved: Curve Lake, New Credit, Alderville, Scugog and Date Received by SCB: 1986/07/17 Hiawatha) Current Status: NLO Registry File Number: B8260-390

Thurlow Purchase Alleged lands covered by the Thurlow Purchase of 1811 & 1816 in - Alderville First Nation (BAND-160) Thurlow Township were improperly ceded & the Mississauga Nation was never adequately compensated for them. Claim located Date Received by SCB: 1991/08/28 in Belleville by the Moira River. Current Status: ACT Registry File Number: B8260-425

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 186 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Mississauga Tribal Claims Council (ASSCTN)

Toronto Purchase Alleged Toronto Purchase (1787 & 1805) covering lands in the - Alderville First Nation (BAND-160) regional municipality of York was illegal. (FN involved: Curve Lake, - Curve Lake (BAND-161) New Credit, Alderville, Scugog and Hiawatha) - Hiawatha First Nation (BAND-162) - Mississauga's of Scugog Island First Nation (BAND-140) - Mississaugas of the Credit (BAND-120) Date Received by SCB: 1986/06/10 Current Status: NLO Registry File Number: B8260-393

Mississaugas of the Credit (BAND-120)

200 Acre Alleged invalid surrender in 1820, of 200 acres (80.9 Ha) of land on north shore of Credit River. Date Received by SCB: 1983/06/23 Current Status: SET Registry File Number: B8260-222

Railway Claim - Loss of Use Alleged invalid expropriation of land for railway purposes in 1875, and failure to compensate for interest in lands taken. Date Received by SCB: 1975/04/02 Current Status: SET Registry File Number: 8260-142+232

Toronto Purchase Alleged Toronto Purchase (1787 & 1805) covering lands in the regional municipality of York was illegal. Date Received by SCB: 1986/06/10 Current Status: ACT Registry File Number: B8260-393-1

Mohawks of Akwesasne (BAND-159)

Cairn Island The First Nation alleges that additional compensation is required for the improper taking, loss of use and other losses associated Date Received by SCB: 2001/11/02 with the taking of the island in 1922. Current Status: BA Registry File Number: B8260-748

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 187 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Mohawks of Akwesasne (BAND-159)

Dundee Alleged improper surrender of lands in Dundee township and claim to unpatented lands on the areas adjacent to existing reserve Date Received by SCB: 1999/05/06 boundaries. The claim is located in the Province of Quebec. Current Status: ACT Registry File Number: B8260-132

Islands in the St-Lawrence Alleged ownership of Islands in the St.Lawrence between Gananoque and Prescott and alleged that in 1856 when they Date Received by SCB: 1996/08/08 ceded their land bordering on the St.Lawrence, the Islands were Current Status: FCL not included, and the islands were therefore unlawfully sold and Registry File Number: B8260-531 patented.

Kawehno:ke Alienation of 196 ac of reserve land in 1821; inadequate compensation of $400/annum between 1920-1933; failure to Date Received by SCB: 1995/03/07 generate revenue during 1933-34. Current Status: ACT Registry File Number: B8260-495

Mohawks of the Bay of Quinte (BAND-164)

Illegal Alienation - Culbertson Tract Alienation of 827 acres of the Mohawk tract. The claim is located in the townships of Deseronto and Tyendinaga. Date Received by SCB: 1995/11/03 Current Status: ACT Registry File Number: B8260-513

Moose Cree First Nation (BAND-144)

Lots 1 and 4 Alleged that lots 1 and 4, Factory Island, should be part of reserve. Date Received by SCB: 1985/04/17 Current Status: FCL Registry File Number: B8260-267

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 188 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Moose Cree First Nation (BAND-144)

Veterans Alleged failure to provide 14 FN World War II veterans with lands promised under the Soldier Settlement Act. Date Received by SCB: 1992/06/02 Current Status: AR Registry File Number: B8260-434

Moose Deer Point (BAND-135)

1837 Treaty Claim FN alleges that promises made in 1837 amounted to a treaty that included: lands for settlement; distribution of presents; and the Date Received by SCB: 1995/04/06 protection of the Crown. Current Status: LIT Registry File Number: 8260-17-2-M1

Moravian of the Thames (BAND-167)

Orford Township Alleged unlawful alienation of 26,325 acres in Orford township. Date Received by SCB: 1985/03/14 Current Status: NLO Registry File Number: B8260-141

Munsee-Delaware Nation (BAND-168)

Reserve Allocation Claimant alleges that they were to receive more land than was allotted to them. Date Received by SCB: 2000/11/20 Current Status: BA Registry File Number: B8260-722

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 189 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Naicatchewenin (BAND-128)

Burditt Dam The FN alleges that Ontario's dam on the Manomin River, its approaches and embankments, the flooded land above it and the Date Received by SCB: 2006/12/22 access road trespass on IR# 17B without authority or Current Status: SUB/REV compensation. It is alleged that Canada has breached statutory Registry File Number: B8260-912 and fiduciary duties when failing to intervene when logging operators used the dam from the 1890s and again ,when informally consenting to the use of the dam by Ontario after 1956. Additionally, it is alleged that Canada did not act as a prudent land owner.

Flooding (Tr3 Flooding Project) Alleged Crown failed to protect their interest when the reserve was flooded as a result of the construction of various dams in the Date Received by SCB: 1996/09/04 Winnipeg River Drainage Basin. Current Status: DOJ Registry File Number: B8260-556

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1996/09/04 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 17A. Registry File Number: B8260-847

Treaty Land Entitlement The First Nation alleges that on account of 2 late counts, its Treaty Land Entitlement was never fulfilled. The failure by Canada to fulfil Date Received by SCB: 2003/11/27 the First Nation's Treaty Land Entitlement constitues a breach of Current Status: RES fiduciary duty. Registry File Number: B8265/N12

Naotkamegwanning (BAND-158)

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1997/04/22 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 32A, B and C. Registry File Number: B8260-848

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 190 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Naotkamegwanning (BAND-158)

Lake of the Woods Watershed - Flooding (Tr3 Alleged damage from flooding attributed to dams located at the Flooding Project) outlet of the Lake of the Woods. Date Received by SCB: 1997/04/22 Current Status: DOJ Registry File Number: B8260-562

Nicickousemenecaning (BAND-129)

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1994/01/14 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 26A, B and C. Registry File Number: B8260-881

Highway 11 - I.R. 26A Alleged wrongful expropriation and breach of fiduciary duty by Canada for allowing a road right-of-way expropriation in 1962. Also Date Received by SCB: 1998/02/20 alleges fiduciary breach with respect to the issuance of a s.28(2) Current Status: BA permit to Bell in 1967; and accounting for revenues Registry File Number: B8260-623 derived from sand and gravel permits. The land in question was reserved for the FN under the terms of Treaty 3.

Railway - Rainy Lake FN alleges the Crown illegally expropriated and failed to adequately compensate for a 34 acre railway right-of-way across Date Received by SCB: 1994/01/14 I.R. 26A in 1900. The FN alleges a further 9 acres was illegally Current Status: DOJ expropriated without adequate compensation for a railway Registry File Number: B8260-466 re-alignment in 1964. The land in question was reserved for the FN under the terms of Treaty 3.

Rainy Lake Watershed-Flooding IR 26A-B-C (Tr3 Alleged demage for flooding attributed to the construction of dams Flooding Project) near I.R. #26A, B and C. Date Received by SCB: 1998/02/19 Current Status: DOJ Registry File Number: B8260-622

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 191 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Nipissing First Nation (BAND-220)

Moerman Alleged 17 acre parcel of land adjacent to reserve was improperly included in a 1907 surrender. Date Received by SCB: 1984/11/26 Current Status: SET Registry File Number: B8260-241

Pipeline FN alleges that the Crown illegally dispossessed 98 acres for a pipeline right-of-way across I.R. 10 in 1955. The FN argues that Date Received by SCB: 1986/01/09 they did not consent to the pipeline, thus, the permit under 28(2) of Current Status: NLO the Indian Act was invalid. The land in question was reserved for Registry File Number: B8260-280 the FN under the Robinson-Huron Treaty.

Reserve No. 10 Boundary Alleged location of the boundaries of I. R. # 10 not surveyed in 1852 in accordance with the provisions of the Robinson-Huron Date Received by SCB: 1999/09/16 Treaty of 1850, resulting in loss of land to First Nation. This is a Current Status: LOS pre-confederation claim dealing with leagues vs miles. Registry File Number: B8260-526

Northwest Angle No.33 (BAND-151)

Flooding of Whitefish Bay 33A and 33B (Tr3 Flooding The First Nation alleges that flooding by a succession of dams at Project) the outlet of the Lake of the Woods caused injury to its reserve lands and interests. Date Received by SCB: 2002/12/06 Current Status: DOJ Registry File Number: B8260-789

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 2002/12/06 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 33A and B. Registry File Number: B8260-849

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 192 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Northwest Angle No.37 (BAND-152)

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1997/12/10 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 34, 34A, B-1, C and 37, 37A, B Registry File Number: B8260-850 and C.

Highway and Access Road Alleged Crown breached its fiduciary obligation to the FN when Ontario expropriated land on I. R. 34A for Highway 71 without Date Received by SCB: 2000/01/12 proper surrender or compensation. Current Status: BA Registry File Number: B8260-705

Lake of the Woods Watershed - Flooding (Tr3 Alleged wrongful flooding of the Northwest Angle #37 Indian Flooding Project) reserve due to the construction of dams at the entrance of the Winnipeg RIver and subsequent flooding of lands of Lake of the Date Received by SCB: 1997/12/10 Woods. Current Status: DOJ Registry File Number: B8260-618

Treaty Land Entitlement FN alleges that Canada's failure to conduct proper censuses and surveys of reserve lands between 1874-1916 has resulted in an Date Received by SCB: 1999/05/14 unspecified land entitlement shortfall under the terms of Treaty 3. Current Status: RES Registry File Number: B8265/N9

Obashkaandagaang (BAND-235)

Flooding (Tr3 Flooding Project) (Band previous name: Washagamis Bay) Alleged reserve lands (Rat Portage 38A) flooded without compensation. Date Received by SCB: 1994/12/28 Current Status: DOJ Registry File Number: B8260-496

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1994/12/28 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 38A. Registry File Number: B8260-851

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 193 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Obashkaandagaang (BAND-235)

Island 646P (Tr3 Flooding Project) (Band previous name: Washagamis Bay) FN Alleges that Island 646P was detached from Indian Reserve 38A by rising waters in Date Received by SCB: 1993/12/21 the Lake of the Woods caused by the construction of the Norman Current Status: DOJ Dam in 1898. The island was then subsequently sold in 1909 by Registry File Number: B8260-465 Ontario without an expropriation or surrender having taken place. This island is located in the Treaty 3 area.

Reserve 38D (Band previous name: Washagamis Bay) Alleged that several islands were not set aside as part of Reserve 38D pursuant to Date Received by SCB: 1983/07/12 Treaty 3. Further more, claimant alleges these islands were Current Status: INACT improperly alienated without compensation. Registry File Number: B8260-223

Ochiichagwe'babigo'ining First Nation (BAND-147)

Flooding of the Dalles I.R. 38C (Tr3 Flooding Project) FN alleges that Canada breached its fiduciary duty towards the FN by failing to protect their reserve lands and their interests in other Date Received by SCB: 2001/01/02 lands from flooding and injury caused by dams at the outlet of Lake Current Status: DOJ of the Woods and in the Winnipeg River. Registry File Number: B8260-735

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1995/01/17 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 38C. Registry File Number: B8260-830

Loss of Timber Revenue Alleges inadequate compensation for timber taken on Dalles Indian reserve 38C. Date Received by SCB: 2005/01/19 Current Status: BA Registry File Number: B8260-840

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 194 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Ochiichagwe'babigo'ining First Nation (BAND-147)

Transmission Line FN alleges insufficient compensation was received for the construction of a 47.35 acre transmission line right-of-way through Date Received by SCB: 1995/01/17 Dalles I.R. #38C in 1956. There is also a timber issue. Current Status: INACT Registry File Number: B8260-485

Ojibways of Onigaming First Nation (BAND-131)

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1994/07/19 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 35C, D, F and H. Registry File Number: B8260-852

Lake of the Woods Watershed - Flooding (Tr3 Alleges breach of fiduciary obligation relating to flooding of reserve Flooding Project) lands as a result of the construction and operation of varoius dams in the Lake of the Woods watershed. Date Received by SCB: 1994/07/19 Current Status: DOJ Reserves affected: Sabaskong Bay IR# 35C, 35D. 35F and 35H. Registry File Number: B8260-673

Reserve 35D Trespass - Highway Alleged that Canada breached its obligations with regard to various trespasses of Reserve 35D including flooding of a portion of the Date Received by SCB: 1994/07/26 reserve and construction of Highway 71. Current Status: INACT Registry File Number: B8260-478

Oneida Nation of the Thames (BAND-169)

Land Acquisition Surplus The FN alleges the disappearance of surplus funds in the amount of £435 18s 5d in 1844. The FN also claims the current value and Date Received by SCB: 2002/07/26 the loss of use of these funds from 1844 to date. Current Status: BA Registry File Number: B8260-785

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 195 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Oneida Nation of the Thames (BAND-169)

Lot 23-B and Subsequent Dealings The FN is seeking repayment of the "short deposit" of £326; repayment of the payment of £100 and £178 16s 7 and loss of use Date Received by SCB: 2002/07/26 of these funds from 1841 to date. Current Status: DOJ Registry File Number: B8260-783

Purchase of East ½ Lot 24-D The FN alleges the mismanagement of £75 withdrawn from the Oneida First Nation Trust Account. The FN also claims the current Date Received by SCB: 2002/07/26 value and the loss of use of these funds from 1842 to date. Current Status: DOJ Registry File Number: B8260-784

Pays Plat (BAND-191)

Highway Alleged Canada breached its fiduciary duty by allowing the expropriation of 8.25 acres of reserve land for a road right-of-way in Date Received by SCB: 1995/06/19 1933, and approximately 17 acres for a second expropriation in the Current Status: DOJ 1950s. Reversionary issues. The land in question was reserved Registry File Number: B8260-505 for the FN under the terms of the Robinson-Superior Treaty.

Railway Right-of-Way Allege illegally obtained patent and sale to of invalidly expropriated 25.05 acres of IR# 51 for a railway Date Received by SCB: 2007/02/02 Right-of-Way and Wye intersection in 1912. Failure to minimally Current Status: RES impair the FN's use; to provide reversionary interest in the lands; Registry File Number: B8260-922 and to obtain adequate compensation.

Treaty Boundary Alleged FN has not received its lawful land entitlement under the Robinson Superior Treaty. Alleged that the acreage of reserve Date Received by SCB: 1994/11/06 land surveyed in 1885 was established at an arbitrary minimum. Current Status: LIT Registry File Number: B8260-484

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 196 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Pic Mobert (BAND-195)

Reserve Allocation FN alleges their right to reserve land under the Robinson-Superior treaty has not been fulfilled. Additionally, the FN alleges fiduciary Date Received by SCB: 2004/01/15 obligation breaches by DIAND relating to negotiations with Ontario Current Status: LIT to purchase reserve land for the Band in 1922. Registry File Number: B8260-813

Rainy River First Nations (BAND-130)

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1995/01/30 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 11 and 12. Registry File Number: B8260-882

Highway 11 and 71 Right Of Way Taking of the rights of way for highways 11 and 71 that cross Manitou Rapids Indian Reserve No. 11. Failure to fulfill lawful Date Received by SCB: 2002/03/15 obligations; breach of lawful obligations; failure to act prudently in Current Status: BA fulfillment of fiduciary duty to protect claimants interest in Reserve Registry File Number: B8260-760 No. 11.

Lake of the Woods Watershed - Flooding (Tr3 Alleged breach of Crown's fiduciary duty with respect to flooding of Flooding Project) reserve lands as a result of dams and other water level control devices constructed at the Westerly Outlet of the Lake of the Date Received by SCB: 1998/06/08 Woods. Current Status: DOJ Registry File Number: B8260-651

Railway - Right of Way Alleged insufficient compensation for the construction of a 95 acre railway line in 1901 by the Ontario and Rainy River Railway and its Date Received by SCB: 1995/01/30 successor companies, Canadian Northern and Canadian National Current Status: DOJ Railways across Manitou Rapids I.R. 11, Long Sault I.R. 12, and Registry File Number: B8260-486 Long Sault I.R. 13.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 197 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Rainy River First Nations (BAND-130)

Surrender/Sales Proceeds Alleged a) the 6 surrenders (1915) of the Rainy River Reserves were void and that, in any event, b) the subsequent land sales Date Received by SCB: 1982/12/17 were not conducted in a proper fashion. Current Status: AR Registry File Number: B8260-187

Robinson Huron Chiefs (ASSCTN)

Treaty Rights Chiefs of the Robinson-Huron treaty area asked that their treaty - Aundeck-Omni-Kaning (BAND-180) dated 1850 be renegotiated alleging that the Crown failed to meet - Dokis (BAND-218) certain commitments under the treaty specifically: Crown liability re - Garden River First Nation (BAND-199) Indian land, hunt/fish rts. - Henvey Inlet First Nation (BAND-231) - Magnetawan (BAND-174) - Mississauga (BAND-200) - Nipissing First Nation (BAND-220) - Sagamok Anishnawbek (BAND-179) - Serpent River (BAND-201) - Shawanaga First Nation (BAND-137) - Sheguiandah (BAND-176) - Wahnapitae (BAND-232) - Wasauksing First Nation (BAND-136) - Whitefish Lake (BAND-224) - Whitefish River (BAND-230) Date Received by SCB: 1975/10/03 Current Status: NLO Registry File Number: B8260-152

Sagamok Anishnawbek (BAND-179)

La Cloche Tract (Band previous name: Spanish River IR No. 5) FN claims that the Lac Cloche Tract, a 2 mile by 5 mile (10 mi²) tract of land adjacent Date Received by SCB: 2002/07/23 to the reserve, was wrongly excluded from the reserve at the time Current Status: DOJ of survey in 1852, due to HBC interests in the land. Registry File Number: B8260-773

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 198 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Sandy Lake (BAND-211)

The Church Land Alleged Canada failed to prevent the taking of approx. 296 acres of reserve land by the Catholic Mission. Date Received by SCB: 1999/05/11 Current Status: DOJ Registry File Number: B8260-555

The Mining Location Allege that 17.31 acres staked out as mining claims were part of the reserve and were never properly surrendered or expropriated. Date Received by SCB: 1999/05/11 Current Status: DOJ Registry File Number: B8260-555

TLE Initial shortfall claim - claim prepared by Nishnawabe-Aski Nation (NAN). FN alleges that there is an outstanding lawful obligation on Date Received by SCB: 2000/03/29 the grounds that because the reserve was first surveyed in 1938 Current Status: BA the land provided to the FN was insufficient according to the tems Registry File Number: B8265/S28 of Treaty 5.

Saugeen (BAND-123)

Burial Ground Owen Sound Burial Grounds - lots 97 & 99 Date Received by SCB: 1992/04/28 Current Status: AR Registry File Number: B8260-501

Saugeen/Nawash Alleged surrender of reserve lands in treaty 45 ½, dated 1836, was invalid, and the First Nation retains aboriginal rights to certain lands Date Received by SCB: 1980/04/02 south of the Bruce (aka Saugeen) Peninsula. Re-examination of Current Status: NLO claim in light of the Supreme Court of Canada's Decision in the Registry File Number: B8260-163 Sparrow Case.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 199 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Seine River First Nation (BAND-132)

Flooding (Tr3 Flooding Project) The claimant alleges breach of fiduciary obligation by the Crown to protect the reserves (23, 23A and 23B) from flooding as a result of Date Received by SCB: 1999/01/18 the construction of dams in the Rainy Lake watershed. Current Status: DOJ Registry File Number: B8260-672

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1999/01/18 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 23, 23 A and B. Registry File Number: B8260-883

Highway 11 Expropriation Alleged wrongful expropriation and breach of fiduciary duty by Canada for issuing an 86.36 acre road right-of-way across their Date Received by SCB: 1998/08/10 reserve in 1962. Also, FN alleges fiduciary breach with respect to Current Status: BA accounting for revenues derived for sand and gravel permits, and Registry File Number: B8260-660 revenue derived from the construction and use of access roads.

Railway Alleged that Canada breached its fiduciary obligations by failing to ensure that the provisions of the Railway Act of 1888 and Indian Date Received by SCB: 1994/01/07 Act were adhered to when permitting the ORRR/CNR to Current Status: DOJ expropriate 48.54 acres from Reserve No. 23 in 1901. Also, FN Registry File Number: B8260-468 alleges failure to provide for adequate, timely compensation and reversionary rights. The land in question was set aside for the FN under the terms of Treaty 3.

Sturgeon Falls Trespass Alleged that Canada failed to prevent the destruction of portions of the lower Sturgeon Falls in 1927 which resulted in loss and Date Received by SCB: 2006/10/13 damage of Seine River IR# 23. Canada is in breach of its fiduciary Current Status: RES trust, constitutional and statutory duties based on Treaty 3, the Registry File Number: B8260-908 Indian Act R.S.C., 1886, as amended, and the Constitution Act, 1982, to protect Seine River IR# 23 from unlawful trespass, use, occupation, damage or alienation. Canada failed to ensure that the Seine River First Nation received adequate compensation for the losses suffered.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 200 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Seine River First Nation (BAND-132)

Timber FN alleges that in 1900-1901, the ORRR trespassed upon the Seine River reserves and cut over 1000 trees, covering an area of Date Received by SCB: 1989/04/10 about 20 acres, without surrender or permission from the band. FN Current Status: DOJ further alleges that Canada's failure to prevent the cutting of timber Registry File Number: B8260-352 consitutes a breach of fiduciary duty.

TLE FN alleges a failure to complete an accurate census at the time of first survey led to a TLE shortfall; this, in addition to late additions, Date Received by SCB: 2005/04/27 has led to a historic TLE shortfall. Current Status: RES Registry File Number: B8265/S26

Serpent River (BAND-201)

Highway Taking Alleged illegal occupation and trespass of approximately 100 acres of I. R. No. 7 by Public Highways constructed between 1870 and Date Received by SCB: 1998/01/30 1956 without proper surrender or compensation. Current Status: FCL Registry File Number: B8260-617

Shawanaga First Nation (BAND-137)

Ontario Hydro & Bell Canada Trespasses The Band alleges that the hydro-Electric Power Commission of Ontario unlawfully occupies the Shawanaga FN's two reserves, Date Received by SCB: 2003/06/27 and has never paid proper compensation for the lines. The Band Current Status: BA further alleges that Bell Canada never received authorization to Registry File Number: B8260-482 occupy the reserves, nor did they pay any compensation. The Band claims that Canada breached provisions of the Indian Act and breached its fiduiary duty by failing to obtain proper compensation.

Shoal Lake No.40 (BAND-155)

Garden Island Alleged inadequate compensation for lands taken for water storage and supply purposes for Greater Winnepeg Water District Project Date Received by SCB: 1991/11/18 and inadequate compensation for sand and gravel taken for same Current Status: ACT project. Registry File Number: B8260-832

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 201 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Shoal Lake No.40 (BAND-155)

GWWD Expropriation & Surrender Alleged inadequate compensation for lands taken for water storage and supply purposes for Greater Winnepeg Water District Project Date Received by SCB: 1991/11/18 and inadequate compensation for sand and gravel taken for same Current Status: FCL project. Registry File Number: B8260-427

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1991/11/18 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 40 and 34 B-2 (held in common Registry File Number: B8260-829 with Iskatewizaggegan #39 Independent FN.)

Six Nations of the Grand River (BAND-121)

Bed of the Grand River and Islands Alleged failure to compensate for certain islands in the Grand River and claim to the bed of the Grand River in 1784. Date Received by SCB: 1992/07/27 Current Status: LIT Registry File Number: B8260-438

Burtch Tract Alleged invalid surrender in 1841 of 5,223 acres in Brantford township. Date Received by SCB: 1989/05/03 Current Status: LIT Registry File Number: B8260-376

Canby - Block 6 Pre-Confederation 19,000 acre tract in Canborough Township. Alleged that in 1798, the tract of land was never lawfully Date Received by SCB: 1988/09/28 surrendered. Government in place at the time breached its Current Status: LIT fiduciary obligation for failing to enforce payment for the grant. Registry File Number: B8260-369

Cayuga Alleged Cayuga township was surrendered in 1831 and 1834, and de-surrendered circa 1844 by Indian Affairs in exchange for Date Received by SCB: 1991/07/10 exclusion of Burtch tract from band lands. Also, that the 1831 and Current Status: LIT 1834 surrenders were for lease and that any sale of the portions of Registry File Number: B8260-416 Cayuga Township, South of the Grand River, was illegal.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 202 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Six Nations of the Grand River (BAND-121)

CNR Lots 45-61 Alleged illegal alienation of land for railway right of way. There was never a surrender document obtained from Six Nations, giving Date Received by SCB: 1991/05/10 consent to the railway right-of-way. Current Status: LIT Registry File Number: B8260-419

Comp. for Lands in Letter Patent # 708 The FN alleges that the surrender dated April 19, 1830 to allow the sale of 807 acres for the town plot of Brantford was invalid. In Date Received by SCB: 1994/12/21 addition, the FN alleges there was a fiduciary breach by the Crown Current Status: LIT when it granted Letters Patent number 708 dated November 5, Registry File Number: B8260-510 1851. The patent covered 33 lots were never credited to the Six Nations Trust Funds.

Comp. for Lands in Letters Patent # 910 The FN alleges that the surrender dated April 19, 1830 to allow the sale of 807 acres for the town plot of Brantford was invalid. In Date Received by SCB: 1995/09/20 addition, the FN alleges there was a fiduciary breach by the Crown Current Status: LIT when it granted Letters Patent Number 910 dated July 12, 1852. Registry File Number: B8260-508 The patent covered 8 lots and consisted of 1.6 acres. According to the FN, no funds from the sale of the 8 lots were ever credited to the Six Nations Trust Funds.

Comp. for Lands Patented to Nathan Gage The FN alleges that the surrender dated April 19, 1830 to allow the sale of 807 acres for the town plot of Brantford was invalid. In Date Received by SCB: 1995/02/27 addition, the FN alleges there was a fiduciary breach by the Crown Current Status: LIT when it granted Letters Patent dated February 25, 1840. The Registry File Number: B8260-509 patent covered 19 lots were never credited to the Six Nations Trust Funds.

Coutts & Co. Investments Alleged breach of fudiciary trust by not properly accounting for Six Nations funds appropriated by Crown and invested in Coutts & Co. Date Received by SCB: 1993/08/23 (London), between 1805 and 1855. Current Status: LIT Registry File Number: B8260-458

Eagle's Nest Tract Alleged 1,800 acres Eagle's Nest Tract, in Brantford Township was not included in the 1841 surrender nor was it surrendered in 1844. Date Received by SCB: 1989/10/04 Also alleged this land was reserved for leasing. Current Status: LIT Registry File Number: B8260-382

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 203 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Six Nations of the Grand River (BAND-121)

East Hawkesbury Alleged invalid surrender, in 1847, of 4,000 acres in the township of East Hawkesbury. Date Received by SCB: 1991/10/15 Current Status: LIT Registry File Number: B8260-246

General Surrender Alleged general surrender of 1841 was invalid. Date Received by SCB: 1989/10/04 Current Status: LIT Registry File Number: B8260-381

Grand River Navigation Company (368 Acres) Alleged illegal alienation of 368.7 acres to the Grand River Navigation Company in 1837. This claim is also known as Grand Date Received by SCB: 1993/05/07 River Navigation Company Claim. Current Status: LIT Registry File Number: B8260-431

Innisfil Township Alleged 900 acres of land in Innisfill Township was alientated without authorization or consent. Date Received by SCB: 1991/10/15 Current Status: LIT Registry File Number: B8260-210

Jarvis Investments Alleged breach of fiduciary obligation for allowing agents of the Crown to appropriate funds in a manner contrary to Six Nations' Date Received by SCB: 1994/05/03 best interests. Current Status: LIT Registry File Number: B8260-474

Johnson's Settlement Alleged invalid surrender of, a 7000 acre tract located in Brantford township. This land was to be reserved as a continual source of Date Received by SCB: 1989/01/19 revenue for Six Nations, through leasing. Current Status: LIT Registry File Number: B8260-371

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 204 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Six Nations of the Grand River (BAND-121)

Martin's Tract Alleged invalid surrender and sale of lots 11-31 consession 3, Onondaga township circa 1840. By Order-in-Council, the land was Date Received by SCB: 1990/04/25 to be leased to create continual income for the Six Nations Indians. Current Status: LIT Registry File Number: B8260-389

Moulton Township Alleged 30,100 acres in Moulton Township were sold, in 1807, without a surrender. Date Received by SCB: 1984/10/30 Current Status: LIT Registry File Number: B8260-247

Oil and Gas Alleged invalid surrender of oil and gas May 1925 and breach of fiduciary duty in the administration of exploration and distribution Date Received by SCB: 1993/01/28 leases. Current Status: LIT Registry File Number: B8260-447

Oneida Township Alleged invalid surrender of entire Oneida township in 1841. Date Received by SCB: 1990/09/27 Current Status: LIT Registry File Number: B8260-407

Onondaga Township Alleged that 2000 acres in Onondaga township were not lawfully surrendered in 1841. Date Received by SCB: 1991/05/10 Current Status: LIT Registry File Number: B8260-387

Oxbow Bend Alleged that in 1841, 1200 acres of land in Brantford township was never lawfully surrendered for sale. That by Order-in-Council of Date Received by SCB: 1990/07/25 Oct/1841, the Oxbow Bend was to be leased on a short-term basis Current Status: LIT to create a continual income for FN. Registry File Number: B8260-406

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 205 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Six Nations of the Grand River (BAND-121)

Plank Road Alleged road lots in Oneida and Seneca Townships were not included in alleged invalid 1841 surrender. Although the Six Date Received by SCB: 1987/06/23 Nations had only agreed to lease the land, it was sold against the Current Status: LIT FNs wishes. Registry File Number: B8260-322

Port Maitland Alleged compensation never received for lots 25 and 26 concession 4, Dunn township, Port Maitland, when land was Date Received by SCB: 1989/07/21 transferred to the Department of the Interior in 1915. Current Status: LIT Registry File Number: B8260-377

Railway Alleged faulty expropriation of land, in 1875, for railway purposes. Date Received by SCB: 1980/11/12 Current Status: SET Registry File Number: B8260-198

Source of the Grand River Alleged terms and conditions of the Haldimand Deed of 1784 were breached in that all the lands described in the Deed, i.e. six miles Date Received by SCB: 1993/04/19 on either side of the Grand River from its mouth to its source, were Current Status: LIT not set aside. Registry File Number: B8260-454

Towpath Alleged unextinguished interest in the towpaths on each side of the Grand River and in the bed and island of the Grand River. This Date Received by SCB: 1992/10/22 claim rests on the interpretation of a land surrender obtained in Current Status: LIT 1784. Although the land was appropriated by the Grand River Registry File Number: B8260-166 Navigation Company in 1836, compensation was never paid for the 368.7 acres granted to the company, including 36 acres of towpath land.

Welland Canal Alleged illegal taking of, and inadequate compensation for approximately 2,000 acres of land along the Grand River flooded Date Received by SCB: 1988/01/27 by the Welland Canal Company 1829-1836. Current Status: LIT Registry File Number: B8260-353

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 206 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Stanjikoming First Nation (BAND-133)

Headlands (Headlands Project) Breach of fiduciary obligations regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 2006/05/12 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 18C. Registry File Number: B8260-896

Land Entitlement & Flooding (SPLIT #1) Flooding (Tr3 Allegations of flooding of reserve land and non-receipt of share of Flooding Project) prior flooding compensation. Date Received by SCB: Current Status: BA Registry File Number: B8260-372

Land Entitlement & Flooding (SPLIT #2) TLE Allegations relating to land provisions under Treaty 3. Date Received by SCB: Current Status: ACT Registry File Number: B8265/S31

Rainy Lake Rainy Lake I.R. 18B and 18C were originally surveyed and set aside in common for the Stanjikoming FN and the Couchiching FN Date Received by SCB: 1982/05/05 in 1876. 18B is now part of Couchiching I.R. 16A and the claimant Current Status: SET alleges unextinguished interest in Rainy Lake 18B. Registry File Number: B8260-211

Temagami First Nation (BAND-222)

Aboriginal Title Alleged unextinguished Aboriginal title to 10, 360 sq. km. in vicinity of Lake Temagami and outstanding annuities. Temagami FN, Date Received by SCB: 1974/09/17 despite occupying an area within the confines of the Current Status: FCL Robinson-Huron Treaty (1850), was not a signatory due to an Registry File Number: B8260-126-1 oversight.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 207 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Thessalon (BAND-202)

Boundaries of Thessalon Alleged that, in 1852, the Thessalon reserve was surveyed in "miles," and not in "leagues" as the FN intended. As a result, the Date Received by SCB: 1997/08/05 FN allegedly did not receive the proper amount of land to which it Current Status: LOS was entitled under the Robinson-Huron Treaty. (note: 1 league = Registry File Number: B8260-597 between 2.5 and 4 miles)

Road Rebates Alleged the government rightfully sold their surrendered lands in 1874 and the beginning of the 1890s, and the proceeds were Date Received by SCB: 1997/06/10 distributed among the members of the FN, government had no right Current Status: FCL in making a deduction or rebate from the sale price due to road Registry File Number: B8260-658 reservations, especially since no such deductions or rebates were made in any other place in Canada.

United Indian Council (ASSCTN)

1923 Williams Treaty Alleged Williams Treaty was invalid, inadequate compensation for - Alderville First Nation (BAND-160) land taken and failure to provide reserves. (FN involved: Alderville, - Beausoleil (BAND-141) Beausoleil, Chippewas of Georgina Island, Chippewas of - Chippewas of Georgina Island (BAND-138) Mnjikaning, Curve Lake, Hiawatha, Mississauga of Scugog Island). - Chippewas of Mnjikaning First Nation (BAND-139) - Curve Lake (BAND-161) - Hiawatha First Nation (BAND-162) - Mississauga's of Scugog Island First Nation (BAND-140) - Mississaugas of the Credit (BAND-120) - Moose Deer Point (BAND-135) Date Received by SCB: 1986/07/17 Current Status: LIT Registry File Number: B8260-298

Wabauskang First Nation (BAND-156)

Headlands Breach of fiduciary obligation regarding the 1894 agreement between Canada and Ontario, and the later revocation of this Date Received by SCB: 1994/01/13 portion of the agreement by Ontario in 1915 (Canada / Ontario Current Status: BA Boundary Dispute); involves IR# 21. Registry File Number: B8260-878

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 208 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Wabigoon Lake Ojibway Nation (BAND-157)

Flooding FN alleges that Canada: permitted non-Indians to construct dams in 1897 on the Wabigoon River which led to the overflow of 1,300 Date Received by SCB: 1992/08/06 acres of reserve land; failed to obtain adequate compensation for Current Status: ACT land lost to flooding; failed to secure appropriate authority for the Registry File Number: B8260-435 taking of the use of the lands and waters of the Wabigoon Reserve; failed to consult with the FN regarding the flooding; and failed to make a claim against Ontario for the flooding of the reserve.

Headlands Breach of fiduciary obligations regarding the 1894 agreement between Canada and Ontario, granting water power rights to the Date Received by SCB: 1992/08/06 province: involves IR# 27. Current Status: BA Registry File Number: B8260-884

Timber Claim FN alleges that Canada failed to obtain proper consent for the sale of timber as required by Treaty 3 and the Indian Act. Further, the Date Received by SCB: 1999/08/05 FN alleges Canada failed to secure a reasonable compensation for Current Status: BA the 1907 sale of timber rights. In addition, FN alleges Canada Registry File Number: B8260-695 breached its fiduciary duty by allowing a third party to trespass on the west side of the reserve and cut timber.

Wahgoshig (BAND-233)

Treaty Land Entitlement FN alleges the 1951 and 1974 division of assets between the Wahgoshig First Nation and Abitibiwinni FN (Quebec) was unfair, Date Received by SCB: 1995/09/21 and has resulted in the non-fulfilment of the FN's Treaty 9 land Current Status: LOS entitlement. The FN also alleges the unfair division of assets Registry File Number: B8260-507 constitutes a breach of Canada's fiduciary duty.

Wahnapitae (BAND-232)

Boundary FN alleges that when their ancestors negotiated and signed the Robinson-Huron Treaty in 1850, it was based on the intention that Date Received by SCB: 1996/06/21 their reserve would be surveyed in "leagues" and not miles. (Note: Current Status: INACT 1 league equals between 2.5 and 4 miles) Thus, the FN alleges the Registry File Number: B8260-527 Crown failed to set aside the proper amount of reserve land under the Treaty.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 209 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Wahnapitae (BAND-232)

Ontario Hydro Flooding Alleges flooding of I.R. #11 and breach of fiduciary obligation for failure to address and seek compensation for flooding and erosion Date Received by SCB: 2005/10/12 by Ontario Hydro and others prior to 1970. Current Status: DOJ Registry File Number: B8260-873

Wahta Mohawk (BAND-134)

Gibson The Mowhaks of Gibson relocated to Gibson Township from Oka, Quebec in 1881, due to land problems between the Indians and the Date Received by SCB: 1981/06/26 Seminary of St. Sulpice. 25,000 acres of land was acquired from Current Status: SET Ontario to establish the reserve. By 1928, when it was apparent Registry File Number: B8260-203 that not all of the Oka Indians relocated to Gibson, Canada returned 10,500 acres to the province without surrender by, or compensation to, the Gibson Indians. ICO process.

Walpole Island (BAND-170)

1958 Seaway Treaty (Surrender Project) Claim concerns construction of 16mi x 1000ft channel on IR #46. FN alleges Crown did not conduct sufficient evaluation or impact Date Received by SCB: 2005/08/09 studies prior to surrender, inadequate compensation provided, Current Status: LOS injurious affection to remaining lands, loss of economic opportunity Registry File Number: B8260-872 related to lands and damages resulting from construction of the channel; FN alleges no consideration was given to a lease rather than surrender.

Anderdon Alleged that the Crown failed to carry out the terms of the surrender of 300 acres in Anderdon Township in 1848. Also raises questions Date Received by SCB: 1994/06/15 regarding the sale of the land, including whether fair value was paid Current Status: DOJ for the land. Registry File Number: B8260-181

Attempted Survey Alleged that the government attempted to survey Walpole Island 1890-1910 against the wishes of the First Nation. Seeks return of Date Received by SCB: 1993/02/26 First Nation trust funds used to pay for the survey. Survey never Current Status: SET completed. Registry File Number: B8260-446

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 210 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Walpole Island (BAND-170)

Bob Lo (Bois Blanc) Island Alleged the surrender in 1786 was invalid and that no compensation was ever paid to the FN. Date Received by SCB: 1992/08/12 Current Status: LIT Registry File Number: B8260-360

Chenail Ecarte Reserve Alleged that Chenail Ecarte Reserve was intended to be 144 sq. miles. Surrender #7 document specified on 12 sq. miles. Further Date Received by SCB: 1993/11/24 the terms of treaty re. payment were never fulfilled. (Sombra Current Status: NLO Townships) Registry File Number: B8260-463

East Sister Island Alleged the Crown breached its fiduciary obligations regarding the use, licence and disposition of the island. Date Received by SCB: 2003/01/16 Current Status: DOJ Registry File Number: B8260-794

Enniskillen (SPLIT #03) Walpole Island Alleges that certain lands in Enniskillen Township were sold without Date Received by SCB: surrender. Other Claimants - Kettle and Stony Point and Aamjiwnaang FN's have settled this claim. Current Status: FCL Registry File Number: B8260-174

Fawn Island The WIFN claims that Canada was negligent in breach of its fiduciary duty regarding the disposition of Fawn Island and that the Date Received by SCB: 2003/07/14 lands were sold for less than their fair market value. The Island was Current Status: BA surrendered in 1857, but only sold in 1875. Registry File Number: B8260-804

Fighting Island Alleged that Fighting Island and the adjacent fishery and waters have never been lawfully surrendered by Walpole Island First Date Received by SCB: 1993/02/26 Nation. Current Status: LIT Registry File Number: B8260-445

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 211 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Walpole Island (BAND-170)

Grass Island Alleged that Canada illegally patented Grass Island in 1890, that the island was never surrendered and no compensation for it was Date Received by SCB: 1993/10/12 paid to Walpole Island. Current Status: LIT Registry File Number: B8260-460

Hen and Chicken Island Alleged the Crown breached its fiduciary obligations regarding the use, licence and disposition of the island. Date Received by SCB: 2003/01/16 Current Status: DOJ Registry File Number: B8260-795

Lower Indian Reserve Seeks the return of lower reserve, or compensation and questions the price paid for the land. The claim is located in the township of Date Received by SCB: 1986/09/29 Moore. Current Status: DOJ Registry File Number: B8260-317

Middle Island Alleged the Crown breached its fiduciary obligations permitting Middle Island to be occupied pursuant to a license of occupation Date Received by SCB: 2003/01/16 with no renumeration to the FN. The Crown also failed to advertise Current Status: DOJ the sale of Middle Island. Registry File Number: B8260-791

Middle Sister Island Alleged the Crown breached its fiduciary obligations regarding the use, licence and disposition of the island, and sold the island for Date Received by SCB: 2003/01/16 less than Fair Market Value. Current Status: DOJ Registry File Number: B8260-792

North Harbour Island Alleged the Crown breached its fiduciary obligations regarding the use, licence and disposition of the island. Date Received by SCB: 2003/01/16 Current Status: DOJ Registry File Number: B8260-793

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 212 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Walpole Island (BAND-170)

Peche Island (Fishing / Peach Island) Claimant alleges licenses and leases were issued to Peche Island without any compensation paid to First Nation. Claimant also Date Received by SCB: 1999/10/25 alleges that they did not receive fair market value for Peche Island Current Status: DOJ at time of surrender in 1857. Registry File Number: B8260-703

Pelee Island Alleged Pelee Island was never surrendered, that 1870 surrender did not include Pelee Island and that no compensation has been Date Received by SCB: 1992/03/31 paid to the FN for the island. Current Status: LIT Registry File Number: B8260-359

Sawmill and Dock Lease Surrender (Surrender FN alleges the Crown broke its fiduciary obligations to the Band Project) regarding a 5 year lease of 3 acres of reserve land in 1883, for the purposes of constructing a dock and lumber mill. Date Received by SCB: 2004/04/06 Current Status: NLO Registry File Number: B8260-819

St. Clair Flats Alleges that in 1892 Ontario illegally sold and patented part of St. Clair Flats. Date Received by SCB: 1993/02/26 Current Status: LIT Registry File Number: B8260-449

Surrenders for Timber on Walpole Island FN alleges that Canada breached its fiduciary obligation by upholding the Jan. 30, 1883 vote when the Indian Agent provided Date Received by SCB: 2004/04/21 only one proposal for consideration and in suggesting or Current Status: DOJ threatening that if the FN didn't vote in favour of the proposal, the Registry File Number: B8260-822 timber would be surrendered to the Crown for sale by tender.

Turkey Island Alleged Walpole Island Indians and the Chippewas of Anderdon were the rightful owners of Turkey Island. Canada erred in seeking Date Received by SCB: 1993/10/12 a surrender from the Wyandotts of Anderdon in 1874. Current Status: LIT Registry File Number: B8260-459

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 213 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Wasauksing First Nation (BAND-136)

External Boundary of Parry Island IR 16 At issue, are 'islands' which the FN claims were attached to Parry Island in 1852, when it was set aside as a Reserve. Fast-track Date Received by SCB: 1997/01/07 Current Status: NLO Registry File Number: B8260-569

Parry Island Formerly Parry Island FN. Claim concerns removal of sand and gravel from drained lands which were originally expropriated in Date Received by SCB: 1985/06/14 1895, for the terminus of the CN railway at Depot Harbour. Harbour Current Status: SET no longer being used for shipping purposes and FN contends that Registry File Number: B8260-259 the railway company had promised to return the area in question to Canada to be reestablished as an Indian reserve when it was no longer required for its original purpose.

Salt's Point (Surrender Project) FN alleges the July 18th, 1900 surrender of 93.5 acres at the northeastern end of Parry Island was invalid. The FN further Date Received by SCB: 1996/03/05 alleges that by allowing the invalid surrender Canada breached its Current Status: NLO fiduciary obligation. Finally, the FN alleges loss of use concerning Registry File Number: B8260-518 the surrendered land..

Whitefish Lake (BAND-224)

Incorrect Survey Alleged boundaries of reserve were incorrectly surveyed, resulting in loss of land to First Nation. Date Received by SCB: 1984/03/27 Current Status: SET Registry File Number: B8260-231

Timber Claim Alleged inadequate compensation for timber surrendered in 1886. The FN further alleges that failure to pay market value for the Date Received by SCB: 1995/02/08 timber constitutes a breach of Canada's fiduciary obligation. Current Status: LIT Registry File Number: B8260-492

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 214 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Ontario

Claimant Substance of Claim

Whitefish River (BAND-230)

Boundaries of Whitefish River Allege that the Whitefish Reserve did not receive the proper amount of land to which it was entitled under the Robinson-Huron Date Received by SCB: 2003/07/03 Treaty. Current Status: LOS Registry File Number: B8260-797

Highway Alleged failure to provide compensation for reserve taken for highway purposes. Date Received by SCB: 1985/03/25 Current Status: INACT Registry File Number: B8260-253

Moose Point The FN alleges that pursuant to the 1901 surrender of 710 acres of reserve lands, due to errors in description of surrendered lands in Date Received by SCB: 1992/12/10 the survey plans, an additional 540 acres of land was included in Current Status: SET letters patent to a railway company for which the FN received no Registry File Number: B8260-441 compensation.

Wikwemikong (BAND-175)

41 Islands Alleged 41 islands near Manitoulin Island were never surrendered to the Crown in 1836 and 1862. Date Received by SCB: 1975/08/11 Current Status: ACT Registry File Number: B8260-148

Point Grondine Alleged boundaries of reserve land were surveyed incorrectly, at the Robinson-Huron Treaty of 1850, using miles rather than Date Received by SCB: 1991/02/15 leagues, resulting in loss of land to the First Nation. Current Status: SET Registry File Number: B8260-316

Total of Claims for Ontario: 271

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 215 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Prince Edward Island

Claimant Substance of Claim

Abegweit (BAND-001)

Lady Wood Trust FN alleged that the Micmacs of P.E.I. did not receive due benefit from an Estate and trust fund. Date Received by SCB: 1979/05/19 Current Status: FCL Registry File Number: B8260-177

Lennox Island (BAND-002)

Hog Island The Claimant alleges that Hog Island, near Lennox Island, belongs - Abegweit (BAND-001) to the Lennox Island First Nation. Date Received by SCB: 1996/12/16 Current Status: INACT Registry File Number: B8260-553

Total of Claims for Prince Edward Island: 2

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 216 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Abénakis de Wôlinak (BAND-071)

Orig. Limits Wolinak: seigneurie Becancour Alleges illegal alienation of lands known as 'The Seigneurie of Bécancour', which FN claimed belonged to the Abenakis of Date Received by SCB: 1998/01/30 Wôlinak. Current Status: DOJ Registry File Number: B-321+321-1

Quebec-Montreal Southern Railway co. 1906-1946 Alleged invalid expropriation of land for the construction of a railroad. It is alleged that the FN was not adequately compensated. Date Received by SCB: 2005/05/11 Current Status: RES Registry File Number: B8260-808

Atikamekw d'Opitciwan (BAND-079)

Création de Re: Perte d`usage 1914-1944 The Band claims that the government was committed to creating a reserve in 1914. Date Received by SCB: 2000/10/02 Current Status: DOJ Creation of a reserve Registry File Number: B8260-719

Création de Re: Provisions territoriales The Band claims that insufficient land was allocated for the creation of the reserve. Date Received by SCB: 2000/10/02 Current Status: DOJ Registry File Number: B8260-720

Inondation 1918 The Band claims that the 1918 agreement was illegal and that compensation received after the 1918 flood was inadequate. Date Received by SCB: 2000/10/02 Current Status: DOJ Flood Registry File Number: B8260-717

Inondation 1957 The Band claims that the loss of reserve land and a sawmill was due to increased water levels in the Gouin Reservoir throughout Date Received by SCB: 2000/10/02 the 1940s and 1950s. Current Status: DOJ Registry File Number: B8260-718 Flood

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 217 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Betsiamites (BAND-085)

Cession des terrains de la réserve-1923 (Surrender FN claims that the 1923 surrender of four lots on the Betsiamites Project) Reserve to the Brown Corporation is not valid. FN alleges that the vote for the surrender and the results obtained did not satisfy the Date Received by SCB: 2003/03/03 requirements set out in the Indian Act. Current Status: RES Registry File Number: B8260-798

Cession du bois marchand - 1918 (Surrender Project) The FN alleges that the 1918 timber surrender was invalid. Date Received by SCB: 2002/04/12 Current Status: RES Registry File Number: B8260-766

Cession et vente du bois de la réserve (1889-1897) The FN alleges that the 1889 surrender of the timber on the reserve is invalid and that the DIA mismanaged the sale of the Date Received by SCB: 2004/11/24 timber (insufficient timber dues and rights; lack of effort to retrieve Current Status: SUB/REV late fees, etc.). Registry File Number: B8260-834

Commerçants Eurocanadiens The FN alleges that the federal government was negligent during commercial activities on the Betsiamites reserve. Date Received by SCB: 2001/05/25 Current Status: DOJ Registry File Number: B8260-747

Exploitation forestière et empiétements The FN alleges that there were illegal timber activities on the reserve, and that the FN never received compensation. Date Received by SCB: 2002/04/12 Current Status: BA Registry File Number: B8260-767

Hydroline 1 Alleged illegal taking of land for hydroline (44-46 kV) in 1953, and for settlement improvements, inadequate compensation and Date Received by SCB: 1990/05/25 mismanagement of FN's assets in the course of purchase of Current Status: FCL shares in an electricity co-operative. Registry File Number: B8260-398

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 218 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Betsiamites (BAND-085)

Hydroline 2 Alleged illegal taking of land and failure to compensate for temporary construction camp in 1956, inadequate compensation Date Received by SCB: 1990/05/25 for hydroline (300 kV) right of way, and intimidation by federal Current Status: SET government officials. Registry File Number: B8260-399

Hydroline 3 Alleged illegal taking of land in 1959 for hydroline (69 kV), failure to honour conditions in BCR and inadequate compensation. Date Received by SCB: 1990/05/25 Current Status: SET Registry File Number: B8260-400

Hydroline 4 Alleged illegal taking of land in 1963 for two hydrolines (735 kV), inadequate compensation, and breach of legal obligations to Date Received by SCB: 1990/05/25 protect FN interests in matters of compensation and management Current Status: SET of reserve lands. Registry File Number: B8260-401

Islets Jeremie Alleges occupation permit of Islets Jeremie in 1861 was never cancelled. Date Received by SCB: 1996/10/15 Current Status: RES Registry File Number: B8260-537

La license no. 160 FN claims that Canada breached its responsibilities with respect to the sale and management of timber on the reserve for the period Date Received by SCB: 2004/01/19 1918 to 1967. Current Status: BA Registry File Number: B8260-812

Le bail de location no 188 des terrains (1923-1969) FN claims that the lease of reserve lands, by virtue of lease no 188 (or 501), with conditions that were different from those previously Date Received by SCB: 2003/09/25 agreed to. FN claims that the Crown failed in its responsibility with Current Status: BA respect to the administration of these lands between 1923 and Registry File Number: B8260-806 1969, namely as regards the low anual rates, unauthorised transfer of the lease, and the absence of band consultation.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 219 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Betsiamites (BAND-085)

Les missionnaires et l'Anse des Aulnes FN claims that the presence of the missionaries on the reserve (viz, l'Anse des Aulnes) did not respect the Indian Act, namely as it Date Received by SCB: 2003/03/03 relates to the alleged residential permits granted to the Current Status: RES missionaries. FN also claims that the occupation of l'Anse des Registry File Number: B8260-799 Aulnes by the missionaries resulted in the FN's loss of use of agricultural and timber resources since 1861.

Les missionnaires et les terrains du village FN claims that the presence of the missionaries on the reserve did (1855-1993) not respect the Indian Act, namely as it relates to the alleged residential permits granted to them as well as it relates to Date Received by SCB: 2003/06/24 agricultural (hay and wood) resources. Current Status: RES Registry File Number: B8260-803

Pont Alleges illegal use of reserve lands for a bridge crossing the Betsiamites River. Date Received by SCB: 1995/05/16 Current Status: ACT Registry File Number: B8260-503

Route 138 Alleges illegal use of reserve lands for public road purposes. Date Received by SCB: 1995/05/16 Current Status: ACT Registry File Number: B8260-502

Telegraph and Telephone Line Alleged illegal taking of lands for a telegraph and telephone line between 1905 and 1959 and failure to compensate FN for taking. Date Received by SCB: 1991/03/19 Current Status: SET Registry File Number: B8260-412

Terres Alleges 6900 acres of reserve land lost in 1861 due to error in legal survey. Date Received by SCB: 1993/07/14 Current Status: ACT Registry File Number: B8260-236

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 220 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Betsiamites (BAND-085)

Timber Alleged failure of the Crown to recover damages on judgements rendered in 1889, as a result of illegal wood cutting on reserve. Date Received by SCB: 1993/11/24 Current Status: NLO Registry File Number: B8260-236-1

Conseil de la Première Nation Abitibiwinni (BAND-055)

Les droits de coupe sur le bois de la réserve d'Abitibi Loss of income from 1908-1942; violations at time of 1942 transfer (1942-1985) regarding employment of Indians in forestry operations; unlawful logging from 1952-1958, from 1978-1980 and from 1982-1985 Date Received by SCB: 2007/06/05 because of invalid renewal of licenses; breach of fiduciary duty. Current Status: SUB/REV Registry File Number: B8260-932

Timiskaming Creation of Reserve Alleged inappropriate allocation of land in the creation of reserve and loss of revenues from 1853. FN sought establishment of Date Received by SCB: 1992/11/17 reserve equal in area to lands allotted under the 1853 schedule Current Status: LOS and set aside in an appropriate location Registry File Number: B8260-440

Traité 9 et réserve de Pikogan The FN alleges non fulfilment of the Crowns obligations towards band members' ancestors during the negotiations (in 1905, 1906), Date Received by SCB: 2003/02/10 signature and adhesion to Treaty 9 (in 1908). The FN claims that Current Status: LOS they should have received land according to Treaty 9. The FN also Registry File Number: B8260-721 claims various issues arising from the setting aside of lands for the Pikogan reserve.

Conseil des Atikamekw de Wemotaci (BAND-077)

Chemin de fer FN seeks compensation for agreement negotiated by DIAND in 1913-1914 for railway right-of-way to National Transcontinental Date Received by SCB: 1992/08/31 across Weymontachie reserve. Current Status: FCL Registry File Number: B8260-436

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 221 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Conseil des Atikamekw de Wemotaci (BAND-077)

La Diaspora Loss of use of a village on the Weymontachie Reserve Date Received by SCB: 1993/09/14 Current Status: BA Registry File Number: B8260-457

Loss of Land at Coucoucache FN seeks compensation and restitution of 368 acres to the Coucoucache reserve. Date Received by SCB: 1992/05/25 Current Status: DOJ Registry File Number: B8260-433

Loss of Timber at Coucoucache FN seeks compensation for alleged illegal removal of timber from the Coucoucache Reserve. Date Received by SCB: 1992/05/25 Current Status: LOS Registry File Number: B8260-432

Crespieul Claimants (ASSCTN)

Crespieul Originally submitted by Abénakis de Wôlinak, alleging illegal - Abénakis de Wôlinak (BAND-071) surrender, loss of use, and mismanagement of proceeds from sale - Odanak (BAND-072) of surrendered land. Claim resubmitted by Abénakis de Wôlinak and Odanak, same claim with additional allegations concerning the Date Received by SCB: 1996/06/10 creation and location of the reserve, except that the two FN's Current Status: SET agreed to address the mismanagement of proceeds from the sale Registry File Number: B8260-238-1 of Crespieul between themselves.

Innu Takuaikan Uashat Mak Mani-Utenam (BAND-080)

Boulevard Laure - Route 138 The FN alleges the illegal use of reserve lands at Uashat and Maliatenam for a road and a bridge. Date Received by SCB: 1996/02/09 Current Status: NLO Registry File Number: B8260-524

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 222 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Innu Takuaikan Uashat Mak Mani-Utenam (BAND-080)

Lot 6 - Range 1 Alleged loss of use of lot 6, range 1, Sept-Iles. Date Received by SCB: 1993/05/18 Current Status: NLO Registry File Number: B8260-452

Range 2 Lots Alleged loss of use of lots in Range 2, Sept-Iles. Date Received by SCB: 1993/05/18 Current Status: NLO Registry File Number: B8260-453

Sept-Iles Creation of Reserve Alleged insufficient allocation of land in the creation of the reserve. Date Received by SCB: 1992/05/01 Current Status: DOJ Registry File Number: B8260-430

Sept-Iles Loss of Use Alleged loss of use of the reserve between 1879 and 1906. Date Received by SCB: 1991/10/03 Current Status: NLO Registry File Number: B8260-429

Innue Essipit (BAND-086)

Creation of Reserve in 1892 Alleges that land set aside for the FN in 1892 was insufficient compared to standard set by the department for other reserves in Date Received by SCB: 1993/11/02 Quebec. Current Status: NLO Registry File Number: B8260-462

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 223 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Kahnawake (BAND-070)

C.P.R. Railway The FN alleges that Canada breached its obligation as regards to the invalid acquisition and subsequent mismanagement of Date Received by SCB: 2004/12/13 expropriated lands in 1888 for CPR railway purposes, and further Current Status: RES owing to a lack of consultation, improper land valuations, and a Registry File Number: B8260-726 number of illegal transactions between the railway company and locatees on the reserve. The FN also alleges that the expropriation lands, no longer used for CPR railway purposes, also reveal a breach to minimally impair.

C.S.X. Railway The FN alleges that Canada breached its obligation as regards to the invalid acquisition and subsequent mismanagement of Date Received by SCB: 2004/12/13 expropriated lands in 1895 for CSX railway purposes, and further Current Status: RES owing to a lack of consultation, improper land valuations, and a Registry File Number: B8260-841 number of illegal transactions between the railway company and locatees on the reserve. The FN also alleges that the expropriation lands, no longer used for CSX railway purposes, also reveal a breach to minimally impair.

Line 1 Alleges breach of lawful obligations in relation to the construction of Hydro Transmission Lines. Leasing of Kahnawake Land for a Date Received by SCB: 1997/07/23 315KV Power Transmission Line (Line 1) Current Status: LOS Registry File Number: B8260-592

Line 2 Alleges breach of lawful obligations in relation to the construction of Hydro transmission lines. Expropriation of Kahnawake Territory by Date Received by SCB: 1997/07/04 the Cedars Rapids Manufacturing & Power Co. and their Current Status: LOS Successors, the Quebec Hydro-Electric Commission for Registry File Number: B8260-592 transmission Lines (Line 2).

Line 3 Alleged breach of lawful obligations in relation to the construction of Hydro transmission lines. Expropriation of Kahnawake Territory for Date Received by SCB: 1997/07/16 a 110 kv Transmission Line by Montreal Light, Heat & Power Current Status: LOS Consolidated (succeeded by Quebec Hydro-Electric Commission) - Registry File Number: B8260-592 Line 3.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 224 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Kahnawake (BAND-070)

Line 4 Alleges breach of lawful obligations in relation to the construction of Hydro transmission Lines. Expropriation of Kahnawake Territory Date Received by SCB: 1997/07/16 for a Hydro transmission Line by the Canadian Light & Power Current Status: LOS Company (Line 4) Registry File Number: B8260-592

Mercier Bridge and its Approaches The FN alleges that Canada breached its obligation by failing to consult it when the expropriation proposition came up and by Date Received by SCB: 2005/04/14 neglecting to accommodate it. The Crown allegedly failed to Current Status: RES compesate the FN for land taken. The expropriation also reveal a Registry File Number: B8260-671 breach to minimally impair in the context of the taking of lands on a reserve.

Sault St. Louis FN alleges the Sault St. Louis seigneurie was originally granted to the Mohawks of Kahnawake by Crown grant in 1680. FN further Date Received by SCB: 1988/06/02 alleges sections of the tract were unlawfully severed from the Current Status: ACT reserve, under the provisions of the 1854 and 1935 Seigniorial Registry File Number: B8260-366 Acts, without a surrender.

St. Lawrence Seaway Authority Expropriation The Mohawk Council of Kahnawake raise a number of issues alleging that Canada breached its fiduciary and legal obligations to Date Received by SCB: 2003/06/13 the FN with respect to events surrounding the expropriation of over Current Status: LOS 1300 acres of Reserve land in 1955-1956 for the construction of Registry File Number: B8260-610 the St. Lawrence Seaway Canal.

Kitigan Zibi Anishinabeg (BAND-073)

Corbeau Dam Lots 4-5 & 6 Gatineau Front Range & Alleges that the 1905 surrender was invalid and the lack of consent ROW on Lots 1 to 4 - 1905/03/25 (Surrender Project) by the FN for a 1925 right-of-way. Date Received by SCB: 1996/12/12 Current Status: RES Registry File Number: B8260-547

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 225 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Kitigan Zibi Anishinabeg (BAND-073)

Lot B - Gilmour - Hall & Burke (O'Hagan) - Timber Alleges invalid surrender due to falsification of signature and Licences (Surrender Project). breach of fiduciary obligation in obtaining sufficient timber revenues and rents from farmland. Date Received by SCB: 1996/07/22 Current Status: DOJ Registry File Number: B8260-528

Lots 32-33-34 GFR Surren 408 - Jan 7 - 1899 Alleges 1899 surrender of Lots 32, 33 & 34, Gatineau Front Range, which involves approximately 64.4 acres, was invalid, and that the Date Received by SCB: 1997/05/05 subsequent sale of lots was illegal. Current Status: INACT Registry File Number: B8260-564

Mani-1873 Sur (SPLIT #1) Lots 12 to 16 DFR Alleged inadequate rents for the lots, illegal occupation until part of Date Received by SCB: lands reacquired in 1947, and inappropriate use of FN funds to repurchase remainder of land. Current Status: SET Registry File Number: B- 260 + 461

Mani-1873 Sur (SPLIT #2) Surrender 136 Lots 1-2 & 3 Invalid surrender and alleged illegal payment of proceeds to DFR 1873/08/19 (Surrender Project) individuals from the lease of reserve land - lot 1, 2 and 3, Desert Front Range. Date Received by SCB: 2000/12/01 Current Status: DOJ Registry File Number: B-260-1 + 724

Maniwaki - 100 acres (Part of Lot 23 Range IV and Lot Alleged 1878 Surrender for lease and 1897 Surrender for sale of 24 RRW) the land were illegal, and the rents were inadequate. Date Received by SCB: 1988/08/08 Current Status: SET Registry File Number: B8260-367

Maniwaki - 400 acres (Lots 18 to 21 RRE & Lots 18B Alleged illegal alienation of some 400 acres (162 Ha.) of reserve and 20 GFR) land by Indian agents and others in 1878 and 1897. Supplementary arguments filed by FN in October/89 alleging forgery in respect of Date Received by SCB: 1988/06/01 1897 surrender for sale. Current Status: SET Registry File Number: B8260-364

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 226 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Kitigan Zibi Anishinabeg (BAND-073)

Maniwaki - Highway Alleged illegal alienation of reserve land for highway purposes lack of compensation for the land taken and misappropriation of FN Date Received by SCB: 1984/04/27 funds by DIAND for road purposes. Current Status: NLO Registry File Number: B8260-235

Maniwaki - Lot 4 - DFR Alleged illegal, 20-year occupation of reserve land by non-Indians and improper transfer of lease proceeds to the chief, rather than to Date Received by SCB: 1985/10/03 the FN. Current Status: SET Registry File Number: B8260-264

Maniwaki - Lot 6 Alleged 1878 surrender for lease and 1897 surrender for sale of lot 6 DFR were illegal, and the rents were inadequate.. Date Received by SCB: 1989/03/15 Current Status: SET Registry File Number: B8260-373

Maniwaki - Lots 1 - 16 GFR Alleged 1917 surrender of some 1,463 acres (592 Ha.) was invalid. Date Received by SCB: 1989/12/04 Current Status: AR Registry File Number: B8260-383

Maniwaki - Oblate Mission Alleged illegal alienation of 200 acres (80.94 HA.) of reserve land in 1868. Date Received by SCB: 1983/09/13 Current Status: SET Registry File Number: B8260-220

Maniwaki - Trust Fund Alleged misappropriation of FN funds to build a provincial courthouse and a prison in Maniwaki in 1879. Date Received by SCB: 1985/02/22 Current Status: NLO Registry File Number: B8260-251

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 227 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Kitigan Zibi Anishinabeg (BAND-073)

Old Indian Burial Ground Alleged the loss of 8,000 square metres (approx. 2 acres) of parts of lots 35 and A, Gatineau Front Range (Old Indian burial ground). Date Received by SCB: 1993/07/14 Current Status: SET Registry File Number: B8260-456

ONWRB CP Railway - Expropriation - 1904 Breach of fiduciary obligation. Insufficient compensation paid for expropriation of 55,91 acres of reserve land for railway right of way Date Received by SCB: 2000/01/28 and lack of compensation for timber cleared on right of way. Current Status: NLO Registry File Number: B8260-707

Road Allowances Lots 1-2-3 & 4 Desert Front Range Alleges road allowances located inside Lots 1 to 4 Desert Front & Lots 32-33 & 34 Gatineau Front Range Range and Lots 32 to 34, Gatineau Front Range were never surrendered. Date Received by SCB: 1997/07/11 Current Status: DOJ Registry File Number: B8260-455-1

Sewer Right-of-Way #1 Improper granting of a sewer right-of-way in 1949. Failure to ensure that the Corporation du Village de Maniwaki take the Date Received by SCB: 2006/03/23 necessary measures to correct the unsanitary situation that led to Current Status: FCL the pollution of surrounding lands. Registry File Number: B8260-891

Sewer Right-of-Way #2 The Crown failed to enforce the terms and conditions of the 1962 agreement, bringing about pollution damages from the degradation Date Received by SCB: 2006/03/23 of the sewer line. Current Status: FCL Registry File Number: B8260-892

Surrender 238 Lot 4 Desert Front Range - 1886/08/02 Alleged invalid surrender and illegal payment of proceeds to (Surrender Project) individuals from the lease of reserve land - Lot 4, Desert Front Range (8.22 acres). Date Received by SCB: 2001/01/17 Current Status: DOJ Registry File Number: B8260-743

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 228 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Kitigan Zibi Anishinabeg (BAND-073)

Surrender 256 Lot 4 Desert Front Range - 1874/06/13 Transgression of the law during the surrender for lease of Lot 4. (Surrender Project) Date Received by SCB: 1999/08/27 Current Status: DOJ Registry File Number: B8260-516

Surrender 257 Lot 3 Desert Front Range - 1887/12/26 The FN alleges that the surrender of 10,000 square feet of Lot 3 (Surrender Project) Desert Front Range on December 26, 1887 is invalid due to its fraudulent nature; a breach of duty regarding the proper surrender Date Received by SCB: 2003/01/30 of reserve land and failure to adhere to Indian Act provisions; that Current Status: RES DIAND failed to instruct the Indian Agent to obtain the consent of Registry File Number: B8260-790 the Band for the rental amount; and that DIAND accepted a flawed surrender document and failed in its fiduciary duty to the Band.

Surrender 276 Lot 3 Desert Front Range - 1889/08/23 The FN alleges that the surrender for lease of one half acre of Lot 3 (Surrender Project) Desert Front Range on August 23, 1889 is invalid because of its fraudulant nature. The FN alleges a failure to adhere to the Date Received by SCB: 2002/09/18 provisions of the Indian Act regarding surrenders. The FN alleges Current Status: DOJ a failure to authorize the Indian Agent to provide a proper valuation Registry File Number: B8260-777 of the land with the best interests of the FN.

Surrender 277 Lot 4 Desert Front Range - 1889/08/23 The First Nation alleges that the surrender for lease of 1 acre of Lot (Surrender Project) 4 Desert Front Range on August 23, 1889 was invalid due to its fraudulent nature and proceeds were illegally paid to individuals. Date Received by SCB: 2002/06/19 Current Status: DOJ Registry File Number: B8260-770

Surrender 291 Lot 3 Desert Front Range - 1890/12/29 Invalid surrender and alleged illegal payment of proceeds to (Surrender Project) individuals from the lease of reserve land - Lot 3, Desert Front Range (3/8 of an acre). Date Received by SCB: 2001/02/06 Current Status: DOJ Registry File Number: B8260-732

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 229 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Kitigan Zibi Anishinabeg (BAND-073)

Surrender 292 Lot 3 Desert Front Range - 1890/12/29 FN alleges that the surrender of 3/4 of an acre of Lot 3 DFR on (Surrender Project) Dec. 29, 1890 is invalid due to its ambiguity and fraudulent nature;.that the payments of proceeds to individuals from the lease Date Received by SCB: 2003/04/08 and sale of land was illegal; that the department failed in its Current Status: DOJ fiduciary obligation in breach of duty regarding the proper surrender Registry File Number: B8260-711 of reserve land, accepting invalid surrender based on falsified testimony in the affidavits, accepting surrender when chief who signed and attested to it would personally benefit from surrender since proceeds would go to him and his children, allowing proceeds from leases and sales to go to individuals to the detriment of the Band and contrary to the Indian Act, accepting a flawed document where Indian Act conditions were not followed, specifically section 39.

Surrender 324 Lots 51-52 & 53 - 8th Range - The FN claims that this surrender for lease is invalid, that it 1892/08/06 (Surrender Project) suffered from loss of use and revenue, and that the Crown breached its fiduciary duty to the FN in all instances relating to the Date Received by SCB: 2003/12/12 administration of reserve land. Current Status: LOS Registry File Number: B8260-811

Surrender 330 Lot 3 Desert Front Range - 1893/01/02 The First Nation alleges that the surrender for lease of 1.13 acres (Surrender Project) of Lot 3 Desert Front Range was invalid, and payment of proceeds to individuals was illegal. Date Received by SCB: 2002/04/04 Current Status: DOJ Registry File Number: B8260-765

Surrender 337 Lot 4 Desert Front Range - 1893/06/17 Alleges illegal sale of reserve land - unsurrendered portion of Lot 4, (Surrender Project) Desert Front Range (20.5 acres) Date Received by SCB: 1998/01/30 Current Status: DOJ Registry File Number: B8260-619

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 230 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Kitigan Zibi Anishinabeg (BAND-073)

Surrender 360 Lot 29 Road Range - 1894/08/13 The First Nation alleges that the surrender for lease of 1 acre of Lot (Surrender Project) 29 Road Range West was invalid, and payment of proceeds to individuals was illegal. Date Received by SCB: 2002/04/04 Current Status: DOJ Registry File Number: B8260-762

Surrender 369 Lot 5 Desert Front Range - 1895/08/13 Alleges forgery of the signatures and other irregularities re. the (Surrender Project) surrender of 1895. Date Received by SCB: 1996/11/25 Current Status: DOJ Registry File Number: B8260-544

Surrender 373 Lots 1-2-3 & 4 Desert Front Range - The First Nation alleges that the surrender of June 2, 1894 was 1894/06/02 (Surrender Project) invalid. Date Received by SCB: 2001/12/17 Current Status: LOS Registry File Number: 8260-494+754

Surrender 389 Lots 18B 19B & 20 Gatineau Front The FN alleges that the surrender dated June 26, 1897 is invalid Range & Lots 18-19-20 & 21 (Surrender Project) because of the fraudulent nature. The FN claims a compensation for the loss of use and loss of revenue with compound interest Date Received by SCB: 2005/11/18 related to the land in question. Current Status: NLO Registry File Number: B8260-875

Surrender 392 Lots 10 & 11 Desert Front Range & Lot FN alleges the improper surrender for sale of approximately 30 25 Range 4-5 - 1897/12/18 (Surrender Project) acres in lots 10 and 11 Desert Front Range and in lot 25 in 4th and 5th Range, dated 18 December 1897. FN alleges loss of use and Date Received by SCB: 2004/04/05 revenue between 1897 and 1902 due to the Department's Current Status: LOS mismanagement of the lots. Registry File Number: B8260-820

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 231 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Kitigan Zibi Anishinabeg (BAND-073)

Surrender 395 Lot 14 Range VII - 1898/06/04 Alleged improper surrender of reserve land on June 4, 1898 which (Surrender Project) resulted in loss of use and revenue. Failure to fulfill fiduciary duty related to the administration of the land. Date Received by SCB: 2006/06/16 Current Status: RES Registry File Number: B8260-901

Surrender 396 Lot 11 Road Range East - 1898/06/04 Alleged improper surrender of reserve land on June 4, 1898 which (Surrender Project) resulted in loss of use and revenue. Failure to fulfill fiduciary duty related to the administration of the land. Date Received by SCB: 2006/06/16 Current Status: RES Registry File Number: B8260-900

Surrender 403 Lot 14 Road Range West - 1898/06/04 Alleged improper surrender of reserve land on June 4, 1898 which (Surrender Project) resulted in loss of use and revenue. Failure to fulfill fiduciary duty related to the administration of the land. Date Received by SCB: 2006/06/21 Current Status: RES Registry File Number: B8260-902

Surrender 405 Lots 1-2 & 3 South Desert Front Range Alleges that the 1898 surrender was invalid. - 1898/08/13 (Surrender Project) Date Received by SCB: 1996/12/12 Current Status: DOJ Registry File Number: B8260-552

Surrender 430 Lots 14 & 15 Road Range West - Alleged improper surrender of reserve land on January 8, 1900 1900/01/08 (Surrender Project) which resulted in loss of use and revenue. Failure to fulfill fiduciary duty related to the administration of the land. Date Received by SCB: 2006/06/21 Current Status: RES Registry File Number: B8260-899

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 232 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Kitigan Zibi Anishinabeg (BAND-073)

Timber fees and rentals (1853-1860) The FN alleges that DIAND failed to discharge its fiduciary obligation to the FN by not properly carrying out its responsibilities Date Received by SCB: 2006/12/04 in relation to the management and accounting of Indian funds from Current Status: SUB/REV timber fees on behalf of the FN from August 9, 1853 to 1860. Registry File Number: B8260-915

Listuguj Mi'gmaq Government (BAND-051)

Mission Property Alleges that land granted in 1824 for mission purposes should have reverted to FN upon termination of the mission and that the lands Date Received by SCB: 1989/08/26 subsequent alienation in the 1960s was illegal. Current Status: AR Registry File Number: B8260-379

Mission property - Loss of Use Alleges that land granted in 1824 for mission purposes should have reverted to FN upon termination of the mission. The mission Date Received by SCB: 1994/02/28 property was returned by OIC. Claimed loss of use of the land. Current Status: BA Registry File Number: B8260-379

Micmacs of Gesgapegiag (BAND-052)

Chaleur Bay Transmission Line / Maria-ROW Alleges breaches of Canada's fiduciary obligations respecting the Chaleur Bay Power Co. transmission line established on the Date Received by SCB: 1997/06/02 reserve in 1938 without lawful authority. Current Status: NLO Registry File Number: 8260-346/570

Maria - Expropriation Alleged failure to compensate for reserve lands expropriated for highway purposes. Date Received by SCB: 1987/10/01 Current Status: SET Registry File Number: B8260-347

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 233 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Micmacs of Gesgapegiag (BAND-052)

Maria - Horse Island Alleged the Gaspe land commission illegally alienated Horse Island land without Micmac consent. Date Received by SCB: 1986/04/29 Current Status: FCL Registry File Number: B8260-288

Mohawks of Kanesatake (BAND-069)

Oka Alleged FN title to land granted to the Seminary of St. Sulpice by a French king. Date Received by SCB: 1977/06/28 Current Status: AR Registry File Number: B8260-134

Montagnais du Lac St.-Jean (BAND-076)

1869 Surrender Alleged unlawful surrender of land from Ouiatchouan reserve in 1869. Date Received by SCB: 1986/02/11 Current Status: SET Registry File Number: B8260-286

1895 Surrender Alleged unlawful surrender of 2,416 acres (978 Ha.) of land from Ouiatchouan reserve in 1895. Date Received by SCB: 1986/02/06 Current Status: SET Registry File Number: B8260-287

Années Donohue Illegal use of band funds and fraud. Date Received by SCB: 1998/12/03 Current Status: INACT Registry File Number: B8260-669

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 234 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Montagnais du Lac St.-Jean (BAND-076)

Canton Métabetchouan FN alleged the inadequate compensation for the 1856 and 1862 land exchanges in the county of Metabetchouan. Date Received by SCB: 2002/09/16 Current Status: BA Registry File Number: B8260-778

Droit de passage accordé à James Bay and Eastern Illegal expropriation of lands from the Mashteuiatsh for the Railway construction of the James Bay and Eastern Railway since 1910. Date Received by SCB: 2005/02/09 Current Status: RES Registry File Number: B8260-855

Exploitation forestière à Pointe-Bleue FN claims Crown negligence with regards to timber cutting on the Pointe-Bleue Reserve, resulting in timber trespasses on the Date Received by SCB: 2003/02/17 reserve and a loss of revenue for the Montagnais between 1856 Current Status: BA and 1874. Registry File Number: B8260-796

Flooding Claims compensation for flooding of 500 acres (202 Ha.) of reserve lands. Date Received by SCB: 1985/05/02 Current Status: ISCC Registry File Number: B8260-256

Gestion des lots 10-11-12 et 13 du rang A de la The FN alleges that the Crown did not obtain the necessary réserve consent to grant land rights to the Oblates; the Crown did not intervene to protect the interests of the Band when real property Date Received by SCB: 2005/12/01 transactions were carried out on the lots and when agricultural and Current Status: SUB/REV forest resources were exploited; the Crown continued to foster Registry File Number: B8260-879 uncertainty, which delayed numerous development projects on the reserve (construction of a school, etc.).

Highway 169 Alleged illegal alienation of and failure to compensate for reserve lands taken for highway 169 purposes CIRCA 1864. Date Received by SCB: 1990/09/11 Current Status: SET Registry File Number: B8260-408

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 235 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Montagnais du Lac St.-Jean (BAND-076)

Lot de la Co de la Baie d'Hudson Lack of surrender and insufficient rent for the lot occupied by the HBC, 1866 to 1980. Date Received by SCB: 1998/12/03 Current Status: LOS Registry File Number: B8260-670

Range IX Alleged unlawful alienation of range IX comprising 2,275 acres (921 Ha.) of Ouiatchouan reserve and compensation for loss of Date Received by SCB: 1985/05/02 use. Current Status: SET Registry File Number: B8260-257

Nation Anishnabe du Lac Simon (BAND-063)

Creation of Reserve Alleges inadequate allocation of land in the creation of reserve and loss of revenues since 1853. Date Received by SCB: 1993/04/14 Current Status: DOJ Registry File Number: B8260-450

Nation Huronne Wendat (BAND-050)

Lot 1033-77 Alleged loss of use of Lot 1033-77 in Cadastre Saint Ambroise, Chateau D'eau, from 1893 to the present. Date Received by SCB: 1994/10/27 Current Status: NLO Registry File Number: B8260-444

Quarante Arpents Alleged 1904 surrender of reserve was invalid (in 1992 claim was lumped with Murray Treaty and self-government files but FN Date Received by SCB: 1984/08/14 agreed to settle separately). Current Status: SET Registry File Number: B8260-242

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 236 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Nation Huronne Wendat (BAND-050)

Rocmont Alleged 1903 surrender of Rocmont reserve was invalid. Date Received by SCB: 1999/01/26 Current Status: NLO Registry File Number: B8260-365

Odanak (BAND-072)

Cession des 38 lots dans le domaine abénakis de The FN alleges that the Crown failed in its fiduciary role by not St-François (Surrender Project) complying with various applicable legislation. Consequently, the FN alleges that the surrender of 38 lots in the Abenaki Estate was Date Received by SCB: 2004/02/05 illegal and did not constitute a favourable settlement. Therefore, the Current Status: DOJ FN is seeking sufficient compensation for illegally acquired Registry File Number: B8260-814 reserves, i.e., land restitution and/or monetary compensation equivalent to this loss, in addition to compensation for the resulting loss of use.

Chemins Maurault et Bout-de-l'Ile The FN alleges that reserve land was alienated for the construction of two roads and the FN received inadequate compensation. Date Received by SCB: 2005/06/14 Current Status: RES Registry File Number: B8260-865

Création de la paroisse de St-Thomas-de-Pierreville The FN alleges that the Crown breached its fiduciary duty through the illegal sale of Abenaki land to a non-Aboriginal owner, and by Date Received by SCB: 2003/11/26 not following the recommendations of a report designed to correct Current Status: SUB/REV the illegal occupation of Abenaki land by settlers. The FN Registry File Number: B8260-810 accordingly requests negotiation of adequate compensation for the lands taken without legal authority.

Limites Originales d'Odanak Loss of advantages/benefits and illegal sale of Abénaki lands in the Seigneurie of Pierreville and St-François. Date Received by SCB: 2005/05/03 Current Status: RES Registry File Number: B8260-662

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 237 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Quebec

Claimant Substance of Claim

Première Nation Malecite de Viger (BAND-054)

1870 - Loss of Interest Alleged a loss of interest revenues arising from a reduction in the rate charged to purchasers of Viger reserve lands in 1870. Date Received by SCB: 1993/03/06 Current Status: SET Registry File Number: B8260-448

Passage du chemin de fer du Témiscouata The First Nation alleges that Canada breached it fiduciary obligation by failing to obtain compensation for the Témiscouata Date Received by SCB: 2001/11/14 railroad on the Whitworth Reserve in 1888. Current Status: LOS Registry File Number: B8260-753

Whitworth - Land Purchase Alleged Canada breached its obligations to the FN by using FN funds to purchase land at Whitworth in 1870. Date Received by SCB: 1994/06/20 Current Status: FCL Registry File Number: B8260-477

Wolf Lake (BAND-068)

Wolf Lake - Reserve Creation Alleged Crown had a fiduciary obligation to set aside lands as a reserve, further to requests and petitions submitted from the 1870s Date Received by SCB: 2004/05/31 to present. Current Status: ISCC Registry File Number: B8260-533

Total of Claims for Quebec: 116

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 238 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Ahtahkakoop (BAND-406)

Treaty Land Entitlement (Band previous name: Sandy Lake - name change on March 9, 1987). The First Nation did not receive sufficient reserve land as Date Received by SCB: 2001/07/23 required by Treaty for all members, including absentees and Current Status: RES arrears, landless transfers and new adherents, and marriages to Registry File Number: B8265/A7 non-treaty women, less double counts.

Young Chipewyan Reserve (Band previous name: Sandy Lake - name change on March 9, 1987). A group of individuals from various FNs claim, based upon Date Received by SCB: 1982/06/17 genealogy, to be entitled to a reserve (Stony Knoll #107) that was Current Status: FCL set aside for the Young Chippeewayan Band in the last century. Registry File Number: B8260-217 This Band ceased to exist around 1889 when the last of its members were transferred to another band list.

Beardy's and Okemasis (BAND-369)

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1980/01/01 Current Status: SET Registry File Number: B8265/B3

Treaty 6 Annuities The First Nation alleges that the Crown owes an outstanding lawful obligation to the First Nations (FNs) for termination of treaty Date Received by SCB: 2001/11/29 annuities without any legal authority to do so. Current Status: BA Registry File Number: B8260-752

Treaty 6 Benefits The First Nation was not given benefits promised in Treaty 6: specifically, a one-time payment of $12 to every individual, yearly Date Received by SCB: 2006/01/17 annuity payments, chief and headmen salaries, livestock and Current Status: SUB/REV agricultural implements, and ammunition and twine. Registry File Number: B8260-887

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 239 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Big Island Lake Cree Nation (BAND-399)

Primrose Lake Air Weapons Range-PLAWR II (Band previous name: Joseph Bighead) Alleged inadequate compensation for loss of traditional harvesting lands (trapping, Date Received by SCB: 1975/04/01 hunting, fishing, etc.) due to the establishment of the Primrose Current Status: FCL Lake Air Weapons Range. Registry File Number: B8260-716-3

TLE (Band previous name: Joseph Bighead) First Nation alleges an insufficient quantity of land was set aside for the band under the Date Received by SCB: 1981/09/01 terms of Treaty 6. Current Status: INACT Registry File Number: B8265/J4

Black Lake (BAND-359)

TLE (Band previous name: Stoney Rapids). Outstanding Treaty Land Entitlement. Date Received by SCB: 1976/07/08 Current Status: SET Registry File Number: B8265/S9

Buffalo River Dene / Birch Narrows (ASSCTN)

Treaty Land Entitlement (Formerly Clear Lake FN) - In their joint submission, the FNs allege - Birch Narrows First Nation (BAND-403) outstanding TLE based on the ADOFS and adjusted population - Buffalo River Dene Nation (BAND-398) calculation under the 1998 TLE policy. Date Received by SCB: 2001/02/08 Current Status: BA Registry File Number: B8265/B15

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 240 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Buffalo River Dene Nation (BAND-398)

Primrose Lake Air Weapons Range-PLAWR II Alleged inadequate compensation for loss of traditional harvesting lands (trapping, hunting, fishing, etc.) due to the establishment of Date Received by SCB: 1975/04/01 the Primrose Lake Air Weapons Range. Current Status: FCL Registry File Number: B8260-716-1

Canoe Lake Cree First Nation (BAND-394)

Ammunition Claimed it had been issued Treaty Ammunition between 1962 and 1975 based on the scale of Treaty 6 rather than Treaty 10, which Date Received by SCB: 1975/05/21 the FN signed in 1906. Current Status: SET Registry File Number: B8260-146

Primrose Lake Air Weapons Range-PLAWR I Alleged inadequate compensation for loss of traditional harvesting lands (trapping, hunting, fishing, etc.) due to the establishment of Date Received by SCB: 1985/07/26 the Primrose Lake Air Weapons Range. Current Status: AR Registry File Number: B8260-143/1

TLE Alleged shortfall of land under Treaty 10. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1978/02/01 Current Status: SET Registry File Number: B8265/C2

Carry The Kettle (BAND-378)

1882 Cypress Hills Surrender Alleged an area of 340 square miles north of Cypress Hills was a reserve and was not surrendered in 1882. Date Received by SCB: 1990/12/04 Current Status: FCL Registry File Number: B8260-414

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 241 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Carry The Kettle (BAND-378)

1905 Assiniboine Surrender Alleged invalid surrender of 5,760 acres of Assiniboine Reserve No. 76 in 1905. Also, agricultural provisions under Treaty 4. Date Received by SCB: 1989/01/05 Current Status: ISCC Registry File Number: B8260-269

TLE Substance of Claim Not Defined Date Received by SCB: 1993/02/16 Current Status: SET Registry File Number: B8265/C8

Clearwater River Dene (BAND-401)

TLE Substance of Claim Not Defined Date Received by SCB: 1994/01/02 Current Status: FCL Registry File Number: B8265/C9

Cote First Nation 366 (BAND-366)

1905 Surrender Alleged 1905 surrender of 18,043 acres of Cote I.R. No. 64 and sale thereof was wrongful. It also alleges that aspects of the Date Received by SCB: 1987/11/03 implementation of the 1907 surrender were improper. Current Status: NLO Registry File Number: B8260-273

1907 Surrender Alleged 1905 surrender of 18,403 acres of Cote I.R. #64 and sale thereof was wrongful and aspects of the implementation of the Date Received by SCB: 1991/06/06 1907 surrender were improper. Current Status: FCL Registry File Number: B8260-615

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 242 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Cote First Nation 366 (BAND-366)

Surrenders Consolidation Alleged invalid surrenders and improper sales of land on Cote I.R.'s. Date Received by SCB: 1997/08/05 Current Status: ACT Registry File Number: B8260-653

Cowessess (BAND-361)

1907 Surrender Alleged 1907 surrender of 20,704 acres was invalid. Date Received by SCB: 1983/05/03 Current Status: FCL Registry File Number: B8260-197

Flooding QVIDA (SPLIT #1) Cowessess The Qu'Appelle Valley bands alleged improper alienation of Date Received by SCB: reserve land and damage due to flooding. Current Status: ACT Registry File Number: B-611/315/604

TLE Substance of Claim Not Defined Date Received by SCB: 1991/01/24 Current Status: SET Registry File Number: B8265/C7

Cumberland House Cree Nation (BAND-350)

100A Joined with March 25/1986's claim. Alleged wrongful taking of portion of Cumberland House 100A, and its amalgamation with Date Received by SCB: 1986/03/25 James Smith Cree Nation. Current Status: ISCC Registry File Number: B8260-277-1

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 243 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Cumberland House Cree Nation (BAND-350)

1893 Improper Surrender of Reserve Lands The FN alleges that the surrender of IR #20 was invalid, because (Surrender Project) only 14 of 32 adult male band members made their mark on the surrender document; the Indian Act requires the consent of the Date Received by SCB: 2005/06/16 majority of adult male band members for any surrender to be valid. Current Status: LOS Registry File Number: B8260-866

TLE Substance of Claim Not Defined Date Received by SCB: 1983/08/01 Current Status: NLO Registry File Number: B8265/C6

English River First Nation (BAND-400)

TLE Alleged shortfall of land under Treaty 10. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1978/02/01 Current Status: SET Registry File Number: B8265/E2

Fishing Lake First Nation (BAND-390)

1907 Surrender Alleged improper surrender and sale of Fishing Lake I.R. No. 89 in 1907. Date Received by SCB: 1989/05/08 Current Status: SET Registry File Number: B8260-291

Flying Dust First Nation (BAND-395)

1932 CPR Right of Way Expropriation Claim that the FN is entitled to the restoration of lands expropriated for railway purposes. Date Received by SCB: 1994/04/04 Current Status: INACT Registry File Number: B8260-608

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 244 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Flying Dust First Nation (BAND-395)

Primrose Lake Air Weapons Range-PLAWR II Alleged inadequate compensation for loss of traditional harvesting lands (trapping, hunting, fishing, etc.) due to the establishment of Date Received by SCB: 1975/04/01 the Primrose Lake Air Weapons Range. Current Status: FCL Registry File Number: B8260-716-2

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1979/11/01 Current Status: SET Registry File Number: B8265/F3

Fond du Lac (BAND-351)

TLE Substance of Claim Not Defined Date Received by SCB: 1976/02/01 Current Status: SET Registry File Number: B8265/F4

Fond du Lac / Black Lake (ASSCTN)

Treaty 8 Agricultural Benefits The FN alleges that an outstanding lawful obligation exists on the - Black Lake (BAND-359) part of the Crown for not having fully provided the benefits under - Fond du Lac (BAND-351) Treaty 8. Date Received by SCB: 2001/01/24 Current Status: DOJ Registry File Number: B8260-741+2

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 245 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Gordon (BAND-391)

TLE Alleged the FN received a shortfall of reserve land pursuant to the terms of Treaty No. 4. Date Received by SCB: 1996/09/10 Current Status: ACT Registry File Number: B8265/G6

Island Lake First Nation (BAND-397)

1914 Ministikwan Alienation Alleged 4,161 hectares were unlawfully alienated from Ministikwan Lake Reserve. Date Received by SCB: 1979/09/25 Current Status: SET Registry File Number: B8260-185

Agricultural Implements - Treaty 6 The FN alleges that it is unclear whether Island Lake received agricultural implements. The FN requests an accounting of whether Date Received by SCB: 2004/03/04 these were provided and in what amounts. Current Status: RES Registry File Number: B8260-817

Ammunition and Twine - Treaty 6 The FN alleges that when the Island Lake Indians entered Treaty they were entitled to ammunition and twine based on fifty three Date Received by SCB: 2004/03/04 cents per person in 1876, which would then be adjusted for Current Status: RES inflation. The FN alleges that they did not receive this amount. Registry File Number: B8260-816

Unfunded Annuities for Chiefs and Headmen The FN alleges that Chief and Headmen were only paid their salary not their individual annuity. The FN alleges that this is a breach of Date Received by SCB: 2004/03/04 Treaty Six. Current Status: SUB/REV Registry File Number: B8260-815

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 246 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

James Smith (BAND-370)

1897 Chacastapasin Surrender and Sale Alleged wrongful surrender and fraud in the sale of the Chacastapasin Reserve. Date Received by SCB: 1984/06/29 Current Status: ISCC Registry File Number: B8260-240

1902 Surrender/Sale of Cumberland 100A Alleged wrongful surrender and fraud in the sale of the southern portion of the Cumberland Reserve 100A. Date Received by SCB: 1991/02/22 Current Status: ISCC Registry File Number: B8260-607

No Man's Land - Trespass - Loss of Use Alleged the Province of Saskatchewan and farmers are in trespass on reserve land. Date Received by SCB: 1996/12/10 Current Status: ISCC Registry File Number: B8260-363

TLE Substance of Claim Not Defined Date Received by SCB: 1982/09/24 Current Status: ISCC Registry File Number: B8265/J2

Kahkewistahaw (BAND-362)

1907 Surrender Alleged 1907 surrender of 33,281 acres of Kahkewistahaw I.R. No. 70 and sale thereof was wrongful. Date Received by SCB: 1989/03/28 Current Status: SET Registry File Number: B8260-225-1

Capital and Revenue Account Mismanagement The FN alleges that the Crown has breached its fiduciary duty to the FN, as well as provisions of the Indian Act in the management Date Received by SCB: 2004/12/23 and expenditures of funds from the surrender of 33,281 acres in Current Status: DOJ 1907. Registry File Number: B8260-838

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 247 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Kahkewistahaw (BAND-362)

Fishing Station FN alleged that they never received a portion of the fishing grounds comprising 27.5 acres, which were to be set apart as Reserve 72A Date Received by SCB: 1984/07/11 in 1889. Current Status: SET Registry File Number: B8260-225

Flooding of IR #72 The First Nation alleges improper alienation of reserve land due to flooding. Date Received by SCB: 2001/07/30 Current Status: BA Registry File Number: B8260-894

TLE Substance of Claim Not Defined Date Received by SCB: 1992/05/21 Current Status: FCL Registry File Number: B8265/K6

Kawacatoose (BAND-393)

1918 Surrender I.R. No. 88 Claimed surrender of 8,080 acres of I.R. No. 88 in 1918 was not valid and that the price paid for the land was inadequate. Date Received by SCB: 1984/08/03 Current Status: SET Registry File Number: B8260-249

TLE Outstanding Treaty Land obligation. Date Received by SCB: 1992/04/15 Current Status: SET Registry File Number: B8265/K7

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 248 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Keeseekoose (BAND-367)

1909 Surrender (Surrender Project) Claimant alleges that the land surrender of May 15, 1909 is invalid, and that Canada mismanaged the sale of the lands, acting in Date Received by SCB: 1999/09/14 contravention of the Indian Act. Current Status: INACT Registry File Number: B8260-297-1

TLE Alleged shortfall of land under Treaty 4. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1976/10/01 Current Status: SET Registry File Number: B8265/K2

Kinistin Saulteaux Nation (BAND-377)

Timber The FN alleges that timber permits were issued by Canada that resulted in the illegal removal of timber from the Kinistin Saulteaux Date Received by SCB: 2004/07/13 reserve #91 between 1898-1925. The FN alleges that they were Current Status: BA not consulted and a surrender was not obtained. The FN alleges Registry File Number: B8260-828 that Canada allowed a sawmill to be built on reserve land. The FN alleges that these actions represent a breach of Canada's treaty, fiduciary and constitutional obligations and jurisdiction pursuant to Treaty 4, the Constitution Act, and the 1886 Indian Act.

Lac La Ronge (BAND-353)

TLE Substance of Claim Not Defined Date Received by SCB: 1982/11/10 Current Status: LIT Registry File Number: B8265/L3

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 249 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Little Black Bear (BAND-379)

1928 Surrender FN alleged that the 1928 surrender of 12,408 acres of land and sale was invalid. Date Received by SCB: 1987/11/24 Current Status: SET Registry File Number: B8260-301

1928 Surrender - Part 2 Alleges unlawful surrender, lack of compensation for road allowances (445.5 acres); excess land taken (153.5 acres); failure Date Received by SCB: 1997/10/28 to compensate for hay lands; unlawful taking of minerals; Current Status: ISCC mismanagement of sale proceeds. Registry File Number: B8260-614

Beaver Hills Alienation - 1889 Claimant alleges Canada ignored the Band's choice re: reserve location, and alientated land at Beaver Hills without the Band's Date Received by SCB: 1998/05/19 consent, knowing that the Beaver Hills land was the traditional Current Status: BA territory of the Band. Registry File Number: B8260-646

Little Pine (BAND-340)

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1974/09/06 Current Status: SET Registry File Number: B8265/L5

Wrongful Denial of Annuity Payments The Department of Indian Affairs unlawfully terminated the treaty annuities owed to the Little Pine First Nation in the aftermath of the Date Received by SCB: 2002/11/04 Northwest Rebellion. Current Status: BA Registry File Number: B8260-782

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 250 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Lucky Man (BAND-341)

TLE Treaty Land Entitlement. Lucky Man FN alleged that IR #116 was set aside for the Little Pine FN only and that Lucky Man never Date Received by SCB: 1974/09/06 received a reserve. Current Status: SET Registry File Number: B8265/L5

TLE Settlement Grievance Alleged TLE settlement in 1989 was unfair. Alleged settlement provided insufficient land. Also claimed loss of use. Date Received by SCB: 1993/03/29 Current Status: ISCC Registry File Number: B8265/L5-1

Makwa Sahgaiehcan First Nation (BAND-396)

1932 CNR Townsite Surrender & 1933 Railway ROW FN alleges Canada breached its duty of care by allowing an Expropriation expropriation for railway right-of-way, station grounds and a surrender for a townsite, when the railway was never built. Date Received by SCB: 1998/03/30 Current Status: DOJ Registry File Number: 8260-706+638

1935 Surrender & Lease to the Church of England The First Nation alleges that Canada breached its fiduciary (Surrender Project) obligations in obtaining two surrenders of portions of IR 129B without the informed consent of the First Nation, and in pursuing Date Received by SCB: 1999/11/15 surrenders that were exploitative and not in the best interests of the Current Status: LOS First Nation. Registry File Number: B8260-704

1938 Surrender & Sale of the Red Cross Hospital The First Nation alleges that Canada breached its fiduciary Lands (Surrender Project) obligations in obtaining two surrenders of portions of IR 129B without the informed consent of the First Nation, and in pursuing Date Received by SCB: 1999/11/15 surrenders that were exploitative and not in the best interests of the Current Status: LOS First Nation. Registry File Number: B8260-706

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 251 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Makwa Sahgaiehcan First Nation (BAND-396)

1939 Surrender (Surrender Project) Allege that the 1939 surrender is invalid because the First Nation did not consent; that the transaction was exploitative; and the lands Date Received by SCB: 2000/02/28 were leased contrary to the provisions of the Indian Act. Current Status: LOS Registry File Number: 8260-712+638

1958 Land Exchange The FN alleges that an exchange of land between the FN and the province in 1958, which was technically an expropriation, was Date Received by SCB: 2001/01/19 unlawful. Current Status: RES Registry File Number: 8260-730+638

Land Sales Admin. 1932 - 1939 Surrenders This is the fifth of five submissions from this First Nation on a series of related events between 1932 and 1958. The claim alleges that Date Received by SCB: 2001/01/19 Canada breached its lawful obligations when the Department Current Status: DOJ administered land sales on individual lots of land surrendered by Registry File Number: 8260-731+638 the First Nation in 1932 and 1939.

TLE Claimants allege Band did not receive it's full land entitlement under Treaty 6. Date Received by SCB: 1998/12/21 Current Status: BA Registry File Number: B8265/S23

Mistawasis (BAND-374)

1911 - 1917 and 1919 Surrenders Alleged surrender of 18,155 acres of I.R. No. 103 in 1911, 1917 and 1919, and the associated land sales, were wrongful, and Date Received by SCB: 1992/11/18 associated road allowances were never properly surrendered. Current Status: SET Registry File Number: B8260-304

Treaty Land Entitlement The FN alleges it did not receive sufficient reserve land as required by Treaty 6, including absentees, arrears, late adherents and Date Received by SCB: 2005/04/18 landless transferees, and marriages to non-treaty women. Current Status: RES Registry File Number: B8265/M13

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 252 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Montreal Lake (BAND-354)

Ammunition & Twine - Annuity Pay.Treaty 6 (SPLIT Unfulfilled provisions under Treaty 6, including ammunition and #1) - Ammunition & Twine twine. Date Received by SCB: Current Status: DOJ Registry File Number: B8260-746

Ammunition & Twine - Annuity Pay.Treaty 6 (SPLIT The FN alleges that Chief and Headmen were only paid their salary #2) - Annuity Payments not their individual annuity. The FN alleges that this is a breach of Date Received by SCB: Treaty Six. Current Status: RES Registry File Number: B8260-746

Non-Indian Encroachment of the Montreal lake IR No. The FN alleges that the Crown breached its trust and/or fiduciary 106 obligation by permitting squatters and trespassers to remain on the reserve despite the Band's request for their removal, permitting Date Received by SCB: 2004/05/12 traders and squatters to remain on the reserve without proper Current Status: BA authorization and licence, and by failing to obtain adequate Registry File Number: B8260-824 compensation for the Band despite the Band's request for an increase of the nominal annual rent. The FN alleges that the Department neglected to comply with the provisions of the Indian Act. The FN also alleges that the Department failed to collect the rents for previous occupation for a substantial period of time.

Montreal Lake / Lac La Ronge (ASSCTN)

1904 Timber Surrender & Sale (Surrender Project) The FN alleges that Canada breached its lawful obligations by - Lac La Ronge (BAND-353) conducting a surrender of the Spruce timber on Little Red reserve - Montreal Lake (BAND-354) #106A without obtaining the proper consent from both FNs in accordance with provisions of the Indian Act. Alternatively the Date Received by SCB: 2003/08/28 Crown breached their fiduciary obligations by proceeding to Current Status: ACT conclude the surrender transaction and conclude the sale without Registry File Number: B8260-685 the FN's sanctioning.

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 253 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Moosomin (BAND-342)

1909 Surrender Alleged wrongful surrender in 1909 of I.R. No. 112 and Moosomin's share in I.R. No. 112A Haylands, or, in the alternative, improper Date Received by SCB: 1986/07/24 collection of monies. Current Status: SET Registry File Number: B8260-305

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1981/02/01 Current Status: SET Registry File Number: B8265/M3

Mosquito, Grizzly Bear's Head, Lean Man Fst.Natns. (BAND-343)

1905 Surrender of I.R. #110 - 111 (Surrender Project) Alleged 1905 surrender of 14,400 acres of I.R. #110 - 111 was obtained by fraud, and that if the surrender was valid that the lands Date Received by SCB: 1995/04/05 sold for an insufficient price. Current Status: RES Registry File Number: B8260-542

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1981/02/01 Current Status: SET Registry File Number: B8265/M4

Muscowpetung (BAND-381)

1909 Surrender (Surrender Project) Alleged wrongful 1909 surrender of 17,600 acres of I.R. No. 80. Date Received by SCB: 1990/07/30 Current Status: NLO Registry File Number: B8260-308

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 254 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Muscowpetung (BAND-381)

Flooding QVIDA (SPLIT #2) Muscowpetung The Qu'Appelle Valley bands alleged improper alienation of Date Received by SCB: reserve land and damage due to flooding. Current Status: ACT Registry File Number: B-611/315/604

Muskeg Lake (BAND-375)

1919 Soldier Settlement Board Surrender (Surrender The First Nation alleges the Crown breached its fiduciary obligation Project) when the First Nation surrendered I.R. No. 102. The First Nation also alleges the sale of land was mismanaged, in that, the Date Received by SCB: 2000/06/07 reduction in the price of land after the sale and the subsequent Current Status: DOJ overpayment to the Soldier Settlement Board was negligent. The Registry File Number: B8260-593 First Nation further alleges that they were not compensated for 840 acres of "waste lands" later discovered to contain valuable minerals. The First Nation asserts they were not compensated for 160 acres of road allowances.

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1981/07/01 Current Status: SET Registry File Number: B8265/M5

Muskoday First Nation (BAND-371)

TLE # 1 - William Erasmus and Family FN claims a treaty land entitlement shortfall due to crown's failure to include all families. Date Received by SCB: 1992/10/20 Current Status: FCL Registry File Number: B8265/M9

TLE # 2 - Late Additions FN claims a TLE shortfall due to increased members under Bill C-31and natural population increase. Date Received by SCB: 1998/05/27 Current Status: SET Registry File Number: B8265/M9

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 255 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Muskowekwan (BAND-392)

1910 and 1920 Surrender Alleged 1910 and 1920 surrenders of 160 and 7,485 acres of I.R. No. 85 and the associated land sales were wrongful, and that the Date Received by SCB: 1992/09/18 FN was never compensated for a 1919 lease or for certain road Current Status: ISCC allowances. Registry File Number: B8260-307

TLE Alleged shortfall of land under Treaty 4. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1978/02/01 Current Status: SET Registry File Number: B8265/M6

Nekaneet (BAND-380)

Maple Creek FN claimed that annuities must be paid to living band members from the time of their respective dates of birth and that the debts of Date Received by SCB: 1975/09/12 the Federal Government, which have remained unpaid to deceased Current Status: SET ancestors should now be paid and distributed to the Band funds, Registry File Number: N/A also claimed that land entitlement as described by Treaty #4 must now be made available to the Band.

Other Treaty Benefits Provision of other treaty benefits pursuant to Treaty 4. Date Received by SCB: 2004/11/02 Current Status: ACT Registry File Number: B8260-625

TLE Outstanding Treaty Land Entitlement. Date Received by SCB: 1975/11/01 Current Status: SET Registry File Number: B8265/N5

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 256 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Nekaneet (BAND-380)

Treaty and Program Benefits Alleged inadequate benefits under treaty. Date Received by SCB: 1986/02/18 Current Status: ACT Registry File Number: B8260-625

Ocean Man (BAND-408)

1901 Amalg. & Surr. Re-Establi. Funding The Ocean Man First Nation alleges that the 1901 amalgamation and surrender were null and void; that the FN suffered losses and Date Received by SCB: 2000/06/01 damages as a result of these transactions and the subsequent sale Current Status: DOJ of these lands; and the FN claims there was insufficient funding Registry File Number: B8260-594 when the Ocean Man First Nation was re-established to their reserve after the ratification of the 1986 settlement agreement with White Bear and their descendants.

TLE Substance of Claim Not Defined Date Received by SCB: 1992/12/11 Current Status: ISCC Registry File Number: B8265-O8

Ochapowace (BAND-363)

1919 Surrender Alleged surrender and sale of 18,240 acres of I.R. No. 71 in 1919 was invalid, and that the price for land was inadequate. Date Received by SCB: 1985/09/25 Current Status: SET Registry File Number: B8260-266

Flooding QVIDA (SPLIT #3) Ochapowace The Qu'Appelle Valley bands alleged improper alienation of Date Received by SCB: reserve land and damage due to flooding. Current Status: ACT Registry File Number: B-611/315/604

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 257 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Ochapowace (BAND-363)

Greater Production Program Alleged Crown breached its fiduciary obligation in failing to ensure that fair market value was obtained for the lease of Land for Date Received by SCB: 1996/12/20 grazing purposes for past three years of lease and alleged it did not Current Status: LIT receive full 10% for grazing lease under the Greater Production Registry File Number: B8260-548 Program.

TLE Alleged shortfall of land under Treaty 4. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1981/02/01 Current Status: SET Registry File Number: B8265/O2

Okanese (BAND-382)

TLE Alleged shortfall of land under Treaty 4. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1981/07/01 Current Status: SET Registry File Number: B8265/O6

One Arrow (BAND-373)

Mismanagement of Sales The Band alleges that the terms of the 1894 & 1897 surrenders of IR #95 and IR #98 (Tchikastepesin) were breached when the Date Received by SCB: 1999/05/21 department failed to sell the lands in a timely fashion. The Band Current Status: BA also alleges the mismanagement of monies derived from the Registry File Number: B8260-686 eventual sales of those lands. Note that the allegations in this claim overlap with the James Smith Claim (Chacastapasin).

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1977/01/01 Current Status: SET Registry File Number: B8265-10/O3

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 258 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Onion Lake (BAND-344)

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1981/02/01 Current Status: SET Registry File Number: B8265/O4

Pasqua First Nation #79 (BAND-383)

1906 Surrender Alleged 1906 land surrender of 16,077 acres of I.R. No. 79 was wrongful. Date Received by SCB: 1995/09/01 Current Status: ISCC Registry File Number: B8260-310

Flooding QVIDA (SPLIT #4) Pasqua The Qu'Appelle Valley bands alleged improper alienation of Date Received by SCB: reserve land and damage due to flooding. Current Status: ACT Registry File Number: B-611/315/604

Treaty Land Entitlement Insufficient land was set aside to satisfy the requirements of Treaty 4, when the base pay list, absentees and arrears, additions, and Date Received by SCB: 2001/06/22 marriages to non-treaty women are combined. Current Status: ACT Registry File Number: B8265/P17

Peepeekisis (BAND-384)

File Hills Colony Alleged improper loss of 26,000 acres (by issuance of Location Tickets) of I.R. No. 81 to establish a colony of former industrial Date Received by SCB: 1986/04/18 school students, who became members of the Peepeekesis FN by Current Status: FCL transfer of membership from their neighbouring FNs. Registry File Number: B8260-290

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 259 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Peepeekisis (BAND-384)

TLE Substance of Claim Not Defined Date Received by SCB: 1983/06/22 Current Status: NLO Registry File Number: B8265/P2

Pelican Lake (BAND-405)

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1979/11/01 Current Status: SET Registry File Number: B8265/P4

Treaty 6 Benefits The First Nation was not given benefits promised in Treaty 6: specifically, a one-time payment of $12 to every individual, yearly Date Received by SCB: 2006/01/25 annuity payments, livestock and agricultural implements, medical Current Status: SUB/REV assistance, education, and ammunition and twine. Registry File Number: B8260-869

Pelly Haylands Claimants (ASSCTN)

Pelly Haylands (1899 Alienation) FN alleges lands known as the 'Pelly Haylands' were wrongfully - Cote First Nation 366 (BAND-366) alienated from reserves in the Fort Pelly District. Jointly submitted - Keeseekoose (BAND-367) with Keeseekoose and Key Bands. - The Key First Nation (BAND-368) Date Received by SCB: 1997/10/07 Current Status: ACT Registry File Number: B8260-600

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 260 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Peter Ballantyne Cree Nation (BAND-355)

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1978/02/01 Current Status: SET Registry File Number: B8265/P5

Piapot (BAND-385)

1918 and 1919 Surrenders Alleged the 1918 and 1919 surrenders of 2,180 and 15,360 acres of I.R. No. 75 were invalid, and that the price for the land was Date Received by SCB: 1987/01/09 inadequate. Current Status: SET Registry File Number: B8260-309

Flooding of Reserve Lands The FN alleges flooding of land by Prairie Farm Rehabilitation Administration (PFRA) control structures both upstream (Craven Date Received by SCB: 2002/02/07 and Valeport Dams) and downstream (Echo Lake Dam) from IR Current Status: BA #75. Registry File Number: B8260-755

TLE Alleged shortfall of land under Treaty 4. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1975/01/31 Current Status: SET Registry File Number: B8265/P6

Poundmaker (BAND-345)

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1977/01/01 Current Status: SET Registry File Number: B8265/P9

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 261 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Poundmaker (BAND-345)

Wrongful Denial of Annuity Payments The Department of Indian Affairs unlawfully terminated the treaty annuities owed to the Poundmaker First Nation in the aftermath of Date Received by SCB: 2002/11/04 the Northwest Rebellion. Current Status: BA Registry File Number: B8260-787

Red Earth (BAND-356)

TLE Substance of Claim Not Defined Date Received by SCB: 1993/11/24 Current Status: FCL Registry File Number: B8265/R2

Red Earth / Shoal Lake Claimants (ASSCTN)

Quality of Reserve Land (Agricultural) Red Earth and Shoal Lake FNs alleged they were not provided with - Red Earth (BAND-356) farming lands pursuant to Treaty #5 and adhesions thereto. - Shoal Lake Cree Nation (BAND-357) Date Received by SCB: 1996/05/03 Current Status: ISCC Registry File Number: B8260-573

Red Pheasant (BAND-346)

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1978/09/01 Current Status: SET Registry File Number: B8265/R3

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 262 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Sakimay First Nations (BAND-364)

1907 Little Bone Surrender Alleged wrongful surrender of 6,000 acres in 1907 from Little Bone I.R. No. 73A. Date Received by SCB: 1984/03/09 Current Status: SET Registry File Number: B8260-233

Flooding QVIDA (SPLIT #5) Sakimay First Nations The Qu'Appelle Valley bands alleged improper alienation of Date Received by SCB: reserve land and damage due to flooding. Current Status: ACT Registry File Number: B-611/315/604

TLE Alleged the FN received a shortfall of reserve land pursuant to the terms of Treaty No. 4. Date Received by SCB: 1997/04/22 Current Status: ACT Registry File Number: B8265/S3

Saulteaux (BAND-347)

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1979/01/24 Current Status: SET Registry File Number: B8265/S5

Standing Buffalo (BAND-386)

Flooding (SPLIT #1) Standing Buffalo The Qu'Appelle Valley bands alleged improper alienation of Date Received by SCB: reserve land and damage due to flooding. Current Status: SET Registry File Number: B8260-761

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 263 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Star Blanket (BAND-387)

TLE Alleged shortfall of land under Treaty 4. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1980/01/01 Current Status: SET Registry File Number: B8265/S8

Sturgeon Lake First Nation (BAND-360)

1906 Timber Surrender Alleged improper administration of Sturgeon Lake Lumber Co. licence and the improper 1915 exchange of land. Date Received by SCB: 1991/02/28 Current Status: SET Registry File Number: B8260-642

1913 Surrender Alleged wrongful surrender of 2,145 acres of I.R. No. 101 in 1913. Date Received by SCB: 1991/02/28 Current Status: ISCC Registry File Number: B8260-248

Red Deer Holdings Agricultural Lease FN alleged that Canada breached fiduciary obligations on failure of Red Deer Holdings Ltd. to meet its payment obligations regarding Date Received by SCB: 1994/10/18 the farming of part of the Sturgeon Lake IR #101. Current Status: SET Registry File Number: B8260-639

TLE FN claims that they are owed TLE lands. Date Received by SCB: 1996/07/31 Current Status: SET Registry File Number: B8265/S25

Treaty 6 Benefits The First Nation was not given benefits promised in Treaty 6: specifically, a one-time payment of $12 to every individual, yearly Date Received by SCB: 2006/01/10 annuity payments, chief and headmen salaries, livestock and Current Status: SUB/REV agricultural implements and ammunition and twine. Registry File Number: B8260-886

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 264 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Sweetgrass (BAND-348)

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1981/09/01 Current Status: SET Registry File Number: B8265/S12

Wrongful Denial of Annuity Payments The Department of Indian Affairs unlawfully terminated the treaty annuities owed to the Sweetgrass First Nation in the aftermath of Date Received by SCB: 2002/11/04 the Northwest Rebellion. Current Status: BA Registry File Number: B8260-788

The Key First Nation (BAND-368)

1909 Surrender Alleged improper 1909 surrender of 11,500 acres of I.R. No. 65. Date Received by SCB: 1989/06/27 Current Status: FCL Registry File Number: B8260-329

Thunderchild First Nation (BAND-349)

1908 Surrender Alleged wrongful surrender in 1908 of I.R. No. 115 and No. 115A and Thunderchild's share in I.R. No. 112A Haylands, or, in the Date Received by SCB: 1986/08/04 alternative, the improper accounting and collection of monies. Current Status: SET Registry File Number: B8260-219

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1978/02/01 Current Status: SET Registry File Number: B8265/T3

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 265 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Touchwood Agency & Qu'Appelle V (ASSCTN)

Mismanagement Claim presented by the Kawacatoose, Muskowekwan, Day Star, - Day Star (BAND-389) Gordons, and Fishing Lake FNs. Alleging financial - Fishing Lake First Nation (BAND-390) mismanagement of the Touchwood Agency 1920-23. - Gordon (BAND-391) - Kawacatoose (BAND-393) - Muskowekwan (BAND-392) Date Received by SCB: 1993/03/15 Current Status: ISCC Registry File Number: B8260-315

Treaty 4 Bands - Treaty Grounds Signatories to Treaty 4 allege treaty grounds were alienated - Day Star (BAND-389) without the consent or approval of the Treaty 4 FNs. Further allege - Fishing Lake First Nation (BAND-390) promise was made to forever pay the annuities on the treaty - Gordon (BAND-391) grounds. - Kawacatoose (BAND-393) - Muskowekwan (BAND-392) Date Received by SCB: 1978/02/01 Current Status: SET Registry File Number: B8260-208

Wahpeton Dakota Nation (BAND-358)

1894 Alienation Alleged 1,920 acres of I.R. No. 94A was confiscated in 1894 without consent. Date Received by SCB: 1990/11/23 Current Status: FCL Registry File Number: B8260-609

Waterhen Lake (BAND-402)

Primrose Lake Air Weapons Range-PLAWR II Alleged inadequate compensation for loss of traditional harvesting lands (trapping, hunting, fishing, etc.) due to the establishment of Date Received by SCB: 1975/04/01 the Primrose Lake Air Weapons Range. Current Status: FCL Registry File Number: B8260-716-4

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 266 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Waterhen Lake (BAND-402)

Reserve Creation Alleged breach of fiduciary obligation in that an Indian reserve created for its use in 1921 has not been recognized by Canada Date Received by SCB: 1996/11/05 since 1926; and that Canada itself deprived the FN of the use and Current Status: DOJ benefit of the said lands from 1926 to date. Registry File Number: B8260-545

White Bear (BAND-365)

1901 Surrender Inadequate compensation for reserve lands surrendered in 1901. Date Received by SCB: 1983/11/10 Current Status: SET Registry File Number: B8260-133

1908 Surrender for Lease Alleges that the 1908 surrender of 500 acres to the town of Carlyle was invalid and that Canada breached pre and post surrender Date Received by SCB: 2007/06/12 fiduciary obligations. Current Status: RES Registry File Number: B8260-933

TLE and Farming Lands (SPLIT #1) Quality Farm FN alleges a breach of the Crown's fiduciary obligations to fulfill its Lands treaty obligation to provide quality farm lands. Date Received by SCB: 2000/12/23 Current Status: BA Registry File Number: B8260-774

TLE and Farming Lands (SPLIT #2) TLE FN alleges an outstanding treaty land entitlement. Date Received by SCB: 2000/12/23 Current Status: BA Registry File Number: B8265/W14

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 267 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Saskatchewan

Claimant Substance of Claim

Whitecap Dakota First Nation (BAND-372)

Haylands The First Nation alleges that the government failed to supply adequate haylands when the band's reserve was created; and was Date Received by SCB: 2005/08/03 negligent in allowing off-reserve land to be acquired by third parties Current Status: BA when it was being used as grazing land for the FN's stock animals. Registry File Number: B8260-871

Witchekan Lake (BAND-407)

TLE Alleged shortfall of land under Treaty 6. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1978/02/01 Current Status: SET Registry File Number: B8265/W7

Wood Mountain (BAND-388)

1910 and 1919 Alienation of Reserve Land FN alleges that Canada made solemn promises to the Wood Mountain Sioux in 1877, including the promise of reserve lands. In Date Received by SCB: 2000/02/03 1910, the Sioux understood that all of Twp. 4, Range 4, West of the Current Status: BA 3rd meridian had been reserved for them. In 1910, this was Registry File Number: B8260-710 changed to exclude the S. 1/2 and the N. 1/2 of Twp. 4. Further, in 1919, 9 sections totalling 5,760 acres were sold for soldier settlement without a surrender, an impartial appraisal, or any compensation to the Wood Mountain First Nation.

Yellow Quill (BAND-376)

TLE Alleged shortfall of land under Treaty 4. This First Nation is a signatory to the Saskatchewan TLE Framework Agreement. Date Received by SCB: 1979/11/01 Current Status: SET Registry File Number: B8265/N8

Total of Claims for Saskatchewan: 145

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 268 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Yukon

Claimant Substance of Claim

Carcross/Tagish First Nations (BAND-491)

Establishment of March Lake IR 5 Alleged failure to confirm March Lake IR 5 as an Indian reserve and failure to protect reserve land. Date Received by SCB: 2003/07/29 Current Status: BA Registry File Number: YK491-C02

Reserve Status of Choutla IR# 9 The FN alleges that Choutla IR# 9 was established as an Indian reserve under the meaning of the Indian Act. Date Received by SCB: 2006/01/09 Current Status: BA Registry File Number: YK491-C03

Surrender of I.R. 4 Land (Surrender Project) Alleged improper surrender of 7.4 hectares of Carcross/Tagish I.R. 4. Date Received by SCB: 2003/03/28 Current Status: RES Registry File Number: YK491-C01

Champagne and Aishihik First Nations (BAND-507)

Aishihik - Lot 1000 One of seven distinct claims. Aishihik - Lot 1000 claims that a letter of confirmation from Northern Economic Dev. Branch to Date Received by SCB: 1991/09/16 Indian-Eskimo Econ. Dev. Branch and recording of parcel in Yukon Current Status: NLO Land Records, set apart a reserve within the meaning of the Indian Registry File Number: YK507-C3 Act (de Facto).

Aishihik - Lot 101 One of seven distinct claims. Aishihik - Lot 101: Claims that Notice of New Entry in Reserve General register (for residential Date Received by SCB: 1991/09/16 purposes) set apart the lands as a reserve within the meaning of Current Status: NLO the Indian Act, de Facto. Registry File Number: YK507-C06

Canyon Creek Alleged Lots 1014 and 1015, Canyon Creek, Yukon should have been recognized as Indian Reserves under the Indian Act. Date Received by SCB: 1995/03/10 Current Status: NLO Registry File Number: YK507-C08

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 269 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Yukon

Claimant Substance of Claim

Champagne and Aishihik First Nations (BAND-507)

Champagne - Lot 1004 One of seven distinct claims. Champagne - Lot 1004 claims that a letter from Northern Economic Dev. Branch (DIA) to Dept. Date Received by SCB: 1991/09/16 Secretariat (DIA) and by approval of DIA Assistant Deputy Minister, Current Status: NLO a reserve within the meaning of the Indian Act was de Facto set Registry File Number: YK507-C04 apart.

Champagne I.R. No. 12 - Lot 4 Failure to set aside land as a reserve in 1929. Date Received by SCB: 1991/09/16 Current Status: SET Registry File Number: YK507-C07

Haines Junction - Lot 30 One of seven distinct claims. Haines Junction - Lot 30 claims that a letter of confirmation from the Assistant Director, Northern Affairs Date Received by SCB: 1991/09/16 to Director, Indian Affairs in 1958 and survey in 1958, set apart (de Current Status: SET facto) a reserve within the meaning of the Indian Act. Registry File Number: YK507-C02

Kloo Lake One of seven distinct claims. Kloo Lake: Claims Notice of New Entry in Yukon Land Records in the name of DIA in 1986, set apart Date Received by SCB: 1991/09/16 (de Facto) a reserve within the meaning of the Indian Act. Current Status: NLO Registry File Number: YK507-C05

Klukshu - Lot 22 One of seven distinct claims. Klukshu - Lot 22: Claims that 'lands set aside' in 1955 created (de Facto) a reserve within the meaning Date Received by SCB: 1991/09/16 of the Indian Act. Current Status: SET Registry File Number: YK507-C01

Klukshu Environmental Claim This claim was spun off in December, 1995 from the Klukshu Lot 22 Land Aspect Claim. The claim concerns herbicide spraying on Date Received by SCB: 1991/09/16 reserve, and oil pipeline spills. Current Status: DOJ Registry File Number: YK507-C09

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 270 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Yukon

Claimant Substance of Claim

Kluane First Nation (BAND-503)

Burwash Landing Alleged the FN's Burwash Landing land should be formally recognized as a reserve. Date Received by SCB: 1993/02/22 Current Status: SET Registry File Number: B8260-513

Kluane National Park Reserve Alleged creation of Kluane National Park Reserve interfered with its hunting and other traditional permits and constituted an illegal Date Received by SCB: 1997/02/26 disposition of indian land. Current Status: FCL Registry File Number: B8260-739

Kwanlin Dun First Nation (BAND-500)

Whitehorse I.R. #8 Alleged failure to declare I.R. No. 8 as a 'reserve' within the meaning of the Indian Act, and wrongful alienation of parts of the Date Received by SCB: 1994/12/08 reserve to third parties. Current Status: FCL Registry File Number: YK500-C01

Little Salmon/Carmacks First Nation (BAND-492)

Little Salmon/Carmacks IR #10 The FN asserts that Canada breached a lawful obligation to the FN by failing to confirm a certain parcel of land, known as Little Date Received by SCB: 1997/09/30 Salmon Indian River IR# 10 and legally described as Lot 3, Group Current Status: NLO 904, yukon Territory ("Lot 3"), as a reserve within the meaning of Registry File Number: YK492-C1 the Indian Act.

Lots 48 - 49 & 125 - Group 903 Alleged Federal Crown breached its fiduciary duty to the FN when it refrained from confirming Lots 48 and 125 as reserves within the Date Received by SCB: 1997/09/30 meaning of the Indian Act, and when it failed to protect and recover Current Status: NLO the FN's interest in Lot 49 Registry File Number: YK492-C2

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 271 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Yukon

Claimant Substance of Claim

Selkirk First Nation (BAND-498)

I.R. #7 Alleged Federal Crown breached its fiduciary duty to the FN when it failed to secure the lands set aside at I.R. #7, and Pelly Date Received by SCB: 1997/09/30 Crossing, as reserve lands for the FN, within the meaning of the Current Status: NLO Indian Act. Registry File Number: YK498-C1

Teslin Tlingit Council (BAND-499)

Lots 7 & 28 Alleged Lots 7 and 28 should have been designated 'reserves' within the meaning of the Indian Act. Date Received by SCB: 1994/01/07 Current Status: NLO Registry File Number: YK499-C02

Surrender Alleged reserve land was never lawfully surrendered or taken under legal authority and was taken without compensation or band Date Received by SCB: 1983/03/18 support. Current Status: SET Registry File Number: YK499-C01

Tr'ondëk Hwëch'in (BAND-494)

58 Lots Failure to set apart 58 lots as reserves. Date Received by SCB: 1993/08/20 Current Status: FCL Registry File Number: YK494-C03

Alienation - Church Lands Alienation of 5 acres of reserve for Church. Date Received by SCB: 1991/03/12 Current Status: SET Registry File Number: YK494-C01

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB. Page 272 of 272

Public Information Status Report Specific Claims Branch Reporting Period: 1970/04/01-2007/12/31 Yukon

Claimant Substance of Claim

Tr'ondëk Hwëch'in (BAND-494)

Moosehide Creek 2B Failure to set apart Moosehide Creek 2B as a reserve pursuant to terms of surrender. Date Received by SCB: 1991/06/20 Current Status: SET Registry File Number: YK494-C02

Vuntut Gwitchin First Nation (BAND-496)

Rampart House Alleged Canada breached its lawful obligation to the FN by not recognizing Rampart House as an Indian reserve within the Date Received by SCB: 1995/02/14 meaning of the Indian Act. Current Status: NLO Registry File Number: YK496-C1

White River First Nation (BAND-506)

Lot 30 - Haines Junction Claimant alleges the transfer of Haines Junction (Lot 30) by Canada to the CAFN was in breach of its lawful obligation to the Date Received by SCB: 1995/11/22 claimant. Current Status: NLO Registry File Number: YK506-C1

Total of Claims for Yukon: 25

National Total of Claims: 1374

Claim Status Descriptions: ACT-Claims in Active Negotiations, AR-Resolved Through Administrative Remedy, BA-SCB Research Report sent to Claimant, DOJ-DOJ preparing Preliminary Legal Opinion, FCL-File closed, INACT-Claims in Inactive Negotiations, ISCC-Claims in the ISCC Process, LIT-Claims in Active Litigation, LOS-Legal Opinion Signed, NLO-No Lawful Obligation found, RES-Research, SET-Claim settled, SUB/REV-Claim received and under review by SCB.