A12 Chelmsford to A120 Widening A12 Scheme Summary
Total Page:16
File Type:pdf, Size:1020Kb
A12 Chelmsford to A120 widening traffic management during construction factsheet A12 scheme summary The proposed changes to this stretch of the A12 road include: n improvements to junctions n construction of new junctions 21, 22 19 and 25 and 24 providing access to the A12 both northbound and southbound n widening of the dual carriageway from two to three lanes in n creation of two bypasses, each direction from Hatfield one between junctions 22 Peverel to Marks Tey and 23 and another between junctions 24 and junction 25 n removal of existing junctions n new and improved existing walking, 20a, 20b and 23 cycling and horse-riding routes www.highwaysengland.co.uk/A12 Our commitment to you n We exist to connect the country, and customer service is one of our priorities n Customer satisfaction and safety are critical components of our vision for the future n We care about our customers and are committed to improving our service to you n We’re committed to improving our customer experience through roadworks by maximising safety (for both road users and road workers) and minimising disruption caused by roadworks schemes What is traffic It can include: n narrowing of road lanes and management some speed restrictions so that traffic can continue to pass while Traffic management is work is carried out where the traffic is directed n diversions which take traffic away from construction areas around disruption so that n where construction of new roads it can continue to flow as or bypasses are needed, the new freely as possible during elements are completed first and the construction of large traffic continues on existing roads n night-time road and slip road infrastructure projects, closures or occasional weekend like the A12 Chelmsford to closures with local diversions for A120 proposed widening traffic travelling at off-peak time to scheme. allow for safe construction work on bridges How we will communicate traffic management during construction The A12 Chelmsford to A120 widening is a major infrastructure project and involves an investment of around £1 billion. When the proposed scheme is in its construction phase, we will use a range of traffic management measures to help keep traffic moving throughout the local area. n When road works are required, n Speed restrictions will be put in we will give customers, drivers, place from when construction businesses and residents as starts until completion on the much notice as possible of up main A12 carriageways requiring and coming roadworks so they upgrading can plan ahead n Where needed, lane closures or n We plan to keep two lanes open full road closures will be in place in each direction on the A12 overnight as these are the times during the day, when the road is when traffic levels are lower busier n All diversion routes for full road n We will use clear signage and closures will be pre-signed and electronic signs to ensure people advance warnings signs will be are aware of roadworks installed before any closure dates n We will use ‘travel time’ message n There will be announcements signs so you are kept up to date on our website and on social while on your journey and aware media on all traffic management of any delays on the route measures and diversions What to expect On new bypass sections between junctions 22 and 23, We are sorry for any inconvenience and junctions 24 and 25 and disruption to our customers New bypasses would be constructed which is likely to be caused when first. Afterwards, our intention is for we are undertaking improvements the bypassed sections of the former of this scale and size. We will A12 road to be passed over to Essex only close the road when we County Council (subject to their really need to for the safety of our agreement), for use by local traffic. road workers and motorists. This is called de-trunking. Whenever required and to minimise In order to connect the new road disruption to our customers, we’ll sections to the existing road work overnight from 8pm to 6am, sections safely, temporary traffic when there are fewer vehicles lights and overnight/weekend on the road. Sometimes we’ll be closures will be required while working seven days a week to that work is carried out. complete the work as quickly as possible. Generally, we will mainly On the existing road between be working Monday to Friday but junctions 24 and 25 weekend working will also be Temporary slip roads are likely to required. During the day, we will be required along the existing A12 keep the carriageway open as usual. southbound carriageway between junction 24 and 25. These will link side road diversions to the A12. On the existing A12 carriageway The temporary slip roads would Where widening work needs then be built into the permanent to take place, narrowed lanes roundabout arrangements during and speed restrictions would the de-trunking of the road. be needed to enable the central reserve to be upgraded and the verges widened if required. On local access roads Where work is to be carried out on local roads, two-way traffic lights/temporary lights might have to be put in place. Traffic management The existing central reserve of the at junctions 19 A12 will be hardened to create additional space for construction Construction of the symmetrical traffic. 24-hour narrow lanes would widening to the junction 19 bridge also operate by moving all four requires the central reserve to be lanes as close to the northbound upgraded. This may need to be verge as possible to provide space carried out under full weekend/ to construct the southbound overnight closures of the carriageway carriageway. Traffic would then and possible lane closures. 24-hour be switched to the opposite side narrow lanes would be introduced to construct the northbound to the northbound carriageway and carriageway. The traffic in each then switched to the southbound direction would be divided by carriageway. Installation of the bridge temporary barriers. Temporary lower surface would require full night-time speed limits with speed cameras will carriageway closures. be in place. Bridge construction and demolition are likely to take place Hatfield Peverel under full weekend carriageway Hatfield Peverel is linked by three closures and local road closures. bridges which, as part of the Junction 21 scheme, will be taken down and reconstructed. Most of the bridge The junction will mostly be construction work is expected to constructed away from the existing be carried out off site to minimise carriageway. Only work on the slip disruption to road users and local roads and the joining of the old residents. Traffic will be able to get and new road will need local road to both sides of the village, as we will weekend/overnight closures. Some aim to keep at least one bridge open weekend and overnight closures will at all times and a diversion route will be required for bridge construction. be in place when required. Once the new junction is fully Junction 25 operational, one lane of both northbound and southbound A12 A temporary southbound entry traffic would be diverted to use slip slip road would be constructed roads to allow the main carriageway so that the existing A12 can be widening to be carried out. kept for use for local traffic. This will require a mix of 24-hour Junction 22 narrow lanes and overnight/ weekend carriageway closures. The construction of the new junction will require phased traffic When the Marks Tey roundabout and management to maintain traffic London Road is re-configured, it will flows. This is likely to be a mix of require phased traffic management 24-hour narrow lanes and some to maintain traffic flows. This may overnight/weekend carriageway mean some night-time closures closures to join the old road and narrower traffic lanes. sections to the new junction and to the new section of the A12 When technology and drainage carriageway. Access to the quarry are installed, some full night- and Little Braxted lane will be open time closures may be required to throughout the construction period. install ducts and crossings under the existing A12 carriageway. Junction 24 The construction of this new junction is key to the scheme, as the junction slip roads will be used to divert A12 traffic while the new underpass structure is constructed. Weekend/possible night closures will be required to join the old and the new sections at junction 24. Temporary barriers and lower speed limits with speed cameras will be in place in this section. If you need help accessing this or any other Highways England information, please call 0300 123 5000 and we will help you. © Crown copyright 2021. If you have any enquiries about this publication email [email protected] You may re-use this information (not including or call 0300 123 5000*. Please quote the logos) free of charge in any format or medium, Highways England publications code PR67/21 under the terms of the Open Government Licence. To view this licence: Highways England creative job number BED21_0054 visit www.nationalarchives.gov.uk/doc/open- government-licence/ *Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count write to the Information Policy Team, The towards any inclusive minutes in the same way as National Archives, Kew, London TW9 4DU, 01 and 02 calls. or email [email protected]. These rules apply to calls from any type of line Mapping (where present): © Crown copyright and including mobile, BT, other fixed line or payphone.