ENVIRONMENT CLEARANCE APPLICATION Mega Infra Dreams
Total Page:16
File Type:pdf, Size:1020Kb
“Group Housing” at Village Purnapur & Kuantanda, Bareilly-Bisalpur Road, Bareilly By Mega Infra Dreams LLP Consortium ENVIRONMENT CLEARANCE APPLICATION “Mega Green City & Mega Eco Park” (Group Housing) At Village Purnapur & Kuantanda, Bareilly-Bisalpur Road, Distt. Bareilly (UP) Developed By Mega Infra Dreams LLP Consortium Add: C-2, Mega City, Sanjay Nagar Bypass, District Bareilly (UP)-243006 Prepared By EARTH PROTECTION GROUP ENVIRONMENTAL CONSULTANT PVT. LTD. (NABET Accredited Consultant, Certificate No: NABET/EIA/1619/IA0020 & S.No. in: 37) 4-D/620-B, SECTOR-4, GOMTI NAGAR EXTENSION, LUCKNOW-226010 Contact No: 9839016959, 7570004689 E-mail: [email protected], [email protected] Website: www.epgec.com Month/Year-December/2018 Prepared By: M/s Earth Protection Group Environmental Consultant Pvt. Ltd. Page | 1 “Group Housing” at Village Purnapur & Kuantanda, Bareilly-Bisalpur Road, Bareilly By Mega Infra Dreams LLP Consortium CONTENTS Particulars Page No. Contents 2 – 7 Enclosure-1: Form-1 & 1A 8 – 43 Enclosure-2: Conceptual Plan 44 – 52 2.1 INTRODUCTION 45 2.2 PROJECT COST 46 2.3 AMENITIES 46 2.4 SITE LOCATION 47 2.5 COORDINATES OF THE PROJECT SITE 48 2.6 TYPE OF THE PROJECT 48 2.7 PROJECT DETAILS 48 2.8 POPULATION DETAILS: 49 2.8.1 During Construction Phase 50 2.8.2 During Operation Phase 50 2.9 WATER REQUIREMENT 50 2.9.1 During Construction Phase 50 2.9.2 During Operation Phase 51 2.10 RAIN WATER COLLECTION & HARVESTING DETAILS 51 2.11 Power Requirement & Backup 51 2.11.1 During Construction Phase 51 2.11.2 During Operation Phase 51 2.12 Solid & Hazardous Waste Management 51 2.12.1 During Construction Phase 51 2.12.2 During Operation Phase 52 2.13 PARKING MANAGEMENT 52 2.13.1 During Construction Phase 52 2.13.2 During Operation Phase 52 2.14 Green Area Development 52 Prepared By: M/s Earth Protection Group Environmental Consultant Pvt. Ltd. Page | 2 “Group Housing” at Village Purnapur & Kuantanda, Bareilly-Bisalpur Road, Bareilly By Mega Infra Dreams LLP Consortium Enclosure-3: Environment Assessment Report 53 – 89 3.1 EXECUTIVE SUMMARY OF THE PROJECT: 55 3.2 NATURE OF THE PROJECT: 57 3.3 LAND OWNERSHIP OF PROJECT LAND 57 3.4 SITE PREPARATION & LAND USE: 57 3.5 LOCATION & CONNECTIVITY OF THE PROJECT SITE 59 3.6 WATER RECOURSE MANAGEMENT 62 3.6.1 Water Requirement 62 3.6.2 Source of Water: 64 3.6.3 Reuse and Disposal of Treated Water: 64 3.7 ENERGY RECOURSE MANAGEMENT 66 3.7.1 During Construction Phase 66 3.7.2 During Operation Phase 66 3.7.3 Energy Conservation 66 3.8 SITE ANALYSIS 66 3.9 SOCIAL INFRASTRUCTURE 67 3.10 ENVIRONMENT MANAGEMENT PLAN 67 3.10.1 ENVIRONMENT MANAGEMENT PLAN (DURING CONSTRUCTION 68 PHASE) 3.10.1.1 Air Environment 68 3.10.1.2 Water Environment 69 3.10.1.3 Noise Environment 69 3.10.1.4 Solid Waste Management 70 3.10.2 ENVIRONMENT MANAGEMENT PLAN (DURING OPERATION PHASE) 70 3.10.2.1 Air Environment 70 3.10.2.2 Water Environment 70 3.10.2.2.a Waste Water Treatment System 71 3.10.2.2.b Schematic Diagram of STP: 73 3.10.2.2.c GROUND WATER STATUS OF THE PROJECT AREA 74 3.10.2.2.d RAIN WATER HARVESTING SYSTEM 75 3.10.2.3 Noise Environment 79 3.10.2.4 Parking Management 79 3.10.2.5 Waste Management 79 Prepared By: M/s Earth Protection Group Environmental Consultant Pvt. Ltd. Page | 3 “Group Housing” at Village Purnapur & Kuantanda, Bareilly-Bisalpur Road, Bareilly By Mega Infra Dreams LLP Consortium 3.10.2.6 Green Belt/Plantation 80 3.10.2.7 Plantation Programme 81 3.10.3 COST OF ENVIRONMENT MANAGEMENT PLAN (EMP) 82 3.11 ANTICIPATED IMPACT & MITIGATION MEASURES 83 3.11.1 DURING CONSTRUCTION PHASE 83 3.11.2 DURING OPERATION PHASE 85 3.12 ENVIRONMENT MONITORING PROGRAMME 87 3.12.1 ENVIRONMENT MONITORING COST FOR CONSTRUCTION PHASE 88 3.12.2 ENVIRONMENT MONITORING COST FOR OPERATIONAL PHASE 89 Enclosure-4: Risk Assessment & Emergency Preparedness Plan 90 – 100 4.1 RISK ASSESSMENT 91 4.1.1 HAZARD IDENTIFICATION 91 4.1.2 VULNERABILITY ANALYSES 91 4.1.3 RISK ANALYSIS 91 4.1.4 EMERGENCY PREPAREDNESS PLAN 93 4.1.5 OFFSITE EMERGENCY PLAN 99 4.1.6 SECURITY PLAN 99 4.2 EVACUATION PLAN 100 Enclosure-5: Disclosure of Consultants 101 – 109 Enclosure-6: Other Maps & Documents 110 – 128 Enclosure-6.1 (Layout Plan) 111 Enclosure-6.2 (Location of STP & Vermicomposting in Self Owned Scheme) 112 Enclosure-6.3 (Location of STP & Vermicomposting in PMAY Scheme) 113 Enclosure-6.4 (Location of Rain Water Harvesting Pits in PMAY Scheme) 114 Enclosure-6.5 (Landscape Plan in Self Owned Scheme) 115 Enclosure-6.6 (Landscape Plan in PMAY Scheme) 116 Enclosure-6.7 (Fire Fighting System in PMAY Scheme) 117 Enclosure-6.8 (Consortium Resolution) 118 Enclosure-6.9 (Landuse Conversion) 119 Enclosure-6.10 (NOC from Tahsil) 124 Prepared By: M/s Earth Protection Group Environmental Consultant Pvt. Ltd. Page | 4 “Group Housing” at Village Purnapur & Kuantanda, Bareilly-Bisalpur Road, Bareilly By Mega Infra Dreams LLP Consortium Enclosure-6.11 (NOC from Fire Department) 125 Enclosure-6.12 (NOC from PWD) 126 Enclosure-6.13.a (Khasra Map for Self Owned Scheme) 127 Enclosure-6.13.b (Khasra Map for PMAY Scheme) 128 Prepared By: M/s Earth Protection Group Environmental Consultant Pvt. Ltd. Page | 5 “Group Housing” at Village Purnapur & Kuantanda, Bareilly-Bisalpur Road, Bareilly By Mega Infra Dreams LLP Consortium LIST OF TABLES Table Description Page No. Table: 2.5 (Coordinates of the Project Site) 48 Table: 2.7 (Project Details) 48 Table: 2.8.2 (Estimated Population for Operation Phase) 50 Table: 3.1 (Project Details) 55 Table: 3.4 (Landuse details of both scheme) 57 Table: 3.5.a (Project Connectivity) 59 Table: 3.5.b (Coordinates of Project Site) 59 Table: 3.6.1.b.i (Water requirement in Operation Phase of Self Owned Scheme) 62 Table: 3.6.1.b.ii (Water requirement in Operation Phase of PMAY Scheme) 63 Table: 3.10.2.1 (Details of D.G. Set with Stack) 70 Table: 3.10.2.2.c.i (Ground Water Level of the Block) 74 Table: 3.10.2.2.c.ii (Average Ground Water Level of the Block) 75 Table: 3.10.2.2.d.i (Calculation of Rain Water Harvesting System of Self 77 Owned Scheme) Table: 3.10.2.2.d.ii (Calculation of Rain Water Harvesting System of PMAY 78 Scheme) Table: 3.10.3 (Cost of Environment Management Plan) 82 Table: 3.12 (Environment Monitoring Programme) 87 Table: 3.12.1 (Environment Monitoring Cost for Construction Phase) 88 Table: 3.12.2 (Environment Monitoring Cost for Operation Phase) 89 Prepared By: M/s Earth Protection Group Environmental Consultant Pvt. Ltd. Page | 6 “Group Housing” at Village Purnapur & Kuantanda, Bareilly-Bisalpur Road, Bareilly By Mega Infra Dreams LLP Consortium LIST OF FIGURES Figure Description Page No. Fig: 3.4.a (Land Use Details of Self Owned Scheme) 60 Fig: 3.4.b (Land Use Details of PMAY Scheme) 58 Fig: 3.5.a (Location Map in 2.5 Km Buffer) 60 Fig: 3.5.b (Location Map in 05 Km Buffer) 61 Fig: 3.6.1.b.i (Water Balance of Self Owned Scheme) 63 Fig: 3.6.1.b.ii (Water Balance of PMAY Scheme) 64 Fig: 3.6.3 (Map showing the Sewage Disposal Line in 2.5 Km Buffer) 65 Fig: 3.10.2.2.b (Schematic Flow Diagram of STP) 73 Prepared By: M/s Earth Protection Group Environmental Consultant Pvt. Ltd. Page | 7 “Group Housing” at Village Purnapur & Kuantanda, Bareilly-Bisalpur Road, Bareilly By Mega Infra Dreams LLP Consortium Enclosure-1: Form-1 & 1A Prepared By: M/s Earth Protection Group Environmental Consultant Pvt. Ltd. Page | 8 “Group Housing” at Village Purnapur & Kuantanda, Bareilly-Bisalpur Road, Bareilly By Mega Infra Dreams LLP Consortium I. Basic Information Sl.No. Item Details 1. Whether it is a violation case and No application is being submitted under Notification No. S.O.804 (E) dated 14.03.2017? 2. Name of the Project/s “Mega Green City & Mega Eco Park” Project Cost (in lacs) 7000 Lacks ( For Both the Scheme i.e. Self Owned Scheme & PMAY Scheme) S. No. in the schedule 8 (a) Project Sector Building and construction projects- Sector 8 (a) 3. Proposed capacity/area/length/tonnage to Total plot area 101720 SQM be handled/command area/lease (Area for Road Widening, Nali, Chuck Road: area/number or wells to be drilled 1720 SQM + Area for Self Owned Scheme: 75000 SQM + Area for PMAY Scheme: 25000 SQM) Total built-up area 77991.22 SQM (Self Owned Scheme: 34568.62 + PMAY Scheme: 43422.60 SQM) New/Expansion/Modernization New 4. MoEFCC file number (Previous EC) Not Applicable 5. Category of project i.e. 'A' or 'B' “B” Does it attract the general condition? If yes, Not Applicable please specify Does it attract the specific condition? If yes, Not Applicable please specify 6. Location of the project Village Purnapur & Kuantanda, Bareilly- Bisalpur Road, Distt. Bareilly (UP) Coordinates of major four corners: 1st Corner: 28°21'6.47"N, 79°31'8.30"E, 174 m 2nd Corner: 28°21'9.30"N, 79°31'14.59"E, 174 m 3rd Corner: 28°21'18.55"N, 79°31'0.38"E, 175 m 4th Corner: 28°21'13.58"N, 79°30'56.24"E, 172 m 7.