Danish Energy Policy and Middelgrunden Off-Shore Wind Farm

Total Page:16

File Type:pdf, Size:1020Kb

Danish Energy Policy and Middelgrunden Off-Shore Wind Farm DanishDanish energyenergy policypolicy andand MiddelgrundenMiddelgrunden OffOff--shoreshore WindWind FarmFarm Jens H. M. Larsen, M.Sc. Copenhagen Environment and Energy Office Energysavings Local information and implementation DanishDanish NetworkNetwork ofof EnergycentersEnergycenters Energyservice Energyservice Offices: 13 People: 50 DanishDanish EnergyEnergy PolicyPolicy z Danish olie in 1972 and oliecrisis in 1973 z Energyplans in year 76, 81, 90, z Year 1996 (Energy 21) z Green majority in parliment 1980-2000 z New libral goverment in 2001 DanishDanish EnergyEnergy PolicyPolicy -- updateupdate z Liberal Energy Market z Electricity Saving Fund, labelling ect. z Energy savings in buildings, new regulation z 2 % energy saving pr. year z 2 new offshore windfarms z Retrofit of 350 MW new wind on land NewNew DanishDanish WindWind PolicyPolicy No new capacity 2003-2006 Low expectations for new capacity after 2007 Market + Added price (Max 0.049 euro/ kWh) From Centralized to Decentralized CHP DK annual consumption 32 TWh Centralized production in the mid 80’s Decentralized production of today Transmission system in Denmark Two autonomy systems. Connection to Norway, Germany and Sweden Annual consumption 32 TWh COCO2--EmissionEmission andand EconomicEconomic GrowthGrowth 130 120 GDP fixed prices 110 CO2-emissions 100 Gross energy consumption 90 80 1988 '90 '92 '94 '96 '98 '00 '02 Explanatory factors: 1) Renewable energy, 2) Energy savings, 3) Combined Heat Power EmissionEmission ofof danishdanish greenhousegreenhouse gasgas Production Cost at Danish on-shore Wind Power Plants 10 9 8 h W 7 k . 6 Actual 5 nt pr e 4 MG offshore Estimated c * o r 3 u E 2 1 0 1984 1987 1990 1993 1996 1999 2002 2005 2008 2011 HistoryHistory ofof DanishDanish WindpowerWindpower HistoryHistory ofof DanishDanish WindpowerWindpower z Gedser møllen, 200 kW z Installed 1957 z shut down, 1967 z Testrun in 1977 was financed by US government HistoryHistory ofof DanishDanish WindpowerWindpower z Oil crisis 1979 z First modern turbine from 1982 z 15 - 45 kW for private household z Privately build z Friend – to - friend HistoryHistory ofof DanishDanish WindpowerWindpower Ready for the big boom in USA 1985 - 88 Ca. 50 % off all wind turbines in the world is made in DK 20.8%20.8% ofof electricityelectricity inin DenmarkDenmark comescomes fromfrom WindWind inin 20042004 WhyWhy diddid wewe havehave thisthis successsuccess ?? z 81% of Danish wind energy projects are local and community-based z We had a policy which supported this development z Feed-in tarif system z Grid connection law Ownership in Denmark Year 2002: 3000 MW, 5000 turbines Utility Others turbines 1% 18% Cooperative turbines Single 23% person 58% Ownership for windturbines in Denmark Private/industry (singel turbines) Cooperative Utility MW 400 Year 2005: 3000 MW 5344 turbines 350 300 250 200 150 100 50 0 90 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 980- 1 Offshore windfarms in Denmark 2005 Build Location Power in year 1. Vindeby 5 MW 1991 2. Tunø Knob 5 MW 1995 3. Middelgrund 40 MW 2001 4. Horns Rev 160 MW 2002 5. Samsø 22 MW 2002 6. Rødsand 160 MW 2003 AA beautifulbeautiful viewview WindWind turbineturbine CoCo--operativeoperative z Big scale wind energy for the city z Local placement z Local dialog z Local ownership z Involve of people in process z Example of Agenda 21 and cityecology HistoryHistory ofof cooperativescooperatives z N.F.S. Grundtvig, 1783 z Theologian, author and poet z Everyone can and must make a difference z Change his conditions of life z Country high schools z Farmers education z DK agriculture and industry organzed by coops WindWind turbineturbine CoCo--operativeoperative z 8527 members private, organizations, companies z 40,500 shares InvolvementInvolvement ofof 85008500 peoplepeople 500500 membersmembers visitedvisited theirtheir turbineturbine onon openopen--househouse dayday inin JuneJune 20052005 ProcesProces DebateDebate DebateDebate –– beforebefore BeforeBefore DebateDebate DebateDebate GreenGreen landmarklandmark forfor CopenhagenCopenhagen z Said by the: Danish Minister of Environment, Conni Hedegaard, member of danish Conservatives DanishDanish opinionsopinions aboutabout windpowerwindpower z 70-85% of people in Denmark support more windpower in Denmark (from 1992-2006) z People are pleased with existing turbines and the positive attitude is highest among those who can see the turbines every day. z Positive attitude is also highest among those who can see the offshore turbines every day. z Complaints from less than 2% of all turbines (mostly old noisy turbines, not allowed today) DanishDanish opinionopinion poll,poll, ACN,ACN, 2006,2006, WildWild aboutabout windwind z Are you favorable to wind power? 1% 3% Yes No Don't know 96% DanishDanish opinionopinion poll,poll, ACN,ACN, 2006,2006, WildWild aboutabout windwind z Should Denmark continuously erect new wind turbines, so that an increasing share of the electricity production is covered by wind power? 6% 3% Yes No Don't know 91% DanishDanish opinionopinion poll,poll, ACN,ACN, 2006,2006, WildWild aboutabout windwind z We should erect more wind turbines, but not in my local area ? 13% 16% Completely Agree/Agree Disagree/Completely disagree Don't know 71% DanishDanish opinionopinion poll,poll, ACN,ACN, 2006,2006, WildWild aboutabout windwind z Wind turbines in the landscape is a positive symbol of Denmark? 9% Completely 14% Agree/Agree Disagree/Complet ely disagree Don't know 77% DanishDanish opinionopinion poll,poll, ACN,ACN, 2006,2006, WildWild aboutabout windwind z In general, wind turbines integrates well into the Danish landscape? 12% Completely Agree/Agree 24% Disagree/Complet ely disagree 64% Don't know OffshoreOffshore opinionopinion pollpoll 2006,2006, 1400 persons z People with direct views for turbines at Horns Reef and Nysted are more positive than people in general, and more positve towards extension of the farms z Nysted, 9-10 km from coast, pay 1200 DDK to go 50 km from coast. z People in general; 900 DDK to go 50 km from coast. z Horns Rev, 14-20 km from coast, pay 600 DDK to go 50 km from coast. TouristTourist TouristTourist opinionopinion pollpoll aboutabout Middelgrunden,Middelgrunden, 20062006 z Are you favorable to wind power? 3% 3% Yes No Neutrale 94% TouristTourist opinionopinion pollpoll aboutabout Middelgrunden,Middelgrunden, 20062006 z What is your impression of the turbines outside Copenhagen harbour? 22% Positive 7% Negative Neutrale 71% DanishDanish opinionopinion pollpoll byby Sonar,Sonar, 20012001 WhatWhat dodo youyou thinkthink aboutabout windwind powerpower inin DenmarkDenmark ?? 18% Enough - stop now Stop - too 7% many already Don´t know 7% 68% Yes - more 0,40 0,34 DebateDebate0,35 0,30 0,25 h 0,21 0,20 /kW kr 0,15 0,13 0,10 0,08 0,05 0,00 Paid price Market Saved Real value for CO2 price for health cost CO2 Source: Danish Environment Ministry, ExternE DebateDebate Source: Prof. Mikael Skou Andersen Danish Environment Institut EnvironmentalEnvironmental ImpactImpact AssesmentAssesment EIAEIA z Visual impact z Risk of leaking: debris and heavy metals contamination from the former dumpsite z Noise propagation z Influence on the free flow of water i Oresund z Risk of collision with vessels z Impact on flora and fauna z Fishing z Risk of shipwrecks and findings of archaeological interest BenefitsBenefits forfor thethe EnvironmentEnvironment z 89.000 MWh per. Year z 3% of electricity in Copenhagen z Gives clean air : z 261 tons SO2 z 234 tons NO2 z 76500 tons CO2 z 4950 tons cinders and ash VisualVisual impactimpact 11 z Several configurations were testet using computer image z Visiual background for the Littel Mermaid z Opposition to all configuations, except straight-line z A straight-line type meant fewer turbines than could be supported bv the area VisualVisual impactimpact 22 VisualVisual impactimpact 33 NoiseNoise propagationpropagation z Regulation: Noise levels below 40-45 dB at nearest neighbour z Fact: You can´t hear after 500 m. ImpactImpact onon thethe freefree flowflow ofof waterwater ii OresundOresund z The Baltic Sea is refreshed by water from the Danish straits z Reduced flow by 0,0012% z Compensation treament was not justified RiskRisk ofof collisioncollision withwith vesselsvessels z Result; Reduced risk of oil spill. z Oresund is a busy seaways, 20.000 ships a year. z Simulations have shown 8% risk of one collision to turbine pr. year. z But reduced ground collison 120% to 40% a year because the low water will become visible ImpactImpact onon floraflora andand faunafauna z No negative influence after 3 years z Vegetation was to be controlled prior to construction, three months after, and on yeare after z Tree months later the sea bed had more or less recovered, and the faundations were covered with seaweed z Conclusion: The faundations served as minireefs FineFine recoveryrecovery ofof eelgrasseelgrass afterafter thethe constructionconstruction BirdsBirds atat MiddelgrundenMiddelgrunden z No effect on birds z Or positive effect z Birds often collide with high voltage lines, masts, poles, and windows in buildings. They are also killed by cars and shot. z Birds are seldom bothered by wind turbines, however. FishingFishing inin thethe areaarea z Compensation for ”no fishing” during the construction z Fishing allowed around the cabels z Better fishing place becaus of the faundations ”minireefs” RiskRisk ofof shipwrecksshipwrecks z Many shipwrecks in the area • No archaeological sites was found • Could have delayed the construchen with
Recommended publications
  • Gravity-Based Foundations in the Offshore Wind Sector
    Journal of Marine Science and Engineering Review Gravity-Based Foundations in the Offshore Wind Sector M. Dolores Esteban *, José-Santos López-Gutiérrez and Vicente Negro Research Group on Marine, Coastal and Port Environment and other Sensitive Areas, Universidad Politécnica de Madrid, E28040 Madrid, Spain; [email protected] (J.-S.L.-G.); [email protected] (V.N.) * Correspondence: [email protected] Received: 27 December 2018; Accepted: 24 January 2019; Published: 12 March 2019 Abstract: In recent years, the offshore wind industry has seen an important boost that is expected to continue in the coming years. In order for the offshore wind industry to achieve adequate development, it is essential to solve some existing uncertainties, some of which relate to foundations. These foundations are important for this type of project. As foundations represent approximately 35% of the total cost of an offshore wind project, it is essential that they receive special attention. There are different types of foundations that are used in the offshore wind industry. The most common types are steel monopiles, gravity-based structures (GBS), tripods, and jackets. However, there are some other types, such as suction caissons, tripiles, etc. For high water depths, the alternative to the previously mentioned foundations is the use of floating supports. Some offshore wind installations currently in operation have GBS-type foundations (also known as GBF: Gravity-based foundation). Although this typology has not been widely used until now, there is research that has highlighted its advantages over other types of foundation for both small and large water depth sites. There are no doubts over the importance of GBS.
    [Show full text]
  • Horns Rev 2 Offshore Wind Farm Bird Monitoring Program 2010-2012
    Dong Energy A/S Horns Rev 2 Offshore Wind Farm Bird Monitoring Program 2010-2012 BIRD MIGRATION Dong Energy A/S Horns Rev 2 Offshore Wind Farm Bird Monitoring Program 2010-2012 BIRD MIGRATION Client Dong Energy A/S att. Birte Hansen Kraftværksvej 53 DK-7000 Fredericia Consultants Orbicon A/S Jens Juuls Vej 16 8260 Viby J DHI A/S Agern Allé 2 2970 Hørsholm Project ID 1321000072 Document 1321000075-03-003 Project manager Simon B. Leonhard Authors Henrik Skov, Simon B. Leonhard, Stefan Heinänen, Ramunas Zydelis, Niels Einar Jensen, Jan Durinck, Thomas W. Johansen, Bo P. Jensen, Brian L. Hansen, Werner Piper, Per N. Grøn Checked by Bo Svenning Pedersen Version 3 Approved by Lars Sloth Issued date December 2012 Data sheet Title: Horns Rev 2 Monitoring 2010-2012. Migrating Birds. Authors: Henrik Skov2, Simon B. Leonhard1, Stefan Heinänen2, Ramunas Zydelis2, Niels Einar Jensen2, Jan Durinck3, Thomas W. Johansen3, Bo P. Jensen2, Brian L. Hansen2, Werner Piper4, Per N. Grøn1. Institutions: 1Orbicon A/S, Jens Juuls Vej 16, DK-8260 Viby J, Denmark; 2DHI, Agern Allé 5, DK-2970 Hørsholm, Denmark; 3Marine Observers, Svankjærvej 6, DK-7752 Snested, Denmark; 4Biola, Gotenstrasse 4, D-20097 Hamburg Germany. Publisher: Horns Rev II A/S. Kraftværksvej 53, DK-7000 Fredericia, Denmark. Year: 2012 Version: 3 Report to be cited: Skov H.; Leonhard, S.B.; Heinänen, S.; Zydelis, R.; Jensen, N.E.; Durinck, J.; Johansen, T.W.; Jensen, B.P.; Hansen, B.L.; Piper, W.; Grøn, P.N. 2012. Horns Rev 2 Monitoring 2010-2012. Migrating Birds. Orbicon, DHI, Marine Observers and Biola.
    [Show full text]
  • Validation of the Dynamic Wake Meandering Model with Respect To
    https://doi.org/10.5194/wes-2020-126 Preprint. Discussion started: 8 December 2020 c Author(s) 2020. CC BY 4.0 License. Validation of the dynamic wake meandering model with respect to loads and power production Inga Reinwardt1, Levin Schilling1, Dirk Steudel2, Nikolay Dimitrov3, Peter Dalhoff1, and Michael Breuer4 1Dep. Mechanical Engineering & Production, HAW Hamburg, Berliner Tor 21, D-20099 Hamburg, Germany 2Dep. Turbine Load Calculation, Nordex Energy GmbH, Langenhorner Chaussee 600, D-22419 Hamburg, Germany 3Dep. of Wind Energy, DTU, Frederiksborgvej 399, 4000 Roskilde, Denmark 4Dep. of Fluid Mechanics, Helmut-Schmidt University Hamburg, Holstenhofweg 85, D-22043 Hamburg, Germany Correspondence: Inga Reinwardt ([email protected]) Abstract. The outlined analysis validates the dynamic wake meandering (DWM) model based on loads and power production measured at an onshore wind farm with small turbine distances. Special focus is given to the performance of a version of the DWM model that was previously recalibrated at the site. The recalibration is based on measurements from a turbine nacelle- mounted lidar. The different versions of the DWM model are compared to the commonly used Frandsen turbulence model. 5 The results of the recalibrated wake model agree very well with the measurements, whereas the Frandsen model overestimates the loads drastically for short turbine distances. Furthermore, lidar measurements of the wind speed deficit as well as the wake meandering are incorporated in the DWM model definition in order to decrease the uncertainties. 1 Introduction Wake models are a key aspect in every site-specific load calculation procedure. The used wake model has significant impact on 10 predicted loads and the power output of the whole wind farm, hence, an accurate wake model is of major importance for a wind farm design optimization process.
    [Show full text]
  • The Middelgrunden Offshore Wind Farm
    The Middelgrunden Offshore Wind Farm A Popular Initiative 1 Middelgrunden Offshore Wind Farm Number of turbines............. 20 x 2 MW Installed Power.................... 40 MW Hub height......................... 64 metres Rotor diameter................... 76 metres Total height........................ 102 metres Foundation depth................ 4 to 8 metres Foundation weight (dry)........ 1,800 tonnes Wind speed at 50-m height... 7.2 m/s Expected production............ 100 GWh/y Production 2002................. 100 GWh (wind 97% of normal) Park efficiency.................... 93% Construction year................ 2000 Investment......................... 48 mill. EUR Kastrup Airport The Middelgrunden Wind Farm is situated a few kilometres away from the centre of Copenhagen. The offshore turbines are connected by cable to the transformer at the Amager power plant 3.5 km away. Kongedybet Hollænderdybet Middelgrunden Saltholm Flak 2 From Idea to Reality The idea of the Middelgrunden wind project was born in a group of visionary people in Copenhagen already in 1993. However it took seven years and a lot of work before the first cooperatively owned offshore wind farm became a reality. Today the 40 MW wind farm with twenty modern 2 MW wind turbines developed by the Middelgrunden Wind Turbine Cooperative and Copenhagen Energy Wind is producing electricity for more than 40,000 households in Copenhagen. In 1996 the local association Copenhagen Environment and Energy Office took the initiative of forming a working group for placing turbines on the Middelgrunden shoal and a proposal with 27 turbines was presented to the public. At that time the Danish Energy Authority had mapped the Middelgrunden shoal as a potential site for wind development, but it was not given high priority by the civil servants and the power utility.
    [Show full text]
  • Horns Rev II Offshore Wind Farm Monitoring of Migrating Waterbirds Baseline Studies 2007-08
    Horns Rev II Offshore Wind Farm Monitoring of Migrating Waterbirds Baseline Studies 2007-08 Client DONG Energy A/S Teglholmen A.C. Meyers Vænge 9 DK 2450 København SV Tel: +45 4480 6000 Representative Lars Bie Jensen E-mail [email protected] Consultant Authors Orbicon A/S Werner Piper Jens Juuls Vej 18 Gerd Kulik DK 8260 Viby J Jan Durinck Tel: +45 8738 6166 Henrik Skov Simon B. Leonhard DHI Water Environment Health A/S Agern Allé 5 DK-2970 Hørsholm Tel: +45 4516 9200 In association with: BIOLA Gotenstrasse 4 D - 20097 Hamburg Tel: + 49 40 2380 8791 Project 132-07.1004 Project manager Simon B. Leonhard Marine Observers Quality assurance Simon B. Leonhard Svankjærvej 6 Revision 3 DK-7752 Snedsted Approved Lars Sloth Tel: +45 9796 2696 Published October 2008 Database: Cynthia Erb, Gerd Kulik, Werner Piper GIS: Ellen Heinsch, Jan Durinck, Observers: Werner Piper, Lutz von der Heyde, Dr. Hans-Wolfgang Nehls, Karsten Kohls, Hans Pelny, Thilo Christophersen Photos: Jan Durinck, Thomas W. Johansen, Henrik Skov, Jens Christensen CONTENTS 1 SUMMARY ................................................................................................................... 3 DANSK RESUME ....................................................................................................................... 5 2 INTRODUCTION .......................................................................................................... 7 2.1 Background .................................................................................................................
    [Show full text]
  • Wind Farm Wake Verification
    Copenhagen, 10 February 2015 Wind farm wake verification Support by Kurt S. Hansen Senior Scientist DTU Wind Energy – Fluid Mechanics Outline • Introduction wind turbine wakes; • Participants & models; • Results Simple wakes and moderate spacing; Wakes for small spacing and speed recovery; Wakes for variable spacing Wind farm clusters; Wake behind a large wind farm; • Discussion & acknowledgements; EERA-DTOC Final Conference, Copenhagen, 10th March 2015 2 Introduction wind turbine wakes 1. Basic wake deficit - pairs of wind turbines; a) Power deficit; b) Peak deficit vs turbulence; 2. Rows of turbines; a) Constant spacing (small or large); b) Speed recovery due to ”missing” turbines; 3. Wind farms with variable spacing; 4. Park efficiency; 5. Wind farm clusters = Farm – Farm wake EERA-DTOC Final Conference, Copenhagen, 10th March 2015 3 Wake deficit between pairs of wind turbines Definition of power deficit = 1 – power ratio = 1 – Pwake/Pfree Ambient EERA-DTOC Final Conference, Copenhagen, 10th March 2015 4 Wake deficit for turbines with constant spacing Increased sector, ∆ EERA-DTOC Final Conference, Copenhagen, 10th March 2015 5 Definition of park efficiency Park efficiency at 8 m/s & ∆=5° Definition of park efficiency ηpark : ηpark = <Pi>/Pref where Pref = undisturbed turbines <Pi>; i=3..8 otherwise: Pref = <Ptop 3> EERA-DTOC Final Conference, Copenhagen, 10th March 2015 6 Introduction to wind farms 1. Horns Rev I WF: 80 x Vestas V80 á 2MW Regular layout with 7D spacing; Well know dataset from other benchmarks; 2. Lillgrund WF: 48 x SWP-2.3-93 m Very dense wind farm with 3.3 and 4.3 D fixed spacing; Missing ”turbines” => speed recovery analysis; 3.
    [Show full text]
  • Structure, Equipment and Systems for Offshore Wind Farms on the OCS
    Structure, Equipment and Systems for Offshore Wind Farms on the OCS Part 2 of 2 Parts - Commentary pal Author, Houston, Texas Houston, Texas pal Author, Project No. 633, Contract M09PC00015 Prepared for: Minerals Management Service Department of the Interior Dr. Malcolm Sharples, Princi This draft report has not been reviewed by the Minerals Management Service, nor has it been approved for publication. Approval, when given, does not signify that the contents necessarily reflect the views and policies of the Service, nor does mention of trade names or commercial products constitute endorsement or recommendation for use. Offshore : Risk & Technology Consulting Inc. December 2009 MINERALS MANAGEMENT SERVICE CONTRACT Structure, Equipment and Systems for Offshore Wind on the OCS - Commentary 2 MMS Order No. M09PC00015 Structure, Equipment and Systems: Commentary Front Page Acknowledgement– Kuhn M. (2001), Dynamics and design optimisation of OWECS, Institute for Wind Energy, Delft Univ. of Technology TABLE OF CONTENTS Authors’ Note, Disclaimer and Invitation:.......................................................................... 5 1.0 OVERVIEW ........................................................................................................... 6 MMS and Alternative Energy Regulation .................................................................... 10 1.1 Existing Standards and Guidance Overview..................................................... 13 1.2 Country Requirements. ....................................................................................
    [Show full text]
  • At Horns Rev 3
    Horns Rev 3 Technical Project Description for the large-scale offshore wind farm (400 MW) at Horns Rev 3 7 Document no. 13/93461-2897, dated 28.04.2014 Table of Content 1. Introduction .............................................................................................. 4 2. Horns Rev 3 – Site Location ........................................................................ 5 2.1 Physical characteristics .................................................................... 7 2.2 Metocean characteristics .................................................................. 7 2.3 Geological Characteristics ................................................................ 9 3. Wind Farm Layout ................................................................................... 12 3.1 Approach to assess wind farm layout .............................................. 12 3.2 Layouts ....................................................................................... 12 4. Wind Turbines at Horns Rev 3 ................................................................... 19 4.1 Description .................................................................................. 19 4.2 Material ....................................................................................... 20 4.3 Lightning and marking .................................................................. 21 5. Foundations - wind turbines ...................................................................... 25 5.1 Driven steel monopile ..................................................................
    [Show full text]
  • Horns Rev 2 Offshore Wind Farm Main Suppliers and Partners
    Horns Rev 2 Offshore Wind Farm Main suppliers and partners About Ørsted Ørsted has a vision of creating a world that runs entirely on green energy. Ørsted develops, builds and operates offshore wind farms, bioenergy plants and innovative solutions that convert waste into energy and supplies its customers with intelligent energy products. Ørsted has 5,600 employees and is headquartered in Denmark. Read more at orsted.com Energinet Owner of offshore substation and export cable Siemens Gamesa Renewable Energy Supplier of wind turbines Aarsleff/Bilfinger Berger J.V. I/S (Bladt Industries A/S) Supplier of foundations A2SEA A/S Supplier of vessels for installation of wind turbines and foundations Semco Maritime A/S Supplier of accommodation platform Nexans Deutschland Industries GmbH & Co. KG Supplier of cables Visser & Smit Hanab bv (Global Marine Systems Ltd.) Supplier of cable installation Port of Esbjerg Installation and service harbour Ørsted Horns Rev 2 Offshore Wind Farm Contact us Kraftværksvej 53, Skærbæk Fiskerihavnsgade 8 Tel. +45 99 55 11 11 7000 Fredericia 6700 Esbjerg [email protected] Denmark Denmark www.orsted.com Horns Rev 2 Offshore Wind Farm 7 We want a world that runs entirely on green energy 93 metres 114 metres Cable station Blåbjerg 68 metres Technical key data Wind turbine type Siemens Gamesa Renewable Weight, nacelle 80 tonnes Energy, SWT 2.3-93 Weight, tower 92 tonnes Number of wind turbines 91 Weight, foundation 150-200 tonnes Wind turbine capacity 2.3MW Total weight of each wind turbine approx 400 tonnes Total wind
    [Show full text]
  • Final Info Packet
    INTERNATIONAL OFFSHORE WIND POLICY FORUM DELEGATE INFORMATION PACKET SEPTEMBER 8 - 10, 2015 THE INTERNATIONAL OFFSHORE WIND POLICY FORUM FOR MASSACHUSETTS ELECTED OFFICIALS TABLE OF CONTENTS SEPTEMBER 8 - 10, 2015 INTERNATIONAL OFFSHORE WIND POLICY FORUM Itinerary 4 Policy Forum Participants 7 Massachusetts Elected Officials 8 Company and Speaker Profiles 14 Copenhagen 20 Brande 21 Aarhus 22 Grenaa 23 Logistical Overview 24 Hotel Overview 24 Medical Insurance 24 Climate 25 Electronics 25 Mobile Devices 26 Currency & Finances 27 Emergency Contacts & Safety 27 ITINERARY SEPTEMBER 8 - 10, 2015 INTERNATIONAL OFFSHORE WIND POLICY FORUM MONDAY, SEPTEMBER 7, 2015 Travel to Copenhagen Dress: Casual Boston to Copenhagen Travel Arrangements TUESDAY, SEPTEMBER 8, 2015 Arrive in Copenhagen - Introductions & Welcome Dress: Business Casual NOON Arrival, Copenhagen 4:45PM Meet in hotel lobby and walk to welcome reception 5:00PM Welcome Reception Location: US Ambassador’s residence, Charlottenlund Speakers RUFUS GIFFORD US Ambassador MARTIN BÆK Climate and Energy Ministry MEMBER OF MA DELEGATION STEPHANIE MCLELLAN, Ph.D. Special Initiative on Offshore Wind, University of Deleware 7:30PM Dinner Location: Skovshoved Hotel Address: Strandvejen 267, 2920 Charlottenlund, Denmark Phone: +45 39 64 00 28 NIGHT Accomodation: Skovshoved Hotel Address: Strandvejen 267, 2920 Charlottenlund, Denmark Phone: +45 39 64 00 28 4 ITINERARY PAGE 2 OF 3 WEDNESDAY, SEPTEMBER 9, 2015 Travel to Grenaa & Aarhus - Offshore Wind Farm Tour and Facility Tour Dress: Casual 6:55AM
    [Show full text]
  • The World´S Largest Off-Shore Windfarm, Middelgrunden 40 Mw
    WORLD SUSTAINABLE ENERGY DAY 2001 WELS, AUSTRIA THE WORLD´S LARGEST OFF-SHORE WINDFARM, MIDDELGRUNDEN 40 MW Jens H. Larsen Copenhagen Environment and Energy Office (CEEO) ABSTRACT The Middelgrunden project is an offshore wind farm with a rated power capacity of 40 MW. The project consisting of 20 wind turbines at each 2 MW, is situated just 2 km outside the Copenhagen harbor on shallow water (3-5 meters deep). The wind farm is owned fifty/fifty by a wind energy cooperative and the Copenhagen Utility. This article summarizes the experiences from the planning of the project, and draws the perspectives for the future development of offshore wind power in Europe. Key words: windturbine cooperative, economic, offshore, foundation, environment, public awareness, renewable. The author is one of the promoter of the project and has been responsible for the preinvestigations and is now the projectleader for the windturbine cooperative. INTRODUCTION Today more than 100,000 Danish families are members of wind energy cooperatives and such owners have installed 86% of all Danish wind turbines. Until recently, the cooperatives were a very important and dominant factor in the development of the Danish wind energy sector (see figure 1). Since then, single person ownership has by far superseded the importance of the cooperatives. In the coming years the utilities are expected to play an increasing role in the establishment of large-scale offshore wind farms. The program of the Danish utilities alone has a total power of 750 MW within the next 8 years (The Offshore Wind-farm Working Group, 1997; Svenson et.
    [Show full text]
  • Wake Measurements from Horns Rev Final
    Wake measurements from the Horns Rev wind farm Leo E. Jensen, Elsam Engineering A/S Kraftvaerksvej 53, 7000 Fredericia Phone: +45 7923 3161, fax: +45 7556 4477 Email: [email protected] Christian Mørch, Elsam Engineering A/S Email: [email protected] Paul B. Sørensen, Elsam Engineering A/S Email: [email protected] Karl Henrik Svendsen, Vestas Wind Systems A/S Email: [email protected] Summary Horns Rev is a large offshore wind farm exposed to low turbulence flow. It has a layout and a location which makes it excellent for general studies of wake effects. Three met masts are installed around the wind farm area to study the recovery of the wake flow behind the wind farm and support the development of new scientific and engineering models for calculation of external wake effects from large offshore wind farms. All wind farm operation data is stored by a SCADA system. The SCADA system collects data from more than 200 sensors every 10 minutes. This data is used for the analysis of internal wake effects. Wind speed and turbulence has been analysed for three lines of turbines - two aligned and one diagonal line of turbines. The analysis shows that there is a large reduction in wind speed from the first turbine to the second in a row, but that the wind speed does not change much from the second to the tenth row. The wind data from the wake masts show that there is still a clear influence of the wind farm 6 km downstream on both mean wind speed and turbulence.
    [Show full text]