March-April-May
Total Page:16
File Type:pdf, Size:1020Kb
Fe IA-202 /81-7-2021-49(uut)/2017 T TET, 30T0 ITVA| T TT fÀPTI, gTUg TE, T Rorl-110002. TT5: fHi6 :|l 2021 fy7-410 yHoutocio, T faooi à faaRTe 3togo Fe-673/2018 TR HET, foo faarretT atoTO vio-673/2018 ufT 3TÈT 3Tr TfdT T U-AI HYI-q4 afea TE-HT, 2021 T. 2021 HRr% 4HTRT HTE ) FiAT-IULEI-202 (1)/81-7-2021-49(T4T) / 2017, TeteTs H0-vl35496/-4/3TRATREI /2020-21, fèHi 10.06.2021TTH FT1 3HIST HTRT THTE) 1 National Mission for Clean Ganga Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020) For the State of Uttar Pradesh March, 2021 - May, 2021 Overall status of the State: I. Total Population: Urban Population & Rural Population separately Urban Population- 4.5 Crore in 2011 Rural Population- 15.51 Crore in 2011 II. Estimated Sewage Generation (MLD): 5500 MLD III. Details of Sewage Treatment Plant: Existing no. of STPs and Treatment Capacity (in MLD): Total No. - 106 (103 operational + 03 Non-operational) Treatment Capacity - 3370. 87 MLD Capacity Utilization of existing STPs: 2630.558 MLD (78.03%) MLD of sewage being treated through Alternate technology: - Sewage of 97 drains of Agra, Mathura, Kanpur, Varanasi and Prayagraj is being treated through Bioremediation. Details submitted in Previous MPR (Dec. 20 – Feb. 21) Gap in Treatment Capacity in MLD: 677 No. of Operational STPs: 103 No. of Complying STPs: 91 No. of Non-complying STPs: 12 No. of Non-operational STPs - 03 Details of each existing, under construction and Sanctioned STPs in the State: Annexed as Annexure- I. 2 Details of Non-Complying STPs S.No. Name Operating Agency Details Present Status 1. Bingawan 210 MLD, U.P. Jal Nigam Notice issued As it is Kanpur 2. Jajmau, Kanpur 130 MLD U.P. Jal Nigam Pumped to irrigation As it is channel and it is further used in floriculture and horticulture 3. 13.59 MLD, Masani, U.P. Jal Nigam Rehab will be completed STPs are non-compliant due to Mathura by Apr – 2021 (HAM) ingression of untreated industrial effluent into the domestic sewage. As a result, the treated effluent parameters are higher than the prescribed standards. In this regard, Chief Engineer Agra, UPJN, Agra, has requested Chief Environmental Officer, UPPCB, Lucknow for taking adequate measures to stop the ingression of untreated industrial effluent into the domestic sewage vide his letter no. 1625/101/199 dated 12.05.2021. In addition to above, several correspondences in this regard have been made earlier to Regional Officer, UPPCB, Mathura vide letter no. 351/Namami Gange/187 dated 23.02.2021, 620/Namami Gange/513 dated 30.06.2020 and 1553/Namami Gange/217 dated 21.11.2020 of Project Manager, Drainage and Sewerage Unit, UPJN, Mathura, but no action has been taken. 4. 16 MLD, Trans Yamuna, U.P. Jal Nigam Rehab will be completed Laxmi Nagar, Mathura by Apr – 2021(HAM) Not related to UPJN 5. 14.5 MLD, Trans-yamuna, U.P. Jal Nigam Rehab will be completed Jamunapar, Mathura by Apr – 2021(HAM) 6. 13.5MLD STP at Mauja Nagar Palika - Umrain, Etawah Parishad, Etawah 7. 2.76 MLD Goverdhan STP, Nagar Palika E.C. imposed of Not related to UPJN Mathura Parishad Rs.100000/- dated 15.02.19 8. 5 MLD Hathia Nala, U.P. Jal Nigam O & M against contract in STP will be compliant by Nov- 3 S.No. Name Operating Agency Details Present Status Sultanpur One City-One Operator. 21 after the completion of rehab Rehab of STP will be works under One City-One completed by Nov – 2021 Operator. 9. 03 MLD STP Firozabad Jal Kal Not related to UPJN 10. 1.6 MLD Saifai, Etawah U.P. Jal Nigam - 11. 36 MLD (9 MLD CETP + U.P. Jal Nigam - 27 MLD STP) Kanpur 12. Jajmau, 43 MLD Kanpur U.P. Jal Nigam - Details of Non-Operational STPs S.No. Name Operating Agency Details UPJN comment 1. 20 MLD Moradabad MDA Not working due to lack of Not related to UPJN sewage 2. 10 MLD, Ganga Nagar, MDA Not related to UPJN Meerut 3. 4 MLD Kanwara Road, U.P. Jal Nigam LOA for Banda STP has been As it is. NOC from Banda issued to M/s Verdhmanh Railway Deptt is Engineering Works Pvt., Delhi likely to be given by Ltd. on 25.11.2020. Permission 06.06.2021. from Railway Deptt. for laying the rising main pipeline beneath the railway line is awaited. Upon receipt of of permission, it will take 45 days to complete the pipe laying work and making the STP operational IV. Details of Industrial Pollution: No. of industries in the State: 11,332 Red- 2058, Orange- 5068, Green - 4206 No. of water polluting industries in the State: 1648 (Grossly Polluting Industries) Quantity of effluent generated from the industries in MLD: 850.5 MLD Quantity of Hazardous Sludge generated from the Industries: 402336.478 MTA 4 Number of industrial units having ETPs: 1404 Number of industrial units connected to CETP: 514 (Most of Tannery Unit at Kanpur are presently closed) Number and total capacity of ETPs (details of existing/ under construction / proposed) Compliance status of the ETPs: 1078 Units out of 1108 Operational Units Complying Number and total capacity of CETPs (details of existing/ under construction / proposed) Number of existing CETP- 07 Capacity of CETP – 58.55 MLD No. of under construction CETP - 03 Capacity of under construction CETP – 26.65 MLD Status of compliance and operation of the CETPs Town Location of Existing Whether CETP Status (DPR/ CETP ETP Complying or not Proposed, if tendering/ Capacity any under construction/ ETC etc.) Ghaziabad Apparel Park 6 MLD Yes - - Tronica City CETP, Phase-I (for textile units), Ghaziabad Mathura CETP, Industrial 6.25 MLD No - Upgradation Area, Site-A, proposed under Mathura Closure order issued Namami Gange on dated 17.05.2021 Project for ZLD. along with show cause for EC Rs. 40,20,000/- Ghaziabad CETP, HPDA, 2.1 MLD Yes - - Pilkhaun, Hapur Kanpur CETP, UPSIDC 1.5 MLD Yes - - Textile Complex, Rooma, Kanpur (for textile units) 5 Kanpur CETP Jajmau, 36 MLD No New 20 MLD Kanpur CETP is under construction & to be completed by Dec, 2021- Unnao Banther Industrial 4.5 MLD Yes DPR Sanctioned Pollution Control by NMCG for Co. CETP, Banther, construction of Unnao new CETP of capacity 4.5 MLD Unnao Unnao Tanneries 2.15 MLD Yes DPR Sanctioned Pollution Control by NMCG for Company (CETP) construction of Site-II, Unnao new CETP of capacity 2.15 MLD Town No. of Industrial Status of ETPs Status of CETPs (existing, industries under construction & proposed) discharge State of U.P. 1108 779.639 MLD Installed and Operational As Above Operational V. Solid Waste Management: Total number of Urban Local Bodies and their Population Urban Local Bodies- 651 Urban Population – 4.5 Crore Current Municipal Solid Waste Generation- 14468 TPD approx. Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc No. of MSW processing facilities- 16 Plants (all are compost plant) Installed Capacity- 5,475 TPD Utilization of existing MSW processing facilities- 5,475 TPD (100%) 6 Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if Gap > 20%) - NA No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction) 1. C& D Waste Processing Facilities Noida Facility of 300 MTD has come into operation since 05-10-2020. (Sector-81) Ghaziabad (Hindon Vihar) Facility of 400 MTD is functional. Rapid Railway Project from The National Capital Region Transportation Delhi to Meerut Corporation is installing C & D Waste Management Facility of 150 TPD at Ghaziabad. Expected to be commissioned by September, 2020. Lucknow, Agra, Varanasi, Funds @ Rs. 1.5 Crore/City released to concerned Kanpur & Prayagraj Municipal Corporation. Expected to be commissioned by March, 2022. Meerut C & D Waste Management Facility is to be developed in 2 years. Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation at source Total no. of wards - 12022 No. of wards having door to door collection service - 12022 (100%) No. of wards practicing segregation at source – 8294 Details of MSW treatment facilities proposed and under construction (no., capacity, and technology): Proposed Number, Place and Capacity Completion Date Plants to be made 01 plant with 80 TPD (Jaunpur) made operational by functional. 31.03.2022 01 Plants with 35 TPD (Fatehpur) Plants to be made 07 Plants with 860 TPD (Sambhal, operational by Badaun, Mirzapur, Balia, Rampur, 7 31.03.2022 Jhansi & Meerut) (Arbitration complete) Plants under land 08 Plants with 930 TPD (Bareilly, dispute to be Firozabad, Loni, Nazibabad, Bhadohi, resolved and Basti, Gorakhpur, Akbarpur) commissioned Bareily, Firozabad, Loni the land has been found and the construction of plant is under progress (45%) in Loni for Bareily and Firozabad, Bhadohi, the tender process is going on. For Basti the land identified is not appropriate and under progress to make it suitable. For Gorakhpur the 75% land acquisition process is completed. DPR is under preparation, the soil testing is done. Akbarpur the Land has been identified. New plants 37 Plants with 3,170 TPD sanctioned to be completed by March, 2022 It is targeted that all smaller ULBs (approximately 450) that generate less than 10 TPD of solid waste establish composting facility for processing by December, 2022. No. and area (in acres) of uncontrolled garbage dumpsites and Sanitary Landfills.- No.