July 12, 2018 FCC FACT SHEET* Accelerating Wireline Broadband

Total Page:16

File Type:pdf, Size:1020Kb

July 12, 2018 FCC FACT SHEET* Accelerating Wireline Broadband July 12, 2018 * FCC FACT SHEET Accelerating Wireline Broadband Deployment by Removing Barriers to Infrastructure Investment; Accelerating Wireless Broadband Deployment by Removing Barriers to Infrastructure Investment Third Report and Order and Declaratory Ruling - WC Docket No. 17-84; WT Docket No. 17-79 Background: This Third Report and Order would adopt a new framework for the vast majority of pole attachments governed by federal law by instituting a “one-touch make-ready” (OTMR) regime, in which the new attacher may opt to perform all work to prepare a pole for a new attachment. OTMR should accelerate broadband deployment and reduce costs by allowing the party with the strongest incentive to prepare the pole to efficiently perform the work itself. This Declaratory Ruling would conclude that section 253(a) of the Communications Act prohibits state and local moratoria on telecommunications facilities deployment. What the Report and Order Would Do: • Permit new attachers to elect an OTMR process for simple make-ready for wireline attachments in the “communications space” on a pole. o Establish safeguards in the OTMR process to promote coordination among the parties and ensure that new attachers perform work safely and reliably. o Retain a multi-party process for other new attachments where safety and reliability risks are greater, while making some modifications to speed deployment. • Codify the Commission’s existing precedent that permits attachers to “overlash” existing wires without first seeking the utility’s approval while allowing the utility to request reasonable advance notice of overlashing. • Eliminate outdated disparities between the pole attachment rates incumbent carriers must pay compared to other similarly-situated cable and telecommunications attachers. • Make clear that the FCC will preempt, on an expedited case-by-case basis, state and local laws that inhibit the rebuilding or restoration of broadband infrastructure after a disaster. What the Declaratory Ruling Would Do: • Conclude that state and local moratoria on telecommunications services and facilities deployment are barred by section 253(a) of the Communications Act because they “prohibit or have the effect of prohibiting the ability of any entity to provide any interstate or intrastate telecommunications service.” o Define “moratoria” barred by section 253(a) to include both express moratoria and de facto moratoria that effectively halt or suspend the acceptance, processing, or approval of applications or permits. • Determine that moratoria are generally not protected by the exceptions to the section 253(a) prohibition. • Direct the Wireline Competition Bureau and Wireless Telecommunications Bureau to act promptly on petitions challenging specific alleged moratoria. * This document is being released as part of a “permit-but-disclose” proceeding. Any presentations or views on the subject expressed to the Commission or its staff, including by email, must be filed in WC Docket No. 17-84, which may be accessed via the Electronic Comment Filing System (https://www.fcc.gov/ecfs/). Before filing, participants should familiarize themselves with the Commission’s ex parte rules, including the general prohibition on presentations (written and oral) on matters listed on the Sunshine Agenda, which is typically released a week prior to the Commission’s meeting. See 47 CFR § 1.1200 et seq. Federal Communications Commission FCC-CIRC1808-03 Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of ) ) Accelerating Wireline Broadband Deployment by ) WC Docket No. 17-84 Removing Barriers to Infrastructure Investment ) ) Accelerating Wireless Broadband Deployment by ) WT Docket No. 17-79 Removing Barriers to Infrastructure Investment ) THIRD REPORT AND ORDER AND DECLARATORY RULING* Adopted: [] Released: [] By the Commission: TABLE OF CONTENTS Para. I. INTRODUCTION .................................................................................................................................. 1 II. BACKGROUND .................................................................................................................................... 5 III. REPORT AND ORDER ...................................................................................................................... 13 A. Speeding Access to Poles ............................................................................................................... 14 1. New OTMR-Based Pole Attachment Process ......................................................................... 16 2. Targeted Changes to the Commission’s Existing Pole Attachment Process ........................... 71 3. Treatment of Overlashing ...................................................................................................... 107 B. New Attachers are Not Responsible for Preexisting Violations .................................................. 112 C. Addressing Outdated Rate Disparities ......................................................................................... 114 D. Other Pole Attachment Issues ...................................................................................................... 121 E. Legal Authority ............................................................................................................................ 126 F. Rebuilding and Repairing Broadband Infrastructure After Disasters .......................................... 129 IV. DECLARATORY RULING .............................................................................................................. 130 A. Background .................................................................................................................................. 131 B. Discussion .................................................................................................................................... 134 1. Moratoria Violate Section 253(a) .......................................................................................... 135 2. Moratoria Are Generally Not Protected Under the Section 253(b) and (c) Exceptions ........ 143 * This document has been circulated for tentative consideration by the Commission at its August 2018 open meeting. The issues referenced in this document and the Commission’s ultimate resolution of those issues remain under consideration and subject to change. This document does not constitute any official action by the Commission. However, the Chairman has determined that, in the interest of promoting the public’s ability to understand the nature and scope of issues under consideration, the public interest would be served by making this document publicly available. The FCC’s ex parte rules apply and presentations are subject to “permit-but-disclose” ex parte rules. See, e.g., 47 C.F.R. §§ 1.1206, 1.1200(a). Participants in this proceeding should familiarize themselves with the Commission’s ex parte rules, including the general prohibition on presentations (written and oral) on matters listed on the Sunshine Agenda, which is typically released a week prior to the Commission’s meeting. See 47 CFR §§ 1.1200(a), 1.1203. Federal Communications Commission FCC-CIRC1808-03 3. Authority to Act..................................................................................................................... 151 V. PROCEDURAL MATTERS .............................................................................................................. 159 VI. ORDERING CLAUSES ..................................................................................................................... 163 APPENDIX A – Final Rules APPENDIX B – Final Regulatory Flexibility Analysis I. INTRODUCTION 1. Today, we continue our efforts to promote broadband deployment by speeding the process and reducing the costs of attaching new facilities to utility poles.1 Now, more than ever, access to this vital infrastructure must be swift, predictable, safe, and affordable, so that broadband providers can continue to enter new markets and deploy facilities that support high-speed broadband. Pole access also is essential to the race for 5G because mobile and fixed wireless providers are increasingly deploying innovative small cells on poles and because these wireless services depend on wireline backhaul.2 Indeed, an estimated 100,000 to 150,000 small cells will be constructed by the end of 2018, and these numbers are projected to reach 455,000 by 2020 and 800,000 by 2026.3 2. In today’s order, we take one large step and several smaller steps to improve and speed the process of preparing poles for new attachments, or “make ready.” 4 Make-ready generally refers to the modification or replacement of a utility pole, or of the lines or equipment on the utility pole, to accommodate additional facilities on the pole. Consistent with the recommendations of the Broadband Deployment Advisory Committee (BDAC),5 we fundamentally shift the framework for the vast majority of attachments governed by federal law by adopting a new pole attachment process that includes “one- touch make-ready” (OTMR), in which the new attacher performs all make-ready work. OTMR speeds and reduces the cost of broadband deployment by allowing the party with the strongest incentive —the new attacher—to prepare the pole quickly to perform all of the work itself, rather than spreading the work across multiple parties. By some estimates, OTMR alone could result in approximately 8.3 million incremental premises passed with fiber and about $12.6 billion in
Recommended publications
  • Bellsouth V. Louisville
    Case 3:16-cv-00124-DJH Document 91 Filed 08/16/17 Page 1 of 14 PageID #: 1189 UNITED STATES DISTRICT COURT WESTERN DISTRICT OF KENTUCKY LOUISVILLE DIVISION BELLSOUTH TELECOMMUNICATIONS, LLC, Plaintiff, v. Civil Action No. 3:16-cv-124-DJH LOUISVILLE/JEFFERSON COUNTY METRO GOVERNMENT, et al., Defendants. * * * * * MEMORANDUM OPINION AND ORDER This case centers on a dispute over access to utility poles in Louisville, Kentucky. In February 2016, the Louisville Metro Council enacted a “one-touch make-ready” ordinance outlining new procedures for the installation of communications networks on utility poles in the city. Make-ready work generally consists of moving or rearranging existing wires and attachments on utility poles to make space for new attachments. One-touch make-ready policies, such as the one implemented by the Louisville Metro ordinance at issue here, seek to avoid delays by having all make-ready work performed at the same time by a single crew. Plaintiff BellSouth Telecommunications, LLC (AT&T) disputes Defendant Louisville Metro’s right to permit new users of utility poles to rearrange existing attachments on the poles in order to complete their own make-ready work. Pending before the Court are cross-motions for summary judgment. (Docket Nos. 40, 53) AT&T requests that the Court declare the ordinance unlawful and enjoin its enforcement. (D.N. 40-1, PageID # 384) Louisville Metro insists that the ordinance is a valid exercise of its authority to manage public rights-of-way. (D.N. 53-1, PageID # 498) The Court heard oral argument on the cross-motions on April 25, 2017.
    [Show full text]
  • In the Chancery Court of Tennessee Twentieth Judicial District Davidson County
    IN THE CHANCERY COURT OF TENNESSEE TWENTIETH JUDICIAL DISTRICT DAVIDSON COUNTY NASHVILLE ELECTRIC SERVICE, ) ) Plaintiff, ) ) v. ) Case No. _______________ ) Chancellor ______________ ACCESS FIBER GROUP, INC.; AMERICAN ) FIBER SYSTEMS, INC.; BELLSOUTH ) TELECOMMUNICATIONS, LCC; ) COMCAST OF NASHVILLE I, LLC; ) CROWN CASTLE NG CENTRAL, LLC; ) DUKENET COMMUNICATIONS, LLC; ) EXTENET SYSTEMS, INC.; GOOGLE ) FIBER TENNESSEE, LLC; LEVEL 3 ) TELECOM OF TENNESSEE, LLC; ) METROPOLITAN GOVERNMENT OF ) NASHVILLE AND DAVIDSON COUNTY, ) TENNESSEE; TENNESSEE TELEPHONE ) COMPANY; WINDSTREAM KDL, ) LLC; and ZAYO GROUP, LLC, ) ) Defendants / Parties-In-Interest. ) REQUEST FOR DECLARATORY RELIEF Plaintiff Nashville Electric Service states as follows for its request for declaratory relief involving Access Fiber Group, Inc., American Fiber Systems, Inc., Bellsouth Telecommunications, LLC, Comcast of Nashville I, LLC, Crown Castle NG Central, LLC, DukeNet Communications, LLC, ExteNet Systems, Inc., Google Fiber Tennessee, LLC, Level 3 Telecom of Tennessee, LLC, Metropolitan Government of Nashville and Davidson County, Tennessee, Tennessee Telephone Company, Windstream KDL, Inc., and Zayo Group, LLC: INTRODUCTION 1. This action is the result of the direct conflict between prior agreements entered into by NES (the “Agreements”) and the recently-enacted One Touch Make Ready Ordinance (the “OTMR Ordinance”). NES is asking this Court to declare its rights and obligations in light of that conflict in an effort to avoid a potential breach and piecemeal, protracted, and expensive litigation. 2. Due to regulations related to the attachment of equipment on poles and engineering requirements for the maintenance of those poles, when a new entity wishes to attach its equipment to a pole, prior attachments often must be moved to make room for the new attachments (“Make Ready Work”).
    [Show full text]
  • One Touch Make Ready Hot Topic.Indd
    ONE TOUCH MAKE READY IS A “HOT” TOPIC “Dig once” policies, which involve laying conduit or can subsequently attach its wires, cables or fi bers. The fi ber optic cables underground, have been hailed as process can often take months. excellent strategies due to their time-and cost-saving Under OTMR, the new provider is given permission to features. The idea has strong bipartisan support in either rearrange ALL of the other existing providers’ Congress and has been praised by the American Cable wires, cables and fi bers itself, or hire a qualifi ed Association, the Fiber to the Home (FTTH) Council, contractor to do so. As a result, all of the attachments and Next Century Cities (which focuses on supporting can be rearranged at the same time. communities in their goal to ensure fast, aff ordable, and reliable Internet service). Proponents of OTMR cite its cost-saving advantages, as well as reduced work crew noise and disruptions to However, a more recent strategy, called “one touch neighborhoods, traffi c backup, and temporary service make ready” (OTMR), while being hailed by some interruptions for residents. The most signifi cant benefi t stakeholders as an equally wise concept, is getting they cite, though, is the fact that new providers are able some pushback. to attach their wires, cables or fi ber much faster than Hogan Lovells, LLP, an international law fi rm focusing before, cutting the time it takes for residents to receive on corporate law, noted in a recent blog that, “We new services from several months to sometimes just a often take for granted the ability to leave home, head few weeks.
    [Show full text]
  • Background One Touch Make Ready
    DISCLAIMER: This document is intended to be a tool for education and information. It offers ​ a list and summary of applicable state legislation that Next Century Cities is aware of. This document is not intended to provide legal advice, or to be a legal analysis or a comprehensive list of all relevant statutes. We offer these links and information for illustration and reference purposes only, as a starting point for analysis by interested parties. We note also that practice in the field can sometimes differ from the language of a statute. Background Utility poles have become one of the great battlegrounds in the effort to expand next- generation internet network infrastructure deployment. Pole access determines whether a new provider is able to easily and cost effectively bring broadband infrastructure to a community. This in turn plays a significant role in the level of competition, and the services available to local businesses and residents. However, gaining access to these poles is often a long, difficult, and expensive process, making the barrier to entry incredibly high. A significant portion of utility poles are not owned by municipal governments, but rather by electric utilities or telecommunications companies. When a new provider enters the market, they must contact the owner of each utility pole to which they would like to attach. Each company with pre-existing wires or attachments on the pole must then be asked to perform “make ready” work. For a pole to be made ready, the owner of each attached wire must separately visit the pole and, if necessary, move its wire to create space for the new provider.
    [Show full text]
  • 1 November 2015 Competition in Broadband and Video Programming
    ROLE OF STATE AND LOCAL GOVERNMENTS IN SIMPLIFYING THE MAKE- READY PROCESS FOR POLE ATTACHMENTS November 2015 EXECUTIVE SUMMARY Competition in broadband and video programming brings consumers better service at lower prices. Competition, in turn, comes from service providers deploying communications networks. Like any other major construction project, however, the process of deploying new broadband facilities on utility poles can be disruptive. The flow of both sidewalk and road traffic can be disturbed, work can be noisy, and construction equipment can be an eyesore. Existing federal and state laws and regulations give certain communications service providers the right to attach their network lines to existing poles owned by electric utilities and incumbent local telephone companies.1 These laws and regulations govern the access rights and obligations of pole owners on the one hand, and communications attachers such as cable operators, competitive carriers, and broadband providers on the other. But they do not address a concern that arises in just about every community—how to effectively, efficiently, and safely manage use of the public rights- of-way. One way for municipalities to reduce the inconveniences that accompany deployment of modern broadband networks is to adopt “one touch” make-ready policies. “Make-ready” is the process by which a pole owner and communications attachers prepare a utility pole for a new attachment of fiber, cable, or other equipment. Traditionally, each communications attacher comes to the site with a construction crew and relocates its own attachment on a pole to make room for the new attacher. This results in a utility pole and its surrounding area becoming a construction site several times over, just for the deployment of a single new broadband or video programming network.
    [Show full text]
  • STATE of NEW YORK PUBLIC SERVICE COMMISSION at A
    STATE OF NEW YORK PUBLIC SERVICE COMMISSION At a session of the Public Service Commission held in the City of Albany on March 14, 2019 COMMISSIONERS PRESENT: John B. Rhodes, Chair Gregg C. Sayre Diane X. Burman James S. Alesi CASE 16-M-0330 - Petition of CTIA – The Wireless Association to Initiate a Proceeding to Update and Clarify Wireless Pole Attachment Protections. ORDER APPROVING PETITION IN PART AND CONTINUING PROCEEDING (Issued and Effective March 14, 2019) BY THE COMMISSION: INTRODUCTION On May 20, 2016, CTIA – The Wireless Association (CTIA) filed a Petition1 pursuant to Public Service Law (PSL) §119-a requesting that the Commission: (1) grant wireless carriers non-discriminatory access to utility poles; (2) establish and enforce timelines for entering into access agreements, completing the permitting and make-ready review processes, and granting final approval to wireless attachers; (3) extend its expedited dispute resolution process to wireless attachers; (4) adopt a rate methodology for wireless attachers; and, (5) adopt other pro-competitive policies, if necessary. 1 Case 16-C-0330, Petition of CTIA - The Wireless Association to Update and Clarify Wireless Pole Attachment Protections (filed May 20, 2016) (Petition). CASE 16-M-0330 Under 47 U.S.C. §224(c), States are permitted to exercise authority to regulate pole attachments in place of the Federal Communications Commission (FCC); and New York has in fact exercised its jurisdiction over pole attachment issues through the reverse-preemption mechanism allowed under that federal statute.2 The Commission, therefore, takes steps here to provide wireless providers with reasonable and equitable access to utility pole infrastructure located in the public rights-of- way (ROW).
    [Show full text]
  • Friday-August-3-2018
    Click here for the online version. This e-mail was created for [email protected] Friday, August 3, 2018 Volume 6 | Issue 151 FCC Makes One-Touch Make-Ready a Reality By Leslie Stimson, Inside Towers Washington Bureau Chief FCC Commissioners Michael O’Rielly, Brendan Carr and Jessica Rosenworcel The FCC passed a one-touch make-ready (OTMR) policy for utility pole attachments yesterday, saying the update will speed the safe and affordable deployment of broadband wireless infrastructure. The change will allow one attacher, usually the last, to perform all the work for the new attachment; it provides for a remedy if an original attacher is unhappy with the outcome. Pole overlashing of existing wires is allowed, without first seeking the utility’s approval, so all pole space can be efficiently used. It ensures telecoms pay rates comparable to cable and other industries for pole use. The Report and Order makes clear the FCC will preempt, on a case-by-case basis, existing local laws, to allow providers access to poles for restoration work after a disaster. A declaratory ruling emphasizes the Telecommunications Act bans state and local moratoria that prevents wireless infrastructure deployment. Commissioner Michael O’Rielly said during the vote that while many localities “get kudos” for making the broadband deployment process more efficient, some state and local governments delay projects and use pole attachment rates as “shakedown bounties.” He said: “State and local governments have been on notice for decades. Congress wants them to stop making decisions based on aesthetics.” (For industry reaction, see story below: “Industry Applauds FCC ‘Keeping Foot on The Gas’ for OTMR”) Continue Reading NATE Members Log In About the Late Payment Issue Inside Towers asked the National Tower Erectors Association what members had to say about payments for tower work being stretched out from 90 to 120 days on average.
    [Show full text]
  • Before the STATE of CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY
    Before the STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY ) PURA Investigation of Developments ) Docket No. 19-01-52 in the Third Party Pole Attachment Process ) ) COMMENTS OF CTIA CTIA1 respectfully submits its comments in response to the Connecticut Public Utilities Regulatory Authority’s (“Authority’s”) Notice of Request for Written Comments entered July 22, 2019 (the “July Notice”) in the above-captioned docket. I. INTRODUCTION The July Notice references suggestions from commenters that the Authority consider allowing applicants to perform some or all of the survey and make-ready phases of the pole attachment process using approved contractors. The July Notice also states that the Authority is considering adopting such an approach, and requests proposals for modifying the existing attachment process.2 CTIA appreciates the Authority’s attention to this issue, as the existing attachment process3 is failing, threatening state deployment goals. The Authority’s process for small cell approvals is working well, but those approvals are of little value if approval of the applications to connect the fiber associated with small cells is delayed. The Authority’s focus on the survey and 1 CTIA – The Wireless Association (“CTIA”) (www.ctia.org) represents the U.S. wireless communications industry and the companies throughout the mobile ecosystem that enable Americans to lead a 21st century connected life. The association’s members include wireless carriers, device manufacturers, and suppliers as well as app and content companies. CTIA vigorously advocates at all levels of government for policies that foster continued wireless innovation and investment. The association also coordinates the industry’s voluntary best practices, hosts educational events that promote the wireless industry and co-produces the industry’s leading wireless tradeshow.
    [Show full text]
  • Kentucky Power Reply Comments.Pdf
    DELIVERED VIA EMAIL October 19, 2020 Kentucky Public Service Commission Administrative Regulations Working Group P.O. Box 615 Frankfurt, Kentucky 40602-0615 [email protected] RE: Kentucky Power Company’s Reply Comments regarding Proposed Chapter 807 KAR 5:0XX, Access and Attachments to Utility Poles and Facilities Dear Sir or Madam: Kentucky Power Company (“Kentucky Power” or the “Company”) hereby respectfully submits the following reply comments regarding proposed Chapter 807 KAR 5:0XX, Access and Attachments to Utility Poles and Facilities. Kentucky Power appreciates the Public Service Commission of Kentucky’s (“Commission”) consideration of Kentucky Power’s suggestions below as the Commission finalizes utility pole attachment rules for the Commonwealth. 807 KAR 5:0XX – Section 1. Definitions. Section 1(9) The Commission’s proposed Section 1(9) definition of a “new attacher” expressly (and correctly) excludes “a utility with an applicable joint use agreement with the utility that owns or controls the pole to which it is seeking to attach.” AT&T proposes to delete this important exclusion and, more broadly, to “expressly mandate non-discriminatory pricing, even for entities that have or had joint use agreements…” AT&T Comments at 1. In other words, AT&T is proposing that the Commission replace the long-standing cost sharing arrangements between telephone and electric utilities (joint use agreements) with the tariffed rate. The Commission should reject AT&T’s proposal because it is anti-competitive, because it would be operationally disruptive, and because it would shift significant costs to electric utilities’ customers. As set forth in Kentucky Power’s initial comments, the vast majority of ILEC networks have already been deployed through joint use agreements.
    [Show full text]
  • Centurylinktm
    CenturyLinkTM Pamela Sherwood Hollick Assistant General Counsel 4625 W 86 th Street Suite 500 Indianapolis, IN 46268 Telephone: 317.713.8977 [email protected] January 13, 2020 VIA Email for Electronic Filing: [email protected] Honorable Michelle L. Phillips Secretary New York State Public Service Commission Three Empire State Plaza Albany, New York 12223-1350 Re: Case 16-M-0330 – Initial Comments of CenturyLi nk Communications, LLC, Level 3 Communications, LLC, Broadwing Communications, LLC, WilTel Communications, LLC, Global Crossing Telecommunications, Inc., Global Cr ossing Local Services, Inc., TelCove Operations, LLC, and Level 3 Telecom of New York LL C (the “CenturyLink Operating Companies”) Dear Secretary Phillips: On behalf of the CenturyLink Operating Companies, e nclosed please find the above-referenced Initial Comments for filing with the Commission. Please acknowledge receipt and acceptance of this f iling. Should you have any questions concerning this filing, please do not hesitate to contact the undersigned. Respectfully submitted, Pamela Sherwood Hollick Assistant General Counsel Enc. BEFORE THE STATE OF NEW YORK PUBLIC SERVICE COMMISSION ) Petition of CTIA - The Wireless ) Association to Update and Clarify ) Wireless Pole Attachment Protections ) Case No. 16-M-0330 ) INITIAL COMMENTS OF CENTURYLINK ON WIRELINE POLE ATTACHMENT ISSUES IDENTIFIED IN THE COMMISSION’S NOVEMBER 12, 2019 NOTICE SEEKING COMMENTS On November 12, 2019, the New York Public Service Commission (“Commission”) issued a Notice Seeking Comments in the above referenced docket, which has been expanded to include not only wireless pole attachment protections, but also wireline pole attachment issues. In its Order, the Commission directed further consideration be given to both wireless and wireline attachment policies, including improvements to streamline the make-ready, survey and construction processes.
    [Show full text]
  • February 5, 2020 Via ECFS Marlene J. Dortch, Secretary Federal
    1001 G Street, N.W. Suite 500 West Washington, D.C. 20001 tel. 202.434.4100 fax 202.434.4646 Writer’s Direct Access Timothy A. Doughty (202) 434-4271 d o u g h t y @ k h l a w. c o m February 5, 2020 Via ECFS Marlene J. Dortch, Secretary Federal Communications Commission Office of the Secretary 445 12th Street SW Washington, DC 20554 Re: The Potomac Edison Company’s Answer to Complainant Verizon Maryland LLC’s Pole Attachment Complaint (Proceeding Number 19- 355; Bureau ID Number EB-19-MD-009) Ms. Dortch: Please find attached the Public Version of The Potomac Edison Company’s Answer to Complainant Verizon Maryland LLC’s Pole Attachment Complaint in Proceeding Number 19- 355; Bureau ID Number EB-19-MD-009. Sincerely, Timothy A. Doughty Attorney for The Potomac Edison Company Enclosures cc: Rosemary McEnery, Enforcement Bureau Anthony DeLaurentis, Enforcement Bureau Washington, D.C. Brussels San Francisco Shanghai Paris This document was delivered electronically. www.khlaw.com PUBLIC VERSION Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 _____________________________________ ) ) Verizon Maryland LLC, ) Complainant, ) ) Proceeding Number 19-355 v. ) Bureau ID Number EB-19-MD-009 ) The Potomac Edison Company, ) Defendant ) _____________________________________ ) TO: ENFORCEMENT BUREAU THE POTOMAC EDISON COMPANY’S ANSWER TO THE POLE ATTACHMENT COMPLAINT OF VERIZON MARYLAND LLC Robert M. Endris Thomas B. Magee FirstEnergy Service Company Timothy A. Doughty 76 S. Main St. Keller and Heckman LLP Akron, OH 44308 1001 G Street NW (330) 384-5728 (phone) Suite 500 West (330) 384-3875 (fax) Washington, DC 20001 [email protected] (202) 434-4100 (phone) (202) 434-4100 (fax) [email protected] [email protected] Attorneys for The Potomac Edison Company Dated: February 5, 2020 PUBLIC VERSION SUMMARY There are numerous reasons why Verizon’s Complaint is unfounded, requiring either the Complaint to be dismissed or the relief it requests otherwise to be denied.
    [Show full text]
  • PLUS: Special Section on ACAM/CAF • Maximize Opportunities • Deliver
    Volume XI, Issue 2 walkerfirst.com/skinny-wire Logistics Solutions for Telecom Professionals PLUS: Special section on ACAM/CAF • Maximize opportunities • Deliver profitable services • Partner selection criteria • and MORE! Give your data centers an extra edge… The 1FINITY Transport Series Open, Disaggregated 1RU Blades for Data Center Interconnect (DCI) If you’re looking to control the cost of space and power as you plan for future bandwidth growth, 1FINITY™ Transport blades cut through these challenges. For open-source, pay-as-you-grow architecture and dependable, disruption-free service, choose a flexible, simple, efficient 1FINITY solution. Forge a DCI solution that’s right for your business. Talk with Fujitsu. Or find out more on the Web by visiting us.fujitsu.com/telecom. 1FINITY T100 1FINITY T400 The 1FINITY T100 blade is the key to dense, The 1FINITY T400 blade is a 1 Tbps Layer 1 efficient transponding of 100 GbE connections aggregator supporting 10 x 100G-BaseR service onto a DWDM system. With this solution, interfaces and 25 x 40 GbE client interfaces. An eight 100 GbE connections are transponded optional 4:1 breakout cable can also be used to onto four 200 Gbps wavelengths. The T100 reach 100 x 10 GbE interfaces on the client side. provides industry-leading density in a modular The T400 combines with the 1FINITY T100 platform that is easily managed with an SDN for data center interconnect, delivering network controller. industry-best aggregation density. Fujitsu Network Communications • 2801 Telecom Parkway, Richardson, TX 75082 Tel: 888.362.7763 © Copyright 2017 Fujitsu Network Communications, Inc. FUJITSU (and design)® and “shaping tomorrow with you” and 1FINITY™ are trademarks of Fujitsu Limited in the United States and other countries.
    [Show full text]