1377The Queensway

Total Page:16

File Type:pdf, Size:1020Kb

1377The Queensway THE QUEENSWAY G A R D I N E R EXPRESSWAY AVAILABLE THE QUEENSWAY FOR SALE / LEASE 1377 ETOBICOKE, ON 196,190 sf over 3 floors | Cold Storage Facility For more information, please contact: Partnership. Performance. Ryan G. Cunningham* Principal 905.283.2384 [email protected] *Sales Representative THE QUEENSWAY Property Details ETOBICOKE, ON COLD STORAGE FACILITY 1377 BUILDING 196,190 sf AREA Across 3 floors GARDINER EXPRESSWAY LOT SIZE 3.09 acres OFFICE 3%, Over 2 floors AREA COLD 97%, Temperature, -5 F STORAGE SHIPPING 17 Truck Level, 4 Drive-In CLEAR 13’ 6” - 14’ 6” HEIGHT ELEVATOR 2 Freight POWER 2,000 amps BAY SIZE 18’ x 18’ ASKING PRICE ASKING NET RATE $25,000,000 $10.00 psf $ REALTY TAX (2019) $TBD per annum COMMENTS • Last mile distribution THE QUEENSWAY • Cold storage facility • Prime redevelopment site • Signage / Exposure on Q.E.W. / Gardiner THE QUEENSWAY COLD STORAGE FACILITY FOR SALE OR LEASE 1377 ETOBICOKE, ON CITY OF TORONTO Zoning E 1.0 | EMPLOYMENT INDUSTRIAL ZONE Uses Permitted with specific conditions • Lawfully Existing Place of Worship • Financial Institution • Body Rub Service • Retail Service • Sorting Activities (Recyclable Materials) • Industrial Sales and Service • Cogeneration Energy • Take-out Eating Establishment • Animal Shelter / Kennel / Pet Services • Laboratory • Crematorium • Transportation Use • Ambulance Depot / Police Station / • Light Manufacturing Uses • Drive Through Facility • Vehicle Depot Fire Hall • Office • Eating Establishment • Vehicle Fuel Station • Artist Studio / Performing Arts Studio • Park • Medical Marihuana Production Facility • Vehicle Repair Shop • Automated Banking Machine • Printing Establishment • Metal Factory involving Forging & • Vehicle Service Shop • Bindery • Production Studio Stamping • Vehicle Washing Establishment • Carpenter’s Shop • Public Works Yard • Open Storage • Retail Store • Cold Storage • Service Shop • Public Utility • Shipping Terminal • Contractor’s Establishment • Software Development and • Recovery Facility • Custom Workshop Processing • Recreation Use • Dry Cleaning or Laundry Plant • Warehouse • Renewable Energy • Wholesaling Use THE QUEENSWAY COLD STORAGE FACILITY FOR SALE OR LEASE 1377 ETOBICOKE, ON Floor Plan FIRST FLOOR SECOND FLOOR THIRD FLOOR THE QUEENSWAY COLD STORAGE FACILITY FOR SALE OR LEASE Create map style 1377 ETOBICOKE, ON Search Address Adjust density of features 110C AMENITIES 110 Transit & Amenities AB WITHIN 5 KMS Roads ISLINGTON AVE 15 Landmarks DUNDAS ST W KIPLING AVE Labels $ 85 BANKS THE QUEENSWAY Select theme THE QUEENSWAY 1377 ETOBICOKE, ON 93 RESTAURANTS THE QUEENSWAY Standard 427 ROYAL YORK BLVD Silver N QUEEN ST 116 EVANS AVE RETAIL STORES Retro THE QUEENSWAY KIPLING AVE THE WEST MALL Gardiner Expressway EVANS AVE MIMICO HORNER AVE GO STATION 51 Dark GAS STATIONS 15 Night QEW Aubergine 110 TRANSIT HORNER AVE 1 ROUTES BROWN’S LINE 15 Evans (TTC) to Sherway Gardens Lakeshore Boulevard W 110C Islington (TTC) to Islington Station GREAT ACCESSIBILITY | CONVENIENT TRAVEL TIMES 110AB Islington (TTC) 110 AB to Longbranch GO DISTANCES FROM minutes minutes minutes minutes minutes 1.2 km to 4.1 km to 11.8 km to 8.5 km to 18.6 km to LONG BRANCH 1 Lakeshore (GO Train) 1377 THE QUEENSWAY 3 Hwy 427GO / Q.E.WSTATION / 9 Ontario Food 10 Pearson International 19 Downtown Toronto 14 Highway 403 Gardiner Expressway Terminal Airport to Union Station MORE OPTIONS FINISH Map data ©2019 Google AVAILABLE FOR SALE / LEASE THE QUEENSWAY 1377 ETOBICOKE, ON Partnership. Performance. For more information, please contact: Ryan G. Cunningham* Principal 905.283.2384 [email protected] *Sales Representative Avison Young Commercial Real Estate (Ontario) Inc., Brokerage 77 City Centre Drive, Suite 301 Mississauga, Ontario, Canada L5B 1M5 T 905.712.2100 I F 905.712.2937 I avisonyoung.ca The information contained herein was obtained from sources deemed reliable and is believed to be true; it has not been verified and as such, cannot be warranted nor form any part of any future contract. .
Recommended publications
  • Park Lawn Lake Shore Transportation Master Plan (TMP)
    Park Lawn Lake Shore Transportation Master Plan (TMP) This document includes all information that was planned to be presented at the Public Open House originally scheduled to take place on March 24, 2020, that was postponed due to COVID-19. Public Information Update June 2020 Park Lawn / Lake Shore TMP Background & Study Area The Park Lawn Lake Shore Transportation Master Plan (TMP) is the first step in a multi-year process to The Park Lawn Lake Shore TMP Study Area within evaluate options to improve the area's transportation network. Following the TMP launch in 2016, the which potential improvements are being considered is TMP was put on hold until a final decision was reached on the land use of the Christie's Site. bound by: Ellis Avenue to the east, Legion Road to the west, The Queensway to the north, Lake Ontario to the south. The Christie's Planning Study was launched in October 2019 with a goal of creating a comprehensive planning framework for the area. The study will result in a Secondary Plan and Zoning By-law for the site. The traffic analysis for this study spans a broader area, and includes: •Gardiner Expressway, from Kipling Avenue on/off Ramps to Jameson Avenue on/off Ramps •Lake Shore Boulevard, from Legion Road to Meeting Objectives Jameson Avenue •The Queensway, from Royal York Road to Jameson Avenue The Christie’s Planning Study Area sits on the former Mr. Christie factory site, and is bound by the Gardiner Expressway to the north; Lake Shore Boulevard West to the east and southeast; and Park Lawn Road to the west and southwest.
    [Show full text]
  • Bulletin Spring/Summer 2019
    BULLETIN SPRING/SUMMER 2019 Welcome to the Spring/Summer 2019 Issue of The Bulletin! Altree is a full-service development company with deep roots in the industry that date back to the 1950's through H&R and Lanterra Developments. Altree is committed to challenging the status quo and breaking new ground in creating inspirational residential, commercial, and retail projects with the commitment to offer significant value for customers, investors, and community stakeholders. Our portfolio continues to expand throughout Toronto and the Tri-state area. The Bulletin is a summary of the latest news and updates at Altree Developments. In this issue: • West Side Square, a purpose-built rental building in the Marion Section of Jersey City • Forest Hill Private Residences, a six property assembly on St. Clair Avenue West & Forest Hill Road • Thirty Six Zorra, a high-rise condominium coming to Etobicoke's Queensway neighbourhood • Military Trail, a mid-rise building surrounded by lush greenery in Highland Creek • Marlee & Hillmount, a four property assembly in Toronto • Chai Lifeline's Raising Hope Event • Hand Up for Hunger Toronto VISION Altree is more than a real estate development company. We respect the fabric of each location in which we build by seamlessly integrating our projects into the neighbourhood culture and aesthetic, while creating opportunities to enhance the community. Dedicated to consistently giving back, we build homes, commercial spaces, and hospitality venues for people to live, dream, and thrive. We bring passion and commitment to every project, and rise to each challenge with enthusiasm, drive, and the vision to enrich the lives of those who live and work in the neighbourhoods in which we operate.
    [Show full text]
  • F17 Proposed Digital Advertising Sign at 8100 Nordel
    City of Delta COUNCIL REPORT F.17 Regular Meeting To: Mayor and Council Files. No. ENQ02415 and FIN19-023 From: Community Planning & Development Department Date: October 10,2019 Proposed Digital Advertising Sign at 8100 Nordel Way The following report has been reviewed and endorsed by the City Manager. • RECOMMENDATIONS: A. THAT Council receive the results of the public consultation as information. B. THAT the City of Delta enter into a lease agreement with the proponent, Outfront Media Canada LP, for the proposed digital advertising sign at 8100 Nordel Way subject to: a. Receiving confirmation from the Ministry of Transportation and Infrastructure that Provincial requirements have been satisfied; b. The proponent undertaking all necessary approvals for sign installation, including obtaining a development variance permit in relation to "Delta Sign Bylaw No. 5860, 2000"; and C. THAT the proposed digital advertising sign details be referred to the Mayor's Public Safety Committee and Delta Police for comment. • PURPOSE: The purpose of this report is to present for Council's consideration the results of the public consultation for the proposed digital advertising sign at 8100 Nordel Way and further recommendations. • BACKGROUND: Council directed staff to undertake a public consultation process to receive comments on the proposed digital advertising sign at 8100 Nordel Way, the location of the new City of Delta Works Yard. Public comments from the consultation are to be considered prior to a decision to enter into a lease agreement with the proponent, Outfront Media Canada LP. Page 2 of 5 Digital Advertising Sign at 8100 Nordel Way ENQ02415 and FIN19-023 October 10, 2019 • DISCUSSION: Details of Proposed Digital Advertising Sign: The proposed digital advertising sign would be double-sided, approximately 14.6 m (48 ft) wide by 4.3 m (14 ft) in height, and would be oriented to vehicles traveling north and south along Highway 91 (Attachment A).
    [Show full text]
  • Retail Space for Lease 125 the Queensway, Etobicoke On
    RETAIL SPACE FOR LEASE 125 THE QUEENSWAY, ETOBICOKE ON Cory Rosen Cooper Blume Vice President Sales Representative Sales Representative (416) 566-8217 (416) 523-7749 [email protected] [email protected] Goudy Real Estate Corp. Real Estate Brokerage Commercial Real Estate Sales & Leasing 505 Hood Rd., Unit 20, Markham, ON L3R 5V6 | (905) 477-3000 e information contained herein has been provided to Goudy Real Estate Corp. by others. We do not warrant its accuracy. You are advised to independently verify the information prior to submitting an O er and to provide for su cient due diligence in an o er. e information contained herein may change from time to time without notice. e property may be withdrawn from the market at any time without notice. OVERVIEW & SITE PLAN 125 THE QUEENSWAY, ETOBICOKE ON 125 THE QUEENSWAY Floor 1 F TD Canada Trust E 5,500 Shoppers Drug Mart 14,706 LOADING 3.5x12 LOADING LOADING LOADING LOADING LOADING 3.75x16.5 3.75x16.5 3.5x12 A 3.75x16.5 D1 Sobeys Subway 50,858 1,218 D2 Dr. William Kavouris 1,600 D3 Dr. Oh 1,642 6% LANDSCAPE AREA C3A Dove Cleaners 673 6% C4 C1 First Choice Haircutters Ltd. LCBO 925 7,780 B1 B6 LOADING Booster Juice Holdings Inc. Rogers Communications Inc 3.5x12 877 1,899 B5A B2 Pet Valu Canada Inc. 1,184 B3 3,439 B2A 1,523 2,430 B4 B4 Pizza Pedi N Nails Netprint & Ship Inc Pier 1 Imports AVAILABLE10,070 10,070 SF 87.81 KEY FEATURES & AREA DETAILS: · Prime Toronto/Etobicoke location in one of the most well known shopping centres in the city with excellent visibility to the Gardiner Expressway and The Queensway.
    [Show full text]
  • CCAA Creditors List
    ROSEBUD CREEK FINANCIAL CORP. AND 957855 ALBERTA LTD. Preliminary list of creditors as at June 17, 2020 as submitted by Rosebud Creek Financial Corp. and 957855 Alberta Ltd., (Unaudited) Creditor Address Amount due (CDN$)* #1 CONVENIENCE 924 EDMONTON TRAIL N.E. CALGARY AB T2E 3J9 3,306.39 #1 CONVENIENCE STORE 1 - 10015 OAKFIELD DR.S.W. CALGARY AB T2V 1S9 313.20 1178160 ALBERTA LTD. DEALER #3424 15416 BEAUMARIS ROAD EDMONTON AB T5X 4C1 1,364.04 12TH AVENUE PHARMACY 529 1192 - 101ST STREET NORTH BATTLEFORD SK S9A 0Z6 1,017.80 21 VARIETY BOX 729 PETROLIA ONN0N 1R0 1,498.12 2867-8118 QC INC (PJC 06 501 MONT ROYAL EST MONTREAL QC H2J 1W6 191.53 329985 ONTARIO LIMITED o/a KISKO PRODUCTS 50 ROYAL GROUP CRES, Unit 1 WOODBRIDGE ON L4H 1X9 44,357.47 3RD AVENUE MARKET 148 - 3 AVENUE WEST BOX 2382 MELVILLE SK S0A 2P0 613.72 407 ETR PO BOX 407, STN D SCARBOROUGH ONM1R 5J8 1,224.96 5 CORNERS CONVENIENCE 176 THE QUEENSWAY SOUTH KESWICK ON L4P 2A4 1,077.00 649 MEGA CONVENIENCE 5651 STEELES AVE E, UNIT 22 SCARBOROUGH ON M1V 5P6 853.72 7-ELEVEN CANADA INC 13450 102ND AVE, SUITE 2400 SURREY BC V3T 5X5 1,602.73 881 CORNER GAS BOX 360, 67165 LAKELAND DR LAC LA BICHE AB T0A 2C0 1,700.24 9334-3580 QUEBE 289 BOUL ST-JEAN POINTE CLAIRE QC H9R 3J1 15,964.29 957855 ALBERTA LTD. 120 SINNOTT ROAD SCARBOROUGH ON M1L 4N1 1,000,000.00 9666753 CANADA CORP.
    [Show full text]
  • September-1-2020-Notice-Updates
    Construction Notice September 1, 2020 Upcoming Infrastructure Improvements at the Intersection of King Street West, Queen Street West, The Queensway and Roncesvalles Avenue (KQQR) Contract: 20ECS-TI-19SP Start Date: September 8, 2020 End Date: August 2022 *Timeline is subject to change. The City of Toronto and Toronto Transit Commission (TTC) have coordinated various infrastructure upgrades at the King Street West, Queen Street West, The Queensway and Roncesvalles Avenue (KQQR) Intersection, The Queensway from Parkside Drive to Roncesvalles Avenue, Roncesvalles Avenue from Queen Street West to Dundas Street West and rehabilitation of the Parkside Drive bridge at The Queensway. The infrastructure improvements will start in September 2020 with underside bridge rehabilitation of the Parkside Drive Bridge at The Queensway. The remaining work starting in 2021 includes: Topside bridge rehabilitation of the Parkside Drive bridge at The Queensway Replacing watermain and relining combined and storm sewers Road reconstruction and sidewalk replacement Overhead wire replacement and reconstruction of the TTC track allowance and platforms Relocating streetcar stops Reconfiguring the KQQR intersection including: removal of the eastbound right-turn channel, removal of the centre TTC platform on The Queensway, a dedicated streetcar lane, left-turn lane, through lane and right-turn lane on the eastbound approach, new raised TTC platform/bicycle facility on Queen Street West and realignment of the northbound approach on King Street West Completing
    [Show full text]
  • 2021 Price List
    2021 PRICE LIST 401 BOWES ROAD 1380 WELLINGTON STREET CONCORD DEPOT CONCORD SNOWBALL DEPOT KING CITY BOWES RD PRODUCTS AVAILABLE: PRODUCTS AVAILABLE: N • Premium Soil N • Premium Soil • Shredded Pine Mulch • Shredded Pine Mulch EELE ST WELLINGTON ST K • Screened Topsoil • Black Enhanced Wood Mulch RIVERMEDE RD • Classic Cedar Mulch 404 • 1 YD Tote Bags LESLIE ST LESLIE 400 ST THURST HWY 400 A B DUFFERIN ST DUFFERIN HWY 7 MAJOR MACKENZIE DR HWY 404 DUFFERIN ST HWY 407 ETOBICOKE DEPOT 200 HORNER AVENUE 8331 HERITAGE ROAD (TORONTO WEST) ETOBICOKE MISSISSAUGA YARD MISSISSAUGA CHINGUACOUSY RD HWY 427 PRODUCTS AVAILABLE: PRODUCTS AVAILABLE: THE QUEENSWAY N • Cu Structural Soil® N HERITAGE RD MISSISSAUGA RD • All Standard Mixes except GARDINER EXPY ROYAL YORK RD • Premium Soil GUELPH ST Mulches, Premium Soil, EVANS AVE • All Standard Soil Mixes and CU Structural Soil® WINSTON CHURCHILL BLVD BROWNS LINE • Shredded Pine Mulch KIPLING OFF-RAMP ISLINGTON AVE TO HORNER • Red Enhanced Wood Mulch K IPLING • Black Enhanced Wood Mulch AVE • Classic Cedar Mulch STEELES AVE W 407 AVE • Playground Wood Chips HORNER E BLVD ESHOR LAK • 1 YD Tote Bags 5 SIDEROAD 5515 CORONATION ROAD 11110 JANE STREET WHITBY YARD WHITBY MAPLE YARD MAPLE PRODUCTS AVAILABLE: RD PRODUCTS AVAILABLE: BRAWLEY • All Standard Mixes, Mulches, KIRBY RD US RD W N • All Standard Mixes except COLUMB and Premium Soils 12 KIRBY RD Mulches, Premium Soil, 400 except CU Structural Soil® 55 and CU Structural Soil® 7 • 1 YD Tote Bags RD W 6 N TER B THICKSON WINCHES ALDWI C O LAKE N R O ST R NATIO
    [Show full text]
  • Escribe Agenda Package
    Executive Committee Meeting Agenda #9/17 November 3, 2017 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Chair Maria Augimeri Vice Chair Jack Heath Jack Ballinger Vincent Crisanti Glenn De Baeremaeker Chris Fonseca Brenda Hogg Jennifer Innis Colleen Jordan Mike Mattos Jennifer McKelvie Anthony Perruzza Pages 1. MINUTES OF MEETING #8/16, HELD ON OCTOBER 14, 2016 Link to Executive Committee Minutes 2. BUSINESS ARISING FROM THE MINUTES 3. DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE THEREOF 4. DELEGATIONS 5. PRESENTATIONS 6. CORRESPONDENCE 7. SECTION I - ITEMS FOR AUTHORITY ACTION 7.1 GREENLANDS ACQUISITION PROJECT FOR 2016-2020 4 Flood Plain and Conservation Component, Duffins Creek Watershed Cougs (Workman’s) Ltd. CFN 56096 7.2 REQUEST FOR EXCHANGE OF TORONTO AND REGION CONSERVATION 7 AUTHORITY-OWNED LAND Flood Plain and Conservation Component, Humber River Watershed Davpart Inc. CFN 56150 8. SECTION II - ITEMS FOR EXECUTIVE COMMITTEE ACTION 9. SECTION III - ITEMS FOR THE INFORMATION OF THE BOARD 10. SECTION IV - ONTARIO REGULATION 166/06, AS AMENDED PERMIT APPLICATION 10.1 IS A MAJOR APPLICATION - REGULAR Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency infrastructure works, resolution of violations/after the fact permits, trail construction. 10.1 CITY OF VAUGHAN 11 813229 ONTARIO LTD. To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and site grade on Part Lot 19, Concession 8, (9732 Highway 27), in the City of Vaughan, Humber River Watershed as located on the property owned by 813229 Ontario Ltd.
    [Show full text]
  • 402 Bus Time Schedule & Line Route
    402 bus time schedule & line map 402 Dufferin Mall View In Website Mode The 402 bus line (Dufferin Mall) has 3 routes. For regular weekdays, their operation hours are: (1) Dufferin Mall: 9:00 AM - 4:30 PM (2) Queen Elizabeth Hospital at 130 Dunn Ave: 10:01 AM - 3:31 PM (3) St Joseph's Health Centre at 30 the Queensway: 4:31 PM - 5:31 PM Use the Moovit App to ƒnd the closest 402 bus station near you and ƒnd out when is the next 402 bus arriving. Direction: Dufferin Mall 402 bus Time Schedule 25 stops Dufferin Mall Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday Not Operational Queen Elizabeth Hospital at 130 Dunn Ave 130 Dunn Ave, Toronto Tuesday 9:00 AM - 4:30 PM West Lodge Ave at May Robinson Apartments Wednesday Not Operational 25 West Lodge Ave, Toronto Thursday Not Operational Queen St West at Lansdowne Ave Friday 9:00 AM - 4:30 PM 1464 Queen St W, Toronto Saturday Not Operational Queen St West at Sorauren Ave 1582 Queen Street West, Toronto Queen St West at Triller Ave 1654 Queen St W, Toronto 402 bus Info Direction: Dufferin Mall Queen St West at Roncesvalles Ave Stops: 25 1730 Queen St W, Toronto Trip Duration: 61 min Line Summary: Queen Elizabeth Hospital at 130 St Joseph's Health Centre at 30 the Queensway Dunn Ave, West Lodge Ave at May Robinson Apartments, Queen St West at Lansdowne Ave, The Queensway at Roncesvalles Ave Queen St West at Sorauren Ave, Queen St West at The Queensway, Toronto Triller Ave, Queen St West at Roncesvalles Ave, St Joseph's Health Centre at 30 the Queensway, The Queen St West at Triller
    [Show full text]
  • Transportation Planning Section | City Planning Division Toronto Transit Commission Waterfront Toronto
    Waterfront Transit “Reset” Phase 1 Study Coordinated Transit Consultation Program May 2016 Transportation Planning Section | City Planning Division Toronto Transit Commission Waterfront Toronto For more information and to provide further comment, please contact us at: Waterfront Toronto Email: [email protected] City of Toronto Email: [email protected] Why Are We Here Today? The City, in partnership with the TTC and Waterfront Toronto, has initiated a “Reset” of waterfront transit planning. In the past, transit planning along the waterfront was incremental. This has left a series of transit plans in various stages of approval. &ROOHFWLYHO\WKHSODQVFDQQRWUHVSRQGWRWKHVLJQLÀFDQWFXUUHQWDQGIXWXUHDQWLFLSDWHGGHPDQGIRUWUDQVLWDORQJWKHZDWHUIURQW 2013 Current City Planning’s “Feeling Congested?” CoordinatingCoordinating withwith thethe emergingemerging City-wideCity-wide 2IÀFLDO3ODQ5HYLHZ preliminary transit prioritypriority rapidrapid transittransit networknetwork plan,plan, 3KDVHPhase QHWZRUNDQDO\VLVLGHQWLÀHVERWKWKH 11 ofof thisthis StudyStudy willwill establishestablish a clear :DWHUIURQW:HVW/57DQG:DWHUIURQW visionvision andand evaluateidentify reasonable alternative alternative concepts (DVW/LJKW5DLO7UDQVLW as within the forconcepts a Waterfront for a Waterfront Transit Solution. Transit 3KDVH ´7RS3HUIRUPLQJ%XW8QIXQGHG 2Solution.VXEMHFWWR&LW\&RXQFLODSSURYDO Phase 2, subject to City Council 7UDQVLW3URMHFWVµ ZRXOGFRQWLQXHWRUHÀQHDQGDGYDQFHDapproval,would continue to refine and Waterfrontadvance a WaterfrontTransit Solution. Transit
    [Show full text]
  • Roadway Alteration and Traffic/Parking Amendments ­ the Queensway, Queen Street West, King Street West and Roncesvalles Avenue
    REPORT FOR ACTION Roadway Alteration and Traffic/Parking Amendments ­ The Queensway, Queen Street West, King Street West and Roncesvalles Avenue Date: January 21, 2019 To: Toronto and East York Community Council From: Acting Director, Traffic Management, Transportation Services Wards: Ward 4, Parkdale - High Park SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on all four legs of this intersection, City Council approval of this report is required. Transportation Services is requesting approval from City Council to reconfigure the intersection of The Queensway, Queen Street West, King Street West and Roncesvalles Avenue, as well as the approaches to the intersection. Also, this report includes required traffic and parking regulation amendments associated with this project. This project will improve public transportation, pedestrian environment, the public realm and traffic circulation in this area. RECOMMENDATIONS The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council approve the alteration of The Queensway, Queen Street West, King Street West and Roncesvalles Avenue intersection and its vicinity, as shown in the Drawing Nos. 421G-3297, 421G-3304, 421G-3305, 421G-3306 and 421G-3307 dated January 2019 and attached to the report from the Acting Director, Traffic Management, Transportation Services, dated January 21, 2019. 2. City Council adopt regulatory amendments listed in Appendices "A" and "B" attached to the report from the Acting Director, Traffic Management, Transportation Services, dated January 21, 2019. Roadway Alteration and Traffic/Parking Regulation Amendments ­ The Queensway, Queen Street West, King Street West and Roncesvalles Avenue Page 1 of 11 FINANCIAL IMPACT Funding for this project is being provided from the 2019 Transportation Services and TTC Capital Budgets.
    [Show full text]
  • Humber Bay Transit Hub Proposal
    1 Humber Bay Transit Hub Proposal for Southern Etobicoke, City of Toronto February 2014 rev. “There are intelligent, practical, and cost-effective ways to integrate multiple modes of public transit for moving people efficiently in the Greater Toronto Area” “When public servants no longer effectively perform their duties to serve the public interest – the public must take action.” Paul Chomik, P.Eng. The intent of this public transportation initiative is to facilitate a rational overall level of upgrading to public transit in southern Etobicoke and Mississauga to Downtown Toronto, while providing for increased flexibility and route choices for transit riders, including a seamless integrated public transit service across municipal boundaries with reduced need for transfers along the base route. This area transit plan proposes intelligent integration and future growth potential for the public transportation network in the western Greater Toronto Area. Copyright: Paul Chomik 2008 – 2014 All rights reserved 2 Overview The major components of this new transit proposal include: 1) Retaining and enhancing the existing Humber Loop facility as an integrated multi- modal area hub for public transit. 2) Introducing a new LRT west from Humber Loop along The Queensway to Sherway Gardens - which is a major transportation corridor that has traditionally been significantly deficient in public transit. 3) Extension of the LRT west into the City of Mississauga, Peel Region, along The Queensway and the existing Hydro right-of-way to Hurontario Street, and beyond (in the future). 4) Re-introduction of streetcar service through Sunnyside to the Canadian National Exhibition grounds, which has been deficient in public transit service since the late 1950s when construction of the F.G.
    [Show full text]