Sr120510dma Update Report Development Control June 2010

Total Page:16

File Type:pdf, Size:1020Kb

Sr120510dma Update Report Development Control June 2010 EEC/10/115/HQ Development Management Committee 2 June 2010 Update Report on the Outcomes of Previous Strategic Planning/Highway Consultation Responses made by the County Council's Development Management Committee – June 2010 Appn Ref. Description of Proposal [District] Devon County Council's Response [date/minute no. of Development Decision issued/Comment Management Committee] 43272 Erection of 9 wind turbines and ancillary Committee resolved (14/02/07 (Minute *135 refers)) that County Council Not yet determined by North development on land at Batsworthy Cross, as Strategic Planning Authority raises no objection subject to conditions Devon District Council. Knowstone, Near South Molton (North Devon). and/or Sec 106 agreement to secure 25 year temporary permission; removal/reinstatement; nature conservation survey and works; hedgerow protection; archaeological survey and works; noise mitigation; visitor viewing and interpretation; and detailed highway/access requirements. As Local Highway Authority also raised no objection subject to conditions and/or Sec 106/278 agreement to secure appropriate traffic management during construction/operation/decommissioning; highway improvements including safety works on A361, ice detection and mitigation systems on Turbines 1 and 2 and highway access details. 43580 2 Wind Turbines and ancillary development at Committee resolved 14/03/07 (Minute *142(b)) that NDDC be advised Not yet determined by North Cross Moor, Knowstone, Near South Molton. that the County Council – as Strategic Planning Authority considers that Devon District Council. (North Devon District). the benefits are outweighed by the landscape impacts and conflicts with provisions of Devon Structure Plan Policies CO1 and CO2; - as Local Highway Authority has no objection in principle subject to Section 106/278 agreement and planning conditions to secure necessary offsite highway works and traffic management during construction, operation and decommissioning. In event of NDDC being minded to grant permission requests that this should be only subject to prior completion of Sec.106/278 agreement and imposition of conditions to secure matters listed in Development Control Committee report (EEC/07/73/HQ) and be referred to GOSW as a departure from the Development Plan. 09/01665/MAJ Outline Application for the Proposed Residential Committee resolved 02/12/09 (Minute *29(a) that Teignbridge District Development of approximately 590 Dwellings at Council be advised that Devon County Council: Land to East of Old Exeter Road, Newcross, Kingsteignton. (i) As Mineral Planning Authority does not object to the proposal, subject to the application entering into an appropriate legal agreement to ensure that: (1) No dwellings are built in Phase 2 of the proposed site within 80 metres of the final eastern working face of Broadway Quarry unless it can be demonstrated by further detailed analysis that dust will not cause a problem to residents, or that the dust can be satisfactorily controlled. Appn Ref. Description of Proposal [District] Devon County Council's Response [date/minute no. of Development Decision issued/Comment Management Committee] (2) No development is carried out until an acoustic barrier has been constructed on the southern side of Broadway Road within the Zitherixon Mineral Site, and that this barrier is maintained for the duration of the mineral working. (3) The Mineral Operator does not object to the imposition of a planning condition on the Scheme of Operating and Restoration Conditions (required by the Review of Old Mineral Permissions) restricting the house of operation to between 0700 hours to 1900 hours on weekdays. (4) Adequate mitigation measures, to include on-site and off-site ponds and wetlands, are provided. (ii) As Highway Authority does not object to the proposal subject to the inclusion of Grampian conditions requiring that: (1) The occupation of any part of the development shall not be begun until the delivery of improvements to Old Exeter Road, including a signalised junction in place of Newcross roundabout are completed. (2) The occupation of more than two hundred dwellings shall not begun until the link to Greenhill Way *the Broadway Link Road), including a signalised junction at Greenhill Way, and improvements to Strap Lane have been delivered. (3) The occupation of more than four hundred dwellings shall not be begun until a bus lane along Newton Road from the roundabout at Tesco to the southern Bank of the River Teign is provided. in Not yet determined by addition, a condition/clause in a legal agreement is required to Teignbridge District Council ensure that construction shall not commence until agreement has been secured over the detailed design of the proposed signalised junction between Newton Road and Greenhill Way. 08/01377/MAJ Outline Application for proposed Residential Committee resolved 02/12/09 (Minute *29(b)) that Teignbridge District Development of 140, 2-3 Storey, Detached, Council be advised that Devon County Council: Attached and Terraced Dwellings at Land at Rackerhayes/Zitherixon, Kingsteignton. (i) As Mineral Planning Authority does not object to the proposal subject to the imposition of a condition to prohibit development within 80 metres of the final eastern working face of Zitherixon Quarry, and to secure alternative noise and dust mitigation measures, such as bunding, screen planting, or acoustic barriers, so as to avoid the potential sterilisation of nationally important reserves of ball clay contrary to the provisions of Policy MP13 of the Devon County Minerals Local Plan; Application Description of Proposal [District] Devon County Council's Response [date/minute no. of Decision issued/Comment Ref. Development Management Committee] (ii) As Highway Authority does not object to the proposal subject to the imposition of conditions requiring that the occupation of any part of the development shall not be begun until the link to Greenhill Way (the Broadway Link Road), including a signalised junction at Greenhill Way, together with the proposed improvements to Strap Lane, have been completed; and, (iii) As Strategic Planning Authority does not object to the proposal: (1) If when carried out in association with the proposed Newcross residential development, appropriate clauses are included in a legal agreement requiring those aspects contained in Recommendation (c) of Report EEC/09/279/HQ. (2) If when carried out in isolation, appropriate clauses are included in a legal agreement requiring the applicant to Not yet determined by provide the additional land and financial contributions to Teignbridge District Council enable existing school capacity to be increased in order to meet the additional pupil needs in full. 08/01376/MAJ Outline Application for Proposed Development of Committee resolved 02/12/09 (Minute *29(c)) that Teignbridge District B1 Employment Use consisting of 203 Storey Council be advised that Devon County Council: Buildings with Parking at Land at Rackerhayes Zitherixon, Kingsteignton. (i) As Mineral Planning Authority does not object to the proposal subject to the imposition of a condition to prohibit development within 80 metres of the final eastern working face of Zitherixon Quarry, and to secure alternative noise and dust mitigation measures, such as bunding, screen planting, or acoustic barrier, so as to avoid the potential sterilisation of nationally important reserves of ball clay contrary to the provisions of Policy MP13 of the Devon County Minerals Local Plan. (ii) As Highway Authority does not object to the proposal subject to the imposition of conditions to ensure that construction does not commence until the detailed design of the proposed signalised junction between Newton Road and Greenhill Way have been secured; and that the occupation of any part of the development shall not be begun until the link to Greenhill Way (the Broadway Link Road), including a signalised junction at Greenhill Way, and improvements to Strap Lane, have been carried out; and, Application Description of Proposal [District] Devon County Council's Response [date/minute no. of Decision issued/Comment Ref. Development Management Committee] (iii) As Strategic Planning Authority does not object to the Not yet determined by proposal. Teignbridge District Council. 08/01375/OUT Outline Application for Proposed 0.56 Hectare Committee resolved 02/12/09 (Minute *29(d)) that Teignbridge Park and Change Site with Associated Works District Council be advised that Devon County Council: for Nearby Employment and Public Services, Land at East Golds (South), Kingsteignton (EEC/09/282/HQ). (i) As Mineral Planning Authority does not object to the proposal; (ii) As Highway Authority does not object to the proposal; and, (iii) As Strategic Planning authority does not object to the Not yet determined by proposal. Teignbridge District Council. 98/01363/MAJ Proposed construction of the Broadway Link Committee resolved 02/12/09 (Minute *29(e)) that Teignbridge District Road, from Broadway Road to Greenhill Way, Council be advised that Devon County Council: to Include Access to the Proposed Residential and Employment Developments at Rackerhayes at Land at Broadway Road to Greenhill Way, Kingsteignton. (i) As Mineral Planning Authority does not object to the proposal. (ii) As Highway Authority does not object to the proposal; and, (iii) As Strategic Planning Authority does not object to the Not yet determined by proposal. Teignbridge District Council. 08/01358/MAJ Proposed Construction of Newton Road Relief Committee
Recommended publications
  • West of Exeter Route Resilience Study Summer 2014
    West of Exeter Route Resilience Study Summer 2014 Photo: Colin J Marsden Contents Summer 2014 Network Rail – West of Exeter Route Resilience Study 02 1. Executive summary 03 2. Introduction 06 3. Remit 07 4. Background 09 5. Threats 11 6. Options 15 7. Financial and economic appraisal 29 8. Summary 34 9. Next steps 37 Appendices A. Historical 39 B. Measures to strengthen the existing railway 42 1. Executive summary Summer 2014 Network Rail – West of Exeter Route Resilience Study 03 a. The challenge the future. A successful option must also off er value for money. The following options have been identifi ed: Diffi cult terrain inland between Exeter and Newton Abbot led Isambard Kingdom Brunel to adopt a coastal route for the South • Option 1 - The base case of continuing the current maintenance Devon Railway. The legacy is an iconic stretch of railway dependent regime on the existing route. upon a succession of vulnerable engineering structures located in Option 2 - Further strengthening the existing railway. An early an extremely challenging environment. • estimated cost of between £398 million and £659 million would Since opening in 1846 the seawall has often been damaged by be spread over four Control Periods with a series of trigger and marine erosion and overtopping, the coastal track fl ooded, and the hold points to refl ect funding availability, spend profi le and line obstructed by cliff collapses. Without an alternative route, achieved level of resilience. damage to the railway results in suspension of passenger and Option 3 (Alternative Route A)- The former London & South freight train services to the South West peninsula.
    [Show full text]
  • West of Exeter Route Resilience Study 140714.Indd
    West of Exeter Route Resilience Study Summer 2014 Photo: Colin J Marsden Contents Summer 2014 Network Rail – West of Exeter Route Resilience Study 02 1. Executive summary 03 2. Introduction 06 3. Remit 07 4. Background 09 5. Threats 11 6. Options 15 7. Financial and economic appraisal 29 8. Summary 34 9. Next steps 37 Appendices A. Historical 39 B. Measures to strengthen the existing railway 42 1. Executive summary Summer 2014 Network Rail – West of Exeter Route Resilience Study 03 a. The challenge the future. A successful option must also off er value for money. The following options have been identifi ed: Diffi cult terrain inland between Exeter and Newton Abbot led Isambard Kingdom Brunel to adopt a coastal route for the South • Option 1 - The base case of continuing the current maintenance Devon Railway. The legacy is an iconic stretch of railway dependent regime on the existing route. upon a succession of vulnerable engineering structures located in Option 2 - Further strengthening the existing railway. An early an extremely challenging environment. • estimated cost of between £398 million and £659 million would Since opening in 1846 the seawall has often been damaged by be spread over four Control Periods with a series of trigger and marine erosion and overtopping, the coastal track fl ooded, and the hold points to refl ect funding availability, spend profi le and line obstructed by cliff collapses. Without an alternative route, achieved level of resilience. damage to the railway results in suspension of passenger and Option 3 (Alternative Route A)- The former London & South freight train services to the South West peninsula.
    [Show full text]
  • RIVER TEIGN ACTION PLAN JANUARY 1998 Foreword
    locafenvironment agency plan RIVER TEIGN ACTION PLAN JANUARY 1998 Foreword The integrated management of the environment is a fundamental philosophy for the Environment Agency with Local Environment Agency Plans (LEAPs) taking a key role in this approach. The River Teign Catchment covers a popular area of Devon including part of Dartmoor National Park and the South Devon Heritage Coast. The towns of Newton Abbot, Teignmouth and Torquay are important economic and tourist centres and it is important that the assets of the catchment are maintained and protected both now and for future generations to enjoy. It is vital that the needs of all uses of the area, including flora and fauna, are balanced to ensure continued protection of these precious assets. This Action Plan epitomises the Agency's commitment to protect and where necessary enhance the environment through the Agency's own actions or in association with other organisations. We are very grateful for the contributions made during the consultation period and are convinced that they represent the spirit of partnership that will be required to implement the plan. GEOFF BATEMAN Area Manager, Devon Environment Agency Information Centre U aari n<fiA/N Further copies of this Action Plan can be obtained from: Richard Parker - Devon Area Environment Agency South West Region Manley House Kestrel Way Exeter EX2 7LQ (01392)444000 Environment Agency Copyright Waiver This report is intended to be used widely and may be quoted, copied or reproduced in any way, provided that the extracts are not quoted out of context and that due acknowledgement is given to the Environment Agency.
    [Show full text]
  • Corridor Survey River Lemon
    CORRIDOR SURVEY NRA RIVER LEMON National Riven Authority South West Region <• J '- * ~ r m p 4 S M k RIVER LEMON CORRIDOR SURVEY A REPORT PREPARED BY ECLOGUE FOR THE NATIONAL RIVERS AUTHORITY (SOUTH WEST REGION) ECLOGUE ENVIRONMENTAL CONSULTANTS THE CUSTOMS HOUSE THE QUAY EXETER EX2 4AN . - - - - ENVIRONMENT AGENCY 1 1 0 1 4 2 ACKNOWLEDGEMENTS The author is grateful to all those people who have offered the assistance on the production of this report. Report compiled by Mary de Lemos October 1990 CONTENTS PAGE INTRODUCTION a brief description of the" river and its surrounding area. 1 METHODOLOGY an explanation of surveying techniques. 2 SUMMARY including descriptions of three dis tinct river types . 8 GENERAL MANAGEMENT recommendations to protect wildlife. 10 SUGGESTIONS for the creation of new wildlife habitats. 12 CHAINAGE MAPS maps showing locations of.chainage lengths. 13 SURVEY individual section maps and . notes. 17 APPENDICES A. Species list of FLORA B. Species list of FAUNA C. SITE of SPECIAL SCIENTIFIC I n t e r e s t - citation sheets D. BIBLIOGRAPHY 1. INTRODUCTION - a brief description of the river and its surrounding area. The Lemon is a lowland river in south Devon. It rises on Haytor Down at a height of about 400m above sea level, and runs south and east to Newton Abbot where it joins the River Teign. The-Lemon has several small tributaries including Kester Brook and Blackford Brook. The river cuts through alluvium and valley gravel deposits with the underlying geology consisting mainly of slates and mudstones, slates and shales and limestone. Until it reaches Newton Abbot, where the river is canalised,the valley is rural.
    [Show full text]
  • NE389:NCA Profile:149. the Culm
    National Character 149. The Culm Area profile: Supporting documents www.gov.uk/natural-england 1 National Character 149. The Culm Area profile: Supporting documents Introduction National Character Areas map As part of Natural England’s responsibilities as set out in the Natural Environment White Paper1, Biodiversity 20202 and the European Landscape Convention3, we are revising profiles for England’s 159 National Character Areas (NCAs). These are areas that share similar landscape characteristics, and which follow natural lines in the landscape rather than administrative boundaries, making them a good decision-making framework for the natural environment. NCA profiles are guidance documents which can help communities to inform theirdecision-making about the places that they live in and care for. The informationthey contain will support the planning of conservation initiatives at a landscape scale, inform the delivery of Nature Improvement Areas and encourage broader partnership working through Local Nature Partnerships. The profiles will also help to inform choices about how land is managed and can change. Each profile includes a description of the natural and cultural features that shape our landscapes, how the landscape has changed over time, the current key drivers for ongoing change, and a broad analysis of each area’s characteristics and ecosystem services. Statements of Environmental Opportunity (SEOs) are suggested, which draw on this integrated information. The SEOs offer guidance on the critical issues, which could help to achieve sustainable growth and a more secure environmental future. 1 The Natural Choice: Securing the Value of Nature, Defra NCA profiles are working documents which draw on current evidence and (2011; URL: www.official-documents.gov.uk/document/cm80/8082/8082.pdf) 2 knowledge.
    [Show full text]
  • River Teign Catchment Action Plan
    NRA 31 i RIVER TEIGN CATCHMENT ACTION PLAN NRA National Rivers Authority South West Region MAP OF NRA SW REGION SHOWING TARGET CATCHMENT 1. INTRODUCTION 2. ROUTINE SERVICES 3. CHALLENGES & PROPOSED ACTIONS APPENDIX 1 - CATCHMENT MAPS APPENDIX 2 - NRA DUTIES, POWERS AND TARGETS National Rivers Authority South West Region NRA Wessex Region NRA National Riven Authority South West Rvglon River Teign Teign River Catchment River Teign Catchment 1. INTRODUCTION CATCHMENT ACTION PLANS are designed to be a simple, practical means of directing resources to achieve environmental improvements on a priority basis, between and within catchments. They set out the essential routine tasks, and a five year programme of specific actions for each catchment to meet regional and national targets. Changes may occur where unplanned work such as an extreme drought requires priority. The NRA has inherited a legacy of environmental challenges arising from the use and abuse of our natural resources. Although significant progress has already been made it will be many years before all the work needed can be assessed, funded and carried out. To achieve the environmental objectives will require not just the clear, vigorous direction of the NRA towards priority work but the help and support of the whole community. The NRA has consulted with the Regional Advisory Board and Advisory Committees and the local interests about the draft action plans and the format is the outcome of those discussions. Progress to achieve the Action Plan objectives will normally be reviewed on an annual basis but more frequently where severe problems have been identified. 2. ROUTINE SERVICES Despite the fact that the NRA is largely a reactive, regulatory body it is possible to plan for much of the environmental protection work even the fact that unpredictable events will occur! Much of the routine workload such as monitoring, enforcement of statutes and dealing with pollution and flooding incidents needs to have clear priority to ensure that it is dealt with to satisfactory standards throughout the region.
    [Show full text]
  • Rural South Devon and Dartmoor Unitary Authority Putting Our Rural Communities fi Rst
    Rural South Devon and Dartmoor Unitary Authority Putting our rural communities fi rst A concept proposal for Unitary Local Government in Devon that safeguards our rural communities 11 April 2008 Sponsoring authorities: South Hams District Council South Hams District Council and West Devon Borough Council Rural South Devon and Dartmoor Unitary Authority - a concept proposal 1 Contacts David Incoll Nick Payne Chief Executive Corporate Director South Hams District and West Devon Borough Council, West Devon Borough Councils, Kilworthy Park, Kilworthy Park, TAVISTOCK, Devon. PL19 0BZ TAVISTOCK, Devon. PL19 0BZ Email: [email protected] Email: [email protected] Tel: 01822 813600 Tel: 01822 813600 Alan Robinson Roger Nicholson Strategic Director (Community) Head of Improvement South Hams District Council, South Hams District and Follaton House, Plymouth Road, West Devon Borough Councils, TOTNES, Devon. TQ9 5NE Follaton House, Plymouth Road, TOTNES, Devon. TQ9 5NE Email: [email protected] Tel: 01803 861234 Email: [email protected] Tel: 01803 861234 www.southhams.gov.uk www.westdevon.gov.uk Contents Courtesy of Dartmoor Tourist Association Page Purpose 4 Introduction 5 Context 6 Support 12 Strategic Leadership 13 Neighbourhood Empowerment 16 Value for money and equality of Public Services 19 Affordability 22 Conclusion 23 Appendices 24 Appendix A - Letters of Support 24 All maps in thisis proposal can Appendix B - Statistical Information 27 be viewed in larger Appendix C - MOSAIC’s Defi nitions 30 scale at: www.indevon.org.uk/cms/von.org.uk/cms/ Appendix D - Parish Clusters 31 South Hams District Council 1. This document proposes a unitary solution in response to the Boundary Committee invitation to Purpose submit concepts for the structural review of local government in Devon by 11 April 2008.
    [Show full text]
  • Display PDF in Separate
    local environment agency plan RIVER TEIGN CONSULTATION REPORT MARCH 1997 The River Teign Local Environment Agency Plan (LEAP) aims to promote integrated environmental management of this important area of Devon. It seeks to develop partnerships with a wide range of organisations and individuals who have a role to play in the management of the River Teign and Torbay Streams. This plan embodies the Agency’s commitment to realise improvements to the environment. An important stage in the production of the plans is a period of public consultation. This Consultation Report is being circulated widely both within and outside of the catchment and we are keen to draw on the expertise and interests of the local communities involved. Please comment - your views are important, even if it is to say that you think particular issues are necessary or that you support the plan and its objectives. Following on from the Consultation Report an Action Plan will be produced with an agreed programme for the future protection and enhancement of this much loved area. We will use these Plans to ensure that improvements in the local environment are achieved and that good progress is made towards the vision. VAA-£.r>------- GEOFF BATEMAN Area Manager (Devon) Environment -Au^ncy Information Centre Your Views We hope that this report will be read by everyone who has an interest in the environment of the River Teign Catchment. Your views will help us finalise the Action Plan. Have we identified all the problems in the catchment? If not, we would like to know. Are there any issues which you would like to highlight? Please fill in the questionnaire provided and send your comments by 31st May 1997 to: Richard Parker Environment Planner - Devon Area Manley House , Kestrel Way EXETER Devon EX2 7LQ We will not republish this Consultation Report.
    [Show full text]
  • Written Guide
    Not just another Devon seaside resort A self guided walk around Teignmouth Become a landscape detective and uncover Teignmouth’s secrets Find out how names, buildings and streets reveal the town’s past Discover how the sea, river and moors shaped local people’s lives Explore a dramatic physical landscape and spectacular estuary .discoveringbritain www .org ies of our land the stor scapes throug discovered h walks 2 Contents Introduction 4 Route overview 5 Practical information 6 Commentary 8 Credits 30 © The Royal Geographical Society with the Institute of British Geographers, London, 2012 Discovering Britain is a project of the Royal Geographical Society (with IBG) The digital and print maps used for Discovering Britain are licensed to the RGS-IBG from Ordnance Survey 3 Not just another Devon seaside resort Discover a different side to Teignmouth Introduction What do you associate with Devon? Perhaps seaside holidays in places like Torquay, driving over the moors of Dartmoor, or sampling the county’s famous cream teas! Few people will think of Teignmouth. This walk gives you the opportunity to discover why it is more than just The beach at Teignmouth (c.1850) another Devon seaside Lithograph by Thomas Hewitt Williams resort. Reproduced with the kind permission of Devon Libraries Discover a dramatic physical landscape of steep valleys, hidden streams, crumbling cliffs, sand banks and a spectacular estuary. Find out how the town has been built on drained marshes and reclaimed sand dunes and protected from the sea by a seawall and flood defences. Explore how the town’s position by the moors, river and sea has provided a livelihood for its people over the centuries.
    [Show full text]
  • ENVIRONMENTAL PROTECTION River Teign Catchment River Water
    ENVIRONMENTAL PROTECTION NRA National Rivers Authority South Wast Region River Teign Catchment River Water Quality Classification 1990 NOVEMBER 1991 WQP/91/006 B L MILFORD G O R D O N H BIELBY BSc Regional General Manager C V M Davies Environmental Protection Manager ACKNOWLEDGEMENTS The Water Quality Planner acknowledges the substantial contributions made by the following staff: R. Broome - Co-ordinator and Editor A. Burrows - Production of Maps and editorial support P. Grigorey - Production of Maps and editorial support B. Steele - Production of Forepage C. McCarthy - Administration and report compilation Special thanks are extended to A. Burghes of Moonsoft, Exeter for computer support and the production of statistical schedules. The following NBA sections also made valuable contributions: Pollution Control Field Control and Wardens Water Resources Thanks also to R. Hamilton and J. Murray-Bligh for their contributions. Suggestions for improvements that could be incorporated in the production of the next Classification report would be welcomed. Further enquiries regarding the content of these reports should be addressed to: Freshwater Scientist, National Rivers Authority, Manley House, Kestrel Way, EXETER, Devon EX2 7LQ ENVIRONMENT AGENCY 130037 RIVE21 WA3ER QUALITY IN THE RIVER TCIGN CATCHMENT LIST OF CONTOiTS Page No. 1 Introduction 1 2 River Teign Catchment 1 3 National Water Council's River Classification System 3 4 1990 River Water Quality Survey 4 5 1990 River Water Quality Classification 4 6 Non-compliance with Quality Objectives
    [Show full text]
  • Devon County Map (CG)
    A B C D E F G To Bristol H 300 .309 309.310 310 .EC Lynmouth Countisbury A LYNTON 21 .21 . 31 .33 EC 35.300 .301 300 301 Barbrook Highbridge ILFRACOMBE 33 33 300 310 Porlock 35 33 301 309 EC Lee 35 21 Berrynarbor 300 EC A Combe 300 1 31 21 33 Parracombe 1 Mortehoe 303Mullacott Cross 31 Martin 300 MINEHEAD 31 .303 301 309 310 31 303 309 300 EC 31 .303 Woolacombe 301 300 31 309 Blackmoor Gate 303 303 West 309 EXMOOR Down 303 310 21. 21C 303 Arlington ver 21 Georgeham Ri Exe 21C 21 Croyde Bay 21. 21C A 21 309 Croyde 303 Guineaford Muddiford 21 C Knowle Bridge Bridgwater 21 Shirwell Saunton Bratton 310 Fleming BARNSTAPLE 303 301 Braunton 309 Chelfham terminating: 21 21 Barton 873 A Ashford 303 657 657 5B. 9 .15A .15C . 21C .71 21 Brayford 21C 72.75B.85.118 . 155 .301.303 303 Goodleigh 310 654 7 309.310.319.322 .325.372 Chivenor 654.65 386.646.654.657.658 BARNSTAPLE 657 873 calling: Fremington (see left for details) 155 21 . 21A 658 657 Yelland 21A Bickington Landkey East 21 Barnstaple West Buckland SOMERSET A Buckland 21 5B 5B 71.72.322 Bishop’s Appledore 15A Tawstock Tawton 2 9 658 ay 2 16. 21 Instow 15C 155 155 r B North 75B.85 71 873 16.21A r 21 Westward Ho! Swimbridge e Molton v 25.398 118 72 658 i 16 R 155 155 Molland 16 Northam 319 155 Dulverton Wiveliscombe 21 322 155 657 856 372 696 Cotford St.
    [Show full text]
  • Devon River Authority River Teign Fisheries Survey
    River Teign Fisheries Survey 1963 Item Type monograph Authors Bielby , G.H. Publisher Devon River Authority Download date 28/09/2021 05:31:44 Link to Item http://hdl.handle.net/1834/27160 DEVON RIVER AUTHORITY RIVER TEIGN FISHERIES SURVEY - 1963 This report is arranged in four sections as follows A - INTRODUCTION B - METHODS C - RESULTS D - APPENDIX (containing recommendations) A. INTRODUCTION The principal object of the survey was to examine the distribution and relative abundance of salmonid fish in the river system in order to assess the possibility of increasing the salmon population by artificial propagation. A secondary object was to examine the condition of the river downstream of the Rookery Brook confluence, which was the length affected by the pollution and fish mortality in 1962, in order to assess the advisability Of restocking the length with brown trout. Before proceeding with the results of the survey, however, it will be worth while to consider the general background of the river as it is in 1963 so that the results will have added perspective and possibly be of more value if studied in future years. The River Teign - General The headwaters of the North Teign are on Dartmoor (see Map A) and the river flows for the first part of its course through typical open moorland with heather-lined banks and little other vegetation. The river in this area has a gentle flow over a bed of rock and gravel and there are deep, good-sized pools at regular intervals. The main physical feature of this upland section is near Manger Rook where the river cascades down a sharply-angled rock face Jbefore resuming its more gentle flow to Batworthy where it is joined by the Walla Brook.
    [Show full text]