Click on Aquaspira

Total Page:16

File Type:pdf, Size:1020Kb

Click on Aquaspira Innovation in Infrastructure Aquaspira FAST AND SAFE Aquaspira supplied prefabricated, multi-leg composite steel reinforce tanks to a housing development in Scotland, saving time on site and ensuring long term performance. s part of the concepts with the developer, the infrastructure required civil engineering contractor, Tough to enable a major Construction identified a series of issues new development concerning the physical construction of for Bellway Homes large concrete underground tanks in both at Broxden, on the locations and the inevitable disruption to port manifold. The inlet pipe connects outskirts of Perth, the consulting local residents and traffic. into the upstream end of the first pipe engineersA for the project, Dougal Baillie The contractor had recently utilised only, which effectively converts the first Associates (DBA) were tasked with AquaSpira Composite Steel Reinforced pipe into the primary, combined carrier providing substantial additional storage (CSR) large diameter pipes in place of and storage pipe, with the remaining six capacity within the local Scottish Water conventional concrete pipes on a number pipes functioning as secondary storage sewer network at two separate locations. of housing developments and approached pipes at times of peak discharge. The initial concept designs were based AquaSpira with a view to assessing the A key criterion was to ensure that once on traditional concrete tank structures potential for providing an alternative the project commenced, the risk which, until recently, had been the solution that would minimise deliveries, of delays to the programme were conventional method of design approved plant requirements, time and disruption minimised. A further complication was by the water company. to local residents and traffic. the fact that the site investigation report One of the challenges of the project The contractor was aware of the fact had identified ground water, which meant was that both sites are located in areas that AquaSpira is primary supplier of that tanks with insitu welded joints could with significant constraints, in terms of large diameter pipes and tanks to Scottish not be used. space, shape, access for heavy plant and Water Capital Projects, and assumed that The manifold and pipes on the delivery of materials. The only access to this would assist in the process of gaining AquaSpira system are supplied with one of the sites is via narrow residential approval for adoption with Scottish Water spigot and socket, push fit joints with streets. The other is surrounded on all Development Operations. integral ring-seals, enabling them to be three sides by two active highways, The design proposal for Tank 1 at installed in trenches where groundwater a traffic junction, and an adjacent Darnall consisted of seven parallel runs may be present. Once connected, a watercourse. of 1650mm diameter pipes, connected high performance, watertight joint is On reviewing the initial design at the downstream end by a single seven formed with no requirement for internal 68 NEW CIVIL ENGINEER | JANUARY 2019 IN PARTNERSHIP WITH AQUASPIRA welding in confined spaces, or fitting large Above: Pipes waste water standards and specifications reduces the risk of problems emanating external couplings. safely pushed manager, visited the site when work from concrete chambers constructed To maximise long-term performance home with began to see the tank components on site. The layout is much simpler and and durability, particularly at the innovative jointing first-hand and observe the start of the more efficient too, with thought given at fabricated weld seams, the manifold was frame installation. the design stage towards minimising the manufactured as a single unit from robust, Top right: Robust “This has to be the way forward,” he risk of blockage, and providing complete, stainless steel material. manifold easily said, “utilising high quality, prefabricated but not excessive, access for future Tough Construction project manager lifted into position units, produced off-site in a quality- inspection and maintenance.” Craig Lavery commented: “On arrival Bottom left: controlled factory environment, greatly Work on site for Tank 2 at Cherrybank, at site, the unit was safely offloaded Manifold quickly Broxden is scheduled to start in January and placed into position with a standard set to line and 2019. While still connecting into a single excavator. level A key criterion four port manifold at the downstream “Once in place, we immediately Bottom right: end, each leg of the tank is different in commenced the systematic process of Simple, concise was to ensure length, designed to precisely match the laying the pipes, working away from the layout of new tapered shape of the location. manifold, and progressively backfilling, storage tank that once the project Since completion of the first tank which in turn kept the size of the in January 2018, several have been excavation, and the arisings from the commenced, the designed and successfully installed for excavation to a minimum at any given risk of delays to the similar applications, clearly marking this time during the installation.” as “the way forward” in terms of design This is the first tank of this type to “ optimization, programme reduction and programme were be approved and adopted by Scottish minimising disruption to local residents Water and Martin Faulds, its water and minimise and traffic. JANUARY 2019 | NEW CIVIL ENGINEER 69.
Recommended publications
  • Engineering Excellence to Unlock Planning and Development Challenges Delivering Comprehensive Advice and Support to the Development Sector
    Engineering excellence to unlock planning and development challenges Delivering comprehensive advice and support to the development sector Ardent Consulting Engineers is an award Ardent offers a wide range of services winning consultancy that provides transport, within the development sector, including: infrastructure planning, engineering and environmental advice to the development Pre-purchase due-diligence, concept design, planning industry. We, add valuable input at every stage and construction of a project, from due diligence and inception, through to planning, design and construction. Transport assessments and supporting documents Flood risk assessments and drainage design We employ over 70 trained professionals at our London head office and five regional Flood alleviation works offices in Essex, Suffolk, Kent, Bristol and Ardent have worked with Bellway Strategic for several years and the Midlands. Noise assessments have provided robust technical information on a number of sites Air quality assessments from pre-offer right the way through to the submission of planning As a multi-disciplinary consultancy, we advise applications and evidence for planning appeals. on a wide range of schemes and development Development feasibility uses across the country, ranging from The team is dynamic, well resourced and has a raft of expertise to industrial and commercial use redevelopment, Infrastructure and highway design provide a full package of technical services to meet our requirements to strategic residential and mixed use schemes. throughout the acquisition and planning process. This enables us Sustainable drainage systems (SuDS) We partner with our clients and government to continue to acquire quality strategic sites and ultimately secure bodies to deliver projects in sustainable S278/38 highway works design planning permissions in a timely manner.
    [Show full text]
  • 2018-19 Community Engagement Statement
    2018-19 Annual Community Engagement Statement Leeds College of Building is the only FE College specialising in Construction and the Built Environment in the UK. Since 1994 the College has experienced significant growth up to 2007 when the overall turnover reached £19.2m. Since then and in line with the 2008 recession the College’s income dropped but has since recovered and is now over £18m. Over this period the College acquired Achieve Through Learning Ltd (ATL), a private training provider in South Yorkshire, and has embarked on significant new builds at Hunslet Lane in Leeds. The College operates as a ‘Group Structure’ with LCB, LCB Enterprises Ltd and ATL Ltd forming the Group members. Section 4 of the English Colleges Code of Good Practice covers: 4. The governing board will ensure that the college is responsive to the relevant labour market by adopting a range of strategies for engaging with employers and other stakeholders that will support students progressing to relevant further study and/or successful employment. The Code goes on to state that the college should have systems in place that facilitates engagement with them (local and business communities) regularly, proactively and effectively so that it can identify and prioritise their present and future needs for education and training, and discuss how they can best be met. These relationships need to be two way. The Code also states that the board should publish on the college website at least annually an account of the college's engagement with the main communities that it serves; the progress made towards meeting their needs for education and training; and how it aims to meet their future needs.
    [Show full text]
  • Protesters and Police Clash for Second Day Running at Hong Kong Airport
    BUSINESS WITH PERSONALITY THE BORED ROOM A DIFFERENT BALL GAME HOW TO LIVEN UP WHY ENGLAND’S FAVOURED THE MOST TEDIOUS DUKE IS YET TO WORK P18 OF MEETINGS P13 WEDNESDAY 14 AUGUST 2019 ISSUE 3,435 CITYAM.COM FREE CHEESED OFF Watchdog blocks TRUMP LIFTS Philadelphia ad over gender roles STOCKS WITH CLIMBDOWNHARRY ROBERTSON video game consoles, certain trade concerns and China, jumped 1.71 toys, computer monitors, per cent and 1.96 per cent respectively. @henrygrobertson and certain items of European stock markets were US PRESIDENT Donald Trump footwear and clothing”, dragged out of the red, where they had lit a rocket under Wall Street APPLE while other items would languished for most of the day. yesterday after backtracking be removed from the Germany’s Dax index rose 0.8 per cent, on his threat of immediate tariff list altogether. the FTSE 100 climbed 0.5 per cent, and tariffs on technology and 4.23% Wall Street opened the pan-European Euronext 100 rose consumer products from China, lower yesterday but imme- 0.9 per cent. offering global markets some diately rallied following the Gold retreated from its record high to relief from Washington’s trade war announcement, with the tech- $1,502 an ounce amid a respite in the with Beijing. heavy Nasdaq leading the drawn-out trade war between the The Trump administration GOLD way to close up 1.95 per world’s two biggest economies. has now delayed fresh tariffs cent at 8,016.36. The yield on 10-year US Treasuries on Chinese imports such as The Dow Jones rose 5.3 basis points (0.053 percentage laptops and mobile phones $1,502 Industrial Average points) to 1.693 per cent.
    [Show full text]
  • CECA Communicates
    CECA Communicates Issue 98 • June 2017 CECA Communicates CECA Publishes Manifesto for Post-Brexit Growth INSIDE THIS ISSUE: In April, Prime Minister Theresa May deliver the industrial strategy with a surprised the political world by calling construction sector deal, and rebalance 2 First Words a snap General Election. The UK will investment across the UK. CECA also 3 CECA Manifesto go to the polls on 8 June and CECA is calls on the next UK Government to working hard to ensure that the case protect the rights of EU construction 5 Stop. Make a Change. for investment in infrastructure as workers, protect the pound via public 7 Workload Trends the best means of driving growth in procurement, and commit to remote 8 Roads Sector the economy remains at the forefront offshore wind - investment in which of the next Government’s plans to could benefit Scotland’s island 9 HR Wallingford secure the economy when Britain economies by up to £725 million over 11 Smart Card Audit leaves the European Union. To these the next 25 years. CECA believes our 13 CSCS ends CECA has published Delivering proposals are the best routemap to Post-Brexit Growth, our manifesto growth, and will be making our case 16 BuildForce that calls on all parties to commit to in the coming weeks when the new 17 Data Saves Lives the existing infrastructure pipeline, Government is setting its agenda. 1 CECA Communicates First Words It is my pleasure to welcome you to this This is all the more important after issue of CECA Communicates, which findings from CECA’s Workload Trends is packed with articles on everything Survey (see page 7) suggest that CECA does to make the case for workloads are slowing and order books infrastructure investment, campaign have dipped into the red for the first for health and safety, and promote the time in four years.
    [Show full text]
  • Katherine Smale
    Future of Buildings p25 Big project culture p20 HS2 stations awarded p08 New Civil Engineer MARCH 2019 CLOSING OUT CROSSRAIL REVEALED: THE TRUE EXTENT OF STATIONS WORK TO BE DONE BIM. ACCURATE PIPE DESIGN at your fingertips FREE! CONNECT TO BETTER FEATURING REVIT CONTENT • Quickest way to a complete ‘as built’ pipe system PACKAGE • Precise designs with intelligent assistance Download yours today! • Fully integrated Bill of Materials Download now at wavin.com/bim CONNECT TO BETTER New Civil Engineer TIME TO PROVE BRITAIN’S WORLD CLASS CREDENTIALS MARK HANSFORD EDITOR his is the March 2019 issue of New Civil Engineer; which happening, at least according to new figures from graduate research means that by the end of the calendar month Britain company High Fliers Research. Its annual review of 150 top graduate should have exited the European Union (EU). What recruiters that includes Atkins, along with fellow consultants Aecom T that means for the careers of civil engineers living in and Arup and client Network Rail (to name four), predicts an impres- Britain is, at time of writing, impossible to predict. sive 9.1% growth in graduate recruitment this year, the highest annual There is a lot of nervousness about workloads, naturally, and there rise in vacancies for university leavers for nine years. are real concerns about access to skilled workers – and how that might impact the businesses they work for. But the hope; the desire even, The hope; the desire even, must be that among the many outcomes of Brexit, one is a re-emer- gence of the belief that British engineering is world class.
    [Show full text]
  • New Civil Engineer DECEMBER 2019
    Lessons from floods p11 Florida bridge failings p12 Managing stormwater p23 New Civil Engineer DECEMBER 2019 DRIVING FORCE THE PRESIDENT’S CHALLENGE: EMBRACE INNOVATION WHILE GETTING THE BASICS RIGHT FREE Online Confi gurator Tool. Another box ticked. The ultimate geocellular attenuation solution Fully compliant with SfA8 Use our tool for fast and accurate design Fully confi gurable lateral Design tanks around irregular site shapes and vertical access points or where there is restricted access Like Q-Bic Plus itself, our free confi gurator tool is going down a storm. In clear steps it asks the questions and makes the calculations to create the optimum attenuation or infi ltration solution, complete with an auto-generated Bill of Materials. For specifi ers, contractors and installers it is yet another box ticked. qbic.wavin.co.uk 07617_002_WAV_Q-Bic Plus Campaign_Ticks Ad G_NCE_265x210__New Brand_AW.indd 1 05/11/2019 12:30 New Civil Engineer NET ZERO CHALLENGE COULD REVITALISE HIGH SPEED 2 MARK HANSFORD EDITOR ew ICE president Paul Sheffield entered office this month It is time for civil engineering with a clear message to civil engineering professionals worldwide: it is time to get serious about tackling the to step up to the challenge and N climate emergency. His call to arms could not have been better timed. show other sectors how net zero can be Sheffield was delivering his address as prime minister Boris Johnson was belatedly convening the government’s emergency Cobra committee to achieved discuss devastating floods across northern England. Meanwhile, Venice was being submerged by the city’s highest tide in 50 years and, across the other side of the world, Australia was battling catastrophic bushfires.
    [Show full text]
  • New Civil Engineer in Association with Sir Robert Mcalpine | December 2019
    150th Anniversary Supplement SIR ROBERT MCALPINE NEVER IN ITS 150 YEARS HAS THERE BEEN A ENGINEERING ACTIVITY TO FURTHER ENHANCE BETTER TIME TO BE A CIVIL ENGINEER AT SIR ITS BREADTH AND RESILIENCE. A CAREFULLY ROBERT MCALPINE. STRONG AND FLOURISHING, CONSTRUCTED STRATEGY LOOKS SET TO OFFER THE COMPANY IS ACTIVELY BOOSTING ITS CIVIL OUTSTANDING PROSPECTS FOR YEARS TO COME P02 SIR ROBERT P06 TEAMBUILDING MCALPINE AND CIVILS P12 DIVERSE TALENTS: In association with P04 CIVILS IN FUTURE DIFFERENT CAREERS SIR ROBERT MCALPINE 150th ANNIVERSARY SUPPLEMENT READY FOR ANYTHING Sir Robert McAlpine has prospered for c the last 150 years and remains family Sir Robert M Alpine’s new civil owned. I have to ensure what is still a highly successful enterprise maintains engineering business unit is and furthers that success in the years building on traditional values to to come. Resilience is being built through become a future proofed force Paul selective diversification of our revenue Hamer streams, in particular expanding back in UK construction. Managing into civil engineering. We will remain focused on the sectors and markets in director Tony Gates narrates the which we have true core competencies. Our strategy is to go deeper into what we know. story to Ty Byrd. I would like 30% of revenues to come from the public sector (hence the expansion of civil engineering capability) as this market tends to be more long term, stable and resilient. Current live examples are High Speed 2 and Highways England. THE STRATEGY We also want a similar percentage of our revenues to be Sir Robert McAlpine spent the first 100 delivered through construction management, where we of its 150 successful years in business are working with significant clients who want an integrated engaging with steel and concrete in a delivery partner to help them shape their end products.
    [Show full text]
  • Individual First Name
    17-18 May 2017 Inmarsat, London 2016 Attendee List Organisations in attendance included: 1st Line Defence Jackson Civil Engineering Aeciom Jacobs AERTEC Solutions Kier Construction Airport Consulting Partners Lagan Construction International All Task Lakesmere Amey London City Airport Arcadis London Luton Airport Arup Mace Atkins Mackley Bachy Soletanche Manchester Airports Group Balfour Beatty McGinley Support Services BAM Nuttall McLaughlin & Harvey Beumer Group Morgan Sindall Birmingham Airport Morson International Bristol Airport Mott MacDonald Brüel & Kjær Murphy Surveys BuroHappold Engineering Pascall+Watson CAT Surveys Phar Partnerships Cementation Skanska PJ Carey CH2M Prater Civil Aviation Authority Raymond Brown Construction Colas Ramboll Concretum Reliable Contractors Cundall Roadbridge Doig and Smith Robert BirdGroup Dragados RPS Planning & Development Dublin Airport Shell Bitumen Dyer & Butler Siemens EJ SnagR Software Elkem Southampton Airport Ernst & Young Stansted Airport Firstco Stride Treglown Farrans Construction Telespazio VEGA Ferrovial Agroman The Swain Group Fjøri Thomson Ecology Frazer Nash Todd Architects Galliford Try Tony Gee and Partners Gatwick Airport UK Power Network Services Gatwick Plant Vanderlande Industries Harry Peers Steelwork Veolia Water Projects Heathrow Airport Vinci Construction Helios VolkerFitzpatrick Hilti Volterra Partners Hoare Lea Weston Williamson and Partners HOC UK Wilson James HOK International WJ Groundwater HSS Hire Service Group Woods Bagot Interserve Engineering Services WSP | Parsons
    [Show full text]
  • 01 Knowledge Foundations Issue 1 January 2021
    Knowledge Foundations Inside this issue Issue 1 – January 2021 01 UCEM News 02 Other News 03 Built Environment Research Welcome to UCEM’s monthly Knowledge Foundations 04 Property & Construction newsletter (formally the Library e-bulletin), a compendium of Statistics news and views, research and resources relating to the 05 e-Journal Review educational sector and Built Environment. 06 e-Book Review 07 UCEM e-Library The UCEM Library aims to disseminate information, promote 08 Student Career Service current awareness and share good practice, to assist in the 09 UCEM’s Sustainability Hub continual professional development of all those working and 10 Information Governance aspiring to work within the Built Environment/Property and Construction industries. A to Z of useful references and web-links “The mission of librarians is to improve society through facilitating knowledge creation in their communities” What’s in this (R. David Lankes) month’s issue The initial aim of this UCEM Library current awareness service • Latest UCEM News incl. was to help keep students and staff informed of the education CBRE Head of Strategic sector and industry specific news, share current and best Advisory and former RICS President, Amanda Clack, practice, highlight the latest research and identify case studies was inaugurated as UCEM that will support studying and supplement teaching and learning Chairman on 27 Nov ‘20. resources. However, over the years and upon request, the readership has now expanded. • Things you need to know this week – London mayor We welcome news and information from readers to include in targets social rent for homes future editions - please email us.
    [Show full text]
  • Covid-19 Update – 25 March 2020 Introduction This Short Briefing Has
    Covid-19 Update – 25 March 2020 Introduction This short briefing has been prepared on behalf of the UK construction sector to brief companies and individuals on the ongoing repercussions of the Covid-19 coronavirus for our sector. The Briefing has been prepared in collaboration between the industry’s leading trade and representative bodies: Association for Consultancy & Engineering, Build UK, Chartered Institute of Building, Civil Engineering Contractors Association, Construction Plant-hire Association, Construction Products Association, Electrical Contractors Association, Federation of Master Builders, National Federation of Builders, and Institution of Civil Engineers. We are also grateful to Building, Construction Enquirer, Construction Manager, Construction News, Highways and New Civil Engineer for support in distribution to the wider industry. Site Operating Procedures The Cabinet Office has confirmed that construction in England can continue as long as it can be done safely AND in accordance with the Public Health England guidance. The latest Construction Leadership Council Site Operating Procedures (SOP) align with the latest Public Health England guidance: http://www.constructionleadershipcouncil.co.uk/news/site-operating-procedures- during-covid-19/ As this guidance changes, the SOP will be updated. If for any reason sites and companies are not able to comply with the PHE guidance, then they must cease activities until they can. NHS Hospitals NHS Hospitals have made the following request for supplies from industry to support their fight against Covid-19: • FFP3 masks • Full face visors (transparent and either disposable or reusable) • Safety goggles and glasses • Hand sanitizer • Haz mat / full body suits. If you can source any of the following please contact any of the trade associations noted at the end of this newsletter, who will liaise with those coordinating this work.
    [Show full text]
  • New Civil Engineer SEPTEMBER 2017 | IBP MAGAZINE of the YEAR FACTORY THINKING CONSTRUCTION EMBRACES the PRODUCTION LINE There’S More To
    Inside: Jacobs buys CH2M p08 Grenfell Tower latest p10 Stockholm metro p52 New Civil Engineer SEPTEMBER 2017 | IBP MAGAZINE OF THE YEAR FACTORY THINKING CONSTRUCTION EMBRACES THE PRODUCTION LINE There’s more to Groundworks Temporary Bridging Permanent Bridging Propping & Jacking Building Refurbishment Formwork & Falsework Site Access & Barriers Instrumentation & Monitoring Contract Services Major Projects Product Sales Training Academy For more information about how we can help you deliver safer, faster and more efficient construction, contact us: tel: 0845 741 3040 email: [email protected] web: www.mabey.com New Civil Engineer THINK FACTORY IF YOU WANT TO END THE PROFITS SLUMP MARK HANSFORD EDITOR he timing of this month’s theme – factory thinking – stated that manufacturing is one of three “strategic themes” in the surely couldn’t be more apposite. recently released Technology Roadmap for the industry. As we move through the “summer of profit warnings” But, there’s still a way to go before the UK embraces offsite the way T the parlous state of UK civils contracting has been laid that Germany, Japan or other countries have done. bare in ways that, while not really surprising, are still Take High Speed 2. Back in 2014 HS2 Ltd’s technical director Andrew really rather concerning. McNaughton was urging his engineers to rise to the challenge and “join It all began in July with Carillion and its massive £845M writedown. The announcement sent shockwaves through the industry and saw 70% immediately wiped off the value of Carillion shares. But since then other major names have shown that Carillion is not Low margin businesses can alone.
    [Show full text]
  • Mott Macdonald Joint Venture (BMM Remaining Teams Offered High Quality Will Support Research Into Amrs, Which JV)
    Inside: Richard Susskind on AI p70 Graduate Award winners p94 New Civil Engineer JANUARY 2018 ECONOMIC ELEVATOR HOW CIVIL ENGINEERING IS NOW KEY TO RAISING BRITAIN'S WAGES Street New Civil Engineer KICK OUT THE OLD JOBS, BRING IN THE NEW MARK HANSFORD EDITOR ots of excitement has inevitably surrounded chancellor Philip Hammond’s Budget and the plethora of reports, It can be difficult to strategies and deals that have been published in the get ‘cutting edge’ skills L weeks following, all largely focused on tackling Britain’s “productivity” challenge. into the university syllabus The engineering industry has largely welcomed it all, largely because the general thrust has been that investing in the right kind of infrastruc- ture is the answer: that by having better road and rail links the nation event back in October, and his thoughts, and the responses of the sen- will collectively work harder in the making of stuff, and that once made, ior business-leader audience, are published in this month’s edition. this stuff can get its way to market quicker. “Digital” infrastructure has He had a stark warning for any engineer that believes they are been a particularly positive thing to talk about – whether that be invest- “immune from the advancing power of computing: “That determined ing in 5G telecoms networks or paving the way for autonomous vehi- view that machines do the routine work underestimates the processing cles (for purposes unclear). power of technology,” he stated. “Machines are outperforming us, but But what has been missing from the post-Budget debate and discus- doing it in a different way” sions has been the other digital – digital delivery.
    [Show full text]