Fast, Safe, and Convenient Railway

Total Page:16

File Type:pdf, Size:1020Kb

Fast, Safe, and Convenient Railway • The symbol of KR is expressed as a mark with the combination of Alphabet K & R: “K”, www.kr.or.kr Management information standing for Korea, “R”, for railway. being focused on the fact that KR is the heart of CEO’s message & Overview of KR Korean railway industry 02 • “R”, standing for rail, symbolizes the image of expanding railway, expressing the vision 01 of Korean railway advancing into global market Fast, Korea’s top public Fast, Leading the railway industry Safe, KOREA RAIL NETWORK AUTHORITY Safe, Convenient, organization Convenient, with consistent change and Rail Network Rail Network innovation Fast 2014 Railway Investment KRW 7.2 trillion (1.1788 trillion won increase compared to that of last year) CEO’s message “KR is doing its best to construct advanced rail Annual investment of Unit: trillion KRW Safe network for the new era of 8 the Korean railway 7.2 7.2 national happiness and hope” 7 Structure of railway industry 6.2 6.4 (Inaugural Speech, 2014.2.18) 6 5.6 5.7 Convenient ➊ Responsible management as Chairman & CEO 5 4.6 Kang Young Il an exemplary public enterprise 4.0 Ministry of Land, 4 3.5 3.3 Infrastructure ➋ Status reinforcement as a Rail Network 3 2.8 and Transport professional rail construction& management organization (Policy) ➌ Pursuit of the best railway quality & Cultivation of competent 2 & creative human resources 1 ➍ Securing financial stability ➎ Creativity & Innovation '04 '05 '06 '07 '08 '09 '10 '11 '12 '13 '14 KR ➏ Establishment of corproate culture for co-prosperity via (Construction, KORAIL Management of (Operator) candid and open communication. (in the Inaugural Speech) facilities, Funding) KTX Credit Rating Moody's (2012.08.27.) (Rated as high quality and very low credit risk) Measures to reduce debt of public institutions – Find Aa3 (2nd operator) (by top global credit rating agencies) answers in the field (on-site safety inspections during Thaw, S&P (2012.09.17.) A+ (Rated as high quality and very low credit risk) 2014.3.6.) ※ One of the highest level among Korean public entities Debt reduction by 846.2 billion won through painful self- 2004.1 Inauguration of Korea Rail Network Authority (Consolidation of Korea High-speed efforts! Construction Authority and Korea Railroad Agency’s sectors of construction & facilities management) Profit creation of 1.6 trillion won through improvement of Redemption of Net 2011 41.5 billon won 41.5 billion won track access charging methods! (countermeasure meeting for Liabilities Major Projects Normalization, 2014.3.13.) 2012 92.9 billon won 134.4 billion won Osong Viaduct ● Gyeongbu High-speed rail (169.5km‘02-’14) 2013 137.7 billon won 272.1 billion won KR is going to play a leading role in global rail market, Total cost : KRW 21.0291 trillion opening the era of Eurasian Iron Silk Road beyond the (KRW 9.5531 trillion from national coffer, 11.476 trillion from KRNA) Korean penninsula. (interview with Munhwa Daily, 2014.3.31.) ● Honam High High-speed rail (182.3km‘06-’17) (Korea Rail Network Authority) Organization Organization 4 headquarters, 1 office, 1 research institute, and 5 regional offices KR constructs Total cost : KRW 10.7161 trillion Aim of KRNA’s foundation Contributing to enhancing convenience of citizens’ use of Number of current staffs 1,333 (KRW 5.3581 trillion from national coffer, 5.3581 trillion from KRNA) fast, safe, and convenient railway & its Mission public transportation and national economic growth with ● Seoul Metropolitan High-speed rail (61.1km‘08-’15) efficient construction and management of railway 1,545 facilities 1,444 Total cost : KRW 3.1181 trillion 1,347 1,333 (KRW 1.2472 trillion from national coffer, 1.8709 trillion from KRNA) ➊ Construction and renewal of High-speed, Conventional and ● Conventional rail : Opening of 23 projects Samnangjin∼Jinju, Jeolla Inter-city railway double-tracked le ➋ Asset Management and Development & Operation of railway 2008 2010 2012 2013 ● Opening of 8 projects such as Inter-city line of Gyeongui and Ori ~ Suwon land and Station area Achieved the goal of development plan of pubic organizations conducted by the Korean government (2012) ➌ Development of railway technology and management of railway facilities in safety ※ Selected as one of the exemplary organization in personal ➍ Creating trans-Korean railway and advancing into Overseas affairs of “Development plan of public organizations” conducted 242 Jungang-ro, Dong-gu, Daejeon City by the Ministry of Strategy and Finance Main Contact : 1588-7270 http://www.kr.or.kr railway market 03 What does KR envision in 2020? 04 KR business 05 Innovative methods of construction 06 Sustainability management Fast, To be one of the global powerhouses Fast, Establishment of low cost and Fast, Great railway by cutting-edge Fast, Citizen-adoring Public Safe, Safe, Safe, Safe, Convenient, in the railway industry by connecting Convenient, high efficient railway infrastructure Convenient, technology Convenient, organization Rail Network Korean major cities within 90 minutes Rail Network Rail Network Rail Network Total length of lines 2020 4,934km Construction of HSR(High-speed rail) Construction of Inter-city Rail Construction of Conventional rail Construction by new Realizing responsible technology and method management Overview of Projects Overview of Projects Overview of Projects 2013 3,661km optimal to on-site 3 Projects of 660.9km : 10 projects of 404.4km: 27 projects of 1,327.9km: Creating jobs Gyeongbu, Honam(Osong∼ Gyeongui, Wangsimni∼Seolleung, Wonju-Gangneung, Seongnam- condition Creation of 21,577 jobs in 2013 Double-track ratio Mokpo), Seoul Metropolitan Busan∼Ulsan double-tracked & Yeoju, Pohang∼Samcheok Renewal Applied technology (increase of 19.9% compared to area(Suseo∼Pyeongtaek) line electrified line Total cost KRW 33.6525 trillion 2020 79% 18,003 jobs in 2012) Total cost KRW 34.4488 trillion Total cost KRW 19.9978 trillion Steel Arch Bridge Method 2013 2,077km 57% Incremental Launching and Geongji overpass (Honam HSR) Yoolhyeon Tunnel Management of railway facilities Asset development Overseas rail projects Rotation method 8.1∼10.1m of superstructure and 3arch Seoul-Metropolitan High-speed rail, “Field Management” of CEO Countermeasures meeting for Electrification ratio most environment-friendly construction (fields visits- center of Daejeon city) normalization Shield Tunnel Boring Machine Method 2020 85% Overview of Projects Overview of Projects Overview of Projects Enhancing citizens’convenience by Development of Station complex & PM(project management), 2013 2,529km 69% the management of rail facilities area, vacant land, and Supervision, and ODA(Official PSM (Precast Span Method) This figure is the highest among that of the six HSR-operating nations (Statistics of (installation of vertical crossing, housing business for the general Development Assistance) International Union of Railways) sound-proofing wall) and renewal populace MSS KR won the 32 overseas projects of old facilities (Movable Scaffolding System) of KRW 84.1 billion from 12 countries during 2004-2013, FCM Accumulated turnover 2020 KRW 16.4 trillion aiming at getting KRW 14.6 billion (Free Cantilever Method) in 2014 Han-river underwater tunnel Booyong 1 bridge (Honam HSR) 2013 KRW 5.89 trillion NTR (Wangsimni∼Seolleung) PSM Granting KR scholarship for young Junior board meeting (New Tubular Roof Method) Korea’s first tunnel applied by TBM technology students Details of turnover (including new businesses) Access charges, Asset lease, Station complex & area development, Profit from Accumulated Overseas Projects of KRNA (2004-2013) : 32 projects of KRW 84.1 billion from 12 countries Asset development and Overseas business Decrease of hazard rate to 0.102% in 2013, by thorough Quality & ※ Participating in a bid for Project Management Construction Managemen Consultancy Service for Oman Railway 2nd National Development Bangladesh China Environment-friendly railway Plan of Rail Network Jejin Consultancy Services of Replacement and (2005) Supervision of Suining ~ Chongqing line (HSR) Modernization of Existing Railway Signalling (2006) Supervision of Wuhan ∼ Guangzhou line (HSR) Operating joint investigation into (2011-2020) System at 11 stations of Bangladesh Railway Sokcho (2008) Supervision of Hal’bin ∼ Dalian line (HSR) environment and ecology in East Zone (2010) Technology consulting for Lanzhou ∼ Xinjiang line (HSR) Realizing low vibration and sound Technology consulting for Xi’an ∼ Baoji line (HSR) charity event(making and sharing Training for 2013 new employees by earthquake-proof tracks and Kimchi) (Daejeon Gyejok Mt.) Technology consulting for Tianjin ~ Qinhuangdao line (HSR) Munsan Nepal sound-absorbing blocks Uijeongbu Chuncheon Technology consulting for Panjin ~ Xinhaicheng line (HSR) Gangneung (2011) Feasibility Study(FS) for Katumandu LRT Daegok Seoul Technology consulting for Ha’erbin ~ Qiqiha’er line (HSR) Creating mid and long-term plan Cheongnyangni Detail Design of electrified railway Training railway specialists Suseo Technology consulting for Changsha ∼ Kunming line (HSR; to prevent climate change Gwangmyeong Wonju Samcheok (2012) Detail Design of electrified railway in Incheon Airport Selected as a top supervising organization for Guizhou line) Reviving the vicinity of the viaduct in the Air-view of the installation of solar Pangyo the 2nd phase Installing environment-friendly and Wonsi (2012) Technology consulting for Zhengzhou ∼ Xuzhou obsolete rail of Gyeongchun line to be energy generator Fostering railway specialist Bubal Dongtan Jecheon renewable
Recommended publications
  • Metro Lines in Gyeonggi-Do & Seoul Metropolitan Area
    Gyeongchun line Metro Lines in Gyeonggi-do & Seoul Metropolitan Area Hoeryong Uijeongbu Ganeung Nogyang Yangju Deokgye Deokjeong Jihaeng DongducheonBosan Jungang DongducheonSoyosan Chuncheon Mangwolsa 1 Starting Point Destination Dobongsan 7 Namchuncheon Jangam Dobong Suraksan Gimyujeong Musan Paju Wollong GeumchonGeumneungUnjeong TanhyeonIlsan Banghak Madeul Sanggye Danngogae Gyeongui line Pungsan Gireum Nowon 4 Gangchon 6 Sungshin Baengma Mia Women’s Univ. Suyu Nokcheon Junggye Changdong Baekgyang-ri Dokbawi Ssangmun Goksan Miasamgeori Wolgye Hagye Daehwa Juyeop Jeongbalsan Madu Baekseok Hwajeong Wondang Samsong Jichuk Gupabal Yeonsinnae Bulgwang Nokbeon Hongje Muakjae Hansung Univ. Kwangwoon Gulbongsan Univ. Gongneung 3 Dongnimmun Hwarangdae Bonghwasan Sinnae (not open) Daegok Anam Korea Univ. Wolgok Sangwolgok Dolgoji Taereung Bomun 6 Hangang River Gusan Yeokchon Gyeongbokgung Seokgye Gapyeong Neunggok Hyehwa Sinmun Meokgol Airport line Eungam Anguk Changsin Jongno Hankuk Univ. Junghwa 9 5 of Foreign Studies Haengsin Gwanghwamun 3(sam)-ga Jongno 5(o)-gu Sinseol-dong Jegi-dong Cheongnyangni Incheon Saejeol Int’l Airport Galmae Byeollae Sareung Maseok Dongdaemun Dongmyo Sangbong Toegyewon Geumgok Pyeongnae Sangcheon Banghwa Hoegi Mangu Hopyeong Daeseong-ri Hwajeon Jonggak Yongdu Cheong Pyeong Incheon Int’l Airport Jeungsan Myeonmok Seodaemun Cargo Terminal Gaehwa Gaehwasan Susaek Digital Media City Sindap Gajwa Sagajeong Dongdaemun Guri Sinchon Dosim Unseo Ahyeon Euljiro Euljiro Euljiro History&Culture Park Donong Deokso Paldang Ungilsan Yangsu Chungjeongno City Hall 3(sa)-ga 3(sa)-ga Yangwon Yangjeong World Cup 4(sa)-ga Sindang Yongmasan Gyeyang Gimpo Int’l Airport Stadium Sinwon Airprot Market Sinbanghwa Ewha Womans Geomam Univ. Sangwangsimni Magoknaru Junggok Hangang River Mapo-gu Sinchon Aeogae Dapsimni Songjeong Office Chungmuro Gunja Guksu Seoul Station Cheonggu 5 Yangcheon Hongik Univ.
    [Show full text]
  • Korea Railroad Corporation
    KOREA RAILROAD CORPORATION Issue of U.S.$ 150,000,000 Floating Rate Notes due 2024 (the “Notes”) Issued pursuant to the U.S.$2,000,000,000 Medium Term Note Program Issue Price: 100% of the Aggregate Nominal Amount Issue Date: November 29, 2019 This investor package includes (a) the offering circular dated August 28, 2018 relating to the U.S.$2,000,000,000 Medium Term Note Program (the “Program”) as supplemented by the pricing supplement dated November 18, 2019 relating to the Notes (the “Offering Circular”), and (b) this document dated November 29, 2019 as the cover page to the Offering Circular (the “Investor Package”). The Notes will be issued by Korea Railroad Corporation (the “Issuer”). Application will be made to the Taipei Exchange (the “TPEx”) for the listing of, and permission to deal in, the Notes by way of debt issues to professional investors as defined under Paragraph 1, Article 2-1 of the Taipei Exchange Rules Governing Management of Foreign Currency Denominated International Bonds of the ROC only and such permission is expected to become effective on or about November 29, 2019. TPEx is not responsible for the contents of this Investor Package and no representation is made by TPEx as to the accuracy or completeness of this Investor Package. TPEx expressly disclaims any and all liabilities for any losses arising from, or as a result of, the reliance on, all or part of the contents of this Investor Package. Admission for listing and trading of the Notes on the TPEx is not to be taken as an indication of the merits of the Issuer or the Notes.
    [Show full text]
  • KSP 7 Lessons from Korea's Railway Development Strategies
    Part - į [2011 Modularization of Korea’s Development Experience] Urban Railway Development Policy in Korea Contents Chapter 1. Background and Objectives of the Urban Railway Development 1 1. Construction of the Transportation Infrastructure for Economic Growth 1 2. Supply of Public Transportation Facilities in the Urban Areas 3 3. Support for the Development of New Cities 5 Chapter 2. History of the Urban Railway Development in South Korea 7 1. History of the Urban Railway Development in Seoul 7 2. History of the Urban Railway Development in Regional Cities 21 3. History of the Metropolitan Railway Development in the Greater Seoul Area 31 Chapter 3. Urban Railway Development Policies in South Korea 38 1. Governance of Urban Railway Development 38 2. Urban Railway Development Strategy of South Korea 45 3. The Governing Body and Its Role in the Urban Railway Development 58 4. Evolution of the Administrative Body Governing the Urban Railways 63 5. Evolution of the Laws on Urban Railways 67 Chapter 4. Financing of the Project and Analysis of the Barriers 71 1. Financing of Seoul's Urban Railway Projects 71 2. Financing of the Local Urban Railway Projects 77 3. Overcoming the Barriers 81 Chapter 5. Results of the Urban Railway Development and Implications for the Future Projects 88 1. Construction of a World-Class Urban Railway Infrastructure 88 2. Establishment of the Urban-railway- centered Transportation 92 3. Acquisition of the Advanced Urban Railway Technology Comparable to Those of the Developed Countries 99 4. Lessons and Implications
    [Show full text]
  • Construction Supervision
    SAMBO ENGINEERING Corporate Profile To the World, For the Future Construction engineering is basically having big change as periodic requirements from “The 4th Industrial Revolution”. SAMBO ENGINEERING is trying hard to change and innovate in order to satisfy clients and react actively to the change of engineering market. SAMBO ENGINEERING provides total solution for the entire process of engineering such as plan, design, CM/PM, O&M in roads, railways, civil structures, tunnels & underground space development, transportation infrastructure & environmental treatment, new & renewable energy, urban & architecture planning for land development, water and sewage resource. Recently, from natural disaster such as earthquakes and ground settlement, in order to create motivation for stable profit system, we adapt BIM, perform topographical survey using Drones, design automation using AI, underground safety impact assessment as well as active investment for new & renewable energy such as solar and wind power plant. We accumulate lots of technologies and experience from R&D participation which develops and applies new technology and patent as well as technical exchange with academies and technical cooperation with major globalized engineering companies. SAMBO ENGINEERING will be one of the leading engineering companies in the future by overcoming “The 4th Industrial Revolution”. Algeria - Bir Touta~Zeralda Railway Project Armenia - Project Management for South-North Expressway Project Azerbaijan - Feasibility Study for Agdas~Laki, Arbsu~Kudamir~Bahramtepe
    [Show full text]
  • 경춘선 (Gyeongchun Line) 지하철 시간표 & 노선 지도
    경춘선 (GYEONGCHUN LINE) 지하철 시간표 & 노선 지도 광운대- 춘천 경춘선 (GYEONGCHUN LINE) (Kwangwoon 웹사이트 모드로 보기 University - Chuncheon) 경춘선 (GYEONGCHUN LINE) 지하철 노선 (광운대- 춘천 (Kwangwoon University - Chuncheon))은(는) 9 경로가 있습니다. 주중운영 시간은 다음과 같습니다: (1) 광운대 →춘천: 오전 8:47 - 오후 8:30 (2) 마석 →상봉: 오전 7:03 (3) 상봉 →마석: 오전 6:16 - 오후 11:55 (4) 상봉 →춘천: 오 전 5:10 - 오후 11:08 (5) 상봉 →평내호평: 오전 8:03 - 오후 10:52 (6) 춘천 →상봉: 오전 5:05 - 오후 10:45 (7) 춘천 →평내호평: 오후 11:05 - 오후 11:25 (8) 평내호평 →상봉: 오전 5:15 - 오후 7:24 (9) 평내호평 →춘천: 오전 5:10 - 오후 3:05 내 근처의 가장 가까운 경춘선 (GYEONGCHUN LINE) 지하철을 찾으려면 무빗을 사용하여 다음 경춘선 (GYEONGCHUN LINE) 지하철 도착시간을 확인하세요. 방향: 광운대 →춘천 경춘선 (GYEONGCHUN LINE) 지하철 시간표 정류장 22개 광운대 →춘천 경로 시간표: 노선 일정 보기 일요일 미 운행중 월요일 오전 8:47 - 오후 8:30 광운대 Kwangwoon University South Korea Seoul Yongsan-gu 석계로 성북역 85 화요일 오전 8:47 - 오후 8:30 상봉 Sangbong (Intercity Bus Terminal) 수요일 오전 8:47 - 오후 8:30 South Korea Seoul Yongsan-gu 망우로 297 목요일 오전 8:47 - 오후 8:30 망우 금요일 오전 8:47 - 오후 8:30 South Korea Seoul Yongsan-gu 망우로55길 11-10 토요일 미 운행중 신내 South Korea Seoul Yongsan-gu 신내역로 신내역사 320 갈매 Galmae South Korea Gyeonggi Namyangju-si 경춘북로 229 경춘선 (GYEONGCHUN LINE) 지하철 정보 방향: 광운대 →춘천 별내 정거장: 22 South Korea Gyeonggi Namyangju-si 경춘북로 375 이동 시간: 90 분 노선 요약: 광운대 Kwangwoon University, 상봉 퇴계원 Sangbong (Intercity Bus Terminal), 망우, 신내, 갈매 South Korea Gyeonggi Namyangju-si 경춘북로 545 Galmae, 별내, 퇴계원, 사릉, 금곡, 평내호평, 천마산, 마석, 대성리, 청평, 상천, 가평 Gapyeong, 굴봉산 사릉 Gulbongsan, 백양리, 강촌, 김유정, 남춘천, 춘천 금곡 South Korea Gyeonggi Namyangju-si 금곡로19번길 47 평내호평 South Korea Gyeonggi Namyangju-si 경춘로 1375 천마산 South Korea Gyeonggi Namyangju-si
    [Show full text]
  • I. Introduction
    TRANSACTIONS ROYAL ASIATIC SOCIETY Korea Branch Volume 93 – 2018 1 COVER: The seal-shaped emblem of the RAS-KB consists of the following Chinese characters: 槿 (top right), 域 (bottom right), 菁 (top left), 莪 (bottom left), pronounced Kŭn yŏk Ch’ŏng A in Korean. The first two characters mean “the hibiscus region,” referring to Korea, while the other two (“luxuriant mugwort”) are a metaphor inspired by Confucian commentaries on the Chinese Book of Odes, and could be translated as “enjoy encouraging erudition.” SUBMISSIONS: Transactions invites the submission of manuscripts of both scholarly and more general interest pertaining to the anthropology, archeology, art, history, language, literature, philosophy, and religion of Korea. Manuscripts should be prepared in MS Word format and should be submitted in digital form. The style should conform to The Chicago Manual of Style (most recent edition). The covering letter should give full details of the author’s name, address and biography. Romanization of Korean words and names must follow either the McCune-Reischauer or the current Korean government system. Submissions will be peer- reviewed by two readers specializing in the field. Manuscripts will not be returned and no correspondence will be entered into concerning rejections. Transactions (ISSN 1229-0009) General Editor: Jon Dunbar Copyright © 2019 Royal Asiatic Society – Korea Branch Room 611, Christian Building, Daehangno 19 (Yeonji-dong), Jongno-gu, Seoul 110-736 Republic of Korea Tel: (82-2) 763-9483; Fax: (82-2) 766-3796; Email: [email protected] Visit our website at www.raskb.com TRANSACTIONS Volume 93 – 2018 Contents The Diamond Mountains: Lost Paradise Brother Anthony 1 Encouragement from Dongducheon 19 North Korean Fragments of Post-Socialist Guyana Moe Taylor 31 The Gyehu Deungnok Mark Peterson 43 “Literature Play” in a New World Robert J.
    [Show full text]
  • Newsletter Newsletter
    2017.11 SEOUL TOUR+ NEWSLETTER A Newly Revived Seoul for the New Year New & Recommended Attractions SeMA Bunker 1 Oil Tank Culture Park 2 Gyeongchun Line Forest Park 3 Bae Ryeom’s House in Gye-dong 4 Hong Geon-ik’s House in Pirun-dong Seoul Sewerage Science Museum 5 [Special] Incheon Hot Place ➁ ‘Songdo’ 6 Special Recommendations Seoullo 7017's Food Space: Seoulista 7 Seoul City Wall Museum 8 2018 Pyeongchang Winter Olympics Special 9 Exhibition Barrier-Free Tours Seoul Upcycling Plaza 10 Seoul Science Center 11 A secret bunker has opened up in Seoul, SeMA Bunker SeMA Bunker Basement of 2-11, Yeouido-dong, Yeongdeungpo-gu, Seoul Tue~Sun 10:00~18:00 (Road name address unassigned) ※ Closed on Mondays & Jan 1 sema.seoul.go.kr Free admission Website: KOR/ENG/CHN/JPN ※ Group inquiries +82-2-2124-8800 / KOR & ENG available On-site: KOR/ENG <SeMA Bunker Entrance> <Interior of Original Facility> <Exhibition Hall> ‣ A secret underground space discovered while building the Yeouido Transfer Center in 2005 - At the time of the discovery, the locked area was investigated through a videoscope. It is presumed to be a security and escape facility for high-ranking government officials in the 1970s and holds historical significance in the fact that it is a holdover from the Cold War era. ‣ It was designated as a future heritage of Seoul in 2013, and opened in October of this year as a specialized complex arts and culture space in Yeouido. - A 150-pyeong exhibition space and 20-pyeong historical gallery were created while preserving the original state of the facility.
    [Show full text]
  • Republic of Korea High-Speed Rail Passenger Traffic
    Republic of Korea High-Speed Rail Passenger Traffic Statistics - to 2018 We present annual passenger traffic statistics for high-speed railway lines in the Re- public of Korea (KR, South Korea) in the table and figure below. This compilation extends from 2004, when South Korea opened its first dedicated high speed railway, to the most recent years for which data are available. List of Tables and Figures (scroll down): Table 1: Passenger Traffic Statistics - KTX-all Figure 1: Passenger Traffic - KTX-all Table 2: Passenger Traffic Statistics - Gyeongbu KTX Figure 2: Passenger Traffic - Gyeongbu KTX Table 3: Passenger Traffic Statistics - Gyeongjeon KTX Figure 3: Passenger Traffic - Gyeongjeon KTX Table 4: Passenger Traffic Statistics - Donghae KTX Figure 4: Passenger Traffic - Donghae KTX Table 5: Passenger Traffic Statistics - Honam KTX Figure 5: Passenger Traffic - Honam KTX Table 6: Passenger Traffic Statistics - Jeolla KTX Figure 6: Passenger Traffic - Jeolla KTX Transcription: All names of KR organizations, cities and railway stations in are transcribed into the Latin alphabet according to the Revised Romanization of Korean system. This was adopt- ed as the official KR standard for romanization from 2000. Organizations and terms: 한국철도공사 (韓國鐵道公社) Hanguk Cheoldo Gongsa. English-language title: Korea Railroad Corporation, This is the national rail operator. It uses 코레일, Korail, as a marketing label. 한국철도시설공단 (韓國鐵道施設公團) Hanguk Cheoldo Siseol Gongdan. English-language title Korea Rail Network Authority. This is the national rail in- frastructure authority. 한국고속철도 (韓國高速鐵道) Hanguk Gosok Cheoldo ("Korea High-Speed Railway"). This is the Korean-language name for high-speed railways in Korea (map of existing and planned KTX services, at 2015).
    [Show full text]
  • Strategies for City Networks
    Strategies for Network Cities explained with the example of South Korea Zur Erlangung des akademischen Grades eines DOKTOR-INGENIEURS an der Fakultät für Bauingenieur-, Geo- und Umweltwissenschaften der Universität Fridericiana zu Karlsruhe (TH) genehmigte DISSERTATION von M. Eng. Hyun-Suk Min aus Seoul Tag der mündlichen Prüfung: 26.06.2006 Hauptreferent: Univ.-Prof. Dr. sc. techn. Bernd Scholl Korreferent: Univ.-Prof. Dr.-Ing. Walter Schönwandt Karlsruhe 2006 Preface People and industries have concentrated to the big cities to achieve economies of scale. However the problems of this urban concentration become gradually obvious and have limited the development of the metropolises. They are hardly managed by current planning measures. In the diversifying social needs for heterogeneous life styles and sustainable mobility, now it is inevitable to adjust the sustainable space system. As an alternative answerable to this new demand here is suggested an approach of network cities. Even though strategies for network cities were proposed with an example of South Korea, the conceptual approaches can be applied to other countries, especially functionally centralized nations or developing countries which experience now rapid urbanization than any other times. Until this concept of network cities was made concrete, however the direct and indirect contribution of several important persons was essential. They were willing to discuss with me and give me recommendations. Here I wish my deep appreciation for their kindness. I thank Prof. Bernd Scholl for not only his scientific support and guidance throughout my works but also his tolerance and encouragement. He suggested me to investigate diverse spatial development plans for city networks in other countries and helped me to think of ideas on network cities.
    [Show full text]
  • KOREA RAIL NETWORK AUTHORITY 01 the Gateway to Hope Is Opening in Korea
    a NKOREA RAILew NETWORK AUTHORITY Path KOREA RAIL NETWORK AUTHORITY 01 The gateway to hope is opening in Korea. Railroads connect dreams with reality. Railroads connect people with culture. And railroads bring Koreans together. As the center of transportation, culture and logistics of Northeast Asia, Korea is developing as the new center of the world - At the heart of this development lies the Korea Rail Network Authority. Contents 01 A New Path 02 Launch of the Korea Rail Network Authority 06 Greetings from the CEO 08 Expansion of Railway Investment 10 Path of Challenge 13 High-speed Railway 15 Conventional Railway / Wide Area Railway 17 Trans-Korea Railway / Northeast Asia Railway 18 Logistics Distribution System 20 Facilities Management 22 Path of Technology 24 Unique Blend of Systems, Human Resources, and Organization 26 Quality, Safety Management and Railroad Industry Technology 28 Construction Techniques and Safety System 30 Path of Hope 32 Transparent Management 34 Future Vision A New Path Korea Rail Network Authority has been 3 years since its launching, Korea Rail Network Authority, the world best railway construction organization, is making a new history of the railway. An organization designed to take full charge of railroad construction and facilities management Korea's railroad industry, which had its start back on September 18, 1899 when the Gyeongin Line opened, now boasts a history of 107 years. Since its inception, the railroad - as a pivotal mode of transportation - has made a significant contribution to Korea's economic growth and regional development, thus fulfilling its role as the backbone of the nation. Since the establishment in 2004 and the proclamation to be the world's best-renowned rail construction expert, Korea Rail Network Authority(KR) has been rewriting the nation's railway history.
    [Show full text]
  • 2010 KORAIL Sustainability Report
    2010 KORAIL SUSTAINABILITY REPORT TSR TMR TMGR TCR East Sea ABOUT THIS REPORT 2010 KORAIL SUSTAINABILITY REPORT ADDITIONAL INFORMATION CHARActerISTICS OF THE REPORT Please use the following contact This is KORAIL’s third sustainability report covering the company’s economic, information if you need more social, and environmental policies and performances. To ensure its accuracy, it information about this report or have has been reviewed by an impartial third party (page 92~93). Going forward, KORAIL any questions about it. will incorporate readers’ opinions about this report into its future management • Home Page http://www.korail.com activities. You can download both the Korean and English versions from KORAIL’s • E-Mail [email protected] home page, http://www.korail.com. • Telephone 82-42-615-3202 • Fax 82-2-361-8278 • D epartment in Charge of Production Customer Value Management Office, WRITING STANDARDS Management Innovation Department We used the G3 guidelines of the GRI (Global Reporting Initiative) in writing this report, with specific reference to its requirements for the logistics and transportation industries. It satisfies all the requirements of the GRI G3 Level A+ level indicators. SCOPE AND TIME PERIOD OF REPORT KORAIL has published a sustainability report every year since 2008. Most of the data in this one cover the period between January and December of 2010. We have also sometimes used data from 2008 and 2009 for purposes of comparison. If a set of data do not belong to the year 2010, we have made specific note of that fact. Instances in which data could not be collected, as well as projects that began after 2010, have been identified as such.
    [Show full text]
  • Express-Centric Train Operation of Korean Capital Wide-Area Railroad
    International Journal of Applied Engineering Research ISSN 0973-4562 Volume 12, Number 9 (2017) pp. 2063-2070 © Research India Publications. http://www.ripublication.com Express-centric train operation of Korean capital wide-area railroad Baekkyu Namkung* Department of Railway Management and Policy, Seoul National University of Science and Technology 232 Gongneung-ro, Nowon-gu, Seoul 01811, South Korea Sungbong Chung Professor, Department of Railway Management and Policy, Seoul National University of Science and Technology 232 Gongneung-ro, Nowon-gu, Seoul 01811, South Korea (Corresponding author) *ORCID: 0000-0002-7843-6766 & SCOPUS ID-57190839043 Abstract provinces with promptness and in quantities. Also its meaning or character may be thought to be different from those of There has been the increase of interest in the materialization of “Urban Railroad” defined by 「Urban Railroad Act」 which is rapid transit system for the reduction of wide-area travel time served for smooth operation of urban traffic in urban transport between cities or provinces. Wide-area railroad is for handling area. In particular, since the wide-area railroad is operated the immense demands for daily transportation between cities or among more than two cities or provinces, 「Enforcement provinces by any relevant laws, the function and role of which Ordinances for Special Act on Metropolitan Wide-Area Traffic is different from that of urban railroad constructed for smooth Control」 prescribes that the scheduled speed should be over operation of urban traffic. But, as a matter of fact, the 50km/h (over 40km/h with Extension of Urban Railroad). distinction between wide-area railroad and urban railroad is ambiguous.
    [Show full text]