ORC VPP Documentation 2019 5

Total Page:16

File Type:pdf, Size:1020Kb

ORC VPP Documentation 2019 5 World Leader in Rating Technology OFFSHORE RACING CONGRESS ORC VPP Documentation 2019 5 2 Copyright c 2019 Offshore Racing Congress All rights reserved. Reproduction in whole or in part is only with the permission of the Offshore Racing Congress. CONTENTS 1 Background 13 2 Introduction 15 2.1 Scope . 15 2.2 Overview . 15 2.3 Layout . 15 3 VPP Methodology 17 3.1 Solution Method . 17 3.2 Boat Model . 18 3.2.1 Functional relationships . 19 3.3 Equations of Equilibrium . 21 3.3.1 Driving Force - Drag . 21 3.3.2 Heeling Moment - Rolling Moment . 22 3.4 Water Ballast and Canting Keel Yachts . 23 3.4.1 Canting Keel . 23 3.4.2 Daggerboard (Centreline lifting appendage) . 23 3.4.3 Daggerboard and Bilge boards . 23 3.4.4 Water ballast . 24 3.4.5 Measurement . 24 3.5 Dynamic Allowance (DA) . 24 3.5.1 Credits (2012) . 25 3.5.2 Calculation Procedure . 25 3.6 Non Manual Power . 25 4 Lines Processing Program 27 4.1 Hydrostatics . 27 4.2 LPP Output parameter definitions . 28 4.2.1 Measurement Trim . 28 4.2.2 Sailing Trim . 28 4.2.3 Second Moment Length (LSM) . 28 4.2.4 Appendage stripping . 28 4.2.5 Beam Depth Ratio (BTR) . 29 4.2.6 Maximum Effective Draft (MHSD) . 30 4.2.7 Bulb/Wing Effects . 31 4.3 Appendage wetted areas and lengths . 34 4.3.1 Conventional Fin keel and rudder . 34 4.3.2 Other appendages . 34 4.4 Righting Moment . 34 4.4.1 Righting Arm Curve . 35 4.4.2 Hydrodynamic Centre of Pressure . 36 4.4.3 Crew righting moment . 36 4.4.4 Dynamic Righting Moment. RMV . 37 4.4.5 Rated Righting Moment . 37 3 4 5 Aerodynamic Forces 39 5.1 Methodology . 39 5.1.1 Individual Sail Areas and 2-Dimensional Aerodynamic Force Coefficients . 39 5.1.2 Simplified Rigging Coefficients . 40 5.1.3 Optimization and De-powering . 41 5.2 Sail Areas & Coefficients . 43 5.2.1 Mainsail . 43 5.2.2 Jib or Genoa . 46 5.2.3 Spinnakers . 48 5.2.4 Spinnaker tack position Power Function . 51 5.2.5 Headsails set flying . 52 5.3 Windage Forces . 55 5.3.1 Rigging . 56 5.4 Total Aerodynamic Lift and Drag . 56 5.4.1 Lift and Drag of complete sail set . 57 5.4.2 Center of Effort Height . 57 5.4.3 Induced Drag . 58 5.4.4 Twist Function . 60 5.5 Resolution of Forces . 60 5.5.1 PHI UP ............................................. 60 5.5.2 Thrust and Heeling Force . 61 5.5.3 Aerodynamic heeling Moment . 61 5.6 Blanketing functions . 61 5.6.1 Mainsail . 61 5.6.2 Jib . 62 5.6.3 Mizzen, Jib Downwind, Spinnaker . 62 5.6.4 Mizzen Staysail . 62 6 Hydrodynamic Forces 63 6.1 Viscous Resistance . 63 6.1.1 Canoe body . 63 6.1.2 Appendages . 63 6.2 Propeller . 65 6.2.1 Shaft Installation . 65 6.2.2 Strut drive . 67 6.2.3 In aperture . 68 6.2.4 Tractor propellers . 68 6.2.5 Twin screws . 68 6.3 Residuary Resistance . 68 6.3.1 Canoe body . 68 6.3.2 Appendages . 70 6.4 Drag due to heel . 71 6.5 Induced Drag . 71 6.5.1 Correction Factors . 74 6.6 Immersed transom . 75 6.7 Rail-under drag . ..
Recommended publications
  • Boat Review: Elliott 50, Canting Keel
    Boat review: Elliott 50, canting keel Out on the Ran Tan Going out on the Ran Tan is easy; like any racing yacht you step on to the wide, open transom and into the cockpit. But getting off the Elliott 50 is really tough – she’s just too much fun. ost of that enjoyment comes from the sense of being For our sea trial in the sunshine, I joined Doyle Sails’ directly in touch with the beast: the wind slides over Richard Bouzaid, Phil Houghton and Andy Pilcher; boatbuilder Mthe sails – the electronic speed log whizzes up like Greg Salthouse of Salthouse Boatbuilders in Greenhithe, who the bathroom scales on Christmas Day. The stiff, also built Sportivo; and Ran Tan II crew Ross Masters. light construction translates the boat’s every movement to I’d expected to be daunted by the hi-tech racer that attracts the crew; it’s pure sailing. rock star sailors but it just seemed so darn easy. The deck lay- Ran Tan II is the younger sister to Sportivo, featured in last out is similar to the Elliott 11m, Mrs Jones, [Boating April 2006]. month’s story on the Auckland to Fiji Race, by racing crew Wide clear sidedecks make it easy to move sails around. The Richard Bicknell of North Sails. Bicknell’s story describes ocean genoa cars are short and well inboard, for the 108% all-purpose racing on an Elliott 50 in more than 40 knots. However, Sportivo genoa and smaller headsails. The coachroof is relatively is publicity shy and so it fell to Ran Tan II, owned by uncluttered by control lines and, despite there being no labels, Wellingtonian John Meade, to face the media for a boat review.
    [Show full text]
  • Current Trends in the Design of Sailing Yachts & the Competition of Racing
    NATIONAL TECHNICAL UNIVERSITY OF ATHENS LABORATORY FOR SHIP AND MARINE HYDRODYNAMICS (Member ITTC, HELLAS LAB. ISO 9002 ) October 11, 2017 INNO BLUE GROWTH Team Marseille Conference 1 Current trends in the design of sailing yachts & The competition of racing sailing yachts by Gregory Grigoropoulos National Technical University of Athens October 11, 2017 INNO BLUE GROWTH Team Marseille Conference 2 Current trends in the design of sailing yachts New Designs - Cruise Boats New Mediterranean Designs emphasized on space on deck enjoy the sun full tables and platforms for swimming. In order to achieve that they have a full stern that give also more space on salon and cabins at stern. A second important factor for the design is depth of the keel, especially for the chartering boats, in order to enable mooring as close to the shore as possible and to ensure mooring in all marinas and ports, while retaining the necessary side force and stability. October 11, 2017 INNO BLUE GROWTH Team Marseille Conference 3 Current trends in the design of sailing yachts New Designs – Racing Yachts Open deck, full stern, very light construction and a deeper carbon keel with bulb and a rudder with carbon fibers. The new designs includes carbon masts and shrouds. The shrouds are pieces of standing rigging which hold the mast up from side to side. There are also canting keels designs and soon will be introduced foils. Canting keels is a form of sailing ballast, suspended from a rigid canting strut beneath the boat, which can be swung to windward of a boat under sail, in order to counteract the heeling force of the sail.
    [Show full text]
  • The British Defence of Egypt 1935–1940
    The British Defence of Egypt 1935–1940 This book offers a comprehensive and challenging analysis of the British defence of Egypt, primarily against fascist Italy, in the critical lead-up period to the Second World War. The security of Egypt, a constant of British imperial strategy, is a curiously neglected dimension of the still burning appeasement debate. Yet it was a factor which demanded constant consider- ation by British policy-makers and figured in the crises of the period over Abyssinia, Czechoslovakia, Albania and Poland. By giving equal weight to the perspectives and assessments of the men on the spot, Steven Morewood adds to the originality of his interpretation by suggesting the old view should be reinstated: that Mussolini should and could have been stopped in his empire-building at the Abyssinian hurdle. Thereafter, as Nazi Germany tore the Versailles peace settlement to shreds, the drift to war accelerated as British resolve and credibility were brought into question. The fascist dictators in Rome and Berlin held no respect for weakness and Mussolini became the conduit through which Hitler could apply pressure to a sensitive British interest through reinforcing Libya at critical moments. Steven Morewood is lecturer in International History in the School of Historical Studies at the University of Birmingham. Cass series: Military history and policy Edited by John Gooch and Brian Holden Reid This series will publish studies on historical and contemporary aspects of land power, spanning the period from the eighteenth century to the present day, and will include national, international and comparative studies. From time to time, the series will publish edited collections of essays and ‘classics’.
    [Show full text]
  • Annual Report of the Public Printer
    ANNUAL REPORT OE THE PUBLIC PRINTER EOR THE FISCAL TEAR ENDED JUNE 30, 1894. WASHINGTON: GOVERNMENT PRINTING OFFICE, 1895. — ANNUAL REPORT OF THE PUBLIC PRINTER. Office of the Public Printer, Washington, J). (7., January 11, 1895. Sir : I have the honor to transmit to Congress a report of the affairs of this office for the fiscal year ended June 30, 1894. Very respectfully, Th. E. Benedict, Public Printer. Hon. A. E. Stevenson, President of the Senate. To the Senate and House of Representatives: In obedience to the provisions of statute, it is my duty to present to Congress a detailed statement of the transactions of this office for the fiscal year which closed June 30, 1894. The statistical information embodied in the accompanying tables, carefully compiled from the records of the office, covers a period of over ten months of the admin- istration of my predecessor in office, and of less than two months of my own charge of the public printing. In addition to this interesting exhibit of the practical operations of the work of public printing, binding, lithographing, etc., the law requires that I shall report such further information touching the condition of the office as may be in my possession. I feel it to be especially my duty at the present time to call the attention of Congress to the new and serious aspect which the question of providing safe and more commodious accommodations for this office has assumed. The following report of the result of an examination into the con- dition of the buildings occupied for public printing—which has already- been transmitted to the Joint Committee on Printing of Congress was made to Brig.
    [Show full text]
  • ORC VPP Documentation 2016.Pdf
    World Leader in Rating Technology OFFSHORE RACING CONGRESS ORC VPP Documentation 2016 1 2 Copyright c 2016 Offshore Racing Congress All rights reserved. Reproduction in whole or in part is only with the permission of the Offshore Racing Congress. Cover picture: tank test tests at Wolfson Unit MTIA by courtesy Dobbs Davis CONTENTS 1 Background 13 2 Introduction 15 2.1 Scope . 15 2.2 Overview . 15 2.3 Layout . 15 3 VPP Methodology 17 3.1 Solution Method . 17 3.2 Boat Model . 18 3.2.1 Functional relationships . 19 3.3 Equations of Equilibrium . 20 3.3.1 Driving Force - Drag . 21 3.3.2 Heeling Moment - Rolling Moment . 22 3.4 Water Ballast and Canting Keel Yachts . 23 3.4.1 Canting Keel . 23 3.4.2 Daggerboard (Centreline lifting appendage) . 23 3.4.3 Bilge boards (lifting boards off centreline) . 23 3.4.4 Water ballast . 23 3.4.5 Measurement . 24 3.5 Dynamic Allowance (DA) . 24 3.5.1 Credits (2012) . 24 3.5.2 Calculation Procedure . 25 3.6 Non Manual Power . 26 4 Lines Processing Program 27 4.1 Hydrostatics . 27 4.2 LPP Output parameter definitions . 28 4.2.1 Measurement Trim . 28 4.2.2 Sailing Trim . 28 4.2.3 Second Moment Length (LSM) . 28 4.2.4 Appendage stripping . 28 4.2.5 Beam Depth Ratio (BTR) . 29 4.2.6 Maximum Effective Draft (MHSD) . 30 4.2.7 Bulb/Wing Effects . 31 4.3 Appendage wetted areas and lengths . 34 4.3.1 Conventional Fin keel and rudder .
    [Show full text]
  • Rules for Classification and Construction I Ship Technology
    Rules for Classification and Construction I Ship Technology 3 Special Craft 7 Guidelines for the Structural Design of Racing Yachts ≥ 24 m Edition 2012 The following Guidelines come into force on 1 December 2012. Germanischer Lloyd SE Head Office Brooktorkai 18, 20457 Hamburg, Germany Phone: +49 40 36149-0 Fax: +49 40 36149-200 [email protected] www.gl-group.com "General Terms and Conditions" of the respective latest edition will be applicable (see Rules for Classification and Construction, I - Ship Technology, Part 0 - Classification and Surveys). Reproduction by printing or photostatic means is only permissible with the consent of Germanischer Lloyd SE. Published by: Germanischer Lloyd SE, Hamburg I - Part 3 Table of Contents Chapter 7 GL 2012 Page 3 Table of Contents Section 1 General Requirements A. Application, Scope ..................................................................................................................... 1- 1 B. Documents for Approval ............................................................................................................ 1- 2 C. Definitions .................................................................................................................................. 1- 3 Section 2 Materials A. Fiber Reinforced Plastics, Sandwich Constructions and Bonding .............................................. 2- 1 B. Steel Alloys ................................................................................................................................ 2- 1 C. Aluminium Alloys
    [Show full text]
  • Insights from the Load Monitoring Program for the 2014-2015 Volvo Ocean Race
    THE 22 ND CHESAPEAKE SAILING YACHT SYMPOSIUM ANNAPOLIS, MARYLAND, MARCH 2016 Insights from the Load Monitoring Program for the 2014-2015 Volvo Ocean Race Suzy Russell, Gurit Composite Components, UK Gaspar Vanhollebeke, Gurit Composite Components, UK Paolo Manganelli, Gurit Composite Components, France ABSTRACT 1. INTRODUCTION This paper describes insights into keel and rigging loads For the first time in history, the 2014-2015 edition of the obtained through a data acquisition system fitted on the Volvo Ocean Race has been competed in with a fleet of fleet of Volvo 65 yachts during the 2014-2015 Volvo one- Ocean Race. In the first part, keel fin stress spectra are Marine, a specialist of high performance composite derived from traces of canting keel ram pressures and keel structures based in the United Kingdom, has coordinated angle; these are reviewed and compared against equivalent the work of a consortium of composite builders including spectra obtained by applying methods proposed by Det Decision S.A., Multiplast, and Persico S.P.A, while Farr Norske Veritas - Germanischer Llo Yacht Design (FYD) has been responsible for the design of guidelines and the ISO 12215 standard. The differences the yachts, including the composite structure engineering. between stress spectra and their validity are discussed, s engineering team has been engaged by Farr Yacht considering two types of keel: milled from a monolithic Design to provide finite element analysis (FEA) to support cast of steel, and fabricated from welded metal sheets. The the VO65 design. second part discusses predicted and actual rigging working Green Marine has also been responsible for assembling and loads for the Volvo 65 yachts, and considers how safety fitting out the VO65s and providing overall quality control factors vary between design loads proposed by DNVGL - and actual recorded loads.
    [Show full text]
  • Cal 34 Owner S Manual
    cal 34 owner s manual File Name: cal 34 owner s manual.pdf Size: 2569 KB Type: PDF, ePub, eBook Category: Book Uploaded: 19 May 2019, 19:58 PM Rating: 4.6/5 from 805 votes. Status: AVAILABLE Last checked: 6 Minutes ago! In order to read or download cal 34 owner s manual ebook, you need to create a FREE account. Download Now! eBook includes PDF, ePub and Kindle version ✔ Register a free 1 month Trial Account. ✔ Download as many books as you like (Personal use) ✔ Cancel the membership at any time if not satisfied. ✔ Join Over 80000 Happy Readers Book Descriptions: We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with cal 34 owner s manual . To get started finding cal 34 owner s manual , you are right to find our website which has a comprehensive collection of manuals listed. Our library is the biggest of these that have literally hundreds of thousands of different products represented. Home | Contact | DMCA Book Descriptions: cal 34 owner s manual For a better experience, please enable JavaScript in your browser before proceeding. It may not display this or other websites correctly. You should upgrade or use an alternative browser. Owners manuals, engine manuals How ccan I replace it By continuing to use this site, you are consenting to our use of cookies. These are done from scans that IBut they are useable as they exist. I was promised a set of drawings for the series 1 Cal 34 about 6 monthsI am sure they willMy plans to make themI added a few extra scans into.
    [Show full text]
  • Navigating, Stacking, Surfing, Snacking, Surviving
    Winning the Volvo Ocean Race 2005-2006 Photos by Jon Nash,AMRO ABN ©TEAM Navigating, Stacking, Surfing, Snacking, Surviving By Stan Honey, San Francisco Station in Gothenburg. There were inshore(above) short-course South races Pacific in sevensunset; of those stopover ports, complicating(below) the choice Maxine of boat andand sailLarry About the Volvo Ocean Race design and adding interest for spectators.(below) MaxineI was fortunate Larry to be The Volvo Ocean Race (VOR) is generally considered to be the asked by Mike Sanderson to navigate on ABN AMRO ONE. I was world championship of professional ocean racing. It is a fully- impressed with the caliber of the crew that Moose had attracted crewed around the world ocean race via the Southern Ocean. and was further impressed to learn that Moose had the time and From 1973 through 1998 it was known as the Whitbread. The VOR sufficient sponsorship from the ABN AMRO bank for a two-boat 2005-2006 comprised nine offshore legs starting in Vigo, Spain, program. While at 51 years of age I was a bit surprised to be then to Cape Town, Melbourne, Wellington, Rio de Janeiro, asked to navigate a Volvo Race, the skill of the team and profes- Baltimore, New York, Portsmouth, Rotterdam, and then finishing sionalism of the overall program were too good to miss, so I quit 14 my normal job and joined the team. By the end of the 18-month 7,300 square feet of sail, and have canting keels that were 14.5 program we had won six of the nine offshore legs and five of the feet deep.
    [Show full text]
  • 2016 PHRF Certificate Form
    PERFORMANCE HANDICAP RACING Office Use Only PHRF-NB FLEET OF NARRAGANSETT BAY P.O. Box 356, Washington, NC 27889 Phone (401) 253-0207 FAX (401) 369-9319 RATINGS 2016 PHRF-NB MEMBERSHIP/RATING CERTIFICATE Provisional Office Use Only This certificate expires on April 30, 2017, or upon change of ownership, whichever comes fi Rating A copy of this rating may be obtained by anyone for a handling fee of $4.00. ADMINISTRATIVE DATA External Mail Opt-Out Spinnaker Non-Spinnaker Name: Email: Street: Home Phone: Business: City: State: Zip: Yacht Name: Sail #: BOAT MEASUREMENTS Yacht Club: Designer: I: J: LOA: Model: Mfctr: P: E: LWL: Hull Serial #: Date Mfd.: ISP: SPL: Draft: Other Ratings: Date Last Rated: WSS: Beam: Headsail to be used Spinnakers to be used Fractional Masthead Disp: LP% Feet Headsail1 Spin # JC SMG Foot Luff Leech Rig Type: Keel Wt: Headsail2 Spin #1 Composite Rigging Keel Mat'l: Headsail3 Spin #2 Symmetric Spinnaker (s) Other Ballast: Headsail4 Spin #3 Asymmetric Spinnaker (s) Code 0 Asymmetric Spinnaker Tacked To: Roller Furling Credit Cruising Headsail Credit Articulating Pole at Mast Fixed Pole To Mast and Bow Check if there have been any new modifications If yes, a complete descripton must be provided in the Comments/Modifications secton or Bow Distance Fwd of Headstay: attached on a separate sheet. Retractable Bow Sprit Fixed Bow Sprit I certify the information contained in this application has been verified by me and is correct. Further, it is my responsibility to notify the PHRF committee of changes to this yacht which Articulating Bow Sprit affect measurements, handicap adjustments, or would alter it from a base boat as defined in the instructions.
    [Show full text]
  • Cal 25-2 Owners Manual
    -~ . •, • •I I' Owner's Manual I ~ ..... _--- I I I I I. I I I I I I CON TEN T S I GENERAL Standard Boat Dimensions Docking Plan Sail Plan Arrangement Plan' Blank Interior Layout Dealer Responsibilities ". ' .. Owner's Responsibilities Limited Warranty . Authorized Service Cehters II COMMISSIONING Commissioning Pre-Launch Check List Post-Launch Check List Commissioning Notes Kenyon Mast Collar Installation Instructions(39/35) Stepping and Tuning the Mast Rigging Dimensions Wire Rigging Rope Rigging Boat Storage III OPERATION Engine Operating Instructions Flooding of Engine with Water Fuel System Diagram Fueling Procedure Steering Gear (39/35/31) I Electrical Electrical Schematic Lightning Ground Navigation Lights I Water Pressure System Plan Cooking Stoves/Propane Stove Alcohol Stoves 1-------- Plumbing - Heads Plumbing - Fresh-Water System I Thru-Hull Locations Plan IV MAINTENANCE Periodic Maintenance Periodic Maintenance Schedule I Basic Rules for Battery Care and Maintenance Finishes I V MANUALS I I 281 BANGOR PUNTA MARINE ... 848 AIRPORT ROAD , '1!ftmfR F ALL RIVER. MA 02722 (6171 678-5291 MARINE CON G RAT UL A T IbN S In choosing your new yacht from the Cal line, you have selected one of the best values in today's sailboat market. The design j, - , and construction of this yacht. reflect over twenty years of ex­ perience and knowledge gained in the building of over 10,000 boats. In the early 1940's, William Lapworth designed "Dasher" and the "L-36," the forerunners of today's light displacement boats. Continuing in .the traditional standards of high quality and fine workmanship, Bangor Punta Marine has commissioned over twenty models of his design.
    [Show full text]
  • High-Low-Mean PHRF Handicaps
    UNITED STATES PERFORMANCE HANDICAP RACING FLEET HIGH, LOW, AND AVERAGE PERFORMANCE HANDICAPS IMPORTANT NOTE The following pages list low, high and average performance handicaps reported by USPHRF Fleets for over 4100 boat classes/types. Using Adobe Acrobat’s ‘FIND” feature, <CTRL-F>, information can be displayed for each boat class upon request. Class names conform to USPHRF designations. The source information for this listing also provides data for the annual PHRF HANDICAP listings (The Red, White, & Blue Book) published by the UNITED STATES SAILING ASSOCIATION. This publication also lists handicaps by Class/Type, Fleet, Confidence Codes, and other useful information. Precautions: Handicap data represents base handicaps. Some reported handicaps represent determinations based upon statute rather than nautical miles. Some of the reported handicaps are based upon only one handicapped boat. The listing covers reports from affiliated fleets to USPHRF for the period March 1995 to June 2008. This listing is updated several times each year. HIGH, LOW, AND AVERAGE PERFORMANCE HANDICAPS ORGANIZED BY CLASS/TYPE Lowest Highest Average Class\Type Handicap Handicap Handicap 10 METER 60 60 60 11 METER 69 108 87 11 METER ODR 72 78 72 1D 35 27 45 33 1D48 -42 -24 -30 22 SQ METER 141 141 141 30 SQ METER 135 147 138 5.5 METER 156 180 165 6 METER 120 158 144 6 METER MODERN 108 108 108 6.5 M SERIES 108 108 108 6.5M 76 81 78 75 METER 39 39 39 8 METER 114 114 114 8 METER (PRE WW2) 111 111 111 8 METER MODERN 72 72 72 ABBOTT 22 228 252 231 ABBOTT 22 IB 234 252
    [Show full text]