World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document The World Bank Report No: ISR4405 Implementation Status & Results Philippines Laguna de Bay Institutional Strengthening and Community Participation/LISCOP (P070899) Operation Name: Laguna de Bay Institutional Strengthening and Community Project Stage: Implementation Seq.No: 15 Status: ARCHIVED Archive Date: Participation/LISCOP (P070899) Public Disclosure Authorized Country: Philippines Approval FY: 2004 Product Line:IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): Laguna Lake Development Authority Key Dates Public Disclosure Copy Board Approval Date 04-Dec-2003 Original Closing Date 31-Jan-2009 Planned Mid Term Review Date 15-Jan-2007 Last Archived ISR Date 08-Feb-2011 Effectiveness Date 02-Apr-2004 Revised Closing Date 30-Apr-2014 Actual Mid Term Review Date 15-Jan-2007 Project Development Objectives Laguna de Bay Institutional Strengthening and Community Participation/LISCOP (P070899) Project Development Objective (from Project Appraisal Document) The overarching objective of the proposed project is to assist the Laguna Lake Development Authority (LLDA), Local Government Units(LGUs) and other stakeholders to improve the environmental quality of the Laguna De Bay watershed. This will be achieved through: (i) behavioral changes and activities undertaken by watershed users to improve the environmental quality o f the lake and its Public Disclosure Authorized watershed; and, (ii) improved planning, regulatory instruments and incentives, and participation in the environmental management o f the Laguna de Bay watershed. Has the Project Development Objective been changed since Board Approval of the Program? Yes No Component(s) Component Name Component Cost CO-MANAGED MICROWATERSHED ENVIRONMENTAL INTERVENTIONS 5.00 STRENGTHENING INSTITUTIONS AND INSTRUMENTS 5.00 Overall Ratings Public Disclosure Authorized Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Public Disclosure Copy Implementation Status Overview At the time of the closing of the Original Financing for the project on April 30, 2011, 29 of the 31 indicators have been met with most of the targets even surpassed. The two indicators Page 1 of 8 Public Disclosure Authorized The World Bank Report No: ISR4405 that were not met are being dropped in the Additional Financing. Specificallyfor Component 1, the overall physical accomplishment at the closing date of the Original Financing was 100%, with the completion of 33 subprojects implemented by 21 Local Government Units around Laguna Lake. Under Component 2, although the funding from the Netherlands Grant closed on July 31, 2010, all seven (7) major tasks supported have been mainstreamed into the operation of the Laguna Lake Development Authority, with various tasks assigned to the different units under the new rationalized structure of LLDA and provided with annual budgetary allocations. The Additional Financing only became effective on July 27, 2011. Progress will be reported in the next supervision mission. Locations Country First Administrative Division Location Planned Actual Philippines Calabarzon Victoria Philippines Calabarzon Teresa Public Disclosure Copy Philippines Calabarzon Taytay Philippines Calabarzon Tanay Philippines Calabarzon Siniloan Philippines Calabarzon Silang Philippines Central Luzon Santa Cruz Philippines Calabarzon Pila Philippines Calabarzon Pangil Philippines Calabarzon Pakil Philippines Calabarzon Morong Philippines Calabarzon Majayjay Philippines Calabarzon Mabitac Philippines Calabarzon Liliw Philippines Calabarzon Province of Laguna Philippines Calabarzon Province of Laguna Philippines Calabarzon Kalayaan Philippines Calabarzon Cavinti Philippines Not Entered Laguna de Bay Public Disclosure Copy Philippines Calabarzon Baras Page 2 of 8 The World Bank Report No: ISR4405 Country First Administrative Division Location Planned Actual Philippines Calabarzon Angono Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target At least a 10% reduction in pollution loading for Text Value BOD loading = 827.56MT 11% 10% regulated parameter. (based on the 1080 firms covered by the environmental Public Disclosure Copy use r fee system in 2003 before project commenced implementation) Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments Attained, even surpassed the BOD loading reduction target. (744.804MT BOD loading from 1080 firms) At least 30 % increase in compliance by Text Value 507 (enterprises/firms with 80% (913 enterprises) 91% (971 enterprises) enterprises. discharge permits) Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments Attained, even surpassed the target. At least 30 percent increase in the number of Text Value 249 (men) + 162 (women) 300 300 percent men and women from community and =411 1644 (1080 men and 564 stakeholder groups that are involved in women) watershed planning and management Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments 300 (Y2008) Attained, even surpassed the target. At least five of the micro-watershed Text Value none 33 50 interventions that are implemented result in measurable reductions in important Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 environmental pressures. Comments All LGUs in at least 10 of the micro-watersheds Text Value none 24 24 have adopted multi-stakeholder micro- watershed planning as part of their municipal Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 development planning process. Comments All LGUS in 24 All LGUS in 24 Public Disclosure Copy microwatershed adopted microwatershed adopted LEAP LEAP Page 3 of 8 The World Bank Report No: ISR4405 Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target At least 20 sub-projects approved with Text Value none 33 50 adequate time for their implementation within the project duration. Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments Attained, even surpassed the target. LLDA has implemented the new structure and Text Value Approved Re-engineering New structure implemented; Sustain implementation of completed its re-engineering program as Program in place 181 of 220 approved positions new structure based on the envisioned in the LIDO. already filled Rationalization Plan Date 30-Nov-2003 10-Aug-2011 30-Apr-2014 Public Disclosure Copy Comments Attained Public disclosure of industry and LGU Text Value 0 5 PDP Cycles for Industries 5 performance occurs at least twice. and 4 PDP Cycles for LGUs conducted Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments Attained, even surpassed the target. Infrastructure strategy adopted by LLDA. Text Value none Infrastructure Promotion and Infra development strategy Development Facility (IPDF) adopted established Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments Operational guidelines for EUF expansion to Text Value none Implementing Rules and Operational guidelines for households and regulation of water-use Regulations for surface water EUF expansion to households developed. absraction adopted. and water use regulation adopted. Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments Attained Laguna de Bay Environment Monitor published Text Value none 5 Laguna de Bay 7 Laguna de Bay annually Environment Monitors Environment Monitors published published Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments 16-25% increase in revenue from EUF system Text Value 0 126% 25% Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Public Disclosure Copy Page 4 of 8 The World Bank Report No: ISR4405 Indicator Name Core Unit of Measure Baseline Current End Target Comments Attained, even surpassed the target. Number of watershed management-related SB Text Value 0 37 50 resolutions approved and/or enforced Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments Attained, even surpassed the target. MIS benchmarking completed Yes/No Value No Yes Yes Date 10-Aug-2011 30-Apr-2014 Public Disclosure Copy Comments Completed Completed Number of Subproject Loan Agreements Number Value 22.00 35.00 (SPLA) signed Date 10-Aug-2011 30-Apr-2014 Comments Attained, even surpassed the target. Data management systems improved Yes/No Value Yes Yes Date 10-Aug-2011 30-Apr-2014 Comments None PMES. DSS,LdBRIS, Legal, Data management systems EUF, M&E, Financial Mgt. further improved and in use System improved Multistakeholder planning process (Lake Text Value 0 24 24 Environment Action Planning-LEAP) conducted in 24 microwatersheds Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments Number of micro-watershed subprojects Text Value 0 38 50 identified and feasibility study completed Date 10-Aug-2011 Comments Capacity of 24 RCs substantially expanded by Text Value 3.59 Indicator dropped Dropped at least 3 levels Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments Modified Environmental User Fee (EUF) Text Value Modified EUF formula Modified EUF formula formula officially adopted. adopted adopted Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Public Disclosure Copy Comments Page 5 of 8 The World Bank Report No: ISR4405 More than 80 percent of subprojects that are Text Value 0 33 50 approved for funding are implemented and completed. Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments Monitoring and evaluation framework set up Text Value None M&E framework and system M&E framework and system and in use in place improved in in use Date 31-Dec-2003 10-Aug-2011 30-Apr-2014 Comments 85-90% of loan proceeds disbursed. Text Value 0 88% of original financing; at least 85% 29% of total financing
Recommended publications
  • Laguna Lake Development and Management
    LAGUNA LAKE DEVELOPMENT AUTHORITY Presentation for The Bi-Lateral Meeting with the Ministry of Environment Japan On LAGUNA DE BAY Laguna Lake Development Authority Programs, Projects and Initiatives Presented By: CESAR R. QUINTOS Division Chief III, Planning and Project Development Division October 23, 2007 LLDA Conference Room Basic Fac ts o n Lagu na de Bay “The Lake of Bay” Laguna de Bay . The largest and most vital inland water body in t he Philipp ines. 18th Member of the World’s Living Lakes Network. QUICK FACTS Surface Area: * 900 km2 Average Depth: ~ 2.5 m Maximum Depth: ~ 20m (Diablo Pass) AerageVolmeAverage Volume: 2,250,000,000 m3 Watershed Area: * 2,920 km2 Shoreline: * 285 km Biological Resources: fish, mollusks, plankton macrophytes (* At 10.5m Lake Elevation) The lake is life support system Lakeshore cities/municipalities = 29 to about 13 million people Non-lakeshore cities/municipalities= 32 Total no. of barangays = 2,656 3.5 million of whom live in 29 lakeshore municipalities and cities NAPINDAN CHANNEL Only Outlet Pasig River connects the lake to Manila Bay Sources of surface recharge 21 Major Tributaries 14% Pagsanjan-Lumban River 7% Sta. Cruz River 79% 19 remaining tributary rivers The Pasig River is an important component of the lake ecosystem. It is the only outlet of the lake but serves also as an inlet whenever the lake level is lower than Manila Bay. Salinity Intrusion Multiple Use Resource Fishing Transport Flood Water Route Industrial Reservoir Cooling Irrigation Hydro power generation Recreation Economic Benefits
    [Show full text]
  • Wage Order No.IVA-12 Final
    Republic of the Philippines DEPARTMENT OF LABOR AND EMPLOYMENT National Wages and Productivity Commission Regional Tripartite Wages and Productivity Board No. IV-A City of Calamba, Laguna WAGE ORDER NO. IVA-12 SETTING THE MINIMUM WAGE FOR CALABARZON AREA WHEREAS, under R. A. 6727, Regional Tripartite Wages and Productivity Board –IVA (RTWPB- IVA) is mandated to rationalize minimum wage fixing in the Region based on various factors such as: the socio-economic condition affecting the cost of living of the workers, the business environment for the creation of new jobs and the preservation of existing employment, the capacity to pay by the majority of the employers, and the comparability of wages that will allow sustainable viability and competitiveness of business and industry; WHEREAS, the Board issues this Wage Order No. IVA-12, granting increases in the basic pay of all covered private sector workers in the region effective fifteen (15) days upon publication in a newspaper of general circulation; WHEREAS, the Board, as part of its regular functions made an assessment of the socio-economic indicators in the region and resolved to review the present wage structure of the region motu proprio; WHEREAS, the Board, in the performance of its mandate, engaged its clientele and stakeholders in the region to a series of consultations on the wage adjustment issue on June 6 and 22, 2007, July 3, 5, 12 and 19, 2007 and a public hearing on August 7, 2007 specifically, the locators in selected economic zones, the garments industry, the labor sector,
    [Show full text]
  • Pattern of Investment Allocation to Chemical Inputs and Technical Efficiency: a Stochastic Frontier Analysis of Farm Households in Laguna, Philippines
    Pattern of investment allocation to chemical inputs and technical efficiency: A stochastic frontier analysis of farm households in Laguna, Philippines Orlee Velarde and Valerien Pede International Rice Research Institute Laguna, Philippines 4030 Selected paper prepared for presentation at the 57th AARES Annual Conference, Sydney, New South Wales, 5th-8th February, 2013 Pattern of investment allocation to chemical inputs and technical efficiency: A stochastic frontier analysis of farm households in Laguna, Philippines † Orlee Velarde †and Valerien Pede International Rice Research Institute Abstract This study focuses on the pattern between investment in chemical inputs such as fertilizer, pesticides and herbicides and technical efficiency of farm households in Laguna, Philippines. Using a one‐stage maximum likelihood estimation procedure, the stochastic production frontier model was estimated simultaneously with the determinants of efficiency. Results show that farmers with a low technical efficiency score have a high investment share in chemical inputs. Farmers who invested more in chemical inputs relative to other variable inputs attained the same or even lower output and were less efficient than those farmers who invested less. The result shows that farmers who invested wisely in chemical inputs can encourage farmers to apply chemical inputs more optimally. Keywords: Agricultural Management, Agricultural Productivity, Farm Household, Fertilizer Use, Rice JEL Classification Q12 – Micro‐Analysis of Farm Firms, Farm Households, and Farm Input Markets © Copyright 2013 by Orlee Velarde and Valerien Pede. All rights reserved. Readers may make verbatim copies of this document for non‐commercial purposes by any means, provided that this copyright notice appears on all such copies. † Corresponding author Email: [email protected] 2 | Page 1.
    [Show full text]
  • Microfilm Publication M617, Returns from U.S
    Publication Number: M-617 Publication Title: Returns from U.S. Military Posts, 1800-1916 Date Published: 1968 RETURNS FROM U.S. MILITARY POSTS, 1800-1916 On the 1550 rolls of this microfilm publication, M617, are reproduced returns from U.S. military posts from the early 1800's to 1916, with a few returns extending through 1917. Most of the returns are part of Record Group 94, Records of the Adjutant General's Office; the remainder is part of Record Group 393, Records of United States Army Continental Commands, 1821-1920, and Record Group 395, Records of United States Army Overseas Operations and Commands, 1898-1942. The commanding officer of every post, as well ad commanders of all other bodies of troops such as department, division, brigade, regiment, or detachment, was required by Army Regulations to submit a return (a type of personnel report) to The Adjutant General at specified intervals, usually monthly, on forms provided by that office. Several additions and modifications were made in the form over the years, but basically it was designed to show the units that were stationed at a particular post and their strength, the names and duties of the officers, the number of officers present and absent, a listing of official communications received, and a record of events. In the early 19th century the form used for the post return usually was the same as the one used for regimental or organizational returns. Printed forms were issued by the Adjutant General’s Office, but more commonly used were manuscript forms patterned after the printed forms.
    [Show full text]
  • Republic of the Philippines DEPARTMENT of LABOR and EMPLOYMENT National Wages and Productivity Commission Regional Tripartite Wages and Productivity Board No
    Republic of the Philippines DEPARTMENT OF LABOR AND EMPLOYMENT National Wages and Productivity Commission Regional Tripartite Wages and Productivity Board No. IV-A City of Calamba, Laguna WAGE ORDER NO. IVA-11 SETTING THE MINIMUM WAGE FOR CALABARZON AREA WHEREAS, under R. A. 6727, Regional Tripartite Wages and Productivity Board –IVA (RTWPB- IVA) is mandated to rationalize minimum wage fixing in the Region considering the prevailing socio-economic condition affecting the cost of living of wage earners, the generation of new jobs and preservation of existing employment, the capacity to pay and sustainable viability and competitiveness of business and industry, and the interest of both labor and management; WHEREAS, the Board issues this Wage Order No. IVA-11, granting wage increases to all covered private sector workers in the Region effective fifteen (15) days upon publication in a newspaper of general circulation; WHEREAS, on 19 May 2006, the Trade Union Congress of the Philippines filed a petition for a Seventy Five Pesos (Php75.00) per day, across-the-board, and region wide wage increase; WHEREAS, the Board, in its intention to elicit sectoral positions on the wage issue, conducted region wide, separate consultations with Labor and Management Sectors on 20 and 22 June 2006, respectively, and a public hearing with Tripartite Sectors on 30 June 2006, in Calamba, Laguna; WHEREAS, the frequent and unpredictable increases in the price of petroleum products especially triggered by the Middle East crises would result to higher production
    [Show full text]
  • Uimersity Mcrofihns International
    Uimersity Mcrofihns International 1.0 |:B litt 131 2.2 l.l A 1.25 1.4 1.6 MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF STANDARDS STANDARD REFERENCE MATERIAL 1010a (ANSI and ISO TEST CHART No. 2) University Microfilms Inc. 300 N. Zeeb Road, Ann Arbor, MI 48106 INFORMATION TO USERS This reproduction was made from a copy of a manuscript sent to us for publication and microfilming. While the most advanced technology has been used to pho­ tograph and reproduce this manuscript, the quality of the reproduction Is heavily dependent upon the quality of the material submitted. Pages In any manuscript may have Indistinct print. In all cases the best available copy has been filmed. The following explanation of techniques Is provided to help clarify notations which may appear on this reproduction. 1. Manuscripts may not always be complete. When It Is not possible to obtain missing pages, a note appears to Indicate this. 2. When copyrighted materials are removed from the manuscript, a note ap­ pears to Indicate this. 3. Oversize materials (maps, drawings, and charts) are photographed by sec­ tioning the original, beginning at the upper left hand comer and continu­ ing from left to right In equal sections with small overlaps. Each oversize page Is also filmed as one exposure and Is available, for an additional charge, as a standard 35mm slide or In black and white paper format. * 4. Most photographs reproduce acceptably on positive microfilm or micro­ fiche but lack clarify on xerographic copies made from the microfilm. For an additional charge, all photographs are available In black and white standard 35mm slide format.* *For more information about black and white slides or enlarged paper reproductions, please contact the Dissertations Customer Services Department.
    [Show full text]
  • Pagsanjan Sub-Basin
    TABLE OF CONTENTS Volume 13. Pagsanjan Sub-basin ........................................................................................... 3 Geographic Location .............................................................................................................. 3 Political and Administrative Boundary ..................................................................................... 4 Land Cover ............................................................................................................................. 6 Watershed Characterization and Properties ........................................................................... 7 Drainage Network ............................................................................................................... 7 Sub-sub basin Properties .................................................................................................... 9 Water Quantity ......................................................................................................................10 Stream Flow ......................................................................................................................10 Water Balance ...................................................................................................................11 LIST OF FIGURES Figure 13-1 Geographical Map ..................................................................................................................... 3 Figure 13-2 Political Jurisdiction Map ..........................................................................................................
    [Show full text]
  • Reg-04-Wo-10.Pdf
    Republic of the Philippines DEPARTMENT OF LABOR AND EMPLOYMENT National Wages and Productivity Commission Regional Tripartite Wages and Productivity Board No. IV-A City of Calamba, Laguna WAGE ORDER NO. IVA-10 SETTING THE MINIMUM WAGE FOR CALABARZON AREA WHEREAS, under R. A. 6727, Regional Tripartite Wages and Productivity Board -IVA (RTWPB- IVA) is mandated to rationalize minimum wage fixing in the Region considering the prevailing socio- economic condition affecting the cost of living of wage earners, the generation of new jobs and preservation of existing employment, the capacity to pay and sustainable viability and competitiveness of business and industry, and the interest of both labor and management; WHEREAS, the Board issued Wage Order No. IVA-09, as amended granting wage increases to all covered private sector workers in the Region effective 01 November 2004; WHEREAS, the Board in anticipation of the wage issue convened on 13 April 2005 to discuss and formulate action plan/s to resolve the issue; WHEREAS, the Board guided by the instruction of President Gloria Macapagal-Arroyo on Labor Day (May 1, 2005) for the Regional Boards to resolve the wage issue within thirty (30) days initiated assessment of the socio-economic situation of the Region and conducted sectoral consultations and public hearing on the wage issue; WHEREAS, the Board conducted series of wage consultations with employers sector locating in industrial parks/economic zones in the Provinces/Municipalities of Sto. Tomas, Batangas on 26 April 2005, Dasmariñas, Cavite on 18 May 2005, Biñan, Laguna on 19 and 24 May 2005, and Canlubang, Laguna on 23 May 2005.
    [Show full text]
  • Philippine Studies Ateneo De Manila University • Loyola Heights, Quezon City • 1108 Philippines
    philippine studies Ateneo de Manila University • Loyola Heights, Quezon City • 1108 Philippines Journey to Majayjay Review Author: Florentino H. Hornedo Philippine Studies vol. 32, no. 2(1984) 239–241 Copyright © Ateneo de Manila University Philippine Studies is published by the Ateneo de Manila University. Contents may not be copied or sent via email or other means to multiple sites and posted to a listserv without the copyright holder’s written permission. Users may download and print articles for individual, noncom- mercial use only. However, unless prior permission has been obtained, you may not download an entire issue of a journal, or download multiple copies of articles. Please contact the publisher for any further use of this work at [email protected]. http://www.philippinestudies.net Fri June 27 13:30:20 2008 BOOK REVIEWS 239 understanding. Not only is there much visual excitement in the photographs. There is much joy and exhilaration in Torres' language. In its unique way, Jeepney has opened up new areas of study for those who perceive in in- digenous artifacts structures of meaning which bind the community. Soledad S. Reyes JOURNEY TO MAJAYJAY.By Paul P. de la Gironiere. Translated by E. Aguilar Cruz. Manila: National Historical Institute, 1983. 61 pages. Journey to Majayjay is as much the journey of the mind of a man certain of the nearness of death as it may be the unified account of several actual trips from Calauang to Majayjay in Laguna, the various episodes having been spliced together to appear like a single trip. The French original was first published in Nantes, France, in 1862.
    [Show full text]
  • Region Totally Partially
    3. Damages 5 The total number of damaged houses is 35,077 (6,866 totally and 28,211 partially). Details in Tab C Region Totally Partially Total 6,866 28,211 Region III (Bataan & Pampanga) 16 50 Region IV-A (Laguna, Cavite, Quezon & Rizal) 5,233 18,972 Region IV-B (Occ & Or Mindoro) 2 21 Region V (Cam Norte & Cam Sur) 1,615 9,168 5 The most affected municipalities in terms of number of houses damaged were: o Paracale, Camarines Norte – 5,201 (3,965 partially, 1,236 totally) o Santa Cruz, Laguna –- 3,174 (2,513 partially, 634 totally) o Liliw, Laguna – 2,348 (2,292 partially, 56 totally) 5 The estimated cost of damage to infrastructure, agriculture, fisheries, schools and private property in Regions IV-A and V were placed at PhP 494,698,172 Region/Prov Infrastructure Agriculture Fisheries Private Schools Total Total 307,770,000 97,968,172 37,050,000 6,500,000 45,410,000 494,698,172 Region IV-A 292,170,000 78,068,172 37,050,000 5,800,000 413,088,172 Batangas 133,000,000 116,250 20,976,000 5,800,000 159,892,250 Cavite 9,570,000 25,544,185 35,114,185 Rizal (48,468,000) 2,974,606 1,530,000 4,504,606 Laguna 143,450,000 3,882,000 2,948,000 150,280,000 Quezon 6,150,000 45,551,131 11,596,000 63,297,131 Region V 15,600,000 19,900,000 6,500,000 39,610,000 81,610,000 Cam Sur 39,610,000 39,610,000 Camarines 15,600,000 19,900,000 6,500,000 Norte 42,000,000 Note: PhP48,468,000 cost of damage due to TS “Ondoy” 5 The National Electrification Administration (NEC) assessed that six (6) Electric Companies (ECs) namely: CANORECO in Camarines Norte; QUEZELCO I and II in Quezon; BATELEC I and II in Batangas and FLECO in Laguna were directly hit by Typhoon “SANTI” 5 DepEd reported that 101 school buildings were damaged in Batangas, Batangas City, Tanauan City and Camarines Sur: 81 Elementary Schools and 20 High Schools with 256 classrooms 4.
    [Show full text]
  • 2018 Annual Report
    D R A F T Table of Contents Acknowledgement LLDA Vision, Mission, Core Values, Quality Policy The General Manager’s Report I. POLICY PLANNING SERVICES 7 APPROVAL OF THE FOLLOWING BOARD RESOLUTIONS: Board Resolution No. 539, Series of 2018 Board Resolution No. 540, Series of 2018 8 Board Resolution No. 542, Series of 2018 Board Resolution No. 545, Series of 2018 Ratification of Moa With Solar Philippines Board Ratification of MOA Between LLDA and University of The Philippines - Diliman For The Implementation of The Meco- Teco Multi-Platform and Cross-Sensor Water Quality Monitoring Report Memoandum of Agreement Between LLDA and The Research Institute For Tropical Medicine (RITM) For The Establishment and Implementation of Environmental Surveillance In The Philippines 9 Board Resolution No. 552, Series of 2018 Board Resolution No. 553, Series of 2018 Board Resolution No. 554, Series of 2018 Board Resolution No. 555, Series of 2018 10 CORPORATE PLANNING PARTNERSHIP AND COLLABORATION 11 DA Secretary Piñol Together with GM Joey Meets with The Hungarian Water Technology Corporation (HWTC) to address Issue on Pollution and Wastewater Treatment in Laguna Lake. 12 “Opensa Kontra Kakulangan Sa Edukasyon (OKKE)” In Partnership with Local Government Unit of Sta. Maria, Laguna and DepE 13 COMMUNICATION, EDUCATION AND PUBLIC AWARENESS LLDA-LGU Summit: “Strengthening Partnerships For Good Environmental Governance” 14 Climate-Smart Land Use Planning For Sustainable and Resilient Laguna De Bay Basin Forum Stakeholders’ Assembly: Sama-Samang Hakbangin Tubig Kanlungan Kalingain 15 Series of Public Consultations on The 2018 Fishery Zoning and Management Guidelines (ZOMAG) of Laguna De Bay 16 International Coastal Clean-Up 2018 17 Customer Satisfaction Survey 18 Water Quality Monitoring Program 20 Biochemical Oxygen Demand (BOD) 22 Dissolved Oxygen (DO) Ammonia Phosphate Fecal Coliform 23 Lake Primary Productivity CONSOLIDATED HYDROMETEOROLOGICAL DATA 24 Rainfall D R A F T 25 Lake Level 26 Laguna De Bay Water Balance II.
    [Show full text]
  • The Philippine Synthesis Report
    Ecosystems and People The Philippine Millennium Ecosystem Assessment (MA) Sub-Global Assessment Ecosystems and People: The Philippine Millennium Ecosystem Assessment (MA) Sub-global Assessment Edited by Rodel D. Lasco Ma. Victoria O. Espaldon University of the Philippines Los Baños/ University of the Philippines World Agroforestry Centre (ICRAF-Philippines) Diliman Editorial Assistant Maricel A. Tapia A contribution to the Millennium Ecosystem Assessment prepared by the Philippine Sub-global Assessment Published by: Environmental Forestry Programme College of Forestry and Natural Resources University of the Philippines Los Baños In collaboration with: Department of Environment Laguna Lake and Natural Resources Development Authority Published by the Environmental Forestry Programme College of Forestry and Natural Resources University of the Philippines Los Baños College, Laguna, Philippines 4031 © Copyright 2005 by College of Forestry and Natural Resources, University of the Philippines Los Baños ISBN 971-547-237-0 Layout and cover design: Maricel A. Tapia This report is a contribution to the Millennium Ecosystem Assessment prepared by the Philippine Sub-global Assessment Team. The report has been prepared and reviewed through a process approved by the MA Board but the report itself has not been accepted or approved by the Assessment Panel or the MA Board. CONTENTS Foreword vii Acknowledgments ix Summary for Decision Makers 1 Philippine Sub-Global Assessment: Synthesis 9 Introduction 35 Laguna Lake: Conditions and Trends 1. Overview of the Laguna Lake Basin 43 2. Laguna Lake’s Tributary River Watersheds 53 3. Water Resources 63 4. Fish 115 5. Rice 133 6. Biodiversity 151 7. Climate Change 167 8. Institutional Arrangements, Social Conflicts, and Ecosystem Trends 187 9.
    [Show full text]