<<

The World Bank Report No: ISR13051

Implementation Status & Results Water Supply and Sanitation Project (P101190)

Operation Name: Water Supply and Sanitation Project (P101190) Project Stage: Implementation Seq.No: 11 Status: ARCHIVED Archive Date: 28-Dec-2013 Country: Belarus Approval FY: 2009

Public Disclosure Authorized Product Line:IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Board Approval Date 30-Sep-2008 Original Closing Date 30-Jun-2013 Planned Mid Term Review Date Last Archived ISR Date 25-Jun-2013 Public Disclosure Copy Effectiveness Date 17-Feb-2009 Revised Closing Date 31-Dec-2014 Actual Mid Term Review Date 16-May-2011

Project Development Objectives Project Development Objective (from Project Appraisal Document) To increase access to water supply services and to improve the quality of water supply and wastewater services in selected urban areas in six participating of the Borrower. Has the Project Development Objective been changed since Board Approval of the Project?

● Yes No Public Disclosure Authorized Component(s)

Component Name Component Cost Rehabilitation of water supply and sanitation systems 53.60 Support to the preparation and sustainability of investments 6.05 Project implementation and management 0.20

Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory

Public Disclosure Authorized Overall Risk Rating Moderate Substantial

Implementation Status Overview Overall progress is moderately satisfactory: disbursements have started to pick up over the last six months and are now increasing at sustained full speed. Construction activities are now back to full speed in all sub-projects under implementation. Works are now completed in eight sub-projects and have been initiated in nine others out of twenty sub-projects.

Public Disclosure Copy Procurement activities have been initiated in two of the three remaining sub-projects. In the last site, preparation of bidding documents is ongoing.

Over the past 6 months:

Page 1 of 10 Public Disclosure Authorized The World Bank Report No: ISR13051

- disbursements have increased by US$ 10.1 million, reaching US$ 34.1 million (57% of loan amount) - commitments have increased by US$ 7.6 million, reaching US$ 48.1 million (80% of loan amount); - works worth close to US$ 8.7 million are at an advanced stage of procurement.

Locations Country First Administrative Division Location Planned Actual Belarus Not Entered Vitsyebskaya Voblasts

Belarus Not Entered Vyerkhnyadzvinsk

Belarus Not Entered Smalyavichy

Public Disclosure Copy Belarus Not Entered

Belarus Not Entered Sharkowshchyna

Belarus Not Entered Rahachow

Belarus Not Entered Pinsk

Belarus Not Entered Mahilyowskaya Voblasts

Belarus Not Entered Minskaya Voblasts

Belarus Not Entered

Belarus Not Entered Mazyr

Belarus Not Entered Masty

Belarus Not Entered Marina Horka

Belarus Not Entered Mahilyow

Belarus Not Entered Hrodna

Belarus Not Entered Hlybokaye

Belarus Not Entered Hrodzyenskaya Voblasts

Belarus Not Entered Homyelskaya Voblasts

Belarus Not Entered Gantsevichi

Belarus Not Entered Dubrowna

Public Disclosure Copy Belarus Not Entered Brestskaya Voblasts

Page 2 of 10 The World Bank Report No: ISR13051

Country First Administrative Division Location Planned Actual Belarus Not Entered Brest

Belarus Not Entered Baravukha

Belarus Not Entered Bogushevsk

Belarus Not Entered Berezino

Belarus Not Entered Baranavichy

Belarus Not Entered

Public Disclosure Copy Belarus Not Entered Gorodok

Results

Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Number of people in urban areas provided with Number Value 0.00 5570.00 7910.00 access to Improved Water Sources under the Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 project Comments Number of people in urban areas provided with Number Value 0.00 4820.00 4820.00 access to Improved Water Sources under the Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 project in Mosty Breakdown Comments Number of people in urban areas provided with Number Value 0.00 750.00 750.00 access to Improved Water Sources under the Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 project in Shklov Breakdown Comments Number of people in urban areas provided with Number Value 0.00 2300.00 2700.00 access to Improved Water Sources under the Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 project in Sharkovschina Breakdown Comments Population provided with access to drinking Number Value 0.00 8800.00 307300.00 water compliant with national quality standards Date 10-Jan-2008 12-Jun-2013 31-Dec-2014 Comments Population provided with access to drinking Number Value 0.00 0.00 50000.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 12-Jun-2013 31-Dec-2014 in Baranovitchi Breakdown Comments Public Disclosure Copy

Page 3 of 10 The World Bank Report No: ISR13051

Population provided with access to drinking Number Value 0.00 2340.00 2340.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 12-Jun-2013 31-Dec-2014 in Bogushevsk Breakdown Comments Population provided with access to drinking Number Value 0.00 2800.00 2800.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 12-Jun-2013 31-Dec-2014 in Sharkovschina Breakdown Comments Population provided with access to drinking Number Value 0.00 0.00 21300.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 12-Jun-2013 31-Dec-2014 in Mariina Gorka Breakdown Comments Value

Public Disclosure Copy Population provided with access to drinking Number 0.00 0.00 17200.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 12-Jun-2013 31-Dec-2014 in Smolevitchi Breakdown Comments Population provided with access to drinking Number Value 0.00 0.00 210000.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 12-Jun-2013 31-Dec-2014 in Bobruisk Breakdown Comments Population provided with access to drinking Number Value 0.00 3300.00 3300.00 water compliant with national quality standards Sub Type Date 10-Jan-2008 12-Jun-2013 31-Dec-2014 in Borovukha Breakdown Comments % of treated wastewater samples complying Percentage Value with national standards for BOD level (BOD-5) Date 10-Jan-2008 12-Jun-2013 31-Dec-2014 Comments (no aggregated value) (no aggregated value) (no aggregated value) % of treated wastewater samples complying Percentage Value 90.00 90.00 95.00 with national standards for BOD level (BOD-5) Sub Type in Baranovitchi Supplemental % of treated wastewater samples complying Percentage Value 80.00 80.00 95.00 with national standards for BOD level (BOD-5) Sub Type in Gantsevitchi Supplemental % of treated wastewater samples complying Percentage Value 90.00 90.00 95.00 with national standards for BOD level (BOD-5) Sub Type in Pinsk Supplemental % of treated wastewater samples complying Percentage Value 71.00 95.00 95.00 with national standards for BOD level (BOD-5) Sub Type in Gorodok Supplemental Public Disclosure Copy

Page 4 of 10 The World Bank Report No: ISR13051

% of treated wastewater samples complying Percentage Value 95.00 with national standards for BOD level (BOD-5) Sub Type in Dubrovno Supplemental

Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target % of produced water effectively treated with Percentage Value iron content below 0.3 mg/l (regulatory water Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 samplings) Comments % of produced water effectively treated with Percentage Value 94.00 94.00 95.00 Public Disclosure Copy iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Baranovitchi Supplemental % of produced water effectively treated with Percentage Value 0.00 70.00 95.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Bogushevsk Supplemental % of produced water effectively treated with Percentage Value 0.00 34.00 46.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Sharkovschina Supplemental % of produced water effectively treated with Percentage Value 75.50 85.50 95.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Rogachev Supplemental % of produced water effectively treated with Percentage Value 0.00 0.00 95.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Mariina Gorka Supplemental % of produced water effectively treated with Percentage Value 0.00 0.00 95.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Smolevitchi Supplemental % of produced water effectively treated with Percentage Value 30.00 70.00 95.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Bobruisk Supplemental % of produced water effectively treated with Percentage Value 0.00 95.00 95.00 iron content below 0.3 mg/l (regulatory water Sub Type samplings) in Borovukha Supplemental Public Disclosure Copy

Page 5 of 10 The World Bank Report No: ISR13051

Number of km of transmission and distribution Kilometers Value 0.00 28.30 48.80 pipelines laid/replaced Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Comments Number of km of transmission and distribution Kilometers Value 0.00 15.50 15.50 pipelines laid/replaced in Mosty Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Breakdown Comments Number of km of transmission and distribution Kilometers Value 0.00 13.70 13.70 pipelines laid/replaced in Sharkovschina Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Breakdown Comments Value

Public Disclosure Copy Number of km of transmission and distribution Kilometers 0.00 0.00 8.30 pipelines laid/replaced in Rogachev Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Breakdown Comments Number of km of transmission and distribution Kilometers Value 0.00 1.50 1.50 pipelines laid/replaced in Shklov Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Breakdown Comments Number of km of transmission and distribution Kilometers Value 0.00 9.80 9.80 pipelines laid/replaced in Mozyr Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Breakdown Comments Piped household water connections that are Number Value 0.00 4250.00 34350.00 benefiting from rehabilitation works undertaken Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 by the project Comments Piped household water connections affected by Number Value 0.00 50.00 50.00 rehabilitation works undertaken under the Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Project in Bogushevsk Breakdown Comments Piped household water connections affected by Number Value 0.00 0.00 14300.00 rehabilitation works undertaken under the Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Project in Rogachev Breakdown Comments Piped household water connections affected by Number Value 0.00 4200.00 5000.00 rehabilitation works undertaken under the Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Project in Mozyr Breakdown Comments Piped household water connections affected by Number Value 0.00 0.00 15000.00 rehabilitation works undertaken under the Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Project in Baranovichi Breakdown Comments Public Disclosure Copy

Page 6 of 10 The World Bank Report No: ISR13051

Share of customers in relevant Project areas Percentage Value reporting improved satisfaction with water Date supply service Comments Share of customers in relevant Project areas Percentage Value 95.00 reporting improved satisfaction with water Sub Type supply service in Borovukha Supplemental Share of customers in relevant Project areas Percentage Value 30.00 95.00 reporting improved satisfaction with water Sub Type supply service in Bobruisk Supplemental Value

Public Disclosure Copy Share of customers in relevant Project areas Percentage 95.00 reporting improved satisfaction with water Sub Type supply service in Shklov Supplemental Share of customers in relevant Project areas Percentage Value 65.00 95.00 reporting improved satisfaction with water Sub Type supply service in Smolevitchi Supplemental Share of customers in relevant Project areas Percentage Value 95.00 reporting improved satisfaction with water Sub Type supply service in Mariina Gorka Supplemental Share of customers in relevant Project areas Percentage Value 70.00 95.00 reporting improved satisfaction with water Sub Type supply service in Rogachev Supplemental Share of customers in relevant Project areas Percentage Value 83.00 reporting improved satisfaction with water Sub Type supply service in Sharkovschina Supplemental Share of customers in relevant Project areas Percentage Value 95.00 reporting improved satisfaction with water Sub Type supply service in Bogushevsk Supplemental Share of customers in relevant Project areas Percentage Value 90.00 95.00 reporting improved satisfaction with water Sub Type supply service in Baranovichi Supplemental % of treated wastewater samples complying Percentage Value with national standards for nitrogen content Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Comments Public Disclosure Copy

Page 7 of 10 The World Bank Report No: ISR13051

% of treated wastewater samples complying Percentage Value 68.00 95.00 95.00 with national standards for nitrogen content in Sub Type Gorodok Supplemental % of treated wastewater samples complying Percentage Value 90.00 90.00 95.00 with national standards for nitrogen content in Sub Type Pinsk Supplemental % of treated wastewater samples complying Percentage Value 70.00 70.00 95.00 with national standards for nitrogen content in Sub Type Gantsevitchi Supplemental Value

Public Disclosure Copy % of treated wastewater samples complying Percentage 90.00 90.00 95.00 with national standards for nitrogen content in Sub Type Baranovitchi Supplemental % of treated wastewater samples complying Percentage Value 0.00 0.00 95.00 with national standards for nitrogen content in Sub Type Brest Supplemental % of treated wastewater samples complying Percentage Value 0.00 0.00 95.00 with national standards for nitrogen content in Sub Type Dubrovno Supplemental % of treated wastewater samples complying Percentage Value with national standards for phosphor content Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Comments % of treated wastewater samples complying Percentage Value 0.00 0.00 95.00 with national standards for phosphor content in Sub Type Brest Supplemental % of treated wastewater samples complying Percentage Value 90.00 90.00 95.00 with national standards for phosphor content in Sub Type Baranovitchi Supplemental % of treated wastewater samples complying Percentage Value 90.00 90.00 95.00 with national standards for phosphor content in Sub Type Gantsevitchi Supplemental % of treated wastewater samples complying Percentage Value 90.00 90.00 95.00 with national standards for phosphor content in Sub Type Pinsk Supplemental Public Disclosure Copy

Page 8 of 10 The World Bank Report No: ISR13051

% of treated wastewater samples complying Percentage Value 71.00 95.00 95.00 with national standards for phosphor content in Sub Type Gorodok Supplemental % of treated wastewater samples complying Percentage Value 0.00 0.00 95.00 with national standards for phosphor content in Sub Type Dubrovno Supplemental Number of km of wastewater collectors laid/ Kilometers Value 0.00 3.50 8.10 replaced Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Comments Value

Public Disclosure Copy Number of km of wastewater collectors laid/ Kilometers 0.00 3.50 6.30 replaced in Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Breakdown Comments Number of km of wastewater collectors laid/ Kilometers Value 0.00 0.00 1.84 replaced in Sub Type Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 Breakdown Comments Number of sub-projects for which feasibility Number Value 0.00 11.00 11.00 studies and detailed designs have been Date 10-Jan-2008 08-Dec-2013 31-Dec-2014 completed and have been competitively awarded Comments

Number of water utilities that the project is Number Value 21.00 21.00 supporting Date 10-Jan-2008 12-Jun-2013 31-Dec-2014 Comments Successful implementation and utilization of Yes/No Value No Yes Yes IBNET tools Date 10-Jan-2008 12-Jun-2013 31-Dec-2014 Comments PCT can independently appraise, monitor, Yes/No Value No Yes Yes supervise and report on sub-projects Date 10-Jan-2008 12-Jun-2013 31-Dec-2014 Comments

Data on Financial Performance (as of 10-Dec-2013)

Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P101190 IBRD-75890 Effective 30-Sep-2008 21-Oct-2008 17-Feb-2009 30-Jun-2013 31-Dec-2014 Public Disclosure Copy

Disbursements (in Millions)

Page 9 of 10 The World Bank Report No: ISR13051

Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P101190 IBRD-75890 Effective USD 60.00 60.00 0.00 34.18 25.82 57.00

Disbursement Graph Public Disclosure Copy

Key Decisions Regarding Implementation Close supervision of ongoing contracts and finalization of the two ongoing procurement activities are critical to ensure their completion before project closing date.

Restructuring History Level one Approved on 20-Dec-2012

Related Projects P127986-TO BE RECYCLED, P146493-Water Supply and Sanitation Project Additional Financing Public Disclosure Copy

Page 10 of 10