The Community Redevelopment Agency of the City of Los Angeles, Ca

Total Page:16

File Type:pdf, Size:1020Kb

The Community Redevelopment Agency of the City of Los Angeles, Ca THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CA M E M O R A N D U M 4 DATE: FEBRUARY 21, 2008 MC6990 TO: CRA/LA BOARD OF COMMISSIONERS FROM CECILIA V. ESTOLANO, CHIEF EXECUTIVE OFFICER RESPONSIBLE PARTY: CAROLYN HULL, REGIONAL ADMINISTRATOR MIRIAM NEGRI, CITY PLANNER SUBJECT: APPROVAL OF A RESIDENTIAL USE AND SETBACK PARKING ON A COMMERCIAL DESIGNATED PARCEL LOCATED AT 8753 SOUTH SAN PEDRO STREET, IN THE BROADWAY/MANCHESTER RECOVERY REDEVELOPMENT PROJECT AREA SOUTH LOS ANGELES REGION (CD9) RECOMMENDATION That the CRA/LA Board of Commissioners approve a residential use and its setback parking on a commercial designated parcel (to allow the construction of two dwelling units and required parking spaces thereon) pursuant to Sections 506 and 514 of the Redevelopment Plan for the Broadway/Manchester Recovery Redevelopment Project Area (“Redevelopment Plan”). SUMMARY 1. The Proposed Project And Its Site This action recommends approval of a residential use and its setback parking on a “commercial” designated parcel (to allow the construction of two dwelling units and related parking in the rear setback area). The parcel is generally bounded by 87th Place on the north, Wall Street on the west, 88th Street on the south, and San Pedro Street on the east. The parcel is located at 8753 South San Pedro Street (“Site”) in the Broadway/Manchester Recovery Redevelopment (“Project Area”). A diagram of the Site is on Attachment “A” hereto. The owner of the Site, Seacliff Properties, Inc. (“Owner”), proposes to construct a two- story duplex and related parking on the 2,520 sq. ft Site (“Project”). The Owner will be renting the duplex building at market rate once completed. A Site Plan of the Project is on Attachment “B” hereto. The City Zoning Code designates the Site as “[Q]C2-1VL” with a maximum density of six units. The City’s Southeast Los Angeles Community Plan designates the Site as “General Commercial” with corresponding zones of CR, C1.5, C2, P and RAS3. Thus, the underlying zone and Community Plan land use designations RESIDENTIAL USE ON COMMERCIAL DESIGNATED PARCEL 2 allow the proposed residential use by right. However, the Redevelopment Plan designates the Site for Commercial use only (see Section 2 below), thus creating an obstacle to develop the Project. Additionally, the Redevelopment Plan prohibits parking in the setback area of the Site (see Section 3 below), thus creating a second obstacle to developing the Project. The proposed two-story building on the Site will contain approximately 2,000 sq. ft. The first floor will contain an 820 sq. ft. two-bedroom unit with living room, dining room, kitchen and 1 and 1/2 bathrooms. The second floor will contain a 1,175 sq. ft. three- bedroom unit with living room, dining room, kitchen, two full baths and a laundry area. Both units meet the “minimum unit area range” specified in the CRA/LA Housing Guidelines for a two and three bedroom unit. There will be four parking spaces for the residents on the Site, two of which will be within a garage. To comply with the City Planning Code, all of the Project’s parking stalls will be provided on the Site. The Project’s floor plans are on Attachment “C” hereto. 2. The Proposed Project Is An Appropriate Nonconforming Use On The Site Plan Section 506 (Nonconforming Uses) states that “the Agency may authorize additions, alterations, repairs, or other improvements or changes in use of land or buildings in the Project Area for uses which do not conform to the provisions of this Plan where, in the determination of the Agency, such improvements would be compatible with surrounding projects uses and developments”. In short, Section 506 provides for discretionary approval of non-conforming residential uses on Commercial designated parcels following a “compatibility” determination. Accordingly, under this Section the CRA/LA Board of Commissioners (“Board”) has the discretion to approve (or disapprove) the proposed Project with such a compatibility determination. The Site is a vacant rectangular shaped parcel. The Project will be properly located on the Site, and with respect to the surrounding uses. These uses are predominantly residential uses to the north, south and west of the Site, a mixture of residential and commercial uses south of the Site, and industrial uses to the east. It should be noted that the Los Angeles Unified School District is planning to purchase the industrial properties directly east of the Site, to build a new high school. See Context Map on Attachment “D” hereto. The existing built environment along the San Pedro Street corridor consists of approximately 80% residential, 17% vacant parcels, and 3% commercial uses. Because the preponderance of uses surrounding the Site are residential (and the proposed duplex will be served by the planned school), staff believes this Project is compatible with these uses. Additionally, the proposed Project meets several Plan Objectives such as a) Improve the quality of the environment and promote a positive image for the area (by the Project’s new construction on a blighted vacant lot); b) Promote architecture and urban design standards including standards for heights, building setbacks, building facades, building materials, and compatibility of new construction with existing structures (by harmonizing the duplex’s box shape bungalow style and tile roof with the surrounding California bungalows with their Craftsman and Spanish designs); c) Provide housing choices and increase the supply of quality housing for all incomes and all age groups (by the Project’s new residential units for market rate rental); and d) Promote the development of sound residential neighborhoods through mechanisms such as land use, density and sensitive infill housing (by the Project’s new residential structure and parking RESIDENTIAL USE ON COMMERCIAL DESIGNATED PARCEL 3 which are properly sited and configured to harmonize with their mostly residential surroundings.) Based on the above, staff recommends that the Board find the proposed Project compatible with its surrounding uses, and accordingly, approve it as a non-conforming residential use on the Site. 3. The Proposed Setback Area Parking Complies With Code Requirements For The Site Plan Section 514 states that “Parking shall be provided in a manner consistent with standards for contemporary development practices, but in no case shall parking be less than the requirements of the Los Angeles Municipal Code (“LAMC”). No parking space shall be located in a setback area except with prior written approval of the Agency. Parking spaces shall be paved and drained so that storm and surface waters draining from parcels will not cross public sidewalks. Parking spaces visible from streets shall be landscaped in accordance with the City’s zoning ordinance to prevent unsightly or barren appearance. Lighting for parking spaces shall be shielded from adjacent properties and adjoining streets.” In short, Section 514 provides that the Board has the discretion to approve the Project’s proposed setback parking by finding LAMC parking requirements are met, and giving (or authorizing staff to give) a written approval for such parking. The Site is a narrow parcel with approximately 25 feet of street frontage and 100 feet of depth. This configuration creates major physical constraints to providing the LAMC required parking for the Project without utilizing the rear setback area. The Site Plan demonstrates that the required number of LAMC-required parking stalls can be safely and conveniently provided in this setback area. Safe and convenient access of the residents to these stalls is provided from the 14 feet wide alley, which abuts the rear setback area of the Site. Based thereon, staff recommends that the Board approve the proposed rear-setback parking to allow development of the Project on the narrow Site (and authorize staff to advise Owner in writing of such approval). RE: Initial Action. SOURCE OF FUNDS No funding is required for this action. PROGRAM AND BUDGET IMPACT The proposed actions will not require CRA/LA funds except for staff working on the Project. There is also no fiscal impact to the City’s General Fund as a result of the recommended actions. Staff time for such activities is budgeted in Objective MC6990 (Response to Development Opportunities). ENVIRONMENTAL REVIEW RESIDENTIAL USE ON COMMERCIAL DESIGNATED PARCEL 4 The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (“CEQA”) pursuant to Article VII, Sec. 1 c (2) of CRA/LA’s CEQA Guidelines. BACKGROUND Staff has reviewed the submitted Project and its design and recommends approval, with the condition that the Owner adhere to the following conditions: 1. Submittal of Final Construction Documents for CRA/LA staff review and approval, and Owner’s execution and recordation of the “Owner’s Acceptance of CRA/LA Conditions” and Schedule of Performance. The “Owner’s Acceptance of CRA/LA Conditions” will define the scope of work, and obligate the Owner to construct the Project in accordance with the Approved Documents and Schedule of Performance. 2. Construction of the Project shall be in compliance with the CRA/LA staff approved Construction Documents. The Owner has accepted the above conditions, and has been working with CRA/LA staff on all design issues. The Project complies with Sections 506 and 514 of the Redevelopment Plan. On October 24, 2007, the CAC reviewed and concurred with the proposed Project with the condition that the building design and landscaping reviewed by the CAC be maintained throughout construction. The Ninth District Council Office also supports the Project to allow the conversion to residential use of the Commercial designated Site to permit the two residential units thereon. Cecilia V. Estolano Chief Executive Officer By ________________________________ Glenn F. Wasserman Chief Operating Officer There is no conflict of interest known to me, which exists with regard to any CRA/LA officer or employee concerning this action.
Recommended publications
  • Lighthouse Café Expansion
    Memorandum To: Joseph Dyke, City of San Jose From: Robert Del Rio, T.E. Ricky Williams Date: October 5, 2016 Subject: Greyhound Site Residential Development Traffic Operations Analysis Introduction Hexagon Transportation Consultants, Inc. has completed a traffic operations study for the proposed residential development on the Greyhound site in San Jose. The project as proposed would consist of two towers providing up to 785 residential units with up to 20,000 square feet (s.f.) of ground floor retail. The site is located along the south side of Post Street, between South Almaden Avenue and South San Pedro Street. The site was formerly occupied by the Greyhound Bus Station. Figure 1 shows the project site location. The proposed project’s most recent description states that the project will be accessed via two full-access residential driveways and two loading driveways along South San Pedro Street. However, the City has stated that only a total of three driveways, two on San Pedro Street and one on Almaden Avenue will be allowed. The City has recommended that the proposed site access be adjusted to provide the two full access residential driveways on San Pedro Street and an on-site loading dock along Almaden Avenue as Almaden Avenue has larger curb-to- curb width to allow for truck movements. Since the project site is located in the Downtown Core area boundary, it is covered under the San Jose Downtown Strategy 2000 Environmental Impact Report (EIR). Accordingly, City staff has already concluded that the project is in conformance with the City of San Jose Transportation Level of Service Policy (Council Policy 5-3) and will not require preparation of a comprehensive Transportation Impact Analysis (TIA).
    [Show full text]
  • 1981 Caltrans Inventory of Pacific Electric Routes
    1981 Inventory of PACIFIC ELECTRIC ROUTES I J..,. I ~ " HE 5428 . red by I58 ANGELES - DISTRICT 7 - PUBLIC TRANSPORTATION BRANCH rI P37 c.2 " ' archive 1981 INVENTORY OF PACIFIC ELECTRIC ROUTES • PREPARED BY CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) DISTRICT 07 PUBLIC TRANSPORTATION BRANCH FEBRUARY 1982 • TABLE OF CONTENTS PAGE I. EXECUTIVE SUMMARY 1 Pacific Electric Railway Company Map 3a Inventory Map 3b II. NQR'I'HIRN AND EASTERN DISTRICTS 4 A. San Bernardino Line 6 B. Monrovia-Glendora Line 14 C. Alhambra-San Gabriel Line 19 D. Pasadena Short Line 21 E. Pasadena Oak Knoll Line 23 F. Sierra Madre Line 25 G. South Pasadena Line 27 H. North Lake Avenue Line 30 10 North Fair Oaks Avenue Line 31 J. East Colorado Street Line 32 K. Pomona-Upland Line 34 L. San Bernardino-Riverside Line 36 M. Riverside-Corona Line 41 III. WESTERN DISTRICT 45 A. Glendale-Burbank Line 47 B. Hollywood Line Segment via Hill Street 52 C. South Hollywood-Sherman Line 55 D. Subway Hollywood Line 58 i TABLE OF CONTENTS (Contd. ) -PAGE III. WESTERN DISTRICT (Conta. ) E. San Fernando valley Line 61 F. Hollywood-Venice Line 68 o. Venice Short Line 71 H. Santa Monica via Sawtelle Line 76 I. westgate Line 80 J. Santa Monica Air Line 84 K. Soldier's Home Branch Line 93 L. Redondo Beach-Del Rey Line 96 M. Inglewood Line 102 IV. SOUTHIRN DISTRICT 106 A. Long Beach Line 108 B. American Avenue-North Long Beach Line 116 c. Newport-Balboa Line 118 D. E1 Segundo Line 123 E. San Pedro via Dominguez Line 129 F.
    [Show full text]
  • 2019-2020 LAHSA Winter Shelter Program
    2019-2020 LAHSA Winter Shelter Program Dates: Saturday, December 1, 2019 through Sunday, March 31, 2020 Time: 5:00pm - 7:00am (times may vary) Winter Shelter Hotline: 1(800) 548-6047 (Available 24-hours, 7 days a week) Please visit our website for more information: www.lahsa.org In Need of Emergency Shelter? Please go directly to one of our listed transportation pick up locations to get a ride to one of our Winter Shelters or see the list for winter shelter sites that take walk-ins. Program Eligibility: • Individuals who are 18 years of age and older • Experiencing homelessness • Must be able to manage Activities of Daily Living (i.e. ability to Important Note: All sites have a one (1) bag restriction. transfer in and out of a bed, bathe and dress) independently. Service Planning Area Service Planning Area The Salvation Army: (661) 723-4873 Hope of the Valley-Pacoima: (818) 257-8521 45150 60th St. W. Lancaster 93536 (93 beds) (138 beds) Coed Coed Transportation Pick Up Pick Up Address Pick Up Time Transportation Pick Up Pick Up Address Pick Up Time Hope of the Valley Help 6425 Tyrone Avenue Grace Resource Center Sierra Hwy and Ave. I. 6pm,7pm,8pm, 4:30pm, 6:00pm (Parking Lot Gate) Lancaster 93534 9pm,10pm Center Van Nuys 91401 Gingham and E. Ave K-6, 6pm,7pm,8pm, Paxton Park & Ride 12501 Foothill Blvd Near Bartz Altadonna Clinic 7:00pm Lancaster 93535 9pm, 10pm (Foothill & Paxton) Pacoima 91331 Note: No Walk-ins are allowed; Individuals must go to one of the transpor- Burbank Metrolink Station 201 N.
    [Show full text]
  • 1147 Wall Street, Los Angeles, CA 90015 Offering Memorandum • Fashion District Location
    BACK ON THE MARKET! Prime DTLA Fashion District Commercial Property 1147 Wall Street, Los Angeles, CA 90015 Offering Memorandum • Fashion District Location • Ideal For Owner/User or Investor • Reposition Opportunity Exclusively offered by Anthony S Behar Bradley A Luster Executive Vice President President • 2 Story Building 213.747.8426 office 213.747.4154 office 310.880.2329 mobile 213.276.2483 mobile [email protected] [email protected] CA BRE # 01368565 CA BRE Lic. # 00913803 • Multi-Tenant Facility The information contained in this offering material is confidential and furnished solely for the purpose of a review by prospective buyers of the subject property and is not to be used for any other purpose or made available to any other person without the express written consent of Major Properties. This Brochure was prepared by Major Properties. It contains summary information pertaining to the Property and does not purport to be all-inclusive or to contain all of the information that a prospective buyer may desire. All information is provided for general reference purposes only and is subject to change. The summaries do not purport to be complete or accurate descriptions of the full documents involved, nor do they constitute a legal analysis of such documents. This information has been secured from sources we believe to be reliable. We make no representations or warranties, expressed or implied, as to the accuracy of the information. References to square footage or age are approximate. Recipient of this report must verify the information and bears all risk for any inaccuracies. majorproperties.com Property Photo majorproperties.com Property Offering • 1147 Wall Street consists of a two-story, multi-tenant building located in the heart of the Downtown Los Angeles Fashion District.
    [Show full text]
  • S Los Angeles and Disneyland/Orange County
    California’s Los Angeles and Disneyland/Orange County Los Angeles and Orange County – Images by Lee Foster by Lee Foster No California urban scene surpasses Los Angeles and Orange County when sheer enthusiasm and brash exuberance are at issue. The Los Angeles region is a scene of worlds within worlds, ranging from the sun and surf worshippers at Venice Beach to the robust Little Saigon enclave of Vietnamese ex-patriots in Westminster, Orange County. Los Angeles, or LA as it is commonly called, boasts an unusual diversity of cultures and lifestyles within its neighborhoods. It is a melange of movie sets, oil wells, neon strips, sprawling suburbs, and broad boulevards. Wilshire Boulevard winds through Beverly Hills, home of movie stars and the site of eclectic boutiques. Hollywood and Sunset Boulevards pulsate in a neon glow, with nightclubs, bars, and restaurants. The lush, sprawling campus of UCLA lies in Westwood, a community with a college town feeling. Venice Beach is famous for its promenade where muscle builders, volleyball players, inline skaters, and strollers come to enjoy the sun and each other. Downtown, the Civic Center and futuristic ARCO plaza area blooms with skyscrapers. Little Tokyo and Chinatown are only minutes away. All these elements make LA special. Steady sunshine and a salubrious climate lend a relaxed flavor to the otherwise fast- paced life on the freeways. Weather is mild, even in winter, and the 14 inches of annual rainfall occurs mostly from November to March. A tinge of smog and the threat of congestion are the down side of life in LA.
    [Show full text]
  • Little Tokyo Redevelopment Project Five-Year Implementation Plan Fy2000 – Fy2004 [Health & Safety Code Section 33490]
    THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CA LITTLE TOKYO REDEVELOPMENT PROJECT FIVE-YEAR IMPLEMENTATION PLAN FY2000 – FY2004 [HEALTH & SAFETY CODE SECTION 33490] Adopted: October 5, 2000 I. INTRODUCTION AND BACKGROUND The Little Tokyo Redevelopment Project was adopted by City Council on February 24, 1970. The 67 acre Project is located immediately southeast of the Los Angeles Civic Center, and is bounded generally by a line parallel to First Street to the north, Alameda Street to the east, Third Street to the south and Los Angeles Street to the west. The north side of the block on First Street between Judge John Aiso (formerly San Pedro Street) and Central Avenue is the historic center of Little Tokyo and is listed on the National Register of Historic Places as the Little Tokyo Historic District. The Little Tokyo Redevelopment Project reached its original close-out date of February 2000. However, on December 7, 1999, the City Council approved Ordinance No. 172949, effective January 22, 2000, to extend the time limitation for the Little Tokyo Redevelopment Project Plan pursuant to Assembly Bill 1342. This extends the Redevelopment Project Plan until February 24, 2010. Agency staff, working with a community advisory group, has initiated the process to prepare an amendment to the Little Tokyo Redevelopment Plan. This redevelopment plan amendment might include, but is not limited to: expanding the project area boundaries toward the east and southeast to the Los Angeles River; extending the time limitation on establishing debt; increasing the limitation on the amount of tax increment to be received from the project area; and providing authority for the Agency to assemble land for development through eminent domain.
    [Show full text]
  • BUSINESS IMPROVEMENT DISTRICTS Coworking Workspaces the LIST Ranked by 2020 Budget
    12 LOS ANGELES BUSINESS JOURNAL JANUARY 27, 2020 NEXT WEEK BUSINESS IMPROVEMENT DISTRICTS Coworking Workspaces THE LIST Ranked by 2020 budget Rank Business Improvement District Budget Profile Term Major Areas Included Programs and Services Top Executive • name • 2020 • members • length • name • address • 2019 • type • renewal date • title • website (thousands) • city blocks • phone Downtown Santa Monica Inc. $9,493 1,155 20 years Third Street Promenade, Ocean Avenue clean and safe, marketing and Kathleen Rawson 1 1351 Third Street Promenade, Suite 201 $8,762 prop./merch. 2028 to Lincoln Boulevard, Santa Monica promotions, business development CEO Santa Monica 90401; downtownsm.com 42 Freeway to Wilshire Boulevard (310) 393-8355 Hollywood Entertainment District 8,592 618 10 years Hollywood Boulevard, Highland Avenue, security, maintenance, marketing, Kristopher Larson 2 6562 Hollywood Blvd. 7,426 property 2029 Vine Street, Cahuenga Boulevard streetscape improvements CEO, President Los Angeles 90028; onlyinhollywood.org 75 (323) 463-6767 Downtown Center BID 7,529 1,936 10 years Grand Avenue, Figueroa Street, 7th clean and safe, security, maintenance, Suzanne Holley 3 600 Wilshire Blvd., Suite 870 7,157 property 2028 Street, Bunker Hill, Financial District, economic development, marketing CEO, President Los Angeles 90017; downtownla.com 65 Pershing Square, Historic Downtown (213) 624-2146 LA Fashion District 6,364 1,300 8 years Main/Broadway/Spring to Essex/ clean and safe, communication, website, Rena Leddy 4 818 S. Broadway, Suite 801 5,907 property 2026 Stanford/Paloma/San Pedro and 6th streetscaping Executive Director Los Angeles 90014; fashiondistrict.org 107 Street to 18th Street (213) 488-1153 Downtown Long Beach Alliance1 4,555 4,800 10 years Downtown Long Beach - Shoreline Drive business recruitment and expansion, Kraig Kojian 5 100 W.
    [Show full text]
  • Critical Time Intervention in Los Angeles' Skid Row: Learning From
    June 2014 Critical Time Intervention in Los Angeles’ Skid Row: Learning from the Downtown Women’s Center Pilot Intervention Critical Time Intervention: Learning from the Downtown Women’s Center Pilot EXECUTIVE SUMMARY Overview CTI Impact: Key Findings The Downtown Women’s Center (DWC) was awarded CTI is an evidence-based approach that has been shown to a grant from the Conrad N. Hilton Foundation and increase the likelihood that chronically homeless Fannie Mae to implement the first large-scale individuals remain stably housed,1 decrease negative implementation of a time-limited intensive case psychiatric symptoms, and prevent psychiatric management model in Skid Row called “critical time rehospitalization.1 The current evaluation found that CTI intervention” (CTI) with 80 chronically homeless significantly impacted women in three main areas: women. With additional support from the Corporation for Supportive Housing, Los Angeles Housing Stability and Independence. Findings suggest County Department of Mental Health, and Housing that CTI was particularly effective at helping clients Innovations, the CTI project began in 2011 with the develop skills to manage everyday life which in turn goal to provide intensive case management to supported their ability to remain stably housed: women transitioning out of shelters, hospitals, and At intake, 60% of clients required assistance with other institutions. living skills “most of the time”; by twelve month follow up, 53% required only “occasional” assistance. About the Evaluation At intake 8% of clients reported being employed; The goal of this evaluation was to understand how by six months into CTI, 21% reported having CTI can be used to support formerly chronically some form of paid employment.
    [Show full text]
  • LOS ANGELES COUNTY PROBATION DEPARTMENT Offices
    LOS ANGELES COUNTY PROBATION DEPARTMENT Offices AREA OFFICE Address Phone Number 1330 West Imperial Highway CE - Centinela Los Angeles, CA 90044 (323) 241-5800 5811 South San Pedro Street DRC - Day Reporting Center Los Angeles, CA 90011 (323) 235-7047 4849 Civic Center Way ELA - East Los Angeles Los Angeles, CA 90022 (323) 780-2185 ESFV - East San Fernando 14414 Delano Street Valley Van Nuys, CA 91401 (818) 374-2000 42011 4th Street West, Suite ESFVAV - ESFV Antelope 1900 Valley Lancaster, CA 93534 (661) 974-7600 ESFVVL - East San Fernando 23759 Valencia Boulevard Valencia Valencia, CA 91355 (661) 253-7271 8526 South Grape Street FIR - Firestone Los Angeles, CA 90001 (323) 586-6469 300 East Walnut Street, Room 200 FO - Foothill Pasadena, CA 91101 (626) 356-5281 3221 Torrance Boulevard HA - Harbor Torrance, CA 90503 (310) 222-2672 12310 Lower Azusa Road LAMAD - Riverview Arcadia, CA 91006 (626) 579-8506 275 Magnolia Avenue, Suite 1985 LB - Long Beach Long Beach, CA 90802 (562) 247-2200 PIC (866) 931-2222 1660 West Mission Boulevard PV - Pomona Valley Pomona, CA 91766 (909) 469-4507 8240 South Broadway Boulevard RIO - Rio Hondo Whittier, CA 90606 (562) 908-3119 ROC - Reentry Opportunity 3965 Vermont Avenue Center Los Angeles, CA 90037 (323) 730-4000 200 West Compton Boulevard, Suite 300 SC - South Central Compton, CA 90220 (310) 603-7311 11234 East Valley Boulevard, Suite 302 SGV - San Gabriel Valley El Monte, CA 91731 (626) 575-4059 1725 Main Street SM - Santa Monica Santa Monica, CA 90401 (310) 260-3525 LOS ANGELES COUNTY PROBATION DEPARTMENT POST RELEASE COMMUNITY SUPERVISION (PRCS) OFFICE & HUB LOCATIONS ANTELOPE VALLEY REGIONAL OFFICE RIO HONDO AREA OFFICE 43423 Division Street Suite 401 8240 S.
    [Show full text]
  • California 40-1
    Representative Lucille Roybal-Allard 117th United States Congress California's 40TH Congressional District NUMBER OF DELIVERY SITES IN 60 CONGRESSIONAL DISTRICT (main organization in bold) ALTAMED HEALTH SERVICES CORPORATION AltaMed Daniel Lara HIV Clinic - East LA - 5427 Whittier Blvd Los Angeles, CA 90022-4101 AltaMed Medical & Dental Group: East LA/Whittier West (Boyle Heights) - 3945 Whittier Blvd Los Angeles, CA 90023-2440 AltaMed Medical and Dental Group: Commerce, Goodrich - 972 Goodrich Blvd Commerce, CA 90022-4114 AltaMed Medical Group: Mobile Van - 5427 Whittier Blvd Los Angeles, CA 90022-4101 AltaMed Medical Group: Mobile Van Counseling & Testing - 512 S Indiana St Los Angeles, CA 90063-3911 AltaMed Medical Group: East LA/Whittier East (Commerce) - 5427 Whittier Blvd Los Angeles, CA 90022-4101 AltaMed Medical Group: Huntington Park - 1900 E Slauson Ave Huntington Park, CA 90255-2725 AltaMed PACE - Downey - 12130 Paramount Blvd Downey, CA 90242-2339 AltaMed PACE - East Los Angeles - 5425 Pomona Blvd Los Angeles, CA 90022-1716 AltaMed PACE - Huntington Park - 1900 E Slauson Ave Ste B Huntington Park, CA 90255-2725 AltaMed Pharmacy - Boyle Heights - 3945 Whittier Blvd Rm 100 Los Angeles, CA 90023-2440 AltaMed Pharmacy - Commerce - 5417 Whittier Blvd Los Angeles, CA 90022-4101 AltaMed Pharmacy - Goodrich - 972 Goodrich Blvd Rm 100 Commerce, CA 90022-4114 AltaMed Pharmacy - Huntington Park - 1900 E Slauson Ave Rm 100 Huntington Park, CA 90255-2725 BEHAVIORAL HEALTH SERVICES INC BHS - Nuestra Health Center - 4477 Whittier Blvd Los Angeles, CA 90022-1535 CENTRAL CITY COMMUNITY HEALTH CENTER, INC. Central City Community Health Center - 57th & Broadway - 5715 S Broadway Los Angeles, CA 90037-4131 Central City Community Health Center - 5970 S Central Ave Los Angeles, CA 90001-1150 Central City Community Health Center - Mobile Medical Unit #1 - 5968 S Central Ave Los Angeles, CA 90001-1150 CENTRAL NEIGHBORHOOD HEALTH FOUNDATION Central Neighborhood Health Foundation - 2707 S Central Ave Los Angeles, CA 90011-5527 COMPLETE CARE COMMUNITY HEALTH CENTER, INC.
    [Show full text]
  • BUSINESS IMPROVEMENT DISTRICTS  NEXT WEEK the LIST Ranked by 2021 Budget Franchisers
    14 LOS ANGELES BUSINESS JOURNAL JANUARY 4, 2021 BUSINESS IMPROVEMENT DISTRICTS NEXT WEEK THE LIST Ranked by 2021 budget Franchisers Rank Business Improvement District Budget Profile Term Major Areas Included Programs and Services Top Executive • name • 2021 • members • length • name • address • 2020 • type • renewal • title • website (thousands) • city blocks date • phone Downtown Santa Monica Inc. $8,961 1,155 20 years Third Street Promenade, Ocean clean and safe, marketing and promotions, Kathleen Rawson 1 1351 Third Street Promenade, Suite 201 $9,493 prop./merch. 2028 Avenue to Lincoln Boulevard, Santa business development CEO Santa Monica 90401; downtownsm.com 42 Monica Freeway to Wilshire Boulevard (310) 393-8355 Hollywood Partnership (Hollywood 8,261 618 10 years Hollywood Boulevard, Highland cleaning, safety, hospitality, beautification, Kristopher Larson 2 Entertainment District) 8,592 property 2029 Avenue, Vine Street, Cahuenga streetscape improvements, CEO, President 6562 Hollywood Blvd. 75 Boulevard communications, events, diversity and (323) 463-6767 Los Angeles 90028; equity, market reports, retail retention and hollywoodpartership.com recruitment Downtown Center BID 7,323 1,793 10 years Grand Avenue, Figueroa Street, 7th clean and safe, security, maintenance, Suzanne Holley 3 600 Wilshire Blvd., Suite 870 7,529 property 2028 Street, Bunker Hill, Financial District, economic development, marketing CEO, President Los Angeles 90017; downtownla.com 65 Pershing Square, Historic Downtown (213) 624-2146 LA Fashion District 6,579 1,200 8 years Main/Broadway/Spring to Essex/ clean and safe, communication and Rena Leddy 4 818 S. Broadway, Suite 801 6,390 property 2026 Stanford/Paloma/San Pedro and 6th marketing, streetscape improvements Executive Director Los Angeles 90014; fashiondistrict.org 107 Street to 18th Street (213) 488-1153 Downtown Long Beach Alliance1 4,800 4,800 10 years Downtown Long Beach - Shoreline business recruitment and expansion, clean Kraig Kojian 5 100 W.
    [Show full text]
  • The Digital Divide in Assembly District 53: Broadband Wireline Service
    The Digital Divide In Assembly District 53: Broadband Wireline Service District 53 Served Underserved Unserved Total 173,779 119 6 173,904 Households 100% 0% 0% 100% 463,430 400 86 463,916 Population 100% 0% 0% 100% Meets and Exceeds State Goal of 98% Served Source: Service availability data submitted by California broadband providers and validated by the CPUC as of December 31, 2014. Prepared by Watsonville GIS Center. This is a graphic representation only of best available sources. The City of Watsonville assumes no responsibility of errors. The Digital Divide in Assembly District 53: Broadband Wireline Service Unconnected and Percent Percent Percentage by Under-Connected Not Connected Connected Smartphone Only Statewide 16% 84% 14% Low-Income (<$20,000 Annually) 32% 68% 25% Spanish-Speakers 31% 69% 30% People With Disabilities 29% 71% 13% Seniors (65 or Older) 44% 56% 5% Non-High School Graduates 37% 63% 29% Most Disadvantaged Populations are Unconnected or Under-Connected Source: The Field Poll 2016 │http://www.cetfund.org/progress/annualsurvey Publicly-Subsidized Housing in Assembly District 53 Source: California Tax Credit Allocation Committee (TCAC), CA Housing Authorities Project Name Project Address Housing Type Total Units MidCities 835 S. Oxford Avenue, Los Angeles, CA 90005 All Low Income 59 Flores Apartments 1507 W. Pico Blvd., Los Angeles, CA 90027 All Low Income 26 Rose Flores 2 1513 W. Pico Blvd., Los Angeles, CA 90027 All Low Income 32 Pershing Hotel 502 S. Main Street, Los Angeles, CA 90013 SRO 65 Marengo Street Apts. 2649 Marengo Street, Los Angeles, CA 90033 Large Family 24 Prentice Apartments 1014 E.
    [Show full text]