Establishment of Common Biomedical Waste Treatment Facility in Plot No. 125 & 128, Mouza: Khirgram, Block: Mongalkote, Sub-D
Total Page:16
File Type:pdf, Size:1020Kb
Establishment Of Common Biomedical Waste Treatment Facility in Plot No. Executive Summary 125 & 128, Mouza: Khirgram, Block: Mongalkote, Sub-division: Katwa, District: Purba Bardhaman, West Bengal EXECUTIVE SUMMARY SL. NO. PARAMETERS DESCRIPTION 1 Identification of project The proposed project falls under Category “B” Projects of activity 7 (da) as per EIA Notification dated 14th September, 2006 and its subsequent amendments made in 2015, under Bio-Medical Waste Treatment Facilities. 2 Project Proponent M/s RVD Waste Tech Pvt. Ltd. 3 Brief Description of A Common Bio-medical Waste Treatment Facility the Project is a setup where bio-medical waste, generated from a number of healthcare units, is suitably treated as per the prescribed procedures & norms laid down in the Bio-Medical Waste Management Rules, 2016. Biomedical waste is generated from all health care institutions; nursing homes, clinics, dispensaries, veterinary institutions, animal houses, pathological laboratories, blood banks and so on. The proposed project is being set up at Khirgram under Mangalkot block in Purba Bardhaman district, to treat Biomedical Wastes generated from health care establishments across the districts of Purba Bardhaman, paschim Bardhaman, Birbhum, Hooghly, Murshidabad and Nadia. 4 Proposed Plant 9.6 metric tons per day @ incinerator capacity of Capacity 400 kg per hour to treat maximum incinerable waste quantity of 4000-5000 kg per day from 20,000 beds @ 200 gms- 250 gms of incinerable waste per bed per day. 5 Total Land Area 1.09 Acre 6 Location Plot No. 125 & 128, Mouza: Khirgram, Block: Mongalkote, Sub-division: Katwa, District: Purba Bardhaman, West Bengal 7 Water Requirement Water requirement for the proposed CBWTF M/s RVD Waste Tech Pvt. Ltd. 1 Establishment Of Common Biomedical Waste Treatment Facility in Plot No. Executive Summary 125 & 128, Mouza: Khirgram, Block: Mongalkote, Sub-division: Katwa, District: Purba Bardhaman, West Bengal project is 50 KLD. 8 Source of Water The water requirement will be met through bore wells & water tankers. A rainwater harvesting system will also be set up at the plant to ensure better water management. 9 Wastewater Waste water generated from the treatment of Management Biomedical Waste during incineration, autoclaving, washing of floors, vehicle wash platform, etc. will be treated in the Biological Effluent Treatment Plant. The treated water would be recycled in the plant to reduce the amount of water used. 10 Manpower During Construction phase, the labourers and workers will be hired from nearby villages. Total 70 persons are proposed to be hired for plant operations including officers, skilled and unskilled workers. 11 Electricity/Power DG set of 62.5 KVA is proposed for the project Requirement and 80 KVA lines will be taken from the West Bengal State Electricity Distribution Company Limited (WBSEDCL). 12 Total Project Cost The total estimated cost for the proposed project is Rs. 10 crores. M/s RVD Waste Tech Pvt. Ltd. 2 .