Final All Funds

Total Page:16

File Type:pdf, Size:1020Kb

Final All Funds INFRASTRUCTURE STIMULUS FUND BCF COMMUNITIES COMPONENT - INTAKE 2 FUNDED PROJECTS Summary - June 12 2009 ISF Results Summary - By Category BCFCC Intake 2 Results Summary - By Category # of Provincial Sector # of Projects Federal Funding Provincial Funding Sector Projects Federal Funding Funding Airport Infrastructure 8 $12,359,140 $12,359,139 Brownfield Remediation and Redevelopment In 1 316,667 316,667 Brownfield Redevelopment Infrastructure 2 $650,000 $650,000 Culture Infrastructure 14 24,049,255 24,049,255 Cultural Infrastructure 25 $27,184,990 $27,184,989 Disaster Mitigation Infrastructure 1 462,550 462,550 Disaster Mitigation Infrastructure 3 $8,843,333 $8,843,333 Green Energy Infrastructure 2 561,967 561,967 Local Road Infrastructure 586 $287,845,679 $287,848,824 Local Road Infrastructure 78 39,942,577 39,942,577 Municipal buildings 216 $183,193,733 $183,183,628 Recreation Infrastructure 38 87,289,072 87,289,072 Parks and Trails 121 $47,372,220 $47,372,218 Regional and Local Airports 1 16,210 16,210 Public Transit Infrastructure 26 $68,512,829 $68,512,832 Solid Waste Management Infrastructure 1 69,259 69,259 Solid Waste Management Infrastructure 12 $7,628,586 $7,628,586 Tourism Infrastructure 3 1,248,850 1,248,850 Wastewater Infrastructure 71 $144,390,308 $144,390,304 Waste Water Infrastructure 22 31,660,131 31,660,131 Water Infrastructure 117 $137,022,566 $137,022,565 Water Infrastructure 22 18,429,695 18,429,695 TOTAL 1187 $925,003,383 $924,996,418 TOTAL 183 $204,046,233 $204,046,233 ISF Results Summary - By Region BCFCC Intake 2 Results Summary - By Region # of Provincial Region # of Projects Federal Funding Provincial Funding Region Projects Federal Funding Funding Central 472 $268,461,037 $268,461,028 Central 14 $25,568,228 $25,568,228 Eastern 251 $217,652,330 $217,652,533 Eastern 56 $70,400,638 $70,400,638 North 157 $76,277,399 $76,269,284 North 70 $33,402,328 $33,402,328 South Central 46 $128,205,986 $128,206,996 South Central 6 $17,891,174 $17,891,174 South West 261 $234,406,632 $234,406,578 South West 37 $56,783,865 $56,783,865 TOTAL 1187 $925,003,383 $924,996,418 TOTAL 183 $204,046,233 $204,046,233 ISF+ BCFCC - By Region Region # of Projects Federal Funding Provincial Funding Central 486 294,029,265 294,029,256 Eastern 307 288,052,968 288,053,171 North 227 109,679,727 109,671,612 South Central 52 146,097,160 146,098,170 South West 298 291,190,497 291,190,443 TOTAL 1,370 1,129,049,616 1,129,042,651 Region Applicant Town/City Name of Applicant Project Category Project Title Federal Provincial Municipal Fund Central Adjala - Tosorontio Township of Adjala - Tosorontio Water Infrastructure Repair Everett Reservoir 30,525.00 30,525.00 31,450.00 ISF Central Adjala - Tosorontio Township of Adjala - Tosorontio Local Road Infrastructure Pave Sideroad 30 Adjala 45,672.00 45,672.00 47,056.00 ISF Central Adjala - Tosorontio Township of Adjala - Tosorontio Local Road Infrastructure Resurface Concession Road 7 79,101.00 79,101.00 81,498.00 ISF Central Ajax Town of Ajax Cultural Infrastructure St. Francis de Sales Rehabilitation and Retrofit 852,473.00 852,473.00 852,473.00 ISF Central Amaranth Township of Amaranth Municipal Buildings Sand Storage Building 86,711.00 86,711.00 86,711.00 ISF Central Aurora Town of Aurora Recreation Infrastructure Construction of Trail Network 108,333.00 108,333.00 108,334.00 BCF-CC Central Aurora Town of Aurora Parks and Trails Park Development 83,333.00 83,333.00 83,334.00 ISF Central Aurora Town of Aurora Municipal Buildings Energy Management and Building System Retro-fits 246,800.00 246,800.00 246,800.00 ISF Central Barrie City of Barrie Municipal Buildings Barrie Fire and Emergency Services Station #1 and Headquarters 4,260,000.00 4,260,000.00 4,260,000.00 ISF Watermain construction on Salem Road from Veterans Drive to Central Barrie City of Barrie Water Infrastructure 506,400.00 506,400.00 506,400.00 ISF Saunders Road Watermain construction on Anne Street, Cundles Road, Kozlov Central Barrie City of Barrie Water Infrastructure 992,700.00 992,700.00 992,700.00 ISF Street and Heather Street Central Barrie City of Barrie Wastewater Infrastructure Operations Centre Site Works and Stormwater Management Pond 1,728,000.00 1,728,000.00 1,728,000.00 ISF Infrastructure improvements on Boys Street and Donald Street, Central Barrie City of Barrie Local Road Infrastructure 1,166,700.00 1,166,700.00 1,166,700.00 ISF including Bunkers Creek and Kidd’s Creek culverts. Road, drainage and other infrastructure improvements on Toronto Central Barrie City of Barrie Local Road Infrastructure 3,281,400.00 3,281,400.00 3,281,400.00 ISF Street, Dunlop Street, and Mary Street Central Barrie City of Barrie Airport Infrastructure Lake Simcoe Regional Airport Upgrades and Expansion 4,596,000.00 4,596,000.00 4,596,000.00 ISF Construction of the Bradford West Gwillimbury Library and Cultural Central Bradford West Gwillimbury Town of Bradford West Gwillimbury Culture Infrastructure 3,675,000.00 3,675,000.00 8,823,961.00 BCF-CC Centre in Bradford Central Bradford West Gwillimbury Town of Bradford West Gwillimbury Local Road Infrastructure 8th Line / Dissette Reconstruction 1,972,000.00 1,972,000.00 1,972,000.00 ISF Central Bradford West Gwillimbury Town of Bradford West Gwillimbury Local Road Infrastructure Colborne Street Reconstruction 540,333.50 540,333.50 540,333.00 ISF Central Brampton City Of Brampton Public Transit Infrastructure Mount Pleasant Village Transit Facility 7,666,666.67 7,666,666.67 7,666,666.66 ISF Central Brampton City Of Brampton Parks and Trails Chinguacousy Park 8,164,000.00 8,164,000.00 8,164,000.00 ISF Central Clarington Municipality of Clarington Green Energy Infrastructure Energy Retrofit of the Garnet B. Rickard Complex 425,000.00 425,000.00 425,000.00 BCF-CC Concession Road 6 Pavement Rehabilitation – Old Scugog Road Central Clarington Municipality of Clarington Local Road Infrastructure 826,667.00 826,667.00 826,667.00 ISF to Acres Road Central Clearview Township of Clearview Parks and Trails Stayner to Collingwood Trail Link 66,667.00 66,667.00 66,666.00 ISF Downtown Collingwood Infrastructure Rehabilitation and Economic Central Collingwood Town of Collingwood Local Road Infrastructure 2,000,000.00 2,000,000.00 2,000,000.00 ISF Revitalization Central County of Simcoe County of Simcoe Local Road Infrastructure Rehabilitation of Avening Bridge 500,000.00 500,000.00 500,000.00 ISF Central County of Simcoe County of Simcoe Local Road Infrastructure Improvements to Highway 400 Detour Route -Cty rd 19 1,603,333.00 1,603,333.00 1,603,334.00 ISF Central County of Simcoe County of Simcoe Municipal Buildings Archives Expansion 1,377,833.33 1,377,833.33 1,377,833.34 ISF Central County of Simcoe County of Simcoe Local Road Infrastructure Improvements to Highway 400 Detour Routes 333,333.00 333,333.00 333,334.00 ISF Central County of Simcoe County of Simcoe Local Road Infrastructure Improvements to Highway 400 Detour Routes - Wilson Dr 816,666.00 816,666.00 816,668.00 ISF Page 1 Region Applicant Town/City Name of Applicant Project Category Project Title Federal Provincial Municipal Fund Central County of Simcoe County of Simcoe Local Road Infrastructure County Road 44 Improvements - Rama Rd. 1,666,666.00 1,666,666.00 1,666,668.00 ISF Central East Garafraxa Township of East Garafraxa Local Road Infrastructure 10th Line Improvement Project 224,586.00 224,586.00 224,586.00 ISF Central East Gwillimbury Town of East Gwillimbury Municipal Buildings Administration Building Renovation 233,333.32 233,333.32 233,333.36 ISF Central East Gwillimbury Town of East Gwillimbury Local Road Infrastructure Boag Road Bridge 250,000.00 250,000.00 250,000.00 ISF Replacement of the Angus Branch of the Essa Public Library in Central Essa Township of Essa Culture Infrastructure 786,666.00 786,666.00 786,668.00 BCF-CC the Township of Essa Central Essa Township of Essa Local Road Infrastructure Rehabilitation and repaving of various urban streets in Angus area 114,322.00 114,322.00 114,356.00 ISF Construction of the Georgina Civic Centre Multi-Season Outdoor Central Georgina Town of Georgina Recreation Infrastructure 4,736,458.00 4,736,458.00 4,736,459.00 BCF-CC Recreation Campus Central Innisfil Town of Innisfil Parks and Trails Innisfil beach Park Improvements 333,300.00 333,300.00 333,400.00 ISF Central King Township of King Municipal Buildings Schomberg Arena/Curling/Fitness Facility Construction Project 4,720,000.00 4,720,000.00 4,720,000.00 ISF Central Markham Town of Markham Municipal Buildings Thornhill Community Centre & Library Expansion 2,000,000.00 2,000,000.00 2,000,000.00 ISF Facility Accessibility, Energy Retrofit and Emergency Operations Central Markham Town of Markham Municipal Buildings 2,400,000.00 2,400,000.00 2,400,000.00 ISF Centre Rehabilitation Central Midland Town of Midland Municipal Buildings Municipal Office Expansion/Retrofit 1,333,333.33 1,333,333.33 1,333,333.34 ISF Central Milton Town of Milton Culture Infrastructure Construction of Arts & Cultural Centre 8,114,920.00 8,114,920.00 8,360,825.00 BCF-CC Central Milton Town of Milton Municipal Buildings Milton Sports Centre Expansion Phase 1 6,678,425.00 6,678,425.00 6,880,803.00 ISF Central Mississauga City of Mississauga Public Transit Infrastructure City Centre Transit Priority - Mavis 443,333.00 443,333.00 443,334.00 ISF Central Mississauga City of Mississauga Public Transit Infrastructure City Centre Transit Priority - Rathburn 1,390,000.00 1,390,000.00 1,390,000.00 ISF Central Mississauga City of Mississauga Cultural Infrastructure Burnhamthorpe
Recommended publications
  • Community Profiles for the Oneca Education And
    FIRST NATION COMMUNITY PROFILES 2010 Political/Territorial Facts About This Community Phone Number First Nation and Address Nation and Region Organization or and Fax Number Affiliation (if any) • Census data from 2006 states Aamjiwnaang First that there are 706 residents. Nation • This is a Chippewa (Ojibwe) community located on the (Sarnia) (519) 336‐8410 Anishinabek Nation shores of the St. Clair River near SFNS Sarnia, Ontario. 978 Tashmoo Avenue (Fax) 336‐0382 • There are 253 private dwellings in this community. SARNIA, Ontario (Southwest Region) • The land base is 12.57 square kilometres. N7T 7H5 • Census data from 2006 states that there are 506 residents. Alderville First Nation • This community is located in South‐Central Ontario. It is 11696 Second Line (905) 352‐2011 Anishinabek Nation intersected by County Road 45, and is located on the south side P.O. Box 46 (Fax) 352‐3242 Ogemawahj of Rice Lake and is 30km north of Cobourg. ROSENEATH, Ontario (Southeast Region) • There are 237 private dwellings in this community. K0K 2X0 • The land base is 12.52 square kilometres. COPYRIGHT OF THE ONECA EDUCATION PARTNERSHIPS PROGRAM 1 FIRST NATION COMMUNITY PROFILES 2010 • Census data from 2006 states that there are 406 residents. • This Algonquin community Algonquins of called Pikwàkanagàn is situated Pikwakanagan First on the beautiful shores of the Nation (613) 625‐2800 Bonnechere River and Golden Anishinabek Nation Lake. It is located off of Highway P.O. Box 100 (Fax) 625‐1149 N/A 60 and is 1 1/2 hours west of Ottawa and 1 1/2 hours south of GOLDEN LAKE, Ontario Algonquin Park.
    [Show full text]
  • The Corporation of the Township of Ear Falls
    THE CORPORATION OF THE TOWNSHIP OF EAR FALLS A G E N D A of the Regular Meeting of Ear Falls Council #05 Ear Falls Municipal Council Chambers April 6th, 2016 @ 7:00 p.m. 1 CALL TO ORDER 2 ROLL CALL 3 DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE THEREOF 4 DELEGATIONS AND PRESENTATIONS None. PART I – CONSENT AGENDA (For the purpose of convenience and for expediting Meetings, matters of business of repetitive or routine nature are included in the Consent Agenda, and all such matters of business contained in the Consent Agenda are voted on collectively. A particular matter of business may be singled out from the Consent Agenda for debate or for a separate vote upon the request of any Member of Council. In the case of a separate vote, the excluded matter of business is severed from the Consent Agenda, and only the remaining matters of business contained in the Consent Agenda are voted on collectively. Each and every matter of business contained in the Consent Agenda is recorded separately in the Minutes of the Meeting.) 5 MINUTES 5.1 The review and passing of the Minutes of the previous Meetings. 5.1.1 March 2nd, 2016 – Regular Meeting of Council Minutes. C.O. 5.2 Minutes of Committees. 5.2.1 February 8th, 2016 – Public Library Board Meeting Minutes. C.O. 5.3 Minutes from other Agencies / Organizations. Agenda – Regular Meeting of Council April 6th, 2016 Page 2 5.3.1 January 12th, 2016 – Keewatin-Patricia District School Board Meeting #2 Minutes. 5.3.2 January 26th, 2016 – Keewatin-Patricia District School Board Special Board Meeting Minutes.
    [Show full text]
  • Patrick Mcmahon Technical Manager Regulatory Research and Records [email protected] (519) 436-5325
    Enbridge Gas Inc. 50 Keil Drive North Chatham, Ontario, Canada N7M 5M1 June 29, 2021 Ms. Christine E. Long Registrar Ontario Energy Board 2300 Yonge Street, 27th Floor Toronto, ON M4P 1E4 Dear Ms. Long: Re: Enbridge Gas Inc. Application for Renewal of Franchise Agreement Township of Ear Falls Attached is an Application by Enbridge Gas Inc. for Orders of the Ontario Energy Board with respect to a Franchise Agreement with the Township of Ear Falls. An agreement has been reached between Enbridge Gas Inc. and the Township of Ear Falls with regards to the terms and conditions of the proposed Franchise Agreement. Should you have any questions on this application, please do not hesitate to contact me. I look forward to the receipt of your instructions. Yours truly, Patrick McMahon Technical Manager Regulatory Research and Records [email protected] (519) 436-5325 Encl. ONTARIO ENERGY BOARD IN THE MATTER OF the Municipal Franchises Act, R.S.O. 1990, c.M.55, as amended; AND IN THE MATTER OF an Application by Enbridge Gas Inc. for an Order approving the terms and conditions upon which, and the period for which, the Corporation of the Township of Ear Falls is, by by-law, to grant to Enbridge Gas Inc. the right to construct and operate works for the distribution, transmission and storage of natural gas and the right to extend and add to the works in the Township of Ear Falls; AND IN THE MATTER OF an Application by Enbridge Gas Inc. for an Order directing and declaring that the assent of the municipal electors of the Township of Ear Falls to the by-law is not necessary.
    [Show full text]
  • Job Postings for the Red Lake/Ear Falls Areas October 7, 2020
    P.O. Box 223 / 146 Howey Street Red Lake, ON P0V 2M0 www.redlakejobs.ca / [email protected] Tel: (807) 727-2297 / Fax: (807) 727-1176 Job Postings for the Red Lake/Ear Falls areas October 7, 2020 RED LAKE RED LAKE CAREER & EMPLOYMENT SERVICES ➢ Employment Adviser ¯ Full-time; permanent; wage dependent on background and experience; group benefits; pension; great working environment. Responsibilities: • Provide client service to job seekers, in the form of clarifying employment needs, and job search assistance. • Administrative duties pertaining to documentation, file maintenance, and statistical reporting: proficient with Microsoft Office applications, database and Internet. • Marketing of programs to area employers, potential job seekers, and community at large. • Workshop presentations to various client groups. Knowledge, Skills & Abilities: ▪ Office administrative procedures and ability to maintain a high level of accuracy, with attention to detail. ▪ Adhere to strict candidate and employer confidentiality. ▪ Demonstrated excellent interpersonal skills. ▪ Demonstrated team building skills. ▪ Demonstrated effective analytical and problem solving. ▪ Effective verbal, written and listening communication skills. ▪ Time management skills. ▪ Must be honest, and trustworthy. ▪ Possess cultural awareness and capability. ▪ Demonstrate sound work ethics. Qualifications: o Related post-secondary education (i.e. Employment Counselling, Career Development, Social Work). o Demonstrated knowledge and understanding of employment and training sector. o Demonstrated knowledge and understanding of challenges faced by Northern Ontario job seekers. o Clear Criminal Background Check and Vulnerable Sector Screening required. o Must have valid driver’s license and access to a vehicle. Submit resume and cover letter by 12:00 Noon, Friday October 16, 2020 to: Sandra Marshall, Director, Red Lake Career & Employment Services P.O.
    [Show full text]
  • Request for Proposals
    REQUEST FOR PROPOSALS - Recreation Centre Accessibility Renovation 30 McCallum Street Ear Falls, Ontario Closing Date: May 27, 2021 1. Background The Township of Ear Falls is a single tier municipality situated in the Kenora District of Northwestern Ontario. Ear Falls lies along Highway 105 in the Patricia Region of Ontario's Sunset Country. Ear Falls is surrounded entirely by unincorporated area and is located approximately: • 100 km north of the Municipality of Machin, which is located on the Trans- Canada Highway (Hwy 17) between Kenora and Dryden • 20 km north of Wabauskang First Nation • 70 km south of the Municipality of Red Lake Ear Falls is a community of 995 residents (Statistics Canada 2016 Census Profile), with a number of local businesses, service organizations and tourism operators. 2. Invitation The Township of Ear Falls is pleased to invite proposals from qualified and experienced organizations to complete renovation work at the Ear Falls Recreation Center to renovate washrooms to make them fully accessible and install a chair lift to provide transport up/down the facility stairs. Proponents have the sole responsibility to submit proposals to the Township of Ear Falls by 11:00 a.m. local time on May 27, 2021. Proposals received after the stipulated deadline will not be accepted. Ear Falls does not intend any contractual relationship upon the submission of a proposal and will only enter into a contractual service relationship with a proponent if the prop proposal is determined to meet the needs of Ear Falls after evaluation. 3. Process Proponents are required to fill out and return the Receipt Confirmation Form attached as Appendix A.
    [Show full text]
  • Allison Lake North Lithium Property Overview Ear Falls, Ontario
    Allison Lake North Lithium Property Overview Ear Falls, Ontario PORTOFINO FORWARD LOOKING STATEMENTS RESOURCES INC. This presentation contains forward looking statements concerning future operations of Portofino Resources Inc. (the “Company”). All forward-looking statements concerning the Company’s future plans and operations, including management’s assessment of the Company’s project expectations or beliefs may be subject to certain assumptions, risks and uncertainties beyond the Company’s control. Investors are cautioned that any such statements are not guarantees of future performance and that actual performance and exploration and financial results may differ materially from any estimates or projections. Such statements include, among others: possible variations in mineralization, grade or recovery rates; actual results of current exploration activities; actual results of reclamation activities; conclusions of future economic evaluations; changes in project parameters as plans continue to be refined; failure of equipment or processes to operate as anticipated; accidents and other risks of the mining industry; delays and other risks related to construction activities and operations; timing and receipt of regulatory approvals of operations; the ability of the Company and other relevant parties to satisfy regulatory requirements; the availability of financing for proposed transactions, programs and working capital requirements on reasonable terms; the ability of third party service providers to deliver services on reasonable terms and in a timely manner; market conditions and general business, economic, competitive, political and social conditions. It is important to note that the information provided in this presentation is preliminary in nature. There is no certainty that a potential mine will be realized. Technical content has been reviewed and approved by Mr.
    [Show full text]
  • Ear Falls Area Kenora District (Patricia Portion)
    THESE TERMS GOVERN YOUR USE OF THIS DOCUMENT Your use of this Ontario Geological Survey document (the “Content”) is governed by the terms set out on this page (“Terms of Use”). By downloading this Content, you (the “User”) have accepted, and have agreed to be bound by, the Terms of Use. Content: This Content is offered by the Province of Ontario’s Ministry of Northern Development and Mines (MNDM) as a public service, on an “as-is” basis. Recommendations and statements of opinion expressed in the Content are those of the author or authors and are not to be construed as statement of government policy. You are solely responsible for your use of the Content. You should not rely on the Content for legal advice nor as authoritative in your particular circumstances. Users should verify the accuracy and applicability of any Content before acting on it. MNDM does not guarantee, or make any warranty express or implied, that the Content is current, accurate, complete or reliable. MNDM is not responsible for any damage however caused, which results, directly or indirectly, from your use of the Content. MNDM assumes no legal liability or responsibility for the Content whatsoever. Links to Other Web Sites: This Content may contain links, to Web sites that are not operated by MNDM. Linked Web sites may not be available in French. MNDM neither endorses nor assumes any responsibility for the safety, accuracy or availability of linked Web sites or the information contained on them. The linked Web sites, their operation and content are the responsibility of the person or entity for which they were created or maintained (the “Owner”).
    [Show full text]
  • Progress Report to the Ontario Living Legacy Trust
    PROGRESS REPORT TO THE ONTARIO LIVING LEGACY TRUST DATE: May 31, 2003 PROJECT LEADER: The Wolverine Foundation (Audrey Magoun, Co-Director) PARTNERS: 1) Ontario Ministry of Natural Resources (Neil Dawson, Wildlife Assessment Program Leader, Northwest Region; Catherine Lipsett-Moore, Species at Risk Biologist, Northwest Region Planning Unit); 2) Ontario Parks (Geoff Lipsett-Moore, Zone Ecologist, Northwest Zone); 3) Wildlife Conservation Society/University of Toronto (Justina Ray, Associate Conservation Zoologist/Adjunct Professor). PROJECT NUMBER: 08-024 PROJECT NAME: Boreal Wolverine: a Focal Species for Land Use Planning in Ontario’s Northern Boreal Forest PROJECT DESCRIPTION: This project will refine knowledge of wolverine distribution; produce a habitat model for NW Ontario to consider the size, distribution, and connectivity of areas needed for viable wolverine populations; develop and test tools for the inventory and monitoring of wolverine populations, including the feasibility of using satellite collars; and develop interim management guidelines and recommendations for maintaining or expanding wolverines in areas of timber harvest. LLT FUNDING PROGRAMS: 7 & 8 PROJECT DURATION: 3 Years, beginning with first payment in August 2002; remaining payments April 2003 and June 2004. REPORTING PERIOD: August 2002 – May 2003. PRIMARY CONTACT (FOR THIS REPORT): Audrey Magoun. Phone: (907) 479-5588. E-mail: [email protected] SECONDARY CONTACT (FOR THIS REPORT): Neil Dawson. Phone: (807) 939-3120. E-mail: [email protected] LLT Ontario Wolverine Progress Report (Project 08-024) -- 31 May 2003 1 TABLE OF CONTENTS SECTION 1: SUMMARY OF PROJECT RATIONALE, GOALS, AND OBJECTIVES………….….. 4 SECTION 2: PROJECT ACTIVITIES, RESULTS, MILESTONES, AND DATES DELIVERED……... 5 2.1 Summary of Results to Date……………………………………………….…….
    [Show full text]
  • Year 1 Status Report
    The Wolverine Foundation - Research, Ontario Boreal Wo... http://www.wolverinefoundation.org/research/onyr1rpt.htm Ontario Boreal Wolverine Project Status Report to the Ontario Living Legacy Trust: Year 1 Participation by The Wolverine Foundation, Inc. in the "Ontario Boreal Wolverine Project" was made possible by a grant through the Living Legacy Trust Date: February 17, 2003 Project Leader: The Wolverine Foundation, Inc. (Audrey Magoun, Co-Director) Partners: 1) Ontario Ministry of Natural Resources - Neil Dawson, Wildlife Assessment Program Leader, Northwest Region; Catherine Lipsett-Moore, Species at Risk Biologist, Northwest Region Planning Unit; 2) Ontario Parks - Geoff Lipsett-Moore, Zone Ecologist, Northwest Zone; 3) Wildlife Conservation Society/University of Toronto - Justina Ray, Associate Conservation Zoologist/Adjunct Professor. Project Number: 08-024 Project Name: Boreal Wolverine: A Focal Species for Land Use Planning in Ontario's Northern Boreal Forest Project Description: This project will refine knowledge of wolverine distribution; produce a habitat model for NW Ontario to consider the size, distribution, and connectivity of areas needed for 1 of 14 2/9/11 10:52 AM The Wolverine Foundation - Research, Ontario Boreal Wo... http://www.wolverinefoundation.org/research/onyr1rpt.htm viable wolverine populations; develop and test tools for the inventory and monitoring of wolverine populations, including the feasibility of using satellite collars; and develop interim management guidelines and recommendations for maintaining
    [Show full text]
  • Municipality of Red Lake and Township of Ear Falls 2020 Community Safety and Well-Being Plan
    Municipality of Red Lake and Township of Ear Falls 2020 Community Safety and Well-Being Plan Summary of Key Statistics, Stakeholder and Public Feedback – Detailed October 2020 Table of Contents Section Page Consultations and Key Data Sources 3 Risks, Gaps and Opportunities – Overview 5 Survey Results – Overview 9 Key Risks – Detail 14 – Substance Abuse – Mental Health and Cognitive Issues – Housing Insecurity – Physical Health – Financial Insecurity / Unemployment / Insufficient Education – Emotional & Sexual Violence – Unsupportive Family Environment – Criminal Involvement Other Considerations 54 Appendices 56 A. Advisory Committee B. Key Stakeholder Focus Groups & Interview Participants C. Detailed Survey Results 2 Consultations (see Appendix A for detailed list of stakeholder organizations) Stakeholder Group (# in attendance) Method of Engagement General Public Advisory Committee Members Group interviews Public Survey • Municipality of Red Lake (7) May 11 to 28 Open June 18 to July 19 • Municipality of Ear Falls (2) • 141 total responses (not all questions To gain professional insights into • Advisory Committee answered by all respondents) community needs, risks, priorities, • Red lake – 111 • Children Youth (1) gaps, opportunities, existing programs, • Community / Social Services (3) data collection, collaboration • Ear Falls – 27 • Custodial Services (2) • Other – 3 • Education (3) Questions focused on public perception of impact / priority of key risks, and vision for • Physical Health (2) community safety and well-being • Mental Health and Addictions (2) • Policing (4) Web-hosted Public Workshop Community Organizations Focus Groups / interviews July 7 – 6:30pm to 7:30pm • Mental Health and Addictions (2) + 1 interview June 30 to July 16 Combined Red Lake / Ear Falls – due to low • Housing and Homelessness (1) registration.
    [Show full text]
  • 2021 SFL Travel Schedule
    2021 Screen for Life Coach Travel Schedule Community/Location Dates Dryden – Dryden Memorial Arena April 8th-26th, and July 28th-August 18th Wabigoon Lake Ojibway Nation – Band Office April 14th Wabaseemoong Independent Nation – Health Centre April 27th Minaki – Community Centre April 28th Wauzushk Onigum - Community Development Centre (CDC) April 29th Rainy River – Public Works Garage April 30th-May 2nd Mishkosiminiziibiing (Big Grassy First Nation) – Esiniiwabe May 3rd Health Centre Anisinaabeg of Naongashiing Access coach in Mishkosiminiziibiing Emo – La Vallee Community Centre May 4th-6th and October 15th-18th Rainy River First Nations – Health Centre May 5th Atikokan – Atikokan Family Health Team May 6th-13th and October 22nd–27th Nigigoonsiminikaaning First Nation – Health Centre May 11th Biinjitiwabik Zaaging Anishnabek – Community Centre May 27th Longlac – Norwest Community Health Centre May 28th-29th and September 20th-21st Geraldton – Northern Horizons Health Centre May 30th-June 5th, September 22nd-25th Ogoki/Marten Falls First Nation Access coach in Geraldton Nakina – Nakina Medical Clinic June 3rd Aroland First Nation – Health Centre June 4th Schreiber – Schreiber Arena June 6th-9th Marathon – Wilson Memorial General Hospital June 10th-17th and September 9th-14th Hornepayne – Hornepayne Community Hospital June 17th-20th Manitouwadge – Santé Manitouwadge Health June 20th-26th White River – White River Medical Clinic July 5th-7th Dubreuilville – Centre Récréatif Dubreuilville Recreation Centre July 7th-9th Wawa – Michipicoten
    [Show full text]
  • LAKE of the WOODS CONTROL BOARD POLICIES L. Operation Of
    LAKE OF THE WOODS CONTROL BOARD POLICIES l. Operation of Hydraulic Generating Stations on the English and Winnipeg Rivers Introduction The Lake of the Woods Control Board has statutory jurisdiction to regulate and control the flow of the waters of the Winnipeg River between its junction with the English River and the Lake of the Woods, and also the flow of water in the English River between its junction with the Winnipeg River and Lac Seul. In order to clarify responsibility for the operation of the generating stations on the English River and the Winnipeg River in recognition of these legislated responsibilities, the Lake of the Woods Control Board has established the following policies concerning such operation. lA. Operation of Hydraulic Generating Stations at the Outlets of Lac Seul and Lake of the Woods This policy pertains to the control of flows which are authorized by the Board from Lac Seul and Lake of the Woods. (a) Policy Statement The Lake of the Woods Control Board authorizes discharges from Lac Seul and Lake of the Woods. Ontario Power Generation (hereinafter OPG), which operates a generating station and the control dam at Ear Falls, and ACH Limited Partnership / AbitibiBowater Inc. (hereinafter ACH), which operates the generating stations and control structures at Kenora, must operate at the flows authorized by the Board. However, the flows authorized may be subject to some flexibilities as outlined below in Section (e) of this Policy. (b) Information from Dam Operators It is the responsibility of OPG and ACH to keep the Secretariat advised at all times of any situation, current or planned, which may either restrict, or make it desirable (if possible) to restrict, the full range of outflow options available to the Board at the Ear Falls and Kenora outlet works.
    [Show full text]