Queensland Floods February 2008

Total Page:16

File Type:pdf, Size:1020Kb

Queensland Floods February 2008 Report on Queensland Floods February 2008 1 2 3 4 5 6 1. Damage to boats in Airlie Beach. (John Webster) 2. High velocity flow in the Don River at the Bruce Highway Bridge in Bowen. (Burdekin Shire Council) 3. Flash flooding in Rockhampton on the 25th February. (Courier Mail Website) 4. A picture taken by the RACQ Central Queensland Rescue helicopter crew shows Mackay heavy floodwaters. 5. Hospital Bridge in Mackay during Mackay flash flood event. (ABC Website) 6. Burdekin River at Inkerman Bridge at Ayre/Home Hill. (Burdekin Shire Council) Note: 1. Data in this report has been operationally quality controlled but errors may still exist. 2. This product includes data made available to the Bureau by other agencies. Separate approval may be required to use the data for other purposes. See Appendix 1 for DNRW Usage Agreement. 3. This report is not a complete set of all data that is available. It is a representation of some of the key information. Table of Contents 1. Introduction ................................................................................................................................................... 3 Figure 1.1 Peak Flood Height Map for February 2008 - Queensland..................................................... 3 2. Meteorological Summary ............................................................................................................................. 4 2.1 Meteorological Analysis......................................................................................................................... 4 Figure 2.1.1 Track of Tropical Low Pressure System from the 8th to the 13th of February 2008. ............. 4 Figure 2.1.2 Mean Sea Level Pressure Charts for Australia at 10 am from the 10th to the 17th of February 2008. ............................................................................................................................................ 5 Figure 2.1.3 Mean Sea Level Analysis near Airlie Beach at 3am on the 12th of February 2008. ............. 6 Figure 2.1.4 Wind analysis at 1500 metres above Mean Sea Level at 10pm on the 11th of February 2008............................................................................................................................................................. 7 Figure 2.1.5 Areas of Warm Air Advection (WAA) and Moist Tropical Air at 10pm on the 11th of February 2008. ............................................................................................................................................ 8 Figure 2.1.6 Map of the Pioneer River basin displaying 24 hour rainfall totals to 10 am on the 15th of February. ..................................................................................................................................................... 9 Figure 2.1.7 Mean Sea Level pressure analysis around Mackay at 9am on the 15th of February 2008. 10 2.2 Radar Imagery Analysis........................................................................................................................ 11 Table 2.2.1 Hourly Rainfall totals for Upper Barrattas Alert and Dalbeg Alert for the 24 hours ending at 9am on the 12th of February 2008. ............................................................................................................ 11 Figure 2.2.1 Sequence of Radar Imagery from Mt Stuart from 7pm to 9:20 pm on the 11th of February 2008........................................................................................................................................................... 12 Figure 2.2.2 Sequence of radar imagery from Gladstone from 2am to 6am on the 12th of February....... 13 Figure 2.2.3 Map of the Pioneer River basin displaying 6-hour rainfall totals to 10 am on the 15th of February. ................................................................................................................................................... 14 Table 2.2.2 Hourly Rainfall totals for Mackay Alert, Gooseponds Alert and Hospital Bridge Alert for the 24 hours ending at 10am on the 15th of February 2008............................................................................ 15 Figure 2.2.4 Sequence of Radar Imagery from Bowen from 8am to 8:50am on the 15th of February 2008. ................................................................................................................................................................... 16 Figure 2.2.5 Map of the Townsville and Thuringowa displaying 6-hour rainfall totals to 1am on the 16th of February. ................................................................................................................................................... 17 Table 2.2.3 30 Minute Rainfall Observations from Rockhampton Airport on the 25th of February 2008.17 Figure 2.2.6 Sequence of Radar Imagery from Gladstone from 2:20am to 3:30am on the 25th of February 2008. .......................................................................................................................................... 18 2.3 Conclusion ............................................................................................................................................. 19 3. Hydrology .................................................................................................................................................... 20 Table 3.0.1 Peak Flood Height Comparison to Records........................................................................... 20 Figure 3.0.1 Peak Flood Height Map for February 2008 - Queensland................................................. 21 Figure 3.0.2 Queensland Isohyetal Rainfall Map – February 2008.......................................................... 22 Figure 3.1.1 Rainfall Map of Queensland - February 2008..................................................................... 23 Figure 3.1.2 Rainfall Map for the Brisbane Basin for 10 days to 09:00 10/2/2008 ................................. 24 Figure 3.1.3 Rainfall Map for the Border Rivers for 10 days to 09:00 10/2/2008.................................... 25 Figure 3.1.4 Rainfall Map for Townsville to Mackay for 7 days to 09:00 17/2/2008 ............................... 26 Figure 3.1.5 Rainfall Map for Townsville to Mackay for the 24 hours to 09:00 12 February 2008 ......... 27 Figure 3.1.6 Rainfall Map for Townsville to Mackay for the 24 hours to 09:00 15 February 2008 ......... 28 Figure 3.1.7 Rainfall Map for Townsville to Mackay for the 24 hours to 09:00 16 February 2008 ......... 29 Figure 3.1.8 Rainfall Map for the Fitzroy Basin for 7 days to 09:00 17/2/2008...................................... 30 Figure 3.1.9 Rainfall Map for the Fitzroy Basin for 24 hours to 09:00 25/2/2008 ................................... 31 3.2 Rainfall Intensity .................................................................................................................................... 32 Table 3.2.1 CRC-FORGE estimates for Mackay Alert (33303) (millimetres)............................................ 32 Figure 3.2.1 Hourly Hyetographs for Dalbeg (Burdekin R) and Upper Barrattas (Haughton R)............... 33 Figure 3.2.2 Intensity Frequency Duration Rainfall Analysis for Dalbeg (Burdekin R) and Upper Barattas (Haughton R) ............................................................................................................................................. 34 Figure 3.2.3 Hourly Hyetographs for Ida Creek and Emu Creek (Don R)................................................. 35 Figure 3.2.4 Intensity Frequency Duration Rainfall Analysis for Ida Creek and Emu Creek (Don R)...... 36 Figure 3.2.5 Hourly Hyetographs for Mackay and Gooseponds (Pioneer R) ........................................... 37 Figure 3.2.6 Intensity Frequency Duration Rainfall Analysis for Mackay and Goosponds (Pioneer R)... 38 Figure 3.2.7 Hourly Hyetographs for Deeragun (Bohle R) and Rockhampton (Fitzroy R)........................ 39 Figure 3.2.8 Intensity Frequency Duration Rainfall Analysis for Deeragun (Bohle R) and Rockhampton (Fitzroy R).................................................................................................................................................. 40 Figure 3.2.9 Intensity Frequency Duration Rainfall Analysis for Southwood (Moonie R) ........................ 41 3.3 Rainfall Totals ........................................................................................................................................ 42 Report on Queensland Floods – February 2008 nd th Table 3.3.1 Rainfall Totals for the South East Coast 2 -8 February 2008............................................ 42 nd th Table 3.3.2 Rainfall Totals for the Brisbane River Basin 2 -8 February 2008 ...................................... 45 nd th Table 3.3.3 Rainfall Totals for the Weir and Moonie Rivers 2 -8 February 2008 ................................. 49 th Table 3.3.4 Rainfall Totals for the Fitzroy and Adjacent Rivers 11-18 February 2008 .......................... 50 th Table 3.3.5 Rainfall Totals for the Central Coast Rivers Rivers 11-18 February 2008.......................... 53 3.4 Peak Flood Heights .............................................................................................................................. 58 Figure 3.4.1 Peak Flood Height Map for South East Queensland for February 2008 ............................. 58 Table 3.4.1 Peak Flood Heights for South East Queensland for February 2008...................................... 59 Figure 3.4.2 Peak Flood Height Map for the Fitzroy
Recommended publications
  • WQ1251 - Pioneer River and Plane Creek Basins Downs Mine Dam K ! R E Em E ! ! E T
    ! ! ! ! ! ! ! ! ! ! ! ! ! ! %2 ! ! ! ! ! 148°30'E 148°40'E 148°50'E 149°E 149°10'E 149°20'E 149°30'E ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! S ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ° k k 1 e ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! re C 2 se C ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! as y ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! M y k S ! C a ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ° r ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! r Mackay City estuarine 1 %2 Proserpine River Sunset 2 a u ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! g ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! e M waters (outside port land) ! m ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Bay O k Basin ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! F C ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! i ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! n Bucasia ! Upper Cattle Creek c Dalr
    [Show full text]
  • Review of Evidence Report on Citiswich Development by Tony Loveday (Bremer Business Park Masterplan) Prepared For
    A part of BMT in Energy and Environment Response Report to Floods Commission – Review of Evidence Report on Citiswich Development by Tony Loveday (Bremer Business Park Masterplan) prepared for Ipswich City Council R.B18414.005.00.doc November 2011 Response Report to Floods Commission – Review of Evidence Report on Citiswich Development by Tony Loveday (Bremer Business Park Masterplan) prepared for Ipswich City Council November 2011 Offices Brisbane Denver Mackay Melbourne Prepared For: Ipswich City Council Newcastle Perth Sydney Prepared By: BMT WBM Pty Ltd (Member of the BMT group of companies) Vancouver G:\ADMIN\B18414.G.RGS\R.B18414.005.00.DOC CONTENTS I CONTENTS Contents i 1 PURPOSE OF THE REPORT 1-1 2 HISTORY OF THE BREMER BUSINESS PARK AND CITISWICH FLOOD ASSESSMENTS 2-1 3 REVIEW OF FLOOD ASSESSMENT METHODOLOGY FOR THE PROJECT INCLUDING CUMULATIVE ASSESSMENT AND FLOOD STORAGE 3-1 4 COMPLIANCE WITH THE PLANNING SCHEME 4-1 5 LIMITATIONS OF THE REVIEW AND ASSUMPTIONS MADE BY MR LOVEDAY 5-1 6 SPECIFIC REVIEW COMMENTS ON MR LOVEDAY’S REPORT 6-1 7 CONCLUSIONS 7-1 APPENDIX A: FLOOD AND STORMWATER REPORTS – CITISWICH ESTATE A-1 APPENDIX B: BCC FILLING AND EXCAVATION CODE B-1 G:\ADMIN\B18414.G.RGS\R.B18414.005.00.DOC PURPOSE OF THE REPORT 1-1 1 PURPOSE OF THE REPORT This Report has been prepared by Neil Collins to assist Ipswich City Council with expert advice in relation to flooding in its response to a Report prepared by Mr Loveday for the Queensland Floods Commission dated 7 November 2011, in relation to the Bremer Business Park (Citiswich) Project.
    [Show full text]
  • Basin-Specific Ecologically Relevant Water Quality Targets for the Great Barrier Reef
    Development of basin-specific ecologically relevant water quality targets for the Great Barrier Reef Jon Brodie, Mark Baird, Jane Waterhouse, Mathieu Mongin, Jenny Skerratt, Cedric Robillot, Rachael Smith, Reinier Mann and Michael Warne TropWATER Report number 17/38 June 2017 Development of basin-specific ecologically relevant water quality targets for the Great Barrier Reef Report prepared by Jon Brodie1, Mark Baird2, Jane Waterhouse1, Mathieu Mongin2, Jenny Skerratt2, Cedric Robillot3, Rachael Smith4, Reinier Mann4 and Michael Warne4,5 2017 1James Cook University, 2CSIRO, 3eReefs, 4Department of Science, Information Technology and Innovation, 5Centre for Agroecology, Water and Resilience, Coventry University, Coventry, United Kingdom EHP16055 – Update and add to the existing 2013 Scientific Consensus Statement to incorporate the most recent science and to support the 2017 update of the Reef Water Quality Protection Plan Input and review of the development of the targets provided by John Bennett, Catherine Collier, Peter Doherty, Miles Furnas, Carol Honchin, Frederieke Kroon, Roger Shaw, Carl Mitchell and Nyssa Henry throughout the project. Centre for Tropical Water & Aquatic Ecosystem Research (TropWATER) James Cook University Townsville Phone: (07) 4781 4262 Email: [email protected] Web: www.jcu.edu.au/tropwater/ Citation: Brodie, J., Baird, M., Waterhouse, J., Mongin, M., Skerratt, J., Robillot, C., Smith, R., Mann, R., Warne, M., 2017. Development of basin-specific ecologically relevant water quality targets for the Great Barrier
    [Show full text]
  • Topics Geo Natural Catastrophes 2008 Analyses, Assessments, Positions
    Knowledge series Topics Geo Natural catastrophes 2008 Analyses, assessments, positions Australasia/Oceania version Contents 2 In focus 5 Hurricane Ike – The most expensive hurricane of the 2008 season 13 North Atlantic hurricane activity in 2008 14 Catastrophe portraits 17 January: Winter damage in China 20 May: Cyclone Nargis, Myanmar 22 May: Earthquake in Sichuan, China 24 May/June: Storm series Hilal, Germany 28 Climate and climate change >>> Topics Geo Australasia/Oceania version 31 Data, facts, background 34 NatCatSERVICE 35 The year in figures 36 Pictures of the year Cover: 38 Great natural catastrophes 1950–2008 The picture on the cover shows the city of Galveston on the coast of Texas on 40 Geo news 9 September 2008 before Hurricane Ike made landfall. 40 Current corporate partnerships Inside front cover: 41 Globe of Natural Hazards This photo was taken on 15 September 2008 after Hurricane Ike had passed through. Apart from a few exceptions, the entire section of coast was razed to the ground. Geo Risks Research think tank Environment and market conditions are changing at breathtak- ing speed. Demand for new coverage concepts for complex risks is constantly increasing. This calls for experience and steady further development of our specialist knowledge. In addition, we are continually networking with external partners in economics and research and entering into business-related cooperative relationships with leading experts. In this issue of Topics Geo we introduce you to some of our cur- rent scientific partnerships. Our intent is to pursue research into new and emerging areas of risk, to make them manageable and thus expand the frontiers of insurability.
    [Show full text]
  • Fisheries Guidelines for Design of Stream Crossings
    Fish Habitat Guideline FHG 001 FISH PASSAGE IN STREAMS Fisheries guidelines for design of stream crossings Elizabeth Cotterell August 1998 Fisheries Group DPI ISSN 1441-1652 Agdex 486/042 FHG 001 First published August 1998 Information contained in this publication is provided as general advice only. For application to specific circumstances, professional advice should be sought. The Queensland Department of Primary Industries has taken all reasonable steps to ensure the information contained in this publication is accurate at the time of publication. Readers should ensure that they make appropriate enquiries to determine whether new information is available on the particular subject matter. © The State of Queensland, Department of Primary Industries 1998 Copyright protects this publication. Except for purposes permitted by the Copyright Act, reproduction by whatever means is prohibited without the prior written permission of the Department of Primary Industries, Queensland. Enquiries should be addressed to: Manager Publishing Services Queensland Department of Primary Industries GPO Box 46 Brisbane QLD 4001 Fisheries Guidelines for Design of Stream Crossings BACKGROUND Introduction Fish move widely in rivers and creeks throughout Queensland and Australia. Fish movement is usually associated with reproduction, feeding, escaping predators or dispersing to new habitats. This occurs between marine and freshwater habitats, and wholly within freshwater. Obstacles to this movement, such as stream crossings, can severely deplete fish populations, including recreational and commercial species such as barramundi, mullet, Mary River cod, silver perch, golden perch, sooty grunter and Australian bass. Many Queensland streams are ephemeral (they may flow only during the wet season), and therefore crossings must be designed for both flood and drought conditions.
    [Show full text]
  • 2012-17 Volume 2 Proserpine River Water Supply Scheme
    Final Report SunWater Irrigation Price Review: 2012-17 Volume 2 Proserpine River Water Supply Scheme April 2012 Level 19, 12 Creek Street Brisbane Queensland 4000 GPO Box 2257 Brisbane Qld 4001 Telephone (07) 3222 0555 Facsimile (07) 3222 0599 [email protected] www.qca.org.au © Queensland Competition Authority 2012 The Queensland Competition Authority supports and encourages the dissemination and exchange of information. However, copyright protects this document. The Queensland Competition Authority has no objection to this material being reproduced, made available online or electronically but only if it is recognised as the owner of the copyright and this material remains unaltered. Queensland Competition Authority Table of Contents TABLE OF CONTENTS PAGE GLOSSARY III EXECUTIVE SUMMARY IV 1. PROSERPINE RIVER WATER SUPPLY SCHEME 1 1.1 Scheme Description 1 1.2 Bulk Water Infrastructure 1 1.3 Network Service Plan 2 1.4 Consultation 3 2. REGULATORY FRAMEWORK 4 2.1 Introduction 4 2.2 Draft Report 4 2.3 Submissions Received from Stakeholders on the Draft Report 6 2.4 Authority’s Response to Submissions Received on the Draft Report 6 3. PRICING FRAMEWORK 7 3.1 Tariff Structure 7 3.2 Water Use Forecasts 8 3.3 Tariff Groups 9 3.4 Kelsey Creek Water Board 10 3.5 Storage Rental Fees 10 4. RENEWALS ANNUITY 11 4.1 Background 11 4.2 SunWater’s Opening ARR Balance (1 July 2006) 12 4.3 Past Renewals Expenditure 13 4.4 Opening ARR Balance (at 1 July 2012) 16 4.5 Forecast Renewals Expenditure 17 4.6 SunWater’s Consultation with Customers 24 4.7 Allocation of Headworks Renewals Costs According to WAE Priority 25 4.8 Calculating the Renewals Annuity 29 5.
    [Show full text]
  • Cyclone Procedure 2017-2018 SOP OPS/40
    CYCLONE PROCEDURE 2017-18 STANDARD OPERATING PROCEDURE Cyclone Procedure 2017-2018 SOP_OPS/40 P…+61 1300 327 946 | W... http://www.darwinport.com.au Darwin Port Operations Pty Ltd (ABN 60 269 541 845) Administration Building, 11 Export Drive, Berrimah, Northern Territory as trustee for the Darwin Port Manager Trust GPO Box 390, Darwin NT 0801 Darwin Port Pilotage Pty Ltd (ABN 98 744 318 229) as trustee for the Darwin Port Pilotage Trust CYCLONE PROCEDURE 2017-18 DARWIN PORT – CYCLONE PROCEDURE 2017 – 2018 SUMMARY STAGE DESCRIPTION DP ACTIONS PORT STATUS Pre-season Preparation for forthcoming Cyclone Cyclone procedure and Standard Operating Procedures reviewed and updated Open Season Port users informed of cyclone precautions Revised Cyclone Procedure distributed to staff and stakeholders Stage 1 Cyclone Watch (48 Hours) Actions as per Stage One requirements in Cyclone Procedure Open Standard Operating Procedures completed by relevant staff members Initial planning for closure Ships placed on four hours notice of readiness activated Stage 2 Cyclone Warning (24 Hours) Actions as per Stage Two requirements in Cyclone Procedure Open but under review Key staff report to designated work areas GMO may action Standard Operating Procedures completed by relevant staff members procedure to close the Ships placed on one hour’s notice of readiness Port Vessels may leave of their own accord Stage 3 Cyclone Warning (12 Hours) Actions as per Stage Three requirements in Cyclone Procedure Closed or time of closure Standard Operating Procedures completed
    [Show full text]
  • Flood Plumes in the GBR –
    1 | Table of Contents 1. Executive Summary .......................................................................................................... 12 1.1. Introduction............................................................................................................... 12 1.2. Methods .................................................................................................................... 12 1.3. GBR-wide results ....................................................................................................... 13 1.4. Regional results ......................................................................................................... 14 1.4.1. River flow and event periods ............................................................................. 14 1.4.2. Water quality characteristics ............................................................................. 17 1.4.1. Spatial delineation of high exposure areas........................................................ 19 1.5. Discussion .................................................................................................................. 21 2. Introduction ...................................................................................................................... 23 2.1. Terrestrial runoff to GBR ........................................................................................... 23 2.2. Mapping of plume waters ......................................................................................... 24 2.3. Review of riverine
    [Show full text]
  • Surface Water Network Review Final Report
    Surface Water Network Review Final Report 16 July 2018 This publication has been compiled by Operations Support - Water, Department of Natural Resources, Mines and Energy. © State of Queensland, 2018 The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright in this publication is licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Under this licence you are free, without having to seek our permission, to use this publication in accordance with the licence terms. You must keep intact the copyright notice and attribute the State of Queensland as the source of the publication. Note: Some content in this publication may have different licence terms as indicated. For more information on this licence, visit https://creativecommons.org/licenses/by/4.0/. The information contained herein is subject to change without notice. The Queensland Government shall not be liable for technical or other errors or omissions contained herein. The reader/user accepts all risks and responsibility for losses, damages, costs and other consequences resulting directly or indirectly from using this information. Interpreter statement: The Queensland Government is committed to providing accessible services to Queenslanders from all culturally and linguistically diverse backgrounds. If you have difficulty in understanding this document, you can contact us within Australia on 13QGOV (13 74 68) and we will arrange an interpreter to effectively communicate the report to you. Surface
    [Show full text]
  • Natural Catastrophes and Man-Made Disasters in 2013
    No 1/2014 Natural catastrophes and 01 Executive summary 02 Catastrophes in 2013 – man-made disasters in 2013: global overview large losses from floods and 07 Regional overview 15 Fostering climate hail; Haiyan hits the Philippines change resilience 25 Tables for reporting year 2013 45 Terms and selection criteria Executive summary Almost 26 000 people died in disasters In 2013, there were 308 disaster events, of which 150 were natural catastrophes in 2013. and 158 man-made. Almost 26 000 people lost their lives or went missing in the disasters. Typhoon Haiyan was the biggest Typhoon Haiyan struck the Philippines in November 2013, one of the strongest humanitarian catastrophe of the year. typhoons ever recorded worldwide. It killed around 7 500 people and left more than 4 million homeless. Haiyan was the largest humanitarian catastrophe of 2013. Next most extreme in terms of human cost was the June flooding in the Himalayan state of Uttarakhand in India, in which around 6 000 died. Economic losses from catastrophes The total economic losses from natural catastrophes and man-made disasters were worldwide were USD 140 billion in around USD 140 billion last year. That was down from USD 196 billion in 2012 2013. Asia had the highest losses. and well below the inflation-adjusted 10-year average of USD 190 billion. Asia was hardest hit, with the cyclones in the Pacific generating most economic losses. Weather events in North America and Europe caused most of the remainder. Insured losses amounted to USD 45 Insured losses were roughly USD 45 billion, down from USD 81 billion in 2012 and billion, driven by flooding and other below the inflation-adjusted average of USD 61 billion for the previous 10 years, weather-related events.
    [Show full text]
  • Harvesting Opportunity Exploring Crop (Re)Insurance Risk in India 02
    Emerging Risk Report 2018 Society & Security Harvesting opportunity Exploring crop (re)insurance risk in India 02 Lloyd’s of London disclaimer RMS’s disclaimer This report has been co-produced by Lloyd's for general This report, and the analyses, models and predictions information purposes only. While care has been taken in contained herein ("Information"), are generally based on gathering the data and preparing the report Lloyd's does data which is publicly available material scientific not make any representations or warranties as to its publications, publications from Indian Government, accuracy or completeness and expressly excludes to the insurance industry reports, unless otherwise mentioned maximum extent permitted by law all those that might (data sources will be provided) along with proprietary otherwise be implied. Lloyd's accepts no responsibility or RMS modelled data and output and compiled using liability for any loss or damage of any nature occasioned proprietary computer risk assessment technology of Risk to any person as a result of acting or refraining from Management Solutions, Inc. ("RMS"). The technology acting as a result of, or in reliance on, any statement, and data used in providing this Information is based on fact, figure or expression of opinion or belief contained in the scientific data, mathematical and empirical models, this report. This report does not constitute advice of any and encoded experience of scientists and specialists kind. (including without limitation: earthquake engineers, wind engineers, structural engineers, geologists, © Lloyd’s 2018. All rights reserved. seismologists, meteorologists, geotechnical specialists and mathematicians). As with any model of physical About Lloyd’s systems, particularly those with low frequencies of occurrence and potentially high severity outcomes, the Lloyd's is the world's specialist insurance and actual losses from catastrophic events may differ from reinsurance market.
    [Show full text]
  • Goosepond Creek (Including Pioneer River) Flood Study
    GOOSEPOND CREEK (INCLUDING PIONEER RIVER) FLOOD STUDY Mackay Regional Council 9 October 2012 REPORT TITLE: Gooseponds Creek (including Pioneer River) Flood Study CLIENT: Mackay Regional Council REPORT NUMBER: 0500-01 O(rev 1) Revision Number Report Date Report Author Reviewer 0 3 September 2012 GR SM 1 9 October 2012 GR For and on behalf of WRM Water & Environment Pty Ltd Greg Roads Director LIMITATION: This advice has been prepared on the assumption that all information, data and reports provided to us by our client, on behalf of our client, or by third parties (e.g. government agencies) is complete and accurate and on the basis that such other assumptions we have identified (whether or not those assumptions have been identified in this advice) are correct. You must inform us if any of the assumptions are not complete or accurate. We retain ownership of all copyright in this advice. Except where you obtain our prior written consent, this advice may only be used by our client for the purpose for which it has been provided by us. 0500-01 O(rev 1) 9 October 2012 TABLE OF CONTENTS Page 1 INTRODUCTION 1 2 BACKGROUND 2 2.1 CATCHMENT CHARACTERISTICS 2 2.1.1 Pioneer River 2 2.1.2 Fursden Creek 2 2.1.3 Goosepond Creek 2 2.2 PREVIOUS (RECENT) FLOOD STUDIES 4 2.2.1 Pioneer River and Bakers Creek Flood Study 4 2.2.2 Goosepond/ Vines Creek flood Study 4 2.2.3 Mackay Storm Tide Study 5 3 GOOSEPOND CREEK MODEL RECALIBRATION 6 3.1 OVERVIEW 6 3.2 MODEL CHANGES 6 3.3 FEBRUARY 2007 FLOOD CALIBRATION 6 3.4 FEBRUARY 2008 FLOOD CALIBRATION 10 4 DESIGN DISCHARGES
    [Show full text]