Major Brighton Main Line Engineering Works / Completing

Total Page:16

File Type:pdf, Size:1020Kb

Major Brighton Main Line Engineering Works / Completing Thameslink Page 1 of 3 16 - 24 Feb Buy tickets My account Ticket types / Major Brighton Main Line Engineering works Network Rail are carrying out major engineering works on the Brighton Main Line from 16 to 24 February closing the line between Three Bridges and Brighton and Three Bridges to Lewes. These are essential works as part of their railway improvement plan. No direct trains will run between Three Bridges and Brighton and Three Bridges to Lewes. 2 trains per hour will run from Brighton to London Victoria via Littlehampton with extended journey times. Replacement buses will also run. For full details and to register for alerts, visit www.BrightonMainline.co.uk Please check before you travel and visit National Rail for live departure updates and timetable information. Find out more / Completing your journey using The Key Smartcard or KeyGo The Key Smartcard We have made various arrangements with other transport operators for ticket acceptance during the blockade, giving customers a range of options to complete their journey. This includes acceptance of tickets on our Key Smartcard. Some transport operator’s staff will be less familiar with The Key Smartcard, so if using non Southern or Thameslink services we advise customers to have their booking confirmation to hand which can be shown to staff as evidence of the product held. Alternatively log into your account to view live products. https://m.email.thameslinkrailway.com/nl/jsp/m.jsp?c=%40LAYUoQYj4EowvF3AKj ... 15/ 02/ 2019 Thameslink Page 2 of 3 KeyGo If using keyGo, it is important to touch in and out to begin and end your journey. In the event that you do not touch in or out, you will receive an incomplete journey notification and you should log into your online account to complete your journey. / Planned engineering work 18 - 24 February Monday 18 to Friday 22 February All day • Buses will replace trains between Three Bridges and Brighton / Lewes. • Trains between Cambridge and Brighton will start / terminate at Three Bridges (Peak times) / London King's Cross (Off-peak). Services to stations south of London King's Cross are available from London St Pancras International, which is a short walk away. Tuesday 19 to Friday 22 February From 00:25 until 04:35 • Buses will replace trains between Dartford and Gillingham / Rainham. Saturday 23 to Sunday 24 February All day • Buses will replace trains between Three Bridges and Brighton. From 23:50 (Saturday) until 02:05 (Sunday) • The 01:40 (Sunday) London King's Cross to Welwyn Garden City service will depart at the earlier time of 01:16. • A replacement bus service from Finsbury Park to Welwyn Garden City will depart at 02:10. We advise you to use London Underground services between London King's Cross and Finsbury Park. Sunday 24 February From 01:20 until 08:45 • Trains between Peterborough and London King's Cross will start and terminate at Hitchin. Buses will replace trains between Peterborough and Hitchin. From 01:45 until 09:15 • Trains between Luton and Sutton will start / terminate at London Blackfriars. https://m.email.thameslinkrailway.com/nl/jsp/m.jsp?c=%40LAYUoQYj4EowvF3AKj ... 15/ 02/ 2019 Thameslink Page 3 of 3 We advise you to use London Buses, Southern services and Southeastern replacement bus services. From 02:40 until 08:30 • Buses will replace trains between St Albans City and Bedford. All day • Services will not call at stations between Deptford and Slade Green but will call additionally at Lewisham, Blackheath, Eltham and Barnehurst. Customers should use alternative Southeastern replacement buses. • Services between London King's Cross and Cambridge / Peterborough will not stop at stations between Finsbury Park and Stevenage. Customers are advised to change at Finsbury Park for intermediate stations. • Trains between London King's Cross and Cambridge will start and terminate at Stevenage. More information Timetable changes / Live running info / Delay Repay Update your email preferences or unsubscribe from updates. Changes to your subscription preferences can take up to 14 days to take effect. The above information was correct at the time of broadcasting. Information is subject to alterations, so please make sure you check before you travel. Gatwick Express, Great Northern, Southern and Thameslink are trading names of Govia Thameslink Railway Ltd. Registered in England under number: 07934306. Registered office: 3rd Floor, 41-51 Grey Street, Newcastle upon Tyne, NE1 6EE. Govia Thameslink Railway Ltd is a wholly owned subsidiary of Govia Ltd. https://m.email.thameslinkrailway.com/nl/jsp/m.jsp?c=%40LAYUoQYj4EowvF3AKj ... 15/ 02/ 2019.
Recommended publications
  • Govia Thameslink Railway Limited 26Th Supplemental Agreement
    26th SUPPLEMENTAL AGREEMENT between NETWORK RAIL INFRASTRUCTURE LIMITED as Network Rail And GOVIA THAMESLINK RAILWAY LIMITED as Train Operator relating to the Track Access Contract (Passenger Services) dated 02 March 2016 380383 CONTENTS 1. INTERPRETATION ....... .. ..... ...... ............ ... ....................... .................. .................. ............ .. 3 2. EFFECTIVE DATE AND TERM ........ .... ........ ..... ....... .. ....................... ............... ... .. ............. 3 3. AMENDMENTS TO CONTRACT .... ............... ......... ..... ..... ......... .. ... ......... .... .. ...... ... ........... 4 4. GENERAL ..... .... ............ .. .. .. .... ... .. ... ...... ..... ................. ... ............ .. .. .. .... ... ... ..... ........ ....... .... 4 5. THIRD PARTY RIGHTS .... ... .................. .............................. .. ........... ...... ... ...... .. ...... .. .... .... 4 6. LAW ..................... ...... .. .. .. .. ....... .. ... ...... ..................... .... .................. .. .. ... ... ........... ..... ... .... .. 4 7. COUNTERPARTS .... .. .... ........... ..... ........ ............... ......... ... ...................................... ....... .... 4 8. ANNEXA .... ......... .. ........ ... ....... ...... ......... ... ......... ......... .. ... .... .... .. ... ... ................6 2 380383 1 THIS 26 H SUPPLEMENTAL AGREEMENT is dated 2018 and made BETWEEN: (1) NETWORK RAIL INFRASTRUCTURE LIMITED, a company registered in England under number 2904587 having its registered
    [Show full text]
  • PART 3: Recommendations & Conclusion
    CRAWLEY BASELINE CHARACTER ASSESSMENT Part 3: RECOMMENDATIONS & CONCLUSION 10 RecOMMenDatiOns & COnclUsiON Summary of recommendations The detailed analysis of the town centre, historic villages and thirteen New 10.1 INTRODUCTION Town neighbourhoods has revealed a number of areas that would benefit EDAW | AECOM were commissioned by Crawley Borough Council to from enhancement, additional protection or regeneration/redevelopment. undertaken a rapid baseline assessment of the character of present day This chapter pulls the findings together to identify priority areas across the Crawley comprising a desk top study, development of a rapid assessment borough which would benefit from further detailed study. toolkit, field assessments and photography, GIS survey and data capture and the production of a report. Three areas offer significant potential for enhancement or regeneration. These are the Town Centre, Broadfield / Bewbush, and on a smaller Eight strategic character areas covering the borough were identified scale the Three Bridges Station area (Refer to figure 31 for details of the comprising: locations). • Town Centre 10.1 Bewbush and Broadfield • Historic Settlements These neighbourhoods were built during the 1970s and contain a number of experimental housing layout styles which depart from the traditional • Pre New Town Expansion arrangement of streets and perimeter block development, and instead separate pedestrian and vehicle traffic, creating cul-de-sacs and semi-public • New Town Phase 1a amenity grassed spaces within the development block. The creation of • New Town Phase 1b poorly overlooked walkways, abundance of semi-public open space, parking courts and a lack of vehicle access to properties is a management burden • New Town Phase 2 / Expansion of Phase 1 and encourages anti-social behaviour.
    [Show full text]
  • Suggested Alternative Routes During Disruption
    Suggested alternative routes during disruption When Southern services from this station are subject to unplanned disruption, we have Issued Date: arranged for your ticket to be accepted as indicated below to get you to your destination May 2018 Suggested alternative route details from Gatwick Airport Southern ticket holders To: Suggested routes: Take the first available train to Three Bridges for connections, OR if trains are Hove Take the first available train to Brighton, then Southern train to Hove Amberley running via Haywards Heath and Worthing then passengers may also travel via that route, changing at Ford or Barnham to Amberley See how to get to London Victoria, Victoria line to Tottenham Hale, Greater Anglia Huntingdon train to Cambridge, bus B to Huntingdon Angmering Take the first available train to Brighton, then Southern train to Angmering Take the first available train to Three Bridges for connections, OR bus 200 from stop Ifield See how to get to London Victoria, then Green Line 757 coach to Luton, bus 100 or A to near Ifield station Arlesey 101 to Hitchin, then bus 72 (Mondays to Saturdays only) to Arlesey Take the first available train to Three Bridges for connections, OR if trains are Lancing Take the first available train to Brighton, then Southern train to Lancing Arundel running via Haywards Heath and Worthing then passengers may also travel via that See how to get to London Victoria, Green Line 757 coach to Luton, bus 100 or 101 Letchworth Garden City route, changing at Ford or Barnham to Arundel to Hitchin, then
    [Show full text]
  • Crawley Horley
    Credits: Redhill Park Hill High Ridge Benting Wood Aerodrome Wood A23 Leigh Salfords A217 Hangdog M23 Wood KEY Baseline Noise Monitoring Sites B o Project Site Boundary - PEIR A217 n Outwood e h u Nalderswood r s t R o 1 - Blue Cedars a d 2 - 3 Charlwood Road 3 - Brook Farm Hamond A217 Greenfields Copse Meath Green 4 - Bear and Bunny Nursery 5 - April Cottage Reffolds Norwood Hill 6 - Oakfield Cottage Copse A217 7 - 103 Cheyne Walk A23 Smallfield h g i r 8 - 82 The Crescent B Horley 9 - Hyders Farm House 10 - Myrtle Cottage Newdigate 5 Hookwood Clay Pit 7 Riverside Gatwick 11 - Rowley Farmhouse 6 Park 9 12 - Trent House 8 M23 Gatwick 4 B2036 9 Burstow B2028 Charlwoo1d Gatwick 9 3 B2037 2 ne Charlwood M23 La Baker's Wood ds Ef Glovers Wood London an fin ntl gh Gatwick A23 12 A am Ro Airport ad A23 Domewood 10 ill 11 w H Tinsley Green no 9 A23 S Copthorne DOCUMENT A23 Forge Wood A264 Orltons Copse Willoughby Heathy Wood PEIR Fields Tilgate Manor Royal A2011 A2220 B2028 A23 Crawley Cuttinglye DRAWING TITLE 10 Wood Furzefield Langley Green A2011 Wood A2011 Crawley Down Baseline Noise Monitoring Sites Ifield A2004 Northgate Pound Hill DATE Horsegills Rusper A23 A2004 Wood Three Bridges B2036 Horsepasture September 2021 West Green Wood B2028 Hundred ORIENTATION DRAWING NO. REVISION Acres For PEIR 14.4.1 Gossops Green Issue A2220 Ifield West Crawley DRAWN BY PM / CHECKED BY A2219 Furnace Green M23 Worth Forest ¯ A2004 JS SM Southgate Turners Hill Maidenbower SCALE @ A3 1:50,000 A23 South East England Tilgate 0 250 500 1,000 1,500 2,000 2,500 Bewbush S m Rough Wood e ls f Worthlodge ie A2220 B ld a R l Forest c o o a Service Layer Credits: Map data © OpenStreetMap contributors, Microsoft, Esri Community Maps contributors, Map layer by Esri A264 Broadfield m B2110 d b © Copyright 2019 Gatwick Airport Limited.
    [Show full text]
  • Up to 30,585 Sq Ft of Exceptional Office Space Manor Royal Crawley Rh10
    up to 30,585 sq ft of exceptional office space MANOR ROYAL CRAWLEY RH10 9PY Palladian comprises a SQ FT SQ M Ground Floor self-contained office Reception 367 34.1 building Offices 15,657 1,454.6 Arranged over ground and first floors providing 30,585 sq ft (2,841 sq m) of Grade A office First Floor accommodation. Offices 14,127 1,312.4 The property has undergone comprehensive Terrace 434 40.3 refurbishment, providing occupiers with highly specified and efficient space, which benefits from Total 30,585 2,841.4 high quality, contemporary finishes. Floors can be The property has been measured in accordance with sub-divided to accommodate requirements from the RICS International Property Measurement Standards approximately 6,000 sq ft. (IPMS3) 1st Edition, dated May 2015. N N RECEPTION MALE MALE FEMALE WC WC WC LIFT LIFT FEMALE WC DIS’ MEZZANINE CLEANER’S SHOWER WC CLEANERS OFFICE OFFICE TERRACE OFFICE DIS’ WC/SHOWER FEMALE FEMALE SHOWER WC WC ROOF MALE ELEC. ACCESS MALE WC SWITCH WC ROOM STAIRS/LOBBY Ground Floor First Floor Dotted line demonstrates indicative half floor split. Specification • All new VRF air conditioning and BMS system • New suspended ceilings and LED lighting • Raised access floor with new carpet installed • New contemporary reception area • Passenger lift • New cycle store and shower facilities • New outdoor amenity area with seating • Electric car charging points • Excellent on-site car parking (1:267 sq ft) for 115 cars • Excellent security with access control and building CCTV • Fully DDA compliant • Full building generator
    [Show full text]
  • Commonwealth Drive, Three Bridges, Crawley, RH10 1AE Welcome To
    Commonwealth Drive, Three Bridges, Crawley, RH10 1AE welcome to Commonwealth Drive, Three Bridges, Crawley Fox and Sons are pleased to offer to the market this stunning TWO double bedroom, first floor flat in the heart of CRAWLEY. In a fantastic central location with en suite, parking, excellent transport links, close to Three Bridges mainline station and local amenities on site! Lounge 14' 2" @ Max x 14' @ Max ( 4.32m @ Max x 4.27m @ Max ) Kitchen 8' 2" @ Max x 7' 2" @ Max ( 2.49m @ Max x 2.18m @ Max ) Bedroom1 11' 7" @ Max x 11' 4" @ Max ( 3.53m @ Max x 3.45m @ Max ) Bedroom 2 11' 9" @ Max x 8' 7" @ Max ( 3.58m @ Max x 2.62m @ Max ) welcome to Commonwealth Drive, Three Bridges, Crawley First Floor Flat Two Double Bedrooms Modern Kitchen En-Suite in Master Bedroom Allocated Parking Space Tenure: Leasehold EPC Rating: B £240,000 Please note the marker reflects the view this property online fox-and-sons.co.uk/Property/CRA107699 postcode not the actual property see all our properties on zoopla.co.uk | rightmove.co.uk | fox-and-sons.co.uk We currently hold lease details as displayed above, should you require further information please contact the branch. Please note additional fees could be incurred for items such as leasehold packs. 1. MONEY LAUNDERING REGULATIONS Intending purchasers will be asked to produce identification documentation at a later stage and we would ask for your co-operation in order that there is no delay in agreeing the sale. 2. These particulars do not 01293 520521 constitute part or all of an offer or contract.
    [Show full text]
  • Crawley Conservative Group
    Cooper, Mark From: Crow, Duncan Sent: 08 April 2018 21:22 To: reviews Subject: Submission for review of Crawley Borough Council Attachments: CBC 2018 Review - Submission to LGBCE from the Crawley Borough Council Conservative Group.docx; WSCC proposed scheme for CBC review - shaded areas moved from neighbourhoods.pdf Please see attached a submission from the Crawley Borough Council Conservative Group with an accompanying map that is referenced in the submission. Best wishes, Duncan. Duncan Crow. Councillor for Furnace Green. Leader of the Conservative Group. Twitter https://twitter.com/Tilgate_FGreen Facebook https://www.facebook.com/Tilgate.FurnaceGreen ********************************************************************** The information contained in this email may be subject to public disclosure under the Freedom of Information Act 2000. Unless the information contained in this email is legally exempt from disclosure, we cannot guarantee that we will not provide the whole or part of this email to a third party making a request for information about the subject matter of this email. This email and any attachments may contain confidential information and is intended only to be seen and used by the named addressee(s). If you are not the named addressee, any use, disclosure, copying, alteration or forwarding of this email and any attachments is unauthorised. If you have received this email in error please advise the sender immediately and permanently delete this email and any attachments from your system. The views expressed within this email and any attachments are not necessarily the views or policies of Crawley Borough Council. We have taken precautions to minimise the risk of transmitting software viruses, but we advise you to carry out your own virus checks before accessing this email and any attachments.
    [Show full text]
  • 14 the Chase, Furnace Green, Crawley, West Sussex, RH10 6HW £475,000
    14 The Chase, Furnace Green, Crawley, West Sussex, RH10 6HW £475,000 Four double bedroom family home Double glazing Garage & parking Desirable cul-de-sac location Recently re-roofed Wonderful size private garden Potential to extend STPP Requires some updating EPC rating C Property Description Homes Partnership is delighted to offer for sale this detached family home situated in a sought after cul-de-sac in Furnace Green just a 20 minute w alk from Three Bridges mainline station. The property has recently been re-roofed and has many benefits including a dow nstairs cloakroom, tw o reception rooms, four double bedrooms, double glazing, gas fired central heating, off road parking for two vehicles, an integral garage and a southerly facing rear garden. In our opinion the property offers scope for an extension (subject to planning permission) and requires some updating providing an ideal opportunity to create your perfect home. Property in this location are highly sought after and an early view ing is highly recommended. Double glazed front door and w indow leading to: ENTRANCE HALL Stairs to the first floor w ith understairs cupboard. Radiator. Doors to lounge, dining room, kitchen and: CLOAKROOM White suite comprising a low level WC. Wall mounted w ash hand basin. Radiator. Opaque double glazed window to the front. LOUNGE 18' 5" x 11' 5" (5.61m x 3.48m) approximate. Double glazed w indow and French doors leading to a lean-to at the rear. Virgin Media point. Radiator. Opening to: DINING ROOM 12' 0" x 9' 5" (3.66m x 2.87m) approximate.
    [Show full text]
  • Appendix 4.1 Crawley LCWIP Routes: Whole Proposed Network
    Appendix 4.1 Crawley LCWIP routes: whole proposed network Route identification in brackets shows shared sections of route, costed in the unbracketed route. The following individual routes are divided into sections for evaluation and costings. 1 LCWIP 2020 cycle routes A Gatwick Airport to town centre via Manor Royal and Northgate (joins route D) B Pound Hill to Manor Royal via Forge Wood C Copthorne to town centre via Three Bridges (limited to Pound Hill within Crawley boundary, joins route D) D Maidenbower to Manor Royal via Three Bridges (joins routes C and A) E Maidenbower to town centre via Furnace Green (joins routes F and I) F Tilgate Park to town centre via Furnace Green (joins routes E and I) G Tilgate to town centre (extended to K2, joins route I) H Pease Pottage to town centre via K2/Tilgate (joins route G) I Bewbush to Three Bridges via Broadfield & Tilgate Nature Centre (joins routes J, F and G) J Broadfield to town centre (joins routes I, H and K) K Kilnwood Vale to town centre (joins route J) L Ifield to town centre M Ifield Avenue to town centre N Lowfield Heath to town centre (subsequently split into a separate route O) O Manor Royal (west) to town centre P Ifield to Manor Royal via Langley Green Q Gatwick Airport to Horley (not developed within this LCWIP) R Worth Way (not developed within this LCWIP) Route proposals follow. 2 Appendix 4.1 Crawley LCWIP routes: A – Gatwick Airport to town centre via Manor Royal (and Northgate) Currently more than 14,500 Gatwick Airport employees drive to work and over half the workforce live in Crawley.
    [Show full text]
  • West Sussex County Council’S Response to the LGBCE’S Consultation on Electoral Divisions – Approved by the Governance Committee on 25 January 2016
    West Sussex County Council’s response to the LGBCE’s consultation on electoral divisions – Approved by the Governance Committee on 25 January 2016 Adur West Sussex County Council supports the LGBCE’s proposals. Arun West Sussex County Council supports the LGBCE’s proposals with one recommendation: the proposed ‘Arundel and Wick’ division should be renamed ‘Arundel and Courtwick’ as this better reflects the community actually in the division. Much of the community of Wick would now be in Littlehampton Town division. Courtwick is going through significant housing development at present, so the title ‘Arundel and Courtwick’ would be more appropriate. Chichester West Sussex County Council’s supports LGBCE’s proposals in general, but subject to these recommendations: The ‘Fernhurst’ division should be renamed ‘Rother Valley’ to better reflect the parishes covered within the division. Fernhurst is one of 13 parishes in the division and is not particularly bigger than several other parishes. The name ‘Rother Valley’ is well-known in the area and would better describe the wide geographical spread of the area. The boundary line between Chichester North and Chichester East should be amended so that the land West of Palmers Field Avenue be included in Chichester North division. This land is part of the ‘lower Graylingwell site’ which has outline planning permission and was subject to a government announcement recently that makes it likely to be completed by 2019. The overall site includes 160 homes and this section west of Palmers Field Avenue will be a natural part of that site, facing inward rather than having any direct access to Palmers Field Avenue.
    [Show full text]
  • Leader of the Crawley Borough Council Conservative Group
    Sent: 12 August 2018 22:48 To: reviews Subject: Submission for the review of Crawley Borough Council Attachments: Crawley Borough Council Conservative Group - LGBCE Submission August 2018.docx Dear Sir or Madam Please see attached a submission on behalf of the Crawley Borough Council Conservative Group. Leader of the Crawley Borough Council Conservative Group. This email and any attachments are confidential and intended solely for the persons addressed. If it has come to you in error please reply to advise us but you should not read it, copy it, show it to anyone else nor make any other use of its content. West Sussex County Council takes steps to ensure emails and attachments are virus‐free but you should carry out your own checks before opening any attachment. 1 Introduction The Crawley Borough Council Conservative Group broadly supports the draft recommendations published by the LGBCE but do have two amendments that we feel could further improve the draft recommendations. In addition, we are strongly opposed to the amendment put forward by the Labour Group at Crawley Borough Council that was forced through the Full Council meeting on 1st August by just a one-vote majority along party lines (18 votes to 17) to place Ifield’s Orchards estate into Langley Green ward. Our two amendments strengthen Crawley’s neighbourhood principle by better matching the Crawley neighbourhoods of Ifield, Northgate, Langley Green and Three Bridges with their proposed neighbourhood based wards. Our amendments are detailed in Appendix B in the link below which is of the agenda for the Crawley Borough Council Full Council meeting on the 1st August 2018.
    [Show full text]
  • Talisman House, Jubilee Walk, Three Bridges Crawley, Rh10 1Lq
    TALISMAN HOUSE, JUBILEE WALK, THREE BRIDGES CRAWLEY, RH10 1LQ FIRST FLOOR OFFICE TO LET 2,019 SQ FT NIA OR PART LET INVESTMENT FOR SALE 3,968 SQ FT NIA KEY FEATURES • First floor offices • Raised access floors • Suspended ceilings • 10 allocated parking spaces • To be redecorated • Close proximity to Three Bridges Station • Gas central heating Sq Ft Sq M DESCRIPTION NIA First Floor Office To Let 2,019 187.6 Part Let Investment For Sale 3,968 398.64 T: 0129 361 2600 vailwilliams.com TALISMAN HOUSE, JUBILEE WALK, THREE BRIDGES CRAWLEY, RH10 1LQ DESCRIPTION Talisman house is purpose built modern office building on Jubilee Way, Three Bridges, comprising ground and first floor office accommodation. The ground floor is predominantly open plan and currently let to Dowgate Stockbrokers. The first floor (currently vacant) comprises of three office suites linked internally via a corridor, the suites can easily be opened out to create an airy open plan office environment. The office space provides a modern ambiance with the good natural light, within the suite there is a kitchenette area. Also located on the first floor is a unisex WC, the ground floor provides one disabled and one female WC LOCATION Talisman House is located in Jubilee Walk a short distance from Three Bridges railway station. The location offers excellent transport connections with national rail services offering connections to London approx (50mins) and Brighton approx (30mins) just 5 minutes walk. Junction 10 of the M23 is just 1.5 miles to the north providing swift access south to Brighton and north to the M25.
    [Show full text]